Assignment 10 (Solution) Six Sigma in Supply Chain, Taguchi Method and Robust Design

Size: px
Start display at page:

Download "Assignment 10 (Solution) Six Sigma in Supply Chain, Taguchi Method and Robust Design"

Transcription

1 Assignment 10 (Solution) Six Sigma in Supply Chain, Taguchi Method and Robust Design Dr. Jitesh J. Thakkar Department of Industrial and Systems Engineering Indian Institute of Technology Kharagpur

2 Instruction Total No. of Questions: 15. Each question carries one point. All questions are objective type. In some of the questions, more than one answers are correct. This assignment includes true/false statement questions.

3 Question 1 Birla Tyres purchases rims from DEL Ltd. an external supplier. DEL Ltd. takes 10 days in manufacturing and delivering an order. Birla Tyres requires 10,000 units of rims annually. Its ordering cost is Rs 60, per order and its carrying costs are Rs per unit per year. The maximum usage per day could be 50 per day. What will be reorder level and safety stock? a) 274 and 400 respectively b) 226 and 500 respectively c) 400 and 274 respectively d) 500 and 226 respectively

4 Solution 1 Answer: d (500 and 226) EOQ = Sqrt (2 Annual Demand Ordering cost per unit/carrying cost per unit) Maximum daily usage is 50 units and average daily usage is 27.4 (10,000 annual demand 365 days). Safety Stock = (Maximum daily usage average daily usage) Lead Time = ( ) 10 = 226 units. Reorder Level = Safety Stock + Average Daily Usage Lead Time Reorder Level = 226 units units 10 = 500 units.

5 Question 2 A Design of an experiment is too sensitive. What will the designer will do to plan for the unexpected? a) Best case scenario b) Optimal case scenario c) Worst case scenario d) None of these

6 Solution 2 Answer: c (Worst case scenario) A worst-case scenario is a concept in robust design wherein the planner, in planning for potential disasters, considers the most severe possible outcome that can reasonably be projected to occur in a given situation.

7 Question 3 Taguchi s robust design uses certain data which are as follows 12, 15, 18, 20, 22, 27, 32, 38, 40, 46, 53, and 57. What will be the SN ratio for the design process? a) b) c) d)

8 Answer: b (2.0944) Solution 3 Mean = μ = x 1+x 2. +x = = The standard deviation is given by σ = 1 1 n i=1 = n 1 (x i μ) 2 12 (x 12 1 i=1 i ) 2 = Signal to noise ratio = μ σ = =

9 Question 4 Indian Cricket Association runs a mail-order business for cricket kit equipment. Annual demand for cricket bat is The annual holding cost per unit is Rs and the cost to place an order is Rs What will be economic order quantity? a) 600 b) 700 c) 800 d) 900

10 Answer: c (800) Best quantity to order for maximum profit is the Economic Order Quantity (EOQ) To calculate EOQ the following formula is used. EOQ = 2DC p Where D = Annual Demand Cp = Cost to place a single order C h = Cost to hold one unit inventory for a year EOQ = Solution 4 C h 2DC p = C h 150 = 800 units

11 Question 5 Which of the following is a 4-level array in the Taguchi s Orthogonal Array Table? a) L 4 (2 3 ) b) L 27 (3 13 ) c) L 25 (5 6 ) d) L 16 (4 5 )

12 Solution 5 Answer: d (L 16 (4 5 )) Taguchi s OA-based Experimental Design Matrix Notation L N (2 k ) Number of Factors Total Number of Runs Number of Levels per Factor

13 Question 6 A push/pull view of the supply chain categorizes processes based on whether they are initiated in response to a customer order (pull) or in anticipation of a customer order (push). This view is very useful when considering strategic decisions relating to supply chain design. a) True b) False

14 Solution 6 Answer: a (True) A push/pull view of the supply chain categorizes processes based on whether they are initiated in response to a customer order (pull) or in anticipation of a customer order (push). This view is very useful when considering strategic decisions relating to supply chain design.

15 Question 7 For a sample of data given below what will be the SN ratio when response is to be maximized by Taguchi? 2, 5, 7, 11, 14, 18, 21, 24, 26, 29, 30, 34, 37 a) b) c) d) None of these

16 Answer: a (15.893) Solution 7 To maximize robustness, when Target performance is the best, Taguchi uses the signal to noise ratio SN t = 10 log( y2 s 2) When response is to be maximized, Taguchi uses 1 y SN t = 10 log( 2 n ) When response is to be minimized, Taguchi uses y 2 SN t = 10 log( n ) Here response maximised formula is used and the by doing calculation we get as the SN ratio.

17 Question 8 What are Taguchi s contributions? a) Quality Engineering Philosophy Targets and Loss functions b) Methodology System, Parameter, Tolerance design steps c) Experimental Design use of Orthogonal arrays d) All are correct.

18 Solution 8 Answer: d (All are correct) The following are Taguchi s Contributions: a) Quality Engineering Philosophy Targets and Loss functions b) Methodology System, Parameter, Tolerance design steps c) Experimental Design use of Orthogonal arrays d) Analysis use Signal-to-Noise (S/N ratios)

19 Question 9 The cost of scrapping a part is Rs when it deteriorates from a target by ±0.25 mm. what will be the quality loss coefficient if the target value for the product s response is 1.5 mm? a) 8.32 b) c) d) 35.46

20 Solution 9 Answer: a (8.32) The most common quadratic loss function is in the form of : L = k(y m) 2 Where L: Total loss due to deviation from target m: Target value for the product response k: Quality loss co-efficient y: Random variable of interest Here L = y = 0.25 m = 1.5 Putting these values in the equation, we get k = 8.32

21 Question 10 Which is not an assumption taken while calculating Economic Order Quantity (EOQ)? a) The ordering cost is constant. b) The rate of demand is random. c) The lead time is fixed. d) The replenishment is made instantaneously; the whole batch is delivered at once.

22 Solution 10 Answer: b The following are some of the assumptions while calculating Economic Order Quantity (EOQ): The ordering cost is constant. The rate of demand is constant. The lead time is fixed. The purchase price of the item is constant i.e. no discount is available. The replenishment is made instantaneously, the whole batch is delivered at once.

23 Question 11 A great deal of inventory piles up along the supply chain due to a) Good quality of suppliers production may go rapidly. b) Poor management of logistics and not monitoring the lead time. c) Machine breakdown resulting from poor quality culture causing production interruption. d) Quality of finished products may be high causing no need to inspect and waist time.

24 Solution 11 Answer: b and c A great deal of inventory piles up along the supply chain due to Poor quality of suppliers production may stop if there are no materials and parts in the buffer stock. Poor management of logistics and not monitoring the lead time. Machine breakdown resulting from poor quality culture causing production interruption again buffers are needed. Quality of finished products may not be high enough to support JIT models of operations in your customer s operations.

25 Question 12 Taguchi focused on off-line Quality Control. What is the meaning of off-line Quality Control? a) A commitment to quality that goes beyond internal company issues to suppliers and customers b) None of these. c) Improving quality and reducing costs in the product or process at the production stage. d) Improving quality and reducing costs in the product or process at the design stage.

26 Solution 12 Answer: d Off-line quality control methods are quality and cost control activities conducted at the product and process design stages to improve product manufacturability and reliability, and to reduce product development and lifetime costs. Parameter design is an off-line quality control method.

27 Question 13 By Minimizing SN ratio one can maximize robustness of a design. a) True b) False c) None of these

28 Solution 13 Answer: b (False) By maximizing SN ratio one can maximize Robustness of a design. Smallest sensitivity to noise gives better Robustness of a design.

29 Question 14 Suppose a genetic algorithm uses chromosomes of the form x = abcdef with a fixed length of six genes. Each gene can be any digit between 0 and 9. Let the fitness of individual x be calculated as: f x = 4a + 3f b + c 2d + 5e Let the initial population consist of four individuals with the following chromosomes: x 1 = x 2 = x 3 = x 4 = Which gene has the minimum fitness using Genetic Algorithm? a) x 1 b) x 2 c) x 3 d) x 4

30 Solution 14 Answer: c (x 3 ) f(x 1 )= = 26 f(x 2 )= = 47 f(x 3 )= = 23 f(x 4 )= = 54 The lowest value has minimum fitness and the highest value has the maximum fitness.

31 Question 15 Which of the following is a Noise factor of Taguchi s robust design? a) Operating Temperature b) Position of the gas pedal c) Dimensions of parts d) Deposition time in silicon wafer fabrication

32 Solution 15 Answer: a Control Factors : Design factors that are to be set at optimal levels to improve quality and reduce sensitivity to noise Dimensions of parts, type of material, etc. Noise Factors : Factors that represent the noise that is expected in production or in use Dimensional variation, Operating Temperature, etc. Adjustment Factor : Affects the mean but not the variance of a response Deposition time in silicon wafer fabrication. Signal Factors : Set by the user to communicate desires of the user Position of the gas pedal

33 Thank you

Production Management Fall 2006 Odette School of Business University of Windsor. Midterm Exam 2 Solution Thursday, November 23, 5:30 6:50 pm

Production Management Fall 2006 Odette School of Business University of Windsor. Midterm Exam 2 Solution Thursday, November 23, 5:30 6:50 pm Name (print, please) ID Production Management 73-604 Fall 2006 Odette School of Business University of Windsor Midterm Exam 2 Solution Thursday, November 23, 5:30 6:50 pm Instructor: Mohammed Fazle Baki

More information

ME 375K Production Engineering Management First Test, Spring 1998 Each problem is 20 points

ME 375K Production Engineering Management First Test, Spring 1998 Each problem is 20 points Name ME 375K Production Engineering Management First Test, Spring 1998 Each problem is 2 points 1. A raw material inventory holds an expensive product that costs $1 for each item. The annual demand for

More information

How much money can you add to the bottom line with good inventory management?

How much money can you add to the bottom line with good inventory management? Inventory Management Key Concepts: Inventory are those stocks or items used to support production (raw materials and work-in-process items), supporting activities (maintenance, repair, and operating supplies),

More information

Inventory Control. Inventory. Inventories in a manufacturing plant. Why inventory? Reasons for holding Raw Materials. Reasons for holding WIP

Inventory Control. Inventory. Inventories in a manufacturing plant. Why inventory? Reasons for holding Raw Materials. Reasons for holding WIP Inventory Control Inventory the oldest result of the scientific management efforts inventory plays a key role in the logistical behavior of virtually all manufacturing systems the classical inventory results

More information

A comparison between Lean and Visibility approach in supply chain planning

A comparison between Lean and Visibility approach in supply chain planning A comparison between Lean and Visibility approach in supply chain planning Matteo Rossini, Alberto Portioli Staudacher Department of Management Engineering, Politecnico di Milano, Milano, Italy (matteo.rossini@polimi.it)

More information

Supply Chain Inventory Management. Multi-period Problems. Read: Chap Chap 11.

Supply Chain Inventory Management. Multi-period Problems. Read: Chap Chap 11. Supply Chain Inventory Management Multi-period Problems Read: Chap 10.1-10.2. Chap 11. Push vs. Pull Processes PUSH: Order decision initiated in anticipation to customer orders A newspaper vendor orders

More information

Inventory Management [10] Outline. Inventory Models. Operations Management, 8e. Heizer/Render. ABC Analysis 2 / Prentice Hall, Inc.

Inventory Management [10] Outline. Inventory Models. Operations Management, 8e. Heizer/Render. ABC Analysis 2 / Prentice Hall, Inc. Inventory Management [10] Heizer/Render Operations Management, 8e Outline Functions Of Inventory Types of Inventory Inventory Management ABC Analysis Record Accuracy Cycle Counting Control of Service Inventories

More information

OPERATIONS RESEARCH. Inventory Theory

OPERATIONS RESEARCH. Inventory Theory OPERATIONS RESEARCH Chapter 5 Inventory Theory Prof. Bibhas C. Giri Department of Mathematics Jadavpur University Kolkata, India Email: bcgiri.jumath@gmail.com MODULE - 1: Economic Order Quantity and EOQ

More information

Modern Logistics & Supply Chain Management

Modern Logistics & Supply Chain Management Modern Logistics & Supply Chain Management As gold which he cannot spend will make no man rich, so knowledge which he cannot apply will make no man wise. Samuel Johnson: The Idler No. 84 Inventory Systems

More information

Lecture 12. Introductory Production Control

Lecture 12. Introductory Production Control Lecture 12 Introductory Production Control 167 Where we ve come from: Models of Manufacturing Systems: Deterministic, Queuing, Simulation Key ideas: Some WIP useful for buffering stations, but More WIP

More information

FAQ: Efficiency in the Supply Chain

FAQ: Efficiency in the Supply Chain Question 1: What is a postponement strategy? Answer 1: A postponement or delayed differentiation strategy involves manipulating the point at which a company differentiates its product or service. These

More information

Outline. Pull Manufacturing. Push Vs. Pull Scheduling. Inventory Hides Problems. Lowering Inventory Reveals Problems

Outline. Pull Manufacturing. Push Vs. Pull Scheduling. Inventory Hides Problems. Lowering Inventory Reveals Problems Outline Pull Manufacturing Why Pull Manufacturing? The Problem of Inventory Just In Time Kanban One Piece Flow Demand / Pull Standard Work & Takt Time Production Smoothing 1 2 Why Pull Manufacturing? Push

More information

On the way to CPFR from ARS.docx

On the way to CPFR from ARS.docx From the SelectedWorks of SREERENGAN VR Winter January 19, 2017 On the way to CPFR from ARS.docx SREERENGAN VR Available at: https://works.bepress.com/sreerengan_vr/3/ On the way to CPFR from ARS by Sreerengan

More information

Inventory Management 101 Basic Principles SmartOps Corporation. All rights reserved Copyright 2005 TeknOkret Services. All Rights Reserved.

Inventory Management 101 Basic Principles SmartOps Corporation. All rights reserved Copyright 2005 TeknOkret Services. All Rights Reserved. Inventory Management 101 Basic Principles 1 Agenda Basic Concepts Simple Inventory Models Batch Size 2 Supply Chain Building Blocks SKU: Stocking keeping unit Stocking Point: Inventory storage Item A Loc

More information

Dennis Bricker Dept of Mechanical & Industrial Engineering The University of Iowa

Dennis Bricker Dept of Mechanical & Industrial Engineering The University of Iowa Dennis Bricker Dept of Mechanical & Industrial Engineering The University of Iowa In an inventory control system for a single product with random demand, where the inventory level is continuously monitored,

More information

Supply Chain Inventory Management Chapter 9. Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall 09-01

Supply Chain Inventory Management Chapter 9. Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall 09-01 Supply Chain Inventory Management Chapter 9 09-01 What is a Inventory Management? Inventory Management The planning and controlling of inventories in order to meet the competitive priorities of the organization.

More information

Inventory Management

Inventory Management Operations & Supply Planning PGDM 2018-20 Inventory Management Vinay Kumar Kalakbandi Assistant Professor Operations Management 109 Why inventories? Economies of Scale Supply and Demand Uncertainty Volume

More information

Operations & Supply Planning

Operations & Supply Planning Operations & Supply Planning PGDM 2017-19 Inventory Management Vinay Kumar Kalakbandi Assistant Professor Operations Management Survey No. 38, Cherlaguda Village, Shamshabad Mandal, RR District, Hyderabad-

More information

Inventory Control Models

Inventory Control Models Chapter 6 Inventory Control Models uantitative Analysis for Management, Tenth Edition, by Render, Stair, and Hanna 2008 Prentice-Hall, Inc. Introduction Inventory is any stored resource used to satisfy

More information

Special Inventory Models

Special Inventory Models Supplement D Supplement D Special Inventory Models Special Inventory Models TRUE/FALSE 1. The economic production lot size represents the maximum quantity of on-hand inventory for a manufacturer. Answer:

More information

Reorder Point Systems

Reorder Point Systems Reorder Point Systems EOQ with a reorder point The reorder point problem The service level method Fixed-order-interval model Reading: Page 563-573 Oct 23 ISMT162/Stuart Zhu 1 EOQ with a Reorder Point The

More information

Chapter 12 Inventory Management. Inventory Management

Chapter 12 Inventory Management. Inventory Management Chapter 12 Inventory Management 2006 Prentice Hall, Inc. Outline Global Company Profile: Amazon.Com Functions Of Inventory Types of Inventory Inventory Management ABC Analysis Record Accuracy Cycle Counting

More information

مدیریت موجودی Inventory Management

مدیریت موجودی Inventory Management مدیریت موجودی Inventory Management Inventory One of the most expensive assets of many companies representing as much as 50% of total invested capital Operations managers must balance inventory investment

More information

Operations and Supply Chain Management Prof. G. Srinivisan Department of Management Studies Indian Institute of Technology, Madras

Operations and Supply Chain Management Prof. G. Srinivisan Department of Management Studies Indian Institute of Technology, Madras Operations and Supply Chain Management Prof. G. Srinivisan Department of Management Studies Indian Institute of Technology, Madras Module No - 1 Lecture No - 22 Integrated Model, ROL for Normal Distribution

More information

Order Quantities - Examples

Order Quantities - Examples Order Quantities - Examples Outline: I. Basic Inventory Planning Questions II. Inventory Models III. EOQ Model IV. EOQ Model Example V. Production Order Quantity Model VI. POQ Model Example VII. Fixed

More information

Test Bank For Operations Management 11th Edition By Krajewski Test Bank for all chapters, Supplements are included. Download at :

Test Bank For Operations Management 11th Edition By Krajewski Test Bank for all chapters, Supplements are included. Download at : Test Bank For Operations Management 11th Edition By Krajewski Test Bank for all chapters, Supplements are included. Download at : Solutions Manual for Operations Management Processes And Supply Chains

More information

Managing stock levels: materials management and inventory control

Managing stock levels: materials management and inventory control 16 Managing stock levels: materials management and inventory control Prerequisites Objectives Introduction For part of this chapter you will find it useful to have some knowledge of the normal distribution

More information

Inventory Management IV

Inventory Management IV Inventory Management IV Safety Stock Lecture 7 ESD.260 Fall 2003 Caplice Assumptions: Basic EOQ Model Demand Constant vs Variable Known vs Random Continuous vs Discrete Lead time Instantaneous Constant

More information

CHAPTER 5 OPTIMIZATION OF GREEN SAND CASTING PROCESS PARAMETERS USING TAGUCHI S METHOD

CHAPTER 5 OPTIMIZATION OF GREEN SAND CASTING PROCESS PARAMETERS USING TAGUCHI S METHOD 66 CHAPTER 5 OPTIMIZATION OF GREEN SAND CASTING PROCESS PARAMETERS USING TAGUCHI S METHOD 5.1 PROCESS PARAMETERS OF GREEN SAND CASTINGS In this work, the robustness of the green sand casting process optimization

More information

CHAPTER 3 THEORY RELATED TO TAGUCHI S METHOD

CHAPTER 3 THEORY RELATED TO TAGUCHI S METHOD CHAPTER 3 THEORY RELATED TO TAGUCHI S METHOD 3.1 TAGUCHI S BRIEF BIOGRAPHY When Japan began its reconstruction efforts after World War II, Japan faced an acute shortage of good quality raw material, high

More information

There are three options available for coping with variations in demand:

There are three options available for coping with variations in demand: Module 3E10 Operations management for Engineers - Crib 1 (a) Define the theoretical capacity of a manufacturing line. Explain why the actual capacity of a manufacturing line is often different from its

More information

Assignment 5 (Solution) Measurement System Analysis and OC curve

Assignment 5 (Solution) Measurement System Analysis and OC curve Assignment 5 (Solution) Measurement System Analysis and OC curve Dr. Jitesh J. Thakkar Department of Industrial and Systems Engineering Indian Institute of Technology Kharagpur Dr. Jitesh J. Thakkar, IIT

More information

Optimal Economic Manufacturing Quantity and Process Target for Imperfect Systems

Optimal Economic Manufacturing Quantity and Process Target for Imperfect Systems Proceedings of the 2014 International Conference on Industrial Engineering and Operations Management Bali, Indonesia, January 7 9, 2014 Optimal Economic Manufacturing Quantity and Process Target for Imperfect

More information

TAGUCHI APPROACH TO DESIGN OPTIMIZATION FOR QUALITY AND COST: AN OVERVIEW. Resit Unal. Edwin B. Dean

TAGUCHI APPROACH TO DESIGN OPTIMIZATION FOR QUALITY AND COST: AN OVERVIEW. Resit Unal. Edwin B. Dean TAGUCHI APPROACH TO DESIGN OPTIMIZATION FOR QUALITY AND COST: AN OVERVIEW Resit Unal Edwin B. Dean INTRODUCTION Calibrations to existing cost of doing business in space indicate that to establish human

More information

Chapter 4. Models for Known Demand

Chapter 4. Models for Known Demand Chapter 4 Models for Known Demand Introduction EOQ analysis is based on a number of assumptions. In the next two chapters we describe some models where these assumptions are removed. This chapter keeps

More information

An Introduction to Inventory Management with reference to Bokaro Steel Plant

An Introduction to Inventory Management with reference to Bokaro Steel Plant An Introduction to Inventory Management with reference to Bokaro Steel Plant 1 Mahavir Prasad, 2 Chandrashekhar Singh 1 Assistant Professor, GGSES-Technical Campus Bokaro, Jharkhand 2 Assistant Registrar,

More information

CHAPTER 13: OPERATIONS MANAGEMENT Multiple Choice Questions

CHAPTER 13: OPERATIONS MANAGEMENT Multiple Choice Questions CHAPTER 13: OPERATIONS MANAGEMENT Multiple Choice Questions 1. Michelle Jackson and other operations managers realized that will be needed to reduce bottlenecks and increase operational efficiency at BNSF

More information

Understanding the Supply Chain. What is a Supply Chain? Definition Supply Chain Management

Understanding the Supply Chain. What is a Supply Chain? Definition Supply Chain Management Understanding the Supply Chain What is a Supply Chain? All stages involved, directly or indirectly, in fulfilling a customer request Includes customers, manufacturers, suppliers, transporters, warehouses,

More information

Inventory Control Model

Inventory Control Model Inventory Control Model The word 'inventory' means simply a stock of idle resources of any kind having an economic value. In other words, inventory means a physical stock of goods, which is kept in hand

More information

Operations Management. Inventory management models. Stock of items kept to meet future demand Purpose of inventory management

Operations Management. Inventory management models. Stock of items kept to meet future demand Purpose of inventory management Operations Management Inventory management models 1 What is Inventory? Stock of items kept to meet future demand Purpose of inventory management how many units to order when to order 2 Types of Inventory

More information

Introduction. Introduction. Introduction LEARNING OBJECTIVES LEARNING OBJECTIVES

Introduction. Introduction. Introduction LEARNING OBJECTIVES LEARNING OBJECTIVES Valua%on and pricing (November 5, 2013) LEARNING OBJECTIVES Lecture 9 Control 1. Understand the importance of inventory control and ABC analysis. 2. Use the economic order quantity (EOQ) to determine how

More information

CHAPTER 3 AN INVENTORY MODEL WITH LOT SIZE DEPENDENT CARRYING / HOLDING COST

CHAPTER 3 AN INVENTORY MODEL WITH LOT SIZE DEPENDENT CARRYING / HOLDING COST CHAPTER 3 AN INVENTORY MODEL WITH LOT SIZE DEPENDENT CARRYING / HOLDING COST 3.1 Introduction In the classical Harris-Wilson (1915) inventory model all the cost associated with the formula was taken to

More information

Inventory Optimization using ERP to reduce final product lead time, Inventory value an inbound logistics cost for MTO, FMCG Company

Inventory Optimization using ERP to reduce final product lead time, Inventory value an inbound logistics cost for MTO, FMCG Company IJMS 2016 vol. 3 (2): 53-60 International Journal of Multidisciplinary Studies (IJMS) Volume 3, Issue 2, 2016 Inventory Optimization using ERP to reduce final product lead time, Inventory value an inbound

More information

CRC Press Taylor &. Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Group, an Informa business

CRC Press Taylor &. Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Group, an Informa business Basics of Supply Chain Management Jayanta Kumar Bandyopadhyay CRC Press Taylor &. Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Group, an Informa business Contents

More information

ID Class MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

ID Class MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. Exam: Operations Management Name Total Scors: ID Class MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. 1) Planning is the process of coping with changes

More information

Inventory Models for Probabilistic Demand: Basic Concepts

Inventory Models for Probabilistic Demand: Basic Concepts CTL.SC1x -Supply Chain & Logistics Fundamentals Inventory Models for Probabilistic Demand: Basic Concepts MIT Center for Transportation & Logistics Notation D = Average Demand (units/time) c = Variable

More information

Notes for Production and Operations Management- I

Notes for Production and Operations Management- I Notes for Production and Operations Management- I Factors affecting Process Design Decisions Nature of product/service demand Degree of vertical integration Production Flexibility Degree of automation

More information

Lecture - 44 Supply Chain

Lecture - 44 Supply Chain Economics, Management and Entrepreneurship Prof. Pratap. K. J. Mohapatra Department of Industrial Engineering and Management Indian Institute of Technology Kharagpur Lecture - 44 Supply Chain Good morning.

More information

This is a refereed journal and all articles are professionally screened and reviewed

This is a refereed journal and all articles are professionally screened and reviewed Advances in Environmental Biology, 6(4): 1400-1411, 2012 ISSN 1995-0756 1400 This is a refereed journal and all articles are professionally screened and reviewed ORIGINAL ARTICLE Joint Production and Economic

More information

LECTURE 8: MANAGING DEMAND

LECTURE 8: MANAGING DEMAND LECTURE 8: MANAGING DEMAND AND SUPPLY IN A SUPPLY CHAIN INSE 6300: Quality Assurance in Supply Chain Management 1 RESPONDING TO PREDICTABLE VARIABILITY 1. Managing Supply Process of managing production

More information

Preview from Notesale.co.uk Page 1 of 51. Inventory Policy Decisions

Preview from Notesale.co.uk Page 1 of 51. Inventory Policy Decisions Page 1 of 51 Inventory Policy Decisions Push Inventory Control Solution: We need to calculate total requirements for each warehouse. Total Requirements = Forecast + ( z x Forecast error ) where, z = number

More information

BSc (Hons) Business Information Systems. Examinations for / Semester 2

BSc (Hons) Business Information Systems. Examinations for / Semester 2 BSc (Hons) Business Information Systems Cohort: BIS/14B/FT Examinations for 2015-2016 / Semester 2 MODULE: QUANTITATIVE ANALYSIS FOR BUSINESS MODULE CODE: Duration: 3 Hours Instructions to Candidates:

More information

Stored resource used to satisfy a current or future need: Raw materials, work-in-process, finished goods.

Stored resource used to satisfy a current or future need: Raw materials, work-in-process, finished goods. Summary 1. Introduction Statistics, management science, operations research, decision aid, 2. Advanced optimization Linear programming Integer programming Non-linear programming 3. Multicriteria decision

More information

INVENTORY THEORY INVENTORY PLANNING AND CONTROL SCIENTIFIC INVENTORY MANAGEMENT

INVENTORY THEORY INVENTORY PLANNING AND CONTROL SCIENTIFIC INVENTORY MANAGEMENT INVENTORY THEORY INVENTORY PLANNING AND CONTROL SCIENTIFIC INVENTORY MANAGEMENT INVENTORY (STOCKS OF MATERIALS) Because there is difference in the timing or rate of supply and demand What would happen

More information

Answer Key Testname: M1 06

Answer Key Testname: M1 06 Testname: M1-06 1) B 2) D 3) A 4) B 5) C 6) C 7) B 8) A 9) D 10) B 11) A 12) D 13) B 14) A 15) B 16) B 17) B 18) D 19) A 20) B 21) B 22) D 23) B 24) B 25) A 26) With the pull method, customer demand (an

More information

Exam Inventory Management (35V5A8) Part 1: Theory (1 hour)

Exam Inventory Management (35V5A8) Part 1: Theory (1 hour) Exam Inventory Management (35V5A8) Part 1: Theory (1 hour) Closed book: Inspection of book/lecture notes/personal notes is not allowed; computer (screen) is off. Maximum number of points for this part:

More information

Chapter 12. The Material Flow Cycle. The Material Flow Cycle ٠٣/٠٥/١٤٣٠. Inventory System Defined. Inventory Basics. Purposes of Inventory

Chapter 12. The Material Flow Cycle. The Material Flow Cycle ٠٣/٠٥/١٤٣٠. Inventory System Defined. Inventory Basics. Purposes of Inventory Chapter 12 Inventory Management The Material Flow Cycle ١ ٢ Input The Material Flow Cycle Other Wait Move Cycle Queue Setup Run Output 1 Run time: Job is at machine and being worked on 2 Setup time: Job

More information

Production Management Fall 2007 Odette School of Business University of Windsor. Midterm Exam 2 Solution Thursday, November 22, 5:30 6:50 pm

Production Management Fall 2007 Odette School of Business University of Windsor. Midterm Exam 2 Solution Thursday, November 22, 5:30 6:50 pm Name (print, please) ID Production Management 7-604 Fall 2007 Odette School of Business University of Windsor Midterm Exam 2 Solution Thursday, November 22, 5:0 6:50 pm Instructor: Mohammed Fazle Baki

More information

Inventory Management

Inventory Management Inventory Management Materials planning AGGREGATE PLANNING Master Production Schedule (MPS) MATERIALS PLANNING The planning of materials requirements consists of the determination of: What How much and

More information

Backorders case with Poisson demands and constant procurement lead time

Backorders case with Poisson demands and constant procurement lead time The Lecture Contains: Profit maximization considering partial backlogging Example for backorder cases Backorders case with Poisson demands and constant procurement lead time The lost sales case for constant

More information

Inventory Management at Big Bazaar

Inventory Management at Big Bazaar Inventory Management at Big Bazaar Submitted to Dr. P. K. Dash Associate Professor Quantitative Techniques and Operations Management IMI-Bhubaneswar Submitted By: Group I PGDM 2012-14 Introduction Ever

More information

P2 Performance Management

P2 Performance Management DO NOT OPEN THIS QUESTION PAPER UNTIL YOU ARE TOLD TO DO SO Performance Pillar P2 Performance Management 21 November 2012 Wednesday Afternoon Session Instructions to candidates You are allowed three hours

More information

EXPERIMENTAL ANALYSIS OF MARKET DEMAND INFLUENCE ON GREENHOUSE GAS EMISSIONS IN SUPPLY CHAINS

EXPERIMENTAL ANALYSIS OF MARKET DEMAND INFLUENCE ON GREENHOUSE GAS EMISSIONS IN SUPPLY CHAINS EXPERIMENTAL ANALYSIS OF MARKET DEMAND INFLUENCE ON GREENHOUSE GAS EMISSIONS IN SUPPLY CHAINS Jasmina ŽIC 1, Samir ŽIC 2 1 Končar - Metalne konstrukcije d.d., Fallerovo šetalište 22, Zagreb, Croatia 2

More information

IEOR 130 Methods of Manufacturing Improvement Fall, 2016, Prof. Leachman Homework Assignment #5, Due Thursday, Oct. 6, 2016

IEOR 130 Methods of Manufacturing Improvement Fall, 2016, Prof. Leachman Homework Assignment #5, Due Thursday, Oct. 6, 2016 IEOR 130 Methods of Manufacturing Improvement Fall, 2016, Prof. Leachman Homework Assignment #5, Due Thursday, Oct. 6, 2016 1. The management of a wafer fabrication facility is trying to sort out how much

More information

IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 09, 2015 ISSN (online):

IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 09, 2015 ISSN (online): IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 09, 2015 ISSN (online): 2321-0613 Selection of Optimal Process Parameters in Machining Aerospace Material by Wire Electric

More information

Optimization of Process Parameter of Submerged Arc Welding By Using Response Surface Method and Genetic Algorithm

Optimization of Process Parameter of Submerged Arc Welding By Using Response Surface Method and Genetic Algorithm Optimization of Process Parameter of Submerged Arc Welding By Using Response Surface Method and Genetic Algorithm Mr. Chetan Kumar Bagde 1, Mr. Shridev Tamrakar 2,Mr. Lokesh singh 3 1,2,3 Department of

More information

Objectives of Chapters 10, 11

Objectives of Chapters 10, 11 Objectives of Chapters 10, 11 Planning and Managing Inventories in a SC: (Ch10, 11, 12) Ch10 Discusses factors that affect the level of cycle inventory within a SC and explain how it correlates to cost.

More information

Design of Experiments (DOE) Instructor: Thomas Oesterle

Design of Experiments (DOE) Instructor: Thomas Oesterle 1 Design of Experiments (DOE) Instructor: Thomas Oesterle 2 Instructor Thomas Oesterle thomas.oest@gmail.com 3 Agenda Introduction Planning the Experiment Selecting a Design Matrix Analyzing the Data Modeling

More information

AUTOSIMPLY. Manufacturing Order. Features. About AutoSimply

AUTOSIMPLY. Manufacturing Order. Features. About AutoSimply AUTOSIMPLY Manufacturing Order About AutoSimply Autosimply is a Sage Developer Partner since 2004. Founded by a group of ACCPAC consultants with over 10 years project experience, we know and understand

More information

Chapter 17. Inventory Control

Chapter 17. Inventory Control 1 Chapter 17 Inventory Control 2 OBJECTIVES Inventory System Defined Inventory Costs Independent vs. Dependent Demand Single-Period Inventory Model Multi-Period Inventory Models: Basic Fixed-Order Quantity

More information

PERT 03 Manajemen Persediaan (1) Fungsi Inventory Inventory Management Inventory Model dengan Independent Demand. EOQ Model

PERT 03 Manajemen Persediaan (1) Fungsi Inventory Inventory Management Inventory Model dengan Independent Demand. EOQ Model PERT 03 Manajemen Persediaan (1) Fungsi Inventory Inventory Management Inventory Model dengan Independent Demand. EOQ Model What Is Inventory? Stock of items kept to meet future demand Purpose of inventory

More information

DOE Wizard Multilevel Factorial Designs

DOE Wizard Multilevel Factorial Designs DOE Wizard Multilevel Factorial Designs Summary The Multilevel Factorial designs are used to study the effects of q quantitative factors. The user begins by specifying a range over which each factor is

More information

Inventory Management. Dr. Richard Jerz rjerz.com

Inventory Management. Dr. Richard Jerz rjerz.com Inventory Management Dr. Richard Jerz 1 Learning Objectives Describe The functions of inventory and basic inventory models Define ABC analysis Record accuracy Cycle counting Independent and dependent demand

More information

Inventory Management. Learning Objectives. Inventory. Dr. Richard Jerz

Inventory Management. Learning Objectives. Inventory. Dr. Richard Jerz Inventory Management Dr. Richard Jerz 1 Learning Objectives Describe The functions of inventory and basic inventory models Define ABC analysis Record accuracy Cycle counting Independent and dependent demand

More information

Inventory Control Models

Inventory Control Models Chapter 12 Inventory Control Models Learning Objectives After completing this chapter, students will be able to: 1. Understand the importance of inventory control. 2. Use inventory control models to determine

More information

Operations Research Models and Methods Paul A. Jensen and Jonathan F. Bard. Inventory Level. Figure 4. The inventory pattern eliminating uncertainty.

Operations Research Models and Methods Paul A. Jensen and Jonathan F. Bard. Inventory Level. Figure 4. The inventory pattern eliminating uncertainty. Operations Research Models and Methods Paul A. Jensen and Jonathan F. Bard Inventory Theory.S2 The Deterministic Model An abstraction to the chaotic behavior of Fig. 2 is to assume that items are withdrawn

More information

EIM. Effective Replenishment Parameters. By Jon Schreibfeder. icepts Technology Group, Inc. l ext.

EIM. Effective Replenishment Parameters. By Jon Schreibfeder. icepts Technology Group, Inc.   l ext. Effective Replenishment Parameters By Jon Schreibfeder EIM Effective Inventory Management, Inc. icepts Technology Group, Inc. www.icepts.com l info@icepts.com 717-704-1000 ext. 3010 www.icepts.com l info@icepts.com

More information

Exam 1 from a Past Semester

Exam 1 from a Past Semester Exam from a Past Semester. Provide a brief answer to each of the following questions. a) What do perfect match and mismatch mean in the context of Affymetrix GeneChip technology? Be as specific as possible

More information

CHAPTER 4 OPTIMIZATION OF PROCESS PARAMETER OF FSW ON AA 5083 USING TAGUCHI METHOD (SINGLE OBJECTIVE)

CHAPTER 4 OPTIMIZATION OF PROCESS PARAMETER OF FSW ON AA 5083 USING TAGUCHI METHOD (SINGLE OBJECTIVE) 52 CHAPTER 4 OPTIMIZATION OF PROCESS PARAMETER OF FSW ON AA 5083 USING TAGUCHI METHOD (SINGLE OBJECTIVE) 4.1 INTRODUCTION Welding is one of the vital and widely used manufacturing processes in any manufacturing

More information

Planning. Dr. Richard Jerz rjerz.com

Planning. Dr. Richard Jerz rjerz.com Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

IT 470a Six Sigma Chapter X

IT 470a Six Sigma Chapter X Chapter X Lean Enterprise IT 470a Six Sigma Chapter X Definitions Raw Materials component items purchased and received from suppliers WIP work in process, items that are in production on the factory floor

More information

Robustness studies on coal gasification process variables

Robustness studies on coal gasification process variables Volume 20 (2), pp. 89 108 http://www.orssa.org.za ORiON ISSN 0529-191-X c 2004 Robustness studies on coal gasification process variables RLJ Coetzer MJ Keyser Received: 23 July 2004; Revised: 11 October

More information

LOT SIZING IN MRP. Week Gross requirements Scheduled receipts Projected available balance Net Requirements

LOT SIZING IN MRP. Week Gross requirements Scheduled receipts Projected available balance Net Requirements LOT SIZING IN MRP The net data is subjected lot sizing Lot sizes developed can satisfy the net for one or more weeks The basic trade-off involves the elimination of one or more setups at the expense of

More information

Synergistic Model Construction of Enterprise Financial Management Informatization Ji Yu 1

Synergistic Model Construction of Enterprise Financial Management Informatization Ji Yu 1 2nd International Conference on Electrical, Computer Engineering and Electronics (ICECEE 205) Synergistic Model Construction of Enterprise Financial Management Informatization Ji Yu School of accountancy,

More information

An integrated production inventory model of deteriorating items subject to random machine breakdown with a stochastic repair time

An integrated production inventory model of deteriorating items subject to random machine breakdown with a stochastic repair time International Journal of Industrial Engineering Computations 8 (217) 217 236 Contents lists available at GrowingScience International Journal of Industrial Engineering Computations homepage: www.growingscience.com/ijiec

More information

(4 Marks) (b) Enumerate the industrial applications of linear programming.

(4 Marks) (b) Enumerate the industrial applications of linear programming. 47 PAPER 5 : COST ACCOUNTING & COST SYSTEMS MAY 2003 Question No.1 is compulsory Answer any four questions from the rest. Working notes should form part of the answer. Make assumptions wherever necessary

More information

A Simple EOQ-like Solution to an Inventory System with Compound Poisson and Deterministic Demand

A Simple EOQ-like Solution to an Inventory System with Compound Poisson and Deterministic Demand A Simple EOQ-like Solution to an Inventory System with Compound Poisson and Deterministic Demand Katy S. Azoury San Francisco State University, San Francisco, California, USA Julia Miyaoka* San Francisco

More information

Inventory / Information Trade Offs: the answer to today s rising costs of inventory

Inventory / Information Trade Offs: the answer to today s rising costs of inventory An Educational Event of the Brazil Roundtable Inventory / Information Trade Offs: the answer to today s rising costs of inventory Friday August 17th, 2007 Thomas L. Freese Principal, Freese & Associates,

More information

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

SPARE PARTS PLANNING FOR NEW METALLURGICAL PLANT START-UPS WHY YOU NEED A SPARE PARTS INVENTORY MODEL

SPARE PARTS PLANNING FOR NEW METALLURGICAL PLANT START-UPS WHY YOU NEED A SPARE PARTS INVENTORY MODEL SPARE PARTS PLANNING FOR NEW METALLURGICAL PLANT START-UPS WHY YOU NEED A SPARE PARTS INVENTORY MODEL Stephen R. Brown Chairman Emeritus 10195 N. Oracle Road, Suite 105 Tucson, Arizona 85704 ABSTRACT Standard

More information

Improving inventory management policies and establishing raw material stock levels CHRISTIAN ALWYN SINGLETON

Improving inventory management policies and establishing raw material stock levels CHRISTIAN ALWYN SINGLETON Improving inventory management policies and establishing raw material stock levels by CHRISTIAN ALWYN SINGLETON 27057730 Submitted in partial fulfilment of the requirements for the degree of BACHELORS

More information

Reduction Of Cost Of Quality By Using Robust Design: A Research Methodology

Reduction Of Cost Of Quality By Using Robust Design: A Research Methodology Reduction Of Cost Of Quality By Using Robust Design: A Research Methodology 1 Jalal Khan, 2 S.N. Teli, 3 B.P. Hada Assistant Professor, SCOE, Kharghar, India Abstract: CoQ and Taguchi Design are to be

More information

Virtual Pull Systems. Don Guild, Synchronous Management INTRODUCTION

Virtual Pull Systems. Don Guild, Synchronous Management INTRODUCTION INTRODUCTION Have you implemented kanban yet? Have you been unable to roll it out or just abandoned it? Most companies who begin kanban implementation struggle to finish the job. In too many cases, the

More information

ECONOMIC PRODUCTION QUANTITY MODEL WITH CONTINUOUS QUALITY INSPECTION

ECONOMIC PRODUCTION QUANTITY MODEL WITH CONTINUOUS QUALITY INSPECTION CONOIC PRODUCTION UANTITY ODL WITH CONTINUOU UALITY INPCTION Jia-Chi TOU and Jen-ing CHN Abstract. In this paper, we consider a continuous product quality inspection process in a production line. Three

More information

Process Performance and Quality Chapter 6

Process Performance and Quality Chapter 6 Process Performance and Quality Chapter 6 How Process Performance and Quality fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management Process

More information

MULTI-LEVEL INVENTORY MANAGEMENT CONSIDERING TRANSPORTATION COST AND QUANTITY DISCOUNT

MULTI-LEVEL INVENTORY MANAGEMENT CONSIDERING TRANSPORTATION COST AND QUANTITY DISCOUNT ISSN : 1978-774X Proceeding 7 th International Seminar on Industrial Engineering and Management MULTI-LEVEL INVENTORY MANAGEMENT CONSIDERING TRANSPORTATION COST AND QUANTITY DISCOUNT 1 Eko Pratomo 1, Hui

More information

CHAPTER 5 INVESTIGATION ON DRILLING CHARACTERISTICS OF HYBRID COMPOSITES

CHAPTER 5 INVESTIGATION ON DRILLING CHARACTERISTICS OF HYBRID COMPOSITES CHAPTER 5 INVESTIGATION ON DRILLING CHARACTERISTICS OF HYBRID COMPOSITES 5.1 Introduction This chapter presents the experimental work carried out with different cutting parameters in drilling to evaluate

More information

SIGNIFICANCE OF MATERIALS MANAGEMENT IN INDUSTRIES CONSTRUCTION

SIGNIFICANCE OF MATERIALS MANAGEMENT IN INDUSTRIES CONSTRUCTION SIGNIFICANCE OF MATERIALS MANAGEMENT IN INDUSTRIES CONSTRUCTION *M.VEERA KRISHNA, *D.SATYANARAYANA, **Dr K.SAMBASIVA RAO *Research Scholar, Rayalaseema University, Kurnool, AP **Professor of DCMS, Andhra

More information

SIGNIFICANCE OF MATERIALS MANAGEMENT IN INDUSTRIES CONSTRUCTION

SIGNIFICANCE OF MATERIALS MANAGEMENT IN INDUSTRIES CONSTRUCTION SIGNIFICANCE OF MATERIALS MANAGEMENT IN INDUSTRIES CONSTRUCTION *M.VEERA KRISHNA, *D.SATYANARAYANA, **Dr K.SAMBASIVA RAO *Research Scholar, Rayalaseema University, Kurnool, AP **Professor of DCMS, Andhra

More information

The Training Material on Logistics Planning and Analysis has been produced under Project Sustainable Human Resource Development in Logistic Services

The Training Material on Logistics Planning and Analysis has been produced under Project Sustainable Human Resource Development in Logistic Services The Training Material on Logistics Planning and Analysis has been produced under Project Sustainable Human Resource Development in Logistic Services for ASEAN Member States with the support from Japan-ASEAN

More information