WBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, Binding Open Season
|
|
- Esther Mariah Allen
- 5 years ago
- Views:
Transcription
1 WBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, 2014 Binding Open Season WBI Energy Wind Ridge Pipeline, LLC announces a Binding Open Season for the sale of long term, firm natural gas transportation capacity on Wind Ridge Pipeline. Project Overview WBI Energy Wind Ridge Pipeline, LLC (WBI Energy Wind Ridge) is soliciting additional commitments for firm natural gas transportation capacity on the Wind Ridge Pipeline. The Wind Ridge Pipeline will create new, firm natural gas transportation capacity from a new interconnect with Northern Border Pipeline Company in McIntosh County, North Dakota to a new fertilizer production facility being constructed near Spiritwood, North Dakota. Wind Ridge Pipeline will also connect with WBI Energy Transmission, Inc. s natural gas transmission system near Spiritwood, North Dakota. A map showing the proposed route for Wind Ridge Pipeline is attached. The initial design of Wind Ridge Pipeline includes approximately 96 miles of new, high pressure steel pipeline and various measurement and interconnection facilities. The pipeline project, as designed to meet the needs of the new fertilizer production facility, consists of a 16-inch diameter pipeline. Based on this initial design, Wind Ridge Pipeline will have a capacity of approximately 90,000 equivalent dekatherms per day (dkt/day). The Wind Ridge Pipeline project can be redesigned to create approximately 50,000 dkt/day of additional firm transportation capacity by increasing the diameter of the pipeline. WBI Energy Wind Ridge is soliciting interest in this additional 50,000 dkt/day of firm capacity through this Open Season. Although WBI Energy Wind Ridge does not currently have a FERC Gas Tariff, WBI Energy Wind Ridge anticipates such FERC Gas Tariff will be substantially similar to WBI Energy Transmission, Inc. s FERC Gas Tariff, Third Revised Volume No. 1. The targeted in-service date of Wind Ridge Pipeline is January Length of Open Season The Open Season will commence on October 10, 2014 and conclude at 4:00 PM Central Time on October 31, The Open Season is available to any party. All related Precedent Agreements must be executed no later than November 21, 2014, unless WBI Energy Wind Ridge agrees, in its sole discretion, to extend such deadline. Page 1
2 Capacity WBI Energy Wind Ridge is offering for sale approximately 50,000 dkt/day of additional new firm transportation capacity for delivery of natural gas to new delivery locations along the Wind Ridge Pipeline route, as well as a new interconnect with WBI Energy Transmission, Inc. s natural gas transmission system near Spiritwood, North Dakota. Constraints may limit WBI Energy Wind Ridge s ability to accept certain delivery locations requested. Pursuant to a separate Open Season, WBI Energy Transmission, Inc. is proposing construction of certain facilities to expand pipeline capacity for receipt of natural gas from a proposed interconnection with Wind Ridge Pipeline to delivery locations in its Sheyenne Sub-system in eastern North Dakota. Bids Shippers have the option of requesting to pay a project recourse rate or a mutually agreeable negotiated rate for the firm transportation capacity associated with this Open Season. The project recourse rate is estimated to be $0.59 per dekatherm on a 100% load factor basis based on the current project cost and volume estimates. Such project recourse rate will be revised based upon final costs and volumes. Both the project recourse rate and the negotiated rate options will be subject to all applicable surcharges and fuel, lost and unaccounted for gas and electric power charges as such may be in effect from time to time. During this Open Season, both the contract term and rates are negotiable. It is projected that a minimum term of ten (10) years from commencement of service may be necessary to support the capital expenditures required to increase the capacity on the Wind Ridge Pipeline. Awarding Capacity In order to respond to this Open Season, shippers must complete an Open Season Bid Sheet that includes the delivery location(s), quantity requested, length of term and desired rate. Capacity on Wind Ridge Pipeline will be awarded to potential shippers based upon the highest net present value per unit of demand to the lowest net present value per unit of demand. WBI Energy Wind Ridge reserves the right to aggregate transportation requests from potential shippers to generate the highest net present value per unit of demand to WBI Energy Wind Ridge. A shipper requesting a negotiated rate which exceeds the project recourse rate shall be treated as if the negotiated rate is equal to the project recourse rate for such service. Any Page 2
3 shipper requesting the project recourse rate has the same right to capacity as a shipper willing to pay a negotiated rate higher than such project recourse rate. Where a negotiated rate is less than the project recourse rate, the negotiated rate shall be evaluated based on such lower rate and shall be afforded a correspondingly lower priority than higher bids, including bids submitted at the project recourse rate. Within the subset of negotiated rate bids, where one negotiated rate is less than another negotiated rate, the lower negotiated rate shall be evaluated based on such lower rate and shall be afforded a correspondingly lower priority than the higher negotiated rate. In no event shall WBI Energy Wind Ridge be required to accept a bid which provides a rate below the project recourse rate. In the event a request specifies a term greater than twenty (20) years in length, the term portion of the net present value calculation will be limited to twenty (20) years. In the case of insufficient capacity to satisfy identical successful requests, WBI Energy Wind Ridge shall allocate available capacity pro rata based upon the total capacity requested by each successful potential shipper to the total capacity requested by all successful potential shippers. Once capacity is awarded, WBI Energy Wind Ridge will require successful shippers to execute a Precedent Agreement. Successful shippers will also be required to provide evidence of creditworthiness satisfactory to WBI Energy Wind Ridge. When executed by both parties, a Precedent Agreement will set forth the terms and conditions under which the shipper and WBI Energy Wind Ridge will execute a firm transportation service agreement. All transported volumes for the entire term of the firm transportation service agreements will be subject to all applicable surcharges and any applicable fuel, lost and unaccounted for gas and electric power charges as such may be in effect from time to time. The Precedent Agreements, when fully executed by both the shipper and WBI Energy Wind Ridge, will constitute a binding agreement. However, WBI Energy Wind Ridge will in no way be obligated to execute the Precedent Agreements. If WBI Energy Wind Ridge notifies a shipper in writing of its election not to execute a Precedent Agreement, then the shipper will be relieved of its obligation. In the event the capacity is not fully subscribed through this Open Season process, the capacity will be sold on a first-come, first-served basis. All transportation services proposed as part of this Open Season are expressly subject to WBI Energy Wind Ridge s receipt of all regulatory approvals required to effectuate the services hereunder in form and substance satisfactory to WBI Energy Wind Ridge. WBI Energy Wind Ridge reserves the right to reject any bid, revise the scope of the proposed project in any way, and, consistent with applicable regulations, to modify, extend or terminate this Open Season process at any time. Interested parties must complete the attached Open Season Bid Sheet and it to mark.anderson@wbienergy.com, fax it to WBI Energy Wind Ridge at (701) or Page 3
4 mail it (to ensure receipt by WBI Energy Wind Ridge prior to the end of the Open Season) to WBI Energy Wind Ridge Pipeline, LLC, Market Services Department, P.O. Box 5601, Bismarck, ND We urge you to respond promptly to this Open Season. If you have any questions please contact: Rob Johnson Telephone: (701) or Mark Anderson Telephone: (701) Page 4
5 Wind Ridge Pipeline Project Open Season Bid Sheet Shipper Name: Contact Person: Mailing Address: Phone: Fax: Primary Receipt and Delivery Location(s): Receipt Location Delivery Location MDDQ (equivalent dkt/day) Northern Border Pipeline Northern Border Pipeline Total Maximum Daily Delivery Quantity (MDDQ) Requested: (equivalent dkt/day) Length of Term: (years following the in-service date of the facilities) Rates (choose one): Project Recourse Rate Negotiated Rate (as follows) MDDQ Reservation Charge (rate per equivalent dkt per month): Commodity Charge (rate per dkt): Note: Both the project recourse rate and the negotiated rate options will be subject to all applicable surcharges and fuel, lost and unaccounted for gas and electric power charges as such may be in effect from time to time. Signed By: Name: Title: Date: By submitting this Wind Ridge Pipeline Project Open Season Bid Sheet, shipper hereby agrees to enter into good faith negotiations with the objective of entering into a binding Precedent Agreement with WBI Energy Wind Ridge in accordance with the terms set forth herein. Page 5
6 Wind Ridge Pipeline Project Overview Map Page 6
Open Season Notice of Available and Expansion Firm Capacity on El Paso Natural Gas Company, L.L.C. (EPNG)
Open Season Notice of Available and Expansion Firm Capacity on El Paso Natural Gas Company, L.L.C. (EPNG) Bid Deadline 2:00 PM Mountain Time, March 22, 2018 Portable Document Format (.pdf) file of Open
More informationCheyenne Connector Binding Open Season
Cheyenne Connector Binding Open Season Page 1 of 9 Cheyenne Connector Description Tallgrass Energy Partners, LP ( Tallgrass ) is pleased to announce a binding open season ( Open Season ) for the Cheyenne
More informationLOCKRIDGE TO WAHA PROJECT NOTICE OF BINDING OPEN SEASON
Announcement of Open Season Natural Gas Pipeline Company of America LLC ( NGPL ) has entered into a binding transaction with a third party ( Prearranged Shipper ) to develop a project to provide 500,000
More informationEl Paso Natural Gas Company Binding Open Season. Delaware Basin to Waha
INTRODUCTION El Paso Natural Gas Company Binding Open Season Delaware Basin to Waha In response to increasing demand for take-away capacity from the Delaware Basin with deliveries to the Waha area interconnections,
More informationNotice Text. Notice 17238/Previous Notice 17236
TSP Name: El Paso Natural Gas Company,L.L.C TSP: 00-800-1703 Notice ID: 17238 Critical: N Notice Type Desc: Other Notice Stat Desc: Initiate Subject: Revised Line 1600 to Waha Open Season (17238) Prior
More informationTransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018
TransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018 Proposing firm service from Empress to the Chicago market area, including
More informationBINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement
BINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement Page 1 of 8 REX Cheyenne Hub Enhancement Rockies Express Pipeline LLC ( REX ) is pleased to announce a binding open season ( Open Season
More informationIssued February 21, Haynesville Global Access Pipeline LLC. Notice of Non-Binding Open Season
Issued February 21, 2018 Haynesville Global Access Pipeline LLC Notice of Non-Binding Open Season Notice of Non-Binding Open Season Haynesville Global Access Pipeline LLC ( HGAP ), a wholly-owned subsidiary
More informationHorizon Pipeline Company, L.L.C. First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS
Horizon Pipeline Company, L.L.C. First Revised Sheet No. 100 Superseding Original Sheet No. 100 1. DEFINITIONS 1.1 AGREEMENT "Agreement" shall mean a transportation agreement subject to, as applicable,
More informationFERC GAS TARIFF. First Revised Volume No. 1 NORTHERN BORDER PIPELINE COMPANY. Filed with. Federal Energy Regulatory Commission
FERC GAS TARIFF of NORTHERN BORDER PIPELINE COMPANY Filed with Federal Energy Regulatory Commission Communications Concerning This Tariff Should Be Addressed To: Joan Collins Manager, Tariffs and Compliance
More informationFERC GAS TARIFF. Second Revised Volume No. 1 CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF Second Revised Volume No. 1 Of CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: James R. Downs,
More informationTexas Eastern Appalachiaa to Market Expansion Project (TEAM
Texas Eastern Appalachiaa to Market Expansion Project (TEAM 2014) Moving emerging natural gas supplies from the Appalachian region to diverse market destinations along the existing Texas Eastern footprint
More informationFoothills Pipe Lines Ltd.
Page 1 SERVICE AGREEMENT FIRM TRANSPORTATION SERVICE FOR TRANSPORTATION OF GAS This AGREEMENT made, 20 BETWEEN: AND: FOOTHILLS PIPE LINES LTD., a body corporate having an office and carrying on business
More informationFERC GAS TARIFF. First Revised Volume No. 1 MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF First Revised Volume No. 1 Of MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: John
More informationFoothills Pipe Lines Ltd.
Page 1 SERVICE AGREEMENT SHORT TERM FIRM TRANSPORTATION SERVICE FOR TRANSPORTATION OF GAS This AGREEMENT made, 20 BETWEEN: AND: FOOTHILLS PIPE LINES LTD., a body corporate having an office and carrying
More informationIssued March 21, Permian Global Access Pipeline LLC. Notice of Non-Binding Open Season
Issued March 21, 2018 Permian Global Access Pipeline LLC Notice of Non-Binding Open Season Notice of Non-Binding Open Season Permian Global Access Pipeline LLC ( PGAP ), a wholly-owned subsidiary of Tellurian
More informationOPEN SEASON
OPEN SEASON 2012-2014 Rooted in Tradition, Branching to New Opportunities E astern Shore Natural Gas Company ( Eastern Shore ) is pleased to announce its Open Season 2012-2014. Eastern Shore has been serving
More informationVector Pipeline L.P. Original Sheet No. 30 FERC Gas Tariff First Revised Volume No. 1 v0.0.0 RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE
Vector Pipeline L.P. Original Sheet No. 30 1. AVAILABILITY RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE This FT-1 Rate Schedule is available to any party (hereinafter called "Shipper"), for firm transportation
More informationFERC GAS TARIFF. Third Revised Volume No. 1. (Superseding Second Revised Volume No. 1) COLUMBIA GULF TRANSMISSION, LLC FILED WITH
FERC GAS TARIFF (Superseding Second Revised Volume No. 1) of COLUMBIA GULF TRANSMISSION, LLC FILED WITH FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this tariff should be addressed to:
More informationTransportation. Tariff. Vector Pipeline Limited Partnership
Transportation Tariff of Vector Pipeline Limited Partnership (Effective April 1, 2004 Unless Indicated Otherwise) Communications Concerning this Tariff Should be Addressed to: Vector Pipeline Limited 38705
More informationALLIANCE PIPELINE LIMITED PARTNERSHIP by its General Partner, ALLIANCE PIPELINE LTD. ( Alliance Canada or Alliance )
ALLIANCE PIPELINE LIMITED PARTNERSHIP by its General Partner, ALLIANCE PIPELINE LTD. ( Alliance Canada or Alliance ) BINDING OPEN SEASON March 28 May 30, 2018 For: Capacity Expansion, Capacity Turn Backs,
More informationTransCanada s GTN System Notice of Available Multi-Month Parking Service. November 17, 2009
TransCanada s GTN System Notice of Available Multi-Month Parking Service November 17, 2009 TransCanada s GTN System ( GTN ) is providing notice of the availability of multi-month Parking Service, offered
More informationTable of Contents. Trailblazer Pipeline Company LLC 6th Revised Volume No. 1. Rate Schedules. Rate Schedule FTS. Rate Schedule ITS.
6th Revised Volume No. 1 Table of Contents Rate Schedules Rate Schedule FTS Rate Schedule ITS Rate Schedule FTB Rate Schedule Wheeling Service Rate Schedule PALS Rate Schedules 6th Revised Volume No. 1
More informationNOTICE OF NON-BINDING OPEN SEASON AG LINE EXPANSION PROJECT
Announcement of Non-Binding Open Season Natural Gas Pipeline Company of America LLC ( NGPL ) is soliciting interest from the market in developing a project to provide approximately 200,000 Dth/d of firm
More informationFERC NGA GAS TARIFF. THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) SEA ROBIN PIPELINE COMPANY, LLC.
FERC NGA GAS TARIFF THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) of SEA ROBIN PIPELINE COMPANY, LLC Filed With The Federal Energy Regulatory Commission Communications Concerning
More informationCORNERSTONE PIPELINE & UTICA BUILD-OUT PROJECTS
NOTICE OF BINDING OPEN SEASON AND INFORMATION MEMORANDUM Issued By MARATHON PIPE LINE LLC & OHIO RIVER PIPE LINE LLC SUBSIDIARIES OF MPLX LP CORNERSTONE PIPELINE & UTICA BUILD-OUT PROJECTS On FEBRUARY
More informationKinder Morgan Louisiana Pipeline LLC First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS
Kinder Morgan Louisiana Pipeline LLC First Revised Sheet No. 100 First Revised Volume No. 1 Original Sheet No. 100 1. DEFINITIONS 1.1 AGREEMENT "Agreement" shall mean a transportation agreement subject
More informationPermian to Katy Pipeline. Non-Binding Open Season
August - September 2017 TABLE OF CONTENTS Notice of Open Season and Project Overview...3 P2K Katy Hub...4 Anchor Shipper Status...6 Length of Open Season...6 Participation in the...6 Bid Evaluation Criteria...7
More informationRate Schedule FT Firm Transportation Service
Rate Schedule FT Firm Transportation Service 1. Availability This Rate Schedule is available for the transportation of natural gas by Heartland Gas Pipeline for any Customer: 1.1 Where Customer: a) Has
More informationRATE SCHEDULE IT-S INTERRUPTIBLE - ACCESS TO STORAGE
Page 1 RATE SCHEDULE INTERRUPTIBLE - ACCESS TO STORAGE 1.0 DEFINITIONS 1.1 The capitalized terms used in this have the meanings attributed to them in the General Terms and Conditions of the Tariff unless
More informationDominion Energy Transmission, Inc. FERC Gas Tariff Tariff Record No. 20. Fifth Revised Volume No. 1 Version TARIFF RATE SCHEDULES
Rate Schedules FERC Gas Tariff Tariff Record No. 20. TARIFF RATE SCHEDULES TARIFF RATE RECORD SCHEDULE SERVICE NO. FT Firm Transportation Service 20.1 FTNN Firm Transportation, No-Notice Service 20.2 IT
More informationTable of Contents/Section Index With Links
Boardwalk Storage Company, LLC Third Revised Volume No. 1 Table of Contents/Section Index With Links Third Revised Volume No. 1 1. Table of Contents 2. Preliminary Statement 3. System Map 4. Currently
More informationKinder Morgan Illinois Pipeline LLC Original Sheet No. 15 FERC Gas Tariff First Revised Volume No. 1
Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 RATE SCHEDULE FTS FIRM TRANSPORTATION SERVICE 1. AVAILABILITY This Rate Schedule FTS is available to any entity (hereinafter called Shipper) which:
More informationOPERATING STATEMENT NORTHERN ILLINOIS GAS COMPANY D/B/A NICOR GAS COMPANY ( NICOR GAS COMPANY ) FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
OPERATING STATEMENT OF NORTHERN ILLINOIS GAS COMPANY D/B/A NICOR GAS COMPANY ( NICOR GAS COMPANY ) FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION EFFECTIVE SEPTEMBER 1, 2015 Communications Concerning
More information6th Revised Volume No. 1 Section Version: TABLE OF CONTENTS
Table of Contents TABLE OF CONTENTS Sixth Revised Volume No. 1 Table of Contents Preliminary Statement System Map Section Name Table of Contents Preliminary Statement System Map Currently Effective Rates
More informationFERC GAS TARIFF VOLUME NO. 1 KO TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
KO Transmission Company Filing Category: Amendment Filing Date: 07/27/2016 FERC Docket: RP16-01097-001 FERC Action: Accept FERC Order: 156 FERC 61,147 Order Date: 08/31/2016 Effective Date: 02/01/2017
More informationOPEN SEASON. I. The BKEP Condensate Pipeline Project
OPEN SEASON I. The BKEP Condensate Pipeline Project Blueknight Energy Partners, L.P. ( BKEP ) is pleased to announce the commencement of an Open Season for the BKEP Condensate Pipeline Project. The BKEP
More informationOpen Season Guidelines
C04-ANA 2.4 (a) Attachment Maritimes & Northeast Pipeline Expansion Project Open Season Guidelines February 15 to March 31, 2005 Maritimes & Northeast Pipeline is ideally situated to expand in order to
More informationINFORMATION MEMORANDUM AND BINDING OPEN SEASON NOTICE
INFORMATION MEMORANDUM AND BINDING OPEN SEASON NOTICE I. The Rangeland RIO Pipeline On April 12, 2016, Rangeland RIO Pipeline, LLC ( Rangeland ) issued a press release announcing this open season ( Open
More informationMISO MODULE B FERC Electric Tariff TRANSMISSION SERVICE MODULES Effective On: November 19, 2013
MISO MODULE B TRANSMISSION SERVICE MISO I INTRODUCTION The Transmission Provider shall provide Point-To-Point and Network Integration Transmission Service pursuant to the applicable terms and conditions
More informationFERC GAS TARIFF FIRST REVISED VOLUME NO. 1 CENTRAL KENTUCKY TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 OF CENTRAL KENTUCKY TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: Stanley
More informationTable of Contents. Great Lakes Gas Transmission Limited Partnership. Third Revised Volume No. 1. Third Revised Volume No. 1 1 TABLE OF CONTENTS
Great Lakes Gas Transmission Limited Partnership Table of Contents 1 TABLE OF CONTENTS 2 PRELIMINARY STATEMENT 3 MAPS 4 STATEMENT OF RATES 4.1 Rate Schedules FT, LFT & EFT 4.2 Reserved for Future Use 4.3
More informationEXTENDED OPEN SEASON FOR INTERIM CAPACITY Ruby Pipeline Project
EXTENDED OPEN SEASON FOR INTERIM CAPACITY Ruby Pipeline Project Ruby Pipeline, LLC ( Ruby ) is conducting an open season for a limited quantity of unsubscribed capacity commencing upon the In-Service Date
More informationMagnum Gas Storage, LLC
September 2016 Non-Binding Open Season Providing the Western US with Critical Energy Infrastructure www.westernenergyhub.com/natural-gas-midstream.php MAGNUM GAS STORAGE PROJECT OPEN SEASON FOR FIRM INTERSTATE
More informationSheet No. 5 - Currently Effective Rates - Rate Schedules FTS and ITS. Sheet No. 6 - Statement of Negotiated Rate Transactions
Kinder Morgan Illinois Pipeline LLC Table of Contents Sheet No. 1 - Table of Contents Sheet No. 3 - Preliminary Statement Sheet No. 4 - System Map Sheet No. 5 - Currently Effective Rates - Rate Schedules
More informationNortheast Energy Direct
Northeast Energy Direct The Northeast Pipeline Expansion Solution for Lower Energy Costs and Enhanced Electric Reliability Open Season for Firm Service www.northeastenergyfuture.com @NEDEnergy Open Season
More informationStatement of Nature, Reasons, and Basis for Proposed Changes
November 25, 2008 The Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First St., N.E. Washington, D.C. 20426 Dear Ms. Bose: RE: Great Lakes Gas Transmission Limited Partnership
More informationSTATE OF MISSOURI, PUBLIC SERVICE COMMISSION P.S.C. MO. No. 2 1 ST Revised Sheet No. 33 Canceling P.S.C. MO. No. 2 Original Sheet No.
P.S.C. MO. No. 2 1 ST Revised Sheet No. 33 Canceling P.S.C. MO. No. 2 Original Sheet No. 33 RATE SCHEDULE SVFT F. SMALL VOLUME FIRM SMALL (SVFTS) 1. Availability: Service under this rate schedule is available
More informationTRANSPORTATION SERVICE RATE SCHEDULE LVFRT
P.S.C. MO. No. 2 1 st Revised Sheet No. 39 Canceling P.S.C. MO. No. 2 Original Sheet No. 39 RATE SCHEDULE LVFRT J. LARGE VOLUME FLEXIBLE RATE (LVFRT) 1. Availability: The Company may, in its sole discretion,
More informationFebruary 10, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426
February 10, 2011 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Northern Border Pipeline Company 717 Texas Street, Suite 2400 Houston, TX
More informationOpen Season Market-Based Storage in the Heart of the PA Marcellus Shale Region
Open Season Market-Based Storage in the Heart of the PA Marcellus Shale Region Open Season starts 8:00AM Feb 12, 2018 Open Season bids due 12:00PM Feb 21, 2018 Contracts awarded on 12:00PM Feb 23, 2018
More information1.0.0 Rate Schedule GPS Gas Parking Service GT&C Section 7. Operational Balancing Agreements
September 28, 2016 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Trunkline Gas Company, LLC Docket No. RP16- Revision to Term Provision
More informationFebruary 28, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.
February 28, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Northern Border Pipeline Company 717 Texas Street, Suite 2400 Houston,
More informationRATE SCHEDULE 291-T ALL CUSTOMERS TRANSPORT ONLY (5,000 Dth but less than 30,000 Dth annually)
1 st Revised Tariff 291-T.1 P. O. BOX 401, OKLAHOMA CITY, OKLAHOMA Replacing Tariff 291-T.1 RATE SCHEDULE 291-T ALL CUSTOMERS TRANSPORT ONLY (5,000 Dth but less than 30,000 Dth annually) Availability Natural
More informationCalifornia Independent System Operator Corporation Fifth Replacement Electronic Tariff
Table of Contents 30. Bid and Self-Schedule Submission for all CAISO Markets... 2 30.1 Bids, Including Self-Schedules... 2 30.1.1 Day-Ahead Market... 2 30.1.2 Real-Time Market... 2 30.2 Bid Types... 3
More informationDECLARATION OF AUTHORITY. This DECLARATION OF AUTHORITY ( Declaration ) is a declaration and certification made on by and between the following:
DECLARATION OF AUTHORITY This DECLARATION OF AUTHORITY ( Declaration ) is a declaration and certification made on by and between the following: ( Party A ) and Revised ( Party B - a PJM Member ) for the
More informationApril 25, 2016 to May 23, 2016
Sistema DA, S. de R.L. de C.V. BINDING OPEN SEASON April 25, 2016 to May 23, 2016 I. DESCRIPTION OF THE PROJECT Sistema DA, S. de R.L. de C.V. ( Dos Águilas México ) intends to design, build and operate
More informationColumbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: May 1, 2018 Service Agreement No.
Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: May 1, 2018 Service Agreement No. 149760 Antero Resources Corporation Option Code A FTS SERVICE AGREEMENT Service
More informationAgency Agreement. Both will be signed by EEC and one will be returned to you.
Elba Express Company, L.L.C. Agency Agreement Under Section 24.2 of the General Terms and Conditions of Elba Express Company s Tariff, a shipper can appoint an agent and request EEC to recognize such appointment.
More informationMarch 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C
March 31, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Northern Border Pipeline Company 700 Louisiana Street, Suite 700 Houston,
More informationNorthern Illinois Gas Company d/b/a Nicor Gas Company
Il1.C.C. No. 16 - Gas 6th Revised Sheet No.75.2 (Canceling 4th Sheet No.75.2, Effective January 18, 2002) Rider 15 Customer Select (Continued From Sheet No. 75.1) Customer may terminate their participation
More informationCarlton Resolution Frequently Asked Questions
What is the? The is a negotiated settlement among Northern s shippers and Northern where the shippers agreed to deliver up to 250,000 Dth/day, upon request by Northern, at the interconnect between Northern
More informationMISO Module E Capacity Transaction Confirmation Version 1.0 October 20, 2008
MISO Module E Capacity Transaction Confirmation Version 1.0 October 20, 2008 NOTE: PARTIES SHOULD SEEK APPROPRIATE LEGAL AND ACCOUNTING ADVICE PRIOR TO USING THIS DOCUMENT. THIS DOCUMENT IS PROVIDED FOR
More informationColorado Interstate Gas Company, L.L.C. Non-binding Open Season Soliciting Interest in DJ Expansion Capacity of up to 1.2 Bcf/day
Colorado Interstate Gas Company, L.L.C. Non-binding Open Season Soliciting Interest in DJ Expansion Capacity of up to 1.2 Bcf/day Portable Document Format (.pdf) file of Open Season: https://pipeportal.kindermorgan.com/portalui/openseasondocs.aspx?tsp=cigd
More informationREQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: August 10, DUE DATE: August 23, 2017.
REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF LEGAL SERVICES General Counsel ISSUE DATE: August 10, 2017 DUE DATE: August 23, 2017 Issued by: Trenton Parking Authority NOTE: In the event an interested
More informationMs. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C
February 1, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Northern Border Pipeline Company 700 Louisiana Street, Suite 700 Houston,
More informationColumbia Gas Transmission, LLC Section Original Volume No. 1.1 Version Non-Conforming Service Agreement No
Columbia Gas Transmission, LLC Section 4.23 FERC NGA Gas Tariff Non-Conf Neg Rate Svc Agmts Original Volume No. 1.1 Version 0.0.0 Non-Conforming Service Agreement No. 161137 Cabot Oil & Gas Corporation
More informationGENERAL SERVICE GAS SCHEDULE C
Baltimore Gas and Electric Company -- Gas 33 GENERAL SERVICE GAS SCHEDULE C 1. AVAILABILITY: For use for 3 or more dwelling units served within a building through a single meter and all other non-domestic
More informationNovember 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426
November 20, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Gas Transmission Northwest LLC 700 Louisiana Street, Suite 700 Houston,
More informationColumbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: December 1, 2016 Service Agreement No.
Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: December 1, 2016 Service Agreement No. 183409 Nytis Exploration Company, LLC Option Code A Service Agreement
More informationTable of Contents Original Sheet No. 0 6 Original Sheet No. 1 7 First Revised Sheet No. 2 8 Original Sheet No. 3 9 First Revised Sheet No.
Table of Contents Original Sheet No. 0 6 Original Sheet No. 1 7 First Revised Sheet No. 2 8 Original Sheet No. 3 9 First Revised Sheet No. 4 10 Sheet Nos. 5-99 11 Third Revised Sheet No. 100 12 Seventh
More informationENERGY IMBALANCE MARKET BUSINESS PRACTICE ( EIM BP ) TABLE OF CONTENTS 1. Introduction 2. Communication with the PSEI EIM Entity 3.
ENERGY IMBALANCE MARKET BUSINESS PRACTICE ( EIM BP ) TABLE OF CONTENTS 1. Introduction 2. Communication with the PSEI EIM Entity 3. PSEI EIM Participating Resource Application and Processing 3.1 Application
More informationAugust 20 th, 2018 Notice of Non-Binding Open Season. CJ Express Pipeline. Midcoast Energy, LLC An affiliate of ArcLight Capital, LLC
1 August 20 th, 2018 Notice of Non-Binding Open Season CJ Express Pipeline Midcoast Energy, LLC An affiliate of ArcLight Capital, LLC 2 Midcoast Energy, LLC Midcoast Energy, LLC is a large-scale natural
More informationNorthern Illinois Gas Company d/b/a Nicor Gas Company I1l.C.C. No Gas 7th Revised Sheet No (Canceling 5th Revised Sheet No.75.8, Effective
Northern Illinois Gas Company d/b/a Nicor Gas Company I1l.C.C. No. 16 - Gas 7th Revised Sheet No. 75.8 (Canceling 5th Revised Sheet No.75.8, Effective September 15,2004) Rider 16 Supplier Aggregation Service
More informationColumbia Gas Transmission, LLC Section Non-Conforming Service Agreement No Virginia Natural Gas, Inc.
Columbia Gas Transmission, LLC Section 2.18 FERC NGA Gas Tariff Non-Conforming Svc Agmts Original Volume No. 1.1 Version 0.0.0 Non-Conforming Service Agreement No. 60536 Virginia Natural Gas, Inc. Agreement
More informationCalifornia Independent System Operator Corporation Fifth Replacement Electronic Tariff
Table of Contents 30. Bid and Self-Schedule Submission for all CAISO Markets... 2 30.1 Bids, Including Self-Schedules... 2 30.1.1 Day-Ahead Market... 2 30.1.2 Real-Time Market... 2 30.2 Bid Types... 3
More informationCalifornia Independent System Operator Corporation Fifth Replacement Electronic Tariff
Table of Contents 30. Bid and Self-Schedule Submission for all CAISO Markets... 2 30.1 Bids, Including Self-Schedules... 2 30.1.1 Day-Ahead Market... 2 30.1.2 Real-Time Market... 2 30.2 Bid Types... 3
More informationJune 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C
June 25, 2010 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Northern Border Pipeline Company 717 Texas Street, Suite 2400 Houston, TX
More informationNORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 Original Sheet 32-1
P.U.C. Or. 25 Original Sheet 32-1 SERVICE AVAILABILITY: Service under this Rate Schedule is available on the Company s Distribution System to Non-Residential Customers in all territory served by the Company
More informationTrailblazer Pipeline Company LLC Docket No. RP Exhibit No. TPC-0080
Trailblazer Pipeline Company LLC Docket No. RP- -000 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Trailblazer Pipeline Company LLC ) ) ) Docket No. RP- -000 SUMMARY OF PREPARED
More informationSOUTHERN LNG SERVICE REQUEST FORM
SOUTHERN LNG SERVICE REQUEST FORM Southern LNG Company, L.L.C. Post Office Box 2563 Birmingham, AL 35202 Gentlemen: (Customer) hereby requests services from Southern LNG Company, L.L.C. (Southern LNG)
More informationFERC GAS TARIFF FIRST REVISED VOLUME NO. 1. (Superseding Original Volume No. 1) SOUTHERN STAR CENTRAL GAS PIPELINE, INC.
FERC Gas Tariff FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 ( Original Volume No. 1) Of SOUTHERN STAR CENTRAL GAS PIPELINE, INC. Filed With FEDERAL ENERGY REGULATORY COMMISSION Communications Covering Rates
More informationRider 16 Supplier Aggregation Service. (Continued From Sheet No. 75.4)
Northern Illinois Gas Company Ill.C.C. No. 16 - Gas d/b/a Nicor Gas Company 11th Revised Sheet No. 75.5 (Canceling 9th Revised Sheet No. 75.5, Effective April 3, 2009) (Continued From Sheet No. 75.4) For
More informationNew carrier setup checklist
New carrier setup checklist Signed Contract Carrier Broker Contract with completed Addendum including flat rate agreed upon. Copy of Interstate Authority Certificate of Liability Insurance (CLI) with KCG
More informationColumbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: October 25, 2018 Service Agreement No.
Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective : October 25, 2018 Service Agreement No. 176680 Noble Energy, Inc. Option Code A FTS SERVICE AGREEMENT Service Agreement
More informationRequest for Proposals Gravel Crushing 2017
Request for Proposals Submitted By: FIRM NAME: ADDRESS: Tenders shall be submitted to the Rural Municipality of Spiritwood No. 496 by February 10 th, 2017 at 4:00 p.m. local time. Tenders may be submitted
More information144 FERC 61,130 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
144 FERC 61,130 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, Cheryl A. LaFleur, and Tony Clark. CenterPoint
More information2017 Renewable Energy Sale - Request for Offers Solicitation Protocol
2017 Renewable Energy Sale - Request for Offers Solicitation Protocol Issuance Date: Week of January 23, 2017 i Table of Contents I. OVERVIEW... 1 A. OVERVIEW... 1 B. RENEWABLE ENERGY SALE RFO COMMUNICATION...
More informationREQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 20, DUE DATE: January 11, 2019.
NOTE: In the event an interested firm has downloaded these specifications from the TPA website, you are responsible for providing the TPA via email at Trentonparkingph@aol.com your contact information,
More informationColumbia Gulf Transmission Company FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: November 1, 2012 Service Agreement No.
Columbia Gulf Transmission Company FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: November 1, 2012 Service Agreement No. 135616 NJR Energy Service Company Option Code A Service Agreement
More informationCONTRACT FOR STORAGE OF FROZEN SEMEN
CONTRACT FOR STORAGE OF FROZEN SEMEN THIS AGREEMENT, made and entered into this day of, 2011 ( Effective Date ), by and between Synbiotics Corporation, a wholly-owned subsidiary of Pfizer Inc., with a
More informationColumbia Gas Transmission, LLC. Fourth Revised Volume No. 1 Version TABLE OF CONTENTS TO GENERAL TERMS AND CONDITIONS
Part VII. Version 9.0.0 Section 1 Definitions 2 Electronic Bulletin Board (EBB) 3 Requests for Service TABLE OF CONTENTS TO GENERAL TERMS AND CONDITIONS 4 Availability of Capacity for Firm Services 5 Service
More informationREQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 11, DUE DATE: December 28, 2017
REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF LEGAL SERVICES General Counsel ISSUE DATE: December 11, 2017 DUE DATE: December 28, 2017 Issued by: Rahway Parking Authority NOTE: In the event an interested
More informationNetwork Integration Transmission Service Agreement (NITSA) and Network Operating Agreement (NOA)
Network Integration Transmission Service Agreement (NITSA) and Network Operating Agreement (NOA) 1. Please complete the NITS Application as follows and execute one (1) original: a. MISO will fill in the
More informationOctober 2010 Open Season Defining the Future of Natural Gas Storage
3 Riverway Suite 1110 Houston, Texas 77056 October 2010 Open Season Defining the Future of Natural Gas Storage RYCKMAN CREEK RESOURCES, LLC OPEN SEASON NOTICE Response Due By November 1, 2010, at 5:00
More informationSHELL PIPELINE COMPANY LP
SHELL PIPELINE COMPANY LP F.E.R.C. No. S-156.4.0 Cancels F.E.R.C. No. S-156.3.0 LOCAL TARIFF APPLYING ON THE TRANSPORTATION OF PETROLEUM PRODUCTS BY PIPELINE SUBJECT TO THE DEFINED HEREIN. (Rates in dollars
More informationFIRM TRANSPORTATION SERVICE AGREEMENT Rate Schedule KRF-1 CONTRACT NO. 1662
FIRM TRANSPORTATION SERVICE AGREEMENT Rate Schedule KRF-1 CONTRACT NO. 1662 THIS FIRM TRANSPORTATION SERVICE AGREEMENT ( Agreement ) is made and entered into as of this 29th day of November, 2017, by and
More informationPUBLIC WORKS REQUEST FOR QUOTATIONS TOPSOIL SUPPLY
PUBLIC WORKS REQUEST FOR QUOTATIONS TOPSOIL SUPPLY APRIL 2018 Quotes shall be submitted by completing this document and placing it in a sealed, opaque envelope, clearly marked on the outside, Public Works
More informationRATE SCHEDULE FT-R FIRM TRANSPORTATION - RECEIPT
Page 1 RATE SCHEDULE FIRM TRANSPORTATION - RECEIPT 1.0 DEFINITIONS 1.1 The capitalized terms used in this have the meanings attributed to them in the General Terms and Conditions of the Tariff unless otherwise
More informationIroquois. Capacity Release. Training Guide
PAGE 1 OF 20 Iroquois Capacity Release Training Guide 10/14/2014 PAGE 2 OF 20 TABLE OF CONTENTS OVERVIEW... 3 DEFINITIONS OF TERMS... 3 INITIAL CONTRACTING REQUIREMENTS FOR RELEASING SHIPPERS... 4 INITIAL
More information