PROJECT EXECUTION STRATEGIES OVERVIEW
|
|
- Evan Blake Allen
- 6 years ago
- Views:
Transcription
1 PROJECT EXECUTION STRATEGIES OVERVIEW UpTech Upstream Oil & Gas Summit Designing And Building Success
2 AGENDA Industry Situation Traditional Project Stage Progression Project Schedule Compression Contracting Strategies and Tools to Achieve Project Success
3 Current Industry Situation Need for faster projects Cost and schedule overruns Mistrust Rigid gated procedures How can we develop systems for selecting the right execution strategy to satisfy project expectations?
4 How do we improve our project execution strategy selection? Need to understand: 1. Where are we? 2. Where do we want to end up? 3. Options available to get us there 4. Factors to consider (risk and benefits) Our goal is to help our customers be more successful.
5 Project Considerations Quality Scope/Safety Budget Schedule
6 Project Timeline Regular Project Schedule Tender & Procurement Long Lead Tender & Procurement Materials Concept FEL 1 Class 5 FEL 2 Class 4 FEED Class 3 Detailed Design Tender Construction Construction Commissioning & Start-up Project Sanction Kickoff Completion
7 Project Timeline Accelerated Project Schedule Tender Construction Concept FEL 1 FEL 2 FEED Detailed Design Tender & Procurement Long Lead Construction Tender & Procurement Materials Commissioning & Start-up Acceleration Kickoff Project Sanction Completion
8 Project Timeline Compressed Project Schedule Tender Construction Concept FEL 1 FEL 2 Feed Scope Change Feed Update Approval Delay Detailed Design Construction Commissioning & Start-Up Tender & Procurement Long Lead Tender & Procurement Materials Compression Kickoff Regular Project Sanction Project Sanction Completion
9 Project Timeline Accelerated Crash Project Procurement Long Lead Procurement Materials NO TENDER Concept FEL 1 FEL 2 FEED Construction Commissioning & Start-up Acceleration Detailed Design Project Sanction Kickoff Completion
10 Project Timeline Compressed Crash Project Procurement Long Lead Procurement Materials NO TENDER Conce pt FEL 1 FEL 2 Feed Scope Change Feed Update Scope Change 2 Feed Update Approval Delay Detailed Design Commissioning & Start-up Construction Compression Regular Project Sanction Project Sanction Kickoff Completion
11 Project Components Engineering Procurement Construction
12 Engineering Engineering Contractual Basis Lump sum Reimbursable target Fee as % of capital Reimbursable
13 ENGINEERING Engineering Contractual Terms - Based on Scope Definition
14 PROCUREMENT There are many systems that are used for procurement of equipment, material and services. Owner direct purchasing As agent on behalf of customer Zero dollar account Consultant/Contractor as part of contract
15 PROCUREMENT Once the procedure for procurement is selected, the way things get purchased can fit into different methods based on schedule constraints. Lump sum tender and bid evaluation Supplier cost plus fee Time and material at agreed shop rates Purchase stock items Purchase used items Use customer stock or used items
16 Construction Construction Contracting Strategies Tendered lump sum Tendered unit prices Cost plus fixed fee Cost plus % fee Force account
17 CONSTRUCTION Construction Plan Based on Design Maturity
18 CONSTRUCTION Construction Contracting Strategies - Based on CM Capabilities
19 Integrated Projects Lump Sum Tendered with bid evaluation, FEED as part of tender process Tendered with bid evaluation, FEED done prior to tender Cost plus fixed fee Cost plus fee as % of capital Reimbursable Project Execution Strategies / May 15, 2014
20 INTEGRATED PROJECT APPROACH Integrated Contracting Strategy - Based on Scope Definition Project Execution Strategies / May 15, 2014
21 The Keys To Project Success Assemble the right team for the project Forward planning - develop strategy early Understanding risks and benefits of each strategy Ability to recognize when to/and how to adjust strategy as project proceeds
5/21/13 PROCUREMENT 5/21/13. Agenda. Common Tendering Systems Procurement Methods
PROCUREMENT 5/21/13 Agenda Common Tendering Systems Procurement Methods 1 Agenda Common Tendering Systems Procurement Methods Common Tendering Systems Competitive / Open-bid: (Qualified) contractors are
More informationECI: Two-Stage Contracts
ECI: Two-Stage Contracts Client and Contractor Considerations Michael Creedon Special Counsel ECI in Infrastructure and Major Projects Summit 2010 Sydney, 17 June 2010 Sessions Outline Introduction /
More informationCorporate Performance Briefing and Management Policy for FY2008
Corporate Performance Briefing and Management Policy for FY2008 Global Toyo for Client Value Enhancement May 14, 2008 Yutaka Yamada President & CEO Contents 2008 1. Looking Back FY2007: Mid-term Plan Achieved
More information45. Feedlot construction delivery
Client Des i gn/ Builder Design Consultant Construction Sub-contractors and suppliers FEEDLOT DESIGN AND CONSTRUCTION 45. Feedlot construction delivery AUTHORS: Rod Davis and Ross Stafford Introduction
More informationUnit 3: The Traditional Procurement Route
Unit 3: The Traditional Procurement Route 3.1 Introduction This Unit briefly introduces the main features of the traditional procurement route as a widely used route that provides a good basis for examining
More informationPROJECT DELIVERY METHODS
Understanding the Construction Contract Project Delivery Methods ISBA April 7,2017 Copyright 2017 by K&L Gates LLP. All rights reserved. Design Bid Build Design Negotiate Build Construction Manager Advisor
More informationOwner s Representative/Owner Team Roles, Obligations and Responsibilities
Page1 Achieving Excellence in Capital Projects Delivery Owner s Representative/Owner Team Roles, Obligations and Responsibilities By George E. Baram P.Eng., M.Sc., PMP, CCE, Fellow AACE International The
More informationRequest for tenders: Baseline Assessment of Scrap Metal Recycling in Samoa and Drafting of the Regional Scrap Metal Strategy
PO Box 240, Apia, Samoa E: sprep@sprep.org T: +685 21929 F: +685 20231 W: www.sprep.org The Pacific environment, sustaining our livelihoods and natural heritage in harmony with our cultures. REQUEST FOR
More informationManaging Mega Projects. Wed 6 th July, Martin Urquhart Project Director
Managing Mega Projects Wed 6 th July, Martin Urquhart Project Director Overview 13,500psi, 350 F, 500 MMscfd 6 Development Wells / 1 PWRI well CPF Jacket 7,874 mt Topsides 13,898 mt WHP 12+2 Slots Jacket
More informationPurchasing Policy Update: Implementation of the Uniform Guidance Procurement Standard. Katie Cattrell, Training Specialist
Purchasing Policy Update: Implementation of the Uniform Guidance Procurement Standard Katie Cattrell, Training Specialist 1 Agenda 1. Background and Timeline 2. Procurement Thresholds 3. Procurement Standards
More informationCHAPTER 1 INTRODUCTION
CHAPTER 1 INTRODUCTION Cost is a major factor in most decisions regarding construction, and cost estimates are prepared throughout the planning, design, and construction phases of a construction project,
More informationTop 10 Areas for Productivity Improvement on Alberta Mega Oil Sands Construction Projects
Top 10 Areas for Productivity Improvement on Alberta Mega Oil Sands Construction Projects George F. Jergeas PhD, PEng Professor of Project Management, University of Calgary October 24, 2012: BREAKOUT:
More informationProgressive Design Build
Progressive Design Build July 19, 2018 Ash Dhingra P.E.,S.E TRADITIONAL PROCUREMENT Design-Bid-Build (DBB) Design to 100%, procurement (bid), and construction proceed sequentially Construction contract
More informationHow we see it EPC vs EPCM
How we see it EPC vs EPCM To EPC or Not to EPCM EPC and EPCM contracting are both very prevalent types of contracts within the construction industry. Dependent on the level of risk the Owner of a project
More informationStandard Appraisal Framework for Hybrid Maintenance Contracts
NZ Transport Agency Page 1 of 5 Standard Appraisal Framework for Hybrid Maintenance Contracts This document is considered a guideline for the establishment of a performance system for the NZ Transport
More informationDesign-Build (DB) and Construction Manager / General Contractor (CMGC)
Design-Build (DB) and Construction Manager / General Contractor (CMGC) IDOT and Industry Preliminary Joint Review for Proposed Legislation December 18, 2012 Welcome Introductions Agenda Purpose Definitions
More informationNEC Experience Sharing on Improvement of Fuk Man Road Nullah Partnering and Financial Aspects from Contractor s view. Ir Ko Wing Nin, Ken
NEC Experience Sharing on Improvement of Fuk Man Road Nullah Partnering and Financial Aspects from Contractor s view Ir Ko Wing Nin, Ken 1 Agenda Tendering Subletting Early Warning Notification 2 Partnering
More informationProject developers for Oil Terminals, SPM/CBM/FSO and Maritime Operations
Project developers for Oil Terminals, SPM/CBM/FSO and Maritime Operations Contracting Strategies for Terminal Construction page 2 Contracting Strategies for Terminal Construction Choosing the way to contract
More informationConstruction contracting methods: Managing risk and delivery in an ever-changing environment
Construction Law in 2010 Putting the Principles into Practice Construction contracting methods: Managing risk and delivery in an ever-changing environment Michael Creedon Partner 28 October 2010 Society
More informationCHAPTER 4 EXISTING PROJECT EXECUTION MODELS
CHAPTER 4 EXISTING PROJECT EXECUTION MODELS 4.1 OVERVIEW 4.2 COMPONENTS OF MODEL 4.2.1 ORGANISATIONAL STRUCTURE 4.2.2 MANAGEMENT INFORMATION SYSTEM 4.2.3 PROJECT MANAGEMENT SYSTEM 4.2.4 RISK MANAGEMENT
More informationCHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS
CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS 1) THE LIFE CYCLE OF A CONSTR. PROJECT: 1.1:CONCEPT AND FEASIBILITY STUDIES: THE START Recognition of a need for a new facility conceptual analyses Technical
More informationProject Agreements, Risk Management and Litigation Risk Sean Ralph, General Counsel, Sasol Canada Phil Scheibel, Partner, Rose LLP
Project Agreements, Risk Management and Litigation Risk Sean Ralph, General Counsel, Sasol Canada Phil Scheibel, Partner, Rose LLP Canadian Energy Law Foundation March 1, 2013 11:00 a.m. 12:00 p.m. Introduction
More information(Online Procurement Initiative)
Internet Negotiations (Online Procurement Initiative) Objective Share Intel s present findings in the application of Internet negotiations (I-NEG) for construction services and facilities equipment. Specifically,
More informationBuilding Schools for the Future: Procurement Review
Building Schools for the Future: Procurement Review ICT in BSF 18 March 2008 Tim Byles Chief Executive Partnerships for Schools Background Strong programme momentum Focus to date on pre-engagement and
More informationContracting and Procurement Strategy. at the Heart of Project Delivery. Tehran, January 28 th, OMV Upstream
Contracting and Procurement Strategy at the Heart of Project Delivery Tehran, January 28 th, 2017 OMV Upstream OMV Upstream Project Delivery Global Project Portfolio Core 2 - Northsea Aasta Hansteen Gulfaks
More information// Achieving the Unachievable
// Achieving the Unachievable A Case Study on Aligning a Project with Stakeholder Expectations Dr. Dan Patterson, PMP CEO & President, Acumen February Table of Contents INTRODUCTION TO THE PROJECT 3 S1:
More informationUNDP Procurement. UNDP Angola Procurement
UNDP Procurement The term procurement refers to the process of acquiring goods, works and services. The process spans the whole cycle from identification of needs, choosing the adequate procurement methods,
More informationRice Building Institute September 13, 2007
Rice Building Institute September 13, 2007 TMHS Capital Construction Program Sid Sanders, Vice President Facilities Planning and Construction Methodist System Overview Willowbrook San Jacinto Medical Center
More informationPre Proposal Proposal Meeting
SOUTHERLY WWTC SECOND STAGE RETURN SLUDGE PUMP IMPROVEMENTS Design Build Project Pre Proposal Proposal Meeting August 15, 2012 Introduction Progressive Design-Build Procurement Approach Request For Proposals
More informationRate Schedule FT Firm Transportation Service
Rate Schedule FT Firm Transportation Service 1. Availability This Rate Schedule is available for the transportation of natural gas by Heartland Gas Pipeline for any Customer: 1.1 Where Customer: a) Has
More informationSUPPLIER QUALIFICATION SYSTEM (SQS)
SUPPLIER QUALIFICATION SYSTEM (SQS) Providing global visibility of Shell suppliers www.shell.com/supplier/qualification OUR APPROACH TO SUPPLIER PREQUALIFICATION Shell Contracting & Procurement is responsible
More informationAlternative Project Delivery Methods and Procurement
Alternative Project Delivery Methods and Procurement Board of Airport Commissioners Meeting 2 June 2014 Presented by: Roger A. Johnson, Deputy Executive Director Definitions Project Delivery Method o The
More informationProposal for Preconstruction Services CM/GC Services-TMSF Office and Maintenance Building Project
Equal Opportunity Employer January 5, 2015 Exhibit A Exhibit A CM/CG Preconstruction Services Proposal Diane Morrison, CPPB PW Purchasing Specialist Public Works Department 150 N Capitol Blvd. Boise, Idaho
More informationUWI Executive Certificate in Public Procurement Law: Major Procurement Projects. Program Agenda. Presented by Paul Emanuelli
The University of the West Indies Cave Hill Campus Faculty of Law UWI Executive Certificate in Public Procurement Law: Major Procurement Projects Program Agenda Presented by Paul Emanuelli Savannah Beach
More informationVillage of Lynbrook. Request for Proposal Engineering Services. Police License Plate Reader/Intersection Camera System
Village of Lynbrook Request for Proposal Engineering Services Police License Plate Reader/Intersection Camera System 1 Columbus Drive Lynbrook, NY 11563 516-599-8300 July 16, 2018 Table of Contents 1.
More informationDefinition. Name of the tool or technique Project mission statement
Tools and Techniques Definitions (or by alphabetic order ; see below) A definition of each of the tools and techniques is provided below. The primary sources of definitions were the PMBOK Guide and Max
More informationIMPROVING SUBCONTRACT CONDITIONS TOWARDS SUCCESSFUL INFRASTRUCTURE PROJECTS IN GAZA
MPROVNG SUBCONTRACT CONDTONS TOWARDS SUCCESSFUL NFRASTRUCTURE PROJECTS N GAZA Rebhy El Sheikh Palestinian Water Authority, Gaza Technical Director, MSc Mechanical Engineering ABSTRACT: Amongst the so many
More informationSEPARATED PROJECT DELIVERY SYSTEMS
SEPARATED PROJECT DELIVERY SYSTEMS Separated (aka Traditional) The traditional delivery method typically involves three sequential project phases: The design phase, which requires the services of a designer
More informationPlanning and Analysis Construction Operation
Planning and Analysis Construction Operation Session 2: Contract Strategy Prepared by zacoeb@ub.ac.id Introduction At the early stage of a project and once a project manager is selected, the main issue
More informationCommittee Meeting. Procurement Processes for Professional Services and Contractors
Citizen s i Oversight Committee Meeting Procurement Processes for Professional Services and Contractors March 2, 2011 1 Procurement Process for Professional Services 2 Procurement Process for Professional
More informationOwners Perspective on Contracting Domestic Projects
Projects have become larger and more complicated. Take advantage of the Economy of Scale in the commodity markets. Increased instrumentation due to Process Safety Management. Perception that only large
More information1. FROM (Bidder): (Name)
Tender No. [ ] Tender Forms Page 1 1. FROM (Bidder): (Name) (Address) TO: Alberta Transportation, Strategic Procurement Branch Main Floor, Twin Atria Building 4999 Avenue 5000 Edmonton, Alberta, T6B 2X3
More informationAlternative ways of financing infrastructure
Alternative ways of financing infrastructure By Rikke Beckmann Danielsen, partner Financial Advisory, DK June 2017 Project overview Wide range of different projects Impact that matters We work on large
More informationWhy Use an Architect?
Architects Can Help Interpret Your Dreams Into A Built Reality Architects provide a service that extends well beyond producing a set of drawings. An architect will listen to your dreams, your aspirations,
More informationTERRE project. Elastic need, social welfare and counter-activations
TERRE project Elastic need, social welfare and counter-activations Author: TERRE TSOs Date 12/03/2018 Page 1 of 14 Contents 1 Introduction... 3 1.1. Background... 3 2 Elastic need... 4 2.1. Examples...
More informationPROGRESSIVE DESIGN-BUILD. Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA
PROGRESSIVE DESIGN-BUILD Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA ADVANTAGES/DISADVANTAGES DESIGN BID BUILD (HARD BID) The traditional project delivery method, which customarily
More informationAncillary Services: Tender Procurement and Development
Ancillary Services: Tender Procurement and Development Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight
More informationOfficer Recommendations
Policy and Resources Committee 19 July 2018 Title Report of Wards Status Award of Contract to Community Sector Development Partner Leader of the Council All Public (with separate exempt report) Enclosures
More informationAlternative Delivery for Municipal Water & Wastewater Projects in 2012
Alternative Delivery for Municipal Water & Wastewater Projects in 2012 a OWEA 2012 Making a Pass at Going Green Looking Towards the Future June 20, 2012 Dennis Tinkler, P.E. Agenda Ohio s Methods of Performing
More informationProject Management in the Design and Construction Industry
Project Management in the Design and Construction Industry Design & Construction Institute of Nova Scotia 2011 February 4, 2011 Game Plan Project Management 201 Consultant s Perspective Contractor s Perspective
More informationAt Procurement Australia, We get it.
WE GET IT At Procurement Australia, We get it. We re always doing the leg work for better results. Welcome to our world. The following pages share our unique approach to helping businesses like yours get
More informationPublic procurement rules
Major infrastructure and energy projects in CEE Public procurement rules Case Study: Poland The European Union will invest 170 billion in ten former Eastern block countries in Central and Eastern Europe
More informationSupplier qualification system guide
Supplier qualification system guide Transforming the way we work together aldermore.co.uk Responsible business practices Aldermore is committed to introducing responsible business practices that make it
More informationBASIC HOST COUNTRY CONSTRUCTION CONTRACTING FOR DEVELOPMENT PROFESSIONALS: A PRIMER
BASIC HOST COUNTRY CONSTRUCTION CONTRACTING FOR DEVELOPMENT PROFESSIONALS: A PRIMER January 2012 This Primer was produced for the United States Agency for International Development (USAID). It was prepared
More informationThe Greater Toronto Electrical Contractors Association endorses the following CCDC/CCA Documents
The Greater Toronto Electrical Contractors Association endorses the following CCDC/CCA Documents CCDC Standard Construction Documents CCDC 2-1994 Stipulated Price Contract Standard prime contract between
More informationBusiness of Anaerobic Digestion Project Delivery Basics
Business of Anaerobic Digestion Project Delivery Basics BioCycle West Pre-Conference Workshop April 16 th Portland Oregon Adam Halsband Business Development Manager EISENMANN Corporation Agenda Key Components
More information5 Best Practices In Capital Project Estimating for the Process Industries. Executive Brief
5 Best Practices In Capital Project Estimating for the Process Industries Executive Brief Introduction As Engineering, Procurement and Construction firms (EPCs) around the world face the reality of fewer
More informationFERC GAS TARIFF. Second Revised Volume No. 1 CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF Second Revised Volume No. 1 Of CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: James R. Downs,
More informationinform practice note Issued by the Construction Industry Development Board
construction industry development inform practice note Issued by the Construction Industry Development Board Development through partnership construction procurement and delivery CONSTRUCTION PROCUREMENT
More informationNutrition Supplier Meeting 2015 UNICEF Supply Division Copenhagen
Nutrition Supplier Meeting 2015 UNICEF Supply Division Copenhagen Anthropometric Equipment/Mechanical Scales Annika Schwenk MSc.Pharm UNICEF SD Medicines and Nutrition Centre 30 th June 2015 Nutrition
More informationIs Your District Ready For the New Law?
Is Your District Ready For the New Law? Ben Pintabona Operations Manager Scaparotti Construction Group Craig Weise Construction Reform Program Director Ohio School Facilities Commission Sylvia Gillis,
More informationCLARIFICATIONS N 2 SERVICE CONTRACT NO CPF III Event Organisation. Clarification request received on 28 December 2016:
Clarification request received on 28 December 2016: Clarification published on 17 January 2017: General explanation: The CEFTA Secretariat kindly requests all tenderers to take into account that the
More informationAn Introduction to Engineering Design in the Nuclear Industry
An Introduction to Engineering Design in the Nuclear Industry Nuclear Supply Chain Event 28 th April 2016 Part 2: The Design Process Rob Barrand Lead Process Engineer Robert.barrand@nnl.co.uk Overview
More informationInform Practice Note #23
Inform Practice Note #23 September 2010 (Version 1 - September 2010) Construction Procurement Strategy cidb s Inform Practice notes provide guidance and clarity in achieving client objectives in construction
More informationA cost analysis is required for any negotiated (non competitive) contract procurement on behalf of any University program, if:
SECTION 7: ACQUISITION PROCEDURES SUBJECT: COST ANALYSIS PROCEDURE 7.4.2 POLICY: A cost analysis is required for any negotiated (non competitive) contract procurement on behalf of any University program,
More informationRodica Sasu*, Argentina Tataru** BROWN FIELD REHABILITATION SUCCESS THROUGH AN EFFECTIVE PROJECT MANAGEMENT SYSTEM
AGH DRILLING, OIL, GAS Vol. 34 No. 2 2017 http://dx.doi.org/10.7494/drill.2017.34.2.577 Rodica Sasu*, Argentina Tataru** BROWN FIELD REHABILITATION SUCCESS THROUGH AN EFFECTIVE PROJECT MANAGEMENT SYSTEM
More informationLM032: Advanced Tendering Procedures & Bid Evaluation
LM032: Advanced Tendering Procedures & Bid Evaluation LM032 Rev.001 CMCT COURSE OUTLINE Page 1 of 6 Training Description: The engagement and management of contractors and suppliers is a vital part of the
More informationTOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR
February 5, 2018 SUMMARY OF CM/GC SELECTION PROCESS FOR DIMMIT II APARTMENT BUILDING The Town of Winter Park requests proposals from qualified Construction Manager / General Contractor (CM/GC) firms for
More informationPublic Building Commission of Chicago Terms and Tools for Public Capital Development and Financing
Project Delivery Methods January 30, 2012 Public Building Commission of Chicago Terms and Tools for Public Capital Development and Financing Terms Capital Project Capital Program Prioritized Capital Plan
More informationProject phases II. Tendering-constructionoperation
Project phases II. -constructionoperation Construction management 2. Lepel BME Department of Construction Technology and Management 09.03.2016 Project phases time Inception initiation Preliminary analysis
More informationAgenda Part 1 (up to break)
Welcome to the Use of the NEC3 Engineering Construction Contract as a project management tool Presenter : Jon Broome leading edge projects consulting ltd jon@leadingedgeprojects.co.uk +44(0)7970 428 929
More informationIndex. Page locators in italics and bold respectively refer to figures and tables separate from the corresponding text.
Construction Planning ISBN 978-0-7277-6057-9 ICE Publishing: All rights reserved http://dx.doi.org/10.1680/cp2e.60579.191 Index Page locators in italics and bold respectively refer to figures and tables
More informationDRAFT. Request for Proposal for Construction Manager at Risk Services ASHRAE. New Headquarters Building. Peachtree Corners, GA
DRAFT Request for Proposal for Construction Manager at Risk Services ASHRAE New Headquarters Building Peachtree Corners, GA 1. INTRODUCTION AND PROJECT DESCRIPTION A. Introduction On behalf of ASHRAE,
More informationSupport for Competitive Procurement of Renewables in Mongolia
TERMS OF REFERENCE Support for Competitive Procurement of Renewables in Mongolia 1. Background The European Bank for Reconstruction and Development ( EBRD or the Bank ) and the Mongolian Ministry of Energy
More informationAn overview of the Standard for Infrastructure Procurement and Delivery Management
An overview of the Standard for Infrastructure Procurement and Delivery Management National Treasury Instruction No 4 of 2015/2016, issued in terms of the Public Finance Management Act of 1999 (PFMA),
More informationMetropolitan Council
2011-A17 Program Evaluation and Audit Metropolitan Council Professional Services Contracts Review August 15, 2011 INTRODUCTION Background Program Evaluation and Audit (Audit) recently conducted a review
More informationProject phases II. Tendering-constructionoperation
Project phases II. -constructionoperation Construction management 2. Lepel BME Department of Construction Technology and Management 04.03.2015 Project phases time Inception initiation Preliminary analysis
More informationTHE USE OF OUTSIDE CONTRACTORS FOR PORT MAINTENANCE. John R. Lethbridge
Page 1 of 5 TRANSPORTATION, WATER AND URBAN DEVELOPMENT DEPARTMENT THE WORLD BANK November 1990 Transport No. PS-2 THE USE OF OUTSIDE CONTRACTORS FOR PORT MAINTENANCE John R. Lethbridge The use of outside
More informationCapital Projects Do your homework. CIM Toronto October 2014 Rocks and Stocks Chris Twigge-Molecey
Capital Projects Do your homework CIM Toronto October 2014 Rocks and Stocks Chris Twigge-Molecey 2 Causes of capital over-runs Old news The symptoms: Persistent over-runs Late start-up Poor ramp-up to
More informationADDENDUM #1. CRUISE TERMINAL NO. 10 DESIGN/BUILD MOBILE PASSENGER GANGWAY for CANAVERAL PORT AUTHORITY PUR-RFP
ADDENDUM #1 CRUISE TERMINAL NO. 10 DESIGN/BUILD MOBILE PASSENGER GANGWAY for CANAVERAL PORT AUTHORITY PUR-RFP-15-12 October 16, 2015 This addendum is issued as part of the Bidding Documents for the above
More informationDG Interconnection Procedures Collaborative. January 20, 2017
DG Interconnection Procedures Collaborative January 20, 2017 1 Interconnection Procedures Collaborative State Ombudsman kick-off October 2016 Goal: develop improvements to Con Edison s internal process
More informationProject Time Management. Course Objectives. Outline
Project Time Management Institute for Facilities Management Course Objectives Explore the challenges with managing a campus project schedule Review industry practices and contractual issues Discuss incentive
More informationCosts and benefits of reducing waste in construction. Defence sector new build Woolwich single living accommodation modernisation (SLAM)
Costs and benefits of reducing waste in construction Defence sector new build Woolwich single living accommodation modernisation (SLAM) Value Percentage of 3.2m construction cost Cost saving potential
More informationPOLICY FOR PROCUREMENT INCLUDING WORK OUTSOURCED TO OTHER ORGANISATIONS AND INDIVIDUALS
Arts Marketing Association POLICY FOR PROCUREMENT INCLUDING WORK OUTSOURCED TO OTHER ORGANISATIONS AND INDIVIDUALS Title: Policy for procurement including work outsourced to other organisations and individuals
More informationIntelligent e-supply Chain Decision Support
University of Minnesota Digital Technology Center December 2002 Intelligent e-supply Chain Decision Support Norman M. Sadeh e-supply Chain Management Laboratory School of Computer Science Carnegie Mellon
More informationsupplier qualification system guide Milton Keynes - Oakgrove
supplier qualification system guide Milton Keynes - Oakgrove responsible business practices Metro Bank is committed to introducing responsible business practices that make it easier for our suppliers to
More informationComparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013
Comparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013 Outline Alternative Delivery Options Oregon and Washington Legal Context Things an Owner Should
More informationJob Order Contracting (JOC) ITB JE Overview August 2016
Job Order Contracting (JOC) ITB 16-14204-JE Overview August 2016 Job Order Contracting (JOC) What is JOC? Using general and specialty trade contractors to perform a series of projects on an as-needed basis.
More informationGP Systems of Choice Lot 3 How to Buy Guide
GP Systems of Choice Lot 3 How to Buy Guide Contents 1. Introduction 2. Disclaimer 3. Benefits of Catalogue 4. The Buying Process 5. Selection Process 6. Legal Documentation 7. Completing the Contract
More informationATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS
ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS CONSULTANT FEE SCHEDULE FOR LANDSCAPE ARCHITECTURAL CONSULTING SERVICES A GUIDELINE NOV 2008 TABLE OF CONTENTS Table Of Contents... 2 INTRODUCTION...
More informationMini Tender PART A External Wall Insulation, Mechanical and Electrical Installation
Mini Tender PART A External Wall Insulation, Mechanical and Electrical Installation Instructions for Mini Tender Throughout the contractual parts of the Mini Tender, the Bidder is referred to as a Subcontractor
More informationAPPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1)
APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter
More informationAdvance Purchase Commitment Considerations
ZIKV Diagnostics webinar 30th August 2016 Advance Purchase Commitment Considerations Lama Ramzi Suleiman Overview UNICEF and PAHO have been working with USAID to put together an Advance Purchase Commitment
More informationDefinition document for wholly owned companies
Freedom of Information Act 2000 Definition document for wholly owned companies This guidance is for wholly owned companies which are public authorities for the purpose of the Freedom of Information Act
More informationFAST TRACK PROJECT IMPLEMENTATION CHARLOTTE WATER IDLEWILD BOOSTER PUMP STATION PIPING IMPROVEMENTS
NC AWWA-WEA 95 TH ANNUAL CONFERENCE FAST TRACK PROJECT IMPLEMENTATION CHARLOTTE WATER IDLEWILD BOOSTER PUMP STATION PIPING IMPROVEMENTS Chuck Bliss, P.E. Charlotte Water Kyle Massey, P.E. Black & Veatch
More informationFrom Uncertainty to Certainty; How Clients can Improve their Experience of the Construction Process
From Uncertainty to Certainty; How Clients can Improve their Experience of the Construction Process www.provelio.com Summary This paper is an independent project manager s critique of two projects. One
More informationLB 889 The Political Subdivisions Construction Alternatives Act
1 LB 889 The Political Subdivisions Construction Alternatives Act What cities, villages, counties, state colleges, community colleges, and school districts need to know about their construction options.
More informationTHE TRUE VALUE OF PROJECT RISK ANALYSIS
THE TRUE VALUE OF PROJECT RISK ANALYSIS Dr. Dan Patterson, PMP Chief Design Officer, PLANNING & SCHEDULING Introduction Much has been written in recent years about the benefits of conducting a project
More informationIdentification Selection Definition Execution. Schedule.
SCHEDULE DEVELOPMENT Schedule development is the identification, definition and sequencing of activities that are required to be performed for successful completion of the project scope. Identification
More informationAdvanced Tendering Procedures & Bid Evaluation
An Intensive 5 Day Training Course Advanced Tendering Procedures & Bid Evaluation Effective Tendering, Bidding Strategies & Evaluation 10-14 Sep 2017, Dubai 21-MAY-17 This course is Designed, Developed,
More information