1 Alyeska Pipeline Service Company, TK-190 Overfill Incident Root Cause Analysis Report And Post Accident Review June 22, 2010 Table of Contents Executive Summary Page 3-5 Incident Description Page 6-8 Background Page 9-10 Investigation Team Page 10 Methodology Page Root Causes & Recommendations Page Contributing Causes & Recommendations Page Attachments: 1) PS09 TK-190 Overfill Photos 2) PS09 Simplified Power Configuration (withheld) 3) PS09 Simplified Control Module UPS Configuration (withheld) 4) PS09 Normal Operational Configuration (withheld) 5) PS09 Relief Event Configuration (withheld) 6) PS09 UPS Panel / Breaker Photos (withheld) 7) PS09 Response Configuration (withheld) 8) Technical Failure Analysis Report (withheld) 9) Incident Event & Causal Factor Chart (withheld) 10) Incident Summary Chart (withheld) 11) Incident Barrier Analysis Worksheet (withheld) 12) Personnel Interview List (withheld) 13) Document Review List In response to a public records request under Alaska statutes, The Alaska State Pipeline Coordinator s Office has released the company investigation report, withholding Attachments 2 through 7 and 9 through 12, citing security and public health and welfare (Attachments 2 through 7), protection of trade secrets (Attachments 9 through 11) and harm to the state s oversight ability (Attachment 12).

2

3

4 I Executive Summary On May 25, 2010, during a scheduled short duration shutdown of the Trans Alaska Pipeline System (TAPS), Pump Station 9 (PS09) experienced an unrecognized relief event. The event resulted in overfilling of Relief Tank 190 (TK-190) and a product spill into secondary containment. There were no injuries and the pipeline was successfully restarted approximately 77 hours after initial notification. The volume of product spilled was approximately 4,500 barrels of Alaska North Slope Crude Oil. On May 19, 2010, the Operations Control Center (OCC) conducted a Safe Operating Committee (SOC) meeting to review procedure TP-OCC-1007, Pipeline Short Duration Shutdown, May 25, 2010, for Valve Testing, Fire System Testing, and Turin Work, and discuss work activities planned for the shutdown. On May 24, 2010, the Shutdown Commander requested and received oral confirmation that everything was in place and all requirements had been satisfied to ensure a successful shutdown. On the same day, the fire system testing TWSPs were approved and the Shutdown Coordinator issued the Approved Work List indicating sacs on these procedures had not been completed. an May 25, 2010, a final golno go meeting was conducted by teleconference with involved personnel attending. The Shutdown Commander again orally verified everything was in-place and all requirements had been satisfied. At 9:02 am, acc initiated the pipeline shutdown in accordance with the approved procedure TP-aCC At 9:24 am, Maintenance Technicians initiated Temporary Work Site Procedure TWSP , Test PS09 Manifold IR Detector Response, the first of three PS09 fire system test procedures to be performed during the shutdown. The purpose of the first test was to specifically trigger a Station Isolation command, At 9:33 am PS09 battery limit valves BL-1 and BL-2 closed as a result of the Station Isolation command issued. In accordance with TP-aCC-1007, acc subsequently initiated a command to reopen battery limit valves BL-1 and BL-2, the valves traveled to their fully open position, and the station was back in normal configuration. The second test of the fire system TWSP , Test PS09 Control Module Room Pull Station Response, was initiated and completed by the Maintenance Technicians. At 10:20 am, the third and final fire system test procedure TWSP , Test PS09 PDC Voted Smoke Response, was initiated. This test simulated an electrical fire in the station Power Distribution Center (PDC) Module. System design for an electrical fire in the PDC Module is to isolate power by opening the breakers to the transformers for the PDC, The Control Module receives power from the PDC so it also lost power as expected. The Control Module's redundant power supply is designed utilizing an Uninterruptible Power Supply (UPS) with batteries and a 65 kw generator The Control Module UPS failed separating the 65 kw generator from the electrical bus. The PDC Module also has a UPS redundant power supply designed to pick-up load, which also failed. The primary power and redundant power outage to the Control Module caused the critical station control systems to shutdown: Safety, Integrity, Pressure Protection System (SIPPS), the Network Interface Panel (NIP), and the Station Control Panel (SCP). As a result, acc lost visibility to and control of PS09. The tank farm audible and visual evacuation alarm did not function as a result of the loss of primary power and the loss of SIPPS. There was also no normal or emergency lighting available in the Control Module. The relief system is designed to fail open during a power outage so that the pipeline is not inadvertently over pressured. There are a total of five relief valves: three suction side (upstream) relief valves and two discharge side (downstream) relief valves. All five valves went to the fully open position upon station power loss. The fire system testing Maintenance Technician called acc via phone to notify the controller of the power loss and that he would begin troubleshooting. The Technician and an on-site Fire Systems Engineer verified the breakers to the POC Module transformers were tripped as expected by performance of the fire system testing procedure. Confidential and proprietary infonnation protected from public disclosure under AS (a)(4) and the Freedom oflnformation Act, Exemption 4,5 USC 522 (b)(4) trade secrets and commercial or financial infonnation obtained from a person and TK-190 Overfill Incident privileged or confidential Page 3 of 17 Root Cause Analysis Report And Post Accident Review 6/22/10

5 acc and PS09 field personnel began to focus attention on reestablishing communications with the Control Module and power restoration to the station. acc contacted an Automation Engineer located at the acc facility to assist field personnel with the troubleshooting process. The attention of acc was singularly focused on restoring power and communication with the Control Module. They did not recognize that loss of power to the Control Module caused the PS09 relief valves to open allowing crude oil to flow into TK-190. PS09 field personnel also did not recognize the relief valves went to the open position after station power joss. The Maintenance Technician troubleshooting the redundant power supply visually inspected the UPS breakers in the Control Module and found them in a closed (normal) position. A UPS providing power to emergency lighting is required by UL 924 to have a guard installed on the breakers to preclude inadvertent contact, which may open the breakers. When the DC input breaker opened during the power outage, the visible switch indicating breaker status was not able to travel to the tripped position due to the protective guard. This masked the actual condition that the breaker was tripped and not closed as indicated by the breaker switch. After several minutes of not being able to identify the redundant power supply failure mode, the troubleshooting team decided to restore primary power. The breakers to the POC transformer that had opened during the final fire system test were reset (closed) and immediately tripped open again. The technicians attempted to close the POC transformer breakers two more times. The troubleshooting team realized that the SCP resets all internal registers to zero during a power outage. When power was restored, the reset SCP indicated a fire in the POC Module and reopened the breakers to the POC transformer. The troubleshooting team decided to isolate the SCP and then restore primary power. Before this action was fully completed TK-190 was observed to be overfilling. At 11 :00 am, the Shutdown Coordinator began a scheduled shutdown status meeting via teleconference, In the background of the teleconference a radio call from PS09 was overheard announcing TK-190 was overfilling. All non-essential personnel were evacuated from the station. A Valve Program Engineer, a Fire System Engineer, and Maintenance Technicians began to systematically close the upstream and downstream relief block valves in the Manifold Building. Maintenance Technicians also reported to the battery limit valve BL-1 and started closing it. acc relieved line pressure into the PS05 relief tank and began isolating the pipeline north of PS09 by sequentially closing Remote Gate Valves (RGV) at 11 :06 am. PS09 on-site personnel finished closing the ten relief block valves at 11:15 am. The PS09 substation 13.8 kv breaker was opened by on-site personnel electrically isolating the station from utility power at 11 :35 am. Technicians closed each pump unit's suction and discharge valves and the station recycle valve. Battery limit valve BL-1 was closed at 11:50 am and battery limit valve BL-2 was closed at 12:16 pm. These actions cumulatively fully isolated the station hydraulically and electrically. The Incident Management Team was activated, which started the response coordination. A number of significant incidents on TAPS over the last several years, demonstrate a trend of operational discipline deficiencies similar to those involved with the TK-190 overfill incident. The investigations were conducted satisfactorily with identification of key contributing factors, root causes, and corresponding recommendations. Many of the key recommendations developed from the previous incident investigations have direct application to the TK-190 overfill incident. The previous investigation reports and corresponding recommendation implementation demonstrate significant energy and resources were dedicated to maintain TAPS safety and integrity. However, there is recognition of a need for significant improvement in the organization's ability to effectively learn from these experiences and prevent recurrence. Root Causes A Technical Failure Analysis was completed but was unable to specifically determine the physical failure cause. The UPS failure was not expected and despite multiple attempts subsequent to the TK-190 overfill incident, the failure could not be recreated and no specific root cause identified. Confidential and proprietary infonnation protected from public disclosure under AS TK-190 Overfill Incident (a)(4) and the Freedom ofinfonnation Act, Exemption 4, 5 USC 522 (b)(4) Page 4 of 17 Root Cause Analysis Report trade secrets and commercial or financial infonnation obtained from a person and And Post Accident Review privileged or confidential. 6/22/10

6 Root Cause #1 - Design Less Than Adeguate (L TAl Several technical and design issues were identified during the investigation These items are detailed further in this report and should be reviewed and fully considered by a team of technical discipline experts to determine any necessary system modifications. Root Cause #2 - Previous Incident MAPs & Lessons Learned LTA Over the last several years, there have been a number of incidents with resulting Management Action Plans (MAPs) intended to implement recommendations identified during the investigations. Lessons Learned are routinely conducted throughout the organization for a wide variety of activities such as major maintenance completion, pipeline shutdowns, oil spill drills, and incident response. Despite the efforts made to address previous incidents and to learn from previous work activities, there continues to be a pattern of significant incidents occurring. As an organization, we are not optimizing our opportunities to learn. Completion of actions intended to prevent incidents and the opportunities to learn from work activities have not been effective in influencing the culture or behaviors. Contributing Causes ContributinQCause #1 - Situational Awareness LTA Employees knowledgeable of operational processes (OCC & field) did not react in a manner that supported the safety and integrity of TAPS. Situational awareness is paramount to responding to abnormal conditions. Interviews suggest many of those directly involved in this event, both at OCC and PS09, reflected that they should have realized the relief valves had opened and crude was flowing to TK 190 when power was lost. Contributing Cause #2 - Safe Operating Committees LTA The Corporate Safety Program, SA-38, and other Department Operating Procedures (OOPs) outline specific requirements for performing Safe Operating Committee (SOC) review of procedures. As a result of the recent PS09 Piping Overpressure Event in July 2009, some of these procedures were improved and others developed. These procedures were reviewed during the investigation and noted as not fully addressing all the issues previously identified. Specific to this event, SOCs were not conducted by field personnel for the three fire system testing procedures (TWSP , 02, 03) to fully assess potential impacts by their execution. An SOC was conducted for the OCC May 25, 2010, shutdown procedure (TP-OCC-1007) by OCC, but it did not include all affected parties as required (e.g., no PS09 participation). Contributing Cause #3 - Standards, Policies, and Administrative Controls (Procedures) LTA Policies, standards, procedures, and administrative controls are in place to help govern personnel actions during pipeline normal and abnormal conditions. During the May 25, 2010 shutdown and the TK-190 overfill incident, there were gaps and conflicts in procedural requirements and compliance. Work permits were issued by the Response Base Supervisor and Pump Station Caretaker. The Shutdown Coordinator located at the FEOC was accountable for coordination of shutdown work activities, the Fairbanks Maintenance Base O&M Supervisor was on site supervision, and work procedural initiation was provided by OCC controllers. Personnel interviews indicated confusion about who had primary control and process oversight during the shutdown. Recommendations See the detailed descriptions of the Root and Contributing Causes of this report for recommendations. Confidential and proprietary information protected from public disclosure under AS TK-190 Overfill Incident (a)(4) and the Freedom oflnfonnation Act, Exemption 4,5 USC 522 (b)(4) Page 5 of 17 Root Cause Analysis Report trade secrets and commercial or financial information obtained from a person and And Post Accident Review privileged or confidential 6/22/10

7 Incident Description On May 25, 2010, during a scheduled short duration shutdown of the Trans Alaska Pipeline System (TAPS), Pump Station 9 (PS09) experienced an unrecognized relief event. The event resulted in overfilling of Relief Tank 190 (TK-190) and a product spill into secondary containment. Immediate actions included personnel evacuation, valve closure to stop flow, pump station electrical isolation, and activation of the Incident Management Team (IMT). There were no injuries and the pipeline was successfully restarted approximately 77 hours after initial notification. The volume of product spilled was approximately 4,500 barrels of Alaska North Slope Crude Oil. (Reference Attachment 1) On May 19,2010, the Operations Control Center (OCC) conducted a Safe Operating Committee (SOC) meeting to review procedure TP-OCC-1 007, Pipeline Shori Duration Shutdown, May 25, 2010, for Valve Testing, Fire System Testing, and Turin Work, and discuss work activities planned for the shutdown. The scope description summarized the work as "... pipeline shutdown to allow Valve Testing at PS07 and PS09, PS05 AT&T Turin work, PS09 Fire System Testing and Gas Building work at PS03." The SOC participants included an oee Controller, Project Lead, Fire System Engineer, Automation Engineer, and PS03 personnel. There were no personnel from PS09 in attendance. In preparation for the shutdown green light meeting on May 24, 2010, the Shutdown Commander requested and received oral confirmation that everything was in place and all requirements had been satisfied to ensure a successful shutdown. SOC reviews were required for the fire system testing Temporary Work Site Procedures (TWSP). On the same day, the fire system testing TWSPs were approved and the Shutdown Coordinator issued the Approved Work List indicating sacs for these procedures had not been completed. Prior to the pipeline shutdown on May 25, 2010, the PS09 fire system was released by OCC to Maintenance to prepare for the scheduled tesflng. A final go/no-go meeting was conducted in the Fairbanks Emergency Operations Center (FEOC) and by teleconference with involved personnel attending. During the meeting the Shutdown Commander again orally verified everything was in place and all requirements had been satisfied. Unit Work Permit U-PS was approved and issued by the PS09 Response Base Supervisor and the Caretaker for the fire system testing. The Unit Work Permit included, "Fire Tests: Manifold, Control & PDC-Test IR, Pull Station & Smoke Appliances per TWSPs NOTE: Valve movement, HVAC, Unit SO's, Stobes & pwr outage (PDC, Control Mod, Guard Shack)..." as the work description. The PS09 Caretaker had multiple roles during the shutdown. The Caretaker was the process representative, one of the maintenance technicians assigned to perform the fire system testing, and the Operations single point of contact (SPOC) for project F645, the PS09 02 Valve Replacement. Project F645 was scheduled to conduct testing on battery limit valve BL-1 during the shutdown in preparation for project implementation during the July, 2010, scheduled shutdown. An Alyeska Valve Program Engineer was on-site at PS09 to support the BL-1 valve testing and a SOC had been completed for this work. At 9:02 am, OCC initiated the pipeline shutdown in accordance with the approved procedure TP-OCC The suction relief set-point at PS09 was changed from normal operating relief pressure of 310 psi to 475 psi for the static state conditions. At 9:24 am, the Maintenance Technicians initiated Temporary Work Site Procedure TWSP , Test PS09 Manifold IR Detector Response, the first of three fire system test procedures to be performed during the shutdown. Similar fire system testing had been completed during pipeline slowdowns in early May at PS03 and PS04. The previous testing required the Maintenance Override System (MOS) to be activated to isolate the pipeline control system. The PS09 testing on May 25, 2010, was being performed to demonstrate the full functionality of the fire system so the MOS was not activated. The purpose of the first test was to specifically trigger a Station Isolation command, which was automatically activated as designed. At 9:33 am PS09 battery limit valves BL-1 and BL-2 closed as a result of the Station Isolation command issued. This portion of the fire system testing was successfully Ccnfidential and proprietary information protected from public disclosure under AS TK-190 Overfill Incident (a)(4) and the Freedom of Information Act, Exemption 4, 5 USC 522 (b)(4) Page 6 of 17 Root Cause Analysis Report trade secrets and commercial or financial information obtained from a person and And Post Accident Review privileged or confidential 6/22/10

8 completed. In accordance with TP-OCC-1007, oce subsequently initiated a command to reopen battery limit valves BL-1 and BL-2, the valves traveled to their fully open position, and the station was back in normal configuration. The second test of the fire system TWSP , Test PS09 Control Module Room Pull Station Response, was initiated by the Maintenance Technicians. aec confirmed that a Station Shutdown was activated successfully completing this fire system test. Controllers in acc noted increasing pipeline head pressure at PS09, due to pipeline topography causing flow, and increased the suction relief set-point from 475 psi to 500 psi. At 10:20 am, the third and final fire system test procedure TWSP , Test PS09 POC Voted Smoke Response, was initiated. This test simulated an electrical fire in the station Power Distribution Center (POC) Module. System design for an electrical fire in the POC Module is to isolate power by opening the breakers to the transformers for the PDC. The Control Module receives power from the POC so it also lost power as expected (Reference Attachment 2). The Control Module's redundant power supply is designed utilizing an Uninterruptible Power Supply (UPS) with batteries and a 65 kw generator. The Control Module UPS failed separating the 65 kw generator from the electrical bus. The POC Module also has a UPS redundant power supply designed to pick-up load, which also failed (Reference Attachment 3). The primary power and redundant power outage to the Control Module caused the critical station control systems to shutdown: Safety, Integrity, Pressure Protection System (SIPPS), the Network Interface Panel (NIP), and the Station Control Panel (SCP). As a result, OCC lost visibility to and control of PS09. There were no system updates received by OCC, with the last known station status conditions displayed on the Operator Work Stations (OWS). There was no normal or emergency lighting available in the Control Module. The relief system is designed to fail open during a power outage so that the pipeline is not inadvertently over pressured. There are a total of five relief valves: three suction side (upstream) relief valves and two discharge side (downstream) relief valves (Reference Attachment 4). All five valves went to the fully open position upon station power loss. Crude oil was flowing into TK-190 from both the suction (north) as well as the discharge (south) sides of the station due to pressure created as a result of area topography (Reference Attachment 5). The tank farm audible and visual evacuation alarm did not function as a result of the loss of primary power and the loss of SIPPS. The tank farm audible and visual alarm is designed to activate when the relief valves are open to 5% or more. The alarm is activated by the SIPPS and is powered on a noncritical circuit. Non-critical circuits are not supported by the redundant power supply. The fire system testing Maintenance Technician/Caretaker called OCC via phone to notify the controller of the power loss and that he would begin troubleshooting. The Technician and an on-site Fire Systems Engineer verified breakers and to the PDC Module transformers were tripped as expected by performance of the fire system testing procedure. The 65 kw generator was running but the back-up automatic transfer switch (ATS) and the UPS indicator lights were not illuminated. The Maintenance Technician verified the ATS linkage and breaker were in the proper configuration. OCC successfully contacted each of the other pump stations to ensure open communications. acc and PS09 personnel began to focus attention on reestablishing communications with the Control Module and power restoration to the station. acc contacted an Automation Engineer located at the OCC facility to assist field personnel with the troubleshooting process. The attention of the acc Pipeline Controllers, Lead Controller, and acc Supervisor was singularly focused on restoring power. No one at acc conducted an overall system review to gain context or larger understanding for the events occurring at PS09. While OCC was focused on restoring communication with the Control Module, they did not recognize that loss of power to the Control Module caused the PS09 relief valves to open allowing crude oil to flow into TK-190. Confidential and proprietary information protected from public disclosure under AS TK-190 Overfill Incident (a)(4) and the Freedom of Information Act, Exemption 4, 5 USC 522 (b)(4) Page 7 of 17 Root Cause Analysis Report trade secrets and commercial or financial information obtained from a person and And Post Accident Review privileged or confidential

9 I Field personnel located at PS09 during the shutdown were focused on maintenance. Similar to acc, they did not recognize the relief valves went to the open position after station power loss. On-site personnel were in the Control Module and the PDC Module troubleshooting the power fa liures. Pump Station electrical distribution is fed through a rectifier in the UPS that converts,a.c to DC power, and then through an inverter that converts the DC power to AC. The design of the system through the UPS is to provide "clean power" to the Control Module. A DC input breaker located before the inverter tripped during the power outage. This breaker is downstream of both the UPS batteries and supplemental generator, which created a single point of faiiure in the system (Reference Attachment 3). The technicians troubleshooting the redundant power supply visually inspected the UPS breakers in the Control Module and found them in a closed (normal) position. These UPS units were originally configured for supplying power to critical circuits. In application, they were also used to provide power for emergency lighting. A UPS providing power to emergency lighting is required by UL 924 to have a guard installed on the breakers to preclude inadvertent contact, which may open the breakers. When the DC input breaker opened during the power outage, the visible switch indicating breaker status was not able to travel to the tripped position due to the particular design of the protective guard. This masked the actual condition that the breaker was tripped and not closed as indicated by the breaker switch (Reference Attachment 6). After several minutes of not being able to identify the redundant power supply failure mode, the troubleshooting team decided to restore primary power. The breakers to the PDC transformer that had opened during the final fire system test were reset (closed) and immediately tripped open again. The technicians continued troubleshooting this condition and subsequently attempted to close the PDC transformer breakers two more times. During the troubleshooting process the team realized that the Station Control Panel (SCP) Programmable Logic Controller (PLC) resets all internal registers to zero during a power outage. When power was restored, the reset Stat'lon Control Panel indicated a fire existed in the PDC Module and opened the breakers to the PDC transformer. On-site personnel working with the Automation Engineer located at OCC, decided to isolate the Station Control Panel and then restore primary power. Before this action was fully completed the fire system testing Maintenance Technician/Caretaker observed TK-190 overfilling. At 11 :00 am, the Shutdown Coordinator began a scheduled shutdown status meeting via teleconference. OCC notified the FEOC there was no visibility to PS09 due to the Control Module loss of power. acc did not have an estimate for when power would be restored. The Fairbanks Maintenance Base Operations and Maintenance (O&M) Supervisor on-site at PS09, reported the fire system testing was complete but they were having difficulty restoring power. In the background of the teleconference, a radio call from PS09 was overheard announcing TK-190 was overfilling. The Maintenance Technician/Caretaker announced via radio for all non-essential personnel to evacuate the station and the on-site Valve Engineer supporting project F645 to report to the Manifold Building. Assisted by the Fire System Engineer and other Maintenance Technicians they began to systematically close the upstream and downstream relief block valves. Maintenance Technicians also reported to the station battery limit valve BL-1 and started closing it using the RB-100 mule and generator, which had been staged at the valve. No gas detection monitoring was conducted at the Manifold Building. However, personnel responding to BL-1 did perform gas detection monitoring. OCC relieved line pressure into the PS05 relief tank and began isolating the pipeline north of PS09 by sequentially closing Remote Gate Valves (RGV) at 11 :06 am. PS09 on-site personnel finished closing the ten relief block valves at 11 :15 am. The PS09 substation 13.8 kv breaker was opened by on-site personnel electrically isolating the station from utility power at 11 :35 am. The Maintenance Technicians closed each pump unit's suction and discharge valves and the station recycle valve. PS09 battery limit valve BL-1 was closed at 11:50 am and battery limit valve BL-2 was closed at 12:16 pm using the relocated RB-100 mule and generator. These actions cumulatively fully isolated the station hydraulically and electrically. The IMT was activated, which started the response coordination and management. Confidential and propnetary information protected from public disclosure under AS TK-190 Overfill Incident l20(a)(4) and the Freedom ofinformation Act, Exemption 4,5 USC 522 (b)(4) Page 8 of 17 Root Cause Analysis Report trade secrets and commercial or fmancial information obtamed from a person and And Post Accident Review privlleged or confidential

10 I Background A number of significant incidents on TAPS over the last several years, demonstrate a trend of operational discipline deficiencies similar to those involved with the TK-190 overfill incident These incidents include: 1. Pump Station 9 Tank Vent Fire on January 6, RGV 32 Leak on January 9, Pump Station 9 TK-190 Overfill Near Loss on March 22, Pump Station 9 Energy isolation Near Loss Events in October, Pump Station 1 Sadelrochit Stream Gas Excursion on January 15, Pump Station 9 Piping Overpressure Event on July 19,2009. Each of the above noted incidents appear to have been investigated in a manner consistent with requirements and expectations. The investigations were conducted satisfactorily with identification of key contributing factors, root causes, and corresponding recommendations. The recommendations were either implemented within a separate Manage Action Plan (MAP) or embedded within the report. These recommendations appear to have been completed within the context of each individual incident in question and were believed to have been effective toward mitigating likelihood and consequence of further incidents. Many of the key recommendations generated from these incident investigations have direct application to the TK-190 overfill incident as summarized below: " Perform a Process Hazard Analysis (PHA) on tank farms, sumps, vents and drains " Strengthen our Process Safety Management (PSM) practices on TAPS " Install automatic audible alarms in Tank Farms for relief events " Review with OCC controilers to provide increased awareness of abnormal conditions " Identify all sources of hazardous energy present in the work site prior to starting work " Consider additional protocols for blocking incoming flows to the pump station if facilities and/or personnel are at risk " Review current requirements for SOC reviews " Establish a standard protocol for evaluating non-routine operations prior to proceeding with same " Consider implementation of clear, concise, quick-reference, guidance documents to expedite correct response and communication by operating personnel " Review the effectiveness of audible station alarms " Modify work permitting and OCC procedures to strengthen and document the turnover/transfer of custody of equipment " Reinforce with OCC controllers their accountabilities for monitoring and maintaining system conditions at all times " Reinforce role/accountability of the maintenance work force in energy isolation and work implementation after taking and when returning custody of equipment " Conduct an Operations Engineering review of pump station valve configurations to identify configurations that could be injurious to the facility " Validate shutdown maintenance planning process; Ensure all personnel understand their roles and accountabilities " In addition to procedure reviews and the SOC process, use the pipeline real-time simulator and/or control system test bed to test shutdown procedures, conflicts with controls system logic, and OCC controller training Clarify expectations regarding when to convene an SOC Review the effectiveness of "Operational Discipline" procedures; reiterate expectations with management teams and employees. The previous investigation reports and corresponding recommendation implementation demonstrate significant energy and resources were dedicated to maintain TAPS safety and integrity. However, there is recognition of a need for significant improvement in the organization's ability to effectively learn from these experiences and prevent recurrence. The previous incident actions have been completed, however, Confidential and proprietary information protected from public disclosure under AS TK-190 Overfill Incident (a)(4) and the Freedom ofinfonnation Act, Exemption 4, 5 USC 522 (b)(4) Page 9 of 17 Root Cause Analysis Report trade secrets and commercial or fmancial information obtained from a person and And Post Accident Review privileged or confidential. 6/22/10

11 I they did not result in the cultural and behavioral changes addressing the above noted issues and those contained further in this report. OMPV-0001, Management of TAPS Shutdown Based Maintenance, includes a requirement of conducting post shutdown Lessons Learned. However, there is no direction or requirements for how this information is specifically considered during planning for the next shutdown. A review of the Lessons Learned Reports from the four previous scheduled pipeline shutdowns revealed a number of "Opportunities for Improvement" items repeated. For example, there are multiple references to SOCs, concern was expressed with the time allotted between shutdowns and resource availability, and procedures received OT revised at the last minute. TAPS employees continually identify hazards, assess risk, and implement mitigation measures in the course of business. An assessment of hazards and risks was conducted in October 2009 for the fire system testing work at another pump station, which identified risks specific to a UPS failure. An was distributed by the responsible Fire Systems Engineer to the Fairbanks Maintenance team which identified the series of events to occur and potential ramifications to consider. The included the following statements: "You will want to notify aee that you are testing. This procedure will remove 480V power from the poe affecting valves, process ventilation, and relief systems. The valves will fail in place, the ventilation will shut down and the relief systems should not be affected because of the UPS system that powers them. It will not shut down the station unless the relief system UPS is not up to snuff. When the test is done the valves and relief will resume where they left off. The ventilation must be restarted." There are two important observations from these statements. First, had an SOC been conducted on the fire system testing procedures and these individuals involved, it is likely the risk would have been identified and a contingency developed in the event of UPS failure (e.g., close in TK-190). Second, this information was never used in a broader consideration of risks for the fire system testing. Investigation Team Immediately after the May 25, 2010 incident, Alyeska's Senior Management requested a team be assembled to investigate the incident and potential management system deficiencies. The Investigation Team was tasked with developing an incident description, identifying root and contributing causes, and developing recommendations to mitigate or prevent recurrence. Team members were selected based on specific expertise and comprised of TAPS personnel with varied qualifications, experience, and backgrounds. These include operations, maintenance, engineering, operational discipline, process safety management, and a Root Cause Analysis Subject Matter Expert (SME). The investigation team members are: Ray Grubb, Quality Assurance Supervisor, (Investigation Team Lead) Whitney Grande, Senior Health & Safety Manager Scott James, Facility Engineering Supervisor Brendan LaBelle-Hamer, Pump Station 1 Operations & Maintenance Supervisor Andres Morales, Valdez Maintenance Manager Tom Stokes, Operations Business Strategy Manager Methodology Two distinct approaches were taken to complete the incident investigation; 1) an Incident Root Cause Analysis (RCA) was conducted in conjunction with, 2) a Technical Failure Analysis. The Incident RCA was conducted to identify any potential management system deficiencies which acted as root or TK-190 Overfill Incident Confidential and proprietary information protected from public disclosure under AS (a)(4) and the Freedom of Information Act, Exemption 4, 5 USC 522 (b)(4) Page 10 of 17 Root Cause Analysis Report trade secrets and commercial or financial information obtained from a person and And Post Accident Review privileged or confidential. 6/22/10

12 contributing causes. The Technical Failure Analysis was conducted to determine the specific technical failure mode (Reference Attachment 8) The Technical Failure Analysis Team members are: Dave Roberts, Automation Engineer Bill Frichtl, Senior Electrical Engineer Rick Signor, Maintenance Technician The Incident RCA included data gathering using various techniques such as personnel interviews, documentation reviews, and records reviews. The data and evidence gathered provided the basis for the development of an Event & Casual Factor Chart (Reference Attachment 9). This investigation tool helps show what happened (or did not), when it happened, and what organizations/personnel were involved. The Event & Casual Factor Chart (E&CF) chart evolved from data gathered during personnel interviews (Reference Attachment 12) and document and record reviews (Reference Attachment 13). The E&CF was also used to identify additional interviewees, documents, and records where potentially useful information could be obtained. It was also used to determine if additional analysis tools (e.g. Barrier or Change Analysis) would assist with the investigation or analysis. Each event on the E&CF was then comprehensively considered based on data gathered to identify causal factors. A Barrier Analysis was completed to assess the adequacy of the barriers or safeguards that should have prevented or at least mitigated the TK-190 overfill (Reference Attachment 11). Barriers can be physical such as labeling, placards, guards and design; or administrative controls such as policies, procedures, or work permits. A Barrier Analysis can also identify missing barriers that should have been in place but were not. The Barrier Analysis did not identify any missing barriers but it did identify additional barriers for the investigation team to consider and include in the E&FC. Following standard root cause determination methods and utilizing the TAPRoot@ Root Cause Tree, each causal factor was worked through the TAPRoot Root Cause Tree to identify specific root causes. The causal factors were then bundled into distinct categories, which were comprehensively considered for root and contributing cause designations. The causal factors, contributing causes, and root causes were used as the basis for recommendation development summarized in an Incident Summary Chart (Reference Attachment 10). The recommendations are for Alyeska Senior Management consideration. If further action is determined necessary, Alyeska management will develop the strategy and identify the resources necessary for successful implementation. Root Causes The Technical Failure Analysis was not able to specifically determine the physical failure cause. The UPS failure was not expected and despite multiple attempts subsequent to the TK-190 overfill incident, the failure could not be recreated and no specific root cause identified. Recommendations are included in the Technical Failure Analysis Report, which is hereby incorporated into this report. (Reference Attachment 8) Root Cause #1 - Desiqn Less Than Adequate (LTA) Several technical and design issues were identified during the investigation. Each item should be reviewed and fully considered by a team of technical discipline experts to determine any necessary system modifications. At the same time the PDC transformer breakers and opened as part of the fire systems test, the Control Module UPS (39-UPS-4603R) internal breaker for DC input opened. This breaker has a shunt trip which opens the breaker on DC under voltage, down stream AC over voltage, or over current through the inverter. These functions are standard features on the UPS to provide protection for the UPS itself and caused a single point of failure. Confidential and proprietary infonnation protected from public disclosure under AS TK-190 Overlill Incident (a)(4) and the Freedom of Infonnation Act, Exemption 4,5 USC 522 (b)(4) Page 11 of 17 Root Cause Analysis Report trade secrets and commercial or fmancial infonnation obtained from a person and And Post Accident Review privileged or confidential 6/22/10

13 A guard was installed on the Control Module UPS DC input breaker to protect it from accidentally being tripped. This guard is UL required because the UPS feeds emergency lighting circuits. The particular configuration of the guard prevented visual confirmation that the breaker had opened and made it difficult to troubleshoot. When power was restored to the Station Control Panel, part of the initialization sequence was to reset al! the PLC internal r'egisters to zero. When this happened, all the outputs were reset, which in this case indicated a fire in the PDC Module and opened the PDC transformer breakers again. The tank farm audible and visual alarm activates whenever any of the relief valves move open 5% or more. The alarm is powered from the non-critical bus and gets the control signal from SIPPS. The loss of power to the Control Module caused the SIPPS panel to be de-energized resulting in the tank farm evacuation alarm not functioning. After the first fire system test, battery limit valves BL-1 and BL-2 could have been either in the normally operated open position or remained in a closed position isolating the station. Had the valves remained in a closed position, the subsequent power outage would have caused minimal crude flow and TK-190 would not have overfilled. The relief valves provide protection from over pressurizing the pipeline. Isolating the pipeline from the relief system is permissible but must be properly executed and managed. In preparation for the shutdown, the fill level of TK-190 had been reduced from 18' to 13.8'. Prior to 1994 the minimum fill level for TK-190 was approximately 5.5'. Currently, the tank has a minimum operating fill level of 13.3' to ensure flooding of the relief valves and elimination of vapor pocket formation. It is unclear if TK-190 capacity at the existing minimum fill level is adequate under the current operating philosophy. Maintenance issues were noted during the investigation including UPS batteries with some dead cells and temperature concerns in the PDC Module. Work orders were generated prior to the May 25, 2010, shutdown to address this work but had not been completed. This work was not considered critical by the Investigation Team and not integral to the incident. Root Cause #1 Recommendations: 1. Establish technical teams to conduct reviews of the technical and design issues identified above and to validate the overall Strategic Reconfiguration (SR) Design Basis. Examples of areas that should be considered for review include: Control Logic Use and capacity of the breakout tanks Process configuration and relief systems Electrical configuration and circuits on the critical bus or non-critical bus How power is fed to the control systems in the Control Module (SIPPS, SCADA, NIPS, and SCP). 2. Conduct a review of the philosophy and operating practice regarding the configuration of the mainline valves (RGVs and BLs) during shutdowns 3. Review Electrical and Automation (E&A) changes made at PS03 and PS04 and ensure all applicable to PS09 have been completed. Expedite the implementation of optimization projects at PS09, specifically the security and controls upgrade projects. Root Cause #2 - Previous Incident MAPs &Lessons Learned LTA Over the last several years, there have been a number of incidents with resulting Management Action Plans (MAPs) intended to implement recommendations identified during the investigations. Lessons Learned are routinely conducted throughout the organization for a wide variety of activities such as major maintenance completion, pipeline shutdowns, oil spill drills, and incident response. Despite the efforts made to address previous incidents and to learn from previous work activities, there continues to be a Confidential and proprietary infonnation protected from public disclosure under AS TK-190 Overfill Incident l20(a)(4) and the Freedom ofinformation Act, Exemption 4, 5 USC 522 (b)(4) Page 12 of 17 Root Cause Analysis Report trade secrets and commercial or financial infonnation obtained from a person and And Post Accident Review 6/22/10 privileged or confidential.

14 pattern of significant incidents occurring. As an organization, we are not optimizing our opportunities to learn. Personnel are working hard to complete all requirements and remain in compliance, but the completion of actions intended to prevent incidents and the opportunities to Jearn from work activities have not been effective in influencing the culture OJ behaviors. Although actions are implemented to address deficiencies and foster continuous improvement, the fragmented approach does not always result in the comprehensive results intended. Reports and recommendations from previous incidents have not been communicated well throughout the organization. There may be some expectation for the communications to be included in the MAPs but most actions are specific with little disseminating of information for possible application to other parts of the organization. Review of the Incident Investigation Process and sub tier procedures reveals no direction regarding MAP development, implementation, or validation of resolution action effectiveness. There is usually no continuity between the Incident Investigation Team and the MAP Development Team. The richness of discussion and complete appreciation for the report recommendations may not always be transferred into the MAPs. The Operations Incident Review Board has not been meeting as routinely as intended and has not effectively communicated incident learning's throughout the organization. The organization does not always conduct Lessons Learned with the rigor necessary or fully use the previous lessons learned for the next major maintenance activity or pipeline shutdown. An example of procedural deficiencies regarding Lessons Learned is OMPV-0001, Management of TAPS Shutdown Based Maintenance. This procedure includes a requirement for conducting post shutdown Lessons Learned but no direction or requirements for how this information is specifically considered during planning for the next shutdown. Management has not fully succeeded in fostering a culture of learning by taking actions such as establishing a centralized repository for lessons learned, establishing expectations for utilization, or developing methods for broader analysis and communication. Root Cause #2 Recommendations: 1. Include TK-190 Investigation Team representation during the MAP development and implementation to ensure continuity during the transfer of recommendations into completed action items. Ensure Incident Investigation Team representation during MAP development and implementation for future incident investigations. 2. Enhance AMS-024, Incident Reporting, Investigation and Analysis Process, and LPS-001, Loss Prevention System, to provide direction and detail on MAP purpose, accountabilities, Investigation Team/MAP continuity, development, communication, tracking, and validation. Also, provide guidance to the Operations Incident Review Board to incorporate knowledge sharing and a learning culture. 3. Improve methods to provide easy and reasonable access to incident investigation reports, Lessons Learned, risk assessments, and hazard analysis (e.g. SOC, PHAs) type documents. Establish expectations for personnel to utilize the tools to foster a culture of knowledge sharing and learning throughout the organization. Contributing Causes Contributing Cause #1. Situational Awareness LTA Employees knowledgeable of operational processes (OCC & Field) did not react in a manner that supported the safety and integrity of TAPS. The investigation team strongly considered "Situational Awareness LTA" as a primary root cause. However, after much deliberation, the team concluded that this was a significant Contributing Cause of this event and actually fit beneath the umbrella of Root Cause #2, Previous Incident MAPs & Lessons Learned LTA. Specifically, situational awareness was identified in the previous PS09 Piping Overpressure Event report and the fact that it was identified as an issue during this incident investigation provides direct linkage to Root Cause #2. Confidential and proprietary information protected from public disclosure under AS TK-190 Overfill Incident (a)(4) and the Freedom of InfOImation Act, Exemption 4, 5 USC 522 (b)(4) Page 13 of 17 Root Cause Analysis Report trade secrets and commercial or financial information obtained from a person and And Post Accident Review privileged or confidential 6/22/10

15 Situational awareness is paramount to responding to abnormal conditions. Interviews suggest many of those directly involved in this event, both at acc and PS09, reflected that they should have realized the relief valves had opened and crude was flowing to TK-190 when power was lost. acc and operational procedures and training do not historically focus on static-state shutdown conditions. Procedures are not consistently written in a manner that provides the user with instruction or guidance on how to address an abnormal condition should the system not react in the expected manner. PS09 field personnel failed to monitor for gas detection before entering the Manifold Building during the initial incident response. Existing hazard recognition training programs focus on personnel safety (e.g., line of fire). During the PS09 power outage, acc and field personnel immediately began troubleshooting the power and communications failures. No one stepped back to take a more holistic view of the pipeline or potential ramifications to the pump station due to loss of power. The acc Controllers had some degree of attention on the relief system because the relief valve set point was changed twice, but they did not recognize available information to help them further assess the situation (e.g., acc data indicating significant upstream flow). acc personnel monitor and react to volumes of data, alarms, and screens. As such, we must ensure they remain focused (situational awareness) and equipped (visibility to critical decision making data) to appropriately respond to abnormal conditions. This lack of action and preparedness prevailed in spite of a communication in 2009 which noted the fire system testing "will not shut down the station unless the relief system LIPS is not up to snuff'. Individuals on-site at PS09 during the shutdown, including the a&m Supervisor, had operational backgrounds but their focus was on maintenance activities and not operational processes. These individuals did not achieve situational awareness nor did they react in a manner to safely address the abnormal condition. Individuals in operating roles must have operational process knowledge and focus to be successful. Currently, there are expectations for maintenance and response personnel to fill some of the roles historically performed by operations personnel. In the case of the TK-190 overfill incident, one individual filled three roles as the Pump Station Caretaker, Maintenance Technician, and project F645 SPOC. While acc did not have visibility of PS09, monitoring upstream pressure at PS08 could have provided insight to the Controllers that pipeline pressure was dropping, indicating flow. OCC is responsible to operate a complex system in terms of station configurations, human machine interfaces (HMI), and complexity of automated systems. Each of the four active pump stations currently has a different configuration. PS09 is fully automated and unstaffed, PS03 and PS04 are also fully automated and transitioning to unstaffed, and PS01 has not started the automation process and remains in the legacy configuration. acc responses to alarms received vary station to station due to their particular configuration. For automated stations, the interconnection and failure modes are complex and can be difficult to troubleshoot. Automation Engineers are routinely consulted to assist acc and field personnel with troubleshooting activities. Contributing Cause #1 Recommendations: 1. Enhance the organization's Process Safety competencies with emphasis on heightened awareness, understanding, and communication of Process Safety. Within this context consider: Provide Process Safety Management (PSM) training for all managers involved with operations, maintenance, and projects The training should familiarize personnel in leadership positions with the differences methods for managing process safety versus personnel safety Develop operating procedures to ensure pipeline shutdown states (e.g. slowdown, static) are considered and appropriately addressed Incorporate sac and risk assessment results with appropriate contingency actions for potential abnormal conditions in operating procedures (e.g., at specific hold points or significant steps within the procedure) Assess the opportunity to apply the Safe Performance Self Assessment (SPSA) concepts within an operating procedure (e.g., if this next step does not respond as intended what will I do and what should I be concerned about) Incorporate elements of Situational Awareness in the work permitting process. 'd t ConfidentIal and propnetary information protected from public disclosure under AS TK verfill I nci en (.. Page 14 of 17 Root Cause Analysis Report a)(4) and the Freedom of InfonnatIOn Act, ExemptIOn 4, 5 USC 522 (b)(4) And Post Accident Review trade secrets and commefciaj or fmanclal mformation obtamed from a person and 6/22/10 privileged or confidential

16 2 Review Situational Awareness training programs and incorporate improvements into existing training considering: e Retaining a resource with expertise in the area of Situational Awareness " Defining Situational Awareness and its importance in operating TAPS safely Scenario based simulations (OCC) and exercises (field) which test situational awareness and related decision making to abnormal conditions.. Specific situational awareness exercises within spill drills e Process knowledge skills based training for accountable managers, supervisors, and technicians ~ Assessment of knowledge for accountable managers, supervisors, and technicians.. A structured feedback or Situational Awareness Mentoring Program where more experienced technicians/controllers mentor new personnel focusing on potential abnormal conditions and how to respond appropriately. 3. Assess industry best practices and improve management processes for OCC alarms and HMI screens. 4. Enhance the investigation and lessons learned processes by incorporating a focus for identifying situational awareness deficiencies for improvement opportunities. Contributing Cause #2 - Safe Operating Committees LTA The Corporate Safety Program, SA-38, and other Department Operating Procedures (OOPs) outline specific requirements for performing Safe Operating Committee (SOC) review of procedures. As a result of the recent PS09 Piping Overpressure Event in July 2009, some of these procedures were improved and others developed. These procedures were reviewed during the investigation and noted as not fully addressing all the issues previously identified. As an example, SA-38 specifically requires DOP's be developed and to identify who can be an SOC Chairperson. OCC procedure OMD-01 01, Oil Movements Department Safe Operating Committee Review Requirements, was published in 2008 but this requirement has not been addressed. Specific to this event, sacs were not conducted by field personnel for the three fire system testing procedures (TWSP , 02, 03) to fully assess potential impacts by their execution. An SOC was conducted for the OCC May 25, 2010, shutdown procedure (TP-OCC-1007) by OCC but it did not include all affected parties as required (e.g., no PS09 participation). There was an opportunity to block in or isolate the station and still accommodate the fire system testing and pressure protection of the pipeline. The SOC process employed did not recognize or encourage discussion involving alternate methods to isolate the station. No requisite training on the SOC requirement was provided to personnel. There appears to be a high degree of variability in implementing the SOC process as it is inherently influenced by the Chairperson and participants. SA-38 provides structure but there is no standard methodology for conducting sacs. sacs may not be viewed as a critical barrier in our overall safety system and their value may not be fully understood. For example, a Lead Maintenance Technician was specifically questioned about sacs for the PS09 shutdown work and he answered affirmatively that they had been completed. However, the SOCs for the fire system testing TWSPs had not been completed prior to the shutdown. Contributing Cause #2 Recommendations: 1. Revise relevant SOC programs, processes, and procedures (e.g. SA-38 and DOPs)to: Ensure sufficient clarity is provided for when an SOC shall be performed and address any remaining gaps previously identified in the PS09 Overpressure Investigation Report (e.g., OMD 0101 OCC Chairperson clarity) Incorporate risk assessment methodologies into the SOC processes and procedures to provide a standardized approach and aid in the performance of SOC's Confidential and proprietary information protected from public disclosure under AS TK-190 Overfill Incident l20(a)(4) and the Freedom of Information Act, Exemption 4,5 USC 522 (b)(4) Page 15 of 17 Root Cause Analysis Report trade secrets and commercial or fmancial information obtained from a person and And Post Accident Review privileged or confidential. 6/22/10

17 .. Consider incorporating a peer review or assurance process for each SOC to improve quality. The assurance activity should also provide verification that an SOC has been completed prior to commissioning affected work. 2. Enhance SOC program to improve training and include: SOC requirements " How to conduct an SOC.. Methodology in assessing risks/hazards ~ Incorporation of risk mitigation into procedures and how to validate effectiveness " Value and importance of sacs.. Evaluation of all forms of energy (e.g. kinetic).. Knowledge transfer assurance (i.e., attendee testing). Contributing Cause #3 - Standards, Policies, and Administrative Controls (Procedures) LTA Policies, standards, procedures, and administrative controls are in place to help govern personnel actions during pipeline normal and abnormal conditions. During the May 25, 2010, shutdown and the TK-190 overfill incident, there were gaps and conflicts in procedural requirements and compliance. Prior to the shutdown, required SOCs were not completed (i.e., fire system testing TWSPs) or did not meet the expectations of SA.-38 and OOPs. For example, OCC procedure OMD-0101 does not meet all SA-38 requirements (see Contributing Cause #2). Personnel interviews indicated confusion about who had primary control and process oversight during the shutdown. Work permits were issued by the Response Base Supervisor and Pump Station Caretaker. The Shutdown Coordinator located at the FEOC was accountable for coordination of shutdown work activities, the Fairbanks Maintenance Base O&M Supervisor was on site supervision, and work procedural initiation was provided by OCC controllers. OMPV-0001, Management of TAPS Shutdown Based Maintenance, specifies personnel at the FEOC as the oversight and coordinating organization, but the role was fulfilled to some degree by the OCC Controllers, Response Base Supervisor, O&M Supervisor, and PS09 Caretaker. During the shutdown, communication protocol between personnel located in the FEOC, OCC and PS09 on-site supervision did not meet the expectations intended by OMPV-0001, Immediately after the PS09 power loss, OCC continually communicated with the fire system testing Maintenance Technicians via phone, but the FEOC was not aware of the abnormal condition until the 11 :00 am scheduled shutdown status teleconference. This resulted in the inability of the FEOC to initiate a contingency plan and subsequent response to the abnormal conditions being encountered. A.dditionally, notification to all shutdown personnel would have increased the collective knowledge base and may have raised situational awareness to a level where there was recognition the PS09 relief valves were open due to the loss of power. The communication protocol outlined in OMPV-0001 describing the roles and responsibilities for accountable positions, content and update frequency of status meetings, and method of communication (i.e. 24 hour Meet-Me-Line) were not fully complied with and did not meet expectations. During an emergency, EC requires that OCC be the primary contact for coordination and OMPV 0001 requires the FEOC to be notified. A. previous event, PS09 Piping Overpressure, was the catalyst for development of OCC-3.15, acc Interface with Field Maintenance Work, to increase the rigor of work activity reviews for broader potential impacts. The log required to be completed by the OCC Controllers in support of OCC-3.15 does not meet the expectations of the intended rigorous review. Inconsistencies between procedures added to the lack of full communications with all involved personnel during the shutdown. Confidential and proprietary infonnation protected from public disclosure under AS l20(a)(4) and the Freedom of Infonnation Act, Exemption 4,5 USC 522 (b)(4) trade secrets and commercial or financial information obtained from a person and privileged or confidential. TK-190 Overfill Incident Page 16 of 17 Root Cause Analysis Report And Post Accident Review 6/22/10

18 Contributing Cause #3 Recommendations: 1. Clarify OMPV-0001, Management of TAPS Shutdown Based Maintenance, to ensure communications and notification consistency with the EC-71 series. 2 Enhance existing shutdown checklists or develop additional checklists as a requirement in OMPV-001 to provide a method for compliance verification 3. Enhance existing procedures to assure authority, control, and organizational hierarchy during pipeline shutdown conditions (e.g. OMPV-0001 & EC. 71). 4. Revise the OCC Field Maintenance Log (form 10089) which supports procedure OCC-3.15 to ensure the required critical questions are systematically asked before an entry to the log is made. Confidential and proprietary infonnation protected from public disclosure under AS (a)(4) and the Freedom of Infonnation Act, Exemption 4,5 USC 522 (b)(4) trade secrets and commercial or financial information obtained from a person and privileged or confidential. TK-190 Overfill Incident Root Cause Analysis Report And Post Accident Review Page 17 of 17 6/22/10

19 Attachments Confidential and proprietary infonnation protected from public disclosure under AS (a)(4) and the Freedom of Infonnation Act, Exemption 4, 5 USC 522 (b)(4) trade secrets and commercial or financial information obtained from a person and privileged or confidential. TK 190 Overfill incident Rool Cause Analysis Report And Post Accident Review 6J22/10

20

21

22

Peter Stock, Executive Director, Sentratech, Seattle, Washington, USA

Peter Stock, Executive Director, Sentratech, Seattle, Washington, USA Peter Stock, Executive Director, Sentratech, Seattle, Washington, USA THE ALASKA EXPERIENCE RELIABILITY CENTRED MAINTENANCE AND ONLINE MONITORING USING THE PI SYSTEM 22-24 November 2010, Johannesburg ABOUT

More information

Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content

Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content Purpose The purpose of this Detailed Requirements Document (DRD) is to provide

More information

PROCESS SAFETY MANAGEMENT PROGRAM UNIPAR CARBOCLORO

PROCESS SAFETY MANAGEMENT PROGRAM UNIPAR CARBOCLORO PROCESS SAFETY MANAGEMENT PROGRAM UNIPAR CARBOCLORO Clorosur Technical Seminar & WCC Safety Workshop Flávia Mariano Pinto November 18, 2016 Facility Cubatao, Sao Paulo -Brazil 1,000 metric tons chlorine/day

More information

FCX Department of Occupational Health and Safety Policy

FCX Department of Occupational Health and Safety Policy FCX Department of Occupational Health and Safety Policy Lockout/Tagout/Tryout (LOTOTO) (Control of Hazardous Energy Sources) Approval Date: 08/29/2014 Original Date: 03/09/2009 Policy # FCX-04 Revision

More information

International ejournals

International ejournals ISSN 2249 5460 Available online at www.internationalejournals.com International ejournals International Journal of Mathematical Sciences, Technology and Humanities 21 (2011) 205 212 ENERGY CONTROL CENTER

More information

195LiquidsCatalog.

195LiquidsCatalog. 195LiquidsCatalog www.energyu.org www.midwestenergy.org 195 Abnormal Operating Conditions... 3 195-0060 General Abnormal Operating Conditions (CT60)... 3 195-0000 Documentation & Reporting... 3 195-0403

More information

SMS Elements Veriforce, LLC. All rights reserved.

SMS Elements Veriforce, LLC. All rights reserved. 1. Leadership and Management Commitment 2. Stakeholder Engagement 3. Risk Management 4. Operational Controls 5. Incident Investigation, Evaluation, and Lessons Learned 6. Safety Assurance 7. Management

More information

INCIDENT AT YERING GORGE PUMPING STATION. HOW WHAT YOU DON T KNOW CAN HURT YOU. John deboer. Melbourne Water

INCIDENT AT YERING GORGE PUMPING STATION. HOW WHAT YOU DON T KNOW CAN HURT YOU. John deboer. Melbourne Water INCIDENT AT YERING GORGE PUMPING STATION. HOW WHAT YOU DON T KNOW CAN HURT YOU Paper Presented by: John deboer Author: John deboer, Operations Specialist, Water Supply Operations, Melbourne Water 79 th

More information

Facility Interconnection Requirements

Facility Interconnection Requirements Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents

More information

Brief Summary of Last Lecture. Model checking of timed automata: general approach

Brief Summary of Last Lecture. Model checking of timed automata: general approach Brief Summary of Last Lecture Formal verification Types: deductive (theorem proving) and algorithmic (model checking) ields proof that a (formal) specification is fulfilled Formalization of specs e.g.

More information

THE COMPLETE GUIDE TO ISO14001

THE COMPLETE GUIDE TO ISO14001 THE COMPLETE GUIDE TO ISO14001 1. Introduction... 3 Plan Do Check Act... 5 2. Requirements... 7 Environmental Policy... 7 Environmental Aspects... 7 Legal and Other Requirements... 8 Objectives & Targets...

More information

COMPARISON OF PROCESS HAZARD ANALYSIS (PHA) METHODS

COMPARISON OF PROCESS HAZARD ANALYSIS (PHA) METHODS COMPARISON OF PROCESS HAZARD ANALYSIS (PHA) METHODS by Primatech Inc. The hazard and operability (HAZOP) study is the most commonly used process hazard analysis (PHA) method. However, there are many other

More information

Ammonia Terminals Risk Management Improvements

Ammonia Terminals Risk Management Improvements Ammonia Terminals Risk Management Improvements Through a series of corporate acquisitions, Agrium has assembled a number of anhydrous ammonia distribution terminals. Prior to Agrium s acquisition, the

More information

NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES REPORTING GUIDANCE

NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES REPORTING GUIDANCE NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES REPORTING GUIDANCE Amended November 2014 PIPELINE PERFORMANCE MEASURES - OVERVIEW Introduction The National Energy Board (Board) took action in March

More information

Nip Point Severs Worker s Finger

Nip Point Severs Worker s Finger Purpose To share lessons learned gained from incident investigations through a small group discussion method format. To understand lessons learned through a Systems of Safety viewpoint. This material was

More information

Lock Out Tag Out (LOTO) Safety Procedure

Lock Out Tag Out (LOTO) Safety Procedure Pars Oil & Gas Company Lock Out Tag Out (LOTO) Safety Procedure HEALTH, SAFETY AND ENVIRONMENT PROCEDURE Lock Out Tag Out (LOTO) Safety Procedure DOCUMENT ID - PR-82-POGC-002 REVISION 0.0 Pars Oil & Gas

More information

DEVELOPMENT AND USE OF SIMULATION TRAINERS FOR PIPELINE CONTROLLERS. D.M. Scott Enbridge Pipe Line Company Edmonton, Alberta, Canada

DEVELOPMENT AND USE OF SIMULATION TRAINERS FOR PIPELINE CONTROLLERS. D.M. Scott Enbridge Pipe Line Company Edmonton, Alberta, Canada IPC2000-254 DEVELOPMENT AND USE OF SIMULATION TRAINERS FOR PIPELINE CONTROLLERS D.M. Scott Enbridge Pipe Line Company Edmonton, Alberta, Canada ABSTRACT Enbridge is in the forefront of development and

More information

National Hydropower Association Operational Excellence Event Report. Environmental

National Hydropower Association Operational Excellence Event Report. Environmental 1) Submitting Organization: Redacted 2) Name of Preparer, Phone & Email: Redacted 3) Report Number (OE Internal Use): To Be Supplied Later 4) Date & Time of Event: 5) Duration of Event: 6) Functional Area:

More information

CUSTOMER SERVICES YOUR PARTNERSHIP WITH THE WORLD LEADER IN INDUSTRIAL GASES

CUSTOMER SERVICES YOUR PARTNERSHIP WITH THE WORLD LEADER IN INDUSTRIAL GASES CUSTOMER SERVICES YOUR PARTNERSHIP WITH THE WORLD LEADER IN INDUSTRIAL GASES Air Liquide Group Air Liquide Engineering & Construction The world leader in gases, technologies and services for Industry and

More information

Integrating Waste Management with Job Hazard Analysis

Integrating Waste Management with Job Hazard Analysis Integrating Waste Management with Job Hazard Analysis Introduction The web-based Automated Job Hazard Analysis (AJHA) system is a tool designed to help capture and communicate the results of the hazard

More information

Employee Falls from Overhead Pipe Rack

Employee Falls from Overhead Pipe Rack Purpose Employee Falls from Overhead Pipe Rack To share lessons learned gained from incident investigations through a small group discussion method format. To understand lessons learned through a Systems

More information

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea Int Conference on Effective Nuclear Regulatory Systems, April 9, 2013, Canada Regulatory Actions and Follow up Measures against Fukushima Accident in Korea Seon Ho SONG* Korea Institute of Nuclear Safety

More information

GUIDELINES FOR INSTALLATION OF ABOVEGROUND DIESEL FUEL TANKS

GUIDELINES FOR INSTALLATION OF ABOVEGROUND DIESEL FUEL TANKS GUIDELINES FOR INSTALLATION OF ABOVEGROUND DIESEL FUEL TANKS Revised 1/1/17 Authority cited: California Fire Code; National Fire Protection Association 30 (NFPA) Flammable and Combustible Liquids Code

More information

Educating System Operators in the New Millennium! Background. Course Level. Target Audience. NERC Continuing Education Hours

Educating System Operators in the New Millennium! Background. Course Level. Target Audience. NERC Continuing Education Hours Background The class will be delivered over a 3-day period. The class is comprised of three training modules covering the areas of: Communications, Critical Thinking, and Restoration. The course consists

More information

MEMORANDUM OF UNDERSTANDING Between UNITED STATES ARMY CORPS OF ENGINEERS And BNSF RAILWAY COMPANY

MEMORANDUM OF UNDERSTANDING Between UNITED STATES ARMY CORPS OF ENGINEERS And BNSF RAILWAY COMPANY MEMORANDUM OF UNDERSTANDING Between UNITED STATES ARMY CORPS OF ENGINEERS And BNSF RAILWAY COMPANY I. Purpose The purpose of this Memorandum of Understanding (MOU) is to establish communication protocols

More information

Long Beach July 2015 Secondary Network Outages RCE. Summary and Report

Long Beach July 2015 Secondary Network Outages RCE. Summary and Report Long Beach July 2015 Secondary Network Outages RCE Summary and Report 1 P age Table of Contents Background... 3 Root Cause... 5 Chronology... 7 Immediate, Interim, and Corrective Actions... 12 Exhibit

More information

EPS 7000 and EPS 8000

EPS 7000 and EPS 8000 EPS 7000 and EPS 8000 Single and Parallel Operation 09/2015 www.schneider-electric.com Legal Information The Schneider Electric brand and any registered trademarks of Schneider Electric Industries SAS

More information

FRCC - PROC - RC - EOP-004. FRCC Disturbance Reporting Procedure

FRCC - PROC - RC - EOP-004. FRCC Disturbance Reporting Procedure FRCC - PROC - RC - EOP-004 FRCC Disturbance Reporting Procedure Revisions Rev. No. Date Description Developed by: Approved by: 1 September 2, 2009 Conversion of RRO Legacy document FRCC Disturbance Reporting

More information

What s On The Horizon: Possible Changes to OSHA s PSM and EPA s RMP Requirements

What s On The Horizon: Possible Changes to OSHA s PSM and EPA s RMP Requirements What s On The Horizon: Possible Changes to OSHA s PSM and EPA s RMP Requirements OCTC Operational Excellence & Sustainability Committee Meeting March 17, 2016 Gary M. Glass (513) 352-6765 Gary.Glass@ThompsonHine.com

More information

Distribution System Optimization Program 101

Distribution System Optimization Program 101 Distribution System Optimization Program 101 How Any Utility Can Participate in the Partnership for Safe Water Distribution System Optimization Program Prepared by William Wankoff PE, BCEE D&B/Guarino

More information

Machine Guarding and Maintenance

Machine Guarding and Maintenance 1. Identification of Workplace Hazard Machine Guarding and Maintenance The exposed moving parts of machinery can cause serious injuries to an employee who is inadvertently caught by the machine. Hazardous

More information

Standard TPL Transmission System Planning Performance Requirements

Standard TPL Transmission System Planning Performance Requirements A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Title Organizational Review LRFP Number 2100.17.01 Project Manager Alan Sorum Submittal Deadline June 17, 2016 Award Announcement July 15, 2016 Submit Proposals to: or Alan Sorum,

More information

Incident Mitigation Management Workshop Recap and To do List Next Steps after Today

Incident Mitigation Management Workshop Recap and To do List Next Steps after Today Incident Mitigation Management Workshop Recap and To do List Next Steps after Today IMM Workshop Team Summary Key Ideas 1. Integrating IMM into Policies Scope Close-coupled to Emergency Plan but risk-driven

More information

SAFETY AND HEALTH PROGRAM ASSESSMENT WORKSHEET

SAFETY AND HEALTH PROGRAM ASSESSMENT WORKSHEET SAFETY AND HEALTH PROGRAM ASSESSMENT WORKSHEET Employer: Consultant: Contact: Date: SIC Code: Number of Employees: Facility Incidence Rates: Lost Workday IR No Lost Workday IR Recordable IR Industry Incidence

More information

Description of Gap or Gaps Use additional rows for each Potential Action.

Description of Gap or Gaps Use additional rows for each Potential Action. API P 1173 5.2 5.3 API P 1173 equirement Has Top Management established and documented the goals and objectives for the PSMS? Has Management documented a process for addressing regulatory and legistlative

More information

Process Safety Management 2008 Update & Review. As if there were safety in stupidity alone. Thoreau

Process Safety Management 2008 Update & Review. As if there were safety in stupidity alone. Thoreau Process Safety Management 2008 Update & Review As if there were safety in stupidity alone. Thoreau PSM A look back to the 90 s OSHA s PSM Standard became effective in 1992. Greatest concern in Meat Industry

More information

Toxic Flammable Gas Release From Rail Car Results in 3 Fatalities

Toxic Flammable Gas Release From Rail Car Results in 3 Fatalities Toxic Flammable Gas Release From Rail Car Results in 3 Fatalities Lessons Learned Volume 03 Issue 23 2004 USW Toxic Flammable Gas Release From Rail Car Results in 3 Fatalities Purpose To conduct a small

More information

ROUND LAKE AREA SCHOOLS DISTRICT 116: LIMITED COMMISSIONING GUIDELINES INTRODUCTION

ROUND LAKE AREA SCHOOLS DISTRICT 116: LIMITED COMMISSIONING GUIDELINES INTRODUCTION INTRODUCTION Commissioning (Cx) is a quality assurance process that works to ensure the design intent of a building is fully realized. It requires a systematic approach to review, verify, and document

More information

Effects of Wide-Area Control on the Protection and Operation of Distribution Networks

Effects of Wide-Area Control on the Protection and Operation of Distribution Networks Effects of Wide-Area Control on the Protection and Operation of Distribution Networks Will Allen Schweitzer Engineering Laboratories, Inc. Published in Wide-Area Protection and Control Systems: A Collection

More information

NEBOSH International Technical Certificate in Oil & Gas Operational Safety

NEBOSH International Technical Certificate in Oil & Gas Operational Safety NEBOSH International Technical Certificate in Oil & Gas Operational Safety UNIT IOG Management of International Oil & Gas Safety Operational Safety Sample Trainer Pack RRC Trainer Packs are designed to

More information

Achieving Reliability-Centered Maintenance and Diagnostics with the PI System

Achieving Reliability-Centered Maintenance and Diagnostics with the PI System Achieving Reliability-Centered Maintenance and Diagnostics with the PI System Darryl Hammond Maintenance Strategies Program Lead Alyeska Pipeline Service Company Nick Wiley Managing Partner, Integration

More information

Employee Burned by Electrical Arc-flash

Employee Burned by Electrical Arc-flash Purpose Employee Burned by Electrical Arc-flash To share lessons learned gained from incident investigations through a small group discussion method format. To understand lessons learned through a Systems

More information

KPMG s Major Projects Advisory Project Leadership Series: Stakeholder Management and Communication

KPMG s Major Projects Advisory Project Leadership Series: Stakeholder Management and Communication KPMG Global Energy Institute KPMG International KPMG s Major Projects Advisory Project Leadership Series: Stakeholder Management and Communication Stakeholder management and communication is critical to

More information

Factory Information Integration and Utilization

Factory Information Integration and Utilization Factory Information Integration and Utilization Prepared by: Pete Larochelle Director of Informatics and Owner - NeoMatrix, Inc. Mark Fehlmann Director of Engineering and Continuous Improvement Madico,

More information

OELG Event Categories

OELG Event Categories OELG Event Categories The table below outlines a proposed set of event categories. These have been developed from the MOD event categories and those used previously by the OELG. The aim of the work has

More information

Are you in control of process safety? Basis of safety assurance can provide the answer

Are you in control of process safety? Basis of safety assurance can provide the answer Loss Prevention Bulletin 231 June 2013 23 Safety practice Are you in control of process safety? Basis of safety assurance can provide the answer Phil Eames Eur Ing BSc CEng FIChemE Eames Risk Consulting

More information

General Electrical Safety Awareness Course: E100

General Electrical Safety Awareness Course: E100 General Electrical Safety Awareness Course: E100 30 minutes No No All "non-qualified" or "unqualified" employees Facility or Plant Management All production personnel Office staff and personnel Any general

More information

SHARING TO BE BETTER Background

SHARING TO BE BETTER Background SHARING TO BE BETTER Background Sharing to be better Under the direction of OLF, a joint industry task force of Operator and Drilling Contractor personnel has been formed to recommend ways to reduce the

More information

Schneider Electric Oil & Gas Liquids Management System

Schneider Electric Oil & Gas Liquids Management System Schneider Electric Oil & Gas Liquids Management System Optimize flow across the entire pipeline Make the most of your energy SM 4 years Schneider Electric LMS provides everything needed to efficiently

More information

12.0 Business Continuity Management

12.0 Business Continuity Management Number 12.0 Policy Owner Information Security and Technology Policy Business Continuity Management Effective 01/01/2014 Last Revision 12/30/2013 Department of Innovation and Technology 12. Business Continuity

More information

CRFA System B BASES

CRFA System B BASES CRFA System B 3.7.2 APPLICABLE SAFETY ANALYSES LCO and 15 ( Refs. 3 and 4, respectively). The isolation mode of the CRFA System is assumed to operate following a DBA. The radiological doses to CRE occupants

More information

Lockout/Tagout. Company Policy

Lockout/Tagout. Company Policy Company Policy Lockout/Tagout is dedicated to the protection of its employees from occupational injuries and illnesses. is responsible for providing a safe working environment and the employees have and

More information

Activplant essentials

Activplant essentials DATASHEET Activplant essentials The toolkit to build your custom MES solution. ActivEssentials the manufacturing operations platform. ActivEssentials lies at the heart of the Activplant solution, where

More information

Larry Strouse Railroad Safety Specialist (HM) Federal Railroad Administration

Larry Strouse Railroad Safety Specialist (HM) Federal Railroad Administration Transportation Technology Center, Inc., a subsidiary of the Association of American Railroads Larry Strouse Railroad Safety Specialist (HM) Federal Railroad Administration Root Cause Analysis 3:00 to 3:30

More information

SOURCE SELECTION PLAN. {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx

SOURCE SELECTION PLAN. {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx SOURCE SELECTION PLAN {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx {INSERT MONTH & YEAR} COORDINATION: Contracting Officer Date IPT Leader

More information

Understanding Internal Controls Office of Internal Audit

Understanding Internal Controls Office of Internal Audit Understanding Internal Controls Office of Internal Audit July 2015 Objectives for this manual Provide guidance to help management understand their responsibility to ensure that internal controls are established,

More information

XSTi Standby UPS. 400VA, 600VA, 800VA Models. User & Installation Manual

XSTi Standby UPS. 400VA, 600VA, 800VA Models. User & Installation Manual XSTi Standby UPS 400VA, 600VA, 800VA Models User & Installation Manual www.xpcc.com 2015. All rights reserved. (Rev 12/14/15) Table of Contents Package Contents... 3 Product Introduction... 3 Product Overview...

More information

LEARNINGS FROM SEVERAL HIGH CHLORINE EVENTS. Raj Mahendrarajah. Coliban Water

LEARNINGS FROM SEVERAL HIGH CHLORINE EVENTS. Raj Mahendrarajah. Coliban Water LEARNINGS FROM SEVERAL HIGH CHLORINE EVENTS Paper Presented by: Raj Mahendrarajah Author: Raj Mahendrarajah, Manager Water Quality Performance, Coliban Water 79 th Annual WIOA Victorian Water Industry

More information

VisiumKMS Industrial. VisiumKMS Operational Risk Management Solution

VisiumKMS Industrial. VisiumKMS Operational Risk Management Solution VisiumKMS Industrial VisiumKMS Operational Risk Management Solution Easily manage changes, assess risks, ensure quality and compliance, and streamline your business process - all from one seamless package.

More information

December Illinois American Water Cross Connection Control Program

December Illinois American Water Cross Connection Control Program December 2007 Illinois American Water Cross Connection Control Program INDEX Page SECTION I PURPOSE..... 1 SECTION II DEFINITIONS..... 3 SECTION III BACKFLOW PROTECTION REQUIREMENTS.....6 SECTION IV BACKFLOW

More information

Regulatory Guide Monitoring the Effectiveness of Maintenance at Nuclear Power Plants

Regulatory Guide Monitoring the Effectiveness of Maintenance at Nuclear Power Plants Regulatory Guide 1.160 Revision 2 Page 1 of 14 Revision 2 March 1997 Regulatory Guide 1.160 Monitoring the Effectiveness of Maintenance at Nuclear Power Plants Publication Information (Draft issued as

More information

EVALUATION OF SAFETY CULTURE IN WANO PRE-STARTUP REVIEWS

EVALUATION OF SAFETY CULTURE IN WANO PRE-STARTUP REVIEWS EVALUATION OF SAFETY CULTURE IN WANO PRE-STARTUP REVIEWS Todd Brumfield World Association of Nuclear Operators (WANO) Atlanta, Georgia, USA ABSTRACT: The requirements for performance of pre-startup reviews

More information

The following definitions apply with regard to requirements specified in this document:

The following definitions apply with regard to requirements specified in this document: GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved

More information

Real-Time Asset Performance in Process Plants ExperTune, Inc. George Buckbee, P.E. ExperTune, Inc.

Real-Time Asset Performance in Process Plants ExperTune, Inc. George Buckbee, P.E. ExperTune, Inc. Real-Time Asset Performance in Process Plants 2007 ExperTune, Inc. George Buckbee, P.E. ExperTune, Inc. Real-Time Asset Performance in Process Plants George Buckbee, P.E., ExperTune Inc. 2007 ExperTune

More information

Imperial Series. Model IMP-425/525/625/825/1000AP IMD-425/525/625/825/1000AP IMP-1025/1200/1500/2000AP IMD-1025/1200/1500/2000AP

Imperial Series. Model IMP-425/525/625/825/1000AP IMD-425/525/625/825/1000AP IMP-1025/1200/1500/2000AP IMD-1025/1200/1500/2000AP Service Manual Imperial Series Model IMP-425/525/625/825/1000AP IMD-425/525/625/825/1000AP IMP-1025/1200/1500/2000AP IMD-1025/1200/1500/2000AP Contents of Service Manual 1. Safety Precautions ------------------------------------------------------------------

More information

Brown University Updated March 11, 2013 Facilities Design & Construction Standards

Brown University Updated March 11, 2013 Facilities Design & Construction Standards SECTION 01 17 90 UTILITY & CRITICAL SYSTEM CONNECTIONS AND INTERRUPTIONS PART 1 - GENERAL 1.1 SUMMARY: A. Brown University operates and maintains extensive campus and building utilities and distribution

More information

The Pig Caddy Advantage

The Pig Caddy Advantage The Pig Caddy automatic launcher and multi-pig receiver makes pigging easy, reliable, safe and efficient increasing the productivity of your pipeline, saving you time and significantly strengthening your

More information

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP VALLEY LATERAL PROJECT RESOURCE REPORT 11 Reliability and Safety FERC Docket No. CP16- -000 November 2015 Section TABLE OF CONTENTS Page 11.0 RELIABILITY AND SAFETY... 11-1 11.1 NATURAL GAS PIPELINE INDUSTRY

More information

FEMA P-1019 Emergency Power Systems for Critical Facilities. ASFPM May 4, 2017 David K Low, PE DK Low & Associates

FEMA P-1019 Emergency Power Systems for Critical Facilities. ASFPM May 4, 2017 David K Low, PE DK Low & Associates FEMA P-1019 Emergency Power Systems for Critical Facilities ASFPM May 4, 2017 David K Low, PE DK Low & Associates FEMA P-1019 FEMA P-1019 A critical facility that is fully compliant with the minimum building

More information

Maintenance Bypass Breaker Cabinet Series Configuration 2. Installation and Operation Manual

Maintenance Bypass Breaker Cabinet Series Configuration 2. Installation and Operation Manual Maintenance Bypass Breaker Cabinet 90881 Series Configuration 2 Installation and Operation Manual 03/13/2012 2 755-00084-C2 R03 Copyright 2012 C&C Power, Inc. All rights reserved. C&C Power, Inc. 395 Mission

More information

POSITION DESCRIPTION

POSITION DESCRIPTION POSITION DESCRIPTION COMPANY: NEWPORT UTILITIES DATE PREPARED: 5/2015 JOB TITLE: OCCUPATIONAL HEALTH, SAFETY, AND SECURITY MANAGER REPORTS TO: GENERAL MANAGER I. PURPOSE OF THE JOB (WHY IS THE JOB PERFORMED?):

More information

UPS Electrical Design and. Installation. critica POWER SUPPLIES

UPS Electrical Design and. Installation. critica POWER SUPPLIES UPS Electrical Design and critica POWER SUPPLIES Installation Important considerations for the electrical design and installation of UPS systems in mission critical applications Where Critical Power applications

More information

C60 Standby UPS. 800VA Models. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved.

C60 Standby UPS. 800VA Models. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved. For more information, visit www.247technology.com/on-line-ups/c60-standby-ups C60 Standby UPS 800VA Models User & Installation Manual 2015. All rights reserved. (Rev 6/23/15) Table of Contents Package

More information

Medium Voltage Service Maintenance and refurbishment

Medium Voltage Service Maintenance and refurbishment Medium Voltage Service Maintenance and refurbishment 2 Service maintenance and refurbishment Brochure Table of contents Maintenance strategies - Concepts...4 Preventative maintenance/testing...6 Preventative

More information

Maintenance Bypass Breaker Cabinet Series Configuration 5. Installation and Operation Manual

Maintenance Bypass Breaker Cabinet Series Configuration 5. Installation and Operation Manual Maintenance Bypass Breaker Cabinet 90881 Series Configuration 5 Installation and Operation Manual 03/13/2012 2 755-00084-C5 R03 Copyright 2012 C&C Power, Inc. All rights reserved. C&C Power, Inc. 395 Mission

More information

Case study of the use of Simatic Batch at Ursus Breweries, Timisoara

Case study of the use of Simatic Batch at Ursus Breweries, Timisoara NJ Walker Systems Automation and Management (SAM) Summary: A new control system based on PCS7 was to be implemented in a brewery in Timisoara, Romania. Due to the client s requirements Simatic Batch was

More information

Implementation of Lessons Learned from Fukushima Accident in CANDU Technology

Implementation of Lessons Learned from Fukushima Accident in CANDU Technology e-doc 4395709 Implementation of Lessons Learned from Fukushima Accident in CANDU Technology Greg Rzentkowski Director General, Power Reactor Regulation Canadian Nuclear Safety Commission on behalf of CANDU

More information

California Resources Corporation. Health, Safety & Environmental Management System

California Resources Corporation. Health, Safety & Environmental Management System California Resources Corporation Health, Safety & Environmental Management System Mission of CRC s HSE Management System The mission of California Resources Corporation s (CRC s) Health, Safety and Environmental

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

Summary of LAKE ONTARIO Policies. 1. Requiring SPC approval: LO SEW 3 LO FUEL 2

Summary of LAKE ONTARIO Policies. 1. Requiring SPC approval: LO SEW 3 LO FUEL 2 Summary of LAE ONTARIO 1. Requiring SPC approval: LO SEW 3 LO FUEL 2 2. Information (editorial, revised, new): LO G 1 (revised) LO NGS 1 (revised) LO G 2 (revised) LO SEW 2 (revised) LO G 6 (revised) LO

More information

Energy Processing for Smart Grid (4.4)

Energy Processing for Smart Grid (4.4) Energy Processing for Smart Grid (4.4) PV Option Charge Transmission lines Synchronize Wind Power Option Charge Controller Storage Technologies PMU Smart Meter Switching Logic James Momoh Howard University

More information

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS SERIES 1 MISCELLANEOUS WATER POLLUTION CONTROL RULES 35-1. General. 1.1. Scope. -- This legislative

More information

Traffic Incident During Refinery Turnaround

Traffic Incident During Refinery Turnaround Traffic Incident During Refinery Turnaround Lessons Learned Volume 02 Issue 04 2004 USW Purpose Traffic Incident During Refinery Turnaround To conduct a small group lessons learned activity to share information

More information

CONTINUITY OF OPERATIONS (COOP) WORKSHEETS

CONTINUITY OF OPERATIONS (COOP) WORKSHEETS CONTINUITY OF OPERATIONS (COOP) WORKSHEETS Martin O Malley, Governor Richard Muth, Director June 2009 Version 2.0 COOP WORKSHEETS These worksheets are tools to help you gather the raw data needed to develop

More information

Years of experience, customized for you.

Years of experience, customized for you. GE Energy Years of experience, customized for you. Industrial Maintenance and Repair Solutions Count on GE Energy Leading companies turn to us for industrial maintenance and repair services. Ours is a

More information

2014 Software Global Client Conference

2014 Software Global Client Conference SS S&T - 03 B The impact of the operator on plant safety Gregor Fernholz DYNSIM Product Manager Mobile App: Please take a moment Check into Session by: Select Detailed Schedule Select the specific session

More information

Structured Approach to Shift Handover Improves Situation Awareness 1

Structured Approach to Shift Handover Improves Situation Awareness 1 Structured Approach to Shift Handover Improves Situation Awareness 1 White Paper Structured Approach to Shift Handover Improves Situation Awareness Brian Thompson, Engen Petroleum, Ltd., and Tom Plocher,

More information

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C 1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100

More information

Steam Valve Locked Out in Wrong Position

Steam Valve Locked Out in Wrong Position Purpose To share lessons learned gained from incident investigations through a small group discussion method format. To understand lessons learned through a Systems of Safety viewpoint. This material was

More information

Main Steam & T/G Systems, Safety

Main Steam & T/G Systems, Safety Main Steam & T/G Systems, Safety Page 1 This steam generator, built for the Wolsong station in Korea, was manufactured in Canada by the Babcock and Wilcox company. In Wolsong 2,3, and 4 a joint venture

More information

RESULTS OF THE GRADUAL UPGRADING AT BOHUNICE WWER - 440/230 NPP

RESULTS OF THE GRADUAL UPGRADING AT BOHUNICE WWER - 440/230 NPP RESULTS OF THE GRADUAL UPGRADING AT BOHUNICE WWER - 440/230 NPP P. Krupa Ingeneer, e-mail: Krupa_Peter@ebo.seas.sk Bohunice NPPs Introduction The centre of upgrading activities in VVER NPP is clearly in

More information

Low Maintenance AC Powered Security Gate

Low Maintenance AC Powered Security Gate AN-9002 IPC Application Note: Low Maintenance AC Powered Security Gate Mechanical Gate components: A typical Security Gate system consists of the gate, a rail or guide system, one or two motors, a cable

More information

Micro Hydroelectricity Installer Skills Assessment

Micro Hydroelectricity Installer Skills Assessment Micro Hydroelectricity Installer Skills Assessment Philip V. Hofmeyer August 2011 Page 1 Overview: This document contains an extensive skills assessment for renewable energy professionals who intend to

More information

TiRack ENERGY STORAGE SYSTEMS. For highest demands in industrial applications

TiRack ENERGY STORAGE SYSTEMS. For highest demands in industrial applications TiRack ENERGY STORAGE SYSTEMS For highest demands in industrial applications Lithium-titanate technology of a new standard Benefit from unprecedented cell qualities The heart of any storage device is the

More information

Kansas Rural Transit ITS Deployment

Kansas Rural Transit ITS Deployment Kansas Rural Transit ITS Deployment Evaluation Prepared for the ENTERPRISE Pooled Fund Study January, 2008 Table of Contents 1. Introduction... 1 2. Evaluation Goals... 1 3. Deployed Transit Systems...

More information

Best Practices for all Elevators and Escalators in British Columbia

Best Practices for all Elevators and Escalators in British Columbia Best Practices for all Elevators and Escalators in British Columbia Duties of the BC Safety Authority: Issue annual operating permits. Issue contractors licenses. And approve qualification of contractors.

More information

BASF Corporation Safety & Loss Prevention Manual

BASF Corporation Safety & Loss Prevention Manual TABLE OF CONTENTS Environmental Protection, Health & Safety Policy - BC032 Preface.. Page i Introduction. 2 1. Management Commitment and Support.. 2 2. Responsibility, Authority and Accountability 3 3.

More information

Twisted Ankle Injury

Twisted Ankle Injury Purpose To share lessons learned gained from incident investigations through a small group discussion method format. To understand lessons learned through a Systems of Safety viewpoint. This material was

More information