ISO 9001:2008, ISO 14001:2004, OHSAS

Size: px
Start display at page:

Download "ISO 9001:2008, ISO 14001:2004, OHSAS"

Transcription

1 Page: 1 of 8 ISSUE STATUS Issue Date: Issued for Use Revision Date: - Revision No.: First Issue Action Position Issued By: Reviewed By: Reviewed By: Approved By: QESH Document Controller Company QESH Management Representative HR and Operations Department Director Chief Executive Officer

2 Page: 2 of 8 1. Scope of the Procedure This Procedure describes all actions performed to identify and efficiently handle all environmental aspects and related impacts, concerning activities in the Offices / Camps / Material Stores / Laydown Areas / Workshops / Plant and Sites. 2. Field of application of the Procedure and responsibilities This Procedure is applied to all activities in Offices / Camps / Material Stores / Laydown Areas / Workshops / Plant and Sites. Those responsible for its application are: The CEO; The COO: HR and Operations Centre Department Director ; Company Representative for Quality, Environmental, Health and Safety (QESH) Management System; Plant and Equipment Manager; Country Managers; Country Representatives for Quality, Environmental, Health and Safety (QESH) Management System; Senior Project Managers; Administration Department Managers; Procurement Department Managers; Workshops Manager; Project Managers; Construction Managers; Site Engineers; Land surveyors; HSE Engineers and Officers; The Country QESH Management Representative is responsible for the overall supervision of handling of the environmental aspects and is responsible to oversee the implementation of this procedure. 3. Description of the Procedure 3.1. Definitions Environmental Aspects are elements of the Branch s activities, products or services that can interact with the environment.

3 Page: 3 of Environmental Impacts are any changes to the environment, whether adverse or beneficial, wholly or partially resulting from the Company s activities, products or services Environmental Risks are classified according to their estimated likelihood and potential severity of harm according to the following table, which gives the means to establish a ranking order for the risks in the workplace: According to the Probability Index as above, the objectives are set for each potential hazard and recorded in Risk Assessment Control with the control measures and documents that will be used listed in the form. Decisions are taken about: The priority of the handling of each health and safety objective and the time schedule; The issue of specific Instructions and monitoring their implementation; The person(s) that will be responsible for the objective; The measuring indicators (if any) that will be used for follow up of the progress of the health and safety objectives and the measurement of the performance (column comments ). Decisions are based on the following consequence and risk factor evaluation tables:

4 Page: 4 of Subsequent to the analysis, impact control measures are taken based on the following table to: - Remove the aspect - Change the aspect to one of less significance or - Reduce the effect of potential impacts Risk Level LOW MEDIUM HIGH Control Measures and time schedule No measures are required and no records need to be kept No additional controls are required. Consideration may be given to a more cost effective solution or improvement that imposes no additional cost burden. Monitor is required to ensure that controls are maintained Efforts should be made to reduce risk within a defined time period, but the associated costs should be carefully measured and limited. Where the moderate risk is associated with extremely harmful consequences, further assessment may be necessary to establish more precisely the likelihood of harm as a basis for determining the need for improved control measures. Work should not be started until risk has been reduced. Considerable resources may have to be allocated to this cause. Where the risk involves work in progress, urgent action should be taken. If risk reduction is not possible even with unlimited resources, work has to remain prohibited.

5 Page: 5 of Environmental Objective is an overall environmental goal arising from the environmental policy, set by the Company itself to achieve, and which is quantified where practicable Environmental Target is a detailed performance requirement, quantified where practicable, applicable to the Company or parts thereof, that arises from the environmental objectives and that needs to be set and met in order to achieve these objectives General The Country Management of the Company provides the resources (human resources, specialised skills, technology, financial resources etc) necessary for the identification and efficient handling and analysis of environmental aspects. For each of the Company s area (Office, Camps, Material Stores, Laydown Areas, Workshops, Plant, Site) a Site HSE Officer is appointed (or a suitable employee is nominated), who is trained for all relevant activities. A Site HSE Officer may cover more than one area according to the Project size and nature. The responsibilities of the Site HSE Officer concerning environmental aspects are, among others, to promote and support the continuing development of a culture of environmental awareness and to evaluate achievements against environmental targets. The Country Management is regularly informed about environmental aspects during the annual QESH System review (Procedure P 830) or on a case by case for important or exceptional events. The Country s employees must be aware of the significant environmental impacts of their work activities and conform to the Company s Environmental Policy, Plans, Procedures, Instructions, and Programs Environmental legislation The Country QESH Management Representative is responsible for collecting and maintaining a library of the respective legislation, regulations and other relevant documents concerning environmental issues applicable to the Country s activities. Environmental aspects can be categorised in the following groups: - Emissions to air; - Releases to water; - Contamination of land; - Depletion of ground water table; - Waste management; - Use of raw materials and natural resources; - Noise observation levels; - Other local environmental and community issues.

6 Page: 6 of 8 The Country QESH Management Representative communicates the legislation concerning their activities to the Site HSE Officers and Department Heads Identification and handling of environmental aspects Based on the legislative, regulatory, client and other requirements the Site HSE Officers (assisted by the Country QESH Management Representative) draw up a table of environmental aspects, as well as of impacts and respective legislative and other requirements for their area of responsibility by using Form F-P 710 The priority of recording of environmental aspects in Form F-P 710 is determined by their importance. All activities of the Office / Camps / Material Stores / Laydown Areas / Workshops / Plant / Site that may have an environmental impact (including purchased materials and activities of suppliers and subcontractors), are considered. Current and scheduled activities (including site / area reinstatements) may also be considered. For each activity the environmental aspect and impact is recorded and a severity rating is given, both for normal (after control measures are applied) and abnormal (before proper control measures are applied) operations (including emergencies). Decisions are taken about: - The objectives and targets for each aspect followed by the appropriate control measures and documents; - The priority of each environmental objective / target and the time schedule taking into account abnormal and potential emergency situations; - The need of drawing up and implementing an Environmental Management Program (see paragraph 3.6 below) or, alternatively, handling by issue of specific Instructions and monitoring their implementation; - The need for drawing up a specific Environmental Plan (see paragraph 3.7 below); - The person(s) responsible for the activity; - The measuring indicators (if any) that will be used for follow up of the progress and the measurement of the environmental performance ( comments ). The analysis and the objectives / targets and relevant measures are approved by the Project Managers Review of the environmental aspects At least every six (6) months or when it is thought that the current analysis is no longer valid or according to Client s requirements (expressed in the respective Environmental Plan, see paragraph 3.7) or if there are significant changes, a review of the environmental aspects takes place by the Site HSE Officer. During the review: - The existing situation is reviewed and the strong and weak points are determined;

7 Page: 7 of 8 - The possibility to meet the requirements that have been set is assessed and corresponding resources are examined (e.g. personnel, equipment, know-how, cost); - Alternative solutions for handling environmental aspects are considered; - Any needs for environmental studies, before taking final decisions, are examined and the studies are assigned to appropriate persons along with time schedules. - These studies shall include any requirements for dealing with emergencies, should they occur; The review of each environmental aspect and all relevant decisions are recorded in Form F-P 710, which is revised and approved as mentioned in paragraph Environmental Management Programs An Environmental Management Program must be implemented for various of the companies areas, e.g. Camps, Laydown Areas, Material Store, Offices and Plant in order to meet the environmental objectives / targets, its contents are as follows: - An introduction, where the title, scope, expected objectives / targets, specifications, regulations, legislation etc applied and the methodology used are mentioned; - A technical description accompanied by any relevant drawings, sketches etc; - Resources (human resources, equipment, financial resources etc); - An organisational chart concerning the people involved in the implementation of the Environmental Management Program and their responsibilities; - Data for the necessary training for the people involved; - Results of aspects and impacts analysis and the effectiveness of the controls as well as provision for new ones if considerable changes from previous situations are present; - A scheduled action plan based on the above aspects and impacts analysis should form part of this program; - The phases, actions and deadlines of the Environmental Management Program; - References to corresponding documents (e.g. drawings, Procedures, Instructions either permanent or specific to the Site etc); - The forms that will be used for recording data; - Any comments or observations. The Environmental Management Programs are prepared by the Site HSE Officer in cooperation with the Department Head of the concerned area. The Country QESH Management Representative may assist in the Environmental Management Program s preparation if necessary. The Environmental Management Programs are approved by those mentioned in paragraph 3.4 and reviewed by the same persons who prepared it (refer to P 810). If this is not absolutely possible, then the Reviewer must have sufficient information regarding the basis for the program in order to carry out an objective review. During the implementation of an Environmental Management Program all actions taken must be recorded. Additionally, the date and effectiveness of such actions must also be recorded.

8 Page: 8 of 8 The Environmental Management Programs are audited by the respective HSE Officer and/or appointed auditors in line with the general requirements of P 830 Internal Audits and System Review Environmental Plans for Projects When there is a Client s requirement, a specific Project Environmental Plan is prepared for each Project either in the phase of bidding or after the Project has been awarded. Based on the environmental aspects analysis of similar projects, the bidding / contract documents, the Client s requirements and the particulars of the specific Project, the Environmental Plan is prepared by the Country QESH Management Representative in co-operation with the Project Manager and the Site HSE Officer. Initially, the Environmental Plan contains all known data concerning the Project. During the Project execution the Site HSE Officer of the Project, in co-operation with the Project Manager and Construction Manager, is responsible to complete and follow-up its implementation, review and revise as necessary. The following items, or references to them, are included in general in an Environmental Plan along with specific Client s requirements: - Environmental Policy; - Organisation; - Human resources and responsibilities; - Suppliers and subcontractors involved (if necessary); - Equipment and tools (measuring, waste handling etc); - Document control and filing system; - Handling of Non-Conformities, corrective and preventive actions; - Audits; - Reviews; - Emergency / Evacuation Plans (see Procedure P 750); - Standards, specifications, legislation, regulations; - Environmental Instructions; - Environmental Management Programs; - Environmental Aspects Analysis Objectives / Targets (Form F-P 710, see clause 3.4). The above may be incorporated with the Health and Safety Plan (ref. P 720) to result in an integrated Health, Safety and Environment Programme. 4. Forms 5. Records F-P 710 Environmental Aspects Analysis Objectives / Targets All records of Environmental Aspects Analysis Objectives / Targets and any accompanying documents, as well as the Environmental Plans where existing, are maintained for five (5) years and they are then scrapped.

9 Page: 9 of 8 6. Revision First issue of Group Wide Procedure.

SUPPLIERS AND SUBCONTRACTORS

SUPPLIERS AND SUBCONTRACTORS Page: 1 of 8 SUPPLIERS AND ISSUE STATUS Issue Date: 11-04-2016 Issued for Use Revision Date: 30-01-2017 Revision No.: 1 Action Position Issued By: Reviewed By: Reviewed By: Approved By: QESH Document Controller

More information

Company QESH Management Representative

Company QESH Management Representative PROJECT MANAGEMENT Page: 1 of 8 PROJECT MANAGEMENT ISSUE STATUS Issue Date: 11-04-2016 Issued for Use Revision Date: 05-06-2017 Revision No.: 1 Action Position Issued By: Reviewed By: Reviewed By: Approved

More information

J&P OMAN COMPANY ORGANISATION P.110 PROCEDURE. Page: 1 of 16. Document Title: Issue Date: 13/04/2014. Revision Date: 06/06/2016 Revision No.

J&P OMAN COMPANY ORGANISATION P.110 PROCEDURE. Page: 1 of 16. Document Title: Issue Date: 13/04/2014. Revision Date: 06/06/2016 Revision No. OMAN PROCEDURE Page: 1 of 16 Title: Issue Date: 13/04/2014 Revision Date: 06/06/2016 Revision No.: 2 Issued By: QESH Controller Approved By: QESH Management Representative Approved By: Company QESH Management

More information

Risk & Opportunities

Risk & Opportunities Page 1 of 11 Risk & Opportunities Ghantoot Transport & General Contracting L.L.C Roads & Infrastructure Division P.O. Box: 30541 Abu Dhabi, UAE Tel: +971 2 641 9004 Fax: +971 2 641 9003 Website: www.ghantootgroup.com

More information

APS Cleaning. Environmental Management System. Scope of Certification

APS Cleaning. Environmental Management System. Scope of Certification Environmental Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Table of Contents Contents 1. Introduction... 3 1.1. The Environmental

More information

Ethical Procurement Policy

Ethical Procurement Policy Ethical Procurement Policy June 2017 Contents page 03 Introduction 04 Our responsibilities 05 Our suppliers responsibilities 06 Our joint responsibility 2 Introduction At Simply Business, we re committed

More information

CHAS Assessment Standards

CHAS Assessment Standards CHAS Assessment Standards Section 1 - All Prosecutions or Enforcement Notices The Supplier has provided details of any enforcement notices or prosecutions served on them in the last three years by the

More information

Table of Contents INTEGRATED MANAGEMENT SYSTEM GUIDANCE

Table of Contents INTEGRATED MANAGEMENT SYSTEM GUIDANCE Table of Contents INTRODUCTION... 3 THE CORE VALUES OF THE IMS... 3 IMPLEMENTATION & DEVELOPMENT... 3 TOP MANAGEMENT COMMITMENT... 4 RECOMMENDED INITIAL GOALS... 5 GAP ANALYSIS... 5 BUDGET & RESOURCES...

More information

Albion Water Limited. Environmental Management System Manual

Albion Water Limited. Environmental Management System Manual Albion Water Limited Revision No. : 1 Prepared by : Gareth King Approved by : David Knaggs Revision History Revision Date Description Sections Affected Revised By Approved By Table of Content 0.0 Terms

More information

HUGHS LIMITADA- SHEQ HSE RESPONSIBILITIES

HUGHS LIMITADA- SHEQ HSE RESPONSIBILITIES HSE RESPONSIBILITIES All levels of Management take an active interest in the development and implementation of the Health & Safety and Environmental Management System. Demonstrating Leadership in HSE Participation

More information

HSE INTEGRATED MANAGEMENT SYSTEM MANUAL & QUALITY POLICY

HSE INTEGRATED MANAGEMENT SYSTEM MANUAL & QUALITY POLICY HSE INTEGRATED MANAGEMENT SYSTEM MANUAL & QUALITY POLICY Quality, Health, Safety & Environmental Integrated Management System Manual HAZARD : An object, physical effect, or condition with potential to

More information

INTRODUCTION TO ISO 14001

INTRODUCTION TO ISO 14001 INTRODUCTION TO ISO 14001 An environmental management system, such as ISO 14001, is a powerful tool that can be utilized by an organization. The obvious beneficiaries are those organizations that have

More information

Verify Category A Audit Content

Verify Category A Audit Content Verify Category A Audit Content V10.0 Achilles Group Limited, 2014. All rights reserved. Objective The objective of this document is to provide suppliers who have registered for a Verify Category A (V10.0)

More information

MANDATE OF THE CONDUCT REVIEW, GOVERNANCE & HUMAN RESOURCE COMMITTEE

MANDATE OF THE CONDUCT REVIEW, GOVERNANCE & HUMAN RESOURCE COMMITTEE MANDATE OF THE CONDUCT REVIEW, GOVERNANCE & HUMAN RESOURCE COMMITTEE Board Approved: February 26, 2019 Purpose The Committee is responsible for assisting the Bank s Board of Directors (the Board ) in overseeing

More information

Evaluation of Occupational Health & Safety Management System

Evaluation of Occupational Health & Safety Management System Section 1 Legal Obligation Employers have a duty of care to provide a safe workplace and systems of work, to consult with workers, to identify and manage workplace hazards and to keep them informed about

More information

Quality Assurance Manual

Quality Assurance Manual Quality Assurance Manual Current Electrical is committed to leading the market in satisfying customer needs by providing versatile and innovative electrical and control solutions We take pride in the ability

More information

QMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets

QMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets QMS Roles, Responsibility and Authority Process Clause Activities Records Required Responsibility Authority Deadline Clause 4: Process Development 4.1 Develop processes and sequence, operation controls

More information

HSE 01 HEALTH, SAFETY AND ENVIRONMENTAL CHARTER

HSE 01 HEALTH, SAFETY AND ENVIRONMENTAL CHARTER HSE 01 HEALTH, SAFETY AND ENVIRONMENTAL CHARTER 2 Health, Safety & Environmental Commitment Purpose: Scope: To send everyone Safe Home Every Day This commitment applies to all employees within the NDA

More information

HSE Aspects and Impacts

HSE Aspects and Impacts HSE Aspects and Impacts 1. APPLICABILITY 1.1 This standard applies to all organizations and majority owned subsidiaries worldwide. The requirements of this standard are applicable to all those health,

More information

MANDATE OF THE CONDUCT REVIEW, GOVERNANCE & HUMAN RESOURCE COMMITTEE

MANDATE OF THE CONDUCT REVIEW, GOVERNANCE & HUMAN RESOURCE COMMITTEE MANDATE OF THE CONDUCT REVIEW, GOVERNANCE & HUMAN RESOURCE COMMITTEE BOARD APPROVED: May 30, 2017 Purpose The Committee is responsible for assisting the Bank s Board of Directors (the Board ) in overseeing

More information

Environmental Aspects & Impacts Procedure EMS 01 Internal Procedures Issue 1, Revision 1

Environmental Aspects & Impacts Procedure EMS 01 Internal Procedures Issue 1, Revision 1 EMS 01 Internal Procedures Issue 1, Revision 1 1 Contents 1 Contents... 1 2 Version Control... 1 3 Information... 1 4 Clauses covered by this procedure... 2 5 Purpose... 2 6 Scope... 2 7 Procedure... 2

More information

Environmental Management System Manual (EM-01) Revision No. : 2 Date : 1/6/2017. Revision History Sections Affected

Environmental Management System Manual (EM-01) Revision No. : 2 Date : 1/6/2017. Revision History Sections Affected ECS GROUNDWORK LTD Management (EM-01) Revision No. : 2 Date : 1/6/2017 Prepared by : Approved by : Stephen Roth (EMR) Martin Reynolds (Managing Director) Revision Date Description Revision History Sections

More information

Construction Safety Audit Scoring System (ConSASS) Audit Checklist

Construction Safety Audit Scoring System (ConSASS) Audit Checklist I 1.1 1 OSH Policy The occupier's management with executive or site responsibility shall define and document its policy for safety including objectives for its commitment to safety. (CP79 - Section 1.2)

More information

CITY OF DARWIN CRUISES Environmental Management System

CITY OF DARWIN CRUISES Environmental Management System CITY OF DARWIN CRUISES Environmental Management System 1. Introduction Environmental Management Systems (EMS) are designed to enable organisations to address both environmental concerns and economic imperatives

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy Policy Version 1.10 Date for Review December 2016 Approved by The Board of Governors Date: 12 th December 2013 December 2013 Health and Safety Policy Page 1 Contents Section 1

More information

Environmental Management Systems Policy

Environmental Management Systems Policy Environmental Management Systems Policy The main goal of an Environmental Management System (EMS) is to continuously improve the environmental aspects arising from a company s activities and to guarantee

More information

TERMS OF REFERENCE OF THE AUDIT COMMITTEE OF THE BOARD OF DIRECTORS

TERMS OF REFERENCE OF THE AUDIT COMMITTEE OF THE BOARD OF DIRECTORS TERMS OF REFERENCE OF THE AUDIT COMMITTEE OF THE BOARD OF DIRECTORS 1. Purpose An Audit Committee (hereinafter called the Committee ) of the Board of Directors (hereinafter called the Board ) of the Business

More information

Environmental Aspects, Impacts, and Risk ISO 14001:

Environmental Aspects, Impacts, and Risk ISO 14001: 1. PURPOSE: This document describes the procedure for identification of environmental risks, opportunities, aspects and impacts for the City of Dallas (City) Environmental Management System (EMS) and determining

More information

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy. Bowmer Kirkland & Kirkland & Accommodation Health & Safety Policy December 2013 www.bandk.co.uk Index Policy Statement Page 3 Interaction of Health and Safety Responsibilities Page 5 Organisation Page

More information

Internal Audit Quality Analysis Evaluation against the Standards International Standards for the Professional Practice of Internal Auditing (2017)

Internal Audit Quality Analysis Evaluation against the Standards International Standards for the Professional Practice of Internal Auditing (2017) Internal Audit Quality Analysis Evaluation against the Standards International Standards for the Professional Practice of Internal Auditing (2017) Assessor 1: Assessor 2: Date: Date: Legend: Generally

More information

Humantech Environmental Management System Manual

Humantech Environmental Management System Manual Humantech Management System Version 1.0 March 2014 Humantech, Inc. Humantech Management System Revision No.: 1 Date : 03-10-14 Prepared by: Approved by: (EMR) President Revision History Revision Date Description

More information

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY HEALTH AND SAFETY POLICY April 2018 NERC H&S Policy Page 1 of 8 April 2018 Part 1: Statement of Intent Natural Environment Research Centre (NERC) UKRI through the NERC Executive Chair, management and staff

More information

Jumeirah Carlton Tower Environmental Policy

Jumeirah Carlton Tower Environmental Policy Jumeirah Carlton Tower Environmental Policy Page 1 of 11 Jumeirah Carlton Tower Environmental Policy Applicable to Policy Owner Related Documents Definitions and Abbreviations Scope This policy applies

More information

Health, Safety and Wellbeing Policy

Health, Safety and Wellbeing Policy Health, Safety and Wellbeing Policy 1 Policy 1.1 Policy application 1.2 General requirements 2 Organisation 2.1 Skanska Board, EMT and SMT 2.2 Business Unit President 2.3 Executive Vice President 2.4 OU

More information

Phoenix Energy Holdings Gas Ltd Health & Safety Policy

Phoenix Energy Holdings Gas Ltd Health & Safety Policy Phoenix Energy Holdings Gas Ltd Health & Safety Policy July 2017 Phoenix Energy Holdings Ltd Health & Safety Policy July 2017 Contents 1.0 Introduction 2.0 Purpose 3.0 Scope 4.0 References 5.0 Definitions

More information

The Advantage of Implementing a Safety Management System. Integrating Occupational Safety Management into Other Management Functions

The Advantage of Implementing a Safety Management System. Integrating Occupational Safety Management into Other Management Functions Contents Introduction, Objectives The Advantage of Implementing a Safety Management System Occupational Safety Charter Integrating Occupational Safety Management into Other Management Functions Establishing

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 11.12.2010 Official Journal of the European Union L 327/13 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 1169/2010 of 10 December 2010 on a common safety method for assessing conformity

More information

Introduction to ISO 14001

Introduction to ISO 14001 Introduction to ISO 14001 ISO 14001 is a powerful management tool that can be utilized by an organization. INTRO-001 Introduction to ISO 14001 (cont.) The benefits of ISO 14001 are not just applicable

More information

RILTA ENVIRONMENTAL Ltd. ENVIRONMENTAL MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL ISO 14001:2004

RILTA ENVIRONMENTAL Ltd. ENVIRONMENTAL MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL ISO 14001:2004 RILTA ENVIRONMENTAL Ltd. ENVIRONMENTAL MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL In accordance with ISO 14001:2004 Environmental Management System Manual Page 1 of 29 CONTENTS i ii iii iv

More information

BCE INC. BOARD OF DIRECTORS CHARTER (INCLUDING BOARD CHAIR POSITION DESCRIPTION)

BCE INC. BOARD OF DIRECTORS CHARTER (INCLUDING BOARD CHAIR POSITION DESCRIPTION) BCE INC. BOARD OF DIRECTORS CHARTER (INCLUDING BOARD CHAIR POSITION DESCRIPTION) Board of Directors I. Purpose The Board of Directors ( Board ) of BCE Inc. (the Corporation ) is responsible for the supervision

More information

People and Culture Committee Charter

People and Culture Committee Charter People and Culture Committee Charter Domain Holdings Australia Limited (ACN 094 154 364) Adopted by the Board on 22 March 2018 Contents Table of contents 1. Membership of the Committee 2 2. Role and responsibilities

More information

Occupational Health and Safety Management Manual v2.2

Occupational Health and Safety Management Manual v2.2 Occupational Health and Safety Management Manual v2.2 Written: February 2013 Author: David Seymour, Director of Operations Co Author: Mathew Sprake, Operations Manager Approved: Board of Directors 1. Introduction

More information

ISO 9001:2015 Internal Audit Checklist 7.0 Support

ISO 9001:2015 Internal Audit Checklist 7.0 Support The internal audit checklist is just one of the many tools available from the auditor s toolbox. The checklist ensures each audit concisely compares the requirements of ISO 9001:2015, and your Quality

More information

Part 148. CAA Consolidation. 10 March Aircraft Manufacturing Organisations - Certification

Part 148. CAA Consolidation. 10 March Aircraft Manufacturing Organisations - Certification Part 148 CAA Consolidation 10 March 2017 Aircraft Manufacturing Organisations - Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 148 prescribes rules governing the

More information

For personal use only

For personal use only Monash Absolute Investment Company Limited (ACN 610 290 143) (Company) Corporate Governance 28 September 2016 The Board of Directors of Monash Absolute Investment Company Limited (the Company) is committed

More information

Quality, Health Safety & Environment Code: 2013

Quality, Health Safety & Environment Code: 2013 Price: AUD 35 Quality, Health Safety & Environment Code Quality, Health Safety & Environment Code: 2013 Published by: TQCS International Pty Ltd Head Office: 117A Tapleys Hill Road HENDON SA 5014 AUSTRALIA

More information

EUROPEAN COMMISSION HEALTH AND CONSUMERS DIRECTORATE-GENERAL. EudraLex. The Rules Governing Medicinal Products in the European Union

EUROPEAN COMMISSION HEALTH AND CONSUMERS DIRECTORATE-GENERAL. EudraLex. The Rules Governing Medicinal Products in the European Union EUROPEAN COMMISSION HEALTH AND CONSUMERS DIRECTORATE-GENERAL Public Health and Risk Assessment Medicinal Product quality, safety and efficacy Brussels, 16 August 2013 EudraLex The Rules Governing Medicinal

More information

GROUP MANUAL Sustainability Environment Management Valid from: Page: 1 of 10

GROUP MANUAL Sustainability Environment Management Valid from: Page: 1 of 10 Page: 1 of 10 Manual owner: Approver: SVP and Head of Group Sustainability EVP and Head of Group Corporate Affairs 1 PURPOSE AND SCOPE... 2 1.1 Purpose... 2 1.2 Scope... 2 2 MAIN PRINCIPLES... 2 2.1 Climate

More information

Integrated System Procedures Legionella Control Association Statement of Compliance

Integrated System Procedures Legionella Control Association Statement of Compliance Procedure No: IP-028 Rev No : 14 Rev Date : 20/07/2016 Page 1 of 7 The services offered by HBE (Healthy Built Environment) under the scope of this code of conduct are limited to: 1. Risk Assessment Services

More information

Part 148 Aircraft Manufacturing Organisation

Part 148 Aircraft Manufacturing Organisation Part 148 Compliance Matrix The rule references in this compliance matrix have been extracted from the Civil Aviation Rules system as the minimum compliance requirements for an applicant for the issue or

More information

Quality Control Manual DOCUMENT NUMBER 15

Quality Control Manual DOCUMENT NUMBER 15 Quality Control Manual DOCUMENT NUMBER 15 Table of Contents 1. Distribution... 2 2. Scope... 2 3. Definitions... 2 4. Principal Characteristics of the Quality Management System... 3 5. Quality Policy...

More information

Policy Work Health and Safety (WHS) RCPA Introduction WHS legislation

Policy Work Health and Safety (WHS) RCPA Introduction WHS legislation Policy Subject: Work Health and Safety (WHS) Approval Date: July 2011, December 2014 Review Date: July 2018 Review By: Board of Directors Number: 1/2011 The Royal College of Pathologists of Australasia

More information

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies Accreditation International Association for Certifying Bodies Guidance on the Application of ISO / IEC 17020 Guidance on the Application of ISO/IEC 17020 Page 1 of 16 Introduction This guidance document

More information

CORRECTIVE AND PREVENTIVE ACTION. Co-X/QHS/SOP06

CORRECTIVE AND PREVENTIVE ACTION. Co-X/QHS/SOP06 CONVENTION & EXHIBITION (PUTRAJAYA) SDN. BHD. Co-X/QHS/SOP06 Revision No.: 03 Effective Date: 1 st November 2017 PREPARED BY REVIEWED BY APPROVED BY Name: Name: Name: Position: Position: Position: REFERENCE

More information

Health, Safety and Wellbeing Policy

Health, Safety and Wellbeing Policy Health, Safety and Wellbeing Policy An overview of how Staffordshire County Council delivers its commitment to the health, safety and wellbeing of employees and stakeholders Staffordshire County Council

More information

QUALITY MANUAL PLASSEY CAMPUS CENTRE. Quality Manual Rev. 1

QUALITY MANUAL PLASSEY CAMPUS CENTRE. Quality Manual Rev. 1 QUALITY MANUAL PLASSEY CAMPUS CENTRE Quality Manual Rev. 1 Table of Contents 1. INTRODUCTION... 1 1.1 Brief Outline of the Division... 1 1.2 Our Commitment to Quality... 1 1.3 Quality Policy... 1 2. CUSTOMER

More information

Five Star Environmental Audit Specification August 2016

Five Star Environmental Audit Specification August 2016 Five Star Environmental Audit Specification August 2016 Membership Training Qualifications Audit and Consultancy Policy and Opinion Awards Contents Page 1 Introduction to the Five Star Audit model 1 2

More information

Health and Safety Management System Manual

Health and Safety Management System Manual Message from the Managing Director Health and Safety Management System Manual The Blackley Group of Companies are committed to ensuring our workers and contractors have a safe place to work and strive

More information

Integrated Management System Manual

Integrated Management System Manual QUALITY & ENVIRONMENTAL MANAGEMENT SYSTYEMS Integrated Management System Manual ISO 9001:2008, 14001:2004 and OHSAS 18001: 2007 Document ID: IMS Manual/ Rev. No. 00/ Rev. Date: 01-Jun-2009/ Page 1 of 19

More information

REV NO. DATE REVISION DESCRIPTION APPROVAL

REV NO. DATE REVISION DESCRIPTION APPROVAL Aurora Energy Work, Health and Safety Policy (v2.0) Version History REV NO. DATE REVISION DESCRIPTION APPROVAL 1 08/07/2014 Combined the HSE Responsibilities procedure document into the Health, Safety

More information

Environmental management systems in plastics processing

Environmental management systems in plastics processing Environmental management systems in plastics processing TANGRAM TECHNOLOGY Environmental management systems in plastics processing Practical worksheets for industry CONTENTS Part 1 - Clean business = good

More information

Solihull Metropolitan Borough Council. Corporate Health and Safety Policy For Core Council Staff. September 2015

Solihull Metropolitan Borough Council. Corporate Health and Safety Policy For Core Council Staff. September 2015 Solihull Metropolitan Borough Council Corporate Health and Safety Policy For Core Council Staff Version Control: September 2015 Version Date Author Sent to Reason 1.1 June 2015 Steve Dean ( Health and

More information

IEMA NE0311E. EMS an introduction S O U T H E R N. S O U T H E R N Consulting. Principles of a Deming management system. Check.

IEMA NE0311E. EMS an introduction S O U T H E R N. S O U T H E R N Consulting. Principles of a Deming management system. Check. IEMA NE0311E EMS an introduction Principles of a Deming management system 2 Structure of an EMS Manual Procedures Work Instructions Records Site Issues Task Issues Policy Objectives Targets Programmes

More information

Environmental Management System Guidance

Environmental Management System Guidance Environmental Management System Guidance Table of Contents Environmental Management System Guidance 1 Introduction 3 2 Gap Analysis 4 3 Implementation & Development 6 4 About Your Organization 7 4.1 Organizational

More information

ENVIRONMENTAL MANUAL. Page 1 of 26 Uncontrolled when printed NCH Env Manual Vers 11.0 date 01/02/18

ENVIRONMENTAL MANUAL. Page 1 of 26 Uncontrolled when printed NCH Env Manual Vers 11.0 date 01/02/18 ENVIRONMENTAL MANUAL Page 1 of 26 Uncontrolled when printed NCH Env Manual Vers 11.0 date 01/02/18 Document Control Identification and Approval Status Document Title: Environmental Manual Version Number:

More information

Identification and evaluation of environmental aspects

Identification and evaluation of environmental aspects 1.0 Purpose This procedure defines the mechanism for the identification and evaluation of environmental aspects of the operations of KSPH&IDCL in order to determine those aspects that have actual or potential

More information

NOT PROTECTIVELY MARKED. Item Number 5.10 Gary Devlin, Partner, Scott- Moncrieff Recommendation to Members Members are requested to note the report.

NOT PROTECTIVELY MARKED. Item Number 5.10 Gary Devlin, Partner, Scott- Moncrieff Recommendation to Members Members are requested to note the report. NOT PROTECTIVELY MARKED Meeting Audit Committee Date 24 July 2018 Location Pacific Quay, Glasgow Title of Paper Internal Audit Annual Report Item Number 5.10 Presented By Gary Devlin, Partner, Scott- Moncrieff

More information

ENVIRONMENTAL POLICY DOCUMENT

ENVIRONMENTAL POLICY DOCUMENT ENVIRONMENTAL POLICY DOCUMENT Issue Date Revision By Next review due Amendment Page 1 Table of Contents 1. Scope 2. Definitions 3. Environmental Management System Requirements 4. Environmental Policy Statement

More information

STANDARD ON INTERNAL AUDIT (SIA) 7 QUALITY ASSURANCE IN INTERNAL AUDIT *

STANDARD ON INTERNAL AUDIT (SIA) 7 QUALITY ASSURANCE IN INTERNAL AUDIT * STANDARD ON INTERNAL AUDIT (SIA) 7 QUALITY ASSURANCE IN INTERNAL AUDIT * Contents Paragraph(s) Introduction... 1-2 Scope... 3 Objective... 4-10 Internal Quality Reviews... 11-14 External Quality Review...

More information

OPW Engineered Systems

OPW Engineered Systems 1 of 5 1.0 Purpose 1.1 The purpose of this manual is to promote a clear understanding of OPW Engineered Systems (OPW-ES) expectations and requirements for suppliers. This manual explains the process OPW-

More information

Uzbekenergo: Talimarjan Thermal Power Plant 2, Uzbekistan Environmental and Social Action Plan (ESAP)

Uzbekenergo: Talimarjan Thermal Power Plant 2, Uzbekistan Environmental and Social Action Plan (ESAP) Uzbekenergo: Talimarjan Thermal Power Plant 2, Uzbekistan Environmental and Social Action Plan (ESAP) No Action Environmental Risks, Liability/ Benefits Legislative Requirement / EBRD Performance Requirement

More information

Trotz sorgfältiger inhaltlicher Prüfung übernehmen wir keine Haftung für die Richtigkeit und Aktualität für Unterlagen von Dritten.

Trotz sorgfältiger inhaltlicher Prüfung übernehmen wir keine Haftung für die Richtigkeit und Aktualität für Unterlagen von Dritten. Trotz sorgfältiger inhaltlicher Prüfung übernehmen wir keine Haftung für die Richtigkeit und Aktualität für Unterlagen von Dritten. IFS HPC Issue 2 Joachim Mehnert Technical Director DQS CFS GmbH 23. February

More information

version 1 / 96 R Green Stars Hotel Environmental Management System

version 1 / 96 R Green Stars Hotel Environmental Management System Environmental Management Manual for Hotels in Hong Kong version 1 / 96 R Green Stars Hotel Environmental Management System 2002 Acknowledgements: This document is a revised version of the manual published

More information

PROOF/ÉPREUVE A ISO INTERNATIONAL STANDARD. Environmental management systems Specification with guidance for use

PROOF/ÉPREUVE A ISO INTERNATIONAL STANDARD. Environmental management systems Specification with guidance for use INTERNATIONAL STANDARD ISO 14001 First edition 1996-09-01 Environmental management systems Specification with guidance for use Systèmes de management environnemental Spécification et lignes directrices

More information

Unit HSP9: Develop and implement health and safety audit systems

Unit HSP9: Develop and implement health and safety audit systems Unit HSP9: Develop and implement health and safety audit systems This unit is for people with a role which involves: evaluating the compliance of the health and safety management system of your organisation

More information

IMS (Quality, Environment, Occupational Health & Safety) Awareness Training Course As per ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007

IMS (Quality, Environment, Occupational Health & Safety) Awareness Training Course As per ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007 IMS (Quality, Environment, Occupational Health & Safety) Awareness Training Course As per ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007 SESSION 1 ST HR INTRODUCTION COURSE OBJECTIVE This course is designed

More information

Auckland Transport HS09-01 Supplier Health and Safety Management

Auckland Transport HS09-01 Supplier Health and Safety Management Auckland Transport HS09-01 Supplier Health and Safety Management (Procedure uncontrolled when printing) Relating to Standard: HS09 Supplier HS Management December 2016 Health and Safety-Procedure-HS09-01

More information

RISK MANAGEMENT POLICY AND PROCEDURES AD-P009

RISK MANAGEMENT POLICY AND PROCEDURES AD-P009 1. OVERVIEW In managing risk, it is the Company's practice to take advantage of potential opportunities while managing potential adverse effects. Managing risk is the responsibility of everyone in the

More information

Environmental impact: Any change to the environment, whether adverse or beneficial, wholly or

Environmental impact: Any change to the environment, whether adverse or beneficial, wholly or 1 Purpose This document provides guidance that supports the business in developing an aspects and impacts register, which is a requirement of the Network Rail Environment and Social Management Systems

More information

North Africa, Middle East & Southern Asia HEALTH SAFETY & ENVIRONMENT POLICY MANUAL

North Africa, Middle East & Southern Asia HEALTH SAFETY & ENVIRONMENT POLICY MANUAL North Africa, Middle East & Southern Asia HEALTH SAFETY & ENVIRONMENT POLICY MANUAL G4S North Africa, Middle East & Southern Asia HSE POLICY STATEMENT All operating companies in the region are committed

More information

Perry Johnson Registrars, Inc. Licensed Copy #2 RECYCLING INDUSTRY OPERATING STANDARD. Prepared for ISRI Services Corporation

Perry Johnson Registrars, Inc. Licensed Copy #2 RECYCLING INDUSTRY OPERATING STANDARD. Prepared for ISRI Services Corporation RECYCLING INDUSTRY OPERATING STANDARD Prepared for ISRI Services Corporation NOT FOR DISTRIBUTION FOR PERRY JOHNSON REGISTRARS, INC. ONLY: LICENSED COPY #2REVISED MARCH 2006 CONTENTS RIOS GLOSSARY... I

More information

ENVIRONMENT, HEALTH & SAFETY MANAGEMENT SYSTEM MANUAL

ENVIRONMENT, HEALTH & SAFETY MANAGEMENT SYSTEM MANUAL ENVIRONMENT, HEALTH & SAFETY MANAGEMENT SYSTEM MANUAL Revision No: 00 Issued On: 1-02-2016 Written By: EHS Management Representative Sign:.. Approved By: Commercial & Sales Manager Sign:. ISO 14001:2004,

More information

Quality and Environmental Business Process Manual

Quality and Environmental Business Process Manual PMC SOIL SOLUTIONS 2 Fountain Court Victoria Square St Albans Hertfordshire AL1 3TF T: 01727 822500 F: 01727 821600 E: headoffice@pmcsoilsolutions.com W: www.pmcsoilsolutions.com Quality and Environmental

More information

Fulcrum (North Sea) Limited. IMS Manual. FUL-MN-001 Rev0

Fulcrum (North Sea) Limited. IMS Manual. FUL-MN-001 Rev0 Fulcrum (North Sea) Limited IMS Manual FUL-MN-001 Rev0 26 th January 2015 Revision Control Rev. Date Reason for Issue Originated Checked Approved 0 26/01/2015 For Comment MF KC KC Revision Notes: First

More information

Managing Contractors (Scotland)

Managing Contractors (Scotland) Managing Contractors (Scotland) University Health and Safety Policy Author: Health & Safety Services 1 Managing Contractors Procedures (Scotland) to support University Health and Safety Policy CONTENT

More information

HEWLETT PACKARD ENTERPRISE COMPANY BOARD OF DIRECTORS HR AND COMPENSATION COMMITTEE CHARTER

HEWLETT PACKARD ENTERPRISE COMPANY BOARD OF DIRECTORS HR AND COMPENSATION COMMITTEE CHARTER I. Purpose HEWLETT PACKARD ENTERPRISE COMPANY BOARD OF DIRECTORS HR AND COMPENSATION COMMITTEE CHARTER The purpose of the HR and Compensation Committee (the Committee ) of the Board of Directors (the Board

More information

JFS-A/B/C Standards <Manufacturing> [Interpretations]

JFS-A/B/C Standards <Manufacturing> [Interpretations] JFS-A/B/C Standards [Interpretations] JFS-A Standard Ver. 1.1 JFS-B Standard Ver. 1.1 JFS-C Standard Ver. 2.2 Japan Food Safety Management Association September 15, 2017 Table of Contents

More information

IAASB Main Agenda (December 2008) Page Agenda Item

IAASB Main Agenda (December 2008) Page Agenda Item IAASB Main Agenda (December 2008) Page 2008 2669 Agenda Item 2-C PROPOSED INTERNATIONAL STANDARD ON AUDITING 265 COMMUNICATING DEFICIENCIES IN INTERNAL CONTROL (Effective for audits of financial statements

More information

Critical 0 Major 0 Minor 0. Certification Body name and address

Critical 0 Major 0 Minor 0. Certification Body name and address Audit Report Global Standard for Agents and Brokers Issue 1: January 2014 1.Audit Summary Company name BRC Site Code BRC Site code 2.Scope Operation Services Scope of audit Product categories Select Operation

More information

Key to Disclosures Corporate Governance Council Principles and Recommendations

Key to Disclosures Corporate Governance Council Principles and Recommendations Rules 4.7.3 and 4.10.3 1 Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations Name of entity: Sayona Mining Limited ABN / ARBN: Financial year ended: 26 091 951 978

More information

Ethical leadership and corporate citizenship. Applied. Applied. Applied. Company s ethics are managed effectively.

Ethical leadership and corporate citizenship. Applied. Applied. Applied. Company s ethics are managed effectively. CORPORATE GOVERNANCE- KING III COMPLIANCE Analysis of the application as at 24 June 2015 by Master Drilling Group Limited (the Company) of the 75 corporate governance principles as recommended by the King

More information

COSCCOMO01 - SQA Unit Code FM74 04 Maintain health, safety and welfare systems in construction contracting operations management

COSCCOMO01 - SQA Unit Code FM74 04 Maintain health, safety and welfare systems in construction contracting operations management Maintain health, safety and welfare systems in construction contracting Overview This unit is about health, safety and welfare policy and its implementation within an organisation. It is applies to construction

More information

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ Quality Manual Quality Manual Issue I Dated 8 th October 2012 Contents Page Section 1 - Introduction 2 Section 2 - Company Details 2 Section

More information

Conducting Quality Audit based on ISO 9001:2015

Conducting Quality Audit based on ISO 9001:2015 Conducting Quality Audit based on ISO 9001:2015 FREE Professional Development Seminar Series At the end of the class, please fill the training feedback and referral forms! Return the form at the reception!

More information

Informa PLC ROLES OF CHAIRMAN, CHIEF EXECUTIVE, SENIOR INDEPENDENT DIRECTOR AND NON-EXECUTIVE DIRECTOR. Adopted by the Board on

Informa PLC ROLES OF CHAIRMAN, CHIEF EXECUTIVE, SENIOR INDEPENDENT DIRECTOR AND NON-EXECUTIVE DIRECTOR. Adopted by the Board on Informa PLC ROLES OF CHAIRMAN, CHIEF EXECUTIVE, SENIOR INDEPENDENT DIRECTOR AND NON-EXECUTIVE DIRECTOR Adopted by the Board on 12 th December 2017 Page 1 of 9 Role of the Chairman A. The Chairman is responsible

More information

Procedures on Management System Certification

Procedures on Management System Certification 1. Purpose Procedure PR-005 describes the roles, responsibilities and processes in a certification body according to ISO 17021 involved in the certification of management systems (MS). The certification

More information

CORPORATE GOVERNANCE. as at 12 September Lycopodium Limited ABN: Level 5, 1 Adelaide Terrace, East Perth Western Australia 6004

CORPORATE GOVERNANCE. as at 12 September Lycopodium Limited ABN: Level 5, 1 Adelaide Terrace, East Perth Western Australia 6004 CORPORATE GOVERNANCE as at 12 September 2016 This document is the property of. It must not be copied or reproduced in any way or transmitted on to any third party without written authority from. ABN: 83

More information

COSCCOMO01 (SQA Unit Code - HA32 04) Maintain health, safety and welfare systems in construction contracting operations management

COSCCOMO01 (SQA Unit Code - HA32 04) Maintain health, safety and welfare systems in construction contracting operations management Overview This unit is about health, safety and welfare policy and its implementation within an organisation. It is applies to construction sites, including public areas (e.g. buildings, roads, motorways,

More information

WHSE POL 1 WORK HEALTH, SAFETY & ENVIRONMENT MANAGEMENT POLICY

WHSE POL 1 WORK HEALTH, SAFETY & ENVIRONMENT MANAGEMENT POLICY Issue Number: 5 Prepared by (author): Greg McDonald, Group Manager WHSE Authorised by: Chen Wei Ng, Managing Director Date of release: 01 January 2014 Date of review 01 December 2015 WHSE POL 1 WORK HEALTH,

More information