Net Demand Variability (NDV) Summary

Size: px
Start display at page:

Download "Net Demand Variability (NDV) Summary"

Transcription

1 Net Demand Variability (NDV) Summary Executive Summary: This document provides a summary of the Net Demand Variability (NDV) work presented to the Energy and Ancillary Service (EAS) workgroup in WG meetings 2, 6, 8 and 9. One reference case and two sensitivity scenarios based on potential generation mixes (Reference Case, High Cogeneration and High Coal to Gas based on the AESOs 2017 LTO) were simulated through 2030 to test possible directional impacts that may be expected for each year. Results on all scenarios indicate that, although system operations could be reliably managed, the lower flexibility of the system (as noted in the scenarios) may require the system controller to dispatch the Energy Market Merit Order (EMMO) more frequently (dispatch for ramp) and in larger volumes to manage future increases of NDV. The increased volume and frequency of dispatching the EMMO for ramp requirements may also have an operational (and cost) impact on some units as noted by both on/off cycling and load following. Further, the more frequent use of the EMMO to manage ramp requirements may result in: Price fluctuations (price fidelity); Supply surplus and in rare instances supply shortfall issues. With the completion of the impact assessment, the mitigation scenarios will be evaluated including; No Change / current rules Rule changes (i.e., dispatch tolerance rules) New products (i.e., Introduction of a specific ramp product); Consideration of how real time price signals can incent flexibility; Need for changes / value to different unit commitment models (ex. SCUC). As noted in the qualitative markets assessment, it is noted that a unit commitment model may not be able to mitigate against forecast error. See separate document on mitigation options for further discussion. Enter Footer Page 1 Public

2 1.0 Introduction In order to assess future views of the system and market, a Net Demand Variability (NDV) study was initiated. The AESO used system and market models to determine how future views of the fleet may impact system operations and market conditions. This summary report reflects the results of that impact assessment. This summary report references materials submitted separately to the Energy & AS (EAS) working group as noted in section Study Context: Net Demand Variability (NDV) is defined as the demand for electricity net of the contribution from variable generation (wind and solar) resources and any changes in load profile. This study evaluates expected changes to the generation mix discussed in the 2017 LTO, its impact on NDV, and resultant impacts on system operations and markets. The following summarizes the context for this study. a) As more variable generation is integrated into the Alberta Interconnected Electric System (AIES) between now and 2030, we can expect increased Net Demand Variability (NDV) and therefore a system that requires increased operational flexibility. b) The AESO currently manages NDV impacts from 1,445MW of variable wind generation using a combination of; Dispatching the EMMO to achieve the required ramp rate; Regulating reserve (AGC) and; Use of the Wind Power Management (WPM) process to manage extreme wind ramp events. c) One reference case and two sensitivity scenarios based on potential generation mixes (Reference Case, High Cogeneration and High Coal to Gas based on the AESOs 2017 LTO) were simulated through 2030 to test possible directional impacts that may be expected for each year 1. d) The early studies concluded that the addition of more than 5,000MW of variable generation by 2030 will result in increased NDV: i. As illustrated at the June 21, Session 2 meeting, in the maximum annual hourly NDV variation between maximum and minimum NDV was 4,720MW in 2015 (11,127MW- 6,407MW). This variation is expected to increase to approximately 9,905MW (12,918MW- 3,013MW) by 2030; 1 Please see slides 2 to 5 of the NDV presentation in WG6 for details on model and metrics Enter Footer Page 2 Public

3 ii. The 10 minute NDV increases between 2015 and 2030 range between approximately 50MW to 80MW. e) Further studies were conducted to provide more granularities to the merit order and test more detailed impact to the system. The results are attached. 2.0 Methodology: a) Two models to simulate market functions (Market Simulation Model) and operations functions (System Dispatch Simulation Model) were developed. b) Simulated merit orders from the Market Simulation Model were input into the System Dispatch Simulation Model to simulate operational behaviour. c) Historic behaviour observations formed the foundation of the models, where; i. Historic data was used to validate the models; ii. iii. iv. Assumptions of future changes to system were considered; The validated models were then used to simulate the future; Alternate sensitivities were simulated based on initial observations from the Reference Case results. d) Load forecasts and future generation scenarios for tested years were based on the 2017 Long Term Outlook (LTO). The modelling assumptions and fleet composition for each scenario could be found within each presentation referenced in section 5.0 below. e) Future variable generation (wind/solar) profiles and simulations were based on 200 sites extrapolated to the future. The profiles were also based on 2014, 2015 and 2016 weather years extrapolated to the future. f) Operations and market practices/behaviour were based on historic observations and related rules. The models were validated by performing a historic backcast. Enter Footer Page 3 Public

4 3.0 Operations Findings: The study tested four operational metrics to determine the impact of increased NDV on the system. a b c d Metric Impact/expected changes to Control Performance Standard 2 (CPS2) violations. System Operating Limit (SOL) violation. (TOP-007-AB-0). Area Control Error (ACE) events. This is related to impact on interties and neighboring systems. Variable energy spill due to power management tool activations. Description To measure the10 minute ACE (Area Control Error Balancing authority MW imbalance) performance at or above the 90% of the time within required threshold. To measure the 30 minute or longer ACE performance benchmark and resultant SOL violation. i.e. to measure the SOL violation that exceeds the tie line Total Transfer Capability (TTC) for more than 30 minutes or longer. To measure the 30 minute or longer ACE performance benchmark. i.e. to measure when the intertie flow exceeds the schedule by more than the Transmission Reliability Margin (TRM) of 65MW for more than 30 minutes, but not exceeding TTC. Potential spill of variable energy due to using the AESO s wind power management tool (how often and how much). The details provided below indicate that in all cases, the operational impact of additional NDV was manageable with the fleet and current dispatch protocol. a) CPS 2-Measure the 10 minute Area Control Error (ACE) or balancing authority MW imbalance performance at or above the minimum requirement of 90%. Conclusion: the operational metric was not violated in any study scenario. The results for the Least Proactive 2 approach The results for the Middle Ground approach indicate The results for the Middle Ground approach indicate 2 Least Proactive- Persistence level wind forecast is assumed and the system controller dispatches the EMMO (in 10 minute intervals) to meet the ramp requirement at the end of two consecutive intervals (dispatch now, only to achieve the required ramp at the end of the next interval). Enter Footer Page 4 Public

5 indicate CPS2 of 93-94%. The Middle Ground 3 and Most Proactive 4 CPS2 results are between 95-98% and 96-99% respectively. CPS2 results of 95-98%. CPS2 results of 97-98%. Impact No issue. The system controller is able to manage NDV using existing dispatch for ramp practice with no CPS2 violations. No issue. The system controller is able to manage NDV using existing dispatch for ramp practice with no CPS2 violations. No issue. The system controller is able to manage NDV using existing dispatch for ramp practice with no CPS2 violations. b) SOL violation-measure the 30 minute or longer ACE performance benchmark and the resultant SOL violation. Conclusion: The impact in the scenarios was the same indicating no issues related to the SOL violations. The 1 st SOL violation under the Least Proactive approach with the BC tie line in service is in 2022 (3,045MW of wind). Same as Reference Case Same as Reference Case The Most Proactive approach would result in no SOL violations when the BC tie line is in service. Impact Any impacts related to SOL violations can be avoided by adopting a Proactive dispatch approach (as done today). Any impacts related to SOL violations can be avoided by adopting a Proactive dispatch approach (as done today). Any impacts related to SOL violations can be avoided by adopting a Proactive dispatch approach (as done today). 3 Middle Ground- A 50% split between persistence and continued variable ramp (persistent ramp) within the past 10 minutes and the EMMO is dispatched to meet the ramp requirement between the current and next interval (10 minute). 4 Most Proactive-The variable ramp observed in the last interval (10 minute) is expected to continue (persistent ramp) to the next interval and the EMMO is dispatched to meet the required ramp requirement at the end of the interval. Enter Footer Page 5 Public

6 This requires the system controller to dispatch the EMMO in order to meet the required ramp requirement rather than to meet demand levels (See dispatch for ramp section below for more details). This result in the system controller dispatching the EMMO in order to meet the required ramp requirement (See dispatch for ramp section below for more details). This result in the system controller dispatching the EMMO in order to meet the required ramp requirement (See dispatch for ramp section below for more details). c) Big ACE event-measure the 30 minute or longer ACE performance benchmark when the intertie flow exceeds the 65MW Transmission Reliability Margin for more than 30 Minutes. Conclusion: The impact in the scenarios was the same indicating no issues. The Least Proactive approach indicates up to 150 instances per year with increased variable generation. Same as Reference Case Same as Reference Case The most Proactive approach indicates less than 10 instances. Impact Most Big ACE events can be avoided by adopting a Proactive dispatch approach (as done today). Most Big ACE events can be avoided by adopting a Proactive dispatch approach (as done today). Most Big ACE events can be avoided by adopting a Proactive dispatch approach (as done today). This result in the system controller dispatching the EMMO in order to meet the required ramp rate (See dispatch for ramp section below for more details). This result in the system controller dispatching the EMMO in order to meet the required ramp rate (See dispatch for ramp section below for more details). This result in the system controller dispatching the EMMO in order to meet the required ramp rate (See dispatch for ramp section below for more details). d) Variable spill due to WPM-Potential variable energy spill due to the use of the AESOs existing Wind Power Management (WPM) process. The variable energy was limited only as a result of WPM due to increased wind ramp. (Less than 0.1% of wind generation is observed).. Conclusion: The impact in the scenarios was the same indicating no issues. Enter Footer Page 6 Public

7 Volume (MWh) increase when moving from a Least Proactive to Most Proactive approach. However, as a percentage of lost variable energy, it is less than 0.1% of the variable generation in all approaches. This is even less when considering non supply surplus periods. As a percentage of lost variable energy, it is less than 0.1% of the variable generation in all approaches. This is even less when considering non supply surplus periods. As a percentage of lost variable energy, it is less than 0.1% of the variable generation in all approaches. This is even less when considering non supply surplus periods. Impact No issue No issue No issue e) Dispatch for ramp: Measure the change in dispatch for ramp with the addition of more variable generation. Conclusion: It is observed that more proactive dispatch of the EMMO is required to meet the required ramp requirement as you move from the Reference Case to the High Cogeneration or High Coal to Gas Scenarios. This proactive dispatch protocol is standard for system control and allows for management of the system based on the merit order submissions. However, there may be market impacts associated with such a practice discussed below. As more variable resources are added to the fleet and the generation mix change over time, the system controller is able to meet the operational ramp needs by dispatching the EMMO as done at present, but at a relatively higher degree. It is also observed that with changes to the generation fleet, ramp capability due to more gas generation replacing coal generation, the relative degree of dispatch for ramp reduce over time. The overall dispatch variance increased by approximately 20-30% over the Reference Case. The increase was similar to the Reference Case until about Between 2024 and 2028, the High Coal to Gas scenario shows a 20%- 30% increase when compared to the Reference Case and between 2029 and 2030, the variance increases by 50%-80%. Impact No operational concerns. However, more frequent use of the EMMO to Additional volume and frequency of dispatch for ramp is observed this may Additional volume and frequency of dispatch for ramp is observed this may Enter Footer Page 7 Public

8 achieve the required ramp may have price fidelity and unit cycling impacts discussed under Market Findings below. lead to further price fidelity and unit cycling impacts discussed under Market Findings below. lead to further price fidelity and unit cycling impacts discussed under Market Findings below. Description and example of dispatch for ramp: In the example below, the model assumes a 10 minute dispatch interval. In reality, there are no set intervals for system controller dispatch and therefore, the dispatch volumes and frequency could be different but, directionally in line with the observations. i. The standard deviation of overall dispatch variance MWs for 2015 was approximately 255MWs.The Reference Case shows that this gradually increases to approximately 330MW by 2020 and then gradually decreases to 2015 levels thereafter and ends up around 200MW by ii. iii. The High Cogeneration scenario shows that the standard deviation of overall dispatch variance MWs reaches a high of approximately 390MW in 2020 and gradually decreases to approximately 265MW by The High Coal to Gas scenario shows that the standard deviation of overall dispatch variance MWs reaches a high of approximately 330MW in 2020 and gradually decreases until However, it shows an increasing trend during to about 355MW likely due to an expected timing delay to new Combined Cycle unit development. 3.0 Market Findings: The study tested thee market metrics to determine the impact of increased NDV on the system. Metric Description a Supply surplus/shortfall situations. To Identify impact of unit commitment on supply surplus and shortfall situations. b Merit order / market asset characteristics. To identify merit order characteristics under different generation mixes such as quantity of $0, Minimum Stable Generation (MSG) and ramp capability. c Unit cycling. Quantify cycling of different types of thermal generation units (CC, SC, CTG and coal for some years). Enter Footer Page 8 Public

9 While the overall system operations are not impacted, the market metrics indicate that there may be potential impacts on the market pricing and asset cycling that must be considered. The details below show the summary. a) Supply Surplus/Shortfall-Identify impact of unit commitment on supply surplus/shortfall situations. Conclusion: Supply surplus events are impacted by increased NDV and a function of the expected fleet. Supply surplus events are expected to change from historic levels (58 hours for ) in the Reference Case and both scenarios. Due to the higher level of must run requirements, the high Cogeneration Scenario indicate the highest instances of supply surplus events. Due to expected fewer $0 blocks, the high Coal to Gas Scenario indicates lower levels of surplus events. Intertie availability and market driven intertie export capability may assists in supply surplus situations. An increase in the number of supply surplus/shortfall hours are also observed because of the over/under commitment of units based on a 24 hour ahead wind forecast error. Supply surplus hours increase as more variable generation is added. The historical benchmark of supply surplus events was exceeded between 2025 and The intertie can have a significant role in managing net demand variability. In 2030 the number of surplus hours increased from 153 to 1,087 by removing the intertie. Unit commitment based on a 24 hour forecast of wind creates a small increase in supply surplus hours and increases the risk of supply shortfall. In 2030, surplus hours increased by approximately 80 hours because of wind forecast error. Compared to the Reference Case, the High Cogeneration scenario was less flexible and resulted in more supply surplus events. Compared to the Reference Case, supply surplus hours increased from 153/1,087 to 367/1,454 Similar to the Reference Case, the intertie can have a large role in managing net demand variability. In 2030 the number of surplus hours increased from 367 to 1,454 by removing the intertie. Similar to the Reference Case, unit commitment based on a 24 hour forecast of wind created a small increase in supply surplus hours and increased the risk of supply shortfall. In 2030, surplus hours increased by approximately 40 hours Compared to the Reference Case, the High Coal to Gas scenario had lower $0 energy and resulted in less supply surplus events (This is similar to the sensitivity on the Reference Case which found if future CC units offer lower volumes of energy at $0, supply surplus events will decrease). Compared to the Reference Case, supply surplus hours decreased from 153/1,087 to 34/439 Similar to the Reference Case, the intertie can have a large role in managing net demand variability. In 2030 the number of surplus hours increased from 34 to 439 by removing the intertie. Similar to the Reference Enter Footer Page 9 Public

10 because of wind forecast error. Case, unit commitment based on a 24 hour forecast of wind created a small increase in supply surplus hours and increased the risk of supply shortfall. In 2030, surplus hours increased by approximately 30 hours because of wind forecast error. Impact Adding more variable generation will lead to more supply surplus events. The future operation of the intertie will have a large impact on the amount of supply surplus events. Higher levels of must run generation will decrease system flexibility and increase supply surplus events. Generation with lower zero dollar blocks will decrease the amount of supply surplus. Long lead time generation will lead to more supply surplus and shortfall events given a 24 hour forecast error in net demand. b) Merit order/market asset characteristic-identify merit order characteristics under different generation mixes such as quantity of $0, Minimum Stable Generation (MSG) and ramp capability.; and accordingly how many MWs could be reduced during supply surplus events. Conclusion: There is some degree of flexibility within the system to manage supply surplus events since some $0 blocks can be reduced to Minimum Stable Generation (MSG) blocks. The generation mix for the Reference Case appears to indicate the highest (fleet) ramp capability, while the lowest fleet ramp capability is observed in the high cogeneration scenario fleet. Results show that there is some degree of flexibility within the system to manage supply surplus events since some $0 Results show that there is some degree of flexibility within the system to manage supply surplus events since some $0 blocks can be Results show that there is some degree of flexibility within the system to manage supply surplus events since some $0 Enter Footer Page 10 Public

11 blocks can be reduced to Minimum Stable Generation (MSG) blocks. Of the generation mixes tested, this mix has the fastest ramping capability. reduced to Minimum Stable Generation (MSG) blocks. This generation mix had a slower ramping capability compared to the Reference Case. blocks can be reduced to Minimum Stable Generation (MSG) blocks. This generation mix had a slower ramping capability compared to the Reference Case. Impact n/a A fleet with more must run generation has a slower ramp capability than one with combined cycle units. A fleet with more coal to gas generation has a slower ramp capability than one with combined cycle units. c) Unit Cycling-Quantify unit cycling for different technologies. Conclusion: Unit cycling (on/off) as well has cycling for net demand (load cycling) increased in all scenarios. The technology impacted, is directly related to the generation mix in each scenario. Further sensitivities were tested related to a range of startup costs (related to on/off cycling) ranging from $20,000 to $120,000 and showed that startup costs had an impact on unit cycling 5. On/off cycles for large commitment units (300MW and larger) could increase to approximately 15 to 90 cycles per year. Load cycling by technology is greatest for CC and SC units. On/off cycles for large commitment units (300MW and larger) is similar to the Reference Case but increases by approximately 20 cycles per unit in Load cycling by technology is similar to the Reference Case with coal to gas units cycling slightly more. On/off cycles for large commitment units (300MW and larger) is similar to the Reference Case but increases by approximately 5 cycles per unit in Load cycling by technology shows that coal to gas units would be required to cycle more often compared to the Reference Case. 5 Please note that a revised on/off cycling metric result was provided following the discovery of a computational error (only impacted the Reference Case). The revised results indicate that although the overall upward-sloping trend remains the same, the revised calculation shifts down estimates by between 1 and 10 starts per unit. This information was sent as an Errata. Enter Footer Page 11 Public

12 Impact An increase in the frequency of on/off cycling demonstrates that units may be required to turn off more often than the existing practice. A fleet with more must run generation requires the remaining generators to cycle more often. With a large amount of converted coal units, these converted units will be required to cycle more to support the increased NDV. An increase in the frequency of load cycling demonstrates that units will need to be able to be more responsive to changes in net demand. 4.0 Alternate Options: The above impacts are directly related to the assumed generation mix. Should the market design incent the development of faster moving technologies, the above market impacts may be reduced. Further, intertie availability may also have a market/operational impact. With the completion of the impact assessment, the mitigation scenarios will be evaluated including; No Change / current rules Rule changes (i.e., dispatch tolerance rules) New products (i.e., Introduction of a specific ramp product); Consideration of how real time price signals can incent flexibility; Need for changes / value to different unit commitment models (ex. SCUC). As noted in the qualitative markets assessment, it is noted that a unit commitment model may not be able to mitigate against forecast error; See separate document on mitigation options for further discussion. Enter Footer Page 12 Public

13 5.0 References: All detailed presentations related to the information contained in this document could be found at the following locations; Date Session Link June Final.pdf September FINAL.pptx Sep-29-clean.pdf Material includes updated modelling on NDV impact for reference case. October Draft-9-for-WG.pdf Material includes NDV impact assessment and appendix on fleet assumptions for reference case and high cogeneration scenario. October 25 9 Meeting materials will be posted following the WG meeting including the NDV impact assessment for CTG plus an Errata to the reference case. Material includes NDV impact assessment and appendix on fleet assumptions details for the CTG scenario. Enter Footer Page 13 Public

Market Mechanics Review of Net Demand Variability from the E&AS Design Stream Working Group Meeting 6&8

Market Mechanics Review of Net Demand Variability from the E&AS Design Stream Working Group Meeting 6&8 Market Mechanics Review of Net Demand Variability from the E&AS Design Stream Working Group Meeting 6&8 Impact of Net Demand Variability Reference Case and High Cogen scenario Background Dispatching to

More information

Technologies to Enable Wind Power Integration. John Kehler Technical Lead System Performance

Technologies to Enable Wind Power Integration. John Kehler Technical Lead System Performance Technologies to Enable Wind Power Integration John Kehler Technical Lead System Performance Presentation Outline The AESO Overview of Wind Development in Alberta Technologies Wind Power Forecasting System

More information

Reliability Modeling: Demand, Outage, Intermittent Generation, & Import

Reliability Modeling: Demand, Outage, Intermittent Generation, & Import Reliability Modeling: Demand, Outage, Intermittent Generation, & Import Adequacy and Demand Curve Workgroup November 15, 2017 Draft for Discussion Outline Reliability modeling updates Question to WG Members:

More information

2017 Long-term Outlook. Information Session July 25, 2017

2017 Long-term Outlook. Information Session July 25, 2017 2017 Long-term Outlook Information Session July 25, 2017 0 Welcome Overview of 2017 Long-term Outlook (2017 LTO) Questions will be answered at the end of the presentation Please use microphone when asking

More information

Energy Market Mitigation Completed Proposal and Supporting Data. EAS WG Meeting April 5, 2018

Energy Market Mitigation Completed Proposal and Supporting Data. EAS WG Meeting April 5, 2018 Energy Market Mitigation Completed Proposal and Supporting Data EAS WG Meeting April 5, 2018 Agenda Market context Purpose of mitigation and design trade-offs Review of CMD1 proposal elements Issues for

More information

Alberta Capacity Market

Alberta Capacity Market Alberta Capacity Market Comprehensive Market Design (CMD 1) Design Proposal Document Section 1: Overview of the Alberta Capacity Market Prepared by: Alberta Electric System Operator Date: January 26, 2018

More information

Capacity Market Technical Design Stakeholder Update Session

Capacity Market Technical Design Stakeholder Update Session Capacity Market Technical Design Stakeholder Update Session Straw Alberta Market (SAM 3.0) Dec. 11, 2017 Session outline Time Agenda Item 1:30 1:35 p.m. Welcome and session overview: Matt Gray, AESO 1:35

More information

Summary of Integrated Capacity and Energy Revenue Modelling

Summary of Integrated Capacity and Energy Revenue Modelling Summary of Integrated Capacity and Energy Revenue Modelling Prepared by: Alberta Electric System Operator Date: January 26, 2018 Public Table of Contents 1. Summary of Integrated Capacity and Energy Revenue

More information

California Independent System Operator (CAISO) Challenges and Solutions

California Independent System Operator (CAISO) Challenges and Solutions California Independent System Operator (CAISO) Challenges and Solutions Presented by Jim Hiebert EMS Power Technology Engineer Lead California ISO by the numbers 65,225 MW of power plant capacity 50,270

More information

Phase Two Wind Integration

Phase Two Wind Integration Phase Two Wind Integration RECOMMENDATION PAPER Kelly Gunsch, Vice-President, Market Services Date: December 20, 2012 Prepared by: Mariya Goloshchapova, Wind Integration Intern cc: Jacques Duchesne, Wind

More information

Briefing on intertie deviation settlement proposal

Briefing on intertie deviation settlement proposal Briefing on intertie deviation settlement proposal Brad Cooper Manager, Market Design Policy EIM Governing Body Meeting General Session January 24, 2019 Management proposes to revise the intertie transaction

More information

ERCOT Public LTRA Probabilistic Reliability Assessment. Final Report

ERCOT Public LTRA Probabilistic Reliability Assessment. Final Report ERCOT Public 2016 LTRA Probabilistic Reliability Assessment Final Report November 21, 2016 Contents Summary... 1 Software Model Description... 3 Demand Modeling... 3 Controllable Capacity Demand Response

More information

Alberta Capacity Market

Alberta Capacity Market Alberta Capacity Market Comprehensive Market Design (CMD 1) Design Proposal Document Section 3: Calculation of Capacity Market Demand Parameters Prepared by: Alberta Electric System Operator Date: January

More information

Decision on intertie deviation settlement proposal

Decision on intertie deviation settlement proposal Decision on intertie deviation settlement proposal Brad Cooper Manager, Market Design Policy Board of Governors Meeting General Session February 7, 2019 Management proposes to revise the intertie nondelivery

More information

4 Calculation of Demand Curve Parameters

4 Calculation of Demand Curve Parameters 4 Calculation of Demand Curve Parameters This section addresses the demand curve for the Alberta capacity market, including the calculations for the components of the demand curve. 4.1 Resource adequacy

More information

Dispatching Variable Generation Resources

Dispatching Variable Generation Resources Dispatching Variable Generation Resources A Discussion Paper for Stakeholder Engagement 91 (Renewable Integration) Table of Contents Introduction... 3 IESO Dispatch Processes... 5 Registration... 5 Dispatch

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination of Ancillary Service Standards... 4 8.2.2 Time-Frame for Revising Ancillary Service

More information

Flexible Ramping Products

Flexible Ramping Products Flexible Ramping Products Revised Draft Final Proposal August 16, 2012 Lin Xu, Ph.D. Senior Market Development Engineer Don Tretheway Senior Market Design and Policy Specialist Agenda Time Topic Presenter

More information

Flexible Ramping Products Straw Proposal Incorporating FMM and EIM

Flexible Ramping Products Straw Proposal Incorporating FMM and EIM Flexible Ramping Products Straw Proposal Incorporating FMM and EIM Lin Xu, Ph.D. Lead Market Development Engineer Don Tretheway Lead Market Design and Policy Specialist August 20, 2014 Agenda Time Topic

More information

Refinement to Comparison between sequential selection and co-optimization between energy and ancillary service markets

Refinement to Comparison between sequential selection and co-optimization between energy and ancillary service markets Refinement to Comparison between sequential selection and co-optimization between energy and ancillary service markets Date: Wednesday, January 10, 2018 Draft for discussion Click here to enter names of

More information

SAM 3.0 Stakeholder Comment Matrix

SAM 3.0 Stakeholder Comment Matrix SAM 3.0 Stakeholder Comment Matrix The AESO welcomes stakeholder input on the working group provisional recommendations and discussion context contained in Section 5 of SAM 3.0. Please review the following

More information

Electricity System Modelling (Generation)

Electricity System Modelling (Generation) [2016 IEAGHG CCS Summer School] Electricity System Modelling (Generation) Doug Opseth, Director Supply Planning and Integration July 17, 2017 What we ll talk about today Why do we need to plan? What are

More information

Regulation Energy Management Draft Final Proposal

Regulation Energy Management Draft Final Proposal Regulation Energy Management Draft Final Proposal January 13, 2011 Renewable Integration: Market and Product Review Phase 1 Regulation Energy Management (REM) Revised Draft Final Proposal Table of Contents

More information

Date of Request for Comment: April 7, 2017 Period of Comment: April 7, 2017 through May 5, 2017

Date of Request for Comment: April 7, 2017 Period of Comment: April 7, 2017 through May 5, 2017 Market Participant Comments and AESO Replies Matrix Proposed Amended Section 304.3, Wind and Solar Power Ramp Up Management ( amended Section 304.3 ) Date of Request for Comment: April 7, 2017 Period of

More information

Eligible Intermittent Resource Dispatch Operating Target EIR DOT

Eligible Intermittent Resource Dispatch Operating Target EIR DOT Eligible Intermittent Resource Dispatch Operating Target EIR DOT CSSA Training August 2018 Stakeholder Learning Objectives Explain the difference between an Operating Instruction and a Dispatch Instruction

More information

Dispatch Variance Notification

Dispatch Variance Notification Dispatch Variance Notification Functionality and Registration Guideline Effective Date: January 25, 2018 Prepared by: ISO Rules Compliance Prepared for: Market Participants Version: Version 3.4 Public

More information

Comparison between sequential selection and co-optimization between energy and ancillary service markets

Comparison between sequential selection and co-optimization between energy and ancillary service markets Comparison between sequential selection and co-optimization between energy and ancillary service markets Date: Tuesday, November 7, 2017 Draft for discussion Click here to enter names of people copied

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents California Independent System Operator Corporation 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination Of Ancillary Service Standards...

More information

Calculation of Demand Curve Parameters

Calculation of Demand Curve Parameters Calculation of Demand Curve Parameters Rationale 4.1 Resource adequacy standard 4.1.1 The resource adequacy standard announced by the Government of Alberta prescribes a minimum level of reliability as

More information

SAM 3.0 Stakeholder Comment Matrix

SAM 3.0 Stakeholder Comment Matrix SAM 3.0 Stakeholder Comment Matrix The AESO welcomes stakeholder input on the working group provisional recommendations and discussion context contained in Section 5 of SAM 3.0. Please review the following

More information

California ISO Preparing California for a Greener and Smarter Grid

California ISO Preparing California for a Greener and Smarter Grid California ISO Preparing California for a Greener and Smarter Grid Presented by Jim McIntosh Director Operations Executive Advisor California ISO Agenda CAISO Overview Current & Future Challenges Renewables

More information

SAM 3.0 Stakeholder Comment Matrix

SAM 3.0 Stakeholder Comment Matrix SAM 3.0 Stakeholder Comment Matrix The AESO welcomes stakeholder input on the working group provisional recommendations and discussion context contained in Section 5 of SAM 3.0. Please review the following

More information

Congestion Cost Metrics

Congestion Cost Metrics Congestion Cost Metrics DRAFT One of the features of a locational marginal price (LMP) based market is the ability to identify grid locations that are difficult to serve with economic generation due to

More information

Resource Adequacy Modeling update. Technical Workgroup #4 June 14, 2018 AESO External

Resource Adequacy Modeling update. Technical Workgroup #4 June 14, 2018 AESO External Resource Adequacy Modeling update Technical Workgroup #4 June 14, 2018 Demand Curve Workgroup Objective: AESO Resource Adequacy Model Through the WG process, AESO seeks workgroup members review and feedback

More information

Alberta Capacity Market

Alberta Capacity Market Alberta Capacity Market Comprehensive Market Design (CMD 1) Design Rationale Document Section 3: Calculation of Capacity Market Demand Parameters Prepared by: Alberta Electric System Operator Date: January

More information

California ISO. Q Report on Market Issues and Performance. February 10, Prepared by: Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. February 10, Prepared by: Department of Market Monitoring California Independent System Operator Corporation California ISO Q4 2013 Report on Market Issues and Performance February 10, 2014 Prepared by: Department of Market Monitoring Department of Market Monitoring

More information

2. Market Operations Overview

2. Market Operations Overview 2. Market Operations Overview 2.5 Market Information This section summarizes and describes the common information that is used by the Day-Ahead and Real-Time processes. 2.5.1 Resource Static Data Static

More information

EIM Settlements Load Customer Training September 13, 2016

EIM Settlements Load Customer Training September 13, 2016 EIM Settlements Load Customer Training September 13, 2016 EIM Settlements Customer Training Review EIM 101 EIM terminology Participating / Non-Participating Base Schedules and etags Settlements and Disputes

More information

Comparison of 15 minute Settlement Interval, hourly settlement interval and Payments to Suppliers on the Margin (PSM) Impacts

Comparison of 15 minute Settlement Interval, hourly settlement interval and Payments to Suppliers on the Margin (PSM) Impacts Shorter settlement interval improves the price fidelity of the settlement price as energy is paid at a price closer to the market value of the energy at the time when it is produced. In the case of 15

More information

Alberta Electric Energy 2006 Market Study

Alberta Electric Energy 2006 Market Study Alberta Electric Energy 2006 Market Study Getting Load to Say No EDC Associates Ltd. Annual Study Introduction 1 Introduction CHAPTER KEY 1. Introduction 2. Executive Summary 3. Macro Economics 4. Electric

More information

Energy Storage Integration in Alberta s Energy Only Market. Kevin Dawson Director, Market Design Alberta Electric System Operator

Energy Storage Integration in Alberta s Energy Only Market. Kevin Dawson Director, Market Design Alberta Electric System Operator Energy Storage Integration in Alberta s Energy Only Market Kevin Dawson Director, Market Design Alberta Electric System Operator Outline The AESO and Alberta s Wholesale Electricity Market About the AESO

More information

Technical Bulletin Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations

Technical Bulletin Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations Technical Bulletin 2009-06-03 Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations June 15, 2009 Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations

More information

SAM 3.0 Stakeholder Comment Matrix

SAM 3.0 Stakeholder Comment Matrix SAM 3.0 Stakeholder Comment Matrix The AESO welcomes stakeholder input on the working group provisional recommendations and discussion context contained in Section 5 of SAM 3.0. Please review the following

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION California Independent System ) Docket Nos. ER12-1630 Operator Corporation ) ER14-971 Informational Report of the California Independent System

More information

Energy Imbalance Market Design Straw Proposal and Issue Paper. Stakeholder Meeting April 11, 2013

Energy Imbalance Market Design Straw Proposal and Issue Paper. Stakeholder Meeting April 11, 2013 Energy Imbalance Market Design Straw Proposal and Issue Paper Stakeholder Meeting April 11, 2013 Agenda Time Topic Presenter 10:00 10:10 Introduction Mercy Parker-Helget 10:10 10:45 Opening Remarks Don

More information

FERC Order 764 Settlements

FERC Order 764 Settlements FERC Order 764 Settlements Spring Release 2014 The information contained in these materials is provided for general information only and does not constitute legal or regulatory advice. The ultimate responsibility

More information

MAY 1, Variable Generation Integration Costs

MAY 1, Variable Generation Integration Costs MAY 1, 2014 Variable Generation Integration Costs Executive Summary The addition of variable generation (wind and solar) to the electrical system introduces additional costs associated with unit dispatch

More information

Economics & Markets: Capacity Markets (Presentation to the CIAC) April 17 th, 2018

Economics & Markets: Capacity Markets (Presentation to the CIAC) April 17 th, 2018 Economics & Markets: Capacity Markets (Presentation to the CIAC) April 17 th, 2018 The information contained in this document is for information purposes only, and the AESO is not responsible for any errors

More information

Flexible Ramping Product Cost Allocation Straw Proposal

Flexible Ramping Product Cost Allocation Straw Proposal Flexible Ramping Product Cost Allocation Straw Proposal March 15, 2012 Flexible Ramping Product Cost Allocation Straw Proposal Table of Contents 1 Introduction... 3 2 Prior discussion on Flexible Ramping

More information

Supporting Documentation for Volume 1, Chapter 11. Table 12-1 Definition of key ancillary services

Supporting Documentation for Volume 1, Chapter 11. Table 12-1 Definition of key ancillary services Supporting Documentation for Volume 1, Chapter 11 Ancillary Service Modeling Ancillary services provide fast and flexible response to keep the supply system in balance. There are two major components to

More information

Wind Update. Renewable Energy Integration Lessons Learned. March 28, 2012

Wind Update. Renewable Energy Integration Lessons Learned. March 28, 2012 Wind Update Renewable Energy Integration Lessons Learned March 28, 212 Contents Summary Review of Historical Wind Growth and Output Impact of Wind on Operations Wind Curtailments Dispatchable Intermittent

More information

Flexible Ramping Products and Cost Allocation

Flexible Ramping Products and Cost Allocation Flexible Ramping Products and Cost Allocation Revised Straw Proposal, December 5, 2011 Lin Xu, Ph.D. Senior Market Development Engineer and Donald Tretheway Senior Market Design and Policy Specialist Agenda

More information

CARIS Procedure Development and Simulation Model Evaluation

CARIS Procedure Development and Simulation Model Evaluation CARIS Procedure Development and Simulation Model Evaluation Bill Lamanna Manager Long Term Planning New York Independent System Operator ESPWG Meeting NYISO September 16, 2009 Draft 1 for discussion only

More information

Assessment of Load Shed Service for Import (LSSi) Product

Assessment of Load Shed Service for Import (LSSi) Product Assessment of Load Shed Service for Import (LSSi) Product Date: March 27, 2014 Prepared by: Prepared for: Mike Law Jenny Chen Senior Market Design Specialist Vice President, Market Services Table of Contents

More information

AESO TRANSMISSION PLANNING CRITERIA BASIS AND ASSUMPTIONS

AESO TRANSMISSION PLANNING CRITERIA BASIS AND ASSUMPTIONS APPENDIX G AESO TRANSMISSION PLANNING CRITERIA BASIS AND ASSUMPTIONS Transmission Planning Criteria - Basis and Assumptions Version 1.0 1. Introduction This document presents the reliability standards,

More information

Day-Ahead Market Enhancements Phase 1: Fifteen-Minute Granularity. Second Revised Straw Proposal

Day-Ahead Market Enhancements Phase 1: Fifteen-Minute Granularity. Second Revised Straw Proposal Day-Ahead Market Enhancements Phase 1: Fifteen-Minute Granularity August 27, 2018 Intentionally left blank D.Tretheway, M.Poage, E.Nethercutt Page 2 August 27, 2018 Day-Ahead Market Enhancements Phase

More information

Alberta Capacity Market Information Session

Alberta Capacity Market Information Session Alberta Capacity Market Information Session November 1, 2018 Public Approach for today The content for today represents the common themes stakeholders requested additional information on during the last

More information

Summary of 2016 MISO State of the Market Report

Summary of 2016 MISO State of the Market Report Summary of 2016 MISO State of the Market Report Presented to: MISO Board Markets Committee David B. Patton, Ph.D. MISO Independent Market Monitor July 20, 2017 Introduction As the Independent Market Monitor

More information

New Brunswick Electricity Business Rules. Chapter 3 Reliable Operations

New Brunswick Electricity Business Rules. Chapter 3 Reliable Operations New Brunswick Electricity Business Rules Chapter 3 Reliable Operations TABLE OF CONTENTS CHAPTER 3 RELIABLE OPERATIONS... 2 3.0 System Operator Roles and Responsibilities... 2 3.1 Reliability Assessments...

More information

EIM Resource Sufficiency Evaluation

EIM Resource Sufficiency Evaluation EIM Resource Sufficiency Evaluation Megan Poage & Don Tretheway Market Design Policy Stakeholder Call September 26, 2018 ISO proposes resource sufficiency evaluation improvements in response to stakeholder

More information

Calculation of Demand Curve Parameters

Calculation of Demand Curve Parameters Calculation of Demand Curve Parameters Rationale 4.1 Resource adequacy standard 4.1.1 The resource adequacy standard announced by the Government of Alberta prescribes the minimum level of reliability to

More information

Stepped Constraint Parameters. Issue Paper

Stepped Constraint Parameters. Issue Paper Stepped Constraint Parameters May 5, 2016 Table of Contents 1. Introduction... 3 2. Plan for Stakeholder Engagement... 4 3. Transmission constraint relaxation parameter... 5 4. Shift factor effectiveness

More information

AESO System Operating Limits Methodology for the Planning Horizon (R1 FAC-010-AB-2.1)

AESO System Operating Limits Methodology for the Planning Horizon (R1 FAC-010-AB-2.1) (R1 FAC-010-AB-2.1) 1 Purpose This document sets out the System Operating Limits Methodology the Alberta Electric System Operator ( AESO ) uses for any studies conducted on the interconnected electric

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 34. Real-Time Market... 3 34.1 Inputs To The Real-Time Market... 3 34.1.1 Day-Ahead Market Results as Inputs to the Real-Time Market... 3 34.1.2 Market Model and System Information...

More information

Description of Current Draft: This is the first draft of the proposed standard posted for stakeholders comment.

Description of Current Draft: This is the first draft of the proposed standard posted for stakeholders comment. Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:

More information

Executive summary. Value of Smart Power Generation for utilities in Australia. A white paper by Wärtsilä and Roam Consulting

Executive summary. Value of Smart Power Generation for utilities in Australia. A white paper by Wärtsilä and Roam Consulting Value of Smart Power Generation for utilities in Australia A white paper by Wärtsilä and Roam Consulting Executive summary This study analyses the potential of Smart Power Generation () power plants in

More information

Information Document Regulating Reserve ID # R

Information Document Regulating Reserve ID # R Information Documents are not authoritative. Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between an Information Document

More information

2017 IRP Advisory Group. July 21, 2017 IRPAG

2017 IRP Advisory Group. July 21, 2017 IRPAG 2017 IRP Advisory Group Today s Agenda 2 General Rate Case Caution Need to avoid the possibility of unintentionally violating ex-parte communication rules Please refrain from bringing up any rate case

More information

Alberta Intertie Restoration Initiative Discussion Paper

Alberta Intertie Restoration Initiative Discussion Paper Alberta Intertie Restoration Initiative Discussion Paper March 25, 2010 Table of Contents 1.0 Executive Summary... 2 2.0 Intertie Capacity Restoration Policy Background... 3 2.1 Obligation to Restore Intertie

More information

California Independent System Operator Corporation Fifth Replacement Tariff

California Independent System Operator Corporation Fifth Replacement Tariff Table of Contents Method to Assess Available Transfer Capability... 2 L.1 Description of Terms... 2 L.1.1 Available Transfer Capability (ATC)... 2 L.1.2 Total Transfer Capability (TTC)... 2 L.1.3 Existing

More information

California Independent System Operator Corporation Fifth Replacement Tariff

California Independent System Operator Corporation Fifth Replacement Tariff Table of Contents Method to Assess Available Transfer Capability... 2 L.1 Description of Terms... 2 L.1.1 Available Transfer Capability (ATC)... 2 L.1.2 Total Transfer Capability (TTC)... 2 L.1.3 Existing

More information

Solutions for Power Generation

Solutions for Power Generation EM SG SOLutions Solutions for Power Generation Energy Management Smart Grid Solutions Solutions for Power Generation Overview Power Applications Generation Planning and Trading Summary Page 2 Solutions

More information

PJM Renewable Integration Study. Ken Schuyler Renewable Energy in West Virginia June 5, 2014

PJM Renewable Integration Study. Ken Schuyler Renewable Energy in West Virginia June 5, 2014 PJM Renewable Integration Study Ken Schuyler Renewable Energy in West Virginia June 5, 2014 PJM as Part of the Eastern Interconnection 27% of generation in Eastern Interconnection 28% of load in Eastern

More information

California ISO Energy Imbalance Market Operations Overview. June 10, 2014 Webinar

California ISO Energy Imbalance Market Operations Overview. June 10, 2014 Webinar California ISO Energy Imbalance Market Operations Overview June 10, 2014 Webinar Objectives 1. EIM Overview 2. CAISO s process in mitigating Unscheduled Flow (USF) 3. WebSAS tool: how dynamic and pseudo

More information

Energy Imbalance Market Year 1 Enhancements

Energy Imbalance Market Year 1 Enhancements Energy Imbalance Market Year 1 Enhancements Don Tretheway Lead Market Design and Regulatory Policy Developer February 18, 2015 Agenda Time Topic Presenter 10:00 10:15 Introduction Kristina Osborne 10:15

More information

Reliability and the Future of the Electricity Grid: A North American Bulk Power System Perspective

Reliability and the Future of the Electricity Grid: A North American Bulk Power System Perspective Reliability and the Future of the Electricity Grid: A North American Bulk Power System Perspective Mark Lauby, Senior Vice President and Chief Reliability Officer North American Electric Reliability Corporation

More information

Chapter 3: The Scheduling & Chapter 4: The Scheduling and Dispatch Process

Chapter 3: The Scheduling & Chapter 4: The Scheduling and Dispatch Process Chapter 3: The Scheduling & Chapter 4: The Scheduling and Dispatch Process 1 Foreword Our scheduling and dispatch process incorporates a range of activities associated with managing the close to real-time

More information

Connection Study Requirements

Connection Study Requirements Document Release Released: September 20, 2010 The Customer shall comply with all the applicable requirements in this document when performing connection studies to produce the engineering study report.

More information

Recommended Values for I-SEM Scheduling and Dispatch Parameters

Recommended Values for I-SEM Scheduling and Dispatch Parameters Recommended Values for I-SEM Scheduling and Dispatch Parameters Report to the Regulatory Authorities Version 1.0 10/05/2017 2017 EirGrid plc. Contents 1. SEM Committee Policy and Trading & Settlement Code

More information

Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid

Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid Greening the Grid Andhra Pradesh Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid State-specific results from Volume II, which includes all of India. The full reports

More information

Extended Short-Term Unit Commitment. Issue Paper/Straw Proposal

Extended Short-Term Unit Commitment. Issue Paper/Straw Proposal Extended Short-Term Unit Commitment May 15, 2018 Intentionally left blank CAISO/MDP/M.Poage & B.Dean Page 2 May 15, 2018 Extended STUC Issue Paper & Straw Proposal Table of Contents 1. Purpose... 4 1.1.

More information

APPENDIX B. Provost to Edgerton and Nilrem to Vermilion Transmission Reinforcement Long-term Outlook Load and Generation Forecasts

APPENDIX B. Provost to Edgerton and Nilrem to Vermilion Transmission Reinforcement Long-term Outlook Load and Generation Forecasts APPENDIX B Provost to Edgerton and Nilrem to Vermilion Transmission Reinforcement 2016 Long-term Outlook Load and Generation 1 Introduction 1.1 Load and generation forecasts are an essential input to the

More information

ELECTRICITY TRADE AGREEMENT. An Assessment of the Ontario-Quebec Electricity Trade Agreement

ELECTRICITY TRADE AGREEMENT. An Assessment of the Ontario-Quebec Electricity Trade Agreement ELECTRICITY TRADE AGREEMENT An Assessment of the Ontario-Quebec Electricity Trade Agreement Spring 2018 About this Document Established by the Financial Accountability Officer Act, 2013, the Financial

More information

Most Severe Single Contingency (MSSC) Impacts on Alberta Balancing Authority Area Operation. Observations and Information Sharing

Most Severe Single Contingency (MSSC) Impacts on Alberta Balancing Authority Area Operation. Observations and Information Sharing Most Severe Single Contingency (MSSC) Impacts on Alberta Balancing Authority Area Operation Observations and Information Sharing Date: June, 2015 Prepared by: AESO Table of Contents Executive Summary...

More information

From: Keith Casey, Vice President, Market and Infrastructure Development

From: Keith Casey, Vice President, Market and Infrastructure Development California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market and Infrastructure Development Date: August 18, 2011 Re: Briefing on Renewable

More information

Flexible Ramping Products

Flexible Ramping Products Flexible Ramping Products Incorporating FMM and EIM Draft Final Proposal Lin Xu, Ph.D. Market Analysis and Development and Donald Tretheway Market and Infrastructure Policy December 4, 2014 CAISO/MA&D/LXU/MIP/DGT

More information

ITP Year 20 Assessment Scope

ITP Year 20 Assessment Scope ITP 20 Year Scope 1 ITP Year 20 Assessment Scope January 6, 2010 Approved by TWG January 5, 2010 Endsored by ESWG January 5, 2010 Table of Contents Overview... 4 Objective... 4 Modeling... 5 1. Economic...

More information

Flexibility in the Swiss Electricity Markets. Jan Abrell Energieforschungsgespräche Disentis 2019,

Flexibility in the Swiss Electricity Markets. Jan Abrell Energieforschungsgespräche Disentis 2019, Flexibility in the Swiss Electricity Markets Jan Abrell Energieforschungsgespräche Disentis 2019, 24.01.2019 Motivation Share of renewable energy sources in electricity supply is increasing Wind and solar

More information

National Council on Electricity Policy Annual Meeting & Workshop Denver, CO. May 8, Jeff Bladen Executive Director Market Development

National Council on Electricity Policy Annual Meeting & Workshop Denver, CO. May 8, Jeff Bladen Executive Director Market Development National Council on Electricity Policy Annual Meeting & Workshop Denver, CO May 8, 2018 Jeff Bladen Executive Director Market Development Assessing the Challenge MISO region is undergoing rapid and substantial

More information

Draft 2011 Long-term Transmission Plan. Stakeholder Session June 20, 2011

Draft 2011 Long-term Transmission Plan. Stakeholder Session June 20, 2011 Draft 2011 Long-term Transmission Plan Stakeholder Session June 20, 2011 Agenda Highlights of draft 2011 Long-term Transmission Plan Discussion of project costs and rate impact Impact of transmission constraints

More information

MOD-001-1a Available Transfer Capability Implementation Document

MOD-001-1a Available Transfer Capability Implementation Document Available Transfer Capability Implementation Document For NERC MOD-001-2a Page 1 of 18 1.0 Purpose The California Independent System Operator Corporation (ISO), as a Transmission Service Provider 1 and

More information

Self-Schedules Bid Cost Recovery Allocation and Lower Bid Floor

Self-Schedules Bid Cost Recovery Allocation and Lower Bid Floor Summary Self-Schedules Bid Cost Recovery Allocation and Lower Bid Floor Draft Final Proposal Comments by Department of Market Monitoring August 23, 2016 The ISO proposal to lower the energy bid floor from

More information

Capacity reserves until 2025: declining, but sufficient

Capacity reserves until 2025: declining, but sufficient 1 Capacity reserves until 2025: declining, but sufficient Trends from ENTSO-E s Scenario Outlook & Adequacy Forecast 2015 Once a year, ENTSO-E 1 publishes a Scenario Outlook & Adequacy Forecast (SO&AF).

More information

California ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring California Independent System Operator Corporation California ISO Q1 2017 Report on Market Issues and Performance July 10, 2017 Prepared by: Department of Market Monitoring TABLE OF CONTENTS Executive

More information

Stakeholder Comments Template. Subject: SCE Comments on Dynamic Transfer Revised Final Draft 2/18/11

Stakeholder Comments Template. Subject: SCE Comments on Dynamic Transfer Revised Final Draft 2/18/11 Stakeholder Comments Template Subject: SCE Comments on Dynamic Transfer Revised Final Draft 2/18/11 Submitted by Company Date Submitted Rich Mettling 626.302.9712 rich.mettling@sce.com SCE Mar 15, 2011

More information

Stakeholder Meeting on Supplement to Dynamic Transfers Straw Proposal

Stakeholder Meeting on Supplement to Dynamic Transfers Straw Proposal Stakeholder Meeting on Supplement to Dynamic Transfers Straw Proposal May 6, 2010 11:00 AM 4:00 PM, California ISO Presenters: Mark Rothleder Jim Price Kyle Hoffman Don Tretheway Agenda Time Topic Presenter

More information

Analysis of Potential Impacts of CO 2 Emissions Limits on Electric Power Costs in the ERCOT Region

Analysis of Potential Impacts of CO 2 Emissions Limits on Electric Power Costs in the ERCOT Region Analysis of Potential Impacts of CO 2 Emissions Limits on Electric Power Costs in the ERCOT Region May 12, 29 29 Electric Reliability Council of Texas, Inc. Table of Contents Executive Summary... 1 1.

More information

Transmission Constraint Relaxation Parameter Revision ISO Straw Proposal

Transmission Constraint Relaxation Parameter Revision ISO Straw Proposal Transmission Constraint Relaxation Parameter Revision ISO Straw Proposal October 18, 2012 Prepared by: Market and Infrastructure Development Version: 1.0 California Independent System Operator Contents

More information

Integrating Wind Generation into the Grid -- A Primer

Integrating Wind Generation into the Grid -- A Primer Integrating Wind Generation into the Grid -- A Primer Authors: Rich Lauckhart, with Steve Balser, Jeffrey R. Dykstra, Ryan Pletka, Tim Mason, Ric O Connell, Dennis Noll, Roger Schiffman, Mark Griffith,

More information

January 3, 2018 MEMORANDUM. Council Members. John Ollis, Power System Analyst. SUBJECT: Marginal Carbon Emissions Rate Study Draft BACKGROUND:

January 3, 2018 MEMORANDUM. Council Members. John Ollis, Power System Analyst. SUBJECT: Marginal Carbon Emissions Rate Study Draft BACKGROUND: Henry Lorenzen Chair Oregon Bill Bradbury Oregon Guy Norman Washington Tom Karier Washington W. Bill Booth Vice Chair Idaho James Yost Idaho Jennifer Anders Montana Tim Baker Montana January 3, 2018 MEMORANDUM

More information