1 Pre-Installation Guide DWL 66 66FS

2 TABLE OF CONTENTS Table of Contents...2 Introduction...4 Validity...4 Assignment of Responsibilities...5 Heidelberg Instruments Responsibilities:...5 Purchaser Responsibilities...5 Room Requirements...6 Equipment Dimensions:...6 Limitations to Distances of Equipment Components...6 Room Space Requirements...6 Machine Layout...7 Floor Loads at Supporting Points...7 Front View...8 Planning Guidelines...8 Example of a DWL 66FS Floor plan...9 Environmental Requirements...10 Clean room Settings and Specifications...10 Vibrations...10 Heat Load...11 Electrical Requirements...12 General Requirements...12 Electrical Supplies...13 Required Outlets...14 Air, Vacuum, and Water Supply...16 Compressed Air...16 Vacuum Communication Requirements...17 Furnishing, Equipment and Materials...18 Receiving, Handling and Storage...19 Crated Dimensions...19 Planning Guidelines

3 Receiving Guidelines...20 Heidelberg Instruments DWL 66FS Pre-Installation Site Inspection...21 Installation Considerations Overview...23 Doc. No. PI-033 Revision: 1 (January 2011) Copyright 2011 by Heidelberg Instruments 3

4 INTRODUCTION This guide is designed as a layout to aid in the planning stages of installation for a DWL 66FS high-resolution laser plotter. It gives information on: geometrical room requirements: footprints, sketches, distances, door sizes technical requirements: o connections and capacities of services (electricity, air, vacuum, water) o clean room specifications (minimum heat load capacity, temperature, humidity, vibrations, clean room class, lighting) materials required for installation start (additional clean room equipment, blanks, chemistry, processing capabilities, ) organizational processes of the pre-installation period (assignment of responsibilities, directions on receiving and unpacking of the system) It also includes a Pre-Installation Site Inspection Checklist at the end which should be filled out by the customer or a Heidelberg Instruments engineer prior to installation arrangement. It is also a valuable tool for the customer to check if all requirements were already taken into consideration. Warning: This is NOT an installation guide. The DWL 66FS must be unpacked and installed only by Heidelberg Instruments authorized representatives. Please note that while every effort has been made to ensure that the data given in this document is accurate, the information, figures, tables, specifications and schematics contained herein are subject to change without notice. Heidelberg Instruments makes no warranty or representation, either expressed or implied with respect to this document. In no event will Heidelberg Instruments be liable for any direct, indirect, special, incidental or consequential damages resulting from any defects in its documentation. VALIDITY This pre-installation guide is valid only for DWL 66FS systems with Genesis UV 355nm 250mW laser. If your system has a different configuration, please contact Heidelberg Instruments for a pre-installation guide matching your configuration. 4

5 ASSIGNMENT OF RESPONSIBILITIES HEIDELBERG INSTRUMENTS RESPONSIBILITIES: 1. Identify all site requirements and make site-planning recommendations (fulfilled with hand over of this document). 2. Unpack and install systems and conduct operation verification tests according to purchase contract. PURCHASER RESPONSIBILITIES 1. Prepare site as to meet all requirements defined in this guide. 2. Complete the enclosed Pre-Installation Site Inspection Checklist and return it to Heidelberg Instruments. 3. Receiving and delivery of system to destination. 4. Provide adequate indoor storage to accommodate coordinated shipments. 5. Provide labor and transportation equipment (e.g., manual or motorized fork lifts, rollers) for unboxing and positioning of the DWL 66FS system under Heidelberg Instruments supervision. 5

6 ROOM REQUIREMENTS Equipment and room dimension requirements are illustrated graphically at the end of this section. EQUIPMENT DIMENSIONS: Width Depth Height Weight DWL 66FS 1300 mm 51.2" 1100 mm mm kg 1760 lb Electronics Rack 630 mm mm mm kg 175 lb Laser Chiller (water/air) 220 mm mm mm kg 20 lb User PC, Conversion PC Standard enclosure Table 1 LIMITATIONS TO DISTANCES OF EQUIPMENT COMPONENTS Component 1 Component 2 Connection type and available length Main System Electronics rack Cables, 1.2m from center of back side of system (non-extendable) Main System Laser Chiller Hoses, 0.8m from center of back side of system, extendable to max. 3m (option) Electronics Rack User PC Power, serial, and network cable connections, 3.0m, extendable to 8.0m (option) Electronics Rack Conversion PC Network cable connection, not limited if done via hubs / switches / repeaters. ROOM SPACE REQUIREMENTS Table 2 Overall Minimum Room Space Requirement (Installed System) Width 2800 mm 110 Depth 2850 mm 112 Height 2450 mm 97 Minimum Work Space Clearances around Main System Front (loading area) 1500 mm 59 Rear, Left and Right 750 mm 29 Top 500 mm 20 Table 3 Table 4 6

7 MACHINE LAYOUT C 630 C B B A A 910 C C B B A A B B B B FLOOR LOADS AT SUPPORTING POINTS Figure 1 Location Description Footprint size (mm) Footprint Area (cm 2 ) Vertical Load (Newton) Maximum Typical A Main Granite System 76 Diameter B Flow Unit Castor Wheel Approx C Electronics Rack Castor Wheel Approx Table 5 7

8 FRONT VIEW PLANNING GUIDELINES 1. Check the maximum possible floor load. The weight per point is indicated in the installation plan. 2. Engage a professional moving company specializing in the transport of extremely heavy equipment. 3. The equipment will be delivered in parts. The granite system and the laminar flow unit are packed separately and are assembled at the final site. 4. For all doorways through which the DWL 66FS must be moved, a minimum width of 1000mm and a minimum height of 2000mm is required. Corners must allow a total area of 1500mm x 1000mm to pass. 5. All floors and elevators that have to be passed or used during move-in have to be capable to hold the system weight, distributed on the rest points of the moving equipment used. 8

9 EXAMPLE OF A DWL 66FS FLOOR PLAN Connections for utilities E- RACK 750 DWL 66FS 275 CHIL- LER Door Loading Area 1800 TABLE FOR PCs Storage Figure 2 9

10 ENVIRONMENTAL REQUIREMENTS CLEAN ROOM SETTINGS AND SPECIFICATIONS Temperature: Relative Humidity: Particles*: Vibrations: Light: set-point between C (65-75 F) stability ±1 C (±1.5 F) or better 40-60% during operation 20-60% during shutdown non-condensing Class 1000 (Max particles larger than 0.5 micron per cubic foot) or better. Should not exceed the values shown in Figure 3 below. According to photosensitive materials to be processed, safe yellow and/or ruby light. * Clean room class requirements depend on the products to be manufactured by the Heidelberg Instruments DWL 66FS. Especially if the system is to be used with a highresolution write head, a considerably higher clean room quality is required to avoid defects that destroy small structures (class 100 recommended). Please contact Heidelberg Instruments for details. VIBRATIONS The DWL 66FS is equipped with vibration isolation buffers. Special building foundations are usually not necessary. Figure 3 below shows the recommended maximum values. half sine displacement in micrometers a=0,25 m/s Frequency (Hz) Figure 3 10

11 HEAT LOAD The average heat generated by the DWL 66FS is based on its configuration. Please contact Heidelberg Instruments for an exact figure for your system. The values represented in Table 6 serve as a guide. Heat dissipation within the DWL 66FS main system by low energy exposure lasers, steppermotors, the interferometer laser, and most other electronic / optics components mounted directly on the granite system is taken care of by the temperature control system of the flow box. Maximum heat load to the clean room: Component Maximum Heat Dissipation E-rack 1500 W 1290 kcal/h Laser Chiller 350 W 300 kcal/h User PC and monitor 500 W 430 kcal/h Camera monitor 50 W 40 kcal/h Conversion PC and monitor 500 W 430 kcal/h Laminar Flow System 1500 W 1290 kcal/h Table 6 11

12 GENERAL REQUIREMENTS ELECTRICAL REQUIREMENTS No high frequency transients, impulses, sags and surges should be present on the input line. An uninterruptible safety earth ground connection may feed no more than a 2Ω impedance into the system. The voltage differential between neutral and earth ground must not exceed 1V when measured at the system power line input terminals. The fluctuation of this value must not exceed 25mV peak-to-peak. Brownouts (U < 90% U nom ) and Blackouts (U < 1% U nom ) should not occur more often than 10 times per year. If short (< 3 minutes) brownouts or blackouts occur more often, an on-line true UPS should be installed with the capacity to keep up the required voltages and currents for at least 3 minutes. To achieve maximum reliability and safety, Heidelberg Instruments recommends the following: A separate power isolation transformer supplying only the system and its peripherals. Regulation transformers may be required if power exhibits drops or surges in the line voltage beyond those ranges stated below. A transformer must be of an adequate size to power all system components and to accept additional equipment in the future. A power cut-off device, such as a remote trip switch or circuit breaker, to shut off power to all system components in the event of an emergency. This device must be easily accessible and located near a principle exit to the room housing the DWL system. 12

13 ELECTRICAL SUPPLIES Electrical Requirements DWL 66FS (excluding PCs (1) ) Power 230 VAC ±5% 50/60 Hz ±0.5% Service Peak Current Average Operating Current Average Power Consumption Electrical Requirements User PC with monitor and camera monitor (1) Conversion PC with monitor (1) Laser Chiller Flow Unit with Temperature Control 16 Ampere, dedicated, single phase (3-wire: phase, neutral, ground) 16 Ampere 12 Ampere 2800 W Auxiliary units DWL 66FS 230V / 115V, 50 / 60Hz, 550 Watt 230V / 115V, 50 / 60Hz, 450 Watt V, 50 / 60 Hz, 625 Watt 230V, 50Hz, 16A, 750 Watt average consumption Table 7 Note 1 The User PC is usually included in the electronics rack of the main system. In this case, the power consumption has to be added there. Optionally, also the Conversion PC can be integrated in the main system electronics rack. For more detailed information, please contact Heidelberg Instruments. The indicated voltage of 230 V is an absolute requirement. If your facility cannot supply this voltage, transformers are needed. Heidelberg Instruments enforces strict design control over the electrical requirements for each system. Electrical service that does not meet stated requirements can seriously affect the performance and the reliability of a system and may, in some cases, cause damage to the electronics. There are no shortcuts to meeting the electrical requirements. If the general and/or specific power specifications (shown above in Table 7) cannot be met for any reason, an online true sine wave UPS is mandatory. 13

14 REQUIRED OUTLETS Main Connector System Connector DWL 66FS The DWL 66FS is connected with a CEE type 230V, 16A single-phase male connector, 2-pole plus earth (3 wire). System Cable Length The cable length is 5m. Wall Connector System: A CEE type 230V, 16A wall connector should be used. Alternatively the CEE type 230V, 16A single-phase female cable connector (see note) can be used to connect a local type cable to a local type wall connector. A 2.5 mm 2, 3 wire cable should be used. Note: Table 8 A CEE type 230V female cable connector is included. HIMT will include a CEE type wall connector upon request. The system itself has a number of 230V receptacles for auxiliary equipment, such as for the User PC, and for servicing tools. Auxiliary Connectors PCs and Monitors Cable Length Wall connector Laser Chiller Cable Length Wall connector DWL 66FS The PCs and monitors of the DWL 66FS come with a connection plug board. It is connected with a single-phase 230V shockproof plug that can be exchanged for a local type 230V plug matching the power and voltage ratings (see above). The cable length is 3m (10 feet). A V, 16 A single-phase shockproof socket should be used. If the cable plug was exchanged for a local type plug, use the according local type socket. The chiller comes with one cable with german standard single-phase 230V shockproof plug, and one cable with US type connector. The connector can be exchanged for a local type plug matching the power and selected voltage ratings (see above). The unit cable is 1.5 m ( feet). A shockproof 16 A single-phase socket wall connector should be used. If a local type plug is used, a corresponding local type wall socket should be prepared. 14

15 Auxiliary Connectors Flow Unit with Temperature Control Cable Length Wall connector DWL 66FS The laminar flow unit for the DWL 66FS is connected with a single-phase 230V connector. The connector can be exchanged for a local type plug matching the power and voltage ratings (see above). The unit cable is 5m (17 feet). A shockproof 16 A single-phase socket wall connector should be used. If a local type plug is used, a corresponding local type wall socket should be prepared. Table 9 15

16 COMPRESSED AIR AIR, VACUUM, AND WATER SUPPLY Minimum Pressure Maximum Pressure 7 bar (100 psi) 10 bar (145 psi) Filter 5-10 µ Flow Continuous flow: 5 SL/min (2) Incidentally: up to 25 SL/min (2) Temperature Conditions Connection VACUUM 1 Minimum Pressure ±1 C (±1.4 F) with respect to room temperature Free of all contaminating fluids, oil, and water, whether liquid or vapor Cleanliness classes according to ISO : Oil:class 1 Partikels: class 1 Water: class 4 A quick connector (male) is provided with the system, which can be connected to the system side female FESTO connector KD-3/8 (FESTO part# 2144). The purchaser must provide factory side connections for 3/8 inch (9 mm) inside diameter (ID) hose, as well as hose of sufficient length for the connection. 0.5 bar (7 psi) Table 10 Capacity Min. 5 SL/min (2) Connection Connector for 1/6-inch (6mm) internal diameter hose Table 11 Note 1 Vacuum pump can optionally be provided by Heidelberg Instruments. Please contact Heidelberg Instruments for more information. Note 2 1SL = 1 standard liter = 1 liter at 1 bar and 20 C 16

17 COMMUNICATION REQUIREMENTS For the time of installation and during servicing periods, a telephone connection for national and international calls should be available close to the machine. The DWL 66FS main controller, the User PC and the Conversion PC are connected with each other via thin ethernet network connection and a hub. This network can be used as a stand alone network, or included into an existing local area network. In the latter case, the conversion PC can be placed anywhere where there is access to the LAN. Network communication Network connections Telephone connection Ethernet; 100BaseT system (RJ-45 connector) 1 LAN connection at the system location 1 LAN connection at each conversion PC location (if not at system) 3 static IP addresses within the LAN address room one telephone for local and international calls at the system location Table 12 As an option, the conversion PC can also be configured as a gateway PC to separate the system network address room from that of the LAN, and protect the system network from external access. For further information, please contact Heidelberg Instruments. 17

18 FURNISHING, EQUIPMENT AND MATERIALS Clean room furnishing: At least one table of at least 1.6 x 0.6m is required for Control PC, Conversion PC and Camera Monitor. Processing equipment: A wet bench, or comparable site prepared for chemical processing has to be available for exposure processing. DI water for rinsing and clean compressed air or nitrogen for drying have to be available at the processing site, as well as the required chemicals for processing of the available substrates (developer, etcher/fixer, stripper). Lithographic materials: Test blanks in sufficient number for function tests and rough calibration of all write modes have to be present at the site at installation start. These test blanks can be of minor quality (e.g., re-coated plates), but should be close to the preconditions listed in the system specifications. For fine calibration and acceptance exposures, commercial quality blanks are required. At least five blanks per write mode should be available. The blanks should be in accordance with the preconditions listed in the system specifications, or very close to them. For more information, contact Heidelberg Instruments. Evaluation equipment: An optical microscope with a resolution corresponding to the system's specified minimum structure size is required for evaluation of exposures. Recommended: 500x or better. For absolute calibration of the system, a golden plate is required, or a calibrated measuring device. Coolants: For filling of the closed loop water cooling circles, sufficient demineralized water (not deionzied!) has to be available. The required volume for the first filling depends on the system configuration. Please contact Heidelberg Instruments for an exact number for your system. Addition of anticorrosives is recommended in some of the circuits. 18

19 CRATED DIMENSIONS RECEIVING, HANDLING AND STORAGE The DWL 66FS is shipped in several crates. Since exact dimensions depend on the type of shipment, you will be informed on the exact sizes of the crates before shipment. Systems are large and heavy, requiring special loading and receiving dock facilities. PLANNING GUIDELINES 1. The purchaser must provide adequate loading / receiving dock and truck platforms and a receiving area protected from adverse weather conditions for receiving the system from a truck. If purchaser does not have a loading dock, then purchaser must notify Heidelberg Instruments at the time of order, or as soon as possible thereafter, to organize the unloading process. A professional moving company is necessary, and will be included for shipment, if requested. 2. Systems can be delivered to a local warehouse equipped to handle computer equipment and transferred to the purchaser s facility later, if requested. Under no circumstance is equipment to be temporarily stored outside, not even crated. CAUTION: The system must not be stored in damp, humid, or uncontrolled environment. If systems are stored for any length of time, the providing storage facility must adhere to a clean, controlled environment that will safeguard equipment from damage due to dust, humidity, and extreme temperature variations. 3. The purchaser must notify the carrier if there are any restrictions on delivery time, or location. 4. The purchaser must either provide or organize moving equipment (e.g., liftforks capable of lifting the system weight, heavy-weight rollers, pallet trucks, cranes if required) and personnel for transporting the equipment to its destination. It is recommended to engage personnel and equipment from an experienced transport company. We strongly recommend that a Heidelberg Instruments representative is present during unloading and moving of the equipment. 19

20 RECEIVING GUIDELINES 1. The purchaser s Receiving Department must conduct a thorough inspection of all incoming equipment and cartons. The number of packages or crates must match the number listed on the bill of loading. Please make note of any missing items. There should be no signs of abuse, mishandling, or damage due to shipping. Note: Do not open boxes that require unpacking prior to installation, only Heidelberg Instruments personnel or their authorized representatives are to open and inventory equipment. Heidelberg Instruments is not responsible for losses, damage, or missing items from boxes opened by unauthorized personnel. 2. If damage or discrepancies are detected, make the following notifications immediately: Driver of the delivery vehicle -Make note of the damage or discrepancies on the bill of loading Shipping carrier Your insurance company The carrier s insurance company Heidelberg Instruments or your HIMT representative. 20

21 HEIDELBERG INSTRUMENTS DWL 66FS PRE-INSTALLATION SITE INSPECTION Please complete the following checklist and return it to Heidelberg Instruments at least three weeks prior to scheduled shipping. Please attach an explanation of all No answers, and transmit the questionnaire by fax to Heidelberg Instruments. Approximate date facility will be ready: Can separate parts of a coordinated shipment be stored temporarily until all parts are received? Yes No If no, what storage arrangements have been made? Is a loading dock available? Yes No Are passageways and floor loads large enough to allow movement of equipment to destination? Yes No Note height and width of narrowest opening: Have you planned for the size and the weight of the system(s)? Yes No Have you planned for the necessary moving equipment, or have you engaged a professional moving company Yes No Have you allowed for the specified clearance around and above the system? Yes No Have you provided the required electrical service? Yes No Have you provided the compressed air, vacuum and water service? 21

22 Yes No Have all environmental requirements been met? Yes No Is the Local Area Network provided for? Yes No Questionnaire completed by: Name: Date: / Company: (Company) Address: Please complete and fax questionnaire to your local Heidelberg Instruments Service Manager or mail to: Heidelberg Instruments Technical Support Department Tullastrasse Heidelberg, Germany. techsupport@himt.de 22

23 INSTALLATION CONSIDERATIONS OVERVIEW DIMENSIONS System Electronics Module Width: 1300 mm 630 mm Depth: 1100 mm 760 mm Height: 1950 mm 1950 mm WEIGHT 900 kg TEMPERATURE STABILITY ±1 ºC HUMIDITY 50% ± 10% (Non-condensing) CLEAN ROOM Class 1000 (Or better) ELECTRICAL 230 VAC ± 5% 1-phase 50/60Hz 16 A COMPRESSED AIR 7-10 bar clean, dry and oilfree VACUUM 0.5 bar FOR MORE INFORMATION ON OUR DIRECT WRITE LASER SYSTEMS, PLEASE CONTACT OUR WORLDWIDE SERVICE ORGANIZATION: USA Heidelberg Instruments Inc. USA 2807 Oregon Court, Unit E2 Torrance, Ca USA Phone +1-(310) Fax +1-(310) service_usa@himt.de GERMANY Heidelberg Instruments Mikrotechnik GmbH Tullastr. 2, Heidelberg Germany Phone / Fax / service@himt.de CHINA Heidelberg Instruments China Rm.101, Block 1, Animation Park Yuehai Street, Nanhai Road, Nanshan District, Shenzhen China Phone: /-2/-7 Fax: service_china@himt.de JAPAN Heidelberg Instruments Japan Germany Center for Industrie and Trade , Hakusan Midori-ku, Yokohama, Japan Phone Fax service_japan@himt.de KOREA (South) Heidelberg Instruments Office #316 Expo Officetel, 381 Mannyeon-dong, Seo-gu Daejeon, South Korea Phone Fax service_korea@himt.de TAIWAN Heidelberg Instruments Taiwan 5F, No. 174 Chung Yang Road Hsinchu City Taiwan Phone Fax service_taiwan@himt.de 23

Gerber. Scientific Products. Dear Gerber Sabre Customer:

Gerber. Scientific Products. Dear Gerber Sabre Customer: Gerber Scientific Products 151 Batson Drive, Manchester, CT 06040 (860) 643-1515 Dear Gerber Sabre Customer: Thank you for purchasing the Sabre, Gerber Scientific Products advanced, high-speed, three-dimensional

More information

Gerber Scientific Products

Gerber Scientific Products Page 1 of 9 Sabre Series Router Pre-Installation Checklist Gerber FastFact # 5003 Supplied by: Gerber Service Last Modified: June 28, 2012 Summary: This document provides the Pre-Installation for your

More information

Agilent Technologies 7620-AS Sample Changer Site Preparation Checklist Hardware Site Preparation Specification

Agilent Technologies 7620-AS Sample Changer Site Preparation Checklist Hardware Site Preparation Specification Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation

More information

Gerber M Series Site Requirements

Gerber M Series Site Requirements Gerber M Series Site Requirements Preparing for the arrival of your new machine. P rior to the arrival of your Gerber M Series Cutting System there are certain things you can prepare to facilitate a quick

More information

CRON HDI-920 Site Planning. Customer Responsibilities

CRON HDI-920 Site Planning. Customer Responsibilities Customer Responsibilities CRON HDI-920 Site Planning You are responsible for providing the following items below to help ensure a trouble free installation. Adequate delivery access (i.e. Company Loading

More information

Customer Responsibilities

Customer Responsibilities Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation

More information

XN24 for Package Production. Site Preparation Guide XN24

XN24 for Package Production. Site Preparation Guide XN24 Site Preparation Guide 10-2014 XN24 Contents 1. Preface... 4 2. Change record...5 3. Introduction...6 3.1 Welcome...6 3.2 About Installation...6 4. Responsibilities... 4.1 Esko Responsibilities... 4.2

More information

Pre-installation Manual. Plate Processor 68/85 Thermal

Pre-installation Manual. Plate Processor 68/85 Thermal Pre-installation Manual Plate Processor 68/85 Thermal Pre-installation Manual Plate Processor 68/85 Thermal T1965 Edition DC, October 2011 Part No 51280 68/85 PLATE PROCESSOR INTRODUCTION RESERVATIONS

More information

E-Series Installing E-Series U Cabinet

E-Series Installing E-Series U Cabinet E-Series Installing E-Series 3040 40U Cabinet September 2018 215-13048_A0 doccomments@netapp.com Table of Contents 3 Contents Overview and specifications... 4 Cabinet features... 4 Power requirements

More information

Customer Responsibilities

Customer Responsibilities Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation of your Agilent ICP-OES, please refer to this site preparation checklist. Correct site

More information

Saphyr System Safety Guide for Saphyr P/N 60325

Saphyr System Safety Guide for Saphyr P/N 60325 Saphyr System Safety Guide for Saphyr P/N 60325 Document Number: 30253 Document Revision: A For Research Use Only. Not for use in diagnostic procedures. Copyright 2019 Bionano Genomics Inc. All Rights

More information

XPM 2. Reflow Soldering / Curing Systems. Site Preparation & Installation

XPM 2. Reflow Soldering / Curing Systems. Site Preparation & Installation XPM 2 Reflow Soldering / Curing Systems Site Preparation & Installation Site Preparation & Installation 1 Revision Date: May 2004 Table of Contents SITE PREPARATION CHECKLIST 3 ROOM PLANNING 4 Oven Clearances

More information

This document provides the Pre-Installation Checklist for the ADVANTAGE Router 600.

This document provides the Pre-Installation Checklist for the ADVANTAGE Router 600. Page 1 of 13 ADVANTAGE Router TM 600 Pre-Installation Checklist Gerber FastFact # 5008 Supplied by: Gerber Service Last Modified: October 29, 2001 Summary: This document provides the Pre-Installation Checklist

More information

TRS100 Rapid Assay System Pre-Installation Guide

TRS100 Rapid Assay System Pre-Installation Guide TRS100 Rapid Assay System Pre-Installation Guide NOTICE: This document contains references to Cobalt or Cobalt Light Systems. Please note that Cobalt Light Systems was purchased by Agilent in July 2017.

More information

RapID Raw Materials Verification System

RapID Raw Materials Verification System RapID Raw Materials Verification System Pre-Installation Guide NOTICE: This document contains references to Cobalt or Cobalt Light Systems. Please note that Cobalt Light Systems was purchased by Agilent

More information

C60 Standby UPS. 800VA Models. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved.

C60 Standby UPS. 800VA Models. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved. For more information, visit www.247technology.com/on-line-ups/c60-standby-ups C60 Standby UPS 800VA Models User & Installation Manual 2015. All rights reserved. (Rev 6/23/15) Table of Contents Package

More information

RENA XPS-3000 Base. User Guide. SC2000 Media Transport System

RENA XPS-3000 Base. User Guide. SC2000 Media Transport System SC2000 Media Transport System User Guide Please refer to your PS-2000 User Guide for information on the print system that may be attached to this base. NOTE: The SC2000 is also available in a stand-alone

More information

SelfCheck System R-Series. Site Planning Guide

SelfCheck System R-Series. Site Planning Guide SelfCheck System R-Series Site Planning Guide Copyright 2006 2007, 3M. All rights reserved. SelfCheck System R-Series Site Planning Guide 78 8129 2082 1 Rev. C 3M, Tattle-Tape, and SelfCheck are trademarks

More information

Table of contents. 1. Introduction

Table of contents. 1. Introduction 2 Year Warranty Table of contents 1. Introduction 1-1. Transportation 1-2. Preliminary steps 1-3. Initial setup 1-4. Important safety instructions 1-5. Maintenance, service and faults 2. Operation 2.1

More information

Pre-installation Manual CONCEPT 301 D/401 D/501 D

Pre-installation Manual CONCEPT 301 D/401 D/501 D Pre-installation Manual CONCEPT 301 D/401 D/501 D Pre-installation Manual CONCEPT 301 D/401 D/501 D Concept 301 D T11416 Edition BA, January 2015 This book has part No 10077155 0-2 This manual is published

More information

Installation and Operation Manual

Installation and Operation Manual Installation and Operation Manual Maintenance Bypass Panel Model: SU2030KMBP Tripp Lite follows a policy of continuous improvement. Product specifications are subject to change without notice. 1111 West

More information

Liquid Metal Cleanliness Analyzer for Continuous Monitoring

Liquid Metal Cleanliness Analyzer for Continuous Monitoring LiMCA CM Liquid Metal Cleanliness Analyzer for Continuous Monitoring n Direct, in-line and real-time inclusion measurement n Fully automated n Minimum maintenance n Integrated to the Process To maintain

More information

Equipment Specifications Low Voltage. Active Harmonic Filter

Equipment Specifications Low Voltage. Active Harmonic Filter Equipment Specifications Low Voltage Active Harmonic Filter 1.0 General Description This section contains the design standards, general equipment type and configuration, components, product description,

More information

XSTi Standby UPS. 400VA, 600VA, 800VA Models. User & Installation Manual

XSTi Standby UPS. 400VA, 600VA, 800VA Models. User & Installation Manual XSTi Standby UPS 400VA, 600VA, 800VA Models User & Installation Manual www.xpcc.com 2015. All rights reserved. (Rev 12/14/15) Table of Contents Package Contents... 3 Product Introduction... 3 Product Overview...

More information

Site Preparation Guide. Scodix Ultra Press and Scodix Ultra-Pro Press and Scodix Ultra Foil Station

Site Preparation Guide. Scodix Ultra Press and Scodix Ultra-Pro Press and Scodix Ultra Foil Station Site Preparation Guide Scodix Ultra Press and Scodix Ultra-Pro Press and Scodix Ultra Foil Station Important Notice Copyright 2012-2015 Scodix Ltd. All rights reserved. All product names are trademarks

More information

XBDM-HW63. 63A Model. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved.

XBDM-HW63. 63A Model. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved. XBDM-HW63 63A Model User & Installation Manual www.xpcc.com 2016. All rights reserved. (Rev 3/02/16) Table of Contents Introduction...3 Product Overview... 3 Installation and Operation...4 Inspection...4

More information

Integrated IC Systems Installation Qualification Dionex Corporation

Integrated IC Systems Installation Qualification Dionex Corporation Integrated IC Systems Installation Qualification 2009 Dionex Corporation Document. 031739 Revision 04 September 2009 2009, Dionex Corporation All rights reserved worldwide. Printed in the United States

More information

LOW PROFILE FLOOR SCALE

LOW PROFILE FLOOR SCALE π LOW PROFILE FLOOR SCALE 1-800-295-5510 uline.com SITE SELECTION Select a site for your new floor scale where it is least likely to be damaged by fork trucks and other material handling devices. Floor

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Digital Loop Carrier System

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Digital Loop Carrier System 1993 Specifications CSJ 0039-17-129 SPECIAL SPECIFICATION ITEM 6797 Digital Loop Carrier System 1.0 Description. This Item shall govern for the furnishing and installation of the Digital Loop Carrier System

More information

Applied Biosystems QuantStudio 12K Flex Real-Time PCR System

Applied Biosystems QuantStudio 12K Flex Real-Time PCR System USER GUIDE Applied Biosystems QuantStudio 12K Flex Real-Time PCR System SITE PREPARATION Publication Part Number 4470654 Rev. B Revision Date 5 May 2012 This guide contains the information needed to prepare

More information

Maintenance Bypass Breaker Cabinet Series Configuration 2. Installation and Operation Manual

Maintenance Bypass Breaker Cabinet Series Configuration 2. Installation and Operation Manual Maintenance Bypass Breaker Cabinet 90881 Series Configuration 2 Installation and Operation Manual 03/13/2012 2 755-00084-C2 R03 Copyright 2012 C&C Power, Inc. All rights reserved. C&C Power, Inc. 395 Mission

More information

1993 Specifications CSJ , etc. SPECIAL SPECIFICATION ITEM Digital Loop Carrier System

1993 Specifications CSJ , etc. SPECIAL SPECIFICATION ITEM Digital Loop Carrier System 1993 Specifications CSJ 0072-12-153, etc. SPECIAL SPECIFICATION ITEM 6285 Digital Loop Carrier System 1.0 Description. This Item shall govern for the furnishing and installation of the Digital Loop Carrier

More information

SYSTEM 600 BILL CHANGER INSTALLATION INSTRUCTIONS Congratulations...

SYSTEM 600 BILL CHANGER INSTALLATION INSTRUCTIONS Congratulations... www.standardchange.com 1-800-968-6955 Technical Phone Support is from 8:00AM to 7:30PM E.S.T., Monday-Friday Walk-in Service is from 8:00AM to 4:30PM E.S.T., Monday-Friday Parts Department is from 8:00AM

More information

OPERATOR S MANUAL Model 56A Prefeed / Dereeler

OPERATOR S MANUAL Model 56A Prefeed / Dereeler 110 Fairgrounds Drive P.O. Box 188 Manlius, NY 13104-0188 USA 315.682.9176 FAX: 315.682.9160 OPERATOR S MANUAL Model 56A Prefeed / Dereeler PRODUCTION WIRE PROCESSING EQUIPMENT Website: www.carpentermfg.com

More information

! CAUTION: Read and follow these instructions.

! CAUTION: Read and follow these instructions. OmniLog SAFETY AND INSTALLATION INSTRUCTIONS! CAUTION: Read and follow these instructions. Avoid Contact with Hazardous Live Parts WARNING: Risk of electrical shock. Refer servicing to qualified personnel.

More information

Dynatronics Parallel Bars

Dynatronics Parallel Bars Dynatronics Parallel Bars Operation & Service Manual For: Electric Height & Width Parallel Bars Electric Height Parallel Bars Platform Parallel Bars Folding Parallel Bars Dynatronics Corporation Dynatronics

More information

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment.

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment. RM140A-R3 RM140A-M-R3 RM145A-R3 RM145A-M-R3 Small Office/Home Office (SOHO) Cabinets Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment. Fit under most desktops in the

More information

Site Preparation Guide for

Site Preparation Guide for Site Preparation Guide for Scodix S52 / S74 / S75 Presses and Scodix Rainbow Station Scodix S52 / S75 Pro Press Scodix S74 Pro Press Scodix Rainbow Station Important Notice Copyright 2010 2014 Scodix Ltd.

More information

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard PART 1 GENERAL 1.1 Scope A. The intent of this specification is to provide power control for the parallel operation of generator

More information

Maintenance Bypass Breaker Cabinet Series Configuration 5. Installation and Operation Manual

Maintenance Bypass Breaker Cabinet Series Configuration 5. Installation and Operation Manual Maintenance Bypass Breaker Cabinet 90881 Series Configuration 5 Installation and Operation Manual 03/13/2012 2 755-00084-C5 R03 Copyright 2012 C&C Power, Inc. All rights reserved. C&C Power, Inc. 395 Mission

More information

J60 Lithium Ion UPS 350VA Model User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved.

J60 Lithium Ion UPS 350VA Model User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved. J60 Lithium Ion UPS 350VA Model User & Installation Manual www.xpcc.com 2018. All rights reserved. (Rev 5/24/18) Table of Contents Package Contents...3 Product Introduction...3 Product Overview...3 Installation

More information

Calibrate Accessory Actuators Instructions

Calibrate Accessory Actuators Instructions Instruction Manual Table of Contents Conditions of Sales and Product Warranty 3 Copyright Notice & Disclaimer 4 1.0 Technical Specifications 5 1.1 Features 6 2.0 Description 7 2.1 Components 8 3.0 Receiving

More information

3M Intelligent Return Classic and Sorter System SL. Architect/Contractor's Package

3M Intelligent Return Classic and Sorter System SL. Architect/Contractor's Package 3M Intelligent Return Classic and Sorter System SL Architect/Contractor's Package 3M, 2015. All rights reserved. 3M Intelligent Return Classic and Sorter System SL Architect/Contractor's Package, 78-8129-4936-6B

More information

Installation. Basic Rack Power Distribution Units AP9560 AP9561

Installation. Basic Rack Power Distribution Units AP9560 AP9561 Installation Basic Rack Power Distribution Units AP9560 AP9561 Contents Preliminary Information...................1 AP9560...........................1 AP9561...........................1 Safety and Grounding....................2

More information

Gerber CAT UV. Site Requirements, Operating Performance Requirements and Warranty Limitations

Gerber CAT UV. Site Requirements, Operating Performance Requirements and Warranty Limitations Gerber CAT UV Site Requirements, Operating Performance Requirements and Warranty Limitations The information in this document is extremely important for you and us, as it specifies the requirements needed

More information

SECTION VEHICLE LIFTS. B. Section Basic Electrical Materials and Methods: Power and controls wiring.

SECTION VEHICLE LIFTS. B. Section Basic Electrical Materials and Methods: Power and controls wiring. SECTION 14450 VEHICLE LIFTS PART 1 GENERAL 1.1 SECTION INCLUDES A. Skylifts. 1.2 RELATED SECTIONS A. Section 03300 - Concrete: Footings and foundations. B. Section 16050 - Basic Electrical Materials and

More information

WARNING ELECTRIC PALLET TRUCK EPT Revised A company dedicated to solving ergonomic and material handling problems since 1955.

WARNING ELECTRIC PALLET TRUCK EPT Revised A company dedicated to solving ergonomic and material handling problems since 1955. VESTIL MANUFACTURING CORPORATION 2999 North Wayne Street, P.O. Box 507 Angola, Indiana 46703 USA Phone (260) 665-7586 Fax (260) 665-1339 sales@vestil.com www.vestil.com SAFETY INSTRUCTIONS & OPERATING

More information

3M Intelligent Return Plus and Sorter System SL. Architect/Contractor's Package

3M Intelligent Return Plus and Sorter System SL. Architect/Contractor's Package 3M Intelligent Return Plus and Sorter System SL Architect/Contractor's Package 3M, 2015. All rights reserved. 3M Intelligent Return Plus and Sorter System SL Architect/Contractor's Package, 78-8129-4937-4B

More information

Agilent 7696A Sample Prep WorkBench

Agilent 7696A Sample Prep WorkBench Agilent 7696A Sample Prep WorkBench Site Preparation Agilent Technologies Notices Agilent Technologies, Inc. 2010 No part of this manual may be reproduced in any form or by any means (including electronic

More information

Pre-Installation Guide

Pre-Installation Guide Pre-Installation Guide PlateWriter 2000 InterPlater 85/135 HD Pre-Installation Guide PlateWriter TM 2000 0-2 2007 Glunz & Jensen A/S. All rights reserved. PlateWriter TM 2000 Pre-Installation Guide Part

More information

PAGODA SERIES OPERATOR'S MANUAL

PAGODA SERIES OPERATOR'S MANUAL Pagoda Series Packaged Blowers Keep This Manual With Pagoda Find additional information on this model at kooltronic.com, or use the Technical Documents QR code below. Technical Documents PAGODA SERIES

More information

Model 5200 Cargo Lift Installation and Operation Manual

Model 5200 Cargo Lift Installation and Operation Manual Model 5200 Cargo Lift Installation and Operation Manual Congratulations on the purchase of your new SpaceLift Products 5200 cargo lift system. Expect to receive many years of reliable service moving household

More information

V 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2

V 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2 V 2.0 ASSEMBLY GUIDE Series 2 TABLE OF CONTENTS OVERVIEW General Specifications...1 Cautions and Disclaimers...1 Contents of Kit...1 Tools Required For Assembly...2 Time Required to Assemble...2 ASSEMBLING

More information

APC Step-Down Transformer. Models: AP9626, AP9627, and AP9628

APC Step-Down Transformer. Models: AP9626, AP9627, and AP9628 User Manual English APC Step-Down Transformer Models: AP9626, AP9627, and AP9628 990-7820F 06/2006 Introduction Introduction The APC step-down transformers are used to convert a higher input voltage (208-200

More information

Quick Start Guide WaveMaster

Quick Start Guide WaveMaster Quick Start Guide WaveMaster Quick Start Guide WaveMaster 27650 SW 95th Ave. Wilsonville, OR 97070 This document is copyrighted with all rights reserved. Under the copyright laws, this document may not

More information

MTTC User Manual. Innovative Technology for a Connected World. General Description. Specifications and features

MTTC User Manual. Innovative Technology for a Connected World. General Description. Specifications and features Innovative Technology for a Connected World MTTC-1410 General Description The MTTC-1410 Thermoelectric is a precision instrument that utilizes Pulse Width Modulation (PWM) control technology to provide

More information

Quick-Start Operating Guide Document No Exhaust Fume Hood Copyright 2010 Terra Universal Inc. All rights reserved. Revised September 2010

Quick-Start Operating Guide Document No Exhaust Fume Hood Copyright 2010 Terra Universal Inc. All rights reserved. Revised September 2010 Document No. 1800-65 Exhaust Fume Hood Copyright 2010 Terra Universal Inc. All rights reserved. Revised September 2010 Terra Universal, Inc. TerraUniversal.com 800 S. Raymond Ave. Fullerton, CA 92831 TEL:

More information

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 11 00 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Site Preparation Guide for CX3-Series Storage Systems in a 40U-C Cabinet

Site Preparation Guide for CX3-Series Storage Systems in a 40U-C Cabinet Site Preparation Guide for CX3-Series Storage Systems in a 40U-C Cabinet P/N 300-003-846 REV A02 Tools Required Scissors Mechanical Lift OR Pallet Jack Copyright 2006-2007 EMC Corporation. All rights reserved.

More information

Precision Range (All Models)

Precision Range (All Models) Precision Range (All Models) Site Preparation Guide SP-Precision-1 12/01/16 Contents Site Preparation Guide 1 Contents 2 Change History 3 How to use this Manual 3 Customer Responsibilities 4 Safety Notices

More information

Precision Automatic Vacuum Control (PAVC+)

Precision Automatic Vacuum Control (PAVC+) USER GUIDE UGE105-1216 www.conairgroup.com Precision Automatic Vacuum Control (PAVC+) Corporate Office: 724.584.5500 l Instant Access 24/7 (Parts and Service): 800.458.1960 l Parts and Service: 814.437.6861

More information

Rack Power Distribution Unit AP7562, AP7563, AP7564 General Information

Rack Power Distribution Unit AP7562, AP7563, AP7564 General Information Rack Power Distribution Unit AP7562, AP7563, AP7564 General Information Description This booklet provides information on installing and operating the Rack Power Distribution Units (PDUs) AP7562, AP7563,

More information

SITE PREPARATION GUIDE

SITE PREPARATION GUIDE DEDICATED 5 x10 UV LED FLATBED PRINTER SITE PREPARATION GUIDE The information contained herein is subject to change without notice. The only warranties for Novus Imaging products and services are set forth

More information

Instruction Manual. Model 2831D. 4 ½ Digit True RMS Digital Multimeter

Instruction Manual. Model 2831D. 4 ½ Digit True RMS Digital Multimeter Instruction Manual Model 2831D 4 ½ Digit True RMS Digital Multimeter CONTENTS 1. PRODUCT DESCRIPTION 1-1. Introduction --------------------------------------------------------- ( 3 ) 1-2. Technical Specifications

More information

LIGHT CONTROLLER LC 500

LIGHT CONTROLLER LC 500 LIGHT CONTROLLER LC 500 Manual and User Guide Please read this manual before operating this product PSI, spol. s r. o., Drásov 470, 664 24 Drásov, Czech Republic FAX: +420 511 440 901, TEL: +420 511 440

More information

Latex 3000 Printer series. Site Preparation Checklist

Latex 3000 Printer series. Site Preparation Checklist Latex 3000 Printer series Site Preparation Checklist 2015, 2017 HP Development Company, L.P. 3 Legal notices The information contained herein is subject to change without notice. The only warranties for

More information

INSTALLATION & OPERATION INSTRUCTIONS ICW-3 WINDOW INTERCOM

INSTALLATION & OPERATION INSTRUCTIONS ICW-3 WINDOW INTERCOM INSTALLATION & OPERATION INSTRUCTIONS ICW-3 WINDOW INTERCOM 9350-7686-000 Rev. H 08/2004 TRADEMARKS AudioCom is a registered trademark of Telex Communications. Names of other products mentioned herein

More information

Model K11. 10ppm Accuracy DC Voltage Standard. Operating Manual

Model K11. 10ppm Accuracy DC Voltage Standard. Operating Manual Model K11 10ppm Accuracy DC Voltage Standard Operating Manual This page intentionally left blank. MODEL K-11 OPERATORS MANUAL Serial No. This page intentionally left blank. K11 OPERATORS MANUAL Copyright

More information

Laboklav. Type 55 to 195 Liter. Technical Datasheet. Dampfsterilisatoren Steam sterilizers

Laboklav. Type 55 to 195 Liter. Technical Datasheet. Dampfsterilisatoren Steam sterilizers Laboklav Dampfsterilisatoren Steam sterilizers Type 55 to 195 Liter Technical Datasheet Edition 07/2008 SHP Steriltechnik AG Gustav-Ricker-Str. 62 D-39120 Magdeburg Tel: +49 (0) 391 626988-0 Fax: +49 (0)

More information

LiMCA CM. Liquid Metal Cleanliness Analyzer for Continuous Monitoring

LiMCA CM. Liquid Metal Cleanliness Analyzer for Continuous Monitoring LiMCA CM Liquid Metal Cleanliness Analyzer To maintain their edge, world-class aluminum plants must be able to monitor in real-time and with precision the quality of their liquid aluminum. They must be

More information

SECTION VERTICAL MEZZANINE GATE U.S. Patent No:

SECTION VERTICAL MEZZANINE GATE U.S. Patent No: Page 1 of 6 Part 1. GENERAL SECTION 05522 VERTICAL MEZZANINE GATE U.S. Patent No: 5806245 1.1 SECTION INCLUDES A. Specialty custom designed, manual, fully electric, electric/pneumatic or fully pneumatic

More information

User Manual. PAT-Stand-16 Docking Station. Release 1.3. November EL-CELL GmbH

User Manual. PAT-Stand-16 Docking Station. Release 1.3. November EL-CELL GmbH User Manual Release 1.3 PAT-Stand-16 Docking Station November 2017 2017 EL-CELL GmbH The information in this manual has been carefully checked and believed to be accurate; however, no responsibility is

More information

Imperial Series. Model IMP-425/525/625/825/1000AP IMD-425/525/625/825/1000AP IMP-1025/1200/1500/2000AP IMD-1025/1200/1500/2000AP

Imperial Series. Model IMP-425/525/625/825/1000AP IMD-425/525/625/825/1000AP IMP-1025/1200/1500/2000AP IMD-1025/1200/1500/2000AP Service Manual Imperial Series Model IMP-425/525/625/825/1000AP IMD-425/525/625/825/1000AP IMP-1025/1200/1500/2000AP IMD-1025/1200/1500/2000AP Contents of Service Manual 1. Safety Precautions ------------------------------------------------------------------

More information

Chapter 9 Storage & Warehouse Systems

Chapter 9 Storage & Warehouse Systems FACILITIES PLANNING & DESIGN Alberto Garcia-Diaz J. MacGregor Smith Chapter 9 Storage & Warehouse Systems 1. Warehouse Layout Model 2. Storage Equipment 3. Automated Storage & Retrieval System 1 Dedicated

More information

USER MANUAL MODEL 1019 and 1019S DB-9 Async. Short Range Modem With Transformer Isolation

USER MANUAL MODEL 1019 and 1019S DB-9 Async. Short Range Modem With Transformer Isolation USER MANUAL MODEL 1019 and 1019S DB-9 Async. Short Range Modem With Transformer Isolation C E R T I F I E D An ISO-9001 Certified Company Part# 07M1019-C Doc# 051021UC Revised 06/03/99 SALES OFFICE (301)

More information

Distribution Box INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS UGC

Distribution Box INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS UGC www.conairgroup.com INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS UGC070-1217 Distribution Box Corporate Office: 724.584.5500 l Instant Access 24/7 (Parts and Service): 800.458.1960 l Parts and

More information

1501 Incubator for Ampoule Biological Indicators

1501 Incubator for Ampoule Biological Indicators MesaLabs 1501 Incubator for Ampoule Biological Indicators MesaLabs Mesa Laboratories, Inc. Biological Indicator Division Omaha Manufacturing Facility 8607 Park Drive, Omaha, NE 68127 USA (402) 593-0781

More information

Model 5200 Cargo Lift Installation and Operation Manual

Model 5200 Cargo Lift Installation and Operation Manual Model 5200 Cargo Lift Installation and Operation Manual Congratulations on the purchase of your new SpaceLift Products 5200 cargo lift system. Expect to receive many years of reliable service moving household

More information

SM-220-MP SHOCK TEST MACHINE. Halfsine. Sawtooth. Squarewave

SM-220-MP SHOCK TEST MACHINE. Halfsine. Sawtooth. Squarewave SHOCK TEST MACHINE SM-220-MP Halfsine Sawtooth Squarewave Technical subject to changes without prior notice! GUTENBERGSTRASSE 27 D-246 REINBEK / HAMBURG GERMANY SM-220-MP SHOCK TEST MACHINE Dimensions

More information

Model: 770 Light Vehicle Scale Size: 8 x30 x5 Size: 10 x30 x5 Capacity: 40K CLC: 20K Capacity: 60K CLC:30K Installation, Set-Up and Operation Manual

Model: 770 Light Vehicle Scale Size: 8 x30 x5 Size: 10 x30 x5 Capacity: 40K CLC: 20K Capacity: 60K CLC:30K Installation, Set-Up and Operation Manual SCALE WORKS, INC. Model: 770 Light Vehicle Scale Size: 8 x30 x5 Size: 10 x30 x5 Capacity: 40K CLC: 20K Capacity: 60K CLC:30K Installation, Set-Up and Operation Manual Cambridge Scale Works, Inc. P.O. Box

More information

Ecologix Environmental Systems, LLC

Ecologix Environmental Systems, LLC Ecologix Environmental Systems, LLC 120 Ansley Way Roswell, GA 30075 Toll Free: 888-326-2020 Tel: 770.993.8292 Fax: 770.993.8824 Email: info@ecologixsystems.com Web Site: www.ecologixsystems.com D412 Ozone

More information

Installation Guide. Single AC or Dual AC Sump Pump Installation. 1 AC Primary Pump or 2 AC Pumps with Auxiliary Alternator

Installation Guide. Single AC or Dual AC Sump Pump Installation. 1 AC Primary Pump or 2 AC Pumps with Auxiliary Alternator TM Installation Guide for the Beacon ProActTM 200 System Single AC or Dual AC Sump Pump Installation 1 AC Primary Pump or 2 AC Pumps with Auxiliary Alternator BEACON recommends that this product, like

More information

3M SelfCheck System V-Series Kiosk. Site Planning Guide

3M SelfCheck System V-Series Kiosk. Site Planning Guide 3M SelfCheck System V-Series Kiosk Site Planning Guide 3M, 2015. All rights reserved. 3M SelfCheck System V-Series Kiosk Site Planning Guide, 78-8126-8054-0_D1 3M, Tattle-Tape, and SelfCheck are trademarks

More information

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Low-Voltage Plug-in Busway - 225 to 5000 ampere, 600 VAC 1.02 RELATED

More information

PD6770 VANTAGEVIEW LOOP-POWERED PROCESS METER

PD6770 VANTAGEVIEW LOOP-POWERED PROCESS METER PD6770 VANTAGEVIEW LOOP-POWERED PROCESS METER 4-20 ma input 1 V drop (4 V with Backlight) 3½ Digits LCD, 1" High Loop-Powered Backlight Option HART Protocol Transparent Plastic NEMA 4X, IP65 Enclosure

More information

Spectrum Spotlight Installation Protocol Pre-Installation Details 16 November, 2001 Page Appendix 2. Related Documents

Spectrum Spotlight Installation Protocol Pre-Installation Details 16 November, 2001 Page Appendix 2. Related Documents Page - 1 - Appendix 2 Spectrum Spotlight System Pre-Installation Details The following information will help you prepare for the installation of your instrument and ensure that you are ready for the installation

More information

RUBBER BANDS 500 USER'S MANUAL. IGS Audio Igor Sobczyk 3 Maja 76d, Mysłowice, Poland ph:

RUBBER BANDS 500 USER'S MANUAL. IGS Audio Igor Sobczyk 3 Maja 76d, Mysłowice, Poland   ph: RUBBER BANDS 500 USER'S MANUAL IGS Audio Igor Sobczyk 3 Maja 76d, 41-400 Mysłowice, Poland e-mail: igs@o2.pl ph: +48 601 597 592 www.igsaudio.com Please read all of the following instructions and save

More information

MTS Criterion Series 40

MTS Criterion Series 40 MTS Criterion Series 40 Manual Title Lifting and Moving Additional Instructions Information be certain. 100-231-444 C Copyright information Trademark information Proprietary information Software validation

More information

Pre-Installation Guide and Checklist Fast T-Jet Blazer

Pre-Installation Guide and Checklist Fast T-Jet Blazer Pre-Installation Guide and Checklist Fast T-Jet Blazer April 2008 Version 2 3 Fast T-Jet Blazer Pre-Installation Guide and Checklist The material in this Guide is believed to be accurate and complete with

More information

INSTALLATION PROCEDURE

INSTALLATION PROCEDURE INSTALLATION PROCEDURE ELECTRA-flo/FI INSPECTION & HANDLING. The ELECTRA-flo/FI should be carefully inspected for damage prior to installation. Report damage to your Freight Department, or contact delivery

More information

KNHE20 SERIES WATER-TO-AIR HEAT EXCHANGER

KNHE20 SERIES WATER-TO-AIR HEAT EXCHANGER Keep This Manual With Heat Exchanger Find additional information on this model at kooltronic.com or use the Technical Documents QR code below. Technical Documents KNHE20 SERIES WATER-TO-AIR HEAT EXCHANGER

More information

Agilent 16047D Test Fixture

Agilent 16047D Test Fixture Agilent 16047D Test Fixture Operation and Service Manual Third Edition Agilent Technologies Japan, Ltd. Agilent PN 16047-90300 May 2000 Printed in Japan Notices The information contained in this document

More information

78-RK VARIABLE SPEED HEAVY DUTY VIBRATOR OPERATING MANUAL

78-RK VARIABLE SPEED HEAVY DUTY VIBRATOR OPERATING MANUAL 78-RK VARIABLE SPEED HEAVY DUTY VIBRATOR OPERATING MANUAL IMPORTANT INSTRUCTIONS WARNING! FOR YOUR SAFETY PLEASE READ INSTRUCTIONS BEFORE OPERATING TOOL & WEAR EYE PROTECTION FD.08/2009 THANK YOU FOR PURCHASING

More information

Ground Fault Protection. Medium Voltage Artificial Neutrals

Ground Fault Protection. Medium Voltage Artificial Neutrals Ground Fault Protection Medium Voltage Artificial Neutrals Installation and Maintenance Instruction Manual 7615 Kimbel Street, Mississauga, Ontario Canada L5S 1A8 Tel: (905)673-1553 Fax: (905)673-8472

More information

Site Preparation Guide. Stratasys J750 3D Printing System. DOC Rev. D1

Site Preparation Guide. Stratasys J750 3D Printing System. DOC Rev. D1 Site Preparation Guide Stratasys J750 3D Printing System DOC-08015 Rev. D1 Copyright Copyright 2016 Stratasys Ltd. All rights reserved. This documentation contains proprietary information of Stratasys

More information

Heat press PF-150C. Spare parts manual and machine diagrams. Author: MA Pagina 1 di 17 Edition: 05/2011 Replaces:

Heat press PF-150C. Spare parts manual and machine diagrams. Author: MA Pagina 1 di 17 Edition: 05/2011 Replaces: Author: MA Pagina 1 di 17 Heat press Author: MA Pagina 2 di 17 CONTENTS 0 PREFACE... 3 1 MACHINE IDENTIFICATION DATA... 4 1.1 IDENTIFICATION PLATE AND EC MARKINGS... 4 2 REGULATIONS AND GENERAL WARNINGS...

More information

COLORWAVE 600 SITE SURVEY Order Number

COLORWAVE 600 SITE SURVEY Order Number COLORWAVE 600 SITE SURVEY Order Number Site Information Customer Name: Department: Floor: Room/Suite: Address: City: State: Zip: Contact Name:(1) Phone: Ext: Contact Name:(2) Phone: Ext: Region: Branch:

More information

SECTION AUTOMATIC TRANSFER SWITCH

SECTION AUTOMATIC TRANSFER SWITCH SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH PART 1: GENERAL 1.01 SCOPE A. Furnish all labor, materials, equipment and appurtenances, install and test electrically operated, automatic transfer switch (ATS)

More information

Manual Rotary Heat Sealers. Type: F108TX. List of content : Introduction 2. General description 3. Application 4. Safety precautions 5

Manual Rotary Heat Sealers. Type: F108TX. List of content : Introduction 2. General description 3. Application 4. Safety precautions 5 Manual Rotary Heat Sealers Type: F108TX List of content : Page: Introduction 2 General description 3 Application 4 Safety precautions 5 Transport and storage 6 Installation 7 First Set-up 8 Connection

More information