1 Ref. No. CNCA-01C-011: 2007 IMPLEMENTATION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICAL AND ELECTRONIC PRODUCTS Low-voltage Electrical Apparatus---switch and control Equipment Announced on Aug. 1, 2007 Implemented on Aug 15, 2007 Certification and Accreditation Administration of People s Republic of China

2 Contents 1. Scope Certification model Major processes for certification Application for certification Type testing Initial inspection of the factory Evaluation of certification results and approval of certification Follow-up inspection General requirements for certification Application for certification Type testing Initial inspection of the factory Evaluation of certification results and approval of certification Follow-up inspection Certificate Maintenance of the certificate Extension of the products covered by certificates Suspension, cancellation and withdrawal of the certificates Use of compulsory certification mark Design of the mark allowed to use Derivations of certification mark Ways of use Location of the mark Charge...14 Appendix Appendix Appendix Appendix Contents Ref. No. CNCA-01C-011: 2007

3 IMPLEMENTATION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICIAL AND ELECTRONIC PRODUCTS Low-voltage Electrical Apparatus---switch and control Equipment 1. Scope This document applies to low-voltage circuit-breakers (frame-type circuit breaker, conventional circuit-breakers, moulded case circuit-breaker, vacuum circuit breaker, circuit-breakers incorporating residual current protection, etc.); Low-voltage switches, disconnectors, switch-disconnectors and fuse-combination units; Low-voltage electromechanical contactors, and motor starters (AC contactors, DC contactors, vacuum contactors, AC motor starters, thermal overload relays, motor protectors, motor controllers, etc.); Control circuit devices and switching elements (contactor relays, time delay relays, change-over switches, foot switches, position limit switches, push-button switches, two direction switches, temperature sensitive switches, pressure switches, hydraulic switches, auxiliary contact assembly, micro switches, etc. AC Semiconductor motor controllers and starters (soft starters, contactless contactors, solid state contactor, etc.); Control and protective switching devices; Proximity switches; Automatic transfer switching equipment; Circuit breaker for equipment; Electromechanical contactors for household and similar purposes. Page 1 of 46 Ref. No. CNCA-01C-011: 2007

4 2. Certification model Type testing + Initial inspection of the factory + Follow-up inspection 3. Major processes for certification 3.1 Application for certification 3.2 Type testing 3.3 Initial inspection of the factory 3.4 Evaluation of certification results and approval of certification 3.5 Follow-up inspection 4. General requirements for certification 4.1 Application for certification Defining application unit for certification In principle, the products, of same manufacturer, of same frame degree rated current or basic type, shall be in defined in one application unit. Products from different manufacturing premises shall be in different application units. Details are as following: Page 2 of 46 Ref. No. CNCA-01C-011: 2007

5 Table 1 definition of application unit Serial Name of the product Application unit Standard Applied number 1 Low-voltage One application unit GB circuit-breakers (frame-type circuit breaker, universal circuit breaker, moulded case circuit-breaker, vacuum circuit breaker, circuit-breakers incorporating residual current protection) for each frame degree rated current 2 Low-voltage switches, disconnectors, switch-disconnectors and fuse-combination units One application unit for each frame degree rated current GB Low-voltage contactors, motor starters, AC contactors, DC contactors, vacuum contactors, thermal overload relays, motor protectors, motor controllers 4 Control circuit devices and switching elements (contactor relays, time delay relays, change-over switches, foot switches, position limit switches, push-button switches, two direction switches, temperature sensitive switches, pressure switches, hydraulic switches, auxiliary contact assembly, micro switches, proximity switches, and etc.) 5 AC Semiconductor motor controllers and starters (soft starters) 6 Control and protective switching devices One application unit for each frame degree rated current One application unit for each frame degree/each basic model One application unit for each frame degree rated current One application unit for each frame degree rated current or the controlled power GB JB/T GB GB GB Proximity switches One application unit GB Page 3 of 46 Ref. No. CNCA-01C-011: 2007

6 for each frame degree/each basic model (2) 8 Circuit breaker for One application unit GB equipment for each frame 9 Electromechanical contactors for household and similar purposes 10 Automatic transfer switching equipment degree rated current One application unit for each frame degree/each basic model One application unit for each frame degree rated current (3) GB GB/T (1) a. One application unit for product of each model, with uniform switch component, installation dimension, as well as uniform structure of driving mechanism except for different actuators such as push buttons, mushroom buttons, key buttons and knobs; b. One application unit for the buttons with or without indicator if they satisfied the requirements of defining application unit for buttons; c. Defining application unit of indicator: one application unit for each model and installation dimension; d. Defining application unit of travel switch: one application unit for products of each model with uniform switch component (different enclosure shape and size, actuators are allowed); e. Defining application unit of time delay relay: one application unit for products of each model, with uniform switch component and time delay component. (2) One application unit for each frame degree (similar shape)/each basic model(same induction methods and similar basic design). (3)Different application unit for different frame and switch frame degree rated current Application documents The formal application shall be submitted with the following documents: 1) Application for CCC certification; 2) Producer s Business license (partnership agreement as well as business licenses of the applicant s and the manufactory are required if the producer is neither the applicant nor the manufactory); 3) Description of products under certification (application unit: main parameters, structure, model description, list of critical components and/or materials, description of the difference between the different model/type of products in the same application unit, product assembly chart (if applicable), and etc.); 4) Questionnaire for factory inspection; Page 4 of 46 Ref. No. CNCA-01C-011: 2007

7 5) Statement of conformity, enterprise commitments; 6) Certification of trade mark registration (if have); 7) Other necessary documents. 4.2 Type testing Sample delivery for type testing The principle of sample delivery Samples for type testing shall be produced in the manufacturing premises applied to be certified. Samples from the units of application for certification shall be selected according to relevant standards for certification and supplied for type testing. Other products covered by the application unit shall be delivered for additional difference testing if necessary Samples quantity/amount requirements The applicants shall take responsibility of sample delivery for type testing in accordance with the certification standard and the requirements of the certification body and be responsible for them. Please refer to appendix 1 for the quantities of samples shall be delivered Handle of samples and relating documents after type testing The samples tested and/or the relating documents should be handled in appropriate ways after type testing Test standards, items and methods for type testing Test standards Table 2 Test standards No. National standards 1 GB Low-voltage switchgear and controlgear Low-voltage circuit-breakers 2 GB Low-voltage switchgear and controlgear Part 3: Switches, disconnectors, switch-disconnectors and fuse-combination units 3 GB Low-voltage switchgear and controlgear Electromechanical contactors and motor starters JB/T Low-voltage motor protectors 4 GB Low-voltage switchgear and controlgear Control circuit devices Page 5 of 46 Ref. No. CNCA-01C-011: 2007

8 and switching element part 1: control circuit devices 5 GB Low-voltage switchgear and controlgear Contactors and motor starters Section 2: AC Semi-conductors, motor controllers and starters 6 GB Low-voltage switchgear and controlgear Multiple function equipment Section 2: Control and protective switching devices (or equipment) 7 GB/T Low-voltage switchgear and controlgear--control circuit devices and switching element-- Section 2: Proximity switches 8 GB circuit-breakers for equipment 9 GB Electromechanical contactors for household and similar purposes Normally, the existing standards shall be applied except for prior notice from CNCA Test items Test items are all the applicable items prescribed in the national standards of the product, for reference, see appendix Test methods The type testing shall be carried out according to the test methods and/or standards prescribed and/or quoted in the safety standards of relevant products Type testing report and products description report The testing body shall issue the Type Testing Report after the completion of the type testing. Rectification is allowed in case some items for type testing are not qualified; the rectification shall be completed before the deadline set by certification body, otherwise it will be considered as abandoning the application. The applicant can also terminate application initiatively. The Products Description Report describes the information relative to the certification of all the products in the application unit. The certification body shall compile the Products Description Report in accordance with defined content and form. The content of the Products Description Report shall be clear and integrated. Certification body shall provide the Type Testing Report and Products Description Report to applicant in time. Certificate holders shall ensure that integrated and effective Type Testing Report and Products Description Report are available in the manufactory. 4.3 Initial inspection of the factory Content of the inspection The content of factory inspection shall include the factory quality assurance ability assessment and the products consistency check. Page 6 of 46 Ref. No. CNCA-01C-011: 2007

9 Assessment of factory quality assurance ability The inspector assigned by the certification body shall carry out the factory quality assurance capability assessment according to the Requirements for Factory s Quality Assurance Ability (see appendix 4) and the additional inspection requirements stipulated by CNCA. Meanwhile, the inspector shall carry out assessment according to the Testing Requirements of Factory Quality Control on Compulsory Product Certification for Switch and Control Equipment (see appendix 3) Check of consistency of the product The consistency of the product applying for certification shall be checked on the site of production. If more than one series of products are involved in the certification, at least one type/model sample shall be taken from each series for the product consistency check. The key point in initial inspection of factory is the inspection of factory assurance ability for the consistency of the products. The following major points shall be checked: 1) The nameplates, labels of products to be certified shall be identical with those indicated in the type testing reports. 2) The constructions of products to be certified (mainly constructions in terms of safety) shall be identical with those of the samples for type testing. 3) The critical components and materials shall be identical with those declared in type testing and confirmed by certification body. The witness tests on site, if necessary, should be carried out to confirm safety performance of the products during the factory inspection. If necessary, samples shall be delivered for consistency check and the report shall be issued All the products to be certified and processing premises shall be covered for inspection of factory quality assurance ability and of consistency of the products Timing of initial factory inspection Normally, the initial inspection should be implemented after the sample has passed the type testing. The type testing and factory inspection can be implemented at the same time if needed. Page 7 of 46 Ref. No. CNCA-01C-011: 2007

10 The duration of factory inspection shall be determined by the amounts of application units of products to be certified and with the consideration of the scale of the factory. It will normally take about 1 to 5 man-day for each manufactory. The factory shall manufacture products covered by certification scope during the initial factory inspection. Factory inspection should be completed within one year after the type testing. Otherwise, additional type testing is needed The results of inspection Inspection group shall report the results of inspection to the certification body. If unqualified items are discovered during the factory inspection, the factory shall conduct rectification that shall be finished within the deadline set by the certification body. The certification body shall take appropriate methods to check the result of rectification. If the rectification could not be completed in time, the inspection results can be regard as unfavorable. 4.4 Evaluation of certification results and approval of certification Evaluation of certification results and approval of certification The certification body shall be responsible for a general evaluation of the results of type testing and factory inspection and for issuing the certificates to the applicants for the conformed products. One certificate shall be issued for one application unit. The application of the certificates shall comply with the requirements for Regulations for Compulsory Product Certification Time frame Time frame for certification means the working days from the acceptance of complete application till the issuance of the certificates, which includes the time of type testing, reports submission after inspection, evaluation of certification results and approval of certificates, etc. Normally, type testing takes working days, counting from receiving the samples, not including the time for corrective actions and retest of the nonconformities. The inspection reports should be submitted within 5 working days after the inspection. It will be counted from the day when the inspectors complete the inspection and receive from the factory the corrective action reports on nonconformities satisfying Page 8 of 46 Ref. No. CNCA-01C-011: 2007

11 the requirements. Evaluating certification results and approving the certificates shall normally be completed within 5 working days Termination of certification The certification body shall make decision that the applicant is unqualified and the certification shall be terminated when the type testing or the factory inspection is concluded as unqualified. 4.5 Follow-up inspection The content of follow-up inspection The content of follow-up inspection includes annual inspection and effective tracking inspection for certified products carried out by the certification body Annual inspection The inspection could be carried out with or without notifying the inspected body beforehand. Normally, the certification body shall notify the inspected body and confirm the inspection date. The factory shall ensure that product categories that have obtained certification are under normally production during the inspection. The inspection can be implemented without prior notification to the inspected body when necessary. Different manufacturers, though in the same premises, shall all be subject to inspection The certificate holder shall accept inspection within a regular period. Otherwise it can be dealt with as can not accept inspection The frequency of follow-up inspection The annual inspection shall normally be implemented at least once a year after the initial inspection of the factory The frequency of inspection should be increased in any of the following cases: 1) The certified product has serious quality problem, or is complained by clients, which has been verified to be the responsibility of the certificate holder. 2) The certification body doubts the conformity of the certified product against the Page 9 of 46 Ref. No. CNCA-01C-011: 2007

12 requirements of safety standards with sufficient reasons. 3) Sufficient information indicates that the conformity or the consistency of certified products might be affected due to the changes in organization structure, production condition and the quality system of the manufacturer and/or manufactories. The content of the check of consistency of certified product shall be the same as that during the initial inspection of the factory. Additionally, check shall also be conducted pursuant to the Testing Requirements of Factory Quality Control on Compulsory Product Certification for Switch and Control Equipment (see appendix 3). The use of CCC marks and the certificates shall also be checked The conclusion of annual inspection The inspection group shall report the conclusion of inspection to the certification body. The inspection group shall report to certification body directly in case of unfavorable conclusion of the inspection. If there is any non-conformity found in the inspection, the factory shall conduct rectification within 40 working days and the certification body shall take appropriate measures to check the results of rectification. If the rectification can not be completed in time, the factory inspection shall be concluded as unfavorable Content of the follow-up inspection The model of follow-up inspection: re-assessment of factory quality assurance ability + check of consistency of products certified, and if necessary, samples may be taken and tested at the testing laboratories (see 4.5.4). The certification body shall implement the factory re-assessment in accordance with Requirements for Factory Quality Assurance Ability. At the same time, checks shall be carried out according to the Testing Requirements of Factory Quality Control on Compulsory Product Certification for Switch and Control Equipment (see appendix 3). The items 3, 4, 5 and 9 specified in Requirements for Factory Quality Assurance Ability (see appendix 4) and the check of consistency of products must be assessed for follow-up inspection and the rest items may be selected. All the items of the Requirements shall be covered at least every four years. The duration for follow-up inspection shall be determined by the amounts of units of certified products with appropriate consideration of the production scale of the factory. It will normally take about 1 to 3 man-day Sampling & testing Page 10 of 46 Ref. No. CNCA-01C-011: 2007

13 If the certified products need to be sampled and tested, the samples shall be taken randomly from the qualified products of the factory (to ensure the consistency and authenticity of products to be certified, samples can be taken from market/on-site sale network, production line, stock, etc). The amount of samples taken for sampling and testing depends on the requirement of the certification body. The samples shall be sent by the factory to the testing bodies designated by the certification for testing. The sampling test, which is taken charge by the designated testing bodies, shall be completed within 40 working days. The test items specified in the standards for type testing can be applied to testing. The certification body may carry out part or all of test items based on the degree of effects on the safety performance of the products Evaluation of follow-up inspection results The certificates can be retained and the certification marks can be continuously used upon favorable annual inspection results. Actions shall be taken in accordance with Clause 5.3 of the present rule upon unfavorable inspection results. 5. Certificate 5.1 Maintenance of the certificate The validity of the certificate The certificate of the products covered by this Rules itself doesn t indicate specific expiry date. The validity of the certificate depends on regular follow-up inspection Change of the certified product Applying for change of certified product Should any change occur in the specification, type/model, manufactory of the critical components and materials (appendix 2) of the certified products, or the design, electric construction involved in safety of the appliances, or the content of the certificate, the application shall be made to the certification body Evaluation and approval of change The certification body shall evaluate the change according to the submitted Page 11 of 46 Ref. No. CNCA-01C-011: 2007

14 information and confirm whether it can be approved or samples should be submitted for tests. In principle, the evaluation is based on the products that initially carried out all test items. If test is necessary, the change will be approved upon favorable test result. 5.2 Extension of the products covered by certificates Procedure for extension For extension of the range of products, which are in the same application unit with the certified products, the certificate holder should first make application. The certification body shall check the consistency of the extended products against the certified products and confirm the applicability of the original certification results to the extended products and carry out additional test or inspection based on the differences. Either a separate certificate can be issued or the original certificate can be updated at the request of the certificate holder Requirements of sample If necessary, the certificate holder shall deliver one sample to the certification body for test according to the requirements of Clause 4.2 of this Rules. If the samples need to be tested, the testing items to be checked shall be decided by the certification body. 5.3 Suspension, cancellation and withdrawal of the certificates The suspension, cancellation and withdrawal of the certificates shall follow Regulations for Compulsory Product Certification and relevant requirements of the certification body. For certificate holders who can not accept annual inspection and sample testing, the certification body shall suspend their use of the certificates. For certificate holders who do not accept annual inspection and/or sample testing, the certification body shall withdraw their use of the certificates. Certificate holders can apply to the certification body for suspending or canceling their certificates. The certification body shall suspend or cancel the certificates upon the certificate holders application. Page 12 of 46 Ref. No. CNCA-01C-011: 2007

15 The time limit for the suspension of certificate, which is applied for due to acceptable reason such as stopping production of certificated products, is 12 months. The certification body shall cancel the certificates of those products that cannot restore production in 12 months. The certificate holders shall apply to the certification body for continuous use of the certificates that have been suspended. The certification body shall inspect the factory according to the requirements of initial factory inspection. If necessary, samples may be taken and tested. The certificates can be continuously used upon favorable factory inspection results and sample testing (where appropriate). Upon unfavorable inspection results, the certification body may suspend or withdraw the certificate depending on the degree of unfavorable result. Certificate holders shall apply for continuous use of the certificate after one month from and within three months of the date of suspension, otherwise the certification body shall withdraw the certificates. Factory inspection is implemented according to the requirement of the initial factory inspection. Certificates can be continuously used upon favorable factory inspection results. Otherwise, the certificates shall be withdrawn. The certification body shall announce the suspension, cancellation and withdrawal of certificates in appropriate way. 6. Use of compulsory certification mark The certificate holder shall follow the Regulations for Compulsory Product Certification Mark 6.1 Design of the mark allowed to use Page 13 of 46 Ref. No. CNCA-01C-011: 2007

16 6.2 Derivations of certification mark The products listed in this Rules shall not be allowed to use any derivation of certification mark. For special products, the derivation of certification mark may be allowed to use when approved by the mark administration body. 6.3 Ways of use Any of the following three ways is required: affixing standard-size marks, printing on the nameplate or moulding. 6.4 Location of the mark The certification mark shall be applied on an exposed location on the outer body of the product. The certification mark shall be applied on the face or the side face of the product. 7. Charge The certification shall be charged by the certification body according to the national statutory structural fee chart. Page 14 of 46 Ref. No. CNCA-01C-011: 2007

17 Appendix 1 Test items and samples Due to the differences of main technical parameters of the application units, the test items and the amount of samples needed may vary according to the requirements of standards. Therefore, the applicants shall deliver samples according to the requirement of specification and quantity listed in the notification from the certification body. For your reference, the sample specification and quantity requirements in the following table are based on certain specific technical parameter. 1. Low-voltage circuit-breakers Test items General operation performance Rated service short-circuit breaking capacity Rated limited short-circuit breaking capacity Rated short-time withstand current Properties of fuse-circuit-breakers Comprehensive testdamp-heat test Appendix B Additional tests for circuitbreakers incorporating residual current protection Appendix C Additional tests for circuitbreakers in phase -earthed systems Appendix F Additional tests for circuitbreakers with electronic over-current protection Appendix H Additional tests for IT systems circuit-breakers Sample specification and quantity Take moulded case circuit-breakers as an example Main parameters: Ue: 400V 690V Ie: 16A 25A 32A 40A 50A 63A 80A 100A Ics=50kA(400V) 35kA(690V) Icu=70kA(400V) 50kA(690V) Icw=8kA 0.4s(400V) 4kA0.4s(690V) Category: B Poles: 3P+N Amount of samples needed: Max. rated current (100A): 12+(3) sets Min. rated current (16A): 5+(2) sets If appendix B is applied to MCCB, additional 4 sets of Max. setting current sample are needed; If appendix C is applied to MCCB, additional 1 set of Max. setting current sample is needed; If appendix F is applied to MCCB, additional 2 to 4 sets of Max. setting current samples are needed; If appendix H is applied to MCCB, additional 1 set of Max. setting current sample is needed; Note: If there is one or more than one Page 15 of 46 Ref. No. CNCA-01C-011: 2007

18 structure in one frame, more samples are needed for additional test according to the requirements of relative standards. 2. Low-voltage switches, disconnectors, switch-disconnectors and fuse-combination units Test items Sample specification and quantity Temperature rise Take switch-disconnector fuse-combination Dielectric properties units as an example Leakage current Rated making and breaking capacity Main parameters: Mechanical strength of actuators Ue: 400V 690V Operation performance Ith: 125A Rated short-time withstand current Ie: 125A(400V) 100A(690V) Rated short-circuit making capacity Category: AC-23A Poles: 4P Short-circuit withstand capabilities of fuse protective devices Amount of samples needed: Short-circuit making capacity of fuse Complete appliance: 9+(3) sets protective devices Insulation materials parts: 1 piece for each Damp heat test Fuse-link applied to complete appliance: Abnormal heat and fire hazard test 64+(12) pieces Overload withstand capacity Mechanical performance of terminals Electromagnetic compatibility 3. Low-voltage electro-mechanical contactor and motor starters Test items Sample specifications and quantity Take AC contactors as an example Damp-resistant test Abnormal heat and fire hazard test Main parameters: Temperature rise Main circuit: Operation condition and range AC-3 Ue/Ie: 400V/15A, 690V/10A Dielectric properties AC-4 Ue/Ie: 400V/10A, 690V/8A Rated making and breaking capacities Category of short-circuit coordination: type Degree of protection of enclosure (where 2, Iq=50kA appropriate) Auxiliary loop: Mechanical performance of terminals AC-15 Ue/Ie: 220V/1.50A Contactor overload withstand capacity DC-13 Ue/Ie: 220V/0.27A Conventional operation performance Performance under short-circuit condition Amount of samples needed: Electromagnetic Compatibility (where Complete appliance: 16+(6) sets appropriate) Insulation materials parts: 1 piece for each Making and breaking capacity and rated conditional short-circuit current of If there are electronic circuits in the Page 16 of 46 Ref. No. CNCA-01C-011: 2007

19 auxiliary contacts (where appropriate) contactors, additional 1 set sample is Protective function needed; Alarming function If the category of contactor short-circuit Controllable function (validate panel coordination is type 1, additional 2 samples controllable function) are needed.; Thermal memory function Failure memory function (validate panel Take thermal overload relays as an display) example: Main parameters: Ue: 690V Ie: 10-15A, 16-18A, 20-25A, 30-36A Category of short-circuit coordination: type 2, Iq=50kA Auxiliary loop: AC-15 Ue/Ie: 220V/1.5A DC-13 Ue/Ie: 220V/0.27A Amount of samples needed: Max. current specification (30-36A):8+(4) sets Current specification (10-15A): 3+(1) sets Current specification (16-18A): 3+(1) sets Current specification (20-25A): 1+(1) sets 4. Electromechanical control circuit devices Test items Damp-resistant test Clearance and creepage distance Degree of protection of enclosure Abnormal heat and fire hazard test Operation range of contactor relays Temperature rise Dielectric properties Mechanical performance of terminals Making and breaking capacity under abnormal conditions Making and breaking capacity under normal conditions Condition short-circuit capacity Electromagnetic Compatibility (where appropriate) Check moment Check the rotary limit of rotary switch Sample specifications and quantity Take auxiliary contactor as an example Main parameters: AC-15 Ue/Ie: 380V/1.2A 220V/1.5A DC-13 Ue/Ie: 220V/0.5A 110V/0.3A Amount of samples needed: Complete appliance: 16+(6) sets Insulation materials parts: 1 piece for each Where appendix F is applied, additional 3 sets are needed. Where appendix G is applied, additional 1 set is needed. Where appendix H is applied, additional 1 set is needed. Where appendix J is applied, additional 5 sets are needed. Where appendix K is applied, additional 5 Page 17 of 46 Ref. No. CNCA-01C-011: 2007

20 Annex F Class II control circuit devices sets are needed. insulated by encapsulation Requirements Where appendix L is applied, additional 1 and tests set is needed. Annex G Additional requirements for control circuit devices with integrally connected cables Annex H Additional requirements for semiconductor switching elements for control circuit devices Annex J Additional requirements for indicator lights Annex K Special requirements for control switches with direct opening action Annex L Special requirements for mechanically linked contact elements 5. AC semi-conductor motor control devices and starters Test items Sample specification and quantity Dielectric properties Take soft starters with the following Temperature rise limit specification as an example Operation performance Operation and operation range Main parameters: Making and breaking capacity of Ue: 400V mechanical switching devices in series in Ith: 100A compound electrical apparatus Ie: 50A 70A 85A 100 Performance in short-circuit condition Category: AC-53a Poles: 3P Mechanical performance of terminals Degree of protection of enclosed control Amount of samples needed: devices and starters Max. power complete appliance (100A): EMC test 6+(2) sets Damp-resistant test Min. power complete appliance (50A): 1+(1) sets Insulation materials parts: 1 piece for each 6. Control and protective switch devices (equipment) Test items Sample specifications and quantity Operation range Temperature rise Dielectric properties Operation performance Performance under short-circuit condition Take CPS with the following specification as an example: Main parameters: Ue: 400V, 500V, 690V Page 18 of 46 Ref. No. CNCA-01C-011: 2007

21 Making and breaking capacity Ith: 32A Electromagnetic compatibility Ie: 0.15~12A, 12~32A Damp-resistant test Ics: 50kA (400V), 25kA (500V), Abnormal heat and fire hazard test 10kA (690V) Degree of protection of enclosure Category: AC-43 Poles: 3P Amount of samples needed: Max. setting current complete appliance(12~32a): 10+(2) sets Min. setting current complete appliance (0.15~12A): 2+(1) sets Insulation materials parts: 1 piece for each 7. Approach switches Test items Mark Temperature rise Dielectric properties Making and breaking capacity of switch elements under normal and abnormal conditions Performance of conditional short-circuit current Structure requirements Degree of protection Operation distance Frequency of operation EMC Impulse withstand capability Vibration withstand capability Damp-resistant test Abnormal heat and fire hazard test Sample specifications and quantity Take inductance-type proximity switches as an example: Main parameters: Ue: 24~230V Ie: 100mA Category: DC-12 Class II Encapsulated insulation Integrally connected cable Amount of samples needed: Complete appliance: 10+(6) sets Insulation materials parts: 1 piece for each Appendix B Class II proximity switches insulated by encapsulation requirements and tests Additional requirements for proximity switches with integrally connected cables Page 19 of 46 Ref. No. CNCA-01C-011: 2007

22 8. Automatic transfer switching equipment Test items Sample specification and quantity Structure requirements Take ATSE with following specification as an Operation example: Operation control, process and range Temperature rise Main parameters: Dielectric properties Ue: 400V Making and breaking capacity Ith: 630A Operation performance Ie: 630A Short-circuit making capacity Category: AC-31B Short-circuit breaking capacity Short-time withstand capacity Amount of samples needed: Conditional short-circuit current Complete appliance: 6+(2) sets Electromagnetic compatibility Insulation materials parts: 1 piece for each Damp-resistant test Abnormal heat and fire hazard test Degree of protection of enclosure Page 20 of 46 Ref. No. CNCA-01C-011: 2007

23 9. Circuit-breakers for equipment Test items Mark General requirements and mechanical structure Clearance and creepage distance Endurance of the mark Reliability of screw, current carrying parts and connection. Reliability of terminals connected with outer conductor Protection against electric shock Heat resistant properties Abnormal heat and inflammation withstand abilities Anti-rust properties Dielectric properties Temperature rise 28-day test CTI test Tripping characteristics Performance at rated current Operation characteristics at rated making and breaking capacity Performance at prescribed over-current Conditional short-circuit current Sample specification and quantity Max In Min In 13 + (12) 4 + (3) Single-pole Two-pole 7 + (6) 3+ (3) 13 + (12) 3+ (3) Three-pole Four-pole 13 + (12) 3 + (3) Note: Quantity in the bracket is the number of samples allowed to be re-tested after one failure in test. Quantity of samples in the table is typically recommended by standards. If products with different poles apply for certification at the same time, samples can be omitted according to relevant provision in the standards. Take circuit-breakers for equipment with the following specification as an example: Ue: 230(1P) 400V(2P 3P 4P) In: 10A 20A 32A 40A Amount of samples needed: Max. In (40A), 4P: 13+(12) sets Max. In (40A), 3P: 7+(6) sets Max. In (40A), 2P: 7+(6) sets Max. In (40A), 1P: 13+(12) sets Min. In (10A), 4P: 3+(3) sets Min. In (10A), 3P: 3+(3) sets Min. In (10A), 4P: 3+(3) sets Min. In (10A), 1P: 4+(3) sets Insulation materials parts: 1 piece for each Black metal parts: 1 piece for each Samples of insulation material: 2 pieces for each 100 (3~5) mm 10. Electro-mechanical contactors for household and similar uses Test items Sample specification and quantity Temperature rise Operation and its range Take household contactors with the following Page 21 of 46 Ref. No. CNCA-01C-011: 2007

24 Rated making and breaking capacity specification as an example: Dielectric properties Conventional operational characteristics Main parameters: Temperature withstand capability AC-7a Ue/Ie: 220V/15A Over-current withstand ability AC-7b Ue/Ie: 220V/10A Anti-rust properties Iq=50kA Endurance of the mark Impact withstand capability Amount of samples needed: Clearance and creepage distance Complete appliance: 20+(6) sets Mechanical performance of terminals Insulation material parts: 1 piece for each Characteristics of Screw and bolts used for Samples of insulation material: 2 pieces for mounting and maintenance each 100 (3~5) mm Heat withstand capability Black metal parts: 1 piece for each Abnormal heat and fire hazard withstand Elastic parts made of rubber, PVC or test similar material: 2 pieces for each CTI test Ageing withstand characteristics Degree of protection of enclosure Performance at short-circuit condition Page 22 of 46 Ref. No. CNCA-01C-011: 2007

25 Appendix 2 List of critical components In principle, critical components and materials shall cover critical components and materials in application units. If application units cover critical components and materials of different specification, the explanations are needed in application documents. If critical components and material change, application to the certification body for change is needed, and corresponding check is needed depending on the change. If there are more than one serial number and for a certain critical component or material, test items shall be added depending on the degree of the influence on products security performance. The s codes are acceptable instead of their names. Applicant shall provide information of critical components and materials according to practical situation of products applied for certification and the following requirements. 1.1 Frame-type circuit breaker (conventional circuit-breakers) Name of material or element Controlled items Base Name of the insulation material, serial number, and name of the of base Revolving spindle Main spindle, external diameter Operation mechanism (manual and Model/type, specification and name of the power-driven) Latched device, tripping device, and re-tripping device Drawer base Model/type, name of the Moving/static main contact, degrees Main contact spring ; P1, P2 value Thermal-magnetic tripping unit Serial number, name of the double metal component material and the Electronic tripping unit Model/type and specification of micro- Micro-processors processors, name of the Electronic groupware board The schematic diagram of electrical groupware board and plan of printed circuit Page 23 of 46 Ref. No. CNCA-01C-011: 2007

26 board, Model/type, specification of integrated circuit and thyristor, and name of the Model/type, specification and name of the Shunt release Model/type, specification and name of the Under-Voltage Release Model/type, specification and name of the Closing electromagnet Arc control device 1.2 Vacuum circuit breaker Name of material or element Base Main spindle Operation mechanism (manual and power-driven) Latched device, tripping device, and re-tripping device Drawer base Moving/static main contact Main contact spring Thermal-magnetic tripping unit Electronic tripping unit: Micro-processors Electrical groupware board Shunt release Under-Voltage Release Closing electromagnet Vacuum interrupters Controlled items Name of the insulation material, serial number, and name of the of base, external diameter Model/type, serial number and name of the Model/type, name of the, degrees ; P1, P2 value Serial number, name of the double metal component material and the Model/type and specification of microprocessors, name of the The schematic diagram of electrical groupware board and plan of printed circuit board Model/type, specification of integrated circuit and thyristor, and name of the Model/type, specification and name of the Model/type, specification and name of the Model/type, specification and name of the Model/type, specification and name of the Page 24 of 46 Ref. No. CNCA-01C-011: 2007

27 1.3 Moulded case circuit-breakers Name of material or element Controlled items Serial number, name of the insulation Enclosure (seat, cover, handle) material and the Revolving spindle, external diameter Latched device, tripping device, and re-tripping device Moving/static main contact, degrees Main contact spring ; P1, P2 value Serial number, name of the double metal component material and the Thermal-magnetic tripping unit Type of silicone oil and name of the Model/type and specification of microprocessors, name of The schematic diagram of electrical Electronic tripping unit: groupware board and plan of printed circuit Micro-processors board, Electrical groupware board Model/type, specification of integrated circuit and thyristor, and name of the Model/type, specification and name of the Shunt release Model/type, specification and name of the Under-voltage release External auxiliary (electric operation mechanism) Arc control device Model/type, specification and name of the, 1.4 Moulded case circuit-breakers incorporating residual current protection Name of material or element Controlled items Enclosure (seat, cover, handle) Serial number, name of the insulation material and the Revolving spindle, external diameter Latched device, tripping device, and re-tripping device ; Moving/static main contact, degrees Main contact spring ; P1, P2 value Page 25 of 46 Ref. No. CNCA-01C-011: 2007

28 Serial number, name of the double metal component material and the Thermal-magnetic tripping unit Type of silicone oil in oil cups and name of the Model/type and specification of microprocessors, name of the The schematic diagram of electrical Electronic tripping unit: groupware board and plan of printed circuit Micro-processors board, Electrical groupware board Model/type, specification of integrated circuit and thyristor and name of the Model/type, specification and name of the Shunt release Model/type, specification and name of the Under-voltage release External auxiliary (electric Operation mechanism) Zero-order mutual inductor Residual current tripping device Leakage detection and control circuit electrical groupware board Arc control device Model/type, specification and name of the Serial number, name of iron core material and the Model/type, specification and name of the The schematic diagram of electrical groupware board and plan of printed circuit board, Model/type, specification of pressure-variable resistor, integrated circuit and thyristor, and name of the 2. Low-voltage switches, disconnectors, switch-disconnectors and fuse-combination units Name of material or component Controlled Items Base (enclosure) Contact (blade) Contact spring (flake or ring) ; P1, P2 value Arc control device Fuse-link Type, specification and manufactory Operation handle of insulation material Page 26 of 46 Ref. No. CNCA-01C-011: 2007

29 3.1 contactors Name of material or element Controlled items Enclosure Contact ; degrees. Arc control device Coil Frame material, serial number of enamel insulated wire, diameter, number of coils Core Main contact spring and reaction spring ; P1, P2 values. 3.2 Overload relays, motor protectors, motor controllers, and etc Name of material or element Controlled items Enclosure Contact, degrees Double metal component Thermal component, resistance Serial number, name of the laminated Mutual inductor material, serial number of enamel insulated wire, diameter, number of coils Model/type and specification of micro- Micro-processors processors, name of The schematic diagram of electrical groupware board and plan of printed circuit Electrical groupware board board, Model/type, specification of integrated circuit and thyristor and name of 3.3 Motor starters, and etc. Name of material or element Controlled items Enclosure Contact Model/type and specification of microprocessors, name of the Overload relay Model/type and specification of microprocessors, name of the Page 27 of 46 Ref. No. CNCA-01C-011: 2007

30 Model/type and specification of micro- Button processors, name of the Model/type and specification of micro- Indicator processors, name of the Serial number, name of the laminated Mutual inductor material, serial number of enamel insulated wire, diameter, number of coils, Model/type and specification of micro- Micro-processors processors, name of the The schematic diagram of electrical groupware board and plan of printed circuit board, Electrical groupware board Model/type, specification of integrated circuit and thyristor and name of the 3.4 Vacuum contactors Name of material or element Enclosure Vacuum interrupters Coil Core Spring Revolving (or bearing) spindle Controlled items Frame material, serial number of enamel insulated wire, diameter, number of coils, DC resistance value at 20, P1, P2 values. 4.1 Control circuit devices and switch elements such as change-over switches, auxiliary contact assembly, time relays and etc. Name of material or component Controlled items Base (enclosure) Contact material ; sizes Spring, P1, P2 values Electrical groupware board The schematic diagram of electrical groupware board and plan of printed circuit board, Page 28 of 46 Ref. No. CNCA-01C-011: 2007

31 Model/type, specification of integrated circuit and thyristor and name of the 4.2 Contactor relay Name of material or component Enclosure Contact Arc control device Coil Core Main contact spring and reaction spring Controlled items ; degrees Frame material, serial number of enamel insulated wire, diameter, number of coils ; P1, P2 value 5. AC semi-conductor motor control devices and starters Name of material or component Controlled items Micro-processors Model/type and specification of microprocessors, name of the Electrical groupware board The schematic diagram of electrical groupware board and plan of printed circuit board, Model/type, specification of integrated circuit and thyristor and name of the Semiconductor used in main circuit (i.e. Model/type and specification of microthyristor) processors, name of the Radiator element Serial number, name of the material and the Enclosure or the base Name of the material and the, serial number Contactor uses in bypass products Model/type and specification of microprocessors, name of the 6. Control and protective switching devices (CPS) Name of material or component Controlled items Enclosure (base) Page 29 of 46 Ref. No. CNCA-01C-011: 2007

32 Cam, Stopping device Main contact, degrees Main contact spring (including reaction spring) Arc control device Electro-magnetic Coil Frame material, serial number, diameter, number of coils of enamel insulated wire Core Double metal component Heat component, resistance Fast (short-circuit) release/ Serial number, diameter, number of coils of Electromagnetic release enamel insulated wire, name and serial Electronic tripping unit: Micro-processors Electrical groupware board Mutual inductor number of electromagnetic material Model/type and specification of microprocessors, name of the The schematic diagram of electrical groupware board and plan of printed circuit board, Model/type, specification of integrated circuit and thyristor and name of the Serial number and name of the laminated material, serial number, diameter and number of coils of enamel insulated wire 7. Proximity switches Name of the component or the material Enclosure Insulating parts in contact with current-carrying Electronic component Electrical groupware board Inductive material Controlled items Name, type/model, specification of component and name of the The schematic diagram of electrical groupware board and plan of printed circuit board, Model/type, specification of integrated circuit and thyristor and name of the (code is acceptable) Page 30 of 46 Ref. No. CNCA-01C-011: 2007

33 8.1 Automatic transfer switching equipment (PC) Name of the component or the material Controlled items Enclosure (base) Contact material, degrees Main contact spring ; P1, P2 value Controller: Micro-processors Model/type and specification of micro- Electrical groupware board processors, name of the The schematic diagram of electrical groupware board and plan of printed circuit board, Model/type, specification of integrated circuit and thyristor and name of the 8.2 Automatic transfer switching equipment (Class CB or CC) Name of the component or the material Controlled items Base (board) or enclosure Main switch component Name, type/model, specification of the component and name of the Controller: Micro-processors Model/type and specification of micro- Electrical groupware board processors, name of The schematic diagram of electrical groupware board and plan of printed circuit board, Model/type, specification of integrated circuit and thyristor and name of the Operation mechanism Type/model and specification of operation motor, name of the ; Name of material and serial number of gear used in transmission mechanism, and name of the 9. Circuit-breakers for equipment Name of the component or the material Controlled items Enclosure Name of the material and the, serial number Contact Name of the material and the, serial number; size Over-current release: Double metal Name of the material and the, Page 31 of 46 Ref. No. CNCA-01C-011: 2007

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained. DOC: STI//1 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ACCORDING TO IS/IEC:2003 1. LABORATORY A laboratory shall be maintained which shall be suitably equipped and staffed, where different tests

More information

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

úê üßµö ÖãÆü ü ¾Ö³ÖÖÖ - III

úê üßµö ÖãÆü ü ¾Ö³ÖÖÖ - III Subject: Implementation of IS/IEC 60947-2:2003 due to revision of IS 13947 series of specifications as IS/IEC 60947 series 1. ETD has informed regarding the publication of the series of specifications

More information

1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained.

1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained. SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SINGLE PHASE a.c. INDUCTION MOTORS FOR GENERAL PURPOSE ACCORDING TO IS 996:2009 (Including Amendment No.1) 1. LABORATORY A laboratory shall be maintained

More information

COMPLEMENT. Switches for Electrical Fixed Installations for household and similar purposes

COMPLEMENT. Switches for Electrical Fixed Installations for household and similar purposes COMPLEMENT Doc: 702-CRC-003-E Revision: 07 Page: 1/8 Elaborated by: Nelson Coelho/ Douglas Ferreira Checked by: Vanessa Hernandes Approved by: Nelson Coelho Approval date: 21/07/2016 1 OBJECTIVE This document

More information

FAST POWER FACTOR REGULATOR. Computer-14df - xx - 144a INSTRUCTION MANUAL ( M / 00A ) (c) CIRCUTOR S.A.

FAST POWER FACTOR REGULATOR. Computer-14df - xx - 144a INSTRUCTION MANUAL ( M / 00A ) (c) CIRCUTOR S.A. FAST POWER FACTOR REGULATOR Computer-14df - xx - 144a INSTRUCTION MANUAL ( M 981 611 / 00A ) (c) CIRCUTOR S.A. -------- POWER FACTOR REGULATOR COMPUTER- 14f --------- Page 2 POWER FACTOR REGULATOR COMPUTER-

More information

C&G 2382 BS7671: th Edition IEE Wiring Regulations. 25 Questions

C&G 2382 BS7671: th Edition IEE Wiring Regulations. 25 Questions C&G 2382 BS7671:2008 17 th Edition IEE Wiring Regulations 25 Questions 1. BS7671 states that installation design must take into account a. current copper prices b. the effects of climate change c. a comparison

More information

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.

More information

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form)

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form) SMALL GENERATOR INTERCONNECTION REQUEST (Application Form) Attachment 2 Transmission Provider: Bluestem Electric Cooperative, Inc. Designated Contact Person: Kevin Heptig Address: P.O. Box 5, Wamego, Kansas

More information

Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content

Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content Purpose The purpose of this Detailed Requirements Document (DRD) is to provide

More information

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists SECTION 412213- BRIDGE CRANES Part 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Alvin.Xu, ABB Xiamen Switchgear Co,Ltd, Green & Energy saving concept of ABB MV apparatus For a better tomorrow.

Alvin.Xu, ABB Xiamen Switchgear Co,Ltd, Green & Energy saving concept of ABB MV apparatus For a better tomorrow. Alvin.Xu, ABB Xiamen Switchgear Co,Ltd, 2014-11 Green & Energy saving concept of ABB MV apparatus For a better tomorrow Slide 1 VD4 vacuum circuit-breaker in China Inheritance and innovation Y1992 Y2003

More information

PERMANENT DOCUMENT CIG 024

PERMANENT DOCUMENT CIG 024 CIG 024 The conduct of Factory Inspections PERMANENT DOCUMENT CIG 024 The conduct of Factory Inspections WARNING: THIS DOCUMENT IS ONLY VALID IF USED BY ECS MEMBERS AND THEIR AUTHORISED AGENTS UL does

More information

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

B. Provide liquid-filled secondary substation transformers as indicated on drawings. SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED

More information

SOMFY SPECIFICATION March 2012 SECTION... ROLLER WINDOW SHADES SOMFY LS 40 MOTOR RANGE. Disclaimer for advice given to architects and engineers

SOMFY SPECIFICATION March 2012 SECTION... ROLLER WINDOW SHADES SOMFY LS 40 MOTOR RANGE. Disclaimer for advice given to architects and engineers V1 SECTION......... ROLLER WINDOW SHADES SOMFY LS 40 MOTOR RANGE * NOTE TO SPECIFIER * [LS40 is a range of motors, only take the appropriate reference within this range for your project specification.]

More information

CSA Group Products, Processes and Services Scheme

CSA Group Products, Processes and Services Scheme 1. CONTACT CSA CSA Group Products, Processes and Services Scheme 1.1 Getting started is easy. There are three ways to contact us: Call 866 797 4272 Email client.services@csagroup.org Complete a request

More information

Certification Programme No. PCW-12. for construction products System 1, 1+ (certification of constancy of performance) CPR-1,1+

Certification Programme No. PCW-12. for construction products System 1, 1+ (certification of constancy of performance) CPR-1,1+ I N S T Y T U T N A F T Y i G A Z U O IL AN D G AS INS TI TUTE PL 31-503 Kraków, ul. Lubicz 25A Tel. +48/12/ 4210033 Fax: +48/12/ 4210050 B I U R O C E R T Y F I K A C J I CERTIFICATION OFFICE Tel. +48/12/

More information

Regulations on Work Permits for Contractors Performing Assembly, Dismantling, and Maintenance of Temporary Facilities in Buildings and at Outdoor

Regulations on Work Permits for Contractors Performing Assembly, Dismantling, and Maintenance of Temporary Facilities in Buildings and at Outdoor Regulations on Work Permits for Contractors Performing Assembly, Dismantling, and Maintenance of Temporary Facilities in Buildings and at Outdoor Areas of the Eastern Economic Forum Central Venue in 2018

More information

Product or Process Modifications Requiring Limited CBTL Retesting to Maintain Safety Certification

Product or Process Modifications Requiring Limited CBTL Retesting to Maintain Safety Certification Product or Process Modifications Requiring Limited CBTL Retesting to Maintain Safety Certification This document sets forth a uniform approach to maintain the safety certification of products that have,

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 29 23 (April 2006) -------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-16261 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Mechatronics Courses by School Period

Mechatronics Courses by School Period Mechatronics Courses by School Period Year One P1 P1 P2 P3 P3 P3 P4 P4 P4 Integrated Systems Industrial Math (Geometry, Trig, Algebra,) Blueprint Reading Machine Tool I (Hand tools-measuring-saws & Drill

More information

Low Voltage Switchgear Construction Checklist (under 500 kva)

Low Voltage Switchgear Construction Checklist (under 500 kva) Low Voltage Switchgear Checklist (under 500 kva) Project: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.

More information

P.V.C. INSULATED ALUMINIUM SERVICE MAIN WIRE-FINISHED PRODUCT

P.V.C. INSULATED ALUMINIUM SERVICE MAIN WIRE-FINISHED PRODUCT CEB SPECIFICATION 005-1: 2012 P.V.C. INSULATED ALUMINIUM SERVICE MAIN WIRE-FINISHED PRODUCT CEYLON ELECTRICITY BOARD SRI LANKA Telephone: +94 11 232 0953 Fax: +94 11 232 3935 CONTENTS PAGE 1. Scope 03

More information

Technical Specification for LV ABC Fuse Switch Disconnectors

Technical Specification for LV ABC Fuse Switch Disconnectors Ergon Energy Corporation Limited Technical Specification for LV ABC Fuse ETS-06-02-02 Check this is the latest Process Zone version before use. Specification ETS 06-02-02 Ver 3 Contents 1. Purpose and

More information

ELECTRICITY SUPPLY - POWER SYSTEM MAINTENANCE Carry out routine inspection and servicing on high voltage minimum oil circuit breakers

ELECTRICITY SUPPLY - POWER SYSTEM MAINTENANCE Carry out routine inspection and servicing on high voltage minimum oil circuit breakers 1 of 9 level: 4 credit: 6 planned review date: December 2006 sub-field: purpose: entry information: Electricity Supply People credited with this unit standard are able to: prepare for inspection, testing

More information

UPS Electrical Design and. Installation. critica POWER SUPPLIES

UPS Electrical Design and. Installation. critica POWER SUPPLIES UPS Electrical Design and critica POWER SUPPLIES Installation Important considerations for the electrical design and installation of UPS systems in mission critical applications Where Critical Power applications

More information

Factory Inspection Report

Factory Inspection Report PERMANENT DOCUMENT CIG 023 Factory Inspection Report WARNING: THIS DOCUMENT IS ONLY VALID IF USED BY ECS MEMBERS AND THEIR AUTHORISED AGENTS Approved by: ECS General Meeting, 22/23-04-2009 Nr of pages:

More information

IECEE OPERATIONAL DOCUMENT

IECEE OPERATIONAL DOCUMENT IECEE OD-G-4001 Edition 1.3 2013-06-20 IECEE OPERATIONAL DOCUMENT IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System) Guidance for Factory Inspectors

More information

Unit Substation Transformer Construction Checklist (under 500 kva)

Unit Substation Transformer Construction Checklist (under 500 kva) Unit Substation Transformer Checklist (under 500 kva) Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.

More information

Normative Document on Enterprise Declaration of Conformity on the Pollution Control of Electrical and Electronic Products

Normative Document on Enterprise Declaration of Conformity on the Pollution Control of Electrical and Electronic Products Normative Document on Enterprise Declaration of Conformity on the Pollution Control of Electrical and Electronic Products Ministry of Industry and Information Technology May 2012 Page 1 of 8 Normative

More information

Installation, Inspection and Maintenance of Dry Type Transformers

Installation, Inspection and Maintenance of Dry Type Transformers Dry Type TX 1 of 8 Installation, Inspection and Maintenance of Dry Type Page 1 of 8 Dry Type TX 2 of 8 Table Of Contents Page Number 1. General... 3 2. Installation... 3 3. Safety Inspections... 4 4. Safety

More information

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

1. Vertical reciprocating conveyor, Hydraulic straddle VRC. PART 1: GENERAL 1.01 Section Includes: 1. Vertical reciprocating conveyor, Hydraulic straddle VRC. a. Machine, controller, platform, structural steel hoist frame. b. Wire mesh enclosure and gates. Related

More information

Daker DK kva. Parallel installation quick start. Part. LE08927AA-09/15-01 GF

Daker DK kva. Parallel installation quick start. Part. LE08927AA-09/15-01 GF Daker DK 4.5-10 kva Parallel installation quick start Part. LE08927AA-09/15-01 GF Daker DK 4.5-10 kva UK ENGLISH 3 2 Daker DK 4.5-10 kva Index Introduction 2 1 Important Safety Instructions 2 2 Parallel

More information

Facility Interconnection Requirements

Facility Interconnection Requirements Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents

More information

2015 Code Rollout Meeting Q & A

2015 Code Rollout Meeting Q & A 1 SECTION QUESTION SaskPower Inspections Dept. ANSWER 2 3 4 5 6 7 8 9 10 11 12 15-02-024 15-02-200 15-02-200 15-02-200 15-02-314 Are existing single or double 'weather proof when not in use' covers allowed

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

Electrical Protection Methods and Devices SAMPLE. Learner Workbook Version 1. Training and Education Support Industry Skills Unit Meadowbank

Electrical Protection Methods and Devices SAMPLE. Learner Workbook Version 1. Training and Education Support Industry Skills Unit Meadowbank Electrical Protection Methods and Devices Learner Workbook Version 1 Training and Education Support Industry Skills Unit Meadowbank Product Code: 5635 Table of Contents Introduction... 5 1. Protection

More information

ELECTRONIC BALLASTS FOR FLUORESCENTS LAMPS NBR e NBR 14418

ELECTRONIC BALLASTS FOR FLUORESCENTS LAMPS NBR e NBR 14418 COMPLEMENT Doc: 704-CRC-002-ILM ELECTRONIC BALLASTS FOR FLUORESCENTS LAMPS NBR 14417 e NBR 14418 Review: 05 page: 1/5 Prepared by: João Damião Checked by: Vanessa Hernandes Approved by: Arnaldo Barbulio

More information

Carry out routine inspection and servicing on high voltage bulk oil circuit breakers

Carry out routine inspection and servicing on high voltage bulk oil circuit breakers Page 1 of 6 Carry out routine inspection and servicing on high voltage bulk oil circuit breakers Level 4 Credits 6 Purpose People credited with this unit standard are able to: prepare for inspection, testing

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

CIRCULAR GENERAL PROVISIONS

CIRCULAR GENERAL PROVISIONS MINISTRY OF CONSTRUCTION -------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 10/2013/TT-BXD Hanoi, July 25, 2013 CIRCULAR ON CONSTRUCTION QUALITY MANAGEMENT Pursuant

More information

International Standard Corresponding Indian Standard Degree of Equivalence

International Standard Corresponding Indian Standard Degree of Equivalence BUREAU OF INDIAN STANDARDS DRAFT FOR COMMENTS ONLY Doc: ET 28 (6756) (Not to be reproduced without the permission of BIS or used as a STANDARD) Draft Indian Standard PHOTOVOLTAIC (PV) ARRAYS DESIGN REQUIREMENTS

More information

Guidance for Factory Inspectors Annex Special Requirements For Europe

Guidance for Factory Inspectors Annex Special Requirements For Europe IECEE OD-G-4001Annex SR-EU Ed. 1.0 FACTORY SURVEILLANCE SERVICE OPERATIONAL & RULING DOCUMENTS Guidance for Factory Inspectors Annex Special Requirements For Europe Except for IECEE members and mandated

More information

IEC Quality Assessment System for Electronic Components (IECQ System)

IEC Quality Assessment System for Electronic Components (IECQ System) IECQ 03-3 Edition 2.1 2013-02 IECQ PUBLICATION IEC Quality Assessment System for Electronic Components (IECQ System) Rules of Procedure Part 3: IECQ Approved Component Products, Related Materials & Assemblies

More information

Supervision of Trainees Holding a Limited Certificate

Supervision of Trainees Holding a Limited Certificate Supervision of Trainees Holding a Limited Certificate EWRB Reference Number Document Category: Board/Legislative/Operational Document Type: Rule/Policy/Procedure/Reference Responsible: Board/Registrar

More information

CITY OF GRANDE PRAIRIE

CITY OF GRANDE PRAIRIE Inspection Services CITY OF GRANDE PRAIRIE HOMEOWNER S PERMIITS AND WIRING GUIDE FOR ELECTRICAL INSTALLATIONS 2016 INDEX Page Applying for an Electrical Permit 3 Permit Application Requirements 3 Permit

More information

ELECTRICAL SAFE WORK PRACTICES

ELECTRICAL SAFE WORK PRACTICES ELECTRICAL SAFE WORK PRACTICES I. PURPOSE To establish minimum acceptable standards for AC and DC electrical safe work practices. The program includes requirements for the training of qualified and unqualified

More information

GUIDELINES FOR SUB-SYSTEM COMPLETION CERTIFICATES AND TEST RECORDS FOR ELECTRICAL INSTALLATIONS IN POTENTIALLY EXPLOSIVE ATMOSPHERES

GUIDELINES FOR SUB-SYSTEM COMPLETION CERTIFICATES AND TEST RECORDS FOR ELECTRICAL INSTALLATIONS IN POTENTIALLY EXPLOSIVE ATMOSPHERES Sub-System Completion Certificate: Scope: In the case of new installations or modifications to existing installations, where part of the installation traverses hazardous areas, this Sub-system Completion

More information

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR Section 083713- Four Fold Doors- With Single Overhead Mounted Operator Part 1-General 1.1 Related Document: A. Drawing and general provisions of contract,

More information

Introduction. Origin

Introduction. Origin Company Profile Introduction Together, Management have 50years of Siemens Product Experience to ensure that our customers receive the correct product the first time. We have a Level 2 (two) B-BBEE procurement

More information

SECTION SLUDGE HOLDING TANK DECANTER PUMP

SECTION SLUDGE HOLDING TANK DECANTER PUMP PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor and equipment to put into service the Sludge Holding Tank Decanter Pumping System in accordance with the

More information

Customer Interface Publication: KCOM (Hull) CIP003

Customer Interface Publication: KCOM (Hull) CIP003 Customer Interface Publication: KCOM (Hull) CIP003 Public Switched Telephone Network (PSTN) Technical Characteristics of the Direct Dialling Inward Exchange Line Interface Issue: 1.2 April 2016 The information

More information

DATA SHEET. EM1000 Fine Ribbed Electrical Safety Matting, rated to IEC61111:2009 Class 0

DATA SHEET. EM1000 Fine Ribbed Electrical Safety Matting, rated to IEC61111:2009 Class 0 DATA SHEET EM1000 Fine Ribbed Electrical Safety Matting, rated to IEC61111:2009 Class 0 Unit 21 Priory Industrial Park Airspeed Road Christchurch Dorset BH23 4HD Tel: 01425 278011 Fax: 01425 278012 www.deltarubber.co.uk

More information

APEC 2016 Component Level Safety Certification in Systems- IEC /UL1577. MARK CANTRELL Senior Applications Engineer

APEC 2016 Component Level Safety Certification in Systems- IEC /UL1577. MARK CANTRELL Senior Applications Engineer APEC 2016 Component Level Safety Certification in Systems- IEC60747-17/UL1577 MARK CANTRELL Senior Applications Engineer 3/20/2016 Agenda What is safety isolation Isolation Concepts Regulatory Landscape

More information

PART MATERIAL REMARK Metal Case with Pig-tail. Brass (Metal Case) Copper (Pig-tail) Star Contact Copper Silver Plated

PART MATERIAL REMARK Metal Case with Pig-tail. Brass (Metal Case) Copper (Pig-tail) Star Contact Copper Silver Plated 1. SCOPE This specification defines the technical requirements of TZ-D series thermal-link with PROFFUSE brand that are produced according to IEC 60691, UL 60691,GB 9816. 2. APPLICABLE STANDARDS IEC 60691,

More information

- CONSTRUCTIONS 300 SECTIONAL VIEW 300 SECTIONAL TABLE 301 QUANTITY FOR MODEL 302 MECHANICAL SEAL 303 BEARINGS 304

- CONSTRUCTIONS 300 SECTIONAL VIEW 300 SECTIONAL TABLE 301 QUANTITY FOR MODEL 302 MECHANICAL SEAL 303 BEARINGS 304 CONTENTS Page - SPECIFICATIONS 200 PERFORMANCE RANGE and SELECTION CHART 201 TYPE KEY and CURVE SPECIFICATIONS 202 PERFORMANCE CURVE 40 203 PERFORMANCE CURVE 80 204 - CONSTRUCTIONS 300 SECTIONAL VIEW 300

More information

Food & Beverage Portfolio

Food & Beverage Portfolio Line card Food & Beverage Portfolio Products for the Primary Processes Process Automation DCS A flexible, scalable and innovative control system that ensures the productivity, availability and safety of

More information

ELECTRICAL BULLETIN

ELECTRICAL BULLETIN PO Box 697 Halifax, Nova Scotia B3J 2T8 Labour and Advanced Education ELECTRICAL BULLETIN 2012-01 From: David MacLeod,C.E.I.,P.Eng. Pg 1 of 8 Provincial Chief Electrical Inspector Date : March 1, 2012

More information

CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS

CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS 1. Introduction 1.1 Scheme for type approval of products of Indian Register of Shipping (IRS) is an impartial certification system based on a design review

More information

SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE

SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE 1. General This annex specifies the requirements for the Factory

More information

MEDIZINTECHNIK FÜR TIERÄRZTE

MEDIZINTECHNIK FÜR TIERÄRZTE GB Tabel of contents: Operation Instructions Electronic Platfoorm Balances MEDIZINTECHNIK FÜR TIERÄRZTE 1 Technical data 17 2 Fundamental information (general) 18 2.1 Intended use 18 2.2 Inappropriate

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design.

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design. Basis of Design This section applies to the design and selection of medium voltage switchgear, primarily for use in substations. Design Criteria 13.8kV equipment shall be 15kV class, 4.16kV and 2.4kV equipment

More information

SEAL & SIGNATURE OF THE TENDERER

SEAL & SIGNATURE OF THE TENDERER MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. SCHEDULE - `A' TECHNICAL SPECIFICATION FOR 11 kv & 22 kv A.B. SWITCH. SPECIFICATION NO:RE/II/A.B.SWITCH/2005 INDEX -----------------------------------------------------------------------------------------------------------------------

More information

Change-over and monitoring unit For medical locations acc. to DIN VDE 0100 Part 710

Change-over and monitoring unit For medical locations acc. to DIN VDE 0100 Part 710 Change-over and monitoring unit For medical locations acc. to DIN VDE 0100 Part 710 Operator manual Information on the manual Information on the manual Please read this manual, before using the change-over

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS. 66 kv LIGHTNING ARRESTORS

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS. 66 kv LIGHTNING ARRESTORS GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA 390 007. TECHNICAL SPECIFICATIONS FOR 66 kv LIGHTNING ARRESTORS GETCO/ENGG/TECH SPECI.- 66 KV LA/R4/Jan11 Sign

More information

A. Product Data shall be provided for each type of product indicated.

A. Product Data shall be provided for each type of product indicated. 32 31 13 CHAIN LINK FENCES AND GATES SECTION 1 GENERAL 1.1 SUMMARY This Section includes the following: 1. Chain Link Fences 2. Gates for Chain Link Fences. See electrical specifications for electrical

More information

TC 121 France

TC 121 France SMB/6112/R STRATEGIC BUSINESS PLAN (SBP) IEC/TC OR SC: SECRETARIAT: DATE: TC 121 France 2016-12-21 Please ensure this form is annexed to the Report to the Standardization Management Board if it has been

More information

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS 13VAC5-91-10. Definitions. The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise. Administrator means the Director of

More information

TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS

TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS TORONTO TRANSPORTATION January 2012 TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS 1. DRAWINGS TTD 801.001 ELECTRICAL ABBREVIATIONS AND SYMBOLS TTD 801.005 ELECTRICAL LEGEND I TTD 801.006 ELECTRICAL

More information

PORT OF SAN FRANCISCO ELECTRICAL CODE. Based on the 2016 California Electrical Code

PORT OF SAN FRANCISCO ELECTRICAL CODE. Based on the 2016 California Electrical Code 2016 PORT OF SAN FRANCISCO ELECTRICAL CODE Based on the 2016 California Electrical Code The complete 2016 Port of San Francisco Electrical Code adopts and amends the 2013 edition of the California Electrical

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

Hazards. Hazards. Hazards. Effects on the Body. GA Tech Electrical Safety Presentation

Hazards. Hazards. Hazards. Effects on the Body. GA Tech Electrical Safety Presentation Hazards The direct result can be electrocution. SHOCK. Electric shock occurs when the human body becomes part of the path through which current flows. The indirect result can be injury resulting from a

More information

Gas-insulated medium-voltage switchgear. for wind parks. Answers for energy.

Gas-insulated medium-voltage switchgear. for wind parks. Answers for energy. Gas-insulated medium-voltage switchgear for wind parks Answers for energy. Switchgear for wind turbines: 8DH10 up to 24 kv, up to 20 ka, up to 1,250 A up to 17.5 kv, up to 25 ka, up to 1,250 A Best performance

More information

PHOTOVOLTAIC SOLAR ENERGY POLYCRYSTALLINE MODULES - SI-ESF-M-P156-60

PHOTOVOLTAIC SOLAR ENERGY POLYCRYSTALLINE MODULES - SI-ESF-M-P156-60 Solar Innova uses the latest materials to manufacture photovoltaic modules. Our modules are ideal for any application that uses the photoelectric effect as a clean energy source because of its minimal

More information

MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS

MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS 1.0 MANUFACTURER'S RESPONSIBILITIES: The manufacturer's responsibilities include, but are not limited to: 1.1 Control of UL Mark - Restrict

More information

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification. SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,

More information

Switch-Tek. LV41 & LV42 Series Manual. Sump Float Level Switches

Switch-Tek. LV41 & LV42 Series Manual. Sump Float Level Switches Switch-Tek Sump Float Level Switches LV41 & LV42 Series Manual LV41 Series Shown LV42 Series Shown Flowline, Inc. 10500 Humbolt Street, Los Alamitos, CA 90720 p 562.598.3015 f 562.431.8507 w flowline.com

More information

Proposals and Process 2017 National Electrical Code

Proposals and Process 2017 National Electrical Code Proposals and Process 2017 National Electrical Code for Solar America Board for Codes and Standards Stakeholder Meeting; October 23, 2014 Ward Bower Ward Bower Innovations LLC Introduction The New NFPA

More information

Maintenance Bypass Breaker Cabinet Series Configuration 5. Installation and Operation Manual

Maintenance Bypass Breaker Cabinet Series Configuration 5. Installation and Operation Manual Maintenance Bypass Breaker Cabinet 90881 Series Configuration 5 Installation and Operation Manual 03/13/2012 2 755-00084-C5 R03 Copyright 2012 C&C Power, Inc. All rights reserved. C&C Power, Inc. 395 Mission

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

YOUR CERTIFICATION PROCESS EXPLAINED

YOUR CERTIFICATION PROCESS EXPLAINED ISO 22000 FOOD SAFETY MANAGEMENT SYSTEMS FSSC 22000 FOOD SAFETY SYSTEM CERTIFICATION This document outlines the audit process for the above referenced standard. It outlines the stages to audit and gives

More information

Electric Service Handbook

Electric Service Handbook Electric Service Handbook Revised August 2017 Contact Information Telephone (253): Electrical Inspection Office 502-8277 7:30 am - 4:30 pm Electrical Inspectors Area Map on Website 7:30 am - 8:30 am Automated

More information

Certificate of Acceptance

Certificate of Acceptance Class II FSP Switchgear Assembly (Type: FSP01 and FSP02) Product Description Product Image Class II FSP Switchgear Assembly (Type: FSP02) for 650V Signalling Power Supplies. Scope of Acceptance Full acceptance

More information

STACK ELEVATORS SECTION - C SUB SECTION A6 SPECIFIC TECHNICAL REQUIREMENT STACK ELEVATORS TITLE:

STACK ELEVATORS SECTION - C SUB SECTION A6 SPECIFIC TECHNICAL REQUIREMENT STACK ELEVATORS TITLE: TITLE: SPECIFIC TECHNICAL REQUIREMENT STACK ELEVATORS SPECIFICATION NO. PE-TS-Q11-503-A-001 VOLUME - IIB SECTION C SUB-SECTION A6 REV. 00 DATE: SHEET 1 OF 5 SECTION - C SUB SECTION A6 STACK ELEVATORS SPECIFIC

More information

Floor stand grinder. The inspection was carried out in accordance with the checklist for Tooling Machines, dated

Floor stand grinder. The inspection was carried out in accordance with the checklist for Tooling Machines, dated CHECKLIST for Tooling Machines Floor stand grinder Issue Date: 2009-03-30, Rev. 1 I. Nature of the inspection First inspection Follow-up inspection Job No. II. Details of the machine: In-house system designation

More information

AT&T January, 2012 Revised April, GENERAL... C Introduction... C-1

AT&T January, 2012 Revised April, GENERAL... C Introduction... C-1 INSTALLER SKILL LEVEL ASSESSMENT Section C, ATT-TP-76300 AT&T January, 2012 Revised April, 2017 SECTION C-- INSTALLER SKILL LEVEL ASSESSMENT CONTENTS PAGE 1. GENERAL... C-1 1.1. Introduction... C-1 2.

More information

Logic Units to ensure safety functions

Logic Units to ensure safety functions Logic Units to ensure safety functions Application of the Machinery Directive 2006/42/EC [1] has been mandatory since 29 December 2009. The directive lists products that are described as "logic units to

More information

INTERIM INSTRUCTION # AMS 001/2014 (To be provided by the Document Control Officer) Protection of Steel Standard Poles incorporating Street Lights

INTERIM INSTRUCTION # AMS 001/2014 (To be provided by the Document Control Officer) Protection of Steel Standard Poles incorporating Street Lights INTERIM INSTRUCTION # AMS 001/2014 (To be provided by the Document Control Officer) Protection of Steel Standard Poles incorporating Street Lights Horizon Power Corporation Page 1 of 8 Print date 6/12/2016

More information

Seismic Considerations of Circuit Breakers

Seismic Considerations of Circuit Breakers Seismic Considerations of Circuit Breakers Willie Freeman, IEEE 693 Working Group ABB Inc, Mt. Pleasant PA, USA IEEE Tutorial - 2008 Abstract: The tutorial covers the seismic qualification of high voltage

More information

1 Customer and contact information

1 Customer and contact information 1 Customer and contact information 1.0 Customer The customer that places the order with Nemko. Can be a third party who has a power of attorney that shall be supplied with the application. The customer

More information

TM Series Cooling Tower Specification

TM Series Cooling Tower Specification 1.0 Cooling Tower TM Series Cooling Tower Specification 1.1 General: Furnish and install factory-assembled, induced draft, counterflow cooling tower(s) with vertical air discharge conforming in all aspects

More information

BEST ONE SUBMERSIBLE SUMP PUMPS EPA. Page Features & Applications 100 Exploded View 101 Pump & Motor Specifications 102 Selection Chart / Type key 103

BEST ONE SUBMERSIBLE SUMP PUMPS EPA. Page Features & Applications 100 Exploded View 101 Pump & Motor Specifications 102 Selection Chart / Type key 103 CONTENTS -SPECIFICATIONS Page Features & Applications 100 Exploded View 101 Pump & Motor Specifications 102 Selection Chart / Type key 103 -PERFORMANCE CURVES Performance Curve Best One 200 Performance

More information

All applicable equipment trip settings must be checked and recorded on the appropriate record sheet.

All applicable equipment trip settings must be checked and recorded on the appropriate record sheet. EXHEAT Electric Heaters and Control Systems Instructions for Completion and Submission of Commissioning Records and Associated Start-up Certificate. It is the responsibility of the installer and end user

More information

Therma Series Insulated Overhead Doors, by Northwest Door Section SECTIONAL DOORS Digicon Information Inc.

Therma Series Insulated Overhead Doors, by Northwest Door Section SECTIONAL DOORS Digicon Information Inc. Digicon Information Inc. Page 1 This section includes Model 650, 308, 308TM steel insulated overhead sectional doors manufactured by Northwest Doors, with manual, chain or electric operation, with our

More information

Specification Technical Requirements for Revenue Electricity Meters

Specification Technical Requirements for Revenue Electricity Meters Specification Technical Requirements for Revenue Electricity Meters Standard Number: HPC-8DJ-16-0001-2013 Document Control Author Name: Richard Flett Position: Metering Technician Document Owner (May also

More information

TESTING PTE EARTHING

TESTING PTE EARTHING 1 SCOPE This section of the Power Systems Live Working Manual details the procedures to be followed to achieve Safety from the System when carrying out examination, testing and remedial work on PTE (Pole

More information

FTW 175 Wireless Monitoring System Reference Manual Part Number

FTW 175 Wireless Monitoring System Reference Manual Part Number FTW 175 Wireless Monitoring System Reference Manual Part Number 7911751 SERIAL NUMBER Flash Technology, 332 Nichol Mill Lane, Franklin, TN 37067 www.spx.com/en/flash-technology (615) 261-2000 Front Matter

More information

Fixed Electrical Testing

Fixed Electrical Testing Fixed Electrical Testing Essential Facts for Business Owners January 2017 Fixed Electrical Testing Employers must comply with the Electricity at Work Regulations 1989, made under the Health and Safety

More information