Joint ESCAP UIC seminar on Facilitation and Costing of Railway Services along the Trans-Asian Railway December 2015 POSITION PAPER BANGLADESH
|
|
- Aubrey Evans
- 6 years ago
- Views:
Transcription
1 Joint ESCAP UIC seminar on Facilitation and Costing of Railway Services along the Trans-Asian Railway December 2015 POSITION PAPER BANGLADESH Presented by: Qazi Md. Rafiqul Alam Additional Director General (Infrastructure) Bangladesh Railway
2 Brief about Bangladesh Railway 1862: Started its journey as Eastern Bengal Railway with km Jagoti-Darsana BG Rail link. 1961: Renamed as Pakistan Eastern Railway. 1972: Started providing services as Bangladesh Railway. 1998: East-West Railway connectivity over river Jamuna was established from the day of opening Bangabandhu Bridge. 2003: Direct BG train communication between East and West zone was established over Bangabandhu Bridge. 2007: Bangladesh signed TAR agreement. 2008: Direct passenger train Maitree Express between Dhaka and Kolkata established. 2011: Ministry of Railways formed under SRO-361. Covers and connects 44 Districts of the country out of 64 Districts. 456 stations encircling core business activities around the country. In 2014: 65 million Passengers and 2.52 million tonnes freight carried by BR. 3
3 Operational Information of Bangladesh Railway Two Zones: East and West Zone East Zone: km MG: km BG: 0.00 km DG: km West Zone: km MG: km BD: km DG: km Operational Division: 4 divisions Dhaka Chittagong Paksey Lalmonirhat Total Route Kilometer: km MG: km BG: km DG: km Existing Railway Network
4 Government s Strategic Position on establishing TAR Bangladesh singed the Intergovernmental Agreement on the Trans-Asian Railway Network on 09 November 2007 as 20 th signatory. Cabinet Committee approved in-principle to ratify the agreement on 09 March The Hona ble Minister of Foreign Affairs issued ratification of the said agreement on 11 August ESCAP recorded the date of 25 August 2010 as date of ratification.
5
6
7
8 Proposed amendment in TAR network in Bangladesh In conformity with article 8(4) of the Agreement, Bangladesh proposed an amendment of TAR network as under: On the Darsana Gundum line Replace Tongi (junction) Dhaka With Tongi (junction) Dhaka Narayanganj [Mawa Bhanga Narail Jessore] Benapol (border station) (India) The above mentioned amendment proposal was adopted by 4 th meeting of Working Group on TAR Network held on November 2015 at Bangkok.
9 Regional Cooperation and Bangladesh In geopolitics, Bangladesh enjoys a unique position. As a member of SAARC, BIMSTEC and BCIM, Bangladesh plays important role in regional integration and cross border connectivity for regional trade facilitation and harmony. In the 18th summit most SAARC leaders had agreed to sign three agreements but unfortunately failed to sign following two: SAARC Motor Vehicles Agreement for the regulation of passenger and cargo vehicular traffic, and SAARC Regional Railways Agreement. However, 18th SAARC summit was encouraging for Bangladesh because it was more than what had happened in the past 29 years. Leaders finally signed one agreement - the SAARC Framework Agreement on Energy Co-operation aimed at sharing and trading electricity through common grids/corridors. When the SAARC, BIMSTEC and BCIM regions will be fully developed, each member country will demand much larger space for marketers and investors. Cross-border direct and indirect investment will rise manifolds.
10 SAARC Rail Corridors
11 Regional Transport Connectivity in South Asia and South-east Asia
12 Physical Barriers of TAR Network in Bangladesh Radhikapur (West Bengal, India) and Birol (Bangladesh): Train operation has been closed since 01 April, 2005 due to conversion of meter gauge line into broad gauge line in Indian side upto Radhikapur. To re-establish the connectivity, the government of Bangladesh undertook a project on to convert the existing Birol- Parbatipur meter gauge section into dual gauge under Japan Debt Cancellation Fund (JDCF). The physical progress of the project is about 95%. The project is targeted to be completed by June 2016.
13 Physical Barriers of TAR Network in Bangladesh (Contd.) Shahbazpur (Bangladesh) to Karimganj-Mohishasan (India): Train operation has been closed since 07 July, 2002 due to deplorable condition of railway track & bridges in Kulaura- Shahbazpur section. GOB has taken a project to reestablish this inter-country railway linkage under Indian Line of Credit fund. Design and supervision consultancy contract was signed on The project is targeted to be completed by June 2019.
14 Physical Barriers of TAR Network in Bangladesh (Contd.) Dohazari-Gundum (Bangladesh): feasibility study, detailed design and preparation of Bid document for construction of dual gauge rail line is being carried out under ADB funded TA project. Total 128 km dual gauge single line Railway track with the provision of future double track will be constructed from Dohazari to Cox s Bazar via Ramu and Ramu to Gundum near Myanmar Border. ADB has been agreed in-principle to finance more than US$ 1.00 Billion for the investment project. The project is planned to be completed by June The land acquisition process for the project is going on.
15 Physical Barriers of TAR Network in Bangladesh (Contd.) Railway Bridge parallel to existing Bangabandhu Bridge: There is load restriction of 43.7 KN/m and speed restriction of 20 kmph on existing Bangabandhu Bridge. As such it is essential to construct a separate bridge for railway to allow TAR traffic. Feasibility study has been carried out under ADB funded TA project. A dedicated railway bridge with the provision of DG double line is going to be constructed under JICA funding. Detailed design under JICA fund is targeted to be completed by The investment project would cost more than 1 billion USD and targeted to be completed by 2020.
16 Improvement of Line Capacity of TAR Network in Bangladesh Dhaka - Chittagong railway corridor: Out of total km Dhaka- Chittagong railway corridor, only km double track is to be constructed to establish double line train operation in the total corridor. Moreover, Government of Bangladesh has decided to convert the entire Dhaka- Chittagong railway corridor into DG for capacity enhancement of the corridor and unification of gauge.
17 Improvement of Line Capacity of TAR Network in Bangladesh (Contd.) Dhaka-Chittagong corridor (Contd.): railway 61km double track in Laksam- Chinki Astana section constructed under JICA & GOB fund was inaugurated on km double track in Tongi- Bhairab Bazar section constructed under ADB & GOB fund is targeted to be inaugurated in December nd Bhairab and 2nd Titas along with railway approaches construction is targeted to be completed by December Only remaining single line section Akhaura-Laksam (72 km) will be double tracked under ADB, EIB and GOB fund which is expected to be completed by 2020.
18 Improvement of Line Capacity of TAR Network in Bangladesh (Contd.) Chittagong-Dohazari section: railway Government of Bangladesh has planned to construct a second rail-cum-road bridge over river Karnaphuli at Kalurghat point. The project is likely to be financed by EDCF, Korea. Feasibility study is on progress by the Korean consultants engaged by EDCF. Loan Agreement is yet to be signed. Government of Bangladesh has planned to convert existing single meter gauge line of Chittagong-Dohazari section into dual gauge double line to cater increasing railway traffic. Feasibility study, detailed design and tendering services is going to be carried out under ADB funded TA project. Investment project is also likely to be financed by ADB.
19 Improvement of Line Capacity of TAR Network in Bangladesh (Contd.) Isurdi-Joydevpur section: GOB has planned to construct 164 km new DG railway track to allow all type of containers commonly used in maritime shipping, double staking of containers and cross border traffic. Feasibility study has been carried out under ADB funded TA project. The investment project would cost around USD 1060 million. A non-binding MOU was signed with China Civil Engineering Construction Corporation on 26 October The project assistance yet to be finalized.
20 Improvement of Line Capacity of TAR Network in Bangladesh (Contd.) Parbatipur- Ishurdi Section: GOB has planned to construct a second dual gauge railway track in Parbatipur- Abdulpur section (157 km) for double line operation of train services in the section. Feasibility study is yet to be done and project assistance yet to be arranged.
21 Improvement of Line Capacity of TAR Network in Bangladesh (Contd.) Akhaura-Kulaura- Sylhet : GOB has planned under Master Plan of Bangladesh Railway to convert meter gauge track of Akhaura-Kulaura- Sylhet section ( km) into dual gauge. The new dual gauge line will be designed with axle load of 25 ton and design speed of 120 kmph. Feasibility study is yet to be carried out. A non-binding MOU was signed with China Railway Construction Bridge Engineering Bureau Group Co. Ltd. on 15 September The project assistance is yet to be finalized.
22 Establishment of an Inland Container Depot Proposed ICD at Dhirasram with the capacity of 3,54,000 TEUs will be ideally suited for containerization of Indo- Bangla trade in the near future and may serve as land hub in Trans-Asian Railway (TAR), SAARC and BIMSTEC corridors. A feasibility study for construction of ICD at Dhirasram was conducted in A TA project under ADB fund is taken in hand for upgradation of the feasibility study along with detailed design preparation and tendering services for construction of the ICD. The investment project is likely to be financed by ADB
23 Proposed Padma Bridge Rail link in Bangladesh 180 km (approx.) BG railway line is going to be constructed connecting Dhaka-Mawa-Padma Bridge-Bhanga- Narail-Rupdia/Singia. The project is going to be implemented under China G2G funding. The line will shorten the distance between Dhaka-Benapole by 185 km. Feasibility study of phase-i & II and detailed design for phase-i is about to complete. Negotiation for commercial contract with China Railway Group Limited is going on.
24 Railway connection with Sea Ports in Bangladesh At present railway connection with only Chittagong sea port exists in Bangladesh. A project is going on to connect Mongla Sea Port under Indian Line of Credit and targeted to be completed by GOB has planned to construct another sea port at Payra and railway line from Bhanga to connect the port.
25 Railway connection with Sea Ports in Bangladesh (Contd.) Government of Bangladesh has decide to establish a power generation hub based on coal-fired power plants in Matarbari 3000 MW and Moheshkhali 6000 MW and also 3000 MW LNG based power plant in the same area in future. The power hub facility will include Deep Sea Port with Coal and Heavy jetty, coal yard, container handling facilities etc. Feasibility study, detailed design and tendering services for construction of railway link with the power hub and deep sea port is going to be carried out under an ADB funded TA project.
26 Some Logistics Potential Priority Sector Projects improvement of Bangladesh needs Railway Opportunities: Growing world trade needs more transportation. Modal shift from road to rail is important for sustainable development. Rail freight increasingly integrates into logistic solutions. International corridors in Europe, the Middle East and Northern Asia promoting efficient long-distance rail traffic. Major growth in intermodal traffic. Idea of globalization is now at implementation stage.
27 Challenges Some Potential for Priority Regional Projects Railway of Bangladesh Connectivity(1) Railway Major constraints: lack of connectivity between rail networks, differences of rail gauges and incompatible rolling stocks No connectivity with Myanmar (high cost) Through link unavailable between main part of India and NE states through Bangladesh Gauge difference India with 3 gauge system Bangladesh generally BG in the west and MG in the east with some dual gauge links MG in Myanmar/Thailand Rolling stock: India with air-braked rolling stock; Bangladesh vacuum-based Key issue: overall deteriorated rail networks, esp. in eastern India and Bangladesh Lack of adequate port facilities for container services Construction of deep sea port
28 Challenges Some Potential for Priority Regional Projects Railway of Bangladesh Connectivity(2) Railway High transportation and handling costs The high cost and uncertainties of trade and transport in the region are major constraints on economic recovery and development in the region Long and costly customs procedures and other inspections Customs administrations do not have aligned legislation and procedures. Complicated, opaque and non-standardized border procedures affect the business environment and deter foreign investment. Operation of international traffic is also critical Lack of political commitment and coordination Countries concerned with high level of corruption, smuggling, organized crime Connectivity to regional landlocked countries
29 Some Approaches Potential Priority for Cross Projects Border of Bangladesh Connectivity Railway Stage 1: Transport Corridor basic transport infrastructure Stage 2: Transport and Trade Facilitation Corridor Stage 3: Logistics Corridor Stage 4: Urban Development Corridor improved infrastructure in corridor towns/cities and enhanced capacities for public-private partnerships Stage 5: Economic Corridor Infrastructure is developed in specific geographical areas based on economic potential. Usually starts with transport links, but extends to other infrastructure as well as the software for their optimal use. Some Characteristics of Economic Corridors: - Create links to major markets; - With nodal points centers of enterprise development; - Extend the benefits of improved transport linkages to remote locations and integrates them with more prosperous areas; - Open up investment opportunities; - Promote synergies through the clustering of projects; - Provide demonstration effects.
30 Some Potential Implementation Priority Projects of Issues Bangladesh Railway Challenges Multiple-agency and multiple-country Financial resources, especially for regional projects Real/perceived dominance of one country Political conflict and security issues Difficulties in implementing soft infrastructure (border formalities, customs, etc.) Key Success Factors Economic complementarities Political support in each member country Depoliticization of regional issues Continuous ADB support Increasing number of common issues
31 Some Potential Priority The Way Projects Forward of Bangladesh Railway Ensure political commitment to enhance regional integration Address inadequate infrastructure -Increase financial resources, ODA, FDI, remittances, PPP Reduce high trade transaction costs Enhance productive capacities, value addition, diversification and reduction of dependency on commodities Strengthen legal framework, international, regional, sub-regional and bilateral agreements Enhance capacity to address impact of global trends: -slow down of economic development triple crisis, climate change, desertification Mainstream LLDCs issues into global post-2015 development agenda, SDGs Strengthen role and contributions of international regional organizations Emerging challenges: addressing climate changes, mobilizing private investments, etc.
32 For More Information Contact Qazi Md. Rafiqul Alam Additional Director General (Infrastructure) Bangladesh Railway Railbhaban Dhaka, Bangladesh Tel. & Fax: Thank you
POSITION PAPER BANGLADESH. 4 th Meeting of the Working Group on the Trans-Asian Railway Network November 2015
4 th Meeting of the Working Group on the Trans-Asian Railway Network 23-24 November 2015 POSITION PAPER BANGLADESH Presented by: Najnin Ara Keya Additional Chief Engineer Bangladesh Railway Brief about
More informationRegional Meeting on Harmonization of Rules and Regulations for Facilitation of International Railway Transport, Ankara, Turkey, 3-4 May 2018
Regional Meeting on Harmonization of Rules and Regulations for Facilitation of International Railway Transport, Ankara, Turkey, 3-4 May 2018 Country Position Paper BANGLADESH Md. Miajahan Additional Director
More informationPOSITION PAPER ON BANGLADESH RAILWAY
POSITION PAPER ON BANGLADESH RAILWAY Ahmed Murshed Joint Secretary Ministry of Railways Md. Monirul Islam Firozi Director (Engineering) Bangladesh Railway Presentation Sequence Brief of Bangladesh Railway
More informationSECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN])
Railway Rolling Stock Project (RRP BAN 49094) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN]) Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Bangladesh s transport
More informationWORKING WITH IFIS BOARD OF TRADE OF METROPOLITAN MONTREAL
WORKING WITH IFIS BOARD OF TRADE OF METROPOLITAN MONTREAL OCTOBER 19, 2016 Presented by : Guillaume Genin Vice President Business Development WHO ARE WE? Founded in 1990 HQ in Montreal (Canada) Our core
More informationConnectivity and Transport Infrastructure Development
A Session on: Connectivity and Transport Infrastructure Development Presented by, NAHID SULTANA MALLIK Deputy Secretary Economic Relations Division, Ministry of Finance Bangladesh Six Priorities areas
More information8 FORMULATION OF THE RAIWAY MASTER PLAN
8 FORMULATION OF THE RAIWAY MASTER PLAN 8.1 Rail Corridors Analysis In Section-7 of this report, and under sub-section 7.2: Approaches, it was indicated that to enable BR to carry the anticipated traffic
More informationStrengthening Railway Transport Connectivity in the South and Southwest Asia March 2017, New Delhi
Strengthening Railway Transport Connectivity in the South and Southwest Asia 15-16 March 2017, New Delhi S.M. NAZMUL HASAN Director BIMSTEC Secretariat, Dhaka, Bangladesh dir_bd@bimstec.org www.bimstec.org
More informationPresentation on Operationalization of Regional Connectivity between Bangladesh, India, Nepal and Bhutan
Presentation on Operationalization of Regional Connectivity between Bangladesh, India, Nepal and Bhutan Presented by Dr. M. Rahmatullah Former Director, Transport UN-ESCAP, Bangkok And currently, Senior
More informationConference on India s Look East Policy
Conference on India s Look East Policy Session III: Regional Connectivity and Infrastructure Presentation by Pinak Ranjan Chakravarty High Commissioner of India to Bangladesh Guwahati, October 8, 2007
More informationProspects of Strengthening Transport Connectivity in SSWA Region
Policy Dialogue on Strengthening Transport Connectivity among SSWA Countries Dhaka, 26-27 June, 2013 Prospects of Strengthening Transport Connectivity in SSWA Region Presented by Dr. M. Rahmatullah Senior
More informationNamaste and Good Afternoon
Namaste and Good Afternoon Country Paper Nepal UNESCAP Cooperation for Facilitation of International Railway Transport 13 15 October 2014 Bangkok,Thailand Old and abandoned Railway station in Nepal (80
More informationUN-ESCAP Meeting on Strengthening Railway Transport Connectivity in south and South- West Asia 15 March, 2017 New Delhi
UN-ESCAP Meeting on Strengthening Railway Transport Connectivity in south and South- West Asia 15 March, 2017 New Delhi Mukul Kumar Director Transport Planning Ministry of Railways Government of India
More informationUPDATED RAILWAY REFORM PROGRESS REPORT
Railway Rolling Stock Operations Improvement Project (RRP BAN 50312-003) A. Background UPDATED RAILWAY REFORM PROGRESS REPORT 1. In 2006 ADB approved the Railway Sector Investment Program Multitranche
More information(ii) Lower and Middle Income countries in South and
Transport infrastructure and services are the concrete expression of our need to connect - with different countries, new markets, and key resources but most importantly with other people. The transport
More informationRegional Policy Dialogue on Strengthening Transport Connectivity in Southern and Central Asia.
Regional Policy Dialogue on Strengthening Transport Connectivity in Southern and Central Asia. 7-8 Feb 2018 Bangkok, Thailand Ministry of Railways Government of India TAR Routes UN ESCAP study identified
More information- Chapter 1 - Introduction
- Chapter 1 - Introduction One main feature of economic development in the last decade of the 20 th century has been the globalisation of markets which brought with it increased demand for the unhindered
More informationIntegrated Transport Network and Development of Transport Corridors to Emerging Markets
Integrated Transport Network and Development of Transport Corridors to Emerging Markets Dongwoo Ha Chief, Transport Infrastructure Section Transport and Tourism Division UNESCAP The ESCAP region in the
More informationTransport Connectivity in South and South-West Asia
Transport Connectivity in South and South-West Asia Dr. Arbind Prasad Director General Federation of Indian Chambers of Commerce & Industry (FICCI) New Delhi, India 1 Transport infrastructure development
More informationEXPERT GROUP MEETING ON HARMONIZATION OF RULES AND REGULATIONS FOR FACILITATION OF INTERNATIONAL RAILWAY TRANSPORT 4 th SEPTEMBER, BANGKOK
EXPERT GROUP MEETING ON HARMONIZATION OF RULES AND REGULATIONS FOR FACILITATION OF INTERNATIONAL RAILWAY TRANSPORT 4 th SEPTEMBER, BANGKOK BASIC FACTS ABOUT INDIAN RAILWAYS Railways were first introduced
More informationInfrastructure Connectivity in Afghanistan
Infrastructure Connectivity in Afghanistan Issyk Kul Kyrgyzstan,6-7 September, 2017 M. Azim Wardak, Acting Deputy Director General Economic Cooperation Department, Ministry of Foreign Affairs of Afghanistan
More informationReview of Development of Transport and Logistics Network in North-East Asia
Seminar on Development of a Comprehensive Transport and Logistics Network in North-East Asia Subregion 21-22 March 2013, Seoul Review of Development of Transport and Logistics Network in North-East Asia
More informationCapacity building Workshop on Strenghtening Integrated Intermodal Transport Connectivity for Southeast and South-Southwest Asia
Capacity building Workshop on Strenghtening Integrated Intermodal Transport Connectivity for Southeast and South-Southwest Asia March 9, 2018 Bangkok UNESCAP Policies, planning and challenges related to
More informationEmbassy of Denmark in Vietnam 2 / 10
Date July 2015 1. Keywords... 2 2. Abstract... 2 3. Introduction... 2 4. Sector Overview... 3 5. Government policy... 7 6. Opportunities for Danish companies... 8 7. Conclusion... 8 Transport, Logistics,
More informationSECTOR ASSESSMENT (SUMMARY): TRANSPORT AND INFORMATION AND COMMUNICATION TECHNOLOGY. 1. Sector Performance, Problems, and Opportunities
Country Partnership Strategy: IND, 2013 2017 SECTOR ASSESSMENT (SUMMARY): TRANSPORT AND INFORMATION AND COMMUNICATION TECHNOLOGY Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Significant
More informationPromoting Transport Connectivity in Southern Asia: A BIMSTEC Perspective. MD. SHAFIQUR RAHMAN DIRECTOR (BANGLADESH) BIMSTEC Secretariat, Dhaka
Promoting Transport Connectivity in Southern Asia: A BIMSTEC Perspective MD. SHAFIQUR RAHMAN DIRECTOR (BANGLADESH) BIMSTEC Secretariat, Dhaka BIMSTEC- A New Sub-regional Grouping? The Bay of Bengal Initiative
More informationTechnical Assistance Consultant s Report
Technical Assistance Consultant s Report Project Number: 46452 October 2017 People s Republic of Bangladesh: South Asia Subregional Economic Cooperation Railway Connectivity Investment Program (Financed
More informationConnecting for Trade and Development: Issues and Prospects of Land Transport Corridors of South Asia
Connecting for Trade and Development: Issues and Prospects of Land Transport Corridors of South Asia 11th South Asia Economic Summit 21st Sustainable Development Conference Corridors of Knowledge for Peace
More informationStrengthening Transport Connectivity in South Asia Sanjay Swarup Director (International Marketing & Operations) CONCOR, INDIA
Strengthening Transport Connectivity in South Asia Sanjay Swarup Director (International Marketing & Operations) CONCOR, INDIA New Delhi, India, March 2017 Multimodal Infrastructure in India India has
More informationDevelopment of port Infrastructure: Bangladesh Perspective FAHMIDA AKHTAR DEPUTY SECRETARY MINISTRY OF SHIPPING
Development of port Infrastructure: Bangladesh Perspective FAHMIDA AKHTAR DEPUTY SECRETARY MINISTRY OF SHIPPING Contents Introduction Major export & import of Bangladesh Development of Chittagong Port
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: Dhaka Mass Rapid Transit Development Project (Line 1) (E/S) Loan Agreement: June
More informationA Perspective on Rail Based Transit in South Asia Underlying Principles
A Perspective on Rail Based Transit in South Asia Underlying Principles D.P Pande Asian Institute of Transport Development ( AITD) UN ESCAP has highlighted issues related to Border crossing for Rail Based
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People's Republic of Bangladesh Project: Kanchpur, Meghna and Gumti 2 nd Bridges Construction and Existing
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: The Kanchpur, Meghna and Gumti 2nd Bridges Construction and Existing Bridges Rehabilitation
More informationStatus of Myanma Railways & Current Development Projects
THE REPUBLIC OF THE UNION OF MYANMAR MINISTRY OF TRANSPORT AND COMMUNICATIONS MYANMA RAILWAYS Status of Myanma Railways & Current Development Projects 20 th March, 2018 CONTENTS Introduction on situation
More informationPerspectives and challenges in operationalizing the
Distr.: General 18 April 2017 Chinese, English and Russian only Economic and Social Commission for Asia and the Pacific Working Group on the Trans-Asian Railway Network 5th meeting Busan, Republic of Korea,
More informationTransport Sector Strategy: Sustainable and Integrated Transport for Trade and Economic Growth in Asia
Transport Sector Strategy: Sustainable and Integrated Transport for Trade and Economic Growth in Asia Background 1. Asia is a large and geographically diverse continent, with many land-locked countries.
More informationIncreasing Russia's Transit Potential. Mikhail Goncharov Advisor to President of RZD
Increasing Russia's Transit Potential Mikhail Goncharov Advisor to President of RZD 1 Global GDP growth rate and GDP (on average) of individual countries in Asia, % According to IMF 2 East West Routes
More informationFundamental Transit Policy Issues
MIDTERM REVIEW OF THE IMPLEMENTATION OF THE VIENNA PROGRAMME OF ACTION FOR LLDCs FOR THE DECADE 2014-2024 IN THE EURO-ASIAN REGION Fundamental Transit Policy Issues Ms. Azhar Jaimurzina Chief, Transport
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA54793 Project Name
More informationFundamental Transit Policy Issues
MIDTERM REVIEW OF THE IMPLEMENTATION OF THE VIENNA PROGRAMME OF ACTION FOR LLDCs FOR THE DECADE 2014-2024 IN THE EURO-ASIAN REGION Fundamental Transit Policy Issues Ms. Azhar Jaimurzina Chief, Transport
More informationGreater Tumen Initiative Perspective
Greater Tumen Initiative Supported by United Nations Development Programme Development of a Comprehensive Transport and Logistics Network in North East Asia Subregion Greater Tumen Initiative Perspective
More informationSouth Asia Subregional Economic Cooperation : SASEC Trade Facilitation
South Asia Subregional Economic Cooperation : SASEC Trade Facilitation Presentation at the UNCTAD South Asia Regional Forum on Trade Facilitation 7-8 October 2013 Regional Cooperation and Operations Coordination
More informationFrom Transport Connectivity to Social Networking. Dr.Esmaeil Tekyeh Sadat Advisor to Deputy Minister MFA iran
From Transport Connectivity to Social Networking Dr.Esmaeil Tekyeh Sadat Smaeils@yahoo.com Advisor to Deputy Minister MFA iran three key challenges out of five, (1) Lack of coordination between government
More informationCHAPTER II. TRANSIT TRANSPORT ISSUES IN LANDLOCKED AND TRANSIT DEVELOPING COUNTRIES
CHAPTER II. TRANSIT TRANSPORT ISSUES IN LANDLOCKED AND TRANSIT DEVELOPING COUNTRIES Efficient transit transport is crucial for landlocked nations. Due to their lack of territorial access to seaports and
More informationRoles of Dry Ports in Economic Corridors. Transport Division, UNESCAP
Roles of Dry Ports in Economic Corridors Transport Division, UNESCAP Outline Definition of Dry Ports Roles of dry port Economic benefits Environmental benefits Social benefits Selected Example of Dry Ports
More informationA BRIEFING NOTE ON THE PORT SECTOR IN BANGLADESH. February 15, 2007
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized A BRIEFING NOTE ON THE PORT SECTOR IN BANGLADESH 1. CURRENT SITUATION February 15, 2007
More informationESCAP Regional Cooperation Framework for Facilitation of International Railway Transport
ESCAP Regional Cooperation Framework for Facilitation of International Railway Transport Sandeep Raj Jain Economic Affairs Officer Transport Facilitation & Logistics Section Transport Division Outline
More informationKey Questions in International Transport Policy
Key Questions in International Transport Policy Jari Kauppila, Senior Economist InterTran seminar Helsinki, 30 Nov 2015 Intergovernmental Organisation 57 member countries (23 non-oecd) focussing on transport
More information3 rd Asia Automobile Institute Summit 3-4 December 2014 Bangkok, Thailand
3 rd Asia Automobile Institute Summit 3-4 December 2014 Bangkok, Thailand Introduction to ESCAP Activities on Sustainable and Inclusive Transport Development Madan B. Regmi, DEng. Transport Division UNESCAP,
More informationStatus of the Development of Dry Ports in Myanmar
Second Meeting of the Working Group on Dry Ports Bangkok, 14-15 November 2017 Status of the Development of Dry Ports in Myanmar Presented by Nyi Nyi Swe Deputy General Manager Myanma Railways, MYANMAR
More informationThailand s Logistics Development & Supply Chain Management toward ASEAN Economic Community (AEC)
Thailand s Logistics Development & Supply Chain Management toward ASEAN Economic Community (AEC) by Mr. Arkhom Termpittayapaisith Secretary General Office of the National Economic and Social Development
More informationPart 1: Introduction to Dry Ports and the Transport Network
Capacity building seminar on planning, design, development and operation of intermodal freight interfaces, including dry ports Part 1: Introduction to Dry Ports and the Transport Network Peter Hodgkinson,
More informationDry Port Policies and Activities
Dry Port Policies and Activities Bhimlal Suberi, MoIC Sonam Gyaltshen,MoEA Outline I. Country Facts: a) Transport International Connectivity b) Cross-Border Traffic Movement II. Policy and Legislation
More informationIndian Railways : Opportunities for Investment. Mukul Saran Mathur Executive Director /PPP September 2016
Indian Railways : Opportunities for Investment Mukul Saran Mathur Executive Director /PPP September 2016 Source : www.mapsofindia.com IR Network and Resources 66,030 Route Km Predominantly Broad Gauge
More informationUNESCAP regional transport activities with focus on SPECA countries
UNESCAP regional transport activities with focus on SPECA countries 62 member countries 12 landlocked countries 4 billion people (62% of world population) 26% of world GDP Unbalanced Development Concentrated
More informationTrade & Transport Corridors. European Projects & Initiatives
Trade & Transport Corridors European Projects & Initiatives Trade Corridors A concept in evolution WORLD BANK Assisting land-locked countries which depend on overland routes to access sea-ports for international
More informationCurrent State and Future development plans in NEA - Republic of Korea - Na, Hee-Seung / ROK
Current State and Future development plans in NEA - Republic of Korea - Na, Hee-Seung / ROK COTENTS Economic Status and Existing transport facilitation measures Freight / Passenger Traffics for the NEA
More informationProject Concept Note
ECE Transport Project Concept Note 2012 Project Title Outcome Technical Assistance for Afghanistan on Rail Network development A well established State Rail Organization in Afghanistan that will operate
More informationPart 2: Policy Issues and Financing of Dry Ports
Capacity building seminar on planning, design, development and operation of intermodal freight interfaces, including dry ports Part 2: Policy Issues and Financing of Dry Ports Peter Hodgkinson, Consultant
More informationPart 2: Policy Issues and Financing of Dry Ports
Capacity building seminar on planning, design, development and operation of intermodal freight interfaces, including dry ports Part 2: Policy Issues and Financing of Dry Ports Peter Hodgkinson, Consultant
More informationMeeting Conclusions and Recommendations
4 May 2018 Economic and Social Commission for Asia and the Pacific High Level Expert Group Meeting on Harmonization of Rules and Regulations for Facilitation of International Railway Transport Ankara,
More informationElectricity is crucial to
Anniversary In line with this aspect, the vision of the government is to enrich Bangladesh as a middle-income country by 2021. The government is planning to speed up power demand growth by setting up economic
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: Dhaka Mass Rapid Transit Development Project (Line 5) (E/S) Loan
More information2.3 CBTI Development. 1) Asian Highway History of Asian Highway 7)
2.3 CBTI Development 1) Asian Highway History of Asian Highway 7) The Asian Highway project started in the 1950s with the aim of developing the international land transport network as was achieved with
More informationPart 2: Policy Issues and Financing of Dry Ports
Capacity building seminar on planning, design, development and operation of intermodal freight interfaces, including dry ports Part 2: Policy Issues and Financing of Dry Ports Peter Hodgkinson, Consultant
More informationDetermination of the Transit Fee for Mongla-Ghasiakhali Canal: Savings from the Daily Running Cost of Ships
Journal of Traffic and Transportation Engineering 3 (2015) 293-300 doi: 10.17265/2328-2142/2015.05.005 D DAVID PUBLISHING Khandaker Rasel Hasan 1, Md. Mashiur Rahaman 2 and Nastia Degiuli 2 1. Department
More informationPotential Multimodal Transport in Bangladesh and Relative Obstacles
Journal of Traffic and Transportation Engineering 3 (2015) 241-246 doi: 10.17265/2328-2142/2015.04.006 D DAVID PUBLISHING Potential Multimodal Transport in Bangladesh and Relative Obstacles Md. Mashiur
More informationSECTOR ASSESSMENT (SUMMARY): TRANSPORT, AND INFORMATION AND COMMUNICATION TECHNOLOGY. 1. Sector Performance, Problems, and Opportunities
Anhui Intermodal Sustainable Transport Project (RRP PRC 45021-002) SECTOR ASSESSMENT (SUMMARY): TRANSPORT, AND INFORMATION AND COMMUNICATION TECHNOLOGY 1. Sector Performance, Problems, and Opportunities
More informationNAMIBIA: LOGISTICS HUB FOR SOUTHERN AFRICA CAPE TOWN, SOUTH AFRICA 17 NOVEMBER 14 (& BEYOND)
NAMIBIA: LOGISTICS HUB FOR SOUTHERN AFRICA (& BEYOND) CAPE TOWN, SOUTH AFRICA 17 NOVEMBER 14 CONTENT 1. WBCG 2. Rationale (Namibia Logistics Hub) 3. Development 4. Benefits (Regional) 5. Critical Success
More informationRegional Cooperation and Asia s New Role in the Global Economy
Regional Cooperation and Asia s New Role in the Global Economy High-Level Conference on Asian Economic Integration: Agenda for East Asia Summit New Delhi, India Sultan Hafeez Rahman Asian Development Bank
More informationTrade Supply Chain. Developing Rail and Sea Access. Peter Keyte PBPL
Trade Supply Chain Developing Rail and Sea Access Peter Keyte PBPL Port of Brisbane key economic enabler Queensland s largest port $50 billion worth of trade handled annually equivalent to c. 20% of Qld
More informationTransportation of export import containers through inland waterways; Challenges & Opportunities
Transportation of export import containers through inland waterways; Challenges & Opportunities Keynote Presentation by Mahboob Ahmed Managing Director Shipwrights Resources Limited Existing DC Surface
More informationCURRENT STATUS AND FUTURE DEVELOPMENT OF DRY PORTS IN MONGOLIA P.SOLONGO
CURRENT STATUS AND FUTURE DEVELOPMENT OF DRY PORTS IN MONGOLIA P.SOLONGO MONGOLIA ASIAN WAY LLC FEDERATION OF MONGOLIAN FREIGHT FORWARDERS BOARD OF DIRECTORS KAZAHSTAN, ALMATY 2018-05-30 CONTENT 1. Current
More informationPUBLIC SECTOR CASE STORY TEMPLATE
#46 COMPLETE Collector: Web Link 1 (Web Link) Started: Thursday, January 29, 2015 3:02:14 AM Last Modified: Thursday, January 29, 2015 6:18:27 AM Time Spent: 03:16:13 IP Address: 192.91.247.212 PAGE 4:
More informationSECTOR ASSESSMENT (SUMMARY): TRANSPORT, AND INFORMATION AND COMMUNICATION TECHNOLOGY
Central Asia Regional Economic Cooperation Corridor 3 (Bishkek Osh Road) Improvement Project, Phase 4 (RRP KGZ 45169) SECTOR ASSESSMENT (SUMMARY): TRANSPORT, AND INFORMATION AND COMMUNICATION TECHNOLOGY
More informationEx-Ante Evaluation (for Japanese ODA Loan)
1. Name of the Project Ex-Ante Evaluation (for Japanese ODA Loan) Country: India Project: Dedicated Freight Corridor Project (Procurement of Electric Locomotives) Loan Agreement: September 15, 2017 Loan
More informationEconomic and Social Council
United Nations Economic and Social Council E/ESCAP/IADP/IGM.1/1 Distr.: General 27 April 2012 Original: English Economic and Social Commission for Asia and the Pacific Ad hoc Intergovernmental Meeting
More informationGlobal Financial Crisis and South Asian Economies: Outlook, Risks and Policy Options
Global Financial Crisis and South Asian Economies: Outlook, Risks and Policy Options Presentation at the South Centre Conference Geneva, 31 January- 1 February 2013 by Nagesh Kumar Director, ESCAP South
More informationSystematic Country Diagnostic and Country Partnership Framework for Bangladesh for FY16-20 SUMMARY REPORT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SUMMARY REPORT 1 ST ROUND OF CONSULTATIONS FOR PREPARATION OF: Systematic Country Diagnostic
More informationDeveloping Corridors for Growth South Asia Regional Transport and Trade Facilitation Program. May 12, World Bank
Developing Corridors for Growth South Asia Regional Transport and Trade Facilitation Program May 12, 2014 World Bank 1 In South Asia, the most binding infrastructure constraints to growth for firms are:
More informationSECTOR ASSESSMENT (SUMMARY): URBAN TRANSPORT 1
Greater Dhaka Sustainable Urban Transport Project (RRP BAN 42169) Sector Road Map SECTOR ASSESSMENT (SUMMARY): URBAN TRANSPORT 1 1. Sector Performance, Problems, and Opportunities 1. Dhaka, the capital
More informationImpact of the global maritime container transport on rail traffic in Europe Klaus-Jürgen Uhl, Senior Adviser, MC Mobility Consultants
Impact of the global maritime container transport on rail traffic in Europe Klaus-Jürgen Uhl, Senior Adviser, MC Mobility Consultants 2016 STA Technical Roundtable 25 October 2016 MC in brief Logistics
More informationEnglish - Or. French EUROPEAN CONFERENCE OF MINISTERS OF TRANSPORT COUNCIL OF MINISTERS SYNTHESIS REPORT AND POLITICAL DECISIONS REQUIRED
For Official Use CEMT/CM(2005)1 CEMT/CM(2005)1 For Official Use Conférence Européenne des Ministres des Transports European Conference of Ministers of Transport 26-Apr-2005 English - Or. French EUROPEAN
More informationESCAP. Ports as gateways to hinterland areas. getting the cogs to work together
Seminar on the development of port infrastructure Bangkok, 20-21 December 2016 Ports as gateways to hinterland areas getting the cogs to work together 1. The mandate resolution 71/6 (May 2015) International
More informationStatus of Development of Dry Ports in Nepal
Status of Development of Dry Ports in Nepal Laxman Bahadur Basnet, Executive Director, Nepal Intermodal Transport Development Board (NITDB) Kathmandu, Nepal (25-26 November 2015, Bangkok) 1 Presentation
More informationRail and Multi-Modal Operations
Rail and Multi-Modal Operations A Logistics Business Perspective Presentation to the Joint ESCAP-OSJD Meeting on Strengthening Railway Transport Connectivity in South and South West Asia March 16 th, 2017,
More informationTrade and Transport Corridor Management A Toolkit for Performance Improvement
WORLD BANK Trade and Transport Corridor Management A Toolkit for Performance Improvement Monica Alina Mustra International Trade Department World Bank November 1, 2012 Colombo New Solutions for an Old
More informationCountry Report - Lao PDR
Country Report - Lao PDR 11 th EST Forum under the theme Sustainable Urban Design and Development ~ Role of EST Sengdarith KATTIGNASACK Director General, Department of Planning and Cooperation Ministry
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People's Republic of Bangladesh Project: Dhaka Urban Transport Development Project (I) Loan Agreement: February
More informationClimate Friendly Transport Systems for Inclusive Growth
Islamic Development Bank Group 41 st Annual Meeting Climate Friendly Transport Systems for Inclusive Growth Tyrrell Duncan, Technical Advisor (Transport) Asian Development Bank Aspects of transport and
More informationPolicies and Issues Relating to the development of Dry Ports
First meeting of the Working Group on Dry Ports Agenda item 5 Bangkok, 25-26 November 2015 Policies and Issues Relating to the development of Dry Ports Document E/ESCAP/DP/WG(1)/2 Policies and issues relating
More informationImportance of Dry Ports in Integrating Infrastructure Networks
National Seminar on Integrated Intermodal Transport Yogyakarta, 8-9 September 2015 Importance of Dry Ports in Integrating Infrastructure Networks Trade and transport: a new context Economic context Since
More informationAsian Development Bank Institute. ADBI Working Paper Series. Connecting South Asia and Southeast Asia: A Bangladesh Country Study
ADBI Working Paper Series Connecting South Asia and Southeast Asia: A Bangladesh Country Study Mustafizur Rahman, Khondaker Golam Moazzem, Mehruna Islam Chowdhury, and Farzana Sehrin No. 500 September
More informationKey Potential Railway Corridor along Trans Asian Railway Southern Corridor Impact on Costs of Trade & challenges involved
Key Potential Railway Corridor along Trans Asian Railway Southern Corridor Impact on Costs of Trade & challenges involved New Delhi, India 15 March 2017 1 The facts» Countries in Asia have had the highest
More informationESCAP activities to promote transport development of landlocked developing countries in the region
18TH OSCE ECONOMIC AND ENVIRONMENTAL FORUM FIRST PREPARATORY CONFERENCE, ASTANA, 12-13 October 2009 ESCAP activities to promote transport development of landlocked developing countries in the region Mr
More informationCE 355. Introduction to Water Transport
CE 355 Introduction to Water Transport Water transport can be broadly divided into two groups - Inland water transport and Shipping. Shipping, in turn, can again be divided into two categories Coastal
More informationUKRAINE: KEY FACTS GROWTH DRIVERS PRODUCTION TRADE. Ukraine GDP (current US$): $131,8billion in 2014 by World Bank estimation
UKRAINE: KEY FACTS GROWTH DRIVERS Ukraine GDP (current US$): $131,8billion in 2014 by World Bank estimation Average salary: $156 per month makes Ukraine the most cost-competitive manufacturing platform
More informationSECTOR ASSESSMENT (SUMMARY): TRANSPORT
Country Partnership Strategy: Pakistan, 2015 2019 SECTOR ASSESSMENT (SUMMARY): TRANSPORT Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Sector performance and problems. The transport
More information