1 PROJECT The University of Akron NASA Flight Readiness Review 12 March 2018

2 Rail Exit velocity of 23 Ft/s Corkscrew flight up to 960 Ft Ballistic crash landing near launch site The University of Akron College of Engineering

3 Software Simulations 4,242 Ft Predicted Altitude from OpenRocket OpenRocket RASAero 4,325 Ft Predicted Altitude from RASAero 960 Ft Actual Altitude Reached

4 Total Mass: 38.7 Pounds Key Vehicle Dimensions Total Length 101 inches Body I.D. 5 inches Body O.D inches Vehicle Wall Thickness inches Key System Dimensions Nose Cone 26 inches Payload Bay 14.5 inches Electronics Bay inches Parachute Bay inches Engine Bay 20.5 inches

5 Stability Calculations Stability Characteristic OpenRocket RASAero Hand CP (in) CG Wet (in) CG Post Burnout (in) Stability Margin on Launch Rail Stability Margin Post Burnout Stability Margin > 2.5 using all methods

6 FLIGHT CHARACTERISTICS Flight Profile Calculations Open Rocket RASAero Thrust to Weight Ratio Ft. Rail Exit Velocity (ft/s) Ft. Rail Exit Velocity (ft/s)

7 The Von Karman wound nose cone with PLA nose cone tip. Design Highlights Carbon Fiber Body PLA Tip Length: 26 with 7.25 shoulder Weight: lb

8 Above Motor Bay 0.2 lb Incremental Weights of Thick Aluminum Disks Secured by Nuts and Washers over Threaded Rods Nose Cone Tip Hollow Nose Cone Tip with room for Weight Addition along Threaded Rod Secured by Fastening Tip to Nose Cone Body with Retaining Plate

9 ABS FIN CAN Three Piece Assembly 3-D Printed Location: Motor Bay Hardware Fastened To Centering Rings and Fins FIBERGLASS DELTA FINS 8 Root Chord 6 Semi Span 1/8 Thick Flutter Safety Factor: 1.3

10 Commercially purchased Aeropack system to retain the motor Thrust Plate distributes thrust force of motor Centering Rings epoxied to motor mount tube to align motor concentrically

11 Air Brakes Connected to the Stability Ballast above the Motor Bay 3D Printed ABS Casing In-flight Analysis with Arduino Determines Deployment

12 Features Arduino Uno to rotate a servo motor based on input from an accelerometer and altimeter Increase drag on launch vehicle Enables target altitude to be reached with greater accuracy

13 Shear and Compression Testing of Body Tubes Wind Tunnel Tests for 1:5 Scale Model with and without Airbrakes and Full Scale Fin

14

15 Stress Analysis Body Tube Bulkheads Fins Fin Can Fluid Flow over Nose Cone

16 Chosen motor for test flight changed from the Cesaroni L995 to the Competition motor Cesaroni L1050 Motor Preparation Procedure Responsibility - Akronauts Mentor: Jerry Appenzeller

17 Drogue Parachute deployed from the lower body tube of the rocket Altitude: Apogee Main parachute deployed from upper body tube of the rocket once tender descender is opened Altitude: 500 ft. 2.

18 Drogue Parachute Diameter (in): 17 Area (sqft): Estimated Fabric Weight (lb): 0.02 Design: Hemispherical Material: Ripstop Nylon Drag Coefficient: 1.30 Terminal Velocity: 120 ft/s Main Parachute Diameter (in): Area (sqft): Estimated Fabric Weight (lb): 0.48 Design: Toroidal Material: Ripstop Nylon Drag Coefficient: 1.86 Terminal Velocity: ft/s

19 Drift distance calculations ensure the rocket does not drift outside of the permitted launch field Drogue and Main Wind Speed (mph) Time (sec) Drift (ft)

20 At apogee, the velocity of the launch vehicle is 0 ft/s. Here are the Kinetic Energy calculations at this key phase during flight. Kinetic Energy Calculations at Apogee Component Upper Rocket Body Lower Rocket Body Weight (lb) Mass (slug) Kinetic Energy (ft-lbf) Potential Energy (ft-lbf) , ,165 System Total ,619

21 At main deployment, the velocity of the launch vehicle is 120 ft/s. Here are the kinetic energy calculations at this key phase during flight. Kinetic Energy Calculations at Main Deploy Component Upper Rocket Body Lower Rocket Body Weight (lb) Mass (slug) Kinetic Energy (ft-lbf) Potential Energy (ft-lbf) System Total

22 Landing Kinetic Energy was calculated to ensure no single section of the rocket descends with a dangerous force Kinetic Energy Calculations upon Landing Component Weight (lb) Mass (slug) Kinetic Energy (ft-lbf) Upper Rocket Body Lower Rocket Body System Total

23 Number Part Name QTY Rated Force (lb) 1 U-Bolt Long Quick-Link Shock Cord Eye-to-Eye Swivel Bridle Short Quick-Link Shroud Lines Hardware and Ropes Used Connection Line to Inner Shroud Lines Connections Between Hardware and Ropes

24 Bulkhead Assembly for Drogue Attachment Components U-bolt Three holes for threaded rods for airbrakes Bulkhead Assembly for Main and Drogue Attachment/Ejection Components U-bolt 2 Ejection charge holes for ejection wires to go through

25 Black Powder Ejection 1 system for drogue ejection 1 redundant system for drogue ejection Total of 2 ejection systems: 2.1 grams of black powder for ejection and 2.75 grams for redundant ejection charge Jolly Logic Chute Release 1 system for main release 1 redundant system for main release Ground test performed with built in system for each to ensure full release prior to each launch.

26 Ground tests for the Jolly Logic Chute Releases were conducted to ensure that the releases worked properly and that redundancy worked. The two releases were wrapped around the main parachute. They were connected to each other, so a redundant system was formed. Both releases were turned on and set to do a ground test by putting the setting below the lowest altitude. This test proved to be very successful.

27 A secondary back up system capable of deploying drogue Features RRC3 Missile Works Altimeters, Two Pole Rotary Switch, and 9 V Batteries

28 RTx/GPS Telematics Navigator System Provides real-time bearing and distance Operates on Industrial, Scientific, and Medical (ISM) radio band (902MHz to 928MHz)

29 Two wheeled Self balancing Ultrasonic navigation Servo-driven latch releases spring loaded solar panel arm

30 Rover wheel diameter: 4.70 Rover length wheel to wheel: Rover body length: 8 Rover body height: 2.57 Rover body depth: 3.54

31 Black powder charges to pressurize payload bay and break shear pins Compressed springs to push payload out of the two sections 6 rods to secure the payload during flight Eye Bolts for ease of installation

32 Designed with Raspberry Pi 3B Code written in python Self balancing via MinIMU 9 v5 chipset Obstacle avoidance using ultrasonic sensor

33 WRC + Remote Control System by Missile Works 4 remote control outputs Operates on the license free ISM band Operational range of 20 miles

34 Updating of FMEA, PHA and Environmental Risk Assessment Tables Verification Column References Overhaul of NASA and Team Compliance Verification Final edits to Safety Procedures

35 QUESTIONS

PROJECT. The University of Akron. NASA Critical Design Review. 12 March 2018

PROJECT. The University of Akron. NASA Critical Design Review. 12 March 2018 PROJECT The University of Akron NASA Critical Design Review 12 March 2018 Air brake deployment just after rail exit as rocket fishtailed Corkscrew flight up to ~900 feet Ballistic crash landing near launch

More information

PROJECT. The University of Akron. NASA Critical Design Review. 26 January 2018

PROJECT. The University of Akron. NASA Critical Design Review. 26 January 2018 PROJECT The University of Akron NASA Critical Design Review 26 January 2018 Flawless Flight Motor detached during recovery during parachute inflation Detachment caused a fin to break off airframe Airframe

More information

Critical Design Review

Critical Design Review Critical Design Review University of Illinois at Urbana-Champaign NASA Student Launch 2016-2017 Illinois Space Society 1 Overview Illinois Space Society 2 Launch Vehicle Summary Illinois Space Society

More information

Georgia Tech CDR VTC Slides. Project Simple Complexity Critical Design Review VTC Slides January 2015

Georgia Tech CDR VTC Slides. Project Simple Complexity Critical Design Review VTC Slides January 2015 Georgia Tech CDR VTC Slides Project Simple Complexity 2014-2015 Critical Design Review VTC Slides January 2015 1 Agenda 1. Team Overview (1 Min) 2. Changes Since Preliminary Design Review (PDR) (1 Min)

More information

Critical Design Review Presentation

Critical Design Review Presentation Critical Design Review Presentation THE UNIVERSITY OF MISSISSIPPI ROCKET REBELS UNIVERSITY STUDENT LAUNCH INITIATIVE Vehicle Layout and Dimensional Data Structure and Propulsion Total Length 111 in Outer

More information

NUSPACE. Northeastern University Scientific Payloads: AtmosphericMeasurement and Controlled-Descent Experiment. Flight Readiness Review

NUSPACE. Northeastern University Scientific Payloads: AtmosphericMeasurement and Controlled-Descent Experiment. Flight Readiness Review NUSPACE Northeastern University Scientific Payloads: AtmosphericMeasurement and Controlled-Descent Experiment Flight Readiness Review Final CDLE Design ATMOS Design and Dimensions ATMOS Components situated

More information

Flight Readiness Review Presentation

Flight Readiness Review Presentation Flight Readiness Review Presentation THE UNIVERSITY OF MISSISSIPPI ROCKET REBELS UNIVERSITY STUDENT LAUNCH INITIATIVE The Launch Vehicle 3/9/2017 2016-2017 USLI FLIGHT READINESS REVIEW 2 Vehicle Layout

More information

System Level Design. Tasks: Aerodynamic Analysis, Atmospheric Measurements. Three Subsystems: Recovery Structural Aerodynamics and Flight Stability

System Level Design. Tasks: Aerodynamic Analysis, Atmospheric Measurements. Three Subsystems: Recovery Structural Aerodynamics and Flight Stability System Level Design Tasks: Aerodynamic Analysis, Atmospheric Measurements Three Subsystems: Recovery Structural Aerodynamics and Flight Stability Significant Features: Drag flap control system Vehicle

More information

University of Florida Rocket Team Flight Readiness Review

University of Florida Rocket Team Flight Readiness Review University of Florida Rocket Team Flight Readiness Review Agenda Overview Concept of Operations Mass Statement and Margin Launch Vehicle Launch Vehicle Dimensions Key Design Features Vehicle Integration

More information

Milestone Review Flysheet

Milestone Review Flysheet Review Flysheet Vehicle Properties Motor Properties Total Length (in) 115 Motor Manufacturer Cesaroni Diameter (in) 7.5 Motor Designation L1115 Gross Lift Off Weigh (lb) 40.9 Max/Average Thrust (lb) 385.1/251.6

More information

University of Florida Rocket Team Preliminary Design Report

University of Florida Rocket Team Preliminary Design Report University of Florida Rocket Team Preliminary Design Report Agenda Overview Mission Statement Concept of Operations Summary Vehicle Subsystems Motor Choice Flight Dynamics and Simulations Vehicle Verifications

More information

Georgia Tech NASA Flight Readiness Review Teleconference

Georgia Tech NASA Flight Readiness Review Teleconference Georgia Tech NASA Flight Readiness Review Teleconference Agenda 1. 2. 3. 4. 5. 6. 7. 8. Project KRIOS - FRR TEAM OVERVIEW Georgia Tech Team Overview Work Breakdown Structure Project KRIOS - FRR CHANGES

More information

University of Florida Rocket Team Critical Design Review

University of Florida Rocket Team Critical Design Review University of Florida Rocket Team Critical Design Review Agenda Overview Concept of Operations Launch Vehicle Dimensions Mass Statement and mass margin Launch Vehicle Key Design Features Motor Choice Stability

More information

Executive Summary. Team Jarts Rocket Design. Brett Foster, Joe Hintz, Eric Logisz, Cameron Schulz. Milwaukee School of Engineering

Executive Summary. Team Jarts Rocket Design. Brett Foster, Joe Hintz, Eric Logisz, Cameron Schulz. Milwaukee School of Engineering Team Jarts Rocket Design Brett Foster, Joe Hintz, Eric Logisz, Cameron Schulz Milwaukee School of Engineering Executive Summary The objective of the 2013 Wisconsin Space Grant Consortium collegiate rocket

More information

University of Florida Rocket Team Preliminary Design Review

University of Florida Rocket Team Preliminary Design Review University of Florida Rocket Team Preliminary Design Review Agenda Overview Mission Statement Concept of Operations Summary Vehicle Subsystems Motor Choice Flight Dynamics and Simulations Payloads Target

More information

PDR: CanSat-1.

PDR: CanSat-1. PDR: CanSat-1 masacontact@umich.edu Preliminary Design Review Presenters: Aaron Skiba - skiba@umich.edu Patrick Kellam - pjkellam@umich.edu Britton Bush - britbush@umich.edu Leslie Davies - Jeremy Jones

More information

NASA SL Flight Readiness Review

NASA SL Flight Readiness Review NASA SL Flight Readiness Review U N I V E R S I T Y O F A L A B A M A I N H U N T S V I L L E C H A R G E R R O C K E T WORKS M A R C H 9, 2 0 1 7 Presentation Summary Project Overview Readiness and Design

More information

NASA Student Launch 2017

NASA Student Launch 2017 NASA Student Launch 2017 Critical Design Review Presentation SOCIETY OF AERONAUTICS AND ROCKETRY January 18th, 2017 1 Final Launch Vehicle Dimensions Property Quantity Diameter (in) 6 Length (in) 145 Projected

More information

Preliminary Design Review Presentation Tarleton State University NASA USLI

Preliminary Design Review Presentation Tarleton State University NASA USLI Preliminary Design Review Presentation Tarleton State University NASA USLI 2012-2013 1 Presentation Outline # Title 3 4 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 22 23 24 25 26 27 Team Introduction Mission

More information

Tacho Lycos PDR Presentation. November 14, 2016

Tacho Lycos PDR Presentation. November 14, 2016 Tacho Lycos PDR Presentation November 14, 2016 Overview Vehicle Summary Flight Data Avionics Recovery System Payload Target Differentiation System (TDS) Upright Landing System (ULS) Compliance 2 Vehicle

More information

Iowa State University CDR Presentation

Iowa State University CDR Presentation Iowa State University CDR Presentation 2017-2018 1 Overview Project Overview Design Subscale Safety Project Plan Conclusion 2 Project Overview 3 Team Structure 4 5 Mission Overview Requirements: Reach

More information

NASA s Student Launch Initiative :

NASA s Student Launch Initiative : NASA s Student Launch Initiative : Seniors 8 Juniors 2 Sophomores 6 Interdisciplinary 2 Preliminary Design Review Payload: Fragile Material Protection Freshman 5 1 Agenda 1. Team Overview 2. 3. 4. I. Airframe

More information

Milestone Review Flysheet

Milestone Review Flysheet Review Flysheet Vehicle Properties Motor Properties Total Length (in) 104 Motor Manufacturer Aerotech Diameter (in) 4.02 Motor Designation K1103X Gross Lift Off Weigh (lb) 13.176 Max/Average Thrust (lb)

More information

University of Illinois Urbana-Champaign Illinois Space Society Student Launch Preliminary Design Review November 4, 2016

University of Illinois Urbana-Champaign Illinois Space Society Student Launch Preliminary Design Review November 4, 2016 University of Illinois Urbana-Champaign Illinois Space Society Student Launch 2016-2017 Preliminary Design Review November 4, 2016 Illinois Space Society 104 S. Wright Street Room 18C Urbana, Illinois

More information

Milestone Review Flysheet

Milestone Review Flysheet Milestone Review Flysheet 2017-2018 Institution University of Alabama in Huntsville Milestone Critical Design Re Vehicle Properties Total Length (in) Diameter (in) Gross Lift Off Weigh (lb.) Airframe Material(s)

More information

NU HOPE. Northeastern University. High-altitude Object Protection Experiment

NU HOPE. Northeastern University. High-altitude Object Protection Experiment NU HOPE Northeastern University High-altitude Object Protection Experiment Agenda Overview of Vehicle Properties Stability Analysis Launch Vehicle Sections and Systems Booster Stage Interstage system Payload

More information

UC Berkeley Space Technologies and Rocketry Post Launch Assessment Review Project U.R.S.A. 1

UC Berkeley Space Technologies and Rocketry Post Launch Assessment Review Project U.R.S.A. 1 UC Berkeley Space Technologies and Rocketry Post Launch Assessment Review Project U.R.S.A. 1 April 24, 2017 1 Upright Recovery and Sight Acquisition Contents 1 Flight Results 2 1.1 Motor Used........................................

More information

Iowa State University PDR Presentation

Iowa State University PDR Presentation Iowa State University PDR Presentation 2017-2018 1 Overview Project Overview Design Subscale Safety Project Plan Conclusion 2 Project Overview 3 Team Structure 4 Mission Overview Requirements: Reach an

More information

S AMUEL G INN C OLLEGE OF E NGINEERING. Auburn University. University Student Launch Initiative Critical Design Review

S AMUEL G INN C OLLEGE OF E NGINEERING. Auburn University. University Student Launch Initiative Critical Design Review S AMUEL G INN C OLLEGE OF E NGINEERING Auburn University University Student Launch Initiative 2013-2014 Critical Design Review Section 1: Summary of PDR Report... 1 1.1 Team Summary... 1 1.2 Launch Vehicle

More information

Table of Contents. California State Polytechnic University, Pomona NSL 1

Table of Contents. California State Polytechnic University, Pomona NSL 1 Student Launch Competition 207-208 Table of Contents General Information... 6. Adult Educators and Mentor... 6.2 Safety Officer... 6.3 Lead Engineer... 6.4 Team Members... 6.5 NAR Association... 7 2 Summary

More information

Team RPGs Flight Readiness Review

Team RPGs Flight Readiness Review Team RPGs Flight Readiness Review 1 Length 89.50 Diameter 6.00 Weight 6.75/15.3 Fin Span 22.00 Center of Gravity 51.4/57.44 Center of Pressure 70.33 Static Stability 3.20/2.11 2 1. The rocket is designed

More information

University of Florida NASA Student Launch

University of Florida NASA Student Launch 1 University of Florida NASA Student Launch Vertical Landing Utilizing Autorotation Preliminary Design Review November 4, 2016 2 Table of Contents TABLE OF CONTENTS... 2 TABLE OF FIGURES... 5 TABLE OF

More information

NUSPACE Scientific Payloads: Atmospheric-Measurement and Controlled-Descent Experiment

NUSPACE Scientific Payloads: Atmospheric-Measurement and Controlled-Descent Experiment NUSPACE Scientific Payloads: Atmospheric-Measurement and Controlled-Descent Experiment 2015-2016 NASA Student Launch Preliminary Design Review Northeastern University 267 Snell Engineering Boston, MA 02115

More information

Harvard-Westlake School Preliminary Design Review. Summary

Harvard-Westlake School Preliminary Design Review. Summary Harvard-Westlake School Preliminary Design Review Summary Team Summary Harvard-Westlake School North Hollywood, California Teachers o Mr. Jacob Hazard o Ms. Karen Hutchison Mentor o Mr. Rick Dickinson

More information

NASA USLI Preliminary Design Review (PDR) Rensselaer Rocket Society (RRS)

NASA USLI Preliminary Design Review (PDR) Rensselaer Rocket Society (RRS) 2016-2017 NASA USLI Preliminary Design Review (PDR) Rensselaer Rocket Society (RRS) Rensselaer Polytechnic Institute 110 8th St Troy, NY 12180 Project Name: Andromeda Task 3.3: Roll Induction and Counter

More information

TERMINATOR 5 BILL RILEY TRIPOLI LEVEL 3 CERTIFICATION PROJECT. Bill Riley Tripoli #12294

TERMINATOR 5 BILL RILEY TRIPOLI LEVEL 3 CERTIFICATION PROJECT. Bill Riley Tripoli #12294 TERMINATOR 5 BILL RILEY TRIPOLI LEVEL 3 CERTIFICATION PROJECT Bill Riley Tripoli #12294 RocketRiley@ip-mail.net Bill Riley Terminator 5 Tripoli Level 3 Certification Project Table of Contents Rocketry

More information

NASA Student Launch Flight Readiness Review

NASA Student Launch Flight Readiness Review NASA Student Launch 2016-2017 Flight Readiness Review 1000 W. Foothill Blvd. Glendora, CA 91741 Project Aegis Fragile Material Protection March 06, 2017 Table of Contents General Information... 13 1. School

More information

University of Iowa AIAA USLI Flight Readiness Review 3/11/2016

University of Iowa AIAA USLI Flight Readiness Review 3/11/2016 University of Iowa AIAA USLI Flight Readiness Review 3/11/2016 1 Team Members: Austin Brenner Andrew Opyd Ryan Bellamy Alec Archer Frank Schmitz Victoria Trojanowski Matthew Driggers Table of Contents

More information

Preliminary Design Review

Preliminary Design Review Preliminary Design Review Rensselaer Rocket Society NASA Student Launch 2017-2018 November 3, 2017 Contents 1 Summary 5 1.1 Team Summary............................................... 5 1.2 Launch Vehicle

More information

NASA Student Launch Critical Design Review

NASA Student Launch Critical Design Review NASA Student Launch 2016-2017 Critical Design Review 1000 W. Foothill Blvd. Glendora, CA 91741 Project Aegis Fragile Material Protection January 13, 2016 Table of Contents General Information... 10 1.

More information

NASA USLI Critical Design Review (CDR) Rensselaer Rocket Society (RRS) Rensselaer Polytechnic Institute 1999 Burdett Avenue Troy, NY 12180

NASA USLI Critical Design Review (CDR) Rensselaer Rocket Society (RRS) Rensselaer Polytechnic Institute 1999 Burdett Avenue Troy, NY 12180 2015 2016 NASA USLI Critical Design Review (CDR) Rensselaer Rocket Society (RRS) Rensselaer Polytechnic Institute 1999 Burdett Avenue Troy, NY 12180 Project Name: Red Gemini Task 3.1.1 Atmospheric Measurements

More information

Flight Readiness Review

Flight Readiness Review AIAA Orange County Section Student Launch Initiative 2010-2011 Flight Readiness Review Project M1 Quantification of the effects of acceleration on hard disk drive latency Submitted by: AIAA Orange County

More information

Tacho Lycos 2019 NASA Student Launch Preliminary Design Review

Tacho Lycos 2019 NASA Student Launch Preliminary Design Review Tacho Lycos 2019 NASA Student Launch Preliminary Design Review High-Powered Rocketry Club at NC State University 911 Oval Drive Raleigh, NC 27695 November 1, 2018 Common Abbreviations & Nomenclature AGL

More information

Georgia Tech Ramblin Rocketeers Critical Design Review

Georgia Tech Ramblin Rocketeers Critical Design Review 2012 2013 eorgia Tech Critical Design Review 2012 2013 EORIA TECH RAMBLIN ROCKETEERS CRITICAL DESIN REVIEW PAE INTENTIONALLY LEFT BLANK eorgia Institute of Technology 2 of 196 2012 2013 EORIA TECH RAMBLIN

More information

Santa Cruz, CA 95064

Santa Cruz, CA 95064 EFFECTIVE-1 Rocket Team at UC Santa Cruz 1156 High Street Santa Cruz, CA 95064 NASA Student Launch Initiative Critical Design Review January 12, 2018 1 1. Summary 6 1.1 Team Summary 6 1.2 Vehicle Summary

More information

NUMAV. Maxi-MAV. Northeastern University 267 Snell Engineering Boston, MA 02115

NUMAV. Maxi-MAV. Northeastern University 267 Snell Engineering Boston, MA 02115 NUMAV Maxi-MAV Northeastern University 267 Snell Engineering Boston, MA 02115 1 16 January 2014 Mentor Robert DeHate President, AMW/ProX NAR L3CC 75198 TRA TAP 9956 robert@amwprox.com 978.766.9271 Table

More information

2016 Northwest Indian College Space Center First Nations Launch Tribal Division Critical Design Report

2016 Northwest Indian College Space Center First Nations Launch Tribal Division Critical Design Report 2016 Northwest Indiann College Space Center First Natio ons Launch Tribal Division Critical Design Report Northwest Indian College Space Center 2016 FNL Preliminary Design Report for Tribal Competition

More information

Georgia Tech Ramblin Rocketeers Flight Readiness Review

Georgia Tech Ramblin Rocketeers Flight Readiness Review 2012 2013 eorgia Tech Flight Readiness Review 2012 2013 EORIA TECH RAMBLIN ROCKETEERS FLIHT READINESS REVIEW PAE INTENTIONALLY LEFT BLANK eorgia Institute of Technology 2 of 187 2012 2013 EORIA TECH RAMBLIN

More information

Eclipse-I Preliminary Design Review

Eclipse-I Preliminary Design Review Eclipse-I Preliminary Design Review NASA University Student Launch Initiative Proposal (2012 2013) Submitted to NASA Marshall Space Flight Center By University of California, Davis SpaceED_Rockets Team

More information

Northwest Indian College Space Center Team Skywalkers USLI Preliminary Design Review

Northwest Indian College Space Center Team Skywalkers USLI Preliminary Design Review 2011 Northwest Indian College Space Center Team Skywalkers USLI Preliminary Design Review INTENTIONALLY LEFT BLANK Contents I) Summary of Preliminary Design Review Report... 1 I.1 Team Summary... 1 I.1.1

More information

University of Mississippi Rocket Rebels

University of Mississippi Rocket Rebels University of Mississippi Rocket Rebels Project Presidium 2016-2017 NASA Student Launch Initiative Post-Launch Assessment Report March 6, 2017 Center for Manufacturing Excellence 1784 University Circle

More information

University of Illinois Urbana-Champaign Illinois Space Society Student Launch Proposal September 30, 2016

University of Illinois Urbana-Champaign Illinois Space Society Student Launch Proposal September 30, 2016 University of Illinois Urbana-Champaign Illinois Space Society Student Launch 2016-2017 Proposal September 30, 2016 Illinois Space Society 104 S. Wright Street Room 18C Urbana, Illinois 61801 Table of

More information

Design and Construction of a Solid Experimental Sounding Rocket, Amy

Design and Construction of a Solid Experimental Sounding Rocket, Amy Design and Construction of a Solid Experimental Sounding Rocket, Amy Team 40 Project Technical Report to the 2018 Spaceport America Cup Student Team Members: Ankita Kalra, Gopika Narayanan Kutty¹, Matthew

More information

Flight Readiness Review

Flight Readiness Review Flight Readiness Review 2012-2013 NASA USLI We can lick gravity, but sometimes the paperwork is overwhelming. - Werner Von Braun [Type text] I) Summary of FFR Report [Type text] i Note to reader: To facilitate

More information

Team 83 Project Report for IREC 2018

Team 83 Project Report for IREC 2018 Peter Wilkins, Jacob Henry, Thomas Hill, Matthew Buczkowski, Owen Langrehr, Owen Torres, Steven Pittaro, Vladimir Shapiro, William Elliott, Nicholas McNally, Gabriel Surina, Ari Rubinsztejn, Mara Boardman,

More information

Northwest Indian College Space Center Team SkyWalkers USLI Flight Readiness Review

Northwest Indian College Space Center Team SkyWalkers USLI Flight Readiness Review 2011 Northwest Indian College Space Center Team SkyWalkers USLI Flight Readiness Review INTENTIONALLY LEFT BLANK Contents I) Summary of Flight Readiness Review Report... 7 I.1 Team Summary... 7 I.1.a Team

More information

rocket s apogee. When this ejection occurs, the balloon and canister will no longer be

rocket s apogee. When this ejection occurs, the balloon and canister will no longer be 4.0 Drogue Chute The balloon and electronics canister will be ejected from the balloon near the rocket s apogee. When this ejection occurs, the balloon and canister will no longer be attached to the rocket

More information

NASA Student Launch Preliminary Design Review

NASA Student Launch Preliminary Design Review 2016-2017 NASA Student Launch Preliminary Design Review Institution: Mailing Address: Project Title: United States Naval Academy Aerospace Engineering Department United States Naval Academy ATTN: NASA

More information

Ares First Stage Development Igniting the Next Generation of Launch Vehicles

Ares First Stage Development Igniting the Next Generation of Launch Vehicles Wernher von Braun Memorial Symposium A premier aerospace and Innovation defense company Delivered. October 21-22, 2008, Von Braun Center, Huntsville, Alabama Ares First Stage Development Igniting the Next

More information

Argonia Cup Senior Capstone Competition Final Presentation

Argonia Cup Senior Capstone Competition Final Presentation Argonia Cup Senior Capstone Competition Final Presentation OSU Rocket Squad School of Mechanical and Aerospace Engineering Oklahoma State University May 2, 2018 ROCKET SQUAD Nick Foster Lucas Utley Andrew

More information

Abstract The following report presents the team s final rocket and payload design as it will be used to compete in the 8 th Intercollegiate Rocket

Abstract The following report presents the team s final rocket and payload design as it will be used to compete in the 8 th Intercollegiate Rocket Abstract The following report presents the team s final rocket and payload design as it will be used to compete in the 8 th Intercollegiate Rocket Engineering Competition. First, a brief introduction gives

More information

Flight Readiness Review

Flight Readiness Review Harding University University Student Launch Initiative Team Flight Readiness Review March 26, 2007 The Flying Bison Sarah Christensen Project Leader Dr. Ed Wilson Faculty Supervisor Dr. James Mackey Technical

More information

Critical Design Review Report

Critical Design Review Report Page 1 of 34 I. Summary of CDR report Team Summary University of Hawai i Windward Campus Hale Imiloa 45-720 Kea ahala Rd. Kane ohe Hawai i 96744 Dr. Joseph Ciotti (Principle Investigator) Dr. Jacob Hudson

More information

University of Mississippi Rocket Rebels

University of Mississippi Rocket Rebels University of Mississippi Rocket Rebels Project Presidium 2016-2017 NASA Student Launch Initiative Flight Readiness Review March 6, 2017 Center for Manufacturing Excellence 1784 University Circle University,

More information

Preliminary Design Review

Preliminary Design Review Preliminary Design Review I) Vehicle Criteria Selection, Design, and Verification of Launch Vehicle Mission Statement The Harding University USLI Team, in order to advance learning and enhance our overall

More information

A Study of Atmospheric Properties as a Function of Altitude

A Study of Atmospheric Properties as a Function of Altitude CRITICAL DESIGN REVIEW TO THE NASA 2011 UNIVERSITY STUDENT LAUNCH INITIATIVE A Study of Atmospheric Properties as a Function of Altitude By HARDING FLYING BISON 2011 USLI ROCKET TEAM JANUARY 24, 2011 Table

More information

NASA Student Launch PDR Report

NASA Student Launch PDR Report NASA Student Launch PDR Report Prepared for NASA by Boy Scout Troop 17 Student Launch Team Boy Scout Troop 17 322 Watercrest Drive Charlottesville, VA 22911 Page: 1 of 81 Date Revision Remarks Nov 2, 217

More information

National Aeronautics and Space Administration. Student Launch. College and University Handbook

National Aeronautics and Space Administration. Student Launch. College and University Handbook National Aeronautics and Space Administration 2018 SL NASA Student Launch College and University Handbook Note: For your convenience, this document identifies Web links when available. These links are

More information

SAFETECH 4.9K ST60-X v1.0. User s manual. Opale-Parachutes.com. Please read this manual before first use.

SAFETECH 4.9K ST60-X v1.0. User s manual. Opale-Parachutes.com. Please read this manual before first use. 2016 v1.0 User s manual SAFETECH 4.9K ST60-X Please read this manual before first use. Thank you for choosing Opale-Parachutes. This user s guide includes all the information you need to assemble and use

More information

F-SERIES: FF XT SPECIFICATIONS Exterior Swinging Four-Fold Door Systems

F-SERIES: FF XT SPECIFICATIONS Exterior Swinging Four-Fold Door Systems Version 5.22.13 F-SERIES: FF100-600XT SPECIFICATIONS Exterior Swinging Four-Fold Door Systems OPTIONS ARE LISTED IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT. CONSULT MANUFACTURER

More information

Critical Design Review

Critical Design Review Critical Design Review 2012-2013 NASA USLI Research is what I m doing when I don t know what I m doing. - Werner Von Braun [Type text] I) Summary of CDR Report [Type text] i Note to reader: To facilitate

More information

IO Project Technical Overview

IO Project Technical Overview IO Project Technical Overview Team 60 Project Technical Report for the 2018 IREC Mark Via 1, David Dembroski 1, Jared Weist 2, Matthew Hokky 1, Harrison Kearby 1, Wilson Flores 1, Matvey Yang 1 The Ohio

More information

PRELIMINARY DESIGN REVIEW November 4, 2016

PRELIMINARY DESIGN REVIEW November 4, 2016 NASA Student Launch Competition 206-207 PRELIMINARY DESIGN REVIEW November 4, 206 California State Polytechnic University, Pomona 380 W Temple Ave, Pomona, CA 9768 Department of Aerospace Engineering Proposal

More information

Flying Bison Team Harding University Flying Bison

Flying Bison Team Harding University Flying Bison Harding University University Student Launch Initiative Preliminary Design Review December 3, 2007 2006-07 Flying Bison Team Harding University Flying Bison Dr. Edmond Wilson Team Official Professor of

More information

Design, Construction, and Testing of West Virginia University s Wild & Wonderful II Sounding Rocket

Design, Construction, and Testing of West Virginia University s Wild & Wonderful II Sounding Rocket Design, Construction, and Testing of West Virginia University s Wild & Wonderful II Sounding Rocket Team 85 Project Technical Report for the 2018 Spaceport America Cup James Cameron Hale 1 West Virginia

More information

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

HIGH MAST CAMERA POLE ASSEMBLY GENERAL 10-3.24 HIGH MAST CAMERA POLE ASSEMBLY GENERAL The Contractor must furnish and install the following equipment for high mast camera pole assembly as described herein and as shown on the plans: 1. Camera

More information

TRAJECTORY ANALYSIS FOR THE HY-V SCRAMJET FLIGHT EXPERIMENT AND THE EFFECTS OF A RECOVERY SYSTEM

TRAJECTORY ANALYSIS FOR THE HY-V SCRAMJET FLIGHT EXPERIMENT AND THE EFFECTS OF A RECOVERY SYSTEM TRAJECTORY ANALYSIS FOR THE HY-V SCRAMJET FLIGHT EXPERIMENT AND THE EFFECTS OF A RECOVERY SYSTEM Amanda I. Smith University of Virginia, Charlottesville, Virginia 22904 Dr. Christopher P. Goyne, Advisor

More information

WALL MOUNTED ARTICULATING JIB CRANE

WALL MOUNTED ARTICULATING JIB CRANE SECTION 14656 WALL MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and

More information

CAR High Power Rocket. Level 4 Certification Process

CAR High Power Rocket. Level 4 Certification Process Canadian Association of Rocketry Level 4 Certification Process CAR High Power Rocket Level 4 Certification Process Version: 1.61 - Updated: September 20, 2009 Page 1 of 13 Contents 1. Introduction... 3

More information

A Comprehensive Study of Healing of Fargesia Furgosa from Hypergravity-Induced Damage

A Comprehensive Study of Healing of Fargesia Furgosa from Hypergravity-Induced Damage November 19, 2010 A Comprehensive Study of Healing of Fargesia Furgosa from Hypergravity-Induced Damage Madison West High School Back: Suhas, Max, Peter, Jacob E, Duncan Front: Yifan, Enrique, Jacob K

More information

UVic Rocketry Hyak-1 Technical Report. Team 117 Project Technical Report for the 2018 IREC

UVic Rocketry Hyak-1 Technical Report. Team 117 Project Technical Report for the 2018 IREC UVic Rocketry Hyak- Technical Report Team 7 Project Technical Report for the 208 IREC Malaki Vandas, Natasha Stefani, Meet Dobariya, Benjamin Stadnik, Annaliese Meyer, Sachi Premathilaka, Dylan Reimer,

More information

Tripoli Advisory Panel Documentation for PHOTON

Tripoli Advisory Panel Documentation for PHOTON Tripoli Advisory Panel Documentation for PHOTON Copyright 1999-2000 By Stephen D. Roberson TRA 1158 NAR 53741 All commercial rights reserved. Free unaltered transmission in cyberspace granted. Section

More information

OPTIONS ARE LISTED IN RED, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS.

OPTIONS ARE LISTED IN RED, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS. Version 5.29.12 FF700, HURRICANE RATED FOUR-FOLD DOOR SPECIFICATIONS OPTIONS ARE LISTED IN RED, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR

More information

Roll Induction and Counter Roll NASA University Student Launch Project Proposal. 30 September Propulsion Research Center,

Roll Induction and Counter Roll NASA University Student Launch Project Proposal. 30 September Propulsion Research Center, Roll Induction and Counter Roll 2016-2017 NASA University Student Launch Project Proposal 30 September 2016 Propulsion Research Center, 301 Sparkman Dr. NW, Huntsville Al, 35899 256-824-7209 Contents 1.

More information

F-SERIES: F SPECIFICATIONS Four-Fold Door Systems

F-SERIES: F SPECIFICATIONS Four-Fold Door Systems Version 5.22.13 F-SERIES: F100-600 SPECIFICATIONS Four-Fold Door Systems OPTIONS ARE IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT. CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS.

More information

80M 4-Square. An antenna project to obtain a bigger signal on the 80 Meter (3.5 to 3.8 MHz) amateur radio band. Bruce Whitney W8RA

80M 4-Square. An antenna project to obtain a bigger signal on the 80 Meter (3.5 to 3.8 MHz) amateur radio band. Bruce Whitney W8RA An antenna project to obtain a bigger signal on the 80 Meter (3.5 to 3.8 MHz) amateur radio band Bruce Whitney W8RA The Goal: Convert a vacant back field into 4.2 db of power (directional) gain Switchable

More information

SOFT RECOVERY SYSTEMS FOR GUN- FIRED PROJECTILE COMPONENTS

SOFT RECOVERY SYSTEMS FOR GUN- FIRED PROJECTILE COMPONENTS SOFT RECOVERY SYSTEMS FOR GUN- FIRED PROJECTILE COMPONENTS Item Type text; Proceedings Authors Fritch, Paul L.; Spinelli, Carmine J. Publisher International Foundation for Telemetering Journal International

More information

SAFETECH 3.2K ST v1.0. User s manual. Opale-Parachutes.com. Please read this manual before first use.

SAFETECH 3.2K ST v1.0. User s manual. Opale-Parachutes.com. Please read this manual before first use. 2016 v1.0 User s manual SAFETECH 3.2K ST60 Please read this manual before first use. Thank you for choosing Opale-Parachutes. This user s guide includes all the information you need to assemble and use

More information

The Effect of Acceleration on the Crystallization of Sodium Acetate

The Effect of Acceleration on the Crystallization of Sodium Acetate May 29th, 2010 The Effect of Acceleration on the Crystallization of Sodium Acetate Madison West High School New Team First Row: John, Enrique, Zoë, Rose Second Row: Yifan, Duncan, Ben, Jacob, Suhas SLI

More information

This guide can be used to prepare a specification for incorporating wall bracket jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating wall bracket jib cranes into a competitively bid construction project. SECTION 14654 WALL BRACKET JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

VSS-2 ½ D HIGH HEAD SUMP PUMP FREE STANDING

VSS-2 ½ D HIGH HEAD SUMP PUMP FREE STANDING Flows to 200 GPM. TDH to 95 Feet at 1750 RPM Free Standing or Guide Rail Design. Available in Standard Submersible or Explosion Proof Design. Provided with 25 feet of submersible motor power cable. Cast

More information

PRE-INSTALLATION GUIDE

PRE-INSTALLATION GUIDE TRUMPF MEDICAL SYSTEMS Inc. Charleston, SC PRE-INSTALLATION GUIDE FOR CEILING MOUNTED EQUIPMENT MANAGEMENT SYSTEMS, SURGICAL / EXAM LIGHTS, AND FLAT PANELS EMS and Light Pre-installation Guide File: 110720

More information

HARRIS RECON DRONE. Sean F Flemming, Senior in Mechanical Engineering, University of Michigan

HARRIS RECON DRONE. Sean F Flemming, Senior in Mechanical Engineering, University of Michigan HARRIS RECON DRONE Sean F Flemming, Senior in Mechanical Engineering, University of Michigan Abstract This project was sponsored by Harris Corporation as part of the Multidisciplinary Design Program (MDP).

More information

Low Cost HALO Cargo Airdrop Systems

Low Cost HALO Cargo Airdrop Systems 2th AIAA Aerodynamic Decelerator Systems Technology Conference and Seminar 4-7 May 29, Seattle, Washington AIAA 29-291 Low Cost HALO Cargo Airdrop Systems James Sadeck 1, Justin Riley 2, Kenneth J.

More information

FF200, FOUR-FOLD DOORS CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS.

FF200, FOUR-FOLD DOORS CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS. FF200, FOUR-FOLD DOORS CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT SECTION 230548 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Elastomeric Isolation pads. 2. Elastomeric Isolation mounts. 3. [Freestanding] [Restrained] [Freestanding and restrained]

More information

Analysis of Pollen Distribution at Various Altitudes

Analysis of Pollen Distribution at Various Altitudes Analysis of Pollen Distribution at Various Altitudes Critical Design Review, Madison, WI First Row: Tenzin Sonam, John Schoech, Ben Winokur, Henry Wroblewski, Alec Walker Second Row: Connie Wang, Zoë Batson,

More information

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS PART 1 - GENERAL 1.01 SUMMARY A. Section Includes furnishing and installing chain-link fabric fence, gate, and appurtenances. 1.02

More information

SECTION SECTIONAL OVERHEAD DOORS

SECTION SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Doors B. Track and Framing 1.2 RELATED SECTIONS A. Section 04810 - Unit Masonry Assemblies: Prepared opening in masonry.

More information

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College SECTION 323113 - CHAIN LINK FENCES AND GATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information