USE OF A SIMULATION MODEL TO IMPROVE THE MANUAL OPERATION PROCEDURES OF AN IRRIGATION CANAL (KIRINDI OYA - SRI LANKA)

Size: px
Start display at page:

Download "USE OF A SIMULATION MODEL TO IMPROVE THE MANUAL OPERATION PROCEDURES OF AN IRRIGATION CANAL (KIRINDI OYA - SRI LANKA)"

Transcription

1 USE OF A SIMULATION MODEL TO IMPROVE THE MANUAL OPERATION PROCEDURES OF AN IRRIGATION CANAL (KIRINDI OYA - SRI LANKA) Jacques REY 1 Pierre-Olivier MALATERRE 2 - Jean-Pierre BAUME 3 SUMMARY Following a presentation of the operational challenges faced by the canal managers, the use of a simulation model to improve the manual operation procedures of an irrigation canal is detailed. The pilot field site for this IIMI-CEMAGREF collaboration is the Kirindi Oya Right Bank Main Canal (Sri Lanka). The simulation model RBMC is a fully interfaced hydrodynamic model solving complete Saint-Venant equations. Its first applications provided detailed information on canal behaviour and a diagnosis on the present manual operation procedures. Its integration in a broader Management Information System provided canal managers with a decision-support package helping them to improve operational procedures. These improvements contributed to increase the water use efficiency. INTRODUCTION Various types of mathematical models have been developed during the past 20 years to improve the water management of irrigation systems. Most of them were used by specialists to design irrigation canals, compute crop requirements or test operational procedures. Nevertheless, except for simple water allocation models, few of them were successfully integrated in the real operational management process of irrigation agencies at the field level. High data requirements, and lack of 1 : Associate Irrigation specialist - International Irrigation Management Institute (IIMI, Sri Lanka) 2 : Research Engineer - Irrigation Division, Centre National du Machinisme Agricole du Génie Rural des Eaux et des Forêts (CEMAGREF, Montpellier, France) 3 : Research Engineer - Irrigation Division, CEMAGREF (Montpellier, France) 1

2 dedicated user interfaces were the main weaknesses that undermined many attempts for transferring these computer tools to the end users. In 1987, a collaborative activity was initiated between IIMI 1 and CEMAGREF 2, to prospect the possibility of providing irrigation canal managers with a decision support tool likely to help them to better understand the hydraulic functioning of their systems. The Kirindi Oya Right Bank Main Canal in southern Sri Lanka was selected as the pilot field site. This paper presents the main phases of this project. The first phase consisted mainly in the development of a mathematical model called RBMC 4 that integrates hydrodynamic simulation models. During the second phase, simulations done with RBMC provided information on canal behaviour and helped in diagnosing weaknesses in current operational procedures. Additional modules were then developed to better integrate RBMC as a support tool in the decision-making process of the canal managers. 1 OPERATIONAL CHALLENGES The Kirindi Oya Right Bank Main Canal is a 30 km long earthen canal. Its design head discharge is about 10 m 3 s -1, its bed width varies from 10 m to 3 m and its average slope is 35 cm per km. The water levels are maintained all along the canal by means of 18 gated cross regulators. Water is delivered to the secondary network through 42 gated offtakes structures. The command area of the canal amounts to 3,300 hectares. It is divided into 5 subdivisions called tracts, each varying from 500 to 1,000 hectares. The water storage at the head is ensured by the Lunugamvehera reservoir, whose capacity is 200 MCM 5. This reservoir supplies water to another main canal (left bank) increasing the total command area of the irrigation system to approximately 10,000 hectares. Due to a severe hydrological deficit in the area, the irrigation agency in charge of the scheme finds it difficult to ensure a cropping intensity higher than 100 %. Even if, during the 4 Right Bank Main Canal 5 Million cubic meters. 2

3 wet season or Maha (from October to March), most of the command area is under cultivation, it is difficult to ensure adequate water deliveries during the dry season or Yala (from April to August). As a response to the water scarce conditions, diversified cropping patterns were promoted in order to progressively replace paddy cultivation with crops less demanding in water, on the well drained soils of the command area. The consequent water delivery patterns require more sophisticated operational plans (intermittent irrigation). Thus, reinforcing water conservation practices at the main canal level while experiencing new operational scenarios became a challenging concern for the Kirindi Oya canal managers. 2 USE OF SIMULATION MODELLING FOR DIAGNOSIS PURPOSES 2.1 Description of RBMC Two main parts of the terms of reference of the RBMC simulation model were the detailed description of the physical system (canal geometry, offtake and cross regulators, etc.) and the computation of hydraulic variables (discharge, water elevation, flow velocity, etc.) under both steady and unsteady flow conditions. Three CEMAGREF programs (TALWEG, FLUVIA and SIRENE) available on mainframe computers were used to design RBMC. The latter is therefore divided into three units: - the Topography unit checks the inputted topographic data of the canal and generates the data files used by the other two units; - the Steady Flow unit calculates the water surface profile as well as the offtake and cross regulator gate openings for any set of water demands; - the Unsteady Flow unit simulates the flow conditions in the canal after modifications of internal and external boundary conditions: gate settings, water 3

4 inflows and outflows. Thus, before implementing a new operational procedure in the field, the user can evaluate its likely consequences on the system. A major component of the project was the development of a user-friendly interface for non-specialised personnel from IIMI and ID 6. On-line help is available and data input is fully interactive. Through data editors, users give all the required information for the hydraulic computation. Graphic and tabulated outputs are designed to provide operational assistance to the canal managers. In particular four indicators are computed at each offtake in order to assess the distribution efficiency and timeliness. RBMC's features and outputs meet the needs of different types of users with various interests in using the model, and different levels of practical experience and theoretical knowledge in hydraulics. The user interface handles all the features of the simulation model, managing spatial and temporal information. Modules linked to the unsteady flow unit allow the simulation of any operational rules (either manual or automatic) at moving structures (main sluice, cross regulators, offtakes), as described in the next chapter. 2.2 Simulation of manual operation After calibration of RBMC, IIMI and CEMAGREF used it to study design and operational issues, together with the canal managers. Maximum capacity, overtopping locations (Sally, ) and influence on water deliveries of water fluctuations in the main canal (Malaterre, 1989) were identified. RBMC was also used to simulate and analyse manual operations, and compare theoretical and real procedures (Malaterre, 1989 and Rey, 1990). The first step was to observe the gate keepers and to understand the cross regulators and offtakes operation. Previous reports and studies were analysed, and data were collected by IIMI through data loggers in The number and frequency of operations as well as the magnitude of oscillations of the water surface in the main canal were determined through simple monitoring 6 Irrigation Department of Sri Lanka 4

5 performed by IIMI during the Yala (or dry) season in This information was completed by field visits in subsequent seasons. Data collection focused especially on the method used to evaluate the magnitude of the operation at the cross regulators in order to be able to simulate it on RBMC. This information was gathered through discussions with the operators and direct measurements at the regulators. Finally, for each cross regulator, the following parameters were determined: - frequency of operation, - duration of an operation, - the time at which work begins, - duration of a working day, - water elevation margin around the target, - maximum and minimum opening and closing during one operation, These parameters and additional rules were introduced in a regulation module linked to the Unsteady Flow unit. This module was tested on several scenarios identified as problems faced by the canal managers. One of them is the transition between two steady states (for example an increase of the main sluice discharge). Simulations proved that the time required for stabilisation was around 2 days, which was confirmed by field observations. Such a long duration was shown to be due mainly to mutual interactions between adjacent cross regulators (1 cross regulator every 1.5 km). Lack of information between gate keepers disturbed operations at regulators and final gate positions were attained only after a long trial and error procedure. New gate positions and optimum time for adjustment can be computed with RBMC. With this improved procedure, the new steady state can be reached much faster (less than one day) and with less operations than with the present practices. These first applications of the simulation model increased the knowledge on the operational procedures performed on the canal. RBMC highlighted problems and difficulties encountered by the canal managers and provided a diagnosis on the canal management (operation but also maintenance and design). Nevertheless, to become operational, RBMC itself is not sufficient. New data, communication flows and processes have to be introduced in the decision-making process. 5

6 3. A DECISION SUPPORT PACKAGE 3.1 Which management intervention? Based on the operational challenges faced by the system, and on the problems of manageability created by uncoordinated operations, an intervention aimed at rationalising the decision-making process at the main canal level was envisaged in Kirindi Oya. As mentioned previously, the driving motivation for improvement was clearly identified as the need for efficient management of an extremely scarce water resource. Under such conditions, key areas of potential improvements concern both the planning stage (choice of crops and cultivation calendar) and the operational stage (water application methods at the field level, water conveyance and distribution management). Among those, main canal management was identified as a critical factor in performance deficiencies and became the focus of the joint intervention by the ID, IIMI and CEMAGREF. 3.2 Identification of performance drivers To study the decision-making process at the main canal level, the quality of the communication system between the field staff and the canal managers, the indicators used as management signals, and the decision-making rules and procedures had to be assessed. This diagnosis was thus articulated around three main questions: Are management decisions based on reality? The actual deliveries at the head of the secondary canals were insufficiently controlled by the manager, due to the lack of measurements and communication along the canal and water wastage occurred by high reaction time lag. Thus, providing him with a timely and reliable "picture" of his system was identified as a prerequisite condition of management improvement. Are management decisions based on performance analysis? Under water scarce conditions, a key indicator lies simply in the computation at regular intervals of the volume delivered to the different secondary canals. The 6

7 maintenance of a small database permitting easy access to this indicator (and potentially others) appeared as an interactive means to promote an optimisation attitude at the decision-making stage. Is the logic of management decisions technically sound? The hydraulic behaviour of open channel systems with cross regulators is sometimes far from intuitive and requires a fairly long experience to be completely mastered. In order to be performed efficiently, critical phases of operational management (implying changes of the main discharge) required additional procedures. Operational plans, created by simple decision support modules, were tested with RBMC. This diagnosis phase did not address the issue of suitability of the hardware (modernisation and rehabilitation) and deliberately concentrated on potential improvements by a better management of the existing system. 3.3 Suggested Management Information System (MIS) Following the previous recommendations, a frequent data collection system and communication network were created and are currently being used. Essentially, basic data on water levels and gate openings are collected at all structures operated along the main canal, including gated regulators and offtakes. These data are recorded twice a day by the gate keepers and summarised in a standard format which is handed over on the same day to the canal manager. These new data are converted into discharges, displayed in the manager's office on a board and stored in a computerised database. The complete set of messages presently in use in Kirindi Oya is presented in Figure 1. The boards display the discharges at the offtakes (in cusecs) stimulating timely control of deliveries. The charts summarise the cumulative volumes (in feet) issued at the offtakes, per tract and for the whole canal, focusing the attention of the manager on the key strategic objective of water use efficiency. 7

8 Field Books Field Books Main Sluice Issues Water Levels HYDRAULICS M INSTRUCTIONS Gate Operations Main Sluice Issues Offtakes - Discharges - Instructions Board (Canal Manager Office) Boards (Field Offices) I Regulators - Guidelines Cultivated Area SCHEDULING S EVALUATION Tract Level Charts (Field Offices) Water Allocation Main Canal Level Charts (Canal Manager Office) Figure 1 - Management Information System Messages This database reflects the information conveyed by the messages and comprises data on canal structures and topography, hydraulic trajectories at the structures (levels, openings, discharges) and some contextual information (areas cultivated, rainfall). Parallel to this first set of activities, the interface between the previous database, hydraulic modules (spreadsheets) and RBMC were developed to allow further improvements in the decision-making process. These modules provide the manager with guidelines for better understanding the hydraulic functioning of the canal, in order to prepare coordinated operational plans at the cross regulators when needed (rotations among tracts, rainfall, start of issues) and test these plans prior to implementation. 4. PRELIMINARY RESULTS IN KIRINDI OYA 4.1 Strengthening of monitoring activities The first part of the management intervention recommendation (introduction of a communication system and of a database) was implemented during the 1991/92 wet season in Kirindi Oya. As a result of new monitoring activities, water distribution at the offtakes was roughly looked into by the manager on a daily basis and control 8

9 actions were performed to conserve water whenever possible. Though difficult to link exclusively to the management intervention, a significant reduction of water consumption was observed during this season (0.2 m on average). At the same time, interviews at the field level revealed an increased accountability of field staff and easier operating tasks due to the greater responsiveness of the manager to the measured field conditions. In addition to the main objective of providing the manager with a daily picture of water deliveries and regularly computing water consumption, the data collection system and associated database permitted a dramatic increase in the available knowledge on the canal hydraulic functioning, as illustrated below. For example, a systematic study of all steady flow periods occurring in the different reaches of the canal during the season was performed. A reach is considered under steady flow conditions when no significant changes in its inflow and outflow discharges, and upstream and downstream water levels occur during hydraulically representative period of time. Table 1 shows that the usual canal flow conditions were unsteady throughout the season: Table 1 - Steady flow periods REACHES (from Dam to Tail-end) NUMBER OF STEADY FLOW PERIODS (in 19 weeks) TOTAL DURATION OF STEADY FLOW PERIODS (Hours) % TIME OF STEADY FLOW PERIODS A second field of investigation was the hydraulic functioning of the different structures (cross regulators and offtakes) and their related achievement with regard to water delivery targets. For this purpose, a set of 6 indicators was systematically computed for all offtakes along the canal: 9

10 Three performance indicators: P1, P2 and P3. These indicators (Molden and Gates, 1990) explicitly take into account the targets formulated by the manager in terms of water deliveries. P1: measure of adequacy (indicative of the notion "enough supply"), P2: measure of efficiency (indicative of the notion "no waste"), P3: dependability (indicative of the notion "timeless of the deliveries"). Three descriptive indicators: D1, D2 and D3. These indicators aim at describing hydraulic behaviour at the structures without explicit reference to managers' targets. D1: total number of gate adjustments performed at a given structure, D2: average submergence at the structure (ratio of the downstream level over the upstream level), D3: average level fluctuation upstream of the structure (standard deviation of the upstream level). The set of performance indicators was first used to detect weaknesses in the water delivery process. The quality of water deliveries at one structure is highly dependent on its location along the canal and on the capabilities of field staff in charge of operating it. Discriminating amongst the different structures according to their achievement with regard to common objectives such as adequacy, efficiency and reliability of water deliveries is of great importance to ensure proper management control. For each of the three performance indicators, structures were separated in three groups: values below, equal to, or above the average, and received respectively the flag number -1, 0, and +1 (Cf. Table 2, e.g. for 5 structures). For further comparison, three main categories were finally created according to the value of the sum of the flags. Structures presenting a good water delivery profile could then be separated from those where problems occurred in meeting their targets during the season. Following the same approach, structures were classified according to their values of the descriptive indicators (Cf. Table 3, e.g. for 6 structures). In the process of diagnosing the potential difficulties faced by field staff at the implementation stage, simple information concerning the hydraulic conditions at the structures is useful. A 10

11 structure is considered as operating well if few operations are done, the degree of submergence is low, and few fluctuations of upstream water level occur. Table 2 - Flags according to performance indicators Tract Structure 7 P1 (Adequacy) P2 (Efficiency) P3 (Dependability) Summary 3 FC DC1A DC1B DC FC Tract Structure D1 (N Operations) Table 3 - Flags according to descriptive indicators D2 (Submergence) D3 (Level fluctuations) Summary 4 FC DC F DC DC FC This set of flags helps the manager in focusing his attention to critical structures of his system and eases his diagnosis. There is no general correlation between the delivery performance and hydraulic functioning of the offtakes as defined by our flags. The full set of 6 indicators is necessary to formulate an accurate diagnosis at one particular structure. 7 FC: Field channel - DC: Distributory canal 11

12 4.2 Gradual test of decision support modules Once the functioning of the canal system is known accurately and in a timely fashion, coordinated operational decisions can be studied. The objective presently pursued in Kirindi Oya, in the second part of the management intervention, is to test and gradually introduce optimisation procedures supported by the RBMC simulation model. This approach is currently tested during the 1992/93 wet season. Simple hydraulic information concerning the water volumes needed to fill certain reaches of the canal, the approximate time lags and diffusion along the canal are provided through spreadsheets to the canal manager who can utilise them to interactively design draft operational plans. Previous records of gate operations stored in the database can also be retrieved to support his decisions with past experiences. Once finalised, the plan consisting of a sequence of operations at the structures can be tested and evaluated through the RBMC simulation model. If considered satisfactory, the plan forms the basis for the implementation guidelines transmitted to the field staff; if not, the decision maker can revise it according to the weaknesses detected in the simulation results and re-test it as many times as needed. This optimisation process is only recommended for typical difficult phases of operational management. This approach is expected to gradually improve the managers' knowledge and confidence about the manageability of his system and dramatically speed up the learning process in case of a new engineer taking over the canal supervision. CONCLUSIONS The problems faced in operational water management are relatively well-known and various tools can be designed to assist managers of irrigation systems. Technical improvements have to be introduced with a full awareness of the existing management context. This involves a careful diagnosis of the field situation and usually leads to the design of a management intervention package instead of the introduction of a single, isolated tool. A real problem remains the gap which usually exists between the communication and measurement facilities of a system and the data requirements of many decision support tools. 12

13 In Kirindi Oya, a gradual approach, involving the upgrading of the data collection and communication system, the introduction of a simple computerised database and a flow simulation model, has been recommended to improve water use efficiency at the main canal level. The research program is still on-going but the first results indicate that this approach is most likely to be validated. REFERENCES BAUME J.P., CERTAIN F., MALATERRE P.O., REY J., SALLY H. "Utilisation d'un modèle informatique hydraulique pour améliorer la gestion des canaux d'irrigation. Application au canal de Kirindi Oya (Sri Lanka)", CIID Budapest - June 1992 CEMAGREF "RBMC Theoretical concepts and User's guide"- Internal report, Irrigation Division, CEMAGREF Montpellier, 1990 IIMI "Hydraulic modelling of a main canal system: The next best thing to buying a canal", IIMI Review, Vol. 2 n 2 - August 1988 MALATERRE P.O. "A study of the Kirindi Oya RBMC operations through an application of a mathematical flow simulation model: prospect of improving performance", CEMAGREF / ENGREF / IIMI - ENGREF internal report, October 1989 MOLDEN, GATES. Journal of Irrigation and drainage engineering - Vol. 116, N 6 Nov./Dec REY J. "Field application of the Kirindi Oya RBMC simulation model", Internal Report, ENGREF Paris - August 1990 BAUME J.P., SALLY H., MALATERRE P.O., REY J., "Development and fieldinstallation of a mathematical simulation model in support of irrigation canal management", Research paper IIMI/CEMAGREF

Operational Behaviour of Hydraulic Structures in Irrigation Canals in Sri Lanka G.G.A. Godaliyadda 1*

Operational Behaviour of Hydraulic Structures in Irrigation Canals in Sri Lanka G.G.A. Godaliyadda 1* Operational Behaviour of Hydraulic Structures in Irrigation Canals in Sri Lanka G.G.A. Godaliyadda 1* 1 IESL College of Engineering, Colombo, Sri Lanka. *E-mail: godali1952@gmail.com, TP+94718008174 Abstract:

More information

Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand

Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand Tawatchai Tingsanchali* School of Civil Engineering, Asian Institute of Technology, P.O.Box

More information

Institutionalizing Agricultural Water Management at Local Level in Sri Lanka What have we learn?

Institutionalizing Agricultural Water Management at Local Level in Sri Lanka What have we learn? Institutionalizing Agricultural Water Management at Local Level in Sri Lanka What have we learn? Eng.(Mrs) K.R.S.Perera Ministry of Agriculture Development & Agrarian Services Sri Lanka. Out Line of the

More information

Phase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility. Hydraulic Modeling Software Selection

Phase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility. Hydraulic Modeling Software Selection DRAFT Technical Memorandum Phase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility Hydraulic Modeling Software Selection Prepared for: City of Newport Public Works Department 70 Halsey Street Newport,

More information

Mapping the management units

Mapping the management units 117 Chapter 11 Mapping the management units Medium to large irrigation systems usually serve thousands of users. Therefore, there needs to be an efficient organization and sharing of responsibility between

More information

Steady and Unsteady Simulation of Lower Bari Doab Canal using SIC Model

Steady and Unsteady Simulation of Lower Bari Doab Canal using SIC Model Pak. J. Engg. & Appl. Sci. Vol. 12, Jan., 2013 (p. 60-72) Steady and Unsteady Simulation of Lower Bari Doab Canal using SIC Model Mazhar Hussain 1, Abdul Sattar Shakir 2 and Noor Muhammad Khan 3 1. Ph.D.

More information

Essential water delivery policies for modern on farm irrigation management

Essential water delivery policies for modern on farm irrigation management Essential water delivery policies for modern on farm irrigation management C.M. Burt, Irrigation Training and Research Center, Department of Agricultural Engineering, California Polytechnic State University,

More information

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA S. Masood Husain Nitya Nand Rai Director Assistant Director Foundation Engineering & Special Analysis Directorate Central

More information

Multiple Uses of Water in the Kirindi Oya Irrigation System, Sri Lanka'

Multiple Uses of Water in the Kirindi Oya Irrigation System, Sri Lanka' Multiple Uses of Water in the Kirindi Oya Irrigation System, Sri Lanka' Margaretha Bakker ABSTRACT As water scarcity in the world intensifies, there will be an increasing pressure to transfer water from

More information

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

Irrigation Infrastructure Management by Public Funds: How It Can Be Made Justifiable

Irrigation Infrastructure Management by Public Funds: How It Can Be Made Justifiable Irrigation Infrastructure Management by Public Funds: How It Can Be Made Justifiable Namalee Madawalagama (engineer) and Badra Kamaladasa (engineer) Irrigation Department, Colombo, Sri Lanka Introduction

More information

Water distribution within the canal network

Water distribution within the canal network Structures for water control and distribution 15 Chapter 4 Water flowing in a secondary irrigation canal can be divided over the tertiary canal network in several ways. One way is to divide the flow proportionally

More information

PERFORMANCE EVALUATION OF IRRIGATION SCHEMES TO IMPROVE LAND & WATER PRODUCTIVITY: A CASE STUDY OF RAJANGANA IRRIGATION SCHEME IN SRI LANKA

PERFORMANCE EVALUATION OF IRRIGATION SCHEMES TO IMPROVE LAND & WATER PRODUCTIVITY: A CASE STUDY OF RAJANGANA IRRIGATION SCHEME IN SRI LANKA PERFORMANCE EVALUATION OF IRRIGATION SCHEMES TO IMPROVE LAND & WATER PRODUCTIVITY: A CASE STUDY OF RAJANGANA IRRIGATION SCHEME IN SRI LANKA S M D L K De Alwis 1 and N T S Wijesekera 2 ABSTRACT The Present

More information

Address for Correspondence

Address for Correspondence Research Paper DYNAMIC FLOOD ROUTING AND UNSTEADY FLOW MODELLING: A CASE STUDY OF UPPER KRISHNA RIVER 1 Doiphode Sanjay L* 2 Oak Ravindra A. Address for Correspondence 1 M tech Student, Bharati Vidyapeeth

More information

HYDRODYNAMIC SIMULATION OF SURFACE WATER CONTROL SLUICE GATES BY HEC-RAS MODEL

HYDRODYNAMIC SIMULATION OF SURFACE WATER CONTROL SLUICE GATES BY HEC-RAS MODEL nd International Conference - Water resources and wetlands. - September, 04 Tulcea (Romania); Available online at http://www.limnology.ro/water04/proceedings.html Editors: Petre Gâştescu ; Włodzimierz

More information

MODERNIZATION OF IRRIGATION SCHEMES THROUGH TRAINING OF WATER USER ASSOCIATIONS IN THE RAPID INTERVENTION PROGRAM

MODERNIZATION OF IRRIGATION SCHEMES THROUGH TRAINING OF WATER USER ASSOCIATIONS IN THE RAPID INTERVENTION PROGRAM MODERNIZATION OF IRRIGATION SCHEMES THROUGH TRAINING OF WATER USER ASSOCIATIONS IN THE RAPID INTERVENTION PROGRAM Guy Fipps 1 and Gabriele Bonaiti 2 ABSTRACT The Rapid Intervention Program (RIP) is unique

More information

Numerical Simulation of Flood Routing in Complex Hydraulic Schemes. The Routing System Computer Program

Numerical Simulation of Flood Routing in Complex Hydraulic Schemes. The Routing System Computer Program Numerical Simulation of Flood Routing in Complex Hydraulic Schemes. The Routing System Computer Program JEROME DUBOIS JEAN-LOUIS BOILLAT Laboratory of Hydraulic Constructions, LCH, Swiss Federal Institute

More information

VII - WATER CONTROL PLAN

VII - WATER CONTROL PLAN VII - WATER CONTROL PLAN 7-01. General Objectives. Regulation of Saylorville Lake in conjunction with Lake Red Rock provides flood control benefits along both the Des Moines and Mississippi Rivers. Additionally,

More information

Review of Hydrological Potential in Combined Gin and Nilwala River Basins of Sri Lanka

Review of Hydrological Potential in Combined Gin and Nilwala River Basins of Sri Lanka Review of Hydrological Potential in Combined Gin and Nilwala River Basins of Sri Lanka A.V.D.Fernando 1, L.S.Sooriyabandara 2 and G.H.A.C.Silva 1 1 Department of Civil and Environmental Engineering, Faculty

More information

K.P.S.T. Pathirana, R.M.A. De S. Thanapathy and K.D.W. Nandalal

K.P.S.T. Pathirana, R.M.A. De S. Thanapathy and K.D.W. Nandalal ENGINEER - Vol. L, No. 02, pp. [11-19], 2017 The Institution of Engineers, Sri Lanka River Basin Modelling for Optimum Water Usage: Uma Oya Downstream Development Area K.P.S.T. Pathirana, R.M.A. De S.

More information

USE OF GABIONS IN SMALL HYDRAULIC WORKS

USE OF GABIONS IN SMALL HYDRAULIC WORKS USE OF GABIONS IN SMALL HYDRAULIC WORKS SECTION 1 SITE SELECTION FOR SMALL DAMS Table of Contents 1.1 CLASSIFICATION ACCORDING TO USE... 2 1.2 CLASSIFICATION BY HYDRAULIC DESIGN (site and basin requirements)...2

More information

CHAPTER SIX PROBLEMS OF SMALL-SCALE IRRIGATION DEVELOPMENT AND MANAGEMENT SYSTEM

CHAPTER SIX PROBLEMS OF SMALL-SCALE IRRIGATION DEVELOPMENT AND MANAGEMENT SYSTEM CHAPTER SIX PROBLEMS OF SMALL-SCALE IRRIGATION DEVELOPMENT AND MANAGEMENT SYSTEM This section of the study paid a particular attention to the assessment of small scale irrigation management activities

More information

Innovative testing of advanced PLCs of sewage water pumping stations

Innovative testing of advanced PLCs of sewage water pumping stations Innovative testing of advanced PLCs of sewage water pumping stations Ivo Pothof, Kees Kooij Industrial Flow Technology, WL Delft Hydraulics P.O. Box 177 2600 MH Delft, The Netherlands ivo.pothof@wldelft.nl,

More information

FLOOD INUNDATION ANALYSIS FOR METRO COLOMBO AREA SRI LANKA

FLOOD INUNDATION ANALYSIS FOR METRO COLOMBO AREA SRI LANKA FLOOD INUNDATION ANALYSIS FOR METRO COLOMBO AREA SRI LANKA Mohamed Mashood Mohamed Moufar* (MEE 13633) Supervisor: Dr. Duminda Perera**, ABSTRACT The canal network in Metro Colombo area in Sri Lanka, initially

More information

CHAPTER 2. Objectives of Groundwater Modelling

CHAPTER 2. Objectives of Groundwater Modelling CHAPTER 2 Objectives of Groundwater Modelling In the last two decades mathematical modelling techniques have increasingly proved their value in furthering the understanding of groundwater systems and,

More information

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire May 4, 2010 Name of Model, Date, Version Number Dynamic Watershed Simulation Model (DWSM) 2002

More information

1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER

1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER 1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER 1.1 Introduction The Hydrologic Model of the Upper Cosumnes River Basin (HMCRB) under the USGS Modular Modeling System (MMS) uses a

More information

APPLICATION OF 1-D HEC-RAS MODEL IN DESIGN OF CHANNELS

APPLICATION OF 1-D HEC-RAS MODEL IN DESIGN OF CHANNELS APPLICATION OF 1-D HEC-RAS MODEL IN DESIGN OF CHANNELS Darshan J. Mehta * Mr. Manthan Ramani Mr. Maulik Joshi Asst. Prof., CED, S.S.A.S.I.T, Surat U.G, Student, CED, S.S.A.S.I.T, Surat U.G, Student, CED,

More information

Module 2 Measurement and Processing of Hydrologic Data

Module 2 Measurement and Processing of Hydrologic Data Module 2 Measurement and Processing of Hydrologic Data 2.1 Introduction 2.1.1 Methods of Collection of Hydrologic Data 2.2 Classification of Hydrologic Data 2.2.1 Time-Oriented Data 2.2.2 Space-Oriented

More information

Development of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring

Development of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring Development of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring Prepared for: Urban Drainage and Flood Control District 2480 W. 26 th Avenue Suite 156-B Denver, CO 80211 May 19, 2006 (Rev

More information

Analysis of Side Sluice in Trapezoidal Channel

Analysis of Side Sluice in Trapezoidal Channel Analysis of Side Sluice in Trapezoidal Channel Dr. L. G. Patil 1, Amol M. Kode 2 1 Associate Professor, Department of Civil Engineering, SGGSIE&T, Nanded 2 M. Tech Student, Department of Civil Engineering,

More information

2

2 1 2 3 4 5 6 The program is designed for surface water hydrology simulation. It includes components for representing precipitation, evaporation, and snowmelt; the atmospheric conditions over a watershed.

More information

Improving whole farm and infield irrigation efficiencies using Irrimate TM tools

Improving whole farm and infield irrigation efficiencies using Irrimate TM tools Improving whole farm and infield irrigation efficiencies using Irrimate TM tools Steven Raine 1,2, Jim Purcell 3 and Erik Schmidt 1,2 1 National Centre for Engineering in Agriculture, University of Southern

More information

Before 1990, roughly 116 wastewater

Before 1990, roughly 116 wastewater F W R J Going Beyond Steady-State Wastewater System Modeling in Sarasota County: A Case for Extended-Period Simulation Christopher C. Baggett, Fatih Gordu, Roberto A. Rosario, and Christopher B. Cole Before

More information

GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS

GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS Darshan Mehta 1, Raju Karkar 2, Lalji Ahir 3 Assistant Professor, CED, S.S.A.S.I.T, Surat, Gujarat, India

More information

Modeling and Simulation of Irrigation Canals with Hydro Turbines

Modeling and Simulation of Irrigation Canals with Hydro Turbines Modeling and Simulation of Irrigation Canals with Hydro Turbines S Mohan Kumar Scientist, Department of Research, ABB Global Industries and Services Ltd Bangalore, India * mohan.s.kumar@in.abb.com (corresponding

More information

Development of Probability Based Rule Curves for a Reservoir

Development of Probability Based Rule Curves for a Reservoir Kasetsart J. (Nat. Sci.) 37 : 234-242 (2003) evelopment of Probability Based Rule Curves for a Reservoir Varawoot Vudhivanich and Areeya Rittima ABSTRACT The probability based rule curves were developed

More information

DRAINAGE OF IRRIGATED LANDS

DRAINAGE OF IRRIGATED LANDS CVE 471 WATER RESOURCES ENGINEERING DRAINAGE OF IRRIGATED LANDS Assist. Prof. Dr. Bertuğ Akıntuğ Civil Engineering Program Middle East Technical University Northern Cyprus Campus CVE 471 Water Resources

More information

Unsteady-Flow Modeling for Emergency Shutdown of the CAP Canal

Unsteady-Flow Modeling for Emergency Shutdown of the CAP Canal Utah State University DigitalCommons@USU International Symposium on Hydraulic Structures Jun 29th, 1:30 PM - 3:30 PM Unsteady-Flow Modeling for Emergency Shutdown of the CAP Canal Bert Clemmens bclemmens@westconsultants.com

More information

Groundwater modelling to assess the effect of interceptor drainage and lining

Groundwater modelling to assess the effect of interceptor drainage and lining Irrigation and Drainage Systems (2006) 20: 23 40 C Springer 2006 Groundwater modelling to assess the effect of interceptor drainage and lining Example of model application in the Fordwah Eastern Sadiqia

More information

THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED

THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED Mark Pennington, Engineer, Pattle Delamore Partners Ltd, Tauranga ABSTRACT The Rational Method has been in use in some form or another at least since

More information

What s so hard about Stormwater Modelling?

What s so hard about Stormwater Modelling? What s so hard about Stormwater Modelling? A Pugh 1 1 Wallingford Software Pty Ltd, ann.pugh@wallingfordsoftware.com Abstract A common misconception of stormwater modelling is that it is simple. While

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH-Y Regulation No. 1110-2-1464 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDROLOGIC ANALYSIS OF WATERSHED RUNOFF Distribution Restriction

More information

1.6 Influence of Human Activities and Land use Changes on Hydrologic Cycle

1.6 Influence of Human Activities and Land use Changes on Hydrologic Cycle 1.6 Influence of Human Activities and Land use Changes on Hydrologic Cycle Watersheds are subjected to many types of changes, major or minor, for various reasons. Some of these are natural changes and

More information

Development of a decision support tool: Preliminary analysis to improve field data collection in Kathiraveli Village, Sri Lanka

Development of a decision support tool: Preliminary analysis to improve field data collection in Kathiraveli Village, Sri Lanka 17 Development of a decision support tool: Preliminary analysis to improve field data collection in Kathiraveli Village, Sri Lanka Tom Le Cerf Engineers Without Borders Australia, Melbourne Tom.lecerf@hotmail.com

More information

ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT

ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT H A E S T A D M E T H O D S ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT F i r s t E d i t i o n Table of Contents Preface Continuing Education Units About the Software xv xix xxi Chapter 1 Introduction

More information

C. Seago 1, L.C. Hattingh 1, B. Mwaka 2, R. Cai 2, F. Botha 2. 1 Introduction. Abstract

C. Seago 1, L.C. Hattingh 1, B. Mwaka 2, R. Cai 2, F. Botha 2. 1 Introduction. Abstract Surface/groundwater interaction: Using water balancing, hydraulic modeling and real-time monitoring to develop a truly Integrated Decision Support System (IDSS) C. Seago 1, L.C. Hattingh 1, B. Mwaka 2,

More information

A State of the Art environmental monitoring and sensing network for the Nile River in Egypt

A State of the Art environmental monitoring and sensing network for the Nile River in Egypt Water Pollution IX 197 A State of the Art environmental monitoring and sensing network for the Nile River in Egypt S. Abdel-Gawad 1, H. Khan 2 & A. A. Khan 2 1 National Water Research Center, Ministry

More information

6 Analysis and evaluation of the data from the questionnaire with respect to irrigation efficiency

6 Analysis and evaluation of the data from the questionnaire with respect to irrigation efficiency 6 Analysis and evaluation of the data from the questionnaire with respect to irrigation efficiency 6.1 Conveyance efficiency The early irrigation projects of more recent times nearly always received their

More information

THE ITRC RAPID APPRAISAL PROCESS (RAP) FOR IRRIGATION DISTRICTS. Stuart Styles 1 Charles Burt 2 ABSTRACT

THE ITRC RAPID APPRAISAL PROCESS (RAP) FOR IRRIGATION DISTRICTS. Stuart Styles 1 Charles Burt 2 ABSTRACT THE ITRC RAPID APPRAISAL PROCESS (RAP) FOR IRRIGATION DISTRICTS Stuart Styles 1 Charles Burt 2 ABSTRACT The ITRC Rapid Appraisal Process (RAP) for irrigation projects was created in 1989 as a tool to quickly

More information

The Development of Hydrological Services

The Development of Hydrological Services The Development of Hydrological Services Bruce Stewart President of the WMO Commission for Hydrology Abstract The primary objective of any Hydrological Service (HS) is the management of water resources

More information

IGHEM 2008 MILANO 3 rd -6 th September International Group for Hydraulic Efficiency Measurements

IGHEM 2008 MILANO 3 rd -6 th September International Group for Hydraulic Efficiency Measurements Optimizing the utilization of hydraulic resources: Calibration with dye dilution of the flow monitoring system in La Nouva intake Authors: Giampaolo Canestri, Fulvio Perino, C.V.A. Valle d Aosta, Italy

More information

Chapter 4. Main problems in a canal network 4.1 INTRODUCTION

Chapter 4. Main problems in a canal network 4.1 INTRODUCTION Canals 21 Chapter 4 4.1 INTRODUCTION This chapter looks at problems which are frequently encountered in irrigation canal systems. Some of these are described in detail. The last section of this chapter

More information

Operational & Planning System for Murrumbidgee Irrigation Area

Operational & Planning System for Murrumbidgee Irrigation Area WATER AND ENVIRONMENT TECHNOLOGY Operational & Planning System for Murrumbidgee Irrigation Area Leonie Williams (MI Project manager) Jordi Ayats (ADASA Technical team leader) Operational & Planning System

More information

Incorporating Ice Effects in Ice Jam Release Surge Models

Incorporating Ice Effects in Ice Jam Release Surge Models CGU HS Committee on River Ice Processes and the Environment 13th Workshop on the Hydraulics of Ice Covered Rivers Hanover, NH, September15-16, 25 Incorporating Ice Effects in Ice Jam Release Surge Models

More information

Measuring discharge. Climatological and hydrological field work

Measuring discharge. Climatological and hydrological field work Measuring discharge Climatological and hydrological field work 1. Background Discharge (or surface runoff Q s) refers to the horizontal water flow occurring at the surface in rivers and streams. It does

More information

Sediment management of hydropower cascade: example of CNR run-of-river developments, French Rhone River, France

Sediment management of hydropower cascade: example of CNR run-of-river developments, French Rhone River, France Sediment management of hydropower cascade: example of CNR run-of-river developments, French Rhone River, France Christophe PETEUIL Compagnie Nationale du Rhone Engineering Department, River Systems and

More information

Solution for Irrigation Engineering

Solution for Irrigation Engineering Solution for Irrigation Engineering December 2015 Index Q.1) a). 2-3 b).3-5 c).5-6 d).6-8 e).9-10 Q.2) a).10-11 b). 12-14 c). 14-15 Q.3) a). 15-16 b). 17 c). 18 Q.4) a). N.A b). N.A c). N.A Q.5) a).20-22

More information

Chapter 7 : Conclusions and recommendations

Chapter 7 : Conclusions and recommendations Chapter 7 : Conclusions and recommendations 7.1 Conclusions The main goal of this research was to investigate the modelling and rainfall data requirements for the design of combined sewer systems and the

More information

Impact of sewer condition on urban flooding: a comparison between simulated and measured system behaviour

Impact of sewer condition on urban flooding: a comparison between simulated and measured system behaviour 9th International Conference on Urban Drainage Modelling Belgrade 2012 Impact of sewer condition on urban flooding: a comparison between simulated and measured system behaviour Marco van Bijnen 1,2, Hans

More information

STORAGE BASIN AND PUMPING PLANT DESIGN (G 500)

STORAGE BASIN AND PUMPING PLANT DESIGN (G 500) TABLE OF CONTENTS STORAGE BASIN AND PUMPING PLANT DESIGN (G 500) SECTION NO. SUBJECT DATE G 510 BASIC DESIGN DATA G 511 Types of Storage and Pumping Systems G 512 Extent of Design " G 513 Design Criteria

More information

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name Balochistan Small Scale Irrigation Project Region SOUTH ASIA

More information

Rain harvesting and stream storage for supplementary irrigation to rain-fed paddy schemes: a case study of Selapon Paddy Scheme

Rain harvesting and stream storage for supplementary irrigation to rain-fed paddy schemes: a case study of Selapon Paddy Scheme Sustainable Irrigation and Drainage V 133 Rain harvesting and stream storage for supplementary irrigation to rain-fed paddy schemes: a case study of Selapon Paddy Scheme K. B. M. Shafiuddin Department

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

By John B. Parrish In,' Associate Member, ASCE, and Charles M. Burt,! Member, ASCE

By John B. Parrish In,' Associate Member, ASCE, and Charles M. Burt,! Member, ASCE CAL POLY MODEL CANAL By John B. Parrish In,' Associate Member, ASCE, and Charles M. Burt,! Member, ASCE ABSTRACT: The Cal Poly Model Canal, located at the Water Delivery Facility. Irrigation Training and

More information

Simulate Your Way out of a Difficult Real Time Control Problem: Automatically Controlling Gates to Reduce Combined Sewer Overflows (CSOs)

Simulate Your Way out of a Difficult Real Time Control Problem: Automatically Controlling Gates to Reduce Combined Sewer Overflows (CSOs) Simulate Your Way out of a Difficult Real Time Control Problem: Automatically Controlling Gates to Reduce Combined Sewer Overflows (CSOs) Maxym Lachance, Eng. 1, Sid Lodewyk, M.Sc., P.Eng. 2 1 Tetra Tech

More information

SECTION IV WATERSHED TECHNICAL ANALYSIS

SECTION IV WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling SECTION IV WATERSHED TECHNICAL ANALYSIS An initial step in the preparation of this stormwater management plan was the selection of a stormwater simulation model to be utilized. It

More information

What is runoff? Runoff. Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream

What is runoff? Runoff. Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream What is runoff? Runoff Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream 1 COMPONENTS OF Runoff or STREAM FLOW 2 Cont. The types of runoff

More information

Title Advanced Hydraulic Modeling to Support Emergency Action Plans

Title Advanced Hydraulic Modeling to Support Emergency Action Plans Title Advanced Hydraulic Modeling to Support Emergency Action Plans Abstract Freese and Nichols, Inc. (FNI) developed an Emergency Action Plan (EAP) for a Levee Improvement District (LID) located in a

More information

Comparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged Catchments

Comparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged Catchments ENGINEER - Vol. XXXXIV, No. 04, pp, [29-36], 2011 The Institution of Engineers, Sri Lanka Comparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged s W.M.D.Wijesinghe and

More information

Development of a Stage-Discharge Rating for Site Van Bibber Creek at Route 93

Development of a Stage-Discharge Rating for Site Van Bibber Creek at Route 93 Development of a Stage-Discharge Rating for Site 330 - Van Bibber Creek at Route 93 Prepared for: Urban Drainage and Flood Control District 2480 W. 26 th Avenue Suite 156-B Denver, CO 80211 May 19, 2006

More information

Predicting Water Availability in Irrigation Tank Cascade Systems: The Cascade Water Balance Model

Predicting Water Availability in Irrigation Tank Cascade Systems: The Cascade Water Balance Model Research Reports IWMI s mission is to improve water and land resources management for food, livelihoods and nature. In serving this mission, IWMI concentrates on the integration of policies, technologies

More information

Neural Network Approximation of a Hydrodynamic Model in Optimizing Reservoir Operation

Neural Network Approximation of a Hydrodynamic Model in Optimizing Reservoir Operation Neural Network Approximation of a Hydrodynamic Model in Optimizing Reservoir Operation D.P. Solomatine International Institute for Infrastructural, Hydraulic and Environmental Engineering, P.O.Box 3015,

More information

A Simulation Library for an Integrated Water Resources Management

A Simulation Library for an Integrated Water Resources Management A Simulation Library for an Integrated Water Resources Management Torsten Pfuetzenreuter, Thomas Rauschenbach Fraunhofer Center for Applied Systems Technology (AST) Ilmenau, Germany Introduction The management

More information

VUNG TAU GO CONG DAM MATHEMATICAL MODELLING: ONE SIZE FITS ALL?

VUNG TAU GO CONG DAM MATHEMATICAL MODELLING: ONE SIZE FITS ALL? 4 th International Conference on Estuaries and Coasts 8-11 October 2012, Water Resources University, Vietnam VUNG TAU GO CONG DAM MATHEMATICAL MODELLING: ONE SIZE FITS ALL? GERRIT JAN SCHIERECK 1), MARCEL

More information

UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH

UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH INTRODUCTION Water is a common chemical substance essential for the existence of life and exhibits many notable and unique

More information

Rapid Implementation Program (RIP) to Improve Operational Management and Efficiencies in Irrigation Districts

Rapid Implementation Program (RIP) to Improve Operational Management and Efficiencies in Irrigation Districts Rapid Implementation Program (RIP) to Improve Operational Management and Efficiencies in Irrigation Districts Gabriele Bonaiti Department of Biological and Agricultural Engineering, 2117 Texas A&M University,

More information

Using SWAT Module in the Design of Submerged Weir on narrow rivers having high flood discharge

Using SWAT Module in the Design of Submerged Weir on narrow rivers having high flood discharge Using SWAT Module in the Design of Submerged Weir on narrow rivers having high flood discharge Presented by Er. Narendra Kumar Tiwary, B.Tech IIT Delhi, M.Tech NIT(Pat), Ph.D Scholar IIT Delhi Professor,

More information

RESERVOIR HYDROLOGIC ROUTING FOR WATER BALANCE OF AL-BURULLUS WETLAND, EGYPT

RESERVOIR HYDROLOGIC ROUTING FOR WATER BALANCE OF AL-BURULLUS WETLAND, EGYPT RESERVOIR HYDROLOGIC ROUTING FOR WATER BALANCE OF AL-BURULLUS WETLAND, EGYPT Ibrahim Abdelmagid El-Shinnawy Associate Prof., Environment and Climate Research Institute (ECRI) National Water Research Center

More information

MODERNISING IRRIGATION INFRASTRUCTURE & MANAGEMENT

MODERNISING IRRIGATION INFRASTRUCTURE & MANAGEMENT MODERNISING IRRIGATION INFRASTRUCTURE & MANAGEMENT Shaping our world A company of OUR EXPERTISE Modernising Irrigation Infrastructure and Management A Modern Approach Irrigated agriculture is essential

More information

Optimizing Canal Structure Operation in the Treasure Valley of Idaho

Optimizing Canal Structure Operation in the Treasure Valley of Idaho International Proceedings of Chemical, Biological and Environmental Engineering, Vol. 97 (2016) DOI: 10.7763/IPCBEE. 2016. V97. 7 Optimizing Canal Structure Operation in the Treasure Valley of Idaho Andrew

More information

Estimation of Infiltration Parameter for Tehri Garhwal Catchment

Estimation of Infiltration Parameter for Tehri Garhwal Catchment Estimation of Infiltration Parameter for Tehri Garhwal Catchment Ashish Bhatt 1 H L Yadav 2 Dilip Kumar 3 1 UG Student, Department of civil engineering, G B Pant Engineering College, Pauri, UK-246194 2,3

More information

Note that the Server provides ArcGIS9 applications with Spatial Analyst and 3D Analyst extensions and ArcHydro tools.

Note that the Server provides ArcGIS9 applications with Spatial Analyst and 3D Analyst extensions and ArcHydro tools. Remote Software This document briefly presents the hydrological and hydraulic modeling software available on the University of Nice Server with Remote Desktop Connection. Note that the Server provides

More information

RBC flume. All it takes for environmental research. Contents. 1. Introduction. 2. The flumes of Eijkelkamp Agrisearch Equipment

RBC flume. All it takes for environmental research. Contents. 1. Introduction. 2. The flumes of Eijkelkamp Agrisearch Equipment 13.17.02 RBC flume operating instructions Contents 1. Introduction... 1 2. The flumes of Eijkelkamp Agrisearch Equipment... 1 3. Principles of discharge-measuring flumes... 2 4. Selection and location

More information

Assessment of the Groundwater Quantity Resulting from Artificial Recharge by Ponds at Ban Nong Na, Phitsanulok Province, Thailand

Assessment of the Groundwater Quantity Resulting from Artificial Recharge by Ponds at Ban Nong Na, Phitsanulok Province, Thailand Research article erd Assessment of the Groundwater Quantity Resulting from Artificial Recharge by Ponds at Ban Nong Na, Phitsanulok Province, Thailand SIRIRAT UPPASIT* Faculty of Technology, Khon Kaen

More information

IV. RESULT AND DISCUSSION

IV. RESULT AND DISCUSSION IV. RESULT AND DISCUSSION The result of forest cover change simulation during 4 years was described. This process is done by using the information of land cover condition obtained from satellite imagery

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Greg Hemmen, P.E. Company: Rosemont Copper Company Date:

More information

Irrigation Structures 2. Dr. M. R. Kabir

Irrigation Structures 2. Dr. M. R. Kabir CHAPTER 9 Irrigation Structures 2 Dr. M. R. Kabir Professor and Head, Department of Civil Engineering University of Asia Pacific (UAP), Dhaka LECTURE 22 What is Cross Drainage Works? In an irrigation project,

More information

Appendix B SOUTHERN CROSS UNIVERSITY. Professional Staff Secondary Classification Descriptors

Appendix B SOUTHERN CROSS UNIVERSITY. Professional Staff Secondary Classification Descriptors Appendix B SOUTHERN CROSS UNIVERSITY Professional Staff Secondary Classification Descriptors APPENDIX B INSTRUCTIONS FOR USING THE CLASSIFICATION DESCRIPTIONS 1. These descriptors present the classification

More information

Modernization of High Hazard Dams in Austin, Texas. TFMA Spring Conference May 23, 2007

Modernization of High Hazard Dams in Austin, Texas. TFMA Spring Conference May 23, 2007 Modernization of High Hazard Dams in Austin, Texas TFMA Spring Conference May 23, 2007 Modernization of High Hazard Dams in Austin, Texas City of Austin Glen Taffinder, P.E. Stormwater Pond Dam Safety

More information

APPLICATION OF A HYDRODYNAMIC MIKE 11 MODEL FOR THE EUPHRATES RIVER IN IRAQ

APPLICATION OF A HYDRODYNAMIC MIKE 11 MODEL FOR THE EUPHRATES RIVER IN IRAQ 2008/2 PAGES 1 7 RECEIVED 13.1.2008 ACCEPTED 26.4.2008 A. H. KAMEL APPLICATION OF A HYDRODYNAMIC MIKE 11 MODEL FOR THE EUPHRATES RIVER IN IRAQ Ing. Ammar H. Kamel Slovak University of Technology Faculty

More information

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel 5 Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel M. P. Cherian, Ari Pandian, Karen Ridgway and Gregory Barden The City of Columbus, Ohio, submitted a wet weather management plan

More information

TA-8267 THA: STRENGTHENING INTEGRATED WATER AND FLOOD MANAGEMENT IMPLEMENTATION

TA-8267 THA: STRENGTHENING INTEGRATED WATER AND FLOOD MANAGEMENT IMPLEMENTATION TA-8267 THA: STRENGTHENING INTEGRATED WATER AND FLOOD MANAGEMENT IMPLEMENTATION Mae Ta Sub-basin IWRM Modelling Results Report March 2015 Prepared for ADB Prepared by Prepared for Copyright Suggested citation

More information

Upper Lightning Lake Water Level Management Environmental Assessment Worksheet. Attachment D Design Report for Upper Lightning Lake

Upper Lightning Lake Water Level Management Environmental Assessment Worksheet. Attachment D Design Report for Upper Lightning Lake Upper Lightning Lake Water Level Management Environmental Assessment Worksheet Attachment D Design Report for Upper Lightning Lake DESIGN REPORT for Upper Lightning Lake Wetland Enhancement MN-332-2 I

More information

UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE

UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE Bodo Hellberg, Stormwater Action Team, Auckland Regional Council Matthew Davis, Stormwater Action Team, Auckland Regional Council ABSTRACT This paper focuses

More information

DPR GUIDELINES FOR ERM OF IRRIGATION PROJECTS

DPR GUIDELINES FOR ERM OF IRRIGATION PROJECTS DPR GUIDELINES FOR ERM OF IRRIGATION PROJECTS 1.0 INTRODUCTION RAJEEV SINGHAL Director NWA, CWC, Pune Modernisation of Irrigation Project includes extension, renovation & modernisation components of existing

More information

Everglades Landscape Sulfate Dynamics: Final Summary Evaluation of CERP ASR Alternatives

Everglades Landscape Sulfate Dynamics: Final Summary Evaluation of CERP ASR Alternatives Everglades Landscape Sulfate Dynamics: Final Summary Evaluation of CERP ASR Alternatives http://ecolandmod.ifas.ufl.edu/projects/elmreg500masr In partial fullfillment of U.S. Army Corps of Engineers Cooperative

More information

CENTAUR: Cost Effective Neural Technique for Alleviation of Urban flood Risk. installed in Coimbra

CENTAUR: Cost Effective Neural Technique for Alleviation of Urban flood Risk. installed in Coimbra CENTAUR: Cost Effective Neural Technique for Alleviation of Urban flood Risk Deliverable 3.1 Report on the CENTAUR installed in Coimbra *Note: this deliverable has not yet been approved by the EC and hence

More information