ISO Quality Management System Manual

Size: px
Start display at page:

Download "ISO Quality Management System Manual"

Transcription

1 TMQ International Pty Ltd ISO Quality Management System Manual Index TMQ International Pty Ltd... 1 Scope... 2 Understanding and Context... 2 Interested Parties... 2 Leadership... 3 Quality Policy... 4 Planning... 5 TMQ Objectives Measurement... 5 Performance Measurement... 6 Quality Management System Processes... 7 Process Approach... 7 Sales... 8 Service Support Documented Information Documents and Records Training Product Design and Development Production Receipt & Dispatch Purchasing Complaints Non-Conformance - Corrective Actions Internal Quality Audits Document changes Appendix A OP18 - GMDSS/SOLAS RADIO SURVEY Appendix B OP19 - RADIO EQUIPMENT TESTING/EXAMINATION Appendix C OP20 - ANNUAL PERFORMANCE TEST (APT) OF VDR AND SVDR Page 1 of 29 TMQ Quality Management System 24 August 2017

2 Scope The Management System requirements are applicable to the design and manufacture of marine autopilots, plotting systems and associated accessories. Stock holding, sales, repair and installation of marine electronic /electrical equipment and marine engines and steering control systems. Servicing of local vessels. Servicing of Deep-sea vessels around Australia. Understanding and Context Relevant to its purpose and strategic direction, TQM International consider, monitor and review internal and external factors and uncertainties to determine the issues (both positive and negative) potentially impacting our ability to provide our products and services. Both probability and consequences of identified issues risks and opportunities are considered. The basis for consideration of external and internal factors will include Strengths, Weaknesses, Opportunities and Threats. (SWOT Analysis) External issues Together with SWOT Analysis, TMQ International may also consider local, regional, national and international issues relevant to political, technological, economic, competitive, market, legal, and social conditions Internal Issues Internal context understanding may consider TMQ International values, culture, knowledge and performance Information relevant to identified External and Internal Factors and any resultant actions addressing these, as appropriate, is monitored reviewed annually. Interested Parties We at TMQ International identify, monitor and review all our interested parties and also their associated needs and expectations directly affecting our quality leadership program. Interested Party Internal. Reason to include ( include risks and opportunities) External Top Leadership Internal Has direct responsibility for company management Company must remain financially healthy, concerned with growth of company and QMS processes must be efficient Certification Body External ISO compliance Audits, issue certifications AMI Internal Parent Company CPA External Provides accounting services and annual financial reviews Customer External Purchase our products and services. Expect high quality products and flows down their QMS requirements into our system Employee / Staff Internal Directly responsible for design, manufacture of products, delivery of services. Good work environment, fair compensation and appropriate training to competence levels Local Community External Impacted by our activities in the region Wants TQM International to hire and retain local workers Public External Maintain good community relationships Concern with Product Page 2 of 29 TMQ Quality Management System 24 August 2017

3 Safety Brisbane City Council External Health and Safety Compliance Neighbours External Emergency Situations/ Environmental Impacts AMSA (Australian Safety Authority) /AusChart AusChart External National Shipping Compliance Regulatory Body National Hydrographic Charting Regulatory Body T.A.F.E External Qualification of Apprentices to Trades best practices Supplier External Provides our products/parts, raw materials and critical support services Expect to be paid promptly and need for company to clearly defined product/part/raw material/service requirements. Testing Authority External Regulatory type testing on prototype designs including materials Classification Society External Product Testing Standards IT Services (AMI) External To provide update IT, security, Information backups, resources ensuring communication and repositories for company financials communications with Stakeholders Plant and Equipment suppliers External Providing Reliable Plant and Equipment Associated Documentation: SWOT Analysis Leadership TMQ International top management demonstrates commitment and leadership toward the effectiveness of the Quality Management System, Quality Policy, customer focus and roles and responsibilities by. Weakly meetings Reviewing objectives Swat analysis Management review meeting Mission Statement Confidence in our product and ensure customer satisfaction. We the Directors and staff of TMQ International, have complete confidence in our product that it is suitable for the end user use and we will do everything possible to ensure our customers satisfaction with our equipment and services. Vision To be an International leader in Marine and Industrial technology. Prime Objectives: TMQ International is a supplier to the marine industry providing a range of electronic, hydraulic and associated hardware equipment to enhance the safety of vessels at sea and, where suitable, to promote this equipment to other markets where the technology can be used. Supply a product suitable for the end user requirements and support the reseller and end users with technical knowledge to ensure an ongoing relationship with both parties. Page 3 of 29 TMQ Quality Management System 24 August 2017

4 To give our suppliers an active marketing programs in our allocated territories, to ensure sales growth for their product and give technical support for their product to enhance our sales of their product. To design and develop product which is accepted by our customers, is suitable for their needs, enhances the company financially and gives pride to staff to manufacture and promote. To ensure product meet international requirement and standard. To give our employees an interesting and fulfilling place to work and ensure long term employment. To ensure funds invested by the shareholders is protected. TQM International Key Quality Performance Indicator criteria are established based on risk and opportunity (LRQA audit report) Approved by Gary Bowater Managing Director Thursday, 24 August 2017 Quality Policy TMQ International s aim is to provide a high quality, professional and efficient service and to ensure the satisfaction of all of the requirements of our clients. This achievement will result in securing efficiency, a strong customer focus and enhancement of long-term sustainability and profitability. The Management Team shows leadership and commitment and bears the responsibility for: - Establishing, implementing, integrating and maintaining the Quality Management System. - Ensuring sufficient resources are made available within the Organisation to achieve this. - Ensuring through communication, engagement, practical example and training that Quality is the aim of all members of the Organisation. Through direction and support, each employee will have a proper understanding of the importance of the Quality System function, their responsibility to contribute to its effectiveness, and its direct relevance to the success of the Organisation. Equally, every employee is responsible for, and will be trained to perform the duties required by his or her specific role. TMQ International is committed to (has a Policy of promoting continual improvement and setting of Quality Objectives in line with the framework laid down within ISO 9001:2015 Standard. These objectives will address the risks and opportunities within the Organisation as determined by Leadership.(Top Management.) Customers Page 4 of 29 TMQ Quality Management System 24 August 2017

5 We regard our customers as the primary reason for us being here and we give our customer satisfaction by, ensuring we supply product from reputable suppliers and our production process provide product of repeatable quality and reliability We ensure we have systems in place to give continued improvement to our services and products. Our Suppliers: Use preferred suppliers with ISO9001 accreditation or have a proven record of product support and reliability. If new supplier, then supplier assessment to be carried out in accordance to TMQ purchasing procedure. (Check ability to Supply, Quality of product, pricing and ability to deliver.) Our Production Process: Qualification of employees - Only suitably qualified or trained personnel to perform work instruction. Material list Micronet kit list to be used as per product code. Test procedure All product to be tested prior to despatch. Test sheet - Product test sheet to be completed. Our Production Performance: Product scheduling to meet budget and cost Reporting Machine Failures Production line failure Component failure Completed unit test failure Filing - Test sheet with serial numbers filed. Customer satisfaction Customer feedback - Results of field test Quality Review: The quality policy is to be reviewed: At Management Review Meetings. When a customer complaint relates to a critical operational failure of any manufactured unit. Associated Documentation Non- Conformance Report NCR Log Customer Complaint Form (Multi form TMQ-1403) Customer Complaint File (CCF Log) Planning The Quality system is planned based on risks and opportunities identified during the context assessment of and the needs and expectations of TMQ International interested parties and Internal and External Factors Quality Systems changes are carried out in a planned manner TMQ Objectives Measurement TMQ International is a supplier to the Marine industry and supports a range of Electronic, Hydraulic and associated Hardware equipment to enhance the safety and efficiency of vessels at sea and where suitable to promote this equipment to other markets where the technology can be used. Page 5 of 29 TMQ Quality Management System 24 August 2017

6 Supply a product suitable for end user TMQ monitor sales to dealers via accounting system, verbal dealer feedback, and end user feedback at exhibitions. To ensure a steady sales growth within the financial and personnel restraint of the company. To give our suppliers enhanced sales of their product. Product sold on behalf of suppliers is monitored by our accounting systems and personal contact to suppliers by telephone conversations and interaction at exhibitions. Sales of imported product must be at levels requested by suppliers and feedback from end users or resellers is to be forwarded to the suppliers. TMQ will commit to service and support these products. To design and develop product TMQ will endeavour to design and manufacture product when a need for a new product is requested by end users and resellers, when an opposition product has technical advantages or when a product can be enhanced and used to improve a TMQ product line Any TMQ designed and manufactured product must have greater financial rewards than reselling a product supplied by a supplier. TMQ aims to give priority service and support of these products. To give our employees long-term employment. The staff at TMQ must have a stimulating environment in which to work, be listened to by management and feel they are involved in the process of TMQ being a successful company. Reviews by management must be forthcoming and open for the individual to improve their worth to the company and for management to understand the employee s requirements. To ensure funds invested by the shareholders is protected. The shareholders expect the funds committed to make TMQ successful must be protected and financial rewards must be greater over a long time than investing in the stock market or property market. The shareholders see TMQ as a long-term investment. TMQ International have identified the Quality Objectives to be measured and also determined planned activities, resources required, responsibilities, timing for completion and evaluation methods to achieved planned outcomes. Performance Measurement In all TMQ International endeavours, the accounting system is used as a tool to provide performance indicators with comparison to previous data. Data to be collected by the accounting system will include but not limited to: Sales Financial Sales volume Returns by Credit notes Profitability Operation Costs Detailed costs Purchase data Manufacturing data Page 6 of 29 TMQ Quality Management System 24 August 2017

7 Other performance indicators to be used: Internal Auditing of sections to confirm procedural compliance Staff reviews and feedback from weekly staff meetings Management meetings to set time scales for projects, to implement improvements, determine monitoring of special projects, ascertain training requirements Production meeting to set schedules and to highlight deficiency or improve work practices. Customer complaint forms indicating any trend in customer feedback which could highlight: Product failure Reseller or end user support failure. Misunderstanding of reseller or end user request. Non Conforming Reports on: Product failure in field or during manufacture and testing, Procedural failure requiring change to work instructions or training Documented or verbal policy unable to be implemented. Relevant functional and process objectives shall be measurable, tracked and monitored, communicated and updated as appropriate. Management Review Meetings A meeting is to be held six monthly, (where possible) to review sales, operation, and Quality System requirements to allow policy planning and implementation. An agenda is to be produced for the meeting. This is to contain all relevant information (where possible) to be distributed to attendees. Quality Management System Processes Process Approach We at TQM International have established and mature processes covering: Sales, Quotation and Servicing Design, Development and Production Customer Service and Satisfaction Management Systems These processes are effectively described in this Quality Manual and include process inputs and outputs, sequence and interdependencies, criteria and methods, responsibilities and authorities. Process Risks and Opportunities are addressed and evaluated for any changes and improvements. Page 7 of 29 TMQ Quality Management System 24 August 2017

8 Sales TMQ supplies service product and goods to satisfy customer needs. To achieve this any orders/contracts are reviewed to ensure orders/contracts requirements are met. TMQ orders/contracts reviews falls into two main categories: 1. Formal review for tenders, quotes and orders where special requirements in accordance with a contract are likely to be specified. This procedure would be applied to the following: - Government tenders, quotes and contracts - Government orders - High Seas sales - Export Sale - Specific sales where the product is not stocked or listed in our price list. 2. Standard review for any quotes, orders (written or verbal) for TMQ manufactured or stock holding products and repair for supply to the domestic market. (May be recorded as a Computer generated quote (Micronet) or a hand written quote, (Pre printed Quote form) Any Formal Review requires input from the General Manager as well as any competent person authorised by the General Manager. Such review should consider the following: Scope of supply Ability supply Resources to ensure timely delivery Regulatory requirements eg: Import / Export regulations, IMO/AMSA standards Cost constraints Design requirements Terms & conditions (including settlement details) Risk to the company Any other areas as determined by the General Manager Standard Review is conducted by any person so authorised (eg: sales or service personnel) and applies to TMQ manufactured and stock holding product documented in a published price list. The review process also applies to service repairs. Review should consider the following: Customer order details Customer account status Ability to supply Confirmation of requirements (if not specified) Advice to customer (delays or variations to order) Method of delivery Risk to company Any other areas as determined from time to time by the General Manager On completion of review the relevant documentation (eg: quote, order, etc) is signed and dated by reviewing personnel Page 8 of 29 TMQ Quality Management System 24 August 2017

9 Sales action. Receive order, facsimile- phone- or by person Review Advise client of any delay Print picking slip or proforma invoice. Confirm proforma matches customer order. Forward to despatch. Quote action. Receive request by facsimile- phone- or by person. Forward to General Manager (or Operations Manager in his absence) Review for acceptance of offer to quote or tender Select type of Quote: Formal, Micronet, Quote / Order Book. Select next quote number Formal :(Micronet or Quote / Order Book number. Print up quote using Quote template as selected Formal or Micronet as required. Review quote to match request. Review of quote by second person. Forward to originating salesman for approval. File in folders. Formal quote file as back up on server. Forward to client. Associated Documentation: Quotes Formal (Quote Register Log) Quote Micronet (Micronet) Quote / Order Books (Numeric) Customer Orders (Customer Supply) Invoices / Picking Slips Computer Generated Invoice Hand Written Credits Computer Generated TMQ Risk Management Log/Sales Page 9 of 29 TMQ Quality Management System 24 August 2017

10 Service Service Personnel provide customer support for equipment where requested by a customer and where TMQ has the information and or knowledge to carry out the support. This support may be in the form of product repair, product servicing, periodic survey, installation and commissioning, or technical information. Product for repair or service may be delivered to TMQ in the following ways: Personally by a customer Courier delivery as organised by a customer Returned by TMQ personnel (e.g. removed from a customer s vessel for repair) Requests for Services such as periodic surveys, field service, installation and commissioning may be requested of TMQ Service Department in the following ways: Personally by a customer By electronic means such as , fax or telephone. By the TMQ Sales Department (e.g. as part of a contract which includes installation and commissioning) Upon receipt at TMQ the product or request is logged into the TMQ accounting system with regard to the following: Customer s details (name, address, telephone number, etc) Customer account status Customer requirements to affect a service I.e. Order number, letter or verbal request. Product identification such as: - Product type or model number Serial number Ancillary parts (cables, knobs, etc.) Product status eg: damage, corrosion, etc For identification purposes where the product cannot be readily identified by serial number or type, a tag is attached with reference to the parent equipment and customer details. Any associated parts must be tagged if not identified by serial number or type and referenced back to the job card number. Product is to be repaired serviced, installed, commissioned and tested to best industry practice and manufacturer specific instructions or methods by relevantly trained personnel. All field work must be performed in a manner observing any appropriate safety requirements determined by site management or relevant legislation, this may include the completion of Safe Work Method Statement, Job Safety Analysis Worksheet, Incident Report, Risk Assessment and Control and Site Specific Inductions as necessary. The organisation knowledge will be safeguarded by recording and sharing information. Personnel and supervisors shall be trained to relevant industry or legislative standards for the tasks being performed with records of training and qualifications kept in files accessible to management. Equipment used for the purpose of testing and surveying customer product shall be in good working order with periodic calibration checks for equipment performing measurement of performance of product. Calibration standards and periods are to be set by either the Manufacturer of the equipment or the appropriate Section Manager. A calibration log is to be kept for this equipment and controlled by the persons appointed from time to time by the relevant Section Manager or General Manager. Page 10 of 29 TMQ Quality Management System 24 August 2017

11 Contractors and Agents: Contractors or Agents performing services on behalf of TMQ shall be authorised as being Technically Competent at the discretion of Management by review. Equipment and associated instructions may be supplied by TMQ from time to time to its authorised agents or contractors where they do not have appropriate or calibrated equipment to complete the task. Final Service Release: Services shall only be released when all planned arrangements have been satisfactorily completed, unless otherwise approved by the customer and/or relevant authority Risk Management: Service risk management is incorporated in the TMQ Risk Management Log and is periodically reviewed and updated Associated Documentation: Job card (computer generated) Identification tags Invoices Product manufacturers instruction, installation, commissioning and service manuals and bulletins as necessary. Test equipment manuals which will include operation and test interpretation. Equipment calibration log For periodic surveys, relevant documents are to be obtained from the Classification Society or Administrative Authority as required. Risk Management Log/Service Appendix A OP18 - GMDSS/SOLAS Radio Survey Appendix B OP19 - Radio Equipment Testing/Examination Appendix C OP20 - Annual Performance Test (APT) of VDR and SVDR Review: Periodic review of work process procedures, complaints and corrective actions are to be carried out by both internal and external audits by personnel appointed, from time to time, by the relevant Section, Quality, or General Managers. Documents can be stored by either electronic (soft copy) or archival (hard copy) means as required by management and or legislature Page 11 of 29 TMQ Quality Management System 24 August 2017

12 Support TMQ International has determined and provided the people, infrastructure, knowledge, awareness and communication channels to implement and improve the requirements of the Quality Management System. Organisational knowledge may be attained from: Customer complaints and non-conformance cause investigations, lessons learnt and resultant implemented actions Internal and external interested party feedback and experience Conferences, training courses, trade shows and exhibitions Associated Documentation Organisation Chart Communication Plan Documents Documented Information Documents and Records Quality System document Ken Brown (Computer) Development documents and software TMQ server (secured) Life (as practical) Production drawings Production Life (as practical) Work Instructions Production Life (as practical) Invoices Despatch 5 years Quotes File (Index and Quotes) Sales 2 years Production Test Procedures Production 3 years Customer Complaint File Office 5 years Non Conformance Report Office 5 years Job card (computer generated) Service 3 years External Documents Rules for Approval of Manufacturers and service suppliers Class NK Service Department (Hard Copy) All documents will be able to be identified by a form name, a document name or a title, which clearly indicates the document. The latest copies of any document (master copy) will be distributed and any obsolete documents will be marked as obsolete but may be kept as reference. Software will be issued from a suitable set up computer to: Program a Microprocessor in a hardware situation. Program a CD. Software for hardware may be programmed from a dedicated programming device (Autopilot production) Page 12 of 29 TMQ Quality Management System 24 August 2017

13 Training Training is an on going commitment to staff carried out as a day-to-day process. And as required, formal training as in respect Apprentices where external training is conducted. Training is planned with the following guidelines: Apprentices: Training on a continuous basis, product information. Technical information. Instruction of mechanical assemble of equipment. Instruction of electronics basis, Instruction of hydraulic basis. College as set by external training bodies. Production Staff. Training on a continuous basis, product information. Technical information. Instruction on assembly of mechanical equipment. Sales and Office staff. Training on a continuous basis. In regards in product, customer relations, computer skills and accounting system operation. Service staff Training on a continuous basis: In regards in product, customer relations, computer skills and accounting system operation. Also service information on equipment. To ensure knowledge and familiarisation with new equipment staff are to be enrolled were possible in training with product suppliers. Records of the training is to be kept in the personal files of staff attending external courses. Staff are also required to have training as required by legislation which if required may be contracted externally. A copy of the training will be in the personal file. Any external training is listed in the personnel file of the respective staff member. Page 13 of 29 TMQ Quality Management System 24 August 2017

14 Product Design and Development TMQ carries out product development when: 1 Manufactured unit requires update due to: a Obsolescence due to parts shortages b Technical improvements c Enhanced features. 2 New product is required due to: d Customer requirements e Market perception The need to develop a new product (or modify existing unit) can be initiated by a staff member through their manager. A Submission for TMQ R&D Review must be completed. The manager will then submit the form to the General Manager if the idea has merit. A meeting will then be held with: General Manager Section Manager Product Development staff. Outcome of the meeting will decide Is the product required Is the project feasible in regards technical resources? Is the project feasible in regards financial resources? Is the project feasible in regards time resources? Sales quantity of the product. Total cost to manufacture Average sale price of the product, If the product has merit, and financially would be successful, requirement list for the product will be documented. Steps to be carried out Time frame Personnel required. The General Manager will then decide with all of the above information if the project would be commenced. Time frame will then be initiated Technical resources Technical requirements Market acceptability. The design team will produce documentation of the project and maintain records. Drawings Software Hardware Page 14 of 29 TMQ Quality Management System 24 August 2017

15 All drawings, software and hardware will be verified independently Prototype to be built and verified The product when ready to be released will be reviewed for acceptance. Documentation approved. I.e. Work instructions. Test Procedures & Test sheets. Drawings, Bills Of Material Risk Management: Design risk management is incorporated in the TMQ Risk Management Log and is periodically reviewed and updated. Production Product for manufacture is determined from an annual budget, sales forecast and actual sales. Works orders are used to program daily, weekly work and to ensure traceability. Meetings are held monthly to ensure that staff are informed of manufacturing targets, to review any parts shortages and resources are adequate. Work Instructions and test procedures detail the relevant processes for manufactured product. Such instructions contain any necessary drawings, pictures, test procedures; bills of material etc. to ensure the consistency and quality of product and customer expectations are met. Final Product Release Products shall only be released when all planned arrangements have been satisfactorily completed, unless otherwise approved by the customer and/or relevant authority Associated Documentation: Work Instructions Drawings Test Procedures & Test Sheets Multi Stage Check Cards Works Orders Bills Of Material Kit Lists Production actions 1. Budget, sales forecast and actual sales. 2. Sets quantities 3. Check parts 4. Make works orders 5. Assemble equipment 6. Test equipment 7. Complete works orders 8. Deliver to storage / despatch Page 15 of 29 TMQ Quality Management System 24 August 2017

16 Receipt, storage and dispatch of product at TMQ. Receipt & Dispatch Receipts - upon receipt of any product the following checks are carried out: Cartons, crates, packages are not damaged (prior to signing receipt documents) Number of packages received is correct in accordance with any consignment notes Where a package is marked for individual attention, the recipient is informed Contents of packages are checked against any delivery note, invoice, order or instruction Where any discrepancy is detected the package is to be quarantined for disposition and the relevant section manager informed Product for stock holding is to be stored within designated area Dispatches product for dispatch is processed as follows: Proforma, packing slip and customer order will be received in despatch Product is identified in accordance with relevant picking slip, proforma or instruction Product is picked from storage area, checked for type and serial number, packed for protection, handling and transportation as appropriate Packages are addressed in accordance with any documented instructions. Freight carriage is arranged as required Associated Documentation: Invoices / Picking Slips (suppliers) Invoices / Proforma / Picking Slips (TMQ computer generated) Delivery Dockets (Freight company supplied for reference only) Miscellaneous shipment document record. Receipt action Check goods Sign for goods Advise person having created order Check product against order, document type and serial number against customer invoice. Receipt in to TMQ accounting system Move product to store Despatch action Receive Proforma, or packing slip and customer order (except service jobs) Compare against order as second check Pick product note type quantity and serial number Address product Enter Delivery Docket for Freight Company Turn packing slip or proforma into invoices File documentation Page 16 of 29 TMQ Quality Management System 24 August 2017

17 TMQ purchases product and parts for the following: Stock holding Manufacturing product Resale to customers Parts for development and design Ancillary parts for operational purposes Purchasing Prior to raising a purchase order any authorised person determines the needs for purchase in accordance with: Parts required for manufacture or replenishment of stock holding Customer requirements after review Research and design requirements Operational needs Purchase orders are computer generated. Parts or products to be ordered are assigned a preferred supplier in the accounting system. Any new supplier should be assessed for suitability prior to being added to the accounting system. Suitability assessment should address (if applicable) the following: Ability to supply, Quality of product to be supplied, Pricing, MOQ s, delivery time frames. ISO9001 accreditation. The following class then will be used as selection. 1. Preferred Supplier, Supplier with a documented quality system. Supplier with specific product range. 2. Supplier without Quality System, or evidence not supplied to TMQ. Supplier with a specific product range. 3. Controlled Limited Purchases. Company used to supply goods with a know good record where the product is available. Sub-contractors 4. Only Supplier of Goods. Supplier only know as supplier of goods. 5. No Review Required. Supplier where supply has no effect on quality and possible only supplier. I.e. Telephone, Electricity. Suppliers are categorised according to ability. Suppliers should be reviewed when any of the following situations occur: Supplier continually fails to deliver Supplies poor quality parts or product Fails to adequately address complaints Supplier circumstances change which may affect TMQ operations Reviews: Orders when printed must be reviewed to ensure information is valid and any ambiguity should be clarified by hand writing on the order or attaching a separate information sheet. Review should be indicated by signature and date if different to date on order. Risk Management: Listing of additional manufactures of all PC Boards and component s out sourced for design and manufacture. Price comparisons, quality checks, delivery timing and cost. Set up the ability to use them as an alternate source. Associated Documentation: Purchase orders Supplier List (computer generated) Supplier invoices TMQ Risk Management Log/Purchasing Page 17 of 29 TMQ Quality Management System 24 August 2017

18 Complaints Any person may receive a complaint from a customer. Complaint severity is designated as Minor or Major. When a complaint is received, the following procedure should be implemented: If the complaint is considered minor and does not affect TMQ operations, the complaint should be handled immediately by the recipient if able. The section manager should be informed to consider any effects. Examples: Product out of warranty reported as faulty. This would not generate a customer fault report. Product during warranty with an unexplained fault. This should generate a customer fault. Damage due to bad packing should generate a customer fault report If complaint is considered major or affects TMQ operations, details of the complaint are recorded on the appropriate form (TMQ-1403) Complaint is passed to Quality Coordinator for registration in the Customer Complaints Log (CCF Log) Quality Coordinator assigns the complaint to the relevant manager for disposition Investigating and eliminating root causes of these failures is an integral part of the TMQ International Continual Improvement Process All corrective actions should be recorded on the complaint form When complaint is resolved to customer s satisfaction, it is returned to Quality for Close Out Where a complaint cannot be resolved to the customer s satisfaction, the General Manager has sole disposition authority The Complaint Log is reviewed from time to time by the General Manager to determine trends or as input for improvement and change Associated Documentation Customer Complaint Form (Multi form TMQ-1403) Customer Complaint File (CCF Log) Page 18 of 29 TMQ Quality Management System 24 August 2017

19 Non-Conformance - Corrective Actions Where a customer complaint is received and after review indicates a failure in a documented procedure, a design error, or a manufacture error, a Non-Conforming Report (NCR) will be raised. Non-conformances are designated with severity classifications of Minor or Major. Or where an internal test or review indicates a failure in a documented procedure, a design error, or a manufacture error, a NCR will be raised. In production a recurring error in assemble or testing similarly should lead to an NCR being actioned Example: Incorrect manual information Raise NCR Customer wish list. Do not raise NCR. Refer section manager. Recurring product fault. Raise NCR. A Non Conformance Report (NCR) should be raised All corrective actions including any design changes should be recorded on NCR Major Non conformities are investigated to determine the underlying causes of problem occurrence Any actions to avoid recurrence of the problem should be recorded and implemented Customer feedback should be monitored for satisfactory resolution of the non-conformance Associated Documentation Non-Conformance Report NCR Log Page 19 of 29 TMQ Quality Management System 24 August 2017

20 Internal Quality Audits TMQ maintains an Internal Audit process, which is controlled by a person (Quality Coordinator) who is appointed by the General Manager. Random audits are also carried out and may be initiated for reasons such as customer complaint, non conformance report, part of a review process, etc. Internal audits are to be performed periodically with the approval of the General Manager to ensure all area have an audit conducted on a 12 monthly basis. The audit may have been off a random nature, which covers the operation of that section. Results of audits will be documented and should include recommendations to rectify non- compliance of procedures or where improvements can be made. A record similar to below should be kept to indicate area audited in any 12-month period. Audit Schedule 2017/ 2018 Area Last Date Next Audit Sales August 2017 August 2018 Production September 2017 September 2018 Service March 2015 November 2017 Receipt & Dispatch January 2017 January 2018 Purchasing May 2015 October 2017 Complaints April 2017 April 2018 Non-Conformance July 2017 July 2016 Documentation June 2017 June 2018 Training December 2016 December 2018 Product Development Review Meetings Review Meetings Internal Quality Audits January 2017 October 2017 Page 20 of 29 TMQ Quality Management System 24 August 2017

21 Document changes Layout Change April 2007 Added Clauses, Records Internal Quality Audits, Changes to NCR clause to involve not only Customer complaints Changed Quote Log to Quote File Changed scope to match certificate. August January 2008 February 2008 July 2008 August 2009 July 2011 October 2011 August 2012 October 2012 November 2012 March 2013 September 2013 January 2014 June 2014 September 2014 Change sales quote system for initial review by manager for request to quote, on TMQ format or as requested. Remove date from front page Under line Quality Management System Procedures Remove Reference to bank in last line of performance measurements. Add in Micronet and Hand quote system Add vision Audit Schedule Updated Add quote in regards hand written quote. Add extra page to ensure page per heading Control of Records Programming device. Due to staff changes Management meetings change from monthly sales meetings back to six monthly management meetings. Update Audit Log. Change to ISO , change prime objective add requirements Duplication on line 3 of Training Addition to service to meet Class Certification requirements Addition to training for service staff. Update Internal Audit Log Update Quality Policy Update Internal Audit Log Added Footer and page numbers Add to Scope: Annual Survey of Radio Communication Equipment, Voyage Data Recorders and Automatic Identification Systems Page 21 of 29 TMQ Quality Management System 24 August 2017

22 May 2015 April 2016 January 2017 February 2017 March 2017 June 2017 August 2017 Audit Schedule Updated Audit schedule updated a) Add to Service. OP18 GMDSS-Solas Survey OP19 GMDSS Testing b) Documentation. Correct document location Complaints Register updated with Cause Audit schedule updated Policy added, Updates toward ISO certification added, SOLAS Radio Survey to Appendix A, VDR Survey added as Appendix B, added Appendix C Annual Performance Test (APT) of VDR And SVDR, Sections re ordered to align with organisational Process flow, Rules for Approval of Manufacturers and service suppliers Class NK added as controlled external document, provision for root cause investigation added for NCRs and complaints Managing Director review of QA policy for ISO 9001:2015 updates and signed off Page 22 of 29 TMQ Quality Management System 24 August 2017

23 Appendix A OP18 - GMDSS/SOLAS RADIO SURVEY OP18 GMDSS/SOLAS RADIO SURVEY - OPERATING PROCEDURES Operation Operation Description Responsibility References 1. Customer inquiries. 1. Receive inquiry from customer and record details on Customer Inquiry Form:TMQ Allocate inquiry to appropriate manager or coordinator. 3. Provide a written quotation to the customer. 4. Upon receipt of the customer s order number, Service Manager to raise a TMQ Job Card and allocate a job number. Service Technical Manager (STM) Service Admin Manager (SAM) Customer Inquiry Form:TMQ TMQ Job Card 2. Calibration 1. Identify all measuring instruments and test equipment required to carryout GMDSS/SOLAS survey. 2. Carry out calibration checks or inspection as required. 3. For instruments that require calibration, use only approved calibration service providers (Refer Preferred Suppliers). Technical & Customer Service Stream Director (TCSM) STM Technical Coodinator (TC) Preferred Supplier 3. Radio survey 1. The Radio Survey Supervisor must hold a GOC, in accordance with Classification Organisations 2. Prior to attending vessel, contact Class Society for any relevant data and latest survey forms. which may affect Radio survey. 3. The person conducting the Radio Survey shall not carry out installation, repair, modification, etc, work onboard the same ship/vessel they are going to survey. 4. Prior to the commencement of the survey, carryout a visual inspection of the following: a. Electronic equipment. b. Antenna s c. Batteries d. EPIRB s, SART s & handheld radios. 5. Carryout the survey of the GMDSS/SOLAS equipment in accordance with the relevant Classification Society s requirements & the instructions for testing & examination of radio equipment OP 19. TC TCSD STM TC 4. Equipment operation 1. Ensure that all GMDSS/SOLAS equipment is within the manufacture specifications. 2. Transcribe the required information the relevant Classification Society check sheet(s) listing all deficiencies found. Forward completed check sheets to the Classification Society. Copies of Check Sheet to be left with the vessel ( EPIRB paperwork) TCSD STM TC Radio Survey Sheet As per Class Paperwork Page 23 of 29 TMQ Quality Management System 24 August 2017

24 Appendix B OP19 - RADIO EQUIPMENT TESTING/EXAMINATION OP19 RADIO EQUIPMENT TESTING / EXAMINATION - OPERATING PROCEDURES Operation Operation Description Responsibility References 1. GMDSS survey. 2. Identify GMDSS equipment to be Surveyed 1. Identify all measuring instruments & test equipment RR1 required to carryout the GMDSS Survey or GMDSS Maintenance 2. Ensure that all relevant test equipment is within its calibration date. 3. For instruments that require calibration, use only approved calibration service providers (Refer Preferred Suppliers). 4. Contact Class Society for any relevant data which may affect the survey. 5. Personnel involved in conducting radio survey shall not carry out installation, repair, modification, etc. work onboard the same ship which they are going to survey. 1. Obtain a copy of the Class society s GMDSS Record of Installation, listing the equipment to be checked. 2. Compare the equipment listed to current equipment on board. Note any changes to equipment must be amended in Class GMDSS Technical & Customer Services Stream Director (TCSD) Technical Services Manager (TSM) TCSD & TSM TCSD & TSM TSM Preferred Suppliers GMDSS Instrument Schedule RR1 DNV Program No 406 Section 2.6 GMDSS Record of Installation record of Installation. 3. Examination 1. Examine equipment for any noticeable TCSD GMDSS Record of & Testing of physical damage. Installation MF/HF 2. Cross Reference with GMDSS Record of TSM Radio(s) Installation the equipment Make, Model and Serial Number to ensure no changes. 3. Test equipment operation from the main, Technical emergency (if provided) & reserve sources Coordinator of power (AC/DC). Check that Emergency (TC) battery source meets IMO requirements. 4. Check antenna tuning in all appropriate bands. 5. Check that the correct MMSI number is programmed into the unit & that latitude/longitude position is displayed. 6. Check the off air self test program. 7. Check that equipment is within frequency tolerance on all appropriate bands (10 KHz). 8. Test operation by contacting a coastal station & measure RF power output & VSWR. 9. Check the audibility of the MF/HF DSC alarm. 10. Check DSC alerting from conning position available by contacting a known coastal station. 11. Confirm only DSC channels indicated in Reg1V/9, 10, 11, & 12 are being monitored. 12. Check that a continuous watch is being maintained while keying MF/HF radio. 13. Test receiver operation by monitoring known stations on all appropriate bands. 14. Test actual voice contact with a coastal station more than 200NM away. 15. If control units are fitted outside the navigational bridge then ensure that the bridge control unit has first priority for the purpose of initiating distress alerts. 16. Check for compliance with IMO standards. Page 24 of 29 TMQ Quality Management System 24 August 2017

25 4. Examination & Testing of MF/HF Radio Telex. 5. Examination & Testing of VHF Radio(s). OP19 RADIO EQUIPMENT TESTING / EXAMINATION - OPERATING PROCEDURES Record all of the test data using the Class society forms 1. Examine equipment for any noticeable TCSM physical damage. 2. Cross Reference with GMDSS Record of STM Installation the equipment Make, Model and Serial Number to ensure no changes. TC 3. Test equipment operation from the main, emergency (if provided) & reserve sources of power (AC/DC). Check that Emergency battery source meets IMO requirements. 4. Confirm that correct selective calling number is programmed into the unit. 5. Test for correct operation by inspecting a recent hard copy or by a test with a coastal station. 6. Check for compliance with IMO standards. Record all of the test data using the Class society form. 1. Examine equipment for any noticeable physical damage. 2. Cross Reference with GMDSS Record of Installation the equipment Make, Model and Serial Number to ensure no changes. 3. Test equipment operation from the main, emergency (if provided) & reserve sources of power (AC/DC). Check that Emergency battery source meets IMO requirements. 4. Check radio operations on channels 6, 13 & 16 by contacting a known coastal station. 5. Check that equipment is within frequency tolerance using an IFR. 6. Test RF power output & VSWR on channels 6, 13 & Check for correct operation of all controls including priority of control units. 8. Check operation of remote VHF equipment used for navigational safety from bridge wings. 9. Check that correct DSC number is programmed into unit & latitude/longitude is displayed. 10. Test operation by on-air contact with a coastal station of another vessel. 11. Check that distress procedure & DSC number are clearly displayed near the unit including Auto Acknowledge. 12. Check compliance with IMO standards. 13. Record all of the test data using the Class Society Form. TC TCSM STM GMDSS Record of Installation 6. Examination & Testing of Inmarsat Equipment 1. Examine equipment for any noticeable physical damage. 2. Cross Reference with GMDSS Record of Installation the equipment Make, Model and Serial Number to ensure no changes. 3. Test equipment operation from the main, emergency (if provided) & reserve sources of power (AC/DC). Check that Emergency battery source meets IMO requirements. 4. Check the distress function. 5. Check for correct operation by inspection of a recent hard copy of the test call. 6. Check distress function only if permitted to TCSM Page 25 of 29 TMQ Quality Management System 24 August 2017 TC STM GMDSS Record of Installation

26 OP19 RADIO EQUIPMENT TESTING / EXAMINATION - OPERATING PROCEDURES carry out test by a coastal earth station. 7. Check compliance with IMO standards. 8. Record all of the test data using the Class Society Form. 7. Examination & Testing of Antennas. 1. Examine antenna(s) for any noticeable physical damage. 2. Check to ensure that MF/HF transmitting antennas are grounded. 3. Check to ensure that MF/HF transmitting antennas are protected against being touched accidentally. 4. NIS ships transmitting results NOT to be tested with a MEGGER. TCSD STM TC Examination & Testing of Handheld VHF Radios. 9. Examination & Testing of EPIRB 1. Examine equipment for any noticeable physical damage. 2. Cross Reference with GMDSS Record of Installation the equipment Make, Model and Serial Number to ensure no changes. 3. Check handheld radio(s) for correct modulation & power using both IFR & voice checks on channels 6, 12 & 16. Check all functions & buttons 1. Examine equipment for any noticeable physical damage. 2. Cross Reference with GMDSS Record of Installation the equipment Make, Model and Serial Number to ensure no changes. 3. Check mounting of EPIRB for float free operation. 4. Carryout the self-test routine. 5. Check that EPIRB ID is clearly marked on the outside of the unit, decode the EPIRB identity number to confirm it is correct. 6. Record battery expiry date on TMQ annual EPRIB test Report and Relevant Class Society documents. 7. Check hydrostatic release & record its expiry date on TMQ annual EPRIB test Report. 8. Check that call sign of vessel is clearly marked on the EPIRB. 9. DNV Requires the completion of DNV Form CRC 630, Annual Testing of 406 MHz EPIRBs in addition to Form CRC 629a TC TCSM STM TCSM STM TC STM TMQ annual EPRIB test Report DNV Radio Survey 10. Examination & Testing of SART(s). 1. Examine equipment for any noticeable physical damage. 2. Cross Reference with GMDSS Record of Installation the equipment Make, Model and Serial Number to ensure no changes.. 3. Check for satisfactory functional test using onboard 9 GHz radar, if possible. 4. Check the transponder s stowage. 5. Check for operating instructions. 6. Check for sufficient battery capacity for Stand-by condition & to Relevant Class Society documents provide transmissions 7. Record battery expiry date on Relevant Class Society documents. Check that call sign of vessel is clearly marked on the SART 11. Examination Removed not listed in the Q46 or GMDSS TCSM Page 26 of 29 TMQ Quality Management System 24 August 2017 TC STM

PACIFIC MARINE SERVICES

PACIFIC MARINE SERVICES APPR No : PMS/D.A.RSP/ Date : Pages : One (7) /UAE Data Sheet for Approval of Firms Issued within the scope of the Pacific Marine Services General Conditions - Radio Service Supplier for Inspection Services

More information

Quality Assurance Manual

Quality Assurance Manual Quality Assurance Manual Current Electrical is committed to leading the market in satisfying customer needs by providing versatile and innovative electrical and control solutions We take pride in the ability

More information

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3 CONTENTS QUALITY MANUAL 1.0 INTRODUCTION... 2 2.0 POLICY AND OBJECTIVES... 2 3.0 DEFINITIONS... 3 4.0 SCOPE... 3 5.0 QUALITY SYSTEM... 3 6.0 ORGANISATIONAL CHARTS... 4 6.0 BRISBANE HEAD OFFICE... 4 7.0

More information

Proprietary Document Disclosure Restricted To Employees and Authorized Holders

Proprietary Document Disclosure Restricted To Employees and Authorized Holders Revision Level: A Page 1 o f 33 Revision Level: A Page 2 o f 33 (This page left blank intentionally.) Revision Level: A Page 3 o f 33 S i g n a t u r e P a g e Reviewed By Management Representative: 1

More information

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By Conforms to ISO 9001:2015 Revision history Revision Date Record of Changes Approved By 0.0 [Date of Issue] Initial Issue Control of hardcopy versions The digital version of this document is

More information

IN2CONNECT UK LTD QUALITY ASSURANCE MANUAL

IN2CONNECT UK LTD QUALITY ASSURANCE MANUAL E L E C T R O N I C C O N N E C T O R S IN2CONNECT UK LTD QUALITY ASSURANCE MANUAL CONTENTS Section Title Related Procedure 1. Introduction & Company Profile 2. Policy & Objectives 3. Definitions 4. Quality

More information

OPERATIONS MANUAL ISO 9001 Quality Management System

OPERATIONS MANUAL ISO 9001 Quality Management System OPERATIONS MANUAL * ISO 9001 Quality Management System Page: 1 of 19 Revision History Date Change Notice Change Description 5/30/2012 Original Original Release. 9/20/2012 005 Clarify post-delivery exclusion

More information

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip UHV SPUTTERING INC Page 1 of 18 ECO REVISION HISTORY ECO# REVISION DATE MGR QA 1001 A 2/25/2008 R.Clement J.Haislip 1017 B 6/17/2008 T.Finneran J.Haislip 1071 C 1/13/2011 R.Clement J.Haislip 1078 D 5/15/2013

More information

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler. Polycraft, Inc. QM - 10 Title: Polycraft, Inc. Quality Manual Copy Approval: D. Wheeler This Quality Manual is the sole property of Polycraft, Inc. and intended for exclusive use by the organization. This

More information

QUALITY ASSURANCE MANUAL

QUALITY ASSURANCE MANUAL Chettisham Business Park Chettisham, Ely, Cambs Cb6 1RY Tel. 01353 666399 Managing Director: Mr G. R. Hartwig QUALITY ASSURANCE MANUAL NOTE: This is a CONTROLLED Document. 1 ST Jan 2004 1.0 INTRODUCTION

More information

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008 QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008 EXPRESS CONTRACTING SERVICES PTY LTD TRADING AS GOLDEN BROWN CLEANING SERVICES Unit 8/217 Mickleham Road Tullamarine VIC 3043 www.goldenbrown.com.au

More information

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3 CONTENTS QUALITY MANUAL 1.0 INTRODUCTION... 2 2.0 POLICY AND OBJECTIVES... 2 3.0 DEFINITIONS... 2 4.0 SCOPE... 3 5.0 QUALITY SYSTEM... 3 6.0 ORGANISATIONAL CHARTS... 4 6.0 BRISBANE HEAD OFFICE... 4 6.1

More information

PTM PLANT ISO 9001 Quality Manual Certification No

PTM PLANT ISO 9001 Quality Manual Certification No PTM PLANT ISO 9001 Quality Manual Certification No. 198746 Table of Contents 1. INTRODUCTION... 3 2. THE ISSUE STATUS... 4 3. THE QUALITY POLICY... 5 4. OVERVIEW OF PTM PLANT... 6 5. THE SCOPE OF REGISTRATION...

More information

Business Management System Manual Conforms to ISO 9001:2015 Table of Contents

Business Management System Manual Conforms to ISO 9001:2015 Table of Contents Table of Contents 1.0 Welcome to Crystalfontz... 3 2.0 About the Crystalfontz Business Systems Manual... 4 3.0 Terms and Conditions... 5 4.0 Context of the Organization... 6 4.1. Understanding the Organization

More information

PRINTED COPY IS NOT CONTROLLED

PRINTED COPY IS NOT CONTROLLED Quality Manual We Deliver Quality on Time Form 1217 (01.16.2018) Rev. 12 SOR Inc. sorinc.com SOR QUALITY MANUAL Page 1 of 18 Table of Contents Quality Manual 8701-001 Revision 12 Introduction....4 1.0

More information

QUALITY SYSTEM MANUAL

QUALITY SYSTEM MANUAL QUALITY SYSTEM MANUAL This Manual is a Proprietary Document and any Unauthorized Reproduction is prohibited. ISSUE DATE July 26, 2012 AUTHORIZED BY: Quality Management Representative Eric Hoff Managing

More information

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Table of Contents Contents 1. Introduction... 3 1.1. Process Approach...

More information

Quality Manual This copy printed on 30 August 2016

Quality Manual This copy printed on 30 August 2016 Quality Manual This copy printed on 30 August 2016 Table of Contents 1. INTRODUCTION... 1 2. THE ISSUE STATUS... 2 3. THE QUALITY POLICY... 3 4. THE QUALITY MANAGEMENT SYSTEM... 4 5. OVERVIEW OF ELECTRICAL

More information

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION PRODUCT REALISATION Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: RELEASE DATE: ALL NEW DOCUMENT A J.BENTINK 5/08/2016 Revision Approval: J.BENTINK Signature:

More information

POLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy

POLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy POLICY MANUAL FOR ISO 9001:2008 Document: PM-9001:2008 Date: April 7, 2015 REVIEWED BY: Tim Powers DATE: 4-7-2015 APPROVED BY: C._Bickford Uncontrolled Copy DATE: 4-7-2015 1.0 GENERAL ISS: 1 REV: E Page:

More information

QUALITY ASSURANCE MANUAL

QUALITY ASSURANCE MANUAL Earle M. Jorgensen Company QUALITY ASSURANCE MANUAL Revision 7, February 19 th, 2018 If Printed - Uncontrolled Copy This manual was re-written for Transition to the ISO9001:2015 Standard. All manuals generated

More information

Quality Control Manual DOCUMENT NUMBER 15

Quality Control Manual DOCUMENT NUMBER 15 Quality Control Manual DOCUMENT NUMBER 15 Table of Contents 1. Distribution... 2 2. Scope... 2 3. Definitions... 2 4. Principal Characteristics of the Quality Management System... 3 5. Quality Policy...

More information

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ Quality Manual Quality Manual Issue I Dated 8 th October 2012 Contents Page Section 1 - Introduction 2 Section 2 - Company Details 2 Section

More information

QMS CO-ORDINATOR & GENERAL PROCEDURES:-

QMS CO-ORDINATOR & GENERAL PROCEDURES:- 1. QMS CO-ORDINATOR & GENERAL PROCEDURES:- (1) How do you measure effectiveness of system for working of your company? How do you collect necessary information for the same? Are you getting information

More information

Quality Commitment. Quality Management System Manual

Quality Commitment. Quality Management System Manual Quality Commitment Quality Management System Manual This printed copy is uncontrolled Page 1 of 30 Thor Machining Quality Management System Manual Section 1 TABLE OF CONTENTS Page # 1 Introduction 5 2

More information

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24 Quality Manual Page 1 of 24 ISO 9001:2015 Standard to Quality Manual Section Matrix ISO 9001:2015 Quality Manual Section 1 Scope 1 Scope 1.1 General 4 Context of the organization 4 Quality management system

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

Product Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A

Product Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A 5/8/2012 Page No. 1 of 32 Date Description Of Change Signature Rev. Level 5/8/2012 New Document Jeremy Wilson Procedure pproval: Company Title: Date: Quality Manager 5/8/2012 5/8/2012 Page No. 2 of 32

More information

Quality Manual QM-9001 Revision 25 May 2013

Quality Manual QM-9001 Revision 25 May 2013 Lion Precision 563 Shoreview Park Road Shoreview, MN 55126 Phone: (651) 484-6544 Fax: (651) 484-6824 info@lionprecision.com Quality Manual QM-9001 Revision 25 May 2013 Approved by: Don Martin, President

More information

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard. AW2 Logistics, Inc Ace Industrial Dr.

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard. AW2 Logistics, Inc Ace Industrial Dr. Quality Manual This manual complies with the requirements of the ISO 9001:2015 International Standard. AW2 Logistics, Inc. 6001 Ace Industrial Dr. Cudahy, WI 53210 Quality Manual Rev 3 Page 1 of 30 Table

More information

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev - February 8, 2015 1 Osprey Technologies, LLC Quality Manual ISO9001:2008 Rev - February 8, 2015 Released by Dave Crockett President 6100 S. Maple Avenue, Suite 117 Tempe, AZ 85283 www.osprey-tech.com February

More information

Quality Assurance Manual, Revision F Page 1 of 20

Quality Assurance Manual, Revision F Page 1 of 20 Quality Assurance Manual, Revision F Page 1 of 20 AUTOMATION TECHNOLOGY QUALITY ASSURANCE MANUAL Prepared By: Joseph Pollard Date: 7/6/2015 Quality Assurance Manager Quality Management System Representative

More information

Quality Manual Template ISO 9001:2015 Quality Management System

Quality Manual Template ISO 9001:2015 Quality Management System Quality Manual Template Table of Contents 1 INTRODUCTION... 5 2 QUALITY MANAGEMENT PRINCIPLES... 6 3 REFERENCES & DEFINITIONS... 6 4 CONTEXT OF THE ORGANIZATION... 8 4.1 ORGANIZATIONAL CONTEXT... 8 4.2

More information

Quality Manual. Print Name Title Date Prepared by L Naughton QA Consultant 9 th April 09. Reviewed by Bernard Lennon Fire and Safety Officer

Quality Manual. Print Name Title Date Prepared by L Naughton QA Consultant 9 th April 09. Reviewed by Bernard Lennon Fire and Safety Officer Quality Manual Print Name Title Date Prepared by L Naughton QA Consultant 9 th April 09 Reviewed by Bernard Lennon Fire and Safety Officer 9 th April 09 Corporate Authorisation Joe Hoare Estates Officer

More information

RUWACON QUALITY MANUAL

RUWACON QUALITY MANUAL RUWACON QUALITY MANUAL Rev Date Preparation Review Approved Description of Revision 1 29 June SHEQ Manager SHEQ Manager Managing 2011 Director Ruwacon (PTY) Ltd P.O. Box 13596 Noordstad 9303 THIS DOCUMENT

More information

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 2 of 18 REVISION HISTORY DATE CHANGE DESCRIPTION 10/11/06 Original release 10/21/09 Revised to ISO9001:2008

More information

Advanced Electronics & Logistics Ltd QUALITY MANUAL QUALITY MANUAL. Iss 7 Rev 0 23/02/18 Page 1 of 18 Approved: F Bates

Advanced Electronics & Logistics Ltd QUALITY MANUAL QUALITY MANUAL. Iss 7 Rev 0 23/02/18 Page 1 of 18 Approved: F Bates QUALITY MANUAL Iss 7 Rev 0 23/02/18 Page 1 of 18 Approved: F Bates Iss 7 Rev 0 23/02/18 Page 2 of 18 Approved: F Bates Contents 1. Introduction...6 2. References...7 3. Definitions...7 4. Context of the

More information

ISO 9001:2008 Quality Management System QMS Manual

ISO 9001:2008 Quality Management System QMS Manual 2501 Kutztown Road Reading, PA, 19605 Tel. 610-929-3330 Fax 610-921-6861 ISO 9001:2008 Quality Management System QMS Manual The information contained in this document is Fidelity Technologies Corporation

More information

UNCONTROLLED DOCUMENT

UNCONTROLLED DOCUMENT Rheem Manufacturing Company Fort Smith, Arkansas Original Release: 4/06/09 Revision Date: 10/25/16 Quality Management System D. Presley 05 1 of 1 Manual Contents A. Johnson 10/25/16 0 Section Title Revision

More information

Quality Manual. Ingenuity at its best WEST INDUSTRIES LLC Silverton, Suite 924 San Diego, CA USA

Quality Manual. Ingenuity at its best WEST INDUSTRIES LLC Silverton, Suite 924 San Diego, CA USA 7949 Silverton, Suite 924 San Diego, CA 92126 USA This document is approved for use Copy Holder Copy Holder: President Copy Number: 1 Scope: This Covers the activities and functions performed by operating

More information

Quality System Manual - Section 00

Quality System Manual - Section 00 Quality System Manual - Section 00 INDEX AND REVISION STATUS Issued by: Quality Assurance Eff. Date: 06/10/2014 Rev.: A Pg. 1 of 4 QUALITY SYSTEM MANUAL SECTION 0 - INDEX AND REVISION STATUS SECTION 1

More information

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17 Quality Manual DRAFT Page 1 of 17 Document Acceptance and Release Notice This is Revision A1 of the East Coast Designer Builders Quality Manual. The Manual is a managed document. For identification of

More information

QUALITY MANAGEMENT SYSTEM ***** OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM ***** MANUAL

QUALITY MANAGEMENT SYSTEM ***** OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM ***** MANUAL QUALITY MANAGEMENT SYSTEM ***** OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM ***** MANUAL Type Your Company Name Street Address City, State Zip Here INSERT COMPANY NAME/LOGO HERE Quality and Occupational

More information

QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM

QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM APPROVED BY: JOSE ALBERTO APPROVED ON: 08/10/2017 Rev.: 1 M001 QUALITY MANAGEMENT SYSTEM PAGE: 1 of 20 TABLE OF CONTENTS SECTION TITLE PAGE Table of Contents

More information

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R.

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R. ISO 9001 The Standard Illustrations The International Standard for Quality Management Systems Year 2000 Edition Leland R. Beaumont ISO 9001, The Standard Illustrations Figures excerpted from ISO 9001,

More information

Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008

Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008 Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008 Copy Number Issued to CONTROLLED / UNCONTROLLED Uncontrolled manuals are current at time of issue but will not be updated. Document history.

More information

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock 1/16 Management of Rolling Stock Revision Date Comments 1 January 2011 Procedure developed to support SMS and legislative requirements. 2 February 2012 Reviewed with RISSB Standards and change of titles

More information

Supplier Quality Requirements SQR-1.0 Rev. 3

Supplier Quality Requirements SQR-1.0 Rev. 3 Supplier Quality Requirements Rev. 3 Approved By: Brian Brown, Quality Manager The current issue of this document is maintained on LSP Technologies, Inc. s Internet Web Site at http://www.lspt.com/resources-supplier_requirements.asp.

More information

COMPLAINT MANAGEMENT POLICY

COMPLAINT MANAGEMENT POLICY COMPLAINT MANAGEMENT POLICY DISCLAIMER No part of this publication may be stored in a retrieval system, transmitted, or reproduced in any way, including but not limited to photocopy, photograph, magnetic

More information

Quality Systems Manual

Quality Systems Manual Quality Systems Manual ISO9001:2008 Prepared By: Date: 06/28/2013 President Approved by: Date: 06/28/2013 Quality Assurance Manager Introduction Cal-Tron Corp has developed and implemented a Quality Management

More information

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Table of Contents Introduction 5 Documentation Scheme..

More information

IBS Electronics, Inc.

IBS Electronics, Inc. ******************************* *** Quality Policy Manual ISO9001:2015 Uncontrolled When Printed 3506-D W. Lake Center Dr. Santa Ana, Ca 92704 U.S.A. 714.751.6633 800.527.2888 714.751.8159 FAX. E-mail:

More information

Connecticut Valve & Fitting Co.

Connecticut Valve & Fitting Co. Connecticut Valve & Fitting Co. 120 Long Hill Cross Road Shelton, CT 06484 Phone 203.929.6341 Fax 203.929.1831 Revision 03 Date of Revision 12/14/2010 Quality Manual Approved by: Greg Hines (President)

More information

Parsippany, NJ QUALITY ASSURANCE MANUAL. QM-01 Rev. 6

Parsippany, NJ QUALITY ASSURANCE MANUAL. QM-01 Rev. 6 Parsippany, NJ QUALITY ASSURANCE MANUAL 1 TABLE OF CONTENTS SECTION REFERENCE TITLE PAGE 0.1 Title Page. 1 0.2 Table of Contents 2 0.3 Forward 5 0.4 Document Control 6 0.5 Statement of Authority 7 0.6

More information

Quality Manual Power Engineering & Manufacturing Inc th Lane NE Blaine Minnesota MN 55449

Quality Manual Power Engineering & Manufacturing Inc th Lane NE Blaine Minnesota MN 55449 Quality Manual Power Engineering & Manufacturing Inc 1463 94th Lane NE Blaine Minnesota MN 55449 COVER PAGE PD 0002 rev. 3 Section QM 01 Page 1 of 17 This document is approved for use Manual Contents Section

More information

Quality Manual In support of ISO 9001:2015 ANSI/NCSL Z , ISO/IEC17025 ISO10012

Quality Manual In support of ISO 9001:2015 ANSI/NCSL Z , ISO/IEC17025 ISO10012 Quality Manual In support of ISO 9001:2015 ANSI/NCSL Z540.3-2006, ISO/IEC17025 ISO10012 Date: 8-Sep-17 Page 1 of 19 Table of Contents 1. Quality manual presentation 1.1 Control of the manual 1.2 Distribution

More information

QUALITY ASSURANCE REQUIREMENTS

QUALITY ASSURANCE REQUIREMENTS SPACE AT MUCKLENEUK CAMPUS PRETORIA QUALITY ASSURANCE REQUIREMENTS SPACE AT MUCKLENEUK CAMPUS, PRETORIA Page 1 1.1 QUALITY ASSURANCE REQUIREMENTS In undertaking the works (including all incidental services

More information

Microgeneration Installation Standard: MCS 001. MCS Contractor certification scheme requirements Issue 2.5

Microgeneration Installation Standard: MCS 001. MCS Contractor certification scheme requirements Issue 2.5 Microgeneration Installation Standard: MCS 001 MCS Contractor certification scheme requirements Issue 2.5 This Microgeneration Installation Standard is the property of Department of Energy and Climate

More information

Quality Management System Manual

Quality Management System Manual SpecSys, Inc. recognizes its responsibility as a provider of quality products and services. To this end, SpecSys, Inc. has documented, implemented and maintains a System that complies with ISO 9001 2000.

More information

CAPITAL AVIONICS, INC. Quality Manual

CAPITAL AVIONICS, INC. Quality Manual CAPITAL AVIONICS, INC. Issued 31 July 2018 Conforms to ISO 9001:2015 2018 ; all rights reserved. This document may contain proprietary information and may only be released to third parties with approval

More information

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14 Page 1 of 14 Quality Manual This Quality Manual provides the overall quality strategy and objectives of Pyramid Semiconductor s quality system. It is based on the requirements of ISO 9000. This manual

More information

EN39 TUBE ASSESSMENT REPORT. Assessment Summary

EN39 TUBE ASSESSMENT REPORT. Assessment Summary EN39 TUBE ASSESSMENT REPORT : Category: Manufacturer Manufacturer Manufacturer Manufacturer Location: Name: Location Location Location Location Previous Assessment Category: N/A Meeting With: Assessment

More information

Quality Manual ISO 9001:2008 ISO 9001:2015

Quality Manual ISO 9001:2008 ISO 9001:2015 Quality Manual ISO 9001:2008 ISO 9001:2015 SAE CIRCUITS, INC. 4820 63 rd Street Suite 100 Boulder, CO 80301 USA www.saecircuits.com Table of Contents 1. Company Information 3 2. QMS Scope and Exclusions

More information

QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008

QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008 QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008 Revision: 9 Issue Date: 28 April 2014 CONTROLLED COPY Number: Issued to: UNCONTROLLED COPY A.M.S. Electronics, Inc. 113 Pillow Street, Butler, PA 16001 (724)

More information

Microgeneration Installation Standard: MCS 001. MCS Contractor certification Scheme requirements Issue 3.0

Microgeneration Installation Standard: MCS 001. MCS Contractor certification Scheme requirements Issue 3.0 Microgeneration Installation Standard: MCS 001 MCS Contractor certification Scheme requirements Issue 3.0 This Microgeneration Installation Standard is the property of Department of Energy and Climate

More information

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard.

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard. Quality Manual This manual complies with the requirements of the ISO 9001:2015 International Standard. Northeast Power Systems, Inc. 66 Carey Road Queensbury, New York 12804 Quality Manual Rev 0 Printed

More information

TÜV SÜD BABT Production Quality Certification Scheme

TÜV SÜD BABT Production Quality Certification Scheme TÜV SÜD BABT Production Quality Certification Scheme The Production Quality Certification Scheme for Manufacturers A Certification Body of Copyright TÜV SÜD BABT 2014 Page 1 of 38 CONTENTS Page AMENDMENT

More information

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX In completing your Documented Quality Management System Review, it is important that the following matrix be completed and returned to us as soon as possible. This will save time during the review and

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Quality Manual ISO 9001:2000

Quality Manual ISO 9001:2000 Quality Manual ISO 9001:2000 Page 2 of 23 TABLE OF CONTENTS COVER PAGE...1 TABLE OF CONTENTS...2 SIGNATURES...3 QUALITY POLICY...4 INTRODUCTION...5 CORPORATE PROFILE...9 4.O QUALITY MANAGEMENT SYSTEM...10

More information

Reliance Aerospace Solutions

Reliance Aerospace Solutions Reliance Aerospace Solutions Quality Manual The information contained in this document is the property of Reliance Aerospace Solutions, a division of Reliance Steel & Aluminum Company This manual is a

More information

Quality Manual. Manasota Optics, Inc & 1749 Northgate Boulevard Sarasota, FL Issue # 7 dated 05/10/2018

Quality Manual. Manasota Optics, Inc & 1749 Northgate Boulevard Sarasota, FL Issue # 7 dated 05/10/2018 Quality Manual Manasota Optics, Inc. 1743 & 1749 Northgate Boulevard Sarasota, FL 34234 Issue # 7 dated 05/10/2018 Schedule QM-01 Page:- 1 of 34 Issue Number:- 7 Effective Date:- 05/10/18 This document

More information

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1.

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1. PROBUILD SUBCONTRACTOR QUALITY MANAGEMENT GUIDE Section Two Project Specific Quality Management Plans Version No 1. PREFACE This document has been developed to assist subcontractors to meet Probuild s

More information

MGD 001. Guidance Document for MCS 001. Version 1.0

MGD 001. Guidance Document for MCS 001. Version 1.0 MGD 001 Guidance Document for MCS 001 Version 1.0 This Microgeneration Installation Standard is the property of Department of Energy and Climate Change (DECC), 3 Whitehall Place, London,SW1A 2HH. DECC

More information

9001:2015. Quality Manual 9001:2015. Engineering Value through Quality and Innovation.

9001:2015. Quality Manual 9001:2015. Engineering Value through Quality and Innovation. Quality Manual 9001:2015 9001:2015 Suburban Manufacturing, Inc. encourages comments from customers, suppliers, employees and friends in order to improve our business and its performance. Information contained

More information

SUPPLIER/SUBCONTRACTOR PURCHASING & RECEIPT PROCEDURE- PRO006.04

SUPPLIER/SUBCONTRACTOR PURCHASING & RECEIPT PROCEDURE- PRO006.04 SUPPLIER/SUBCONTRACTOR PURCHASING & RECEIPT PROCEDURE- Contents 1. INTRODUCTION:... 1 2. RESPONSIBILITIES... 2 2.1 Managing Director shall;... 2 2.2 Authorised Personnel shall;... 2 2.3 Project manager/site

More information

ISO 9001 QUALITY MANUAL

ISO 9001 QUALITY MANUAL ISO 9001 QUALITY MANUAL Origination Date: 10/01/14 Document Identifier: AIF quality control manual Date: 10/01/14 Project: Customer review Document Status: Released Document Link: www.aeroindfast.com Abstract:

More information

ENVIRONMENTAL MANUAL. Page 1 of 26 Uncontrolled when printed NCH Env Manual Vers 11.0 date 01/02/18

ENVIRONMENTAL MANUAL. Page 1 of 26 Uncontrolled when printed NCH Env Manual Vers 11.0 date 01/02/18 ENVIRONMENTAL MANUAL Page 1 of 26 Uncontrolled when printed NCH Env Manual Vers 11.0 date 01/02/18 Document Control Identification and Approval Status Document Title: Environmental Manual Version Number:

More information

Procedure 14 Internal Audits

Procedure 14 Internal Audits Procedure 14 Internal Audits Table of Contents 1 Introduction... 2 2 Audit Planning... 2 2.1 Head Office... 2 2.2 Critical Locations... 3 3 Conducting the Audit... 3 4 Non-conformances... 3 5 Client file

More information

Quality Manual. AARD Spring & Stamping Quality Manual

Quality Manual. AARD Spring & Stamping Quality Manual Quality Manual Page 1 of 25 AARD Spring & Stamping QM/5.0 Title: QM 5.0 AARD Spring & Stamping Quality Manual Copy Approval Date: 1/27/2011 Reviewer(s): Sign / Print Title Date Dan Wheeler Document Originator

More information

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

PRECISE INDUSTRIES INC. Quality Manual

PRECISE INDUSTRIES INC. Quality Manual PRECISE INDUSTRIES INC Revision N Issued July 5, 2017 Conforms to AS9100 Rev. D and ISO 9001:2015 Copyright Year2017 [PRECISE INDUSTRIES INC]; all rights reserved. This document may contain proprietary

More information

PCA ELECTRONICS, INC. Quality Manual

PCA ELECTRONICS, INC. Quality Manual PCA ELECTRONICS, INC. Conforms to ISO 9001:2015 (c) 2018 PCA Electronics, Inc.; all rights reserved. This document may contain proprietary information and may only be released to third parties with approval

More information

The following is an example systems manual from a low volume (TE, but not an automotive supplier) company.

The following is an example systems manual from a low volume (TE, but not an automotive supplier) company. The following is an example systems manual from a low volume (TE, but not an automotive supplier) company. You will note that this is essentially a copy of ISO 9001:2000. I take this path because long

More information

Quality, Health Safety & Environment Code: 2013

Quality, Health Safety & Environment Code: 2013 Price: AUD 35 Quality, Health Safety & Environment Code Quality, Health Safety & Environment Code: 2013 Published by: TQCS International Pty Ltd Head Office: 117A Tapleys Hill Road HENDON SA 5014 AUSTRALIA

More information

PURCHASING AND RECEIVING INSPECTION

PURCHASING AND RECEIVING INSPECTION PURCHASING AND RECEIVING INSPECTION Rev Issued To Title Date Signed By Rev 0 Management Team 12-03-07 ###### Rev 1 Management Team 19-04-07 ###### Rev 2 Management Team 25-05-09 ###### Rev 3 Management

More information

Table of Contents. Project Agreement Schedule 14

Table of Contents. Project Agreement Schedule 14 Table of Contents PART 1 DEFINITIONS... 3 PART 2 INTEGRATED MANAGEMENT SYSTEM REQUIREMENTS... 6 2.1. Introduction... 6 2.2. Overview... 6 2.2.1 Management System Requirements... 7 2.2.2 Certification...

More information

Machined Integrations, LLC

Machined Integrations, LLC QUALITY MANUAL Machined Integrations, LLC ISO9001: 2008 Electronically Controlled by Quality Representative, Rev2, January 2014 Page 2 of 25 TABLE OF CONTENTS SECTION ELEMENT PAGE No A Revision and Approval

More information

(Insert Firm Name) Quality System Manual

(Insert Firm Name) Quality System Manual (Insert Firm Name) Quality System Manual Ver. 1.1 (enter implementation/revision date) Controlled Document Created date: Revised date: Revision number: Approved by: Quality System Manual Ver 1.1: (date)

More information

TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME

TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME Copyright TUV SUD BABT 2017 A Certification Body of: Page 1 of 33 Contents AMENDMENT RECORD 3 0. INTRODUCTION 3 1. PRE-CONDITIONS TO SUPPORT PRODUCTION

More information

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C 1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100

More information

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept ALTA Quality Requirements for Suppliers 25 Sept 2017 1 2 3.2. Purchase order information a- When Alta customer is indicated on the purchase order or related engineering documents, customer quality requirements

More information

Quality Manual Revision: C Effective: 03/01/10

Quality Manual Revision: C Effective: 03/01/10 TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL

More information

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008 Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008 This document belongs to Luminus Devices, Inc. It cannot be reproduced without authorized authority. Area: Quality System Document Page

More information

QUALITY MANAGEMENT SYSTEM MANUAL

QUALITY MANAGEMENT SYSTEM MANUAL High Temp Metals, Inc. 12500 Foothill Blvd. Sylmar, CA 91342-6038 Phone: 800-500-2141 818-362-5357 FAX: 818-362-9884 Email: sales@hightempmetals.com QUALITY MANAGEMENT SYSTEM MANUAL This document is uncontrolled

More information

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing Supplier: Phone: Prime Contact/Title: Sales Contact/Title: Address: Fax: e-mail address e-mail address Quality Contact/Title: e-mail address 1. Type of Business: a) Number of years in business? b) Company

More information

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General 1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General The organization s management with executive The commitment and involvement of the responsibility shall define, document

More information

ISO9001 QUALITY POLICY MANUAL

ISO9001 QUALITY POLICY MANUAL 1 OF 26 Metalife Industries, Inc. Serial No.: Master Revision: 1 Issue Date: October 14, 2011 Originator: Becky Wentling ISO9001 QUALITY POLICY MANUAL Prepared By (Document Controller): Becky Wentling

More information

EVANS CAPACITOR COMPANY

EVANS CAPACITOR COMPANY DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution

More information

Everest Engineering Works ISO REVISION DATE ISSUE

Everest Engineering Works ISO REVISION DATE ISSUE Page 1 of 28 QUALITY MANAGEMENT MANUAL ISSUED BY : MANAGEMENT REPRESENTATIVE (MR) ISSUED TO : ALL AUTHORIZED BY : Proprietor OFFICE & FACTORY G/3,Sudama Industrial Estate,Dharam Kanta, Mira-Bhayndar Road,

More information