1 EINRIP Specification and Construction Issues
2 There are a significant number of changes in the Specification Not all issues can be discussed here A more detailed list of changes will be provided with bid documents
3 The specification is based on the SRIP Specification with amendments Changes have been discussed and approved* in three workshops and by BINTEK Standards Sub Directorate *Except for rigid pavement which still requires final concurrence
4 The presentation aims to give bidders a taste of what to look for when estimating unit prices for EINRIP projects. The underlying message should be clear: Bidders should carefully review the Specification, Drawings and Bidding documents and must ensure that tendered d Unit Prices account for Specification and policy changes
5 This is not a Pre Bid Meeting Individual projects will not be discussed Discussion issues that apply to all projects should be self evident The drawings and BOQs define specific project issues
6 DESIGN REVIEW
7 Designs are fully detailed. d Therefore FIELD ENGINEERING and Design Review requirements will differ from the past.
8 Clause The Field Engineering review period is limited to 30 days after mobilisation. Only minor design revisions are permitted.
9 Clause Field Survey for Minor Revision: i the Contractor shall locate and propose corrections for errors and omissions the Engineer shall make corrections and interpretations deemed necessary
10 SUPERVISION
11 General Conditions of Contract: FIDIC Harmonized Version Engineer: RSC Team Leader
12 QUALITY
13 A SIMPLE RULE FOR EINRIP PROJECTS: SPECIFIED QUALITY STANDARDS MUST BE ACHIEVED
14 THERE WILL BE INDEPENDENT AUDITS SPONSORED BY THE LENDING AGENCY
15 Contractual and specified sanctions will be enforced if specified quality is not delivered
16 BIDDERS MUST HAVE A QUALITY ASSURANCE PLAN AND MUST BE SERIOUS ABOUT DELIVERING SPECIFIED QUALITY
17 There will be ZERO TOLERANCE for false laboratory test t records. False records can be identified by recognizable data patterns Quality Managers must not tolerate such practices
18 SURVEY AND TOLERANCES
19 The drawings provide complete alignment and level data
20 Construction tolerances are realistic and in some cases less stringent than in past Specifications they must be adhered to
21 Example: grade finished level (or sub grade) Reference Relative to absolute level SRIP Clause (3) (a) (sub grade) +1 cm -1 cm EINRIP based on Survey Standards, Setting Out and Earthworks Measurements Less stringent but (Report of a joint IHE and ICE (UK) Working Party, achievable and will be 1982) Table 4.1 enforced needs SETTING OUT pegs +2 cm -3 cm
22 A qualified surveyor preferably equipped with a Total Station must be provided to set out the works Specified construction tolerances must be achieved to satisfy layer thickness, riding quality, appearance and other objectives
23 BRIDGE TYPES
24 The following bridge structure types are used: Integral abutment Pre-stressed Beam Steel truss Multi cell box culvert NEW TYPE
25 AGGREGATE G AND SAND
26 A 3 stage crushing plant is required to achieve the specified aggregate shape for more heavily trafficked projects EBL 01, EBL 02, EKS 01
27 NEW SCREEN SIZE FOR AC BASE (if used) Aggregate sizes for AC (only if AC BASE USED) ( (or 7) Abu batu New screen size For AC wearing Therefore preferable to have a 4 deck crusher plant screen deck if AC Base is produced
28 Sand Washing Sand Equiv 75 specified for heavy traffic asphalt Sand for concrete <3% pass 75 micron washed THEREFORE A SAND WASHING PLANT WILL BE NEEDED FOR EBL 01, EBL 02, EKS 01 etc
29 TRANSPORT OF MATERIALS
30 All trucks shall be legally ll loaded d overloading will not be permitted
31 Bids must allow for legal loading egclause 6349(a)
32 Extra for Haulage of Excavated Materials in excess of 5 km Pay Item: 3.1 (9) Problem : a) BOQ quantity not possible without contractors work plan -?? b) contractors responsibility to find most efficient work plan c) big problem for Engineer to decide NECESSARY long haulage for payment and keep balanced budget SOLUTION: Delete Pay Item 3.1 (9), (Item still exists for bridgeworks)
33 THE PAY ITEM FOR HAULAGE OVER 5 km IS NOT AVAILABLE FOR EINRIP EARTHWORKS DIVISION 3 (ONLY FOR STRUCTURES DIVISION 7) BIDDERS MUST ESTIMATE HAUL LENGTHS AND ALLOW FOR TRANSPORT COST IN OTHER UNIT PRICES
34 DRAINAGE
35 Full design includes invert levels Drains must be built to correct invert levels and gradients Specification requires drains to be installed before earthworks Therefore maximum use of pre cast elements is recommended d to minimise i i delay
36 EARTH WORKS
37 Some projects require heavy earthworks to improve alignments. A vibrating gpad foot roller may be required
38 Pantura and EKS 02 5 problems OVERLOADING SOFT SOIL WATER
39 soft soil EINRIPSection Saturated Silty Clay problem (EKS xx projects) : Usually high moisture content prevents compaction. Therefore AASHTO CBR test is inappropriate to determine sub grade value for tropical silty clay Actual CBR on site for saturated silty clay << 2% Field CBR for saturated silty clay must be based on DCP or soil properties, not on AASHTO CBR Requires capping layer of 0.5 to 1.0 meter to develop an equivalent CBR 2 bearing capacity
40 Typical flexible pavement structure for saturated soft soil sub grade eg EKS Asphalt varies Aggregate base A 20 cm Aggregate base B 20 cm Selected embankment 30 cm Typical wet season standing water ae level e Lower capping layer (granular) 100 cm CBR Insitu subgrade << 2% cm
41 EINRIP earthworks measurement ROCK AND COMMON EXCAVATION + design reconnaissance bore holes at deep cuts to assess rock Surplus to embankment demand etc or declared unsuitable Used in embankment (or other project applications) PAY ITEMS: Rock and Common Excavation PAY ITEMS: Rock and Common Excavation Common Embankment
42 Unsealed shoulder material (Class S) Class B problems as shoulder Erodes easily permeable safety problem for motor bikes Class S = approx SRIP unsealed road gravel Class C
43 ASPHALT
44 Refer recent BM/EINRIP Asphalt workshop Filler silo required AMP 60 tph required for AC Additional equipment Power broom 2 sprayers with spray bar Waterpass for crossfall Other see spec 14 and 30 mm hot screens
45 PAVEMENT STRUCTURES
46 Asphalt Overlay Rigid Reconstruction ti Heavy patching Recycling Full construction Grade raise
47 Pavement design principles Real axle loads 15 year design for asphalt 40 year design for sub grade Test pit analysis if BB > 2.4 mm Minimum CBR 15 granular base support Reconstruct if AC thin and failed, BB > 2.4 and granular base quality is poor
48 Typical full construction (CIRCLY) Traffic ESA million (5 th power) <1 <2 <5 <50 >50 HRS 6.5 AC (f) rigid AC (c) 22.5 Cement treated base 20 unbound Base
49 Typical existing structure of local roads upgraded to National and requiring reconstruction Asphalt 8 15 cm cracked Sirtu cm
50 Reconstruction process: 1 remove asphalt (if milled it can be reused)
51 Reconstruction process: 2 Excavate widening to sub grade ( excavated material used as embankment if suitable )
52 Reconstruction process: 3 Trim to final sub base level or lower cast surplus to widening
53 Reconstruction process: 4 Make up to design sub base level with new material and compact existing and new in 20 cm layers
54 Reconstruction process: 5 Place and compact new pavement layers Asphalt varies Aggregate base A 20 cm
55 Reconstruction process: 6 Use milled asphalt as specified Asphalt varies Aggregate base A 20 cm
56 ROAD SIDE FURNITURE ETC
57 New guard rail end types Semi mountable curb for safety and aesthetic reasons Grated pit entries for drainage Invalid ramp for curb lines at intersections, pedestrian crossings and bus stops other
58 Vehicle accesses Will be provided d to ROW line Usually not shown on plan Standard or special drawings will be provided Mountable curb used when private access spacing less than 10 metres
59 CONCLUSION Quality standards will be enforced There are a number of changes in the Specification Certain additional equipment items must tbe provided dparticularly l for heavily trafficked roads Take account of these factors when pricing bids
Select Subgrade Material, Compacted
314.1 GENERAL B314 SHOULDER, SELECTED SUBGRADE, AND STOCKPILING OPSS.PROV 314 Granular materials meeting the requirements of OPSS.PROV 1010 are obtained from pits and quarries, and recycled materials.
More informationFiji Roads Authority GUIDE to PAVEMENT DESIGN. Supplement to the AUSTROADS Guide to the Structural Design of Road Pavements
Fiji Roads Authority GUIDE to PAVEMENT DESIGN Supplement to the AUSTROADS Guide to the Structural Design of Road Pavements TA-8777 FIJI 1 VERSION 2 June 2018 TA-8777 FIJI 2 VERSION 2 June 2018 1.0 Introduction
More informationTable of Contents. Chapter 1 : Introduction 1. Chapter 2 : Structure and design 15
Table of Contents Chapter 1 : Introduction 1 1-1 Overview of Japan 1 1-1-1 Topography 1 1-1-2 Climate 1 1-1-3 Population 3 1-1-4 Economy 3 1-2 History and current status of roads in Japan 5 1-2-1 Road
More informationSECTION ASPHALT CONCRETE
SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare
More informationINDEX Warrant for Reclaiming Asphalt Pavement - Partial Depth Warrant for Reclaiming Asphalt Pavement - Full Depth
399-2 - INDEX 399-2.1 GENERAL 399-2.1.1 Tender Items 399-2.1.2 Traffic Warrant 399-2.1.3 Reference Publication 399-2.1.4 Warrant for Reclaiming Asphalt Pavement - Partial Depth 399-2.1.5 Warrant for Reclaiming
More information2.1 Backfill - General
2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More informationElectrical Work. NOV Embankments Over Swamps and Compressible Soils
GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification
More informationJanuary 2008 No. 700
January 2008 No. 700 INDEX FOR SPECIFICATIONS FOR GRANULAR BASE COURSE Page 700. 1 SCOPE...1 1.1 Pre-Construction Meeting...1 1.2 Mobilization of Equipment...1 700. 3 MATERIALS 3.1 Granular Base Course
More informationConstruction Specification for General Excavation
Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03
More informationDESIGN BULLETIN #77/2013 AMENDMENTS TO PAVEMENT DESIGN MANUAL. Re: Updated Requirements for Agency Practice, Design Inputs and Design Report Contents
DESIGN BULLETIN #77/2013 AMENDMENTS TO PAVEMENT DESIGN MANUAL Re: Updated Requirements for Agency Practice, Design Inputs and Design Report Contents Introduction This design bulletin provides a number
More informationSECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS
SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction
More informationPERFORMANCE BASED SPECIFICATION FOR STRUCTURAL DESIGN AND CONSTRUCTION OF FLEXIBLE UNBOUND PAVEMENTS
PERFORMANCE BASED SPECIFICATION FOR STRUCTURAL DESIGN AND CONSTRUCTION OF FLEXIBLE UNBOUND PAVEMENTS 1. SCOPE This specification sets out design, maintenance and performance requirements of the surfacing
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS
More informationSpecial Provision No. 421F01 April 2006
RIGID PIPE CULVERTS Item No. FLEXIBLE PIPE CULVERTS Item No. CSP ARCH CULVERTS Item No. STRUCTURAL PLATE CSP Item No. CORRUGATED STEEL PIPE EXTENSIONS Item No. ROCK EXCAVATION FOR CULVERTS Item No. CLAY
More informationINDEX DESCRIPTION MATERIALS APPROVAL FOR BASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6
03005_Jan31_2018.pdf Page 1 of 6 INDEX Page 03005-1 DESCRIPTION 2 03005-2 MATERIALS 2 03005-3 APPROVAL FOR BASE COURSE 3 03005-4 CONSTRUCTION 3 03005-5 MEASUREMENT 6 03005-6 PAYMENT 6 03005_Jan31_2018.pdf
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More information- Earthwork Operations & Equipments
- Earthwork Operations & Equipments Earthwork Operations Those construction processes that involve the soil or earth in its natural form and that precede the building of the pavement structure itself Basic
More informationCONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 902 DECEMBER 1983 CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES 902.01 SCOPE 902.02 REFERENCES 902.03 DEFINITIONS TABLE OF
More informationCITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5
Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 1.0 EXCAVATION AND FILL 1.1 GENERAL.1 The excavation or fill shall be made to provide proper grade, lines and crosssection for the laying of
More informationFULL-DEPTH RECLAMATION WITH EXPANDED ASPHALT STABILIZATION
B331 - FULL-DEPTH RECLAMATION WITH EXPANDED ASPHALT STABILIZATION - OPSS 331 331.1 GENERAL The work of Full-Depth Reclamation with Expanded Asphalt Stabilization consists of in-place full-depth reclamation
More informationInvitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $
Addendum No. 1 TOWNSHIP ROAD 510 RECONSTRUCTION Invitation to Tender No. T170523EN Amendment 1. Bidders shall note the following: a) Revised Section 3.3.2 Unit Price Table : REVISED Schedule A : Invitation
More informationSECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01
More informationSECTION BITUMINOUS CONCRETE PAVING
PART 1 GENERAL 1.1 SECTION INCLUDES: SECTION 02400 BITUMINOUS CONCRETE PAVING A. The intent of this specification section is to provide requirements for materials, equipment, and methods for constructing
More informationSECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...
SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...
More information313-1 HOT MIX ASPHALT - OPSS.PROV 313
313-1 - OPSS.PROV 313 313-1.1 GENERAL Hot mix asphalt consists of several mix types, which are grouped into two categories: Stone Mastic Asphalt and Superpave as detailed below. The type of hot mix asphalt
More information313-1 HOT MIX ASPHALT - OPSS.PROV 313
313-1 - OPSS.PROV 313 313-1.1 GENERAL Hot mix asphalt consists of several mix types, which are grouped into two categories: Stone Mastic Asphalt and Superpave as detailed below. The type of hot mix asphalt
More informationCONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 314 DECEMBER 1993 CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING 314.01 SCOPE 314.02 REFERENCES
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 351 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK TABLE OF CONTENTS 351.01 SCOPE 351.02 REFERENCES 351.03 DEFINITIONS 351.04 DESIGN
More informationCLARIFICATION DOCUMENT No.1 Answers to the Requests for Clarification received from prospective Tenderers
REPUBLIC OF MOLDOVA ROAD SECTOR PROGRAM STATE ROAD ADMINISTRATION *** CLARIFICATION DOCUMENT No.1 Answers to the Requests for Clarification received from prospective Tenderers Road Rehabilitation & Construction
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 353 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS
More informationCITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP
INFRASTRUCTURE SERVICES Page 1 of 7 1.0 GRANULAR BASE AND SUB-BASE 1.1 DESCRIPTION.1 This section specifies requirements for supplying, producing, hauling placing and compacting processed gravel or quarried
More informationINDEX DESCRIPTION MATERIALS CONSTRUCTION MEASUREMENT PAYMENT 10
04060_Jan31_2018.pdf Page 1 of 12 INDEX Page 04060-1 DESCRIPTION 2 04060-2 MATERIALS 3 04060-3 CONSTRUCTION 4 04060-4 MEASUREMENT 8 04060-5 PAYMENT 10 04060_Jan31_2018.pdf Page 2 of 12 04060-1 DESCRIPTION
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3
CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING Section Number Title 301 GENERAL 302 MATERIALS SPECIFICATIONS 303 CLEARING
More informationAustStab Construction Tip
AustStab Construction Tip Version No.8A January 2006 Pavement crossblending prior to stabilisation Introduction The performance of insitu and plant-mix stabilisation methods relies on many factors, with
More informationSection 25 Aggregate Subbase
Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GRANULAR
More informationSECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.
PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and
More informationSpecial Provision No. 103F31 January 2014
AMENDMENT TO OPSS 313, APRIL 2007 Special Provision No. 103F31 January 2014 Asphaltic Concrete Payment Adjustment for Surface Smoothness Based on Quality Assurance Measurements Taken by an Inertial Profiler
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS
CITY OF TORONTO STANDARD CONSTRUCTION SPECIFICATIONS FOR ROADS TS 3.80 November 2010 CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS INDEX TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS 3.80.03
More informationGeneral Info Number: PROJECT NO Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST TRUMBULL COUNTY, OHIO
General Info Number: PROJECT NO. 59-18-03 Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST 209.20 TRUMBULL COUNTY, OHIO Deadline: April 25, 2018 at 2:00 P.M. (Eastern) (Estimated Cost: $3,100,000.00)
More informationB STEEL BEAM GUIDE RAIL - OPSS 552
B552-2 - - OPSS 552 552-2.1 GENERAL Steel Beam Guide Rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,
More informationB STEEL BEAM GUIDE RAIL - OPSS 721
B721-2 - - OPSS 721 721-2.1 GENERAL Steel Beam Guide Rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,
More informationBASE CONSTRUCTION MATERIALS A Aggregate
BASE CONSTRUCTION 2211 AGGREGATE BASE 2211.1 DESCRIPTION This work consists of placing aggregate base. 2211.2 MATERIALS A Aggregate... 3138 Provide the class of aggregate as required by the contract. 2211.3
More informationB HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313
B 313-1 OPSS 313 313-1.1 GENERAL HL,, Mixture, and/or Mix, is hot mixed, hot laid asphaltic concrete, used for pavement construction and other uses. 1. HL 1 This dense graded surface course mix is used
More informationSECTION 14 EMBANKMENT
SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of
More informationCHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH
CHAPTER 2 201 ROADS 201.1 General This section is to assist the designer in determining what is needed for the design of roads in public rights-of-way. For these standards, the terms used are: Restricted
More informationSpecial Provision Item P-152 Excavation and Embankment
Special Provision Item P-152 Excavation and Embankment DESCRIPTION This item shall be constructed in conformity with FAA Standard Specification "Item P-152 Excavation and Embankment, except as herein modified
More informationEXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013
GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary
More informationSECTION ASPHALT PAVING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 32 12 16 ASPHALT PAVING SPEC WRITER NOTE: Delete or add information between // ---- // and any other items applicable to project. Any item added to the text shall
More informationB510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement
B510-5 OPSS 510 510-5.1 GENERAL This section is for Pavement Work removal tender items. The work covered by these tender items includes the removal and disposal of materials. 510-5.2 REFERENCES CDED B510-0
More informationSECTION STRUCTURAL EXCAVATION FOR STRUCTURES
1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all
More informationStanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.
SECTION 32 14 23 ASPHALT UNIT PAVING PART 1 GENERAL 1.1 DESCRIPTION Work Included: All labor, materials, appliances, tools, equipment, facilities, transportation, and services for and incidental to performing
More informationDEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.
LD-0 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Revised Soil Survey Report November 2, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia
More informationDIVISION 4100 SITEWORK
DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES
More informationTOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984
1 TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION June 1984 1. DEFINITIONS APPROVAL, APPROVED, ACCEPTED OR WORDS OR TERMS OF SIMILAR MEANING: Written approval of the Highway Superintendent. BASE
More informationPlan Preparation Guide. Chapter 2. Typical Sections - Pavement Design
Plan Preparation Guide Chapter 2 Typical Sections - Pavement Design Section Description Page 1 Typical Sections 2-1 2 Secondary ( C projects) Typical Sections 2-3 3 Base Course 2-4 4 Full Depth Asphalt
More informationSECTION SOILS REPORT
SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.
More informationOver-coming differential settlement in soft grounds using Floating Semi-Rigid Pavement
14 th REAAA Conference 2013, 26 28 March 2013, Kuala Lumpur, Malaysia Over-coming differential settlement in soft grounds using Floating Semi-Rigid Pavement Dato Ir Dr Safry Kamal Ahmad, Dr Wu DQ, Francis
More informationSECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.
SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom
More information1.01 The work shall consist of spreading and compacting crushed and pugmilled aggregate on a prepared surface.
3505 - SPECIFICATION FOR GRANULAR BASE COURSE 3505 - l DESCRIPTION 1.01 The work shall consist of spreading and compacting crushed and pugmilled aggregate on a prepared surface. 1.02 The following definitions
More informationITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS
ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown
More informationSpecial Provision No. 103F31 December 2014
ASPHALTIC CONCRETE SURFACE SMOOTHNESS Special Provision No. 103F31 December 2014 Asphaltic Concrete Payment Adjustment for Surface Smoothness Based on Quality Assurance Measurements Taken by an Inertial
More informationPAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS.
PAY QUANTITY NOTES (F-1) (F-2) (F-3) (F-4) (F-5) (F-6) (F-7) (F-8) (F-9) (F-10) (F-11) (F-12) (F-13) (F-14) (F-15) (F-16) (F-17) (F-18) (F-19) INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS
More informationAdvantages of Full Depth Recycling
Definition of FDR re-use existing asphalt, base and subgrade material 6 12 (150 300 mm) to produce a new base course a new wearing surface is applied a stabilizer can be incorporated Advantages of Full
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3
CITY OF TORONTO TS 3.70 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS 3.70.01 SCOPE...3 TS
More informationSPECIFICATION FOR PIPE CULVERT CONSTRUCTION
SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.
More informationIMPLEMENTING FULL DEPTH RECLAMATION BY: HENRY HAWKINS CHAMBERS COUNTY ENGINEER
IMPLEMENTING FULL DEPTH RECLAMATION BY: HENRY HAWKINS CHAMBERS COUNTY ENGINEER BRIEF HISTORY OF ALABAMA COUNTY ROADS -Alabama Farm to Market Act was passed in 1943 and began in 1946 -One Cent was set aside
More informationADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN
ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB #4320 2014 RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN The following changes, additions, and/or deletions shall be made to the Bid Documents
More informationSl No. Rate. Hct By manual means In area of light jungle
BILL OF QUANTITIES Name of Work : Extension of NH 37 from its dead end near Saikhowaghat in Assam ending near Roing in Arunachal Pradesh under Trans Arunachal Highway programme. SH: Strengthening of Shantipur
More informationConstruction Specification for Concrete Unit Pavers
Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990
KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 90P-270 Sheet 1 of 5 SECTION PAVEMENT PATCHING Page 591, Section. Delete the Section and replace with
More informationSPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1
SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL TABLE OF CONTENTS 2.1 General...2-1 2.2 Materials...2-1 2.2.1 Compacted Non-granular Material...2-1 2.2.2 Gravel Material and Crushed Aggregate
More informationSECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS
SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required
More informationPAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA
PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTETATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA Terracon Project No. 3105079, Revision 3 1.0 INTRODUCTION This report presents the results of
More informationCAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PRECAST BOX CULVERTS CONSTRUCTION SPECIFICATION
CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 ISSUE: NO:3 July 2018 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL... 2 C222.01
More informationSustainable Pavement Design in Christchurch Southern Motorway
Sustainable Pavement Design in Christchurch Southern Motorway Dr Bryan Pidwerbesky General Manager Technical Fulton Hogan Ltd, PO Box 39185, Christchurch 8545, New Zealand Tel: +64 3 357 0615 email: bryan.pidwerbesky@fultonhogan.com
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain
More informationSpecial Provision No. 103F31 June This Special Provision covers all surface smoothness requirements for hot mix asphalt construction.
ASPHALTIC CONCRETE SURFACE SMOOTHNESS - Asphaltic Concrete Payment Adjustment for Surface Smoothness Based on Quality Assurance Measurements Taken by an Inertial Profiler Special Provision No. 103F31 June
More informationSPECIFICATIONS FOR BONDED WEARING COURSE
SPECIFICATIONS FOR BONDED WEARING COURSE 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee shall mean an employee
More informationROAD SECTOR DEVELOPMENT PROGRAMME - PACKAGE 3 NATIONAL ROADS PAVEMENT DESIGN GUIDELINES AND PRACTICE DEFICIENCIES
PROGRAMME - PACKAGE 3 NATIONAL ROADS PAVEMENT DESIGN GUIDELINES AND PRACTICE DEFICIENCIES NATIONAL ROADS PAVEMENT DESIGN GUIDELINES AND PRACTICE DEFICIENCIES INDONESIA INFRASTRUCTURE INITIATIVE December
More informationERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007
ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007 Sheet 1 of 7 GENERAL The Kansas Department of Transportation STANDARD SPECIFICATIONS FOR STATE ROAD AND
More informationB. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.
SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.
More informationSOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004
SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 General: Sections of the Minnesota Department of Transportation (Mn/DOT), Standard Specification for Construction, 2000 or Current
More informationBILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil
United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 350 MARCH 1998 CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE 350.01 SCOPE 350.02 REFERENCES 350.03 DEFINITIONS TABLE OF CONTENTS
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 553 FEBRUARY 1991 CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS 553.01 SCOPE 553.02 REFERENCES 553.03 DEFINITIONS TABLE OF CONTENTS 553.04 SUBMISSION
More informationSECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS
SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material
More informationDECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids
General Info Number: PROJECT NO. 43-17-04 : BRIDGE DECK REPAIR AND BRIDGE REMOVAL OHIO TURNPIKE OVER QUARRY ROAD, M.P. 138.0 OHIO TURNPIKE OVER INACTIVE RAILROAD, M.P. 138.2 LORAIN COUNTY, OHIO Deadline:
More informationPROPOSED COMPLETION OF ROAD INFRASTRUCTURE AND MAINTENANCE WORKS AT EXPORT PROCESSING ZONES AUTHORITY - ATHI RIVER. ITEM NO.
BILL 1 : GENERAL & PRELIMINARIES A B C Allow for preliminaries of mobilization and set up, storage facilities etc,minor preparatory works and compliance with conditions of contract. 1.00 Allow a Prime
More informationARTICLE 500 PAVEMENT DESIGN
ARTICLE 500 PAVEMENT DESIGN SEC. 500.1 PAVEMENT TYPES Street pavement sections shall be either flexible type with an asphalt concrete surface or rigid type consisting of a Portland Cement Concrete section
More informationMi l l er Pac i fic E N G I N E ERI NG GR O UP 504 Redwood B l vd. Suite 220 Novato, Ca l i f o rnia 94947
April 8, 2010 File: 739-17bltr.doc CSW/Stuber-Stroeh Engineering Group 45 Leveroni Court Novato, CA 94949 Mi l l er Pac i fic E N G I N E ERI NG GR O UP 504 Redwood B l vd. Suite 220 Novato, Ca l i f o
More informationCONSTRUCTION SPECIFICATION
CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES EARTHWORKS C213 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C213 ISSUE: NO:1 October 2007 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL...4
More informationDIVISION 2100 SITEWORK
DIVISION 2100 SITEWORK SECTION 2120 STABILIZED SUBGRADE PART 1 - GENERAL 1.01 SCOPE This section covers the preparation of subgrade for pavement, sidewalks, recreational trails, and drive approaches. 1.02
More informationADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works
ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON - April 24, 2017 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 25, 2017 in accordance
More information205 - EXCAVATION AND EMBANKMENT FOR HIGHWAYS SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS. Common Excavation (Contractor-Furnished)
SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS 205.1 DESCRIPTION Excavate, haul, place, remove and dispose of the specified materials. Construct the embankments as specified in the Contract Documents.
More informationPublic Works Manual. Revised September Concrete & Asphalt
Public Works Manual Revised September 2015 Concrete & Asphalt Where it must cross domestic it must cross above and with a 1 minimum separation. Nonpotable water tape. 10.00 PORTLAND CEMENT CONCRETE 10.01
More informationLADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH
LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH Presentation Outline General Introduction Part II Site Preparation & Earthwork Part III Base Courses
More informationNORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone.
PART 1 GENERAL 1.01 SUMMARY A. This section includes: Section 02712 1. Foundation course of cement stabilized crushed stone. 2. Foundation course of cement stabilized bank run gravel. 1.02 MEASUREMENT