Implementation Analysis of the Self-Management Contract System and Contract System Long Segment on Road Performance

Size: px
Start display at page:

Download "Implementation Analysis of the Self-Management Contract System and Contract System Long Segment on Road Performance"

Transcription

1 ISSN (e): Volume, 07 Issue, 07 July 2017 International Journal of Computational Engineering Research (IJCER) Implementation Analysis of the Self-Management Contract System and Contract System Long Segment on Road Performance Aspiani¹, Muh. Wihardi Tjaronge², Baharuddin Hamzah³ 1 Master Degree of Transportation Planning, Faculty of Postgraduate, Hasanuddin University, 2 Professor, In the Departemen of Civil Engineering, Hasanuddin University, 2 Professor, Department of Architecture, Hasanuddin University, Makassar-Indonesia Makassar-Indonesia Corresponding Author: * Aspiani ABSTRACT This research aims to (1) analyze the technical implementation of self-management contract system and long segment contract for routine maintenance work, (2) evaluate factors affecting road performance of self-management contract work and long segment contract, and (3) formulate maintenance strategies of routine road maintenance. This research is a descriptive with qualitative descriptive approach and analysis Strengths, Weaknesses, Opportunities, and Threats (SWOT). The data collections are (1) primary data obtained by field observation, interview, questionnaire, documentation, and (2) secondary data obtained from reports or documents. Data were analyzed by qualitative descriptive analysis and SWOT analysis for routine maintenance management strategy, factors influencing road performance for self-management contract work and long segment contracts used external and internal factor analysis. The result of this research shows that (1) the routine maintenance of self-management contracts and long technical segment contract implementation is passably, (2) the factors affecting road performance in routine road maintenance are affected by the condition and limitations of routine maintenance equipment, for routine long-segment maintenance of road performance influenced by Alacrity of the provider in dealing with road damage, allocation of funds, level of understanding from providers and mobilization of personnel and equipment for routine maintenance, (3) special strategies namely the addition of routine equipment, the addition of technical/operator, the need for socialization involving the owner/committing Officer, job executor elements and job inspection elements and the application of sanctions for delay in handling routine maintenance on long segment contract. Keywords: Routine maintenance, self-management, long segment Date of Submission: Date of acceptance: I. INTRODUCTION The role of the road is very important to bring implications for the efforts and hard work of the government in realizing the implementation of quality road infrastructure. One such effort is through the provision of an annual road development budget for upgrading activities and the construction of new roads that are the responsibility of the government and/or local government [1]. Support from the Ministry of Public Works and People's Housing to realize the fulfillment of the role of roads, will be achieved through strategic objectives that will be achieved through program targets reduced travel time on the main corridor from 37 km/hour to 45 km/hour; Increased national road service from 101 billion vehicles km to 133 billion vehicles km; Increased facilitation of local roads to support the area from 0% to 100%, which will be achieved through a 47,017 km national road preservation strategy, 2,650 km of new road development (Border Area, Kalimantan, missing link completion in Aceh, Kalimantan, Papua, etc. ), National road capacity improvement of 3,073 km, bridge construction, 29,859 m long, bridge replacement along 19,951 m, 1,000 km of toll road construction, regional road support for regional development [2]. Target and funding in the Medium Term Development Plan (MTDP) in the Strategic Plan of the Ministry of Public Works and People's Housing ( ) for the road management program that is IDR.278,177 Trillions with the expectation of road stabilization rate reaching 98% in In order to achieve the level of road stability, the Ministry of Public Works and People s Housing through the Directorate General of Highways Open Access Journal Page 1

2 is implementing a long segment contract in the implementation of national roads implemented in the National Road Implementation Area throughout Indonesia including the Great Hall of National Road Implementation or called BBPJN XIII Makassar. In carrying out road maintenance, BBPJN XIII Makassar for 2016 gets a self-management contract and a long segment contract, whereby self-management contracts are conducted independently while long segment contracts are made through a public tender process. In 2016 the Great Hall of National Road Implementation of XIII Makassar, hereinafter referred to as BBPJN XIII Makassar, obtains a budget for road handling fees of IDR 1,482,132,425,000 for South Sulawesi and West Sulawesi Province, which is allocated for contract activities both physical and non-physical, self-management activities as well as general administration. The government through BBPJN XIII Makassar allocated 37.04% of the total ceiling with details of 32.43% for long segment contracts along 1, km and 4.61% for the self-management Contracts of 1, km [3]. The form of work contracts in the implementation of construction and road maintenance at this time is carried out periodically where the period of accountability of the implementation of the work is during physical execution and the period of guarantee a few months. So if there is construction damage faster than the age of the plan will be the responsibility of service users. The above mentioned occurs because the form of employment contracts between service users and service providers is a binding contract of work in the shortest timeframe [4]. High quality road infrastructure is needed to accelerate development. To improve the quality of road infrastructure needs to be reformed in the field of road management, ranging from planning, development, operation to maintenance. One form of reform is to implement performance based contracts [5]. To ensure the quality of road services, the Directorate General of Highways in the last 5-7 years has made a breakthrough to implement Performance Based Contract (PBC) to replace the conventional maintenance contracts that have been done. Unlike conventional maintenance that controls the inputs and maintenance processes that contractors must perform, the PBC emphasizes the achievement of road performance to be achieved through output or outcome parameters, which are first clearly defined and measurable [6]. However, due to a request for a review of the PBC contract from the Financial Auditor Agency (FAA) to the Ministry of Public Works and People s Housing because the use of state money must be clearly accounted for the measurement. Meanwhile, in the PBC contract, the government only ensures the achievement of the level of road service based on interpretation. In addition, the long term contract period is also shorter than the PBC contract, which is only about 3-5 years to be more effective. Long segment contracts are an integration of some jobs handled in a road segment. The scope of work includes road widening, road reconstruction, road rehabilitation, road preventive maintenance, routine road maintenance, routine maintenance of bridges. The government hopes that the implementation of this long segment contract will be a solution for road handling, both from the government side in order to provide a continuous path in good condition, as well as from service providers who view this business as profitable and attractive to them. Routine maintenance previously carried out by self-management can be done by the service providers in a long segment contract. This routine maintenance work can reduce the administrative burden of self-management contracts, monitor quality and measure the volumes of routine maintenance work, focus on performance that road users expect, greater responsibility and motivate risk contractor initiatives and innovation, and create jobs, business, and new business actors in building the construction industries. Road managers have desire an approach to performance-based contracts due to the following: reducing the cost of managing and maintaining road assets; provide more revenue for road managers; Have the ability to manage the road network with fewer human resources, the satisfaction of the road users about the service and the condition of the road; and stable financial conditions [7]. In addition, Performance Based Contract patterns can be a win-win solution for both service providers, service users, and the people who enjoy the results [8]. The objectives of this research are to analyze the technical implementation of the self-management contract system and the long segment contract for routine maintenance work, to analyze the factors affecting the road performance of the self-management contract work and the long-segment contract, and to formulate the strategy for handling routine road maintenance. II. MATERIALS AND METHOD Research Sites This research was taken for the case study in the Work Unit of the National Road Implementation I West Sulawesi Province, namely the long segment contract of the Preservation Contract of Minor Road Rehabilitation of Mamuju Regency border - Tameroddo - Majene - Boundary of Polewali Regency as long as 100,50 km, and case study self-management contract is selected by Routine Maintenance Route of Kalukku road - Boundary of Mamuju City (007) along the km. The research area in Mamuju and Majene Regency where are: The self-management contract is on Kalukku road Boundary of Mamuju city at km up to km with the type of flexible pavement and Open Access Journal Page 2

3 long segment contract on the Boundary Road of Mamuju Regency - Tameroddo - Majene - Boundary of Polewali Regency that is at km up to km Design and Research variables This research uses a qualitative-descriptive approach and SWOT analysis method. The Qualitative-descriptive approach is to know the technical implementation of routine self-management and long segment maintenance as well as factors affecting road performance for routine self-management maintenance and long-segment. The descriptive approach uses a SWOT analysis to formulate routine road maintenance management strategies. A Case Study and Population The entire research population of the National Road Development Project is under the Environment of the Great Hall of National Road Implementation of XIII Makassar. The case studies used are 2 national road packages with the criteria of pavement structure using rigid asphalt the status of job implementation is self-management job and routine maintenance for long segment contract. The project location is located in West Sulawesi Province under the control of the National Road Working Unit of Region I of West Sulawesi Province. Data collecting methods The type of data was used in this research are primary and secondary data. Primary data is to know the performance of the road by distributing questionnaires and conducting interviews to the elements of the owner/commitment Maker Officials (CMO), Executor of Works/Contractor and Supervisor/Consultant. Secondary data obtained from self-management contract documents and long segment contract documents. The data obtained, i.e., 1) Respondent profile data, 2) Bid value in contract documents of self-management and long segment contract, 3) Variables that affect the technical implementation of routine maintenance work, and 4) Variables that affect routine road maintenance performance. Data analysis The research uses questionnaires to the parties involved in routine maintenance projects and contract documents. The data obtained is analyzed by using qualitative-descriptive analysis and the indicator is road maintenance service of self-management contract and long segment contract. The analysis results can be known whether the service provider has maintained the road performance (maintenance period) well or not. If there are unsuitable road performance indicators, then the service provider should improve in accordance with the specified response time. To answer the problem formulation about road maintenance management strategies used SWOT analysis method, and then the results of SWOT analysis will be formulated its TOWS strategy, including: a. S-O strategy (using power factor to seize opportunities); a. S-T Strategy (using force factor to counter threats); c. W-O strategy (reducing the weakness factor to exploit opportunities); d. W-T strategy (reduce the weakness factor and counter the threat). III. RESULTS Technical implementation of routine maintenance work for self-management contracts and long segment contracts From the results of interviews with CMO 01 and CMO 03 related to the technical implementation of routine maintenance refers to the Manual of Construction and Building No /M/BM/2011 on Road Condition Survey for routine road maintenance [9] and No /M/BM/2011 on Standard Improvement for routine road maintenance [10]. As for routine long segment maintenance refers to the Special Conditions of Contract (SCOC) contained in the long segment contract [11]. Routine maintenance work with self-management is self-sustaining and done by you, not through providers. Prior to the implementation of routine maintenance work, Budget Users/CMO conduct a road condition survey that refers to the Construction and Building Manual No /M/ BM/2011 on Road Condition Survey for routine road maintenance. From the survey results, so it is known by the type of action to be taken on road damage to maintain good road conditions. If the percentage of damage restriction is <6%, the handling program is routine maintenance [12]. Before taking action on field conditions, CMO prepared an estimated unit price for each type of work to be performed. And the price as a reference held by procurement officials to make the procurement process. The procurement official conducts the procurement process in accordance with the Presidential Regulation of the Republic of Indonesia No.54 of 2010 along with its amendment on Government Procurement of Goods/Services. After the material procurement process that will be used for routine maintenance is done, and then routine maintenance work can be done. Open Access Journal Page 3

4 The routine maintenance work with long segment of the procurement process is carried out by a public tender by the Working Group (WG) and this work is carried out by the service provider/contractor and supervised by the supervisor of the work/consultant. To know the level of understanding and technical implementation of self-management contracts, questionnaires were given to the project owner, in this case the respondents from elements of CMO 01 and CMO 03 of Implementation of National Road Region 1 West Sulawesi with the total number of respondents 19 people. The educated Strata One (S1) is 10 people. Others are educated School of Mechanical Engineering or High School, Diploma 3, and Master (S2) with varying length of work. Meanwhile, to know the level of understanding of routine maintenance of long segment contract the number of respondents 32 people based on the project organization structure. Respondents come from 3 elements: project owner, job/contractor executor and supervisor of work/consultant. Respondents of project owner elements of the self-management contract packages and long segment contracts are the same people. Table 1. Distribution of respondents by education level No. Level of Education Project Owner (Self-Managemen and Long segment) Contractor (Long segment) Consultant (Long segment) 1. Senior High School/School of Mechanical Engineering 2. Diploma (D3) Strata One (S1) Master (S2) Total Source: Results of the questionnaire, 2017 Factors that influence the performance of routine maintenance roads for self-management contracts and long segment contracts From the results of the survey and interviews routine self-management of maintenance work, it is found that affecting routine maintenance is the limitations of routine maintenance equipment, old equipment condition, and limited skill of operator/equipment technicians. For routine long segment maintenance, in this case Minerals Rehabilitation Presentation Contract Boundary Road Mamuju Regency - Tameroddo - Majene - Polewali Regency Boundary, there is no special inspection due to the absence of good management. Management is done in ad hoc or at any time. Visually the condition of the flexible pavement structures in the routine self-management of maintenance contracts and no holes as well as the level of other road services, as per the performance indicators required in the maintenance period, includes road pavement, road shoulders, and drainage and road equipment in good condition. While the routine maintenance of long segment in moderate conditions and the existence of the hole caused is not the maintenance period of long segment. Strategies used in routine maintenance of handling The routine maintenance of handling strategy used SWOT (Strength, Weakness, Opportunity, and Threat) methods [13]. SWOT analysis aims to identify internal factors that include strengths and weaknesses and external factors that include opportunities and threats. From the observations result, questionnaire and other supporting data obtained strategy that need to be done on routine maintenance to achieve steady road performance, hence can be identified that become internal factor and external factor on routine maintenance as follows: a. Internal Factors (IFAS), which consists of: 1) Strength a) The existence of rules/standard Operational Procedure (SOP) that regulate related routine maintenance b) Understanding of the owner/elements of CMO related to routine maintenance 2) Weaknesses a) Lack of routine maintenance equipment b) The number of technical personnel/operator less c) Low price allocated for routine maintenance b. External Strategic Factors which consist of: 1) Opportunities a) Produce steady road performance 2) Threats a) The lack of knowledge of job executor and supervisor of work related to routine maintenance b) No provider is ready to handle routine maintenance c) Unpredictable weather conditions Open Access Journal Page 4

5 IV. DISCUSSION Technical Analysis of the implementation of routine maintenance work for self-management contracts and long segment contracts From the results of the questionnaire shows that respondents who understand self-management contracts and long segment contracts for routine maintenance work 89.47% of the 19 respondents from the owner/cmo. From 89.47% or 17 respondents who know about routine maintenance of the road comes from following socialization as much as 58.83% and other respondents know from reading books, getting information from friends or searching information online, the results can be seen in Table 2. Table 2. Source of respondent's understanding of the owner/cmo on routine maintenance No. Sources Self-Management Contracts Long segment Contracts Total % Total % 1. Reading some books Information from friends Following the socialization Reading some books and Following the socialization Reading some books and Information from friends Reading some books, Information from friends and Following the socialization 7. Reading some books and online Total Source: Results of questionnaire, 2017 All respondents knew that there was Standard Operating Procedure (SOP) for routine self-management maintenances, but it did not know the exact name of the SOP of routine self-management maintenance. The number of respondents who do not know the name of SOP of routine self-management maintenance is 47.37% of 17 respondents, which can be seen in Table 3. As for routine maintenance on long segment packages are respondents from owner/owner, job/contractor, and supervisor /consultant. Of the three elements there are 55.17% of respondents who do not know the name of SOP for routine maintenance of long segment with the details can be seen in Table 4. Table 3. Respondents who know the Standard Operating Procedures (SOP) routine self-management maintenance No. Descriptions Respondent Total % 1 Manual Book /M/ BM/ Manual Book /M/ BM/2011 and Manual Book /M/ BM/ Technical Guidelines No.020/BM/ Manual Book /M/ BM/2011 and Technical Guidelines No.020/BM/ Manual Book /M/ BM/2011, Manual Book /M/ BM/2011 and Technical Guidelines No.020/BM/ Not knowing the routine maintenance SOP Total Source: Results of questionnaire, 2017 In terms of implementation in the field, implementation of routine self-management of maintenance implementation has been done well. This case can be seen from the results of questionnaires given to respondents from 19 respondents who were given 100% of respondents said the implementation has been done well. While on the implementation of routine long segment maintenance, there is 87.50%, which states have been carried out well, but coordination with related parties in this case coordination between party owner, executor and supervisor of work only done 84.38% from s32 total respondents. And there are 71.88% of respondents who stated that the fulfillment time of routine maintenance on long segment contract. Table 4. Respondents who know the SOP of long segment routine maintenance CMO 01 & CMO No. Descriptions 03 Contractor Consultant Total Total % Total % Total % Total % 1. Routine maintenance specification/sbd Long Segment Not knowing the SOP of long segment maintenance Total Source: Questionnaire results, Open Access Journal Page 5

6 From the interview result, the implementation of routine maintenance of long segment contract has not been carried out well because the respondent has not understood the implementation of routine maintenance on long segment packages. So the need for understanding of the three sides so that the implementation of routine maintenance of the road either on the contract of self-management or contract long segment. Table 5. Implementation of routine self-management and long segment maintenance No. Descriptions Self-Management Long segment Total % Total % 1. Well Implemented Poorly Implemented Source: Results of questionnaire, 2017 Analysis Factors that influence the performance of routine maintenance roads for self-management contracts and long segment contracts According to the results of the questionnaire, although it has been implemented well the implementation of routine self-maintenance, but there are constraints in the implementation so that these factors affect the performance of the road, i.e. a) Limitations of routine maintenance equipment, b) Equipment, c) conditions for routine maintenance are old, d) Limited technician skill for equipment operation, and d) Limitations of technical personnel/operators. While the constraints encountered in the implementation of routine maintenance so that affect the performance of roads for routine maintenance long segments, i.e. a) Not readily implementing the work/contractor in the routine handling of long segment contract packages. The allocation of funds for minor routine maintenance contained in the contract is not proportional to the length of the segment handled. This can be seen in Table 6, b) Application of understanding of the implementation of routine long working method, c) Mobilization of equipment and personnel due to long distances, and c) Weather factor. The scheme of comparison of routine maintenance cost of self-management contract with long segment contract. Table 6. Comparison of Routine Maintenance Costs on Long Segment Contracts and Self-Management Contracts No. Descriptions Fee Contracts of Long segment Fee Contracts of Self- Management 1. Routine Road Maintenance (Damage and repair pavement 50,000, ,489,816, and road shoulders) 2. Routine maintenance of road equipment 5,000, Routine Maintenance of Water ditch, Excavation and Heaps 35,000, ,885, Total 90,000,000,00 1,940,702,000,02 Source: Contract, 2016 Strategy for Handling Routine Maintenance From the result of arrangement of internal and external factors above can produce the following scores: a) Strengths : 1.60 b) Weaknesses : 2.20 c) Opportunities : 1.00 d) Threats : 3.00 From the set of scores, the matrix area and strategic priorities are given in Table 7. Table 7. Matrix area and strategic priorities Quadrant Position Point Matrix area Rank Strategic Choice SO (1.60 x 1.00) 1.60 IV Aggressive WO (2.20 x 1.00) 2.20 III Turn Around WT (2.20 x 3.00) 6.60 I Defensive ST (1.60 x 3.00) 4.80 II Diversification Source: Result of analysis, Open Access Journal Page 6

7 Figure 1. Diagram of SWOT Routine Road Maintenance Analysis Based on the SWOT matrix table according to Rangkuti, then it obtained the results of SWOT analysis routine maintenance implementation strategy is as follows: External Table 8. SWOT Matrix Routine Maintenance Internal Strengths (S) Weaknesses (W) 1. Understanding of the owner/elements of CMO related to routine maintenance 2. The existence of rules/sop that related routine maintenance Opportunities (O) Strategies (SO) Strategies (WO) 1. Produce a steady road performance 1. Improve understanding of maintenance can be realized in the field to be able to maintain the road conditions remain steady 1. Lack of routine maintenance equipment 2. Numbers of technical personnel/operator less 3. Low price allocated for routine maintenance 1. The need for the addition of routine equipment 2. The need for additional technical personnel 3. Letters of warning related to provider's inconsistency Threats (T) Strategies (ST) Strategies (WT) 1. Lack of knowledge of the executing 1. Utilizing the owner's understanding to 1. Apply for improvement of long jobs and supervisor of work related to routine maintenance 2. Uncertain weather conditions 3. Unscrupulous the provider in handling routine maintenance distribute knowledge related to routine maintenance to job executors and job inspectors 2. Implement Administrative sanctions related to provider's delay in carrying out routine maintenance segment contract, especially for routine maintenance work. 2. The needs for socialization for the three elements related to road maintenance are the elements of the owner/cmo, the implementing/contracting elements, and the element of the supervisor/consultant 3. The need for additional routine equipment 4. The need for training of operators for routine equipment 5. The need for additional technical personnel 4. The need for coordination with the executive with the road inspector to determine the condition of the road. After SWOT analysis will be formulated by the plan of routine road maintenance of implementation based on Figures 1 and 8 above are based on SWOT calculation, formulated strategy on WT (Weakness, Threat) resources in quadrant III that is reducing the weakness factor and preventing the threat with strategy as following: 1. Apply for improvement of long segment contract, especially for routine maintenance, 2. The need for socialization for the three elements related to road maintenance, i.e. the owner/cmo elements, the implementing/contracting elements, and the supervisory/consultant elements. Open Access Journal Page 7

8 3. The need for the addition of routine equipment for routine road maintenance 4. The need for training of operators for routine equipment 5. The need for additional manpower for routine self-management maintenance 6. The need for coordination from the implementer with road inspector is to know the condition of the road. V. CONCLUSION From the research conducted on the routine maintenance of self-management contracts and long segment contracts on the Kalukku - Mamuju City - Tameroddo - Majene road segment after the discussion. It can be concluded that: (1) there is still a need to reorganize personnel, cost and management so that for technical implementation (2) the need to increase the number of personnel/technical personnel and routine maintenance equipment both in the implementation of routine self-management maintenance and long segment contract, (3) the coordination of the owner/ CMO elements, the executing jobs/contractor and the job supervisor/consultant, (4) A contractual review of the contract document for routine maintenance work descriptions of the long segment contract is required due to the insignificant contract value the length of the segment handled to maintain the road performance in steady condition. REFERENCES [1]. Law of the Republic of Indonesia no. 38 of 2004, on the "Way" [2]. The Strategic Plan of the Ministry of Public Works and People s Hosing, [3]. Directorate General of Highways, 2016, e-monitoring Budget Absorption Report, Available form; [Last accessed on 2016 December 31] [4]. Nurul Malahayati, Saiful Husin, and Asyifa Mursalin, 2009, Review of conventional contract system and Performance Based Contract (PBC) system on road maintenance project, Prosiding Regular Seminar Series I JTS UNSYIAH-ELTEES-MTS UNSYIAH ISBN [5]. Hendra Hendrawan, 2015, Supporting Regulations To Implement Performance Based Contract On Roads Management (Journal), Widyariset, Vol. 18 No. 2, 2015: [6]. Rizal Z. Tamin, Adriananda Z. Tamin, and Puti F. Marzuki, 2016, Performance-Based Employment Contract And Implementation Evaluation On National Roads, HPJI Journal Vol. 2 No. July 2, 2016: [7]. Soelaeman, Wahyudi. (2009), Performance Based Contract Application (Performance Based Contract) to Improve the Effectiveness of Road Handling, Thesis, University of Indonesia, Jakarta. [8]. Bulletin DwiWulan Construction Construction Agency Ministry of Public Works, 2014, Bulletin of Construction Construction Agency Edition VI / 2014 Page. 8 [9]. Directorate of Program Development Directorate General of Highways Ministry of Public Works, 2011, Manual of Construction and Building No /M/BM/2011 on Survey of Road Conditions for Routine Maintenance, Jakarta. [10]. Directorate of Program Development Directorate General of Highways Ministry of Public Works, 2011, Manual of Construction and Building No /M/BM/2011 on Standard Improvement for Routine Maintenance, Jakarta [11]. Contract Document Long segment Preservation Package Min Road Rehabilitation of Mamuju Regency border - Tameroddo - Majene Polewali- Majene Regency border, 2016 [12]. Minister of Public Works Regulation no. 13/PRT/M/2011 on Procedures for Maintenance and Road Ownership, 2011, Jakarta [13]. Tamin, O, Z Transport Planning and Modeling. Institute Technology Bandung (ITB), Bandung. Aspiani. "Implementation Analysis of the Self-Management Contract System and Contract System Long Segment on Road Performance." International Journal of Computational Engineering Research (IJCER) 7.7 (2017): Open Access Journal Page 8

The Influence of Price Offers for Procurement of Goods and Services on the Quality of Road Constructions

The Influence of Price Offers for Procurement of Goods and Services on the Quality of Road Constructions ISSN (e): 2250 3005 Volume, 07 Issue, 05 May 2017 International Journal of Computational Engineering Research (IJCER) The Influence of Price Offers for Procurement of Goods and Services on the Quality

More information

An Analysis of Road Network in Supporting Transport of Containers for Agropolitan Commodities in Enrekang Regency, South Sulawesi, Indonesia

An Analysis of Road Network in Supporting Transport of Containers for Agropolitan Commodities in Enrekang Regency, South Sulawesi, Indonesia IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X, Volume 14, Issue 2 Ver. VII (Mar. - Apr. 2017), PP 18-22 www.iosrjournals.org An Analysis of Road Network

More information

BUSINESS DEVELOPMENT STRATEGY OF CULINARY START-UP: A CASE STUDY OF KEDAI MAS GIBO

BUSINESS DEVELOPMENT STRATEGY OF CULINARY START-UP: A CASE STUDY OF KEDAI MAS GIBO The Journal of Innovation and Entrepreneurship Vol. 1, No.1, 2016: 29-42 BUSINESS DEVELOPMENT STRATEGY OF CULINARY START-UP: A CASE STUDY OF KEDAI MAS GIBO Muhammad Gilang Perdana Hamim and Dwi Larso School

More information

The Implementation of Competency-Based Human Resource Management in the Company

The Implementation of Competency-Based Human Resource Management in the Company International Journal of Humanities and Social Science Invention ISSN (Online): 2319 7722, ISSN (Print): 2319 7714 Volume 6 Issue 12 December. 2017 PP.17-21 The Implementation of Competency-Based Human

More information

Performance audit report. New Zealand Transport Agency: Information and planning for maintaining and renewing the state highway network

Performance audit report. New Zealand Transport Agency: Information and planning for maintaining and renewing the state highway network Performance audit report New Zealand Transport Agency: Information and planning for maintaining and renewing the state highway network Office of the Auditor-General PO Box 3928, Wellington 6140 Telephone:

More information

STRATEGIES IN ENHANCING THE QUALITYSERVICES OF TRAFFIC SPECIAL DIVISION

STRATEGIES IN ENHANCING THE QUALITYSERVICES OF TRAFFIC SPECIAL DIVISION STRATEGIES IN ENHANCING THE QUALITYSERVICES OF TRAFFIC SPECIAL DIVISION Yuliantini Fachry Azhar WyndRizaldy STMT Trisakti STMT Trisakti STMT Trisakti stmt@indosat.net.id stmt@indosat.net.id stmt@indosat.net.id

More information

Road infrastructure plays an important role to

Road infrastructure plays an important role to Regional Conference in Civil Engineering (RCCE) 149 Life Cycle Analysis (LCCA) in Road Organization Application in Supiori Regency of Papua Province Fitriah Menufandu 1, Ary Setyawan 2, Budi Yulianto 2

More information

A RANKING AND PRIORITIZING METHOD FOR BRIDGE MANAGEMENT

A RANKING AND PRIORITIZING METHOD FOR BRIDGE MANAGEMENT A RANKING AND PRIORITIZING METHOD FOR BRIDGE MANAGEMENT Saleh Abu Dabous and Sabah Alkass Department of Building, Civil and Environmental Engineering, Concordia University, Rm: EV-6139 1455 de Maisonneuve,

More information

Summary of Findings. Bridge Inspection and Monitoring. Introduction. Findings

Summary of Findings. Bridge Inspection and Monitoring. Introduction. Findings Summary of s Introduction The Province s bridges are aging and their related condition is deteriorating. This situation highlights the need for an adequate system of bridge inspection and planning for

More information

The Role of Pavement Preservation in Asset Management

The Role of Pavement Preservation in Asset Management The Role of Pavement Preservation in Asset Management Keith D. Herbold, P.E. Senior Pavement Engineer FHWA Resource Center keith.herbold@fhwa.dot.gov 708-283-3548 PRESENTATION TOPICS FHWA Resource Center

More information

Rural road in Indonesia: Issues and challenges

Rural road in Indonesia: Issues and challenges Rural road in Indonesia: Issues and challenges Max Antameng Senior Policy Advisor Directorate General of Highways Ministry of Public Works- Indonesia Indonesia Overview Indonesia, an archipelago of 17,504

More information

Changes Required by Road Administrations and the Consulting and Contracting Industries

Changes Required by Road Administrations and the Consulting and Contracting Industries Regional Seminar on Performance- Based Management and Maintenance Contracts Changes Required by Road Administrations and the Consulting and Contracting Industries César Queiroz, Ph.D. Roads and Transport

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION 1.1 Background of Study Tender means make a formal written offer to carry out work, supply goods, etc. for a stated fixed price (Oxford Dictionary, 2002). The greater part of the

More information

Analysis of Causes of Delay and Time Performance in Construction Projects

Analysis of Causes of Delay and Time Performance in Construction Projects IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X, Volume 13, Issue 5 Ver. III (Sep. - Oct. 2016), PP 116-121 www.iosrjournals.org Analysis of Causes of Delay

More information

Re: EX8.12 F.G. Gardiner Expressway Strategic Rehabilitation Plan Procurement Strategy

Re: EX8.12 F.G. Gardiner Expressway Strategic Rehabilitation Plan Procurement Strategy Re: EX8.12 F.G. Gardiner Expressway Strategic Rehabilitation Plan Procurement Strategy Presentation to Executive Committee September 21, 2015 1 Overview Project Background Procurement Options Analysis

More information

Summary of Terminal Evaluation Results

Summary of Terminal Evaluation Results Summary of Terminal Evaluation Results 1. Outline of the Project Country:Democratic Republic of the Congo Project Title:The Project on Development of Capacity of Instructors at INPP Sector:Human resources-

More information

REGULATION OF GOVERNMENT OF THE REPUBLIC OF INDONESIA NO. 36/2004 ON OIL AND GAS DOWNSTREAM BUSINESS

REGULATION OF GOVERNMENT OF THE REPUBLIC OF INDONESIA NO. 36/2004 ON OIL AND GAS DOWNSTREAM BUSINESS REGULATION OF GOVERNMENT OF THE REPUBLIC OF INDONESIA NO. 36/2004 ON OIL AND GAS DOWNSTREAM BUSINESS PRESIDENT OF THE REPUBLIC OF INDONESIA, Considering: that, to enforce the provisions of Articles 8 paragraph

More information

Performance Level Analyses of Public Transportation Using Importance- Performance Analysis Method

Performance Level Analyses of Public Transportation Using Importance- Performance Analysis Method Performance Level Analyses of Public Transportation Using Importance- Performance Analysis Method Nursyamsu HIDAYAT Civil Engineering Diploma Program, Gadjah Mada University, Yogyakarta, Indonesia E-mail:

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of Indonesia Project: Engineering Services (E/S) for Construction of Jakarta Mass Rapid Transit East-West

More information

STRATEGIC UTILIZATION OF RICE STRAW AS FEED FOR RUMINANTS IN THE BANTAENG DISTRICT : SWOT Analysis Approach

STRATEGIC UTILIZATION OF RICE STRAW AS FEED FOR RUMINANTS IN THE BANTAENG DISTRICT : SWOT Analysis Approach STRATEGIC UTILIZATION OF RICE STRAW AS FEED FOR RUMINANTS IN THE BANTAENG DISTRICT : SWOT Analysis Approach (Strategi Pemanfaatan Jerami Padi Sebagai Pakan Ruminansia di Kabupaten Bantaeng : Pendekatan

More information

Presented by: PRASETYO BOEDITJAHJONO

Presented by: PRASETYO BOEDITJAHJONO Presented by: PRASETYO BOEDITJAHJONO Beijing, 12 March 2014 The Outline I. NATIONAL RAILWAYS II. PROCEDURE FOR INVESTMENT III. The Opportunity on PPP RAILWAYS PROJECT SHIA Railways IV. CONCLUSION MINISTRY

More information

BULGARIA E-government Strategy

BULGARIA E-government Strategy BULGARIA E-government Strategy TABLE OF CONTENTS 1. INTRODUCTION...3 2. REALITIES...3 3. VISION AND STRATEGIC OBJECTIVES...5 4. GOALS...7 5. GENERAL PRINCIPLES...8 6. ORGANISATION AND MANAGEMENT...9 ANNEX

More information

NUSANTARA REPORT. Review of Regional Economic and Finance JULI 2013

NUSANTARA REPORT. Review of Regional Economic and Finance JULI 2013 JULI 2013 For further information, please contact: Bank Indonesia Department of Economic Research and Monetary Policy Monetary Policy Group Regional Economic and Inflation Division Ph. 021-3818161, 3818868

More information

Project phases II. Tendering-constructionoperation

Project phases II. Tendering-constructionoperation Project phases II. -constructionoperation Construction management 2. Lepel BME Department of Construction Technology and Management 09.03.2016 Project phases time Inception initiation Preliminary analysis

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN])

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN]) Railway Rolling Stock Project (RRP BAN 49094) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN]) Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Bangladesh s transport

More information

BENCHMARKING PPP PROCUREMENT 2017 IN MALAYSIA

BENCHMARKING PPP PROCUREMENT 2017 IN MALAYSIA BENCHMARKING PPP PROCUREMENT 2017 IN MALAYSIA Regulatory and Institutional Framework for PPPs Does the regulatory framework in your country allow procuring PPPs?. specify the relevant regulatory framework

More information

NATURAL GAS MARKET IN AZERBAIJAN AND REGULATORY FRAMEWORK

NATURAL GAS MARKET IN AZERBAIJAN AND REGULATORY FRAMEWORK MULTI-YEAR EXPERT MEETING ON SERVICES, DEVELOPMENT AND TRADE: THE REGULATORY AND INSTITUTIONAL DIMENSION Geneva, 17-19 March 2010 NATURAL GAS MARKET IN AZERBAIJAN AND REGULATORY FRAMEWORK By Yaqub HASANOV

More information

Disclaimer: Translation provided by Bappenas

Disclaimer: Translation provided by Bappenas Disclaimer: This English translation is only for reference purpose. Where there are any discrepancies between original Bahasa Indonesia version and English translation version, the original Bahasa Indonesia

More information

CIRCULAR GENERAL PROVISIONS

CIRCULAR GENERAL PROVISIONS MINISTRY OF CONSTRUCTION -------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 10/2013/TT-BXD Hanoi, July 25, 2013 CIRCULAR ON CONSTRUCTION QUALITY MANAGEMENT Pursuant

More information

The Implications of Government Policy for the Development of Agro-industry Sago with SWOT Analysis

The Implications of Government Policy for the Development of Agro-industry Sago with SWOT Analysis International Journal of Business and Management Invention ISSN (Online): 2319 8028, ISSN (Print): 2319 801X Volume 5 Issue 7 July. 2016 PP 18-22 The Implications of Government Policy for the Development

More information

Project phases II. Tendering-constructionoperation

Project phases II. Tendering-constructionoperation Project phases II. -constructionoperation Construction management 2. Lepel BME Department of Construction Technology and Management 04.03.2015 Project phases time Inception initiation Preliminary analysis

More information

TRANSPORT REFORM AND INSTITUTIONAL DEVELOPMENT: LESSONS FROM THE SUB-SAHARAN AFRICA TRANSPORT PROGRAM. Philip Moeller

TRANSPORT REFORM AND INSTITUTIONAL DEVELOPMENT: LESSONS FROM THE SUB-SAHARAN AFRICA TRANSPORT PROGRAM. Philip Moeller January 1993 Transport No. OT-3 TRANSPORT, WATER AND URBAN DEVELOPMENT DEPARTMENT THE WORLD BANK TRANSPORT REFORM AND INSTITUTIONAL DEVELOPMENT: LESSONS FROM THE SUB-SAHARAN AFRICA TRANSPORT PROGRAM Philip

More information

TRANSPORT REFORM AND INSTITUTIONAL DEVELOPMENT: LESSONS FROM THE SUB-SAHARAN AFRICA TRANSPORT PROGRAM. Philip Moeller

TRANSPORT REFORM AND INSTITUTIONAL DEVELOPMENT: LESSONS FROM THE SUB-SAHARAN AFRICA TRANSPORT PROGRAM. Philip Moeller January 1993 Transport No. OT-3 TRANSPORT, WATER AND URBAN DEVELOPMENT DEPARTMENT THE WORLD BANK TRANSPORT REFORM AND INSTITUTIONAL DEVELOPMENT: LESSONS FROM THE SUB-SAHARAN AFRICA TRANSPORT PROGRAM Philip

More information

Introduction. Background

Introduction. Background Example Transportation Asset Management Plan Outline This outline was created using the Transportation Asset Management Plan (TAMP) Builder ( www.tamptemplate.org ), a product of NCHRP Project 8-36/116.

More information

D. Kai Rizal Said. Manahara Parhusip

D. Kai Rizal Said. Manahara Parhusip Journal of KONES Powertrain and Transport, Vol. 17, No. 2 2010 HUMAN RESOURCES GRADING FOR PRODUCTION ENGINEERING PROFESSION IN COMMERCIAL VEHICLE ASSEMBLING PLANT BASED ON PROFESSION WITH 3 LANES GRADING

More information

EAST COAST ROAD, TAMIL NADU, INDIA. Case Study (Transportation) Project Summary:

EAST COAST ROAD, TAMIL NADU, INDIA. Case Study (Transportation) Project Summary: EAST COAST ROAD, TAMIL NADU, INDIA Case Study (Transportation) Project Summary: The southern India state of Tamil Nadu has been a leader in the area of urban sector reforms and has established an efficient

More information

PREPARING A NEW ERA OF THE MINING LICENSE a brief legal update on the implementation of the tender system

PREPARING A NEW ERA OF THE MINING LICENSE a brief legal update on the implementation of the tender system PREPARING A NEW ERA OF THE MINING LICENSE a brief legal update on the implementation of the tender system Presented by Eva Armila Djauhari for Mining in a Day, on 20 April 2017 Dharmawangsa Hotel, Jakarta,

More information

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION)

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) 1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) The national water legislative framework in the Republic of Macedonia is comprehensive and regulates, from different perspectives,

More information

Toll Road Development in China: Highlights in Practice

Toll Road Development in China: Highlights in Practice Toll Road Development in China: Highlights in Practice Xiaoxia Yao September 11, 2012 Outline Evolution and Current Development Challenges and Issues Missions Ahead Toll Road Network of National Arterial

More information

Template for ToR for Transaction Advisory Services

Template for ToR for Transaction Advisory Services Template for ToR for Transaction Advisory Services Addendum 1 Prepared by Genesis Analytics 4 December 2013 PPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services

More information

Terms of Reference for International Consultant

Terms of Reference for International Consultant Ref: BTN/IC/2015-01 Terms of Reference for International Consultant Intelligent Transport Systems (ITS) feasibility study and preparation of a comprehensive ITS Action Plan for Thimphu City I. BACKGROUND

More information

CHAPTER 2 Analyzing the Business Case (Phase 1: System Planning)

CHAPTER 2 Analyzing the Business Case (Phase 1: System Planning) CHAPTER 2 Analyzing the Business Case (Phase 1: System Planning) Jakrapop Maisen STRATEGIC PLANNING Strategic Planning Overview During strategic Planning, top managers ask a series of questions that called

More information

Strategy Analysis and Choice. Chapter Five

Strategy Analysis and Choice. Chapter Five Strategy Analysis and Choice Chapter Five Chapter Objectives 1. Describe a three-stage framework for choosing among alternative strategies. 2. Explain how to develop a SWOT Matrix, SPACE Matrix, BCG Matrix,

More information

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway in association with Design 151.66 Km (Existing Road Apr. 180 km) 2 OBJECTIVE: The Government of Timor Lestewishes to Engage Consultant to carry out the Preliminary, Detailed Engineering Design and Environment

More information

Information System Strategic Planning Using IT Balanced Scorecard In Ward & Peppard Framework Model

Information System Strategic Planning Using IT Balanced Scorecard In Ward & Peppard Framework Model Information System Strategic Planning Using IT Balanced Scorecard In Ward & Peppard Framework Model Awan Setiawan and Erwin Yulianto Langlangbuana University Karapitan Street 116, Bandung, West Java, Indonesia

More information

SEMESTA SEPTEMBER 2011 CBMS4303 MANAGEMENT INFORMATION SYSTEM

SEMESTA SEPTEMBER 2011 CBMS4303 MANAGEMENT INFORMATION SYSTEM FACULTY OF INFORMATION TECHNOLOGY & MULTIMEDIA COMMUNICATION SEMESTA SEPTEMBER 2011 MANAGEMENT INFORMATION SYSTEM MATRICULATION NO. : 771116065996-001 IDENTITY CARD NO. : 771116-06-5996 TELEPHONE NO. :

More information

As a step to accelerate the provision of

As a step to accelerate the provision of PREFACE As a step to accelerate the provision of infrastructure to achieve the targets which included in the National Medium Term Development Plan (RPJMN) 2015-2019, the government has issued Presidential

More information

International Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships

International Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships International Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships Budapest, Hungary March 7 8, 2007 The views expressed in this paper are those of the

More information

Schedule and Condition Responsive Maintenance Strategies for Optimum Utilization of Maintenance Budget

Schedule and Condition Responsive Maintenance Strategies for Optimum Utilization of Maintenance Budget International Journal of Engineering Research and Development ISSN: 2278-067X, Volume 1, Issue 8 (June 2012), PP.47-53 Schedule and Maintenance Strategies for Optimum Utilization of Maintenance Budget

More information

EVALUATION OF INFRASTRUCTURE INFORMATION TECHNOLOGY GOVERNANCE USING COBIT 4.1 FRAMEWORK

EVALUATION OF INFRASTRUCTURE INFORMATION TECHNOLOGY GOVERNANCE USING COBIT 4.1 FRAMEWORK International Conference on Information Systems for Business Competitiveness (ICISBC 2013) 20 EVALUATION OF INFRASTRUCTURE INFORMATION TECHNOLOGY GOVERNANCE USING COBIT 4.1 FRAMEWORK Rusmala Santi 1) Syahril

More information

PHASE TWO FOLLOW-UP REPORT ON THE AUDIT OF CONTRACTS (2008)

PHASE TWO FOLLOW-UP REPORT ON THE AUDIT OF CONTRACTS (2008) PHASE TWO FOLLOW-UP REPORT ON THE AUDIT OF CONTRACTS (2008) PREPARED BY: Government Audit Services Branch Government of Yukon APPROVED BY: Audit Committee Table of Contents Page PREFACE 3 EXECUTIVE SUMMARY

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of reference GENERAL INFORMATION Title: Consultant for Complaint Handling Mechanism (Banjarmasin) Project Name : Support Facility for BRG (Badan Restorasi Gambut) Institutional Set-Up Reports to:

More information

INTERREG IVA Programme. Guidance Note on Procurement and Tendering G4/IIVA

INTERREG IVA Programme. Guidance Note on Procurement and Tendering G4/IIVA INTERREG IVA Programme Introduction Guidance Note on Procurement and Tendering G4/IIVA This guidance note sets out the procurement processes and thresholds in relation to projects funded in the INTERREG

More information

CHAPTER I INTRODUCTION

CHAPTER I INTRODUCTION CHAPTER I INTRODUCTION CHAPTER I. INTRODUCTION A. Background Tanjung Priok Port is the busiest port in Indonesia which located in North Jakarta, the Island of Java. The port has facilities to handle all

More information

The following is an example systems manual from a low volume (TE, but not an automotive supplier) company.

The following is an example systems manual from a low volume (TE, but not an automotive supplier) company. The following is an example systems manual from a low volume (TE, but not an automotive supplier) company. You will note that this is essentially a copy of ISO 9001:2000. I take this path because long

More information

Decentralization of Education: Legal Issues Ketleen Florestal and Robb Cooper, 1997

Decentralization of Education: Legal Issues Ketleen Florestal and Robb Cooper, 1997 Decentralization of Education: Legal Issues Ketleen Florestal and Robb Cooper, 1997 Every major effort to decentralize basic education throughout the world has involved changes to the law. That is not

More information

Clause-byclause. Interpretation. Transitioning to ISO 9001:2015

Clause-byclause. Interpretation. Transitioning to ISO 9001:2015 We re committed to helping you and your organization understand the updated requirements. This guidance document identifies the steps you should take to achieve compliance to ISO 9001:2015, and more importantly;

More information

Management. Part II: Planning Ch. 6. Strategic management

Management. Part II: Planning Ch. 6. Strategic management Management Part II: Planning Ch. 6. Strategic management Dan C. Lungescu, PhD, assistant professor 2015-2016 Course outline Management Part I: Introduction Part II: Planning Part III: Organizing Part IV:

More information

PASSENGER SOCIO ECONOMIC APPROACH AND SERVICE QUALITY OF PUBLIC TRANSPORT IN DETERMINING BUS FARE

PASSENGER SOCIO ECONOMIC APPROACH AND SERVICE QUALITY OF PUBLIC TRANSPORT IN DETERMINING BUS FARE PASSENGER SOCIO ECONOMIC APPROACH AND SERVICE QUALITY OF PUBLIC TRANSPORT IN DETERMINING BUS FARE Ika Setiyaningsih 1, Renaningsih 1 1 Muhammadiyah University of Surakarta, Civil Enginering Department,

More information

PROJECT EXECUTION STRATEGIES OVERVIEW

PROJECT EXECUTION STRATEGIES OVERVIEW PROJECT EXECUTION STRATEGIES OVERVIEW UpTech Upstream Oil & Gas Summit Designing And Building Success AGENDA Industry Situation Traditional Project Stage Progression Project Schedule Compression Contracting

More information

Asset Management Performance Measures for Privatized Highway Concessions in British Columbia

Asset Management Performance Measures for Privatized Highway Concessions in British Columbia Asset Management Performance Measures for Privatized Highway Concessions in British Columbia Travis Gilbertson Geoplan Opus Consultants Inc. Victoria, British Columbia Canada 1 Outline 1. DBFO Projects

More information

Determination of Sustainability Criteria in Strategic Appraisal of Mass Transit Development Policy Evaluation in the Greater Jakarta Metropolitan Area

Determination of Sustainability Criteria in Strategic Appraisal of Mass Transit Development Policy Evaluation in the Greater Jakarta Metropolitan Area Determination of Sustainability Criteria in Strategic Appraisal of Mass Transit Development Policy Evaluation in the Greater Jakarta Metropolitan Area Ofyar Z. Tamin 1,2,a, Rudi Sugiono Suyono 3,b 1 Institute

More information

Case Study PDAM Tirtanadi, Indonesia

Case Study PDAM Tirtanadi, Indonesia Public Disclosure Authorized WATER GLOBAL PRACTICE WSS GSG UTILITY TURNAROUND SERIES Case Study PDAM Tirtanadi, Indonesia Public Disclosure Authorized Alizar Anwar and Maria Salvetti AUGUST 2017 Key Characteristics

More information

10 Success Factors. That Make a Procurement Champion

10 Success Factors. That Make a Procurement Champion 10 Success Factors That Make a Procurement Champion 10 Success Factors That Make a Procurement Champion Is your authority Champions League material or still in the Second Division? An effective and efficient

More information

A RISK ASSESSMENT STUDY ON ELECTRONIC VOTING SYSTEM FAISAL ABDULLAH SAKHAR AL AMRY MASTER OF TECHNOLOGY MANAGEMENT UNIVERSITI MALAYSIA PAHANG

A RISK ASSESSMENT STUDY ON ELECTRONIC VOTING SYSTEM FAISAL ABDULLAH SAKHAR AL AMRY MASTER OF TECHNOLOGY MANAGEMENT UNIVERSITI MALAYSIA PAHANG A RISK ASSESSMENT STUDY ON ELECTRONIC VOTING SYSTEM FAISAL ABDULLAH SAKHAR AL AMRY MASTER OF TECHNOLOGY MANAGEMENT UNIVERSITI MALAYSIA PAHANG UNIVERSITI MALAYSIA PAHANG DECLARATION OF THESIS AND COPYRIGHT

More information

Creative Thinking in Problem Solving. Application to Professional Consultancy

Creative Thinking in Problem Solving. Application to Professional Consultancy Creative Thinking in Problem Solving Application to Professional Consultancy Page 1. Company Background 2. Problem faced by the company 3. Fishbone diagram - Mess finding and Problem finding Technique

More information

Commencement of Works vs commencement of Works Program (FIDIC Rainbow Conditions of Contracts)

Commencement of Works vs commencement of Works Program (FIDIC Rainbow Conditions of Contracts) Volume (5) Number (8) August 2015 J. Appl. Environ. Biol. Sci., 5(8)55-69, 2015 2015, TextRoad Publication ISSN: 2090-4274 Journal of Applied Environmental and Biological Sciences www.textroad.com Commencement

More information

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No.: 19/2015/ND-CP Hanoi, 14 February 2015 DECREE

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No.: 19/2015/ND-CP Hanoi, 14 February 2015 DECREE THE GOVERNMENT ------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No.: 19/2015/ND-CP Hanoi, 14 February 2015 DECREE DETAILING THE IMPLEMENTATION OF A NUMBER OF ARTICLES

More information

Determining the Critical Success Factors in Construction Projects: AHP Approach

Determining the Critical Success Factors in Construction Projects: AHP Approach Determining the Critical Success Factors in Construction Projects: AHP Approach Afshin Pakseresht 9, Dr. Gholamreza Asgari 30 Corresponding Author: Department of Master of executive management, Electronic

More information

Strategic Planning for Public Relations Section of Karaj Municipality

Strategic Planning for Public Relations Section of Karaj Municipality 2015, TextRoad Publication ISSN: 2090-4274 Journal of Applied Environmental and Biological Sciences www.textroad.com Strategic Planning for Public Relations Section of Karaj Municipality Zeinab Riazi 1,

More information

Commercial Construction 1

Commercial Construction 1 Commercial Construction 1 Your topic: Your written report should be 2,500 words in length and should be referenced where necessary using an appropriate referencing style. Your report should analyze at

More information

The Cost Savings Potential of Sustainability Practices

The Cost Savings Potential of Sustainability Practices The Cost Savings Potential of Sustainability Practices The Sustainability Triple Bottom Line The Triple Bottom Line (TBL) means addressing Environmental, Economic and Social Equity dimensions of a project

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

JOB DESCRIPTION. Department: Public Realm Grade: PO6. Low Hall, Argall Avenue or other locations within the Borough

JOB DESCRIPTION. Department: Public Realm Grade: PO6. Low Hall, Argall Avenue or other locations within the Borough JOB DESCRIPTION Position Principal Engineer Date Prepared: Nov 2012 Title: Highway Maintenance Directorate: Environment and Regeneration JD Reference no Department: Public Realm Grade: PO6 Location: Low

More information

ENGI 5708 Design of Civil Engineering Systems

ENGI 5708 Design of Civil Engineering Systems ENGI 5708 Design of Civil Engineering Systems Lecture 22: Decision Tree Analysis Part 1 Shawn Kenny, Ph.D., P.Eng. Assistant Professor Faculty of Engineering and Applied Science Memorial University of

More information

Problems in Materials and Equipment Procurement of Indonesian Contractors

Problems in Materials and Equipment Procurement of Indonesian Contractors Problems in Materials and Equipment Procurement of Indonesian Contractors Krishna Mochtar, PhD Affiliation: INDONESIA CONSTRUCTION EXPERTS ASSOCIATION AFFILIATION Indonesia Construction Experts Association

More information

Fisheries and Aquaculture Forum (10AFAF) Aquaculture in Asia (CAA4) in Yeosu, The paper is presented in 10 th Asian

Fisheries and Aquaculture Forum (10AFAF) Aquaculture in Asia (CAA4) in Yeosu, The paper is presented in 10 th Asian VULNERABLE WOMEN ROLE IN SECURING HOUSEHOLD INCOME UNDER THE CIRCUMTANCES OF CLIMATE CHANGE IN BRACKISH WATER POND BUSINESS IN PATI REGENCY, CENTRAL JAVA- INDONESIA : TOWARD ADAPTATION AND MITIGATION STRATEGY

More information

Frequency Analysis of Genesis Risk In Construction Projects

Frequency Analysis of Genesis Risk In Construction Projects IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 78-684 Volume 5, Issue 6 (Mar. - Apr. 03), PP 45-5 Frequency Analysis of Genesis Risk In Construction Projects Anita Rauzana (Staff

More information

4 Desired Levels of Service (LOS)

4 Desired Levels of Service (LOS) 4 Desired Levels of Service (LOS) LOS are a key business driver and influence all asset management decisions. LOS statements describe the outputs Halton intends to deliver to its residents and commonly

More information

Japanese ODA Loan. Ex-Ante evaluation

Japanese ODA Loan. Ex-Ante evaluation Japanese ODA Loan Ex-Ante evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Matarbari Ultra Super Critical Coal-Fired Power Project (I) Loan Agreement: June 16, 2014 Loan

More information

Developing an EITI work plan

Developing an EITI work plan Guidance note 2 May 2016 This note has been issued by the EITI International Secretariat in association with GIZ. The purpose of the note is to provide guidance to implementing countries on developing

More information

Internal Construction Management at Michigan State University

Internal Construction Management at Michigan State University Internal Construction Management at Michigan State University MSU Construction Industry Research and Education Center Sp Funding Provided by MSU office of Vice President of Finance and Operations Grant

More information

Determining and ranking essential criteria of Construction Project Selection in Telecommunication of North Khorasan-Iran

Determining and ranking essential criteria of Construction Project Selection in Telecommunication of North Khorasan-Iran Determining and ranking essential criteria of Construction Project Selection in Telecommunication of North Khorasan-Iran Majid Mojahed, Rosnah bt Mohd Yusuff, Mohammad Reyhani Abstract Economy project

More information

EINRIP. Specification and Construction Issues

EINRIP. Specification and Construction Issues EINRIP Specification and Construction Issues There are a significant number of changes in the Specification Not all issues can be discussed here A more detailed list of changes will be provided with bid

More information

THE ROLE OF COSO FRAMEWORK IN ACHIEVING STRATEGIC OBJECTIVES IN IRANIAN COMPANIES

THE ROLE OF COSO FRAMEWORK IN ACHIEVING STRATEGIC OBJECTIVES IN IRANIAN COMPANIES I J A B E R, Vol. The, Role No. of 0 COSO (06): Framework 7055-707in Achieving Strategic Objectives in Iranian Companies 7055 THE ROLE OF COSO FRAMEWORK IN ACHIEVING STRATEGIC OBJECTIVES IN IRANIAN COMPANIES

More information

Pavement Design. TTP Orientation Seminar 2011

Pavement Design. TTP Orientation Seminar 2011 Pavement Design TTP Orientation Seminar 2011 What are Pavements? Engineered structures in contact with the earth's surface built to facilitate movement of people and goods Pedestrians Personal vehicles

More information

STANDING COMMITTEE ON PUBLIC ACCOUNTS

STANDING COMMITTEE ON PUBLIC ACCOUNTS STANDING COMMITTEE ON PUBLIC ACCOUNTS MINISTRY OF TRANSPORTATION ROAD INFRASTRUCTURE CONSTRUCTION CONTRACT AWARDING AND OVERSIGHT (SECTION 3.10, 2016 ANNUAL REPORT OF THE OFFICE OF THE AUDITOR GENERAL

More information

TECHNICAL ASSISTANCE

TECHNICAL ASSISTANCE TECHNICAL ASSISTANCE A. Methodology and Key Activities 1. After the Government of Indonesia launched the Master Plan for Acceleration and Expansion of Indonesia s Economic Development (MP3EI), 2011 2025,

More information

THE USAGE OF BALANCED SCORECARD IN EVALUATING THE EFFECTIVENESS OF CONTRACTOR PERFORMANCE APPRAISALS IN HEAVY OIL OPERATING UNIT OF PT.

THE USAGE OF BALANCED SCORECARD IN EVALUATING THE EFFECTIVENESS OF CONTRACTOR PERFORMANCE APPRAISALS IN HEAVY OIL OPERATING UNIT OF PT. THE USAGE OF BALANCED SCORECARD IN EVALUATING THE EFFECTIVENESS OF CONTRACTOR PERFORMANCE APPRAISALS IN HEAVY OIL OPERATING UNIT OF PT. CDE Sjamsuddin Pontoh 1 1 School of Business and Management, Bandung

More information

CASE STUDY 10 Amazon.Com: An E-Commerce Retailer

CASE STUDY 10 Amazon.Com: An E-Commerce Retailer Amazon.Com Case Study CASE STUDY 10 Amazon.Com: An E-Commerce Retailer Patrick Collins, Robert J. Mockler, and Marc Gartenfeld STRATEGIC MANAGEMENT PMN6023 Prof. Madya. Dr. Hj. Hamzah Dato Hj. Abdul Rahman

More information

RJOAS, 5(65), May 2017

RJOAS, 5(65), May 2017 DOI https://doi.org/10.18551/rjoas.2017-05.31 IMPLEMENTATION OF PALANGKA RAYA CITY GOVERNMENT POLICY TO IMPROVE TRADITIONAL RETAIL COMPETITIVENESS: STUDY ON IMPLEMENTATION OF REGIONAL REGULATION OF PALANGKA

More information

Use of AHP Method in Efficiency Analysis of Existing Water Treatment Plants

Use of AHP Method in Efficiency Analysis of Existing Water Treatment Plants International Journal of Engineering Research and Development ISSN: 78-067X, Volume 1, Issue 7 (June 01), PP.4-51 Use of AHP Method in Efficiency Analysis of Existing Treatment Plants Madhu M. Tomar 1,

More information

International journal of advanced production and industrial engineering

International journal of advanced production and industrial engineering Available online at www.ijapie.org International journal of advanced production and industrial engineering IJAPIE-017-01-116, Vol (1), 3-40 IJAPIE Connecting Science & Technology with Management. A Journal

More information

The Concepts: Team Management Systems

The Concepts: Team Management Systems The Concepts: Team Management Systems The Concepts: Work Preferences Understanding work preferences is a critical component in developing individual, team and organizational performance. The Team Management

More information

Managing Risk with PM 2

Managing Risk with PM 2 Managing Risk with PM 2 lex.vander.helm@capgemini.com Lex van der Helm Lead trainer - Capgemini Academy Introduction Risk Risk Management Risk Management in PM 2 Process Steps & Artefacts 2 Speaker's name

More information

< < CLOSING THE COMPETITIVE OPPORTUNITY GAP DEVELOP YOUR STRATEGY OUR WORLDWIDE PRESENCE OPTIMIZE YOUR SYSTEMS SIMPLIFY YOUR ENVIRONMENT

< < CLOSING THE COMPETITIVE OPPORTUNITY GAP DEVELOP YOUR STRATEGY OUR WORLDWIDE PRESENCE OPTIMIZE YOUR SYSTEMS SIMPLIFY YOUR ENVIRONMENT CLOSING < < PAYMENTS INDUSTRY BY THE NUMBERS These statistics are indicative of a definitive shift that s taking place in the payments market: 1/3 of retail banking revenues will go to new non-bank players

More information

Partnering In Construction: Improvementthrough. Integration And Collaboration

Partnering In Construction: Improvementthrough. Integration And Collaboration Partnering In Construction: Improvementthrough Downloaded from ascelibraryorg by 3744193189 on 01/24/18 Copyright ASCE For personal use only; all rights reserved Integration And Collaboration SEVDA BAYRAMOGLU

More information

OCCUPATIONAL STANDARD (For use in the development of supply chain related job descriptions, performance evaluations, career development plans, etc.

OCCUPATIONAL STANDARD (For use in the development of supply chain related job descriptions, performance evaluations, career development plans, etc. OCCUPATIONAL STANDARD (For use in the development of supply chain related job descriptions, performance evaluations, career development plans, etc.) Description of Position (As defined by the CSCSC Stakeholder

More information

Keywords: Indonesia; Infrastructure; Provincial capitals; Rank; Transportation

Keywords: Indonesia; Infrastructure; Provincial capitals; Rank; Transportation International Journal of Technology (2016) 4: 544-552 ISSN 2086-9614 IJTech 2016 MAPPING PRIORITIES FOR THE DEVELOPMENT OF THE TRANSPORTATION INFRASTRUCTURE IN THE PROVINCIAL CAPITALS OF INDONESIA Yusuf

More information

Fleet Maintenance Privatization Update. Finance, Audit, and Accountability Committee May 29, 2007

Fleet Maintenance Privatization Update. Finance, Audit, and Accountability Committee May 29, 2007 Fleet Maintenance Privatization Update Finance, Audit, and Accountability Committee May 29, 2007 1 Overview Review year one of pilot privatization of fleet maintenance and repair services Savings realized

More information