1 Answers to Vendor Questions Questions are in black, Answers are in red 1. Question: Page 7, section 2 number 3, you state that a minimum expectation for consideration is Experience and knowledge of multiple products and vendors. Vendor- or product-affiliated proposals/consultants will not be considered. We are a business partner with both IBM and Informatica. Do our partnerships constitute product-affiliations and mean that you will not consider us as a consultant for this assessment project, or are we still eligible since we are knowledgeable about both products as well as others?, your partnerships do not constitute product-affiliations. PCC will consider you as a consultant for this assessment project. You are still eligible since you are knowledgeable about both products as well as others. 2. Question: Page 7 of the RFP under Miscellaneous states, PCC will only reimburse at the state government rate. What does this refer to specifically? If travel costs associated with onsite consulting, what is the state rate? Answer: The State reimbursement rates are as follows: Mileage, 44.5 cents per mile Meals, $44 per day Lodging: Oct 1 - Dec 31, $83 per day/jan 1 - Mar 31, $119 per day/apr 1 - Sep 30, $83 per day 3. Question: As stated in the RFP, Pima uses the Banner ERP system in addition to Desire2Learn. Please confirm which of the following modules/additional products are currently in use and should be included in our proposal: Banner Student, Banner Finance, Banner Human Resources, Banner Financial Aid, Banner Advancement, Banner Relationship Management (BRM) of Recruiter, Banner CAPP, Banner Operational Data Store (ODS), Banner Enterprise Data Warehouse (EDW), Luminis, Degree Works Answer: Banner Student, Banner Finance, Banner Human Resources, Banner Financial Aid, Luminis, Degree Works are currently used. If other modules are not used, it does not mean that PCC does not intend to use them. The analysis of why they are not used will be the part of the assessment. 4. Question: Page 5 Background and Environment: It seems the initiation of this project is at the highest levels and connected to strategic planning. Who is the executive sponsor of this project? If not the President, Provost or CFO, what kind of visibility will this project have at the cabinet level? Answer: This project is sponsored by the Chancellor Cabinet through the Capital Approval process. 5. Question: Page 5 Background and Environment: Is there an existing Business Intelligence/Reporting team? Answer: Several departments have reports developers; the majority are concentrated in the Planning and Institutional Research and the Information Technology departments.
2 6. Question: Page 5 Background and Environment: Does Pima CC have an Institutional Research office or team of people currently responsible for official state and federal reporting? Answer: Yes, PCC has an Institutional Research office currently responsible for official state and federal reporting. 7. Question: Page 5 Background and Environment: Are there any departments or areas that are more successful than others when it comes to BI/reporting? Answer: To find the response to this question will be the part of the project. 8. Question: Page 5 Background and Environment: The RFP mentions a lack of historical or a lack of comprehensive data in the bullet list of keys areas to address. Do the business questions of the college requiring this data have a source today? Or is it necessary to build repositories of historical and additional data and begin new collection efforts using new systems? Are those systems in scope of this project? Answer: Yes, our regular data freeze process captures snapshots that serves as our repository of historical data. We are open to an evaluation of how this data is collected and reported; it is within the scope of this project. 9. Question: Page 5 Current IT Environment: When was Banner first implemented? Answer: Question: Page 5 Current IT Environment: Since the implementation of Banner, has there been a review of business processes by department and do these review documents exist as a source to this project? and No; piecemeal throughout departments, at best. 11. Question: Page 5 Current IT Environment: Does the original Banner implementation team exist? Do they meet on an ongoing basis? Answer: A Banner working group exists which manages patches and upgrades but the majority of original implementation team are no longer with the college. 12. Question: Page 5 Current IT Environment: Have you licensed the Ellucian Banner ODS/EDW? Was it ever implemented? If so, are any departments using it?
3 13. Question: Page 5 Current IT Environment: Have you licensed any of the Ellucian Banner Performance Applications (Recruitment Admissions Performance (RAP), Student Retention Performance (SRP), Advancement Performance (AP)? Were they ever implemented? If so, are any departments using them? 14. Question: Page 6 Project Deliverables: Pima requests an estimate for how long it will take to complete the project from date of award. Is there a time frame that Pima expects the entire project to be completed? Answer: The project is to be completed on or before February 1, Question: Page 6 Project Deliverables: Are there any significant/key staff departures in the last few years that would impact the availability of persons to interview and knowledge base of data/reporting?. 16. Question: Page 6 Comprehensive review: What is the count/proportion of open staff positions that might affect the availability or persons for interviewing and the available assignment of time resources to this project? t significant. 17. Question: Page 12 Proposal response format, item 8, Cost proposal is this document to be provided in a separately sealed envelope, or are the cost and functional/technical proposal to be delivered together? Is the cost proposal being evaluated separately from the rest of the proposal response? Answer: The cost and technical proposals should be delivered together. The cost proposal will not be evaluated separately from the rest of the proposal response. 18. Question: Are the 3 higher education references/experience and unchangeable requirement? Answer: Yes. 19. Question: What level of Banner experience are you looking for? Answer: Proficiency. 20. Question: What is the state government reimbursement rate? Answer: See answer to Question 2.
4 21. Question: Is there a state government consulting rate that you re tied to? 22. Question: Page 8 Organization of the Project: 1. Describe the timeline and main stages of the project. Would a sample project plan suffice for this? (with the full breakdown by task, duration, type of resources i.e. our resource and/or PCC resource) Answer: Yes. 23. Question: Page 8 Deployment and outcomes of the project: Describe how you intend to deploy the project. If this phase/project is the Assessment, is this just asking how we would normally deploy the solution when design and implementation is finished? Answer: In the RFP response you need to indicate only how you plan to conduct the assessment and develop the recommendations based on the assessment. However, the understanding of the Assessment can vary, that s why we precise, that you need to conduct such Assessment that will result in recommendations and corresponding road maps for implementing a business intelligence solution at PCC. In RFP you need to describe the structure, timelines and phases of such assessment. In Deliverables, the consultant will describe the structure, timelines and phases of the proposed solutions. 24. Question: Section 3, page 10, 4. Qualifications, g.: Description of project structure and detailed project timelines and phases (if applicable). Without going through the actual Assessment, a detailed project timeline cannot be tailored to PCC. Does this question just want a sample of our usual project plan and breakdown of tasks and phases in the actual design and implementation project? Answer: In the RFP response you need to indicate only how you plan to conduct the assessment and develop the recommendations based on the assessment. However, the understanding of the Assessment can vary, that s why we precise, that you need to conduct such Assessment that will result in recommendations and corresponding road maps for implementing a business intelligence solution at PCC. In RFP response you need to describe the structure, timelines and phases of such assessment. In Deliverables, the consultant will describe the structure, timelines and phases of the proposed solutions. 25. Question: Page 5 Current IT Environment: The main source of data resides in the Banner ERP transactional database. Some other data sources, mostly in Microsoft Access and Excel formats, exist at different locations. We assume you are open to a central repository or more properly a Data Warehouse for reporting that
5 would be modeled in a proper dimensional approach? Answer: The primary objective of this assessment is to identify the business intelligence solution that is most appropriate for Pima Community College. If a data warehouse based on a dimensional model is recommended, we would be open to it. 26. Question: Page 5 Current IT Environment: Business Object 9.0 with Crystal Reports is used now with some deficiencies as the primary reporting tool. Also, some Webi licenses are used for standard reports, as well as Microsoft suite tools. A small number of reports are also run through Oracle Forms and Reports. Are you looking to consolidate license fees and platforms to a solution that will meet all of your business needs? Answer: Consolidation of platforms/tools confers many advantages and would be a major consideration. However, the assessment must be platform/tool-agnostic. 27. Question: Page 6 Project Deliverables: The successful firm will conduct a comprehensive needs and requirements assessment resulting recommendations and corresponding road maps for implementing a business intelligence solution at PCC. At its conclusion, the College will be able to: Identify main BI stakeholders, determine current and future functional BI requirements, prioritize BI requirements, generate data source inventory and hierarchy. In the RFP response, do we need to go to the level of design and implementation, or is this to be kept at the level of an Assessment? Answer: In the RFP response you need to indicate only how you plan to conduct the assessment and develop the recommendations based on the assessment. However, the understanding of the Assessment can vary, that s why we precise, that you need to conduct such Assessment that will result in recommendations and corresponding road maps for implementing a business intelligence solution at PCC. In RFP response you need to describe the structure, timelines and phases of such assessment. In Deliverables, the consultant will describe the structure, timelines and phases of the proposed solutions.
Subject: Enterprise Resource Planning (ERP) Assessment Services; Request for Proposals # TS Date Due: December 19, 2017 at 2:00 PM EDT
December 14, 2017 NOTICE OF ADDENDUM ADDENDUM #3 Subject: Enterprise Resource Planning (ERP) Assessment Services; Request for Proposals # TS-2017-004 Date Due: December 19, 2017 at 2:00 PM EDT Dear Sir
More informationSenior Programmer Analyst
Senior Programmer Analyst CLOSING DATE: Tuesday January 16, 2018 Full-Time Permanent 12 month Position (1.0 FTE) 40 hours per week plus full benefits $87,333.22 - $106,142.29 per year IDEAL CANDIDATE:
More informationEllucian Luminis Portal Roadmap
Ellucian Luminis Portal Roadmap Roadmap Framing and Confidentiality This information provides a general strategic view of Ellucian s anticipated future offerings. The information in this document is confidential
More informationStrategic Planning Consultant Proposal No. P13/9824 Date: July 17, 2013
Answers to Vendor Questions - Questions are in black, answers are in red. 1. In reference to Section 7 Agreement Page 15 are we to include a copy of this within our returned proposal or will this be executed
More informationEnabling SDBOR s Goals
Enabling SDBOR s Goals Standardization, Optimization, Modernization Cindy Martini, Director Strategic Solutions Sue Stern, VP Operations ATTACHMENT I 5 Agenda 1 SDBOR Project Goals 2 Proposed Approach
More informationADDENDUM 2 TO REQUEST FOR PROPOSAL NO. 663-BC WORKDAY HUMAN CAPITAL MANAGEMENT AND WORKDAY FINANCIAL CAPITAL MANAGEMENT IMPLEMENTATION CONSULTANTS
ADDENDUM 2 TO REQUEST FOR PROPOSAL NO. 663-BC WORKDAY HUMAN CAPITAL MANAGEMENT AND WORKDAY FINANCIAL CAPITAL MANAGEMENT IMPLEMENTATION CONSULTANTS University of Nevada, Las Vegas Purchasing Department
More informationREQUEST FOR PROPOSAL Financial Report Writing Support for Cognos BI Solicitation No.: COMPASS
Issue Date: January 4, 2018 Closing Date: January 19, 2018 5:00 PM EDT Award Expected: February 2, 2018 Respond to: Tanya Johnson TJohnson@fhi360.org and Mike Vilardo MVilardo@fhi360.org FHI 360 is soliciting
More informationQuestions & Answers to RFP for Efficiency & Transformation Review
Questions & Answers to RFP for Efficiency & Transformation Review Questions are listed in the order received. Responses for the Sourcing & Procurement RFP and the Delivery of Services are Combined in this
More informationHuman Resources Structure Review Proposal No. P14/9860 Date: June 9, 2014
Answers to Vendor Questions - Questions are in black, answers are in red. 1. Question: There is an indication that the project should be completed within 60 days. Does that mean 60 calendar days (2 months)
More informationADVANCEMENT PERFORMANCE ADVANCEMENT ANALYTICS FOR COGNOS RELEASE NOTES. Release 1.1.1, Revision 1 November 2011
ADVANCEMENT PERFORMANCE ADVANCEMENT ANALYTICS FOR COGNOS RELEASE NOTES Release 1.1.1, Revision 1 November 2011 Trademark, Publishing Statement and Copyright Notice SunGard Data Systems and/or its subsidiaries
More informationAdministrative & Student Information Systems Refresh: Phase I Project Update
Administrative & Student Information Systems Refresh: Phase I Project Update Treasurer s Town Hall @ Rutgers University New Brunswick J. Michael Gower, SVP for Finance and Treasurer September 21, 2015
More informationReceive and file information technology services report IT providing an update on the city s Enterprise Resource Planning (ERP) systems.
Page 1 of Report IT-04-18 SUBJECT: Enterprise System update TO: FROM: Committee of the Whole Information Technology Services Report Number: IT-04-18 Wards Affected: not applicable File Numbers: 200-06
More informationQuestion 1: How many users would be accessing the replacement tool?
Questions and Answers Discoverer Replacement RFCSP # 1469 Updated April 20, 2017 Questions and Answers will be updated on this document as they are received Question 1: How many users would be accessing
More informationAddendum No. 1. RFP Enterprise elearning Business Requirements Definition
Enterprise elearning Business Requirements Definition Following are the answers to questions submitted in response to the above referenced RFP as of September 17, 2008. All of the questions have been listed
More informationITS STRATEGIC PLAN. ITS Strategic Plan
2017 2020 ITS STRATEGIC PLAN ITS Strategic Plan 2017 2020 p. 1 ITS Strategic Plan 2017 2020 p. 2 TABLE OF CONTENTS Letter Of Introduction... 4 Who We Are... 6 Our Vision... 6 Our Mission... 6 Our Principles...
More informationData Organization. Data Movement. Data Delivery
Data Organization Data Movement Data Delivery At Daman Consulting, our goal is to be a premier provider of data management solutions. And we are. We provide a range of services and products, each designed
More informationConference Banner Document Management System. University of the Fraser Valley
Conference 2017 Banner Document Management System University of the Fraser Valley Background and Strategy Definition: Document Management system is a complete solution for digitizing and managing information
More informationACADEMIC AFFAIRS COUNCIL ******************************************************************************
ACADEMIC AFFAIRS COUNCIL AGENDA ITEM: 4 D DATE: April 12, 2017 ****************************************************************************** SUBJECT: Banner Student XE Update During the February 2016
More informationGeorgia Summit 2006 Unified Product Update
January 30, 2009 www.sungardhe.com Georgia Summit 2006 Unified Product Update January 30, 2009 Sign of the times. When I was your age, computers were connected with wires. Agenda Unified Product Calendar
More informationThinking ERP? Important factors to keep in mind while considering an investment in enterprise business software.
Thinking ERP? Important factors to keep in mind while considering an investment in enterprise business software pg3 pg4 pg5 Assessing your top business priorities Outlining a roadmap for success Determining
More information27 Powerful Questions to Ask ERP Providers
27 Powerful to Ask ERP Providers Table of Contents 1. Who is WebSan Solutions Inc.? 2. Business Opportunity 3. Security & Risk 4. Reference and Vendor 5. Implementation 6. Training and Support 7. Scalability
More informationRevised SMIS+ implementation plan. 4 th August 2015 SMIS+ Team
Revised SMIS+ implementation plan 4 th August 2015 SMIS+ Team Content Purpose and rationale Revised implementation plan Design & Build Plan (including workstreams) Design & Build Phases Deployment Phase
More informationTECHNOLOGY AFFAIRS COUNCIL
TECHNOLOGY AFFAIRS COUNCIL AGENDA ITEM: 8 DATE: December 15, 2016 ****************************************************************************** SUBJECT: Banner Student Proposal PREPARED BY: Monte R. Kramer
More informationCOURSE OUTLINE: Implementing a Data Warehouse with SQL Server Implementing a Data Warehouse with SQL Server 2014
Course Name Course Duration Course Structure Course Overview Course Outcome Course Details 20463 Implementing a Data Warehouse with SQL Server 2014 5 Days Instructor-Led (Classroom) This course describes
More informationQUICK FACTS. Implementing Business Intelligence and Retail Signal Solutions for Sony PlayStation TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES
[ Manufacturing, Enterprise Applications and Middleware Services ] TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES Client Profile Industry: Video and computer entertainment Global Revenue: $77.58 billion
More informationTips for Reducing the Total Cost of Ownership of Oracle E-Business Suite
Tips for Reducing the Total Cost of Ownership of Oracle E-Business Suite an eprentise white paper tel: 407.591.4950 toll-free: 1.888.943.5363 web: www.eprentise.com Author: Helene Abrams www.eprentise.com
More informationProposal No. P18/9978L Information Technology Service Management Solution
Proposal No. P18/9978L Information Technology Service Management Solution Answers to Vendor Questions Questions are in black, Answers are in red 1. Question: Whether companies from Outside USA can apply
More informationS2 IT GROUP IT AND CLOUD CONSULTING CORPORATE TRAINING QUALITY ASSURANCE & PRODUCTION SUPPORT SOFTWARE DEVELOPMENT YOUR ON-SHORE IT PARTNER
INFORMATION BY YOU, TECHNOLOGY BY US YOUR ON-SHORE IT PARTNER IT AND CLOUD CONSULTING SOFTWARE DEVELOPMENT QUALITY ASSURANCE & PRODUCTION SUPPORT CORPORATE TRAINING ARE THESE VALID CONCERNS Not having
More informationThe City of San Luis Obispo, CA
Price Proposal to Serve The City of San Luis Obispo, CA Re: Enterprise Resource Planning (ERP) System, RFP No: 91621 Presented by: Coronus XES, Ltd. 668 North Coast Highway, Suite 516 Laguna Beach, CA
More informationCustomer Information System (CIS) Replacement Project
Customer Information System (CIS) Replacement Project Presented by Mark O Bryan March 5, 2018 1 Today s discussion No decisions today, planning to request Board approvals on March 19, 2018 Review background
More informationCity of Lincoln, Nebraska Request for Proposal (RFP) Consulting Services for JD Edwards World Software A7.3 Migration to World Software A9.3.
City of Lincoln, Nebraska Request for Proposal (RFP) 13-140 Consulting Services for JD Edwards World Software A7.3 Migration to World Software A9.3.1 1. INTENT 1.1 The City of Lincoln, Nebraska desires
More informationERP Selection for Multi-faceted Higher Education Systems in the Software-as-a-Service Era
ERP Selection for Multi-faceted Higher Education Systems in the Software-as-a-Service Era Steven Fulkerson, President s Delegate, ERP Selection Committee, The University of Arkansas System David Hemingson,
More informationAcademic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation. College Officers Group November 21, 2017
Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group November 21, 2017 Topics Academic & Event Scheduling (AES) Tool Implementation Project
More informationState of Florida Department of Financial Services. Invitation to Negotiate DFS RM ITN 13/14-07 For Insurance Management System
State of Florida Department of Financial Services Invitation to Negotiate DFS RM ITN 13/14-07 For Insurance Management System Addendum #2 Modifications to the ITN documentation ITN, Section 2.2, Schedule
More informationOur Services. Staff Augmentation Provision of quality resources Long term, medium term and short term engagements
May 2015 Executive Summary is a key partner of Oracle, specialized in implementation of the Oracle solutions and has strong domain knowledge and a team of skilled and certified Oracle consultants. We have
More informationRFP Microsoft Dynamics 365 Implementation Services and Managed Services Questions and Answers
RFP 42017 Microsoft Dynamics 365 Implementation Services and Managed Services Questions and Answers 1. In the scope of the work there was no mention of security. Do you have advanced security requirements?
More informationStudent Information System Implementation Project Part of the Administrative Systems Renewal Project Project Charter
Student Information System Implementation Project Part of the Administrative Systems Renewal Project Project Charter University of Manitoba September 2003 Table of Contents Introduction 1 Objectives and
More informationAcademic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation. University Managers Work Group November 2, 2017
Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation University Managers Work Group November 2, 2017 Topics Academic & Event Scheduling (AES) Tool Implementation
More informationA Magical Grants WorkCenter. July 14, 2017
A Magical Grants WorkCenter July 14, 2017 About SpearMC and Your Presenter Your Presenter Bullet Points Jessica Mann SpearMC Practice Director jessica.mann@spearmc.com 2014 HEUG Midwest Regional About
More informationFixed Scope Offering for Implementation of Oracle Fusion CRM in Cloud
Fixed Scope Offering for Implementation of Oracle Fusion CRM in Cloud Today s Business Challenges Adopt leading CRM practices and stream line processes Take advantage of CRM to attract new customers, develop
More informationRequest for Proposals Baltimore Accountable Health Communities - Technical Infrastructure
Request for Proposals Baltimore Accountable Health Communities - Technical Infrastructure 1 1. BACKGROUND / PURPOSE Addressing health-related social needs is essential to driving population health and
More informationRFP ATTACHMENT V: PROPOSAL TEMPLATE
Instructions are provided in blue and may be deleted. Please complete your response in the template provided, and indicate clearly where separate documents are provided. Executive Summary 1. Proposer Information
More informationFlorida School Financial Officers Association FSFOA June 2017 Conference IT- Change Management
Florida School Financial Officers Association FSFOA June 2017 Conference IT- Change Management Presented by: Sandra Ford, MS, SNS Chief Operations Officer Manatee County School District Bradenton, Fl Change
More information2019 Project Prioritization and Budgeting Process
2019 Project Prioritization and Budgeting Process Brian Hurysz Manager, Market Products Budget and Priorities Working Group May 10, 2018, Krey Corporate Center Agenda Project Prioritization Process Project
More informationREQUEST FOR PROPOSAL PROFESSIONAL SERVICES AUTOMATION SOLUTION. Submittal Date: April 22, 11:00 AM (PST)
REQUEST FOR PROPOSAL PROFESSIONAL SERVICES AUTOMATION SOLUTION Submittal Date: April 22, 2016 @ 11:00 AM (PST) Issued by: Southern California Coastal Water Research Project 3535 Harbor Blvd., Suite 110
More informationEasy Flow-Based Reporting
Easy Flow-Based Reporting Procure to Pay, Order to Cash etc. Andy Donovan A little about your speaker Oracle for 9 years Noetix for 4 years in-depth knowledge of Oracle applications from 10.5 through Release
More informationQUICK FACTS. Integrating Multiple Databases for The Institutes TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES. Client Profile
[ Financial Services, Application Development ] TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES Client Profile Industry: Education Services Revenue: $27 million Employees: Approximately 100 Geographic
More informationSAP BusinessObjects For Your SAP Environment: Business Intelligence In the Cloud. April 15, 2009
SAP BusinessObjects For Your SAP Environment: Business Intelligence In the Cloud April 15, 2009 Speakers Mike Beckerle, Chief Technology Officer, Oco, Inc. Aaron Graber, Senior Manager, OnDemand Solution
More informationBusiness Intelligence at Penn State. June 2011
Business Intelligence at Penn State June 2011 Agenda Introduction and Status Update. Who is Using itwo and how they are using it. Conclusion Introduction and Status Update Business Intelligence Early History
More informationAligning and Performing to MACRA & Value Based Quality Data. William Holland, MD VP and Chief Medical Informatics Officer
Aligning and Performing to MACRA & Value Based Quality Data William Holland, MD VP and Chief Medical Informatics Officer MACRA Status Our MACRA Goals Meet MIPS reporting requirements while setting a
More informationRequests for qualifications proposal for Services
Requests for qualifications proposal for 9-1-1 Services Vendor Qualifications: The requested and responding vendor must have the following minimum requirements to be considered for evaluation of this qualification
More informationAPPENDIX A BANNER AND THIRD PARTY PROJECTS
APPENDIX A BANNER AND THIRD PARTY PROJECTS SUMMARY OF PROJECTS FROM DISTRICT ITS STRATEGIC PLAN (July 2013) The District Strategic Plan for ITS Projects was approved by the Chancellor s Cabinet members
More informationAlabama State Port Authority
M. Barlow/IT Re: Purchase and Install Business Intelligence Platform KM-lb 8/1/16 ALABAMA STATE PORT AUTHORITY INSURANCE REQUIREMENTS FOR CONTRACT WORK Information Technology Alabama State Port Authority
More informationState of West Virginia DW/DSS Bureau for Medical Services RFP MED11015
Vendor Qualifications and Experience Section 8.0 RFP reference: 4.1.8, Vendor Qualifications and Experience, Page 51 Proposals should provide a comprehensive profile of the organization that includes a
More informationREQUEST FOR PROPOSALS (RFP) 17/18-02 FOR RECORDS RETENTION CONSULTING SERVICES. 1. Addendum No. 1 to the above referenced Request for Proposals.
REQUEST FOR PROPOSALS (RFP) 17/18-02 FOR RECORDS RETENTION CONSULTING SERVICES TO ALL POTENTIAL PROPOSERS: Attached are the following: 1. Addendum No. 1 to the above referenced Request for Proposals. 2.
More informationHigher Education. Smarter Spend Management Across. Robert Raucci, AVP Financial Services Thomas Jefferson University and Jefferson Health System
Smarter Spend Management Across Higher Education Isaac Abbs, Director of IT Enterprise Systems, Pima Community College Robert Raucci, AVP Financial Services Thomas Jefferson University and Jefferson Health
More informationAction Plan Report New River Community and Technical College. Suzette Compton, Ph.D., PMP Client Partner
Action Plan Report New River Community and Technical College Suzette Compton, Ph.D., PMP Client Partner August 13, 2014 Table of Contents Executive Summary... 3 Maximize Your Ellucian Enterprise Platform
More informationInformation Technology Services 2013 Program of Works Summary. May itservices.anu.edu.au
Information Technology Services 2013 Program of Works Summary May 2013 itservices.anu.edu.au Contents Introduction 3 ANU Email 4 ANU Enterprise Travel System 4 ANU Identity and Access Management 4 ANU
More informationFinancial Planning & Analysis Solution. A Financial Planning System is one of the core financial analytics applications that an enterprise needs.
Financial Planning & Analysis Solution A Financial Planning System is one of the core financial analytics applications that an enterprise needs. Trusted Experts in Analytics What is Financial Planning
More informationInformation Technology Services Project Management Office Operations Guide
Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...
More informationIFMS presentation to SCOPA. 29 August 2017
IFMS presentation to SCOPA 29 August 2017 1 Background The Integrated Financial Management System (IFMS) project was approved by Cabinet during 2005 (Cabinet Memorandum 16 of 2005, dated September 2005)
More informationYour partner in Financial Participation, Reward Plan and Compliance Solutions. Share Register
Your partner in Financial Participation, Reward Plan and Compliance Solutions Share Register About Monidee Our Team Since 1999, Monidee employees and consultants have established reputations as thoughtleaders
More informationDRAFT. Fusion ERP Cloud Service October Oracle Fusion ERP Cloud Service. Magdalene Ritter
DRAFT Oracle Fusion ERP Cloud Service Fusion ERP Cloud Service October 2013 Magdalene Ritter 1 Copyright 2013, Oracle and/or its affiliates. All rights reserved. The following is intended to outline our
More informationIT Strategic Plan Portland Community College 2017 Office of the CIO
IT Strategic Plan Portland Community College 2017 Office of the CIO 1 Our Vision Information Technology To be a nationally recognized standard for Higher Education Information Technology organizations
More informationReal-Life Examples: Oracle Advanced Controls (OAC) Benefits in Oracle EBS R12 Upgrades/Implementations
Real-Life Examples: Oracle Advanced Controls (OAC) Benefits in Oracle EBS R12 Upgrades/Implementations TIM MURPHY, Director Governance risk & Compliance kpmg.com Introduction Implementing or upgrading
More informationCHAPTER 3 ENTERPRISE SYSTEMS ARCHITECTURE
CHAPTER 3 ENTERPRISE SYSTEMS ARCHITECTURE 1 Learning Objectives Examine in detail the enterprise systems modules and architecture. Understand the effects of a well-designed architecture on ERP implementation.
More informationSAP CENTRAL PROCESS SCHEDULING BY REDWOOD: FREQUENTLY ASKED QUESTIONS
SAP NetWeaver SAP CENTRAL PROCESS SCHEDULING BY REDWOOD: FREQUENTLY ASKED QUESTIONS Exploring the Central Process-Scheduling Software Developed by Redwood Software for SAP NetWeaver As IT landscapes become
More informationCity of Chicago Clarifying Questions Template. Key Question Input No Input. Clarifying Questions
ID Question RFP Name Does the vendor need to support Chicago EZ Pay Stations? 001 Software? Mailings? Point of Sale Payment Terminal? 002 How many on-line accounts do they have today? 182,492 registered
More informationBanner Advancement Future
September 26, 2006 www.sungardhe.com Banner Advancement Future Pamela Rollins, Product Manager Banner Advancement April 27, 2007 Agenda Value of a Unified Digital Campus Components of your Banner Advancement
More informationA roadmap for intelligent archiving
August 2013 Effective database archiving in a new era of computing ENTER» Contents 3 5 7 8 11 12 14 2 Database archiving strategies, whether applied to packaged applications, custom applications or data
More informationTeradata The Leader in Enterprise Data Warehousing
Teradata The Leader in Enterprise Data Warehousing September 2008 Note to Investors Certain non-gaap financial information regarding operating results may be discussed during this presentation. Reconciliations
More informationSection III.D.3. Purchasing of Professional Services Purchasing of Architecture and Engineering Services Procedures
Section III.D.3. Purchasing of Professional Services Purchasing of Architecture and Engineering Services Procedures These procedures supplement and clarify Section III.D.3. of the Lone Star College System
More informationSAP S4 HANA Simple Logistics Training and Certification
About Intellipaat Intellipaat is a fast-growing professional training provider that is offering training in over 150 most sought-after tools and technologies. We have a learner base of 600,000 in over
More informationSAP S4 HANA Simple Logistics Training and Certification
About Intellipaat Intellipaat is a fast-growing professional training provider that is offering training in over 150 most sought-after tools and technologies. We have a learner base of 600,000 in over
More informationBusiness Intelligence - BI - ETL - Developer -Training
Business Intelligence - BI - ETL - Developer -Training etl developer resume pdf, etl development training, etl testing training, etl testing training material, best etl courses, etl testing course fees,
More informationDesign and Development of the ASEAN Secretariat s Enterprise Resource Planning (ERP) System ASEAN SECRETARIAT. Request for Proposal
ASEAN SECRETARIAT Request for Proposal Design and Development of the ASEAN Secretariat s Enterprise Resource Planning (ERP) System PROPOSAL MUST BE RECEIVED BY Monday, 07 January 2019 before 4.30 PM DELIVER
More informationLiberty Healthcare Management, Inc.
CUSTOMER INNOVATION STUDY Liberty Healthcare Management, Inc. makes a smooth transition to the cloud on time and 15% under budget with Infor Consulting Services Liberty chose to move to the cloud because
More informationDRAFT CTCLINK PROJECT CHARTER. SBCTC ctclink PROJECT MANAGEMENT OFFICE. Revised Aug-Sept 2018 to reflect project reorganization and restart
DRAFT CTCLINK PROJECT CHARTER SBCTC ctclink PROJECT MANAGEMENT OFFICE Revised Aug-Sept 2018 to reflect project reorganization and restart Table of Contents Table of Contents... 2 Introduction... 3 Purpose...
More informationEnterprise Resource Planning Project Update
Enterprise Resource Planning Project Update GGAF May 31, 2017 1 Project Purpose Project approved and funded in FY 2017 Budget Conduct a needs assessment for finance and human resources functions Provide
More informationExternal Program Office for the California Improvement Network Questions and Answers Regarding the Request for Proposal
External Program Office for the California Improvement Network: Regarding the Request for Proposal External Program Office for the California Improvement Network and Regarding the Request for Proposal
More informationOperations Plan: Quarterly Review. July 14, 2014
Operations Plan: Quarterly Review July 14, 2014 A Reminder: Operational Priorities Operational priorities drove the strategic plan and continue to drive execution of work: 1. Grow/Retain Customer Base
More informationWork Plan and IV&V Methodology
Work Plan and IV&V Methodology ISG Public Sector has been helping public sector organizations acquire and implement (from a project oversight and organizational change management perspective) new, enterprise-wide
More informationFUSION CAMPUS SOLUTIONS INTELLIGENCE FOR PEOPLESOFT ENTERPRISE
FUSION CAMPUS SOLUTIONS INTELLIGENCE FOR PEOPLESOFT ENTERPRISE KEY BENEFITS ROLE-BASED INSIGHT Access to dashboard pages is associated with user roles to provide intelligence and information that are secured
More informationTechnology: The Tools that We Use (Part 2) Presented by: William (Bill) Edmunds Gentleman s C Higher Ed Consulting April 24, 2017
Technology: The Tools that We Use (Part 2) Presented by: William (Bill) Edmunds Gentleman s C Higher Ed Consulting April 24, 2017 1. Process: How we do our Work (Part 1) 9:30 AM Today 2. Technology: The
More informationWhat s New with Ellucian and the Transformation of Banner by Ellucian? Rick Skeel Director, Product Management Ellucian BUGMI September 2015
What s New with Ellucian and the Transformation of Banner by Ellucian? Rick Skeel Director, Product Management Ellucian BUGMI September 2015 Agenda 1 Banner Today 2 Ellucian XE: Setting the Stage Ellucian
More informationSAP ABAP SERVICES Page : 1 / 16 Technical specifications. SAP ABAP Services. 11-July Abstract
SAP ABAP SERVICES Page : 1 / 16 SAP ABAP Services 11-July-2013 Abstract This document is the Technical specification for the Call for Expertise for the SAP ABAP Services for ITER Organization (IO). It
More informationSAP on Azure & Migration
SAP on Azure & Migration Overview SAP Architecture Overview SAP on Azure TechData SAP Services Capabilities SAP on Azure rules of engagement SAP on Azure example Q&A 2 SAP Architecture Overview Quick Introduction
More informationCity of Kingston Report to Council Report Number
To: From: Resource Staff: City of Kingston Report to Council Report Number 15-019 Mayor and Members of Council Date of Meeting: December 16, 2014 Subject: Executive Summary: Desiree Kennedy, Chief Financial
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL Solicitation No.: COMPASS-201803-02 Issue Date: March 9, 2018 Closing Date: March 23, 2018 5:00 PM EDT Award Expected: March 30, 2018 Respond to: Maria Marta Sobico MSobico@fhi360.org
More informationTo Reach Your Business Goals, Reach for the Cloud.
To Reach Your Business Goals, Reach for the Cloud. Progressus is next-generation Professional Services Automation and ERP software, mobile-enabled and architected for the intelligent cloud. Progressus
More informationDig Deeper. Discover Diamonds. Reveal insights to drive business decisions with Pronto iq
Dig Deeper. Discover Diamonds. Reveal insights to drive business decisions with Pronto iq Introducing Pronto iq Pronto iq brings Next Level Analytics to your business a deeper level of business intelligence
More informationManufacturing ERP. Delivering flexibility, Managing Complexity & providing optimal service
Manufacturing ERP Delivering flexibility, Managing Complexity & providing optimal service idempiere allows us to build an interface which is custom made for the work done by the employee. It helps them
More informationAdministrative & Student Information Systems Upgrade
Administrative & Student Information Systems Upgrade J. Michael Gower Executive Vice President, University Finance & Administration and University Treasurer Treasurer s Town Hall Busch Student Center,
More informationBuilding a Business Case for KYield
Building a Business Case for KYield Introduction Step 1: Investigate with Knowledge Audit Step 2: Crafting of the Situation Analysis Step 3: Proposed Solution: KYield Step 4: Cost Benefit Analysis Step
More informationWCIRBCalifornia. Job Description. Business Intelligence (BI) Engineer. Department: Summary
Job Title: Department: Business Intelligence (BI) Engineer IT Summary The Business Intelligence (BI) Engineer is responsible developing and supporting enterprise data management applications and projects.
More informationBUSINESSOBJECTS EDGE STANDARD
PRODUCTS BUSINESSOBJECTS EDGE STANDARD Use business intelligence to: Get visibility into all aspects of your business operations Uncover new opportunities Spot and resolve critical issues before it s too
More informationCity of Jacksonville Beach
City of Jacksonville Beach Purchasing Division: 1460A Shetter Ave., Jacksonville Beach, FL 32250 Tel: 904-247-6229 Fax: 904-270-1639 THIS IS NOT A COMPLETE RFP PACKAGE REQUEST FOR PROPOSAL RFP Number:
More informationGUIDEBOOK ADAPTIVE INSIGHTS
GUIDEBOOK ADAPTIVE INSIGHTS December 2013 July 2013 Document NX THE BOTTOM LINE Although corporate performance management (CPM) solutions have been in the market for some time, a new set of vendors such
More informationAutomating Your Hyperion EPM and BI Environments. Tom Tortolani, VP Products January 2010
Automating Your Hyperion EPM and BI Environments Tom Tortolani, VP Products January 2010 About Star Analytics Star Analytics is the leader in Finance Application Process Automation software, offering a
More informationOracle Buys Primavera Creates First, Comprehensive Enterprise Project Portfolio Management Solution for Project-intensive Industries
Oracle Buys Primavera Creates First, Comprehensive Enterprise Project Portfolio Management Solution for Project-intensive Industries November 7, 2008 The following is intended to outline our general product
More information