Colorado Interstate Gas Company, L.L.C. Non-binding Open Season Soliciting Interest in DJ Expansion Capacity of up to 1.2 Bcf/day
|
|
- Peregrine Stone
- 5 years ago
- Views:
Transcription
1 Colorado Interstate Gas Company, L.L.C. Non-binding Open Season Soliciting Interest in DJ Expansion Capacity of up to 1.2 Bcf/day Portable Document Format (.pdf) file of Open Season: Colorado Interstate Gas Company, L.L.C. (CIG) is conducting a non-binding Open Season soliciting statements of interest in expansion capacity on its existing pipelines in the DJ Basin along Colorado s Front Range. CIG has identified opportunities to create between 100 Mdth/day and 1,200,000 Mdth/day of additional transportation capacity out of the DJ Basin to interstate natural gas pipeline interconnections at the Cheyenne Hub, and/or to other existing points on the CIG pipeline system. The incremental transportation capacity offered in this Open Season will have primary receipt rights at existing and potentially new interconnections with processing plants in the DJ Basin and will have primary delivery rights at various points off the CIG system at the Cheyenne Hub as described below. Depending on requested timing and volumes, CIG could have a portion of this capacity available as early as April 2019 and can stage further expansions to meet the anticipated needs of interested shippers. CIG anticipates the expansion capacity can be made available with minimal new pipeline construction activity using existing underutilized compression that is repurposed as needed, and with additional compression added as required to match production increases in the basin. Depending on timing, volume, and additional required new facilities, CIG anticipates that it would require 100% Load Factor rates for a 7 year term in the 10 cent to 11.5 cent/dth range, and/or rates for a 10 year term in the 8 cent to 9.75 cent/dth range.** This non-binding Open Season commences on February 22, 2018 and closes at 10:00 a.m. Mountain Time on March 15, Statements of interest should be submitted prior to the close of the Open Season to KMWestBids@kindermorgan.com using the form attached hereto. CIG will contact interested parties following the close of the Open Season to initiate discussions regarding the needs of the interested parties and the abilities of CIG to accommodate those needs. Questions concerning this Open Season should be directed to: Greg Ruben Laine Lobban DESCRIPTION OF THE DJ EXPANSIONS PIPELINES AND CAPACITY CIG owns, controls, or has an opportunity to acquire a number of different pipeline assets that can be used to provide the expansion capacity. By utilizing these various pipeline assets in connection with minor facility additions/modifications and the repurposing of existing compression assets and the potential installation of new compression facilities, CIG believes it can accommodate a wide variety of capacity expansion requirements, including requirements for expansion capacity that may ramp-up over time. The specific pipeline facilities and expansion opportunities under consideration by CIG include the following:
2 CIG Line No. 5C Expansions (500 Mdth/day): CIG could expand its south-to-north capacity on Line No. 5C in several increments via minor system modifications and reconfiguration of the pipeline to provide up to 500 Mdth/day of capacity to Cheyenne. Existing CIG 5AB receipt points would have secondary rights on the CIG 5C expansion capacity. Additionally, CIG could connect the High Plains Lancaster Lateral to CIG 5C to allow existing and new meter stations on High Plains Lateral access to this capacity. CIG HIGH PLAINS (350 Mdth/day): CIG could expand its High Plains facilities by utilizing off-system capacity from a third party. CIG anticipates connecting its High Plains Lateral system with the pipeline near Ft. St. Vrain and using a combination of off-system capacity on that pipeline with existing compression capacity at Cheyenne to provide up to 350 Mdth/day of expansion capacity from existing High Plains receipt points and potentially new interconnections with processing plants in the DJ Basin to Cheyenne. CIG High Plains Midpoint Compression Expansion (350 Mdth/day): CIG could construct a new midpoint compression facility on the High Plains Lateral that could provide an additional 220 Mdth/day of south-to-north capacity from existing or new DJ receipt points to points of delivery at the Cheyenne Hub. Additionally, CIG has identified an opportunity to reconfigure existing compression at Cheyenne (not included in any of the expansions above) to provide an additional 130 Mdth/day of incremental south-tonorth expansion capacity to Cheyenne. While the High Plains Midpoint Compression Expansion would not require additional pipeline facilities, it would require a FERC 7(c) filing for the new compression facilities and CIG anticipates a development timeline of 2 years from contracting to in-service. The various expansion opportunities described above could access some or all of the following delivery points at Cheyenne. The available capacity as of December 2018 is listed below and in most cases the capacity at these points could be expanded if needed. LOCATION PIN NUMBER LOCATION NAME INTERCONNECTING PIPE AVAILABLE CAPACITY (AS OF DECEMBER 2018) DTH/DAY Dullknife (DUL) Trailblazer 1,547, Thunder Chief (TDC) Cheyenne Plains 437, Curley (CUR) Cheyenne Plains 742, Bowie ((BOW) CIG 631, Rockport (RKP) TIGT 238, Little Wolf (LTW) PSCo 67, Owl Creek (OWL) PSCo 394, Sitting Bull (STB) REX 62, Dover (DOV) CIG 159, Red Cloud (RCD) Cheyenne plains 128, Tomahawk (TOM) Trailblazer 166, Ponderosa (PON) PSCO 236, Arrowhead (AHD) TIGT 184, Flying Hawk (FLY) High Plains 339,100 CIG has also identified opportunities to repurpose certain existing underutilized compression to facilitate deliveries into the Rockies Express Pipeline ( REX ) if that delivery point is requested. CIG will provide the requested transportation services under existing Rate Schedule TF-1 or TF-HP of CIG s FERC Gas Tariff (CIG s Tariff). For expansion proposals involving the use of off-system capacity, CIG anticipates providing for seamless service under CIG s Rate Schedule TF-HP, with CIG managing/administering that off-system capacity. CIG anticipates a portion of the expansion capacity could be available by approximately April 2019, and in increments thereafter to match production ramps in the DJ Basin.
3 CONDITIONS AND PROCEDURES FOR THE SUBMISSION OF STATEMENTS OF INTEREST Parties interested in potentially acquiring expansion capacity are invited to submit Statements of Interest using the attached form. Based on the information received in response to this solicitation, CIG will evaluate the various expansion opportunities to determine the best match with the Statements of Interest and will then initiate discussions with the interested parties with the goal of completing binding Transportation Precedent Agreements ( TPAs ). It is anticipated the TPAs will be subject to the results of one or more binding open seasons, and the receipt of approval from the appropriate management, management committee, and/or board of directors of bidder and its parent companies. In addition, the obligations of CIG under the binding TPAs will be subject to CIG s determination, in its sole discretion, that: - CIG is able to obtain any necessary regulatory or administrative authority to provide the expansion capacity; - Sufficient demand for the expansion capacity is demonstrated in this Open Season; - CIG is able to obtain any necessary CIG mainline capacity and/or any necessary off-system capacity on acceptable terms and conditions; and - The development of the additional capacity will provide an acceptable return on the expansion project. Creditworthiness Requirements: Shippers acquiring capacity on expansion projects will be required to satisfy the creditworthiness requirements of CIG's Tariff. In addition, in connection with service requiring the construction of new facilities, the shipper MAY also be required to demonstrate creditworthiness of up to two (2) years of anticipated charges for the awarded transportation capacity. CIG will assess the creditworthiness of each interested party in connection with the negotiation of the TPA and in accordance with Section 4.14 of CIG s Tariff. ** In addition to these rates, the expansion capacity would be subject to any applicable surcharges, including ACA, Fuel and L&U, and any other authorized surcharges assessed under the TF-HP or TF-1 Rate Schedule as those amounts may be amended or superseded from time-to-time.
4 STATEMENT OF INTEREST IN DJ BASIN EXPANSION CAPACITY Colorado Interstate Gas Company, L.L.C. Non-Binding Open Season Open Season EBB Identifier: 2018 Solicitation of Expressions of Interest in DJ Expansion Capacity Bid To: A. Shipper Information: Legal Name of Interested Party: Name of Authorized Representative: Title of Authorized Representative: DUNS Number: Phone: B. Desired Term of Service (e.g., 1 Year): Requested Term Start Date: Requested Term End Date: C. Desired Quantity: Maximum Daily Quantity (MDQ): Dth/day Receipt Point(s) Delivery Point(s) Requested Dth/day MDQ D. Reservation Rate (select one): CIG s maximum recourse rate Negotiated Rate: $ per Dth per Month
5 E. Additional Conditions or Requirements: Interested Party is invited to provide additional information regarding its needs or desires regarding the development of the expansion capacity, including but not limited to the schedule on which the interested party may desire to acquire the expansion capacity:
BINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement
BINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement Page 1 of 8 REX Cheyenne Hub Enhancement Rockies Express Pipeline LLC ( REX ) is pleased to announce a binding open season ( Open Season
More informationCheyenne Connector Binding Open Season
Cheyenne Connector Binding Open Season Page 1 of 9 Cheyenne Connector Description Tallgrass Energy Partners, LP ( Tallgrass ) is pleased to announce a binding open season ( Open Season ) for the Cheyenne
More informationEl Paso Natural Gas Company Binding Open Season. Delaware Basin to Waha
INTRODUCTION El Paso Natural Gas Company Binding Open Season Delaware Basin to Waha In response to increasing demand for take-away capacity from the Delaware Basin with deliveries to the Waha area interconnections,
More informationOpen Season Notice of Available and Expansion Firm Capacity on El Paso Natural Gas Company, L.L.C. (EPNG)
Open Season Notice of Available and Expansion Firm Capacity on El Paso Natural Gas Company, L.L.C. (EPNG) Bid Deadline 2:00 PM Mountain Time, March 22, 2018 Portable Document Format (.pdf) file of Open
More informationNotice Text. Notice 17238/Previous Notice 17236
TSP Name: El Paso Natural Gas Company,L.L.C TSP: 00-800-1703 Notice ID: 17238 Critical: N Notice Type Desc: Other Notice Stat Desc: Initiate Subject: Revised Line 1600 to Waha Open Season (17238) Prior
More informationLOCKRIDGE TO WAHA PROJECT NOTICE OF BINDING OPEN SEASON
Announcement of Open Season Natural Gas Pipeline Company of America LLC ( NGPL ) has entered into a binding transaction with a third party ( Prearranged Shipper ) to develop a project to provide 500,000
More informationMarch 9, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.
March 9, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20046 Attention: Ms. Kimberly D. Bose, Secretary Re: Non-Conforming Transportation Service Agreement; Docket No.
More informationQuarterly Recomputation of Fuel and Lost and Unaccounted-for Percentages, Wyoming Interstate Company, L.L.C.; Docket No. RP19-
Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 October 31, 2018 Attention: Ms. Kimberly D. Bose, Secretary Re: Quarterly Recomputation of Fuel and Lost and Unaccounted-for
More informationColorado Interstate Gas Company, L.L.C; Update to Non-Conforming Agreements; Docket No. RP16-
August 31, 2016 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20046 Attention: Ms. Kimberly D. Bose, Secretary Re: Colorado Interstate Gas Company, L.L.C; Update to Non-Conforming
More informationFERC GAS TARIFF THIRD REVISED VOLUME NO. 2. (Superseding Second Revised Volume No. 2) WYOMING INTERSTATE COMPANY, L.L.C.
FERC GAS TARIFF THIRD REVISED VOLUME NO. 2 (Superseding Second Revised Volume No. 2) of WYOMING INTERSTATE COMPANY, L.L.C. filed with the FEDERAL ENERGY REGULATORY COMMISSION Communication Covering This
More informationOPEN SEASON
OPEN SEASON 2012-2014 Rooted in Tradition, Branching to New Opportunities E astern Shore Natural Gas Company ( Eastern Shore ) is pleased to announce its Open Season 2012-2014. Eastern Shore has been serving
More informationFERC GAS TARIFF FIRST REVISED VOLUME NO. 1 CHEYENNE PLAINS GAS PIPELINE COMPANY, L.L.C. filed with the FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 of CHEYENNE PLAINS GAS PIPELINE COMPANY, L.L.C. filed with the FEDERAL ENERGY REGULATORY COMMISSION Communications regarding this Tariff should be addressed to:
More informationEXTENDED OPEN SEASON FOR INTERIM CAPACITY Ruby Pipeline Project
EXTENDED OPEN SEASON FOR INTERIM CAPACITY Ruby Pipeline Project Ruby Pipeline, LLC ( Ruby ) is conducting an open season for a limited quantity of unsubscribed capacity commencing upon the In-Service Date
More informationNOTICE OF NON-BINDING OPEN SEASON AG LINE EXPANSION PROJECT
Announcement of Non-Binding Open Season Natural Gas Pipeline Company of America LLC ( NGPL ) is soliciting interest from the market in developing a project to provide approximately 200,000 Dth/d of firm
More informationTrailblazer Pipeline Company LLC Docket No. RP Exhibit No. TPC-0080
Trailblazer Pipeline Company LLC Docket No. RP- -000 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Trailblazer Pipeline Company LLC ) ) ) Docket No. RP- -000 SUMMARY OF PREPARED
More informationWBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, Binding Open Season
WBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, 2014 Binding Open Season WBI Energy Wind Ridge Pipeline, LLC announces a Binding Open
More informationFERC GAS TARIFF. Third Revised Volume No. 1. (Superseding Second Revised Volume No. 1) COLUMBIA GULF TRANSMISSION, LLC FILED WITH
FERC GAS TARIFF (Superseding Second Revised Volume No. 1) of COLUMBIA GULF TRANSMISSION, LLC FILED WITH FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this tariff should be addressed to:
More informationMagnum Gas Storage, LLC
September 2016 Non-Binding Open Season Providing the Western US with Critical Energy Infrastructure www.westernenergyhub.com/natural-gas-midstream.php MAGNUM GAS STORAGE PROJECT OPEN SEASON FOR FIRM INTERSTATE
More informationWhite River Hub Customer Meeting November 6, 2008
White River Hub Customer Meeting November 6, 2008 Gary A. Schmitt Questar Pipeline Company General Manager, Marketing and Business Development Enterprise White River Hub Questar Northwest REX TransColorado
More informationIssued March 21, Permian Global Access Pipeline LLC. Notice of Non-Binding Open Season
Issued March 21, 2018 Permian Global Access Pipeline LLC Notice of Non-Binding Open Season Notice of Non-Binding Open Season Permian Global Access Pipeline LLC ( PGAP ), a wholly-owned subsidiary of Tellurian
More informationIssued February 21, Haynesville Global Access Pipeline LLC. Notice of Non-Binding Open Season
Issued February 21, 2018 Haynesville Global Access Pipeline LLC Notice of Non-Binding Open Season Notice of Non-Binding Open Season Haynesville Global Access Pipeline LLC ( HGAP ), a wholly-owned subsidiary
More informationMagnum Gas Storage, LLC
MAGNUM GAS STORAGE PROJECT OPEN SEASON FOR INTERSTATE NATURAL GAS STORAGE SERVICES Response Due By July 31, 2009, at 5:00 MDT June 9, 2009 Magnum Gas Storage, LLC (Magnum), invites your company to participate
More informationFERC GAS TARIFF. First Revised Volume No. 1 NORTHERN BORDER PIPELINE COMPANY. Filed with. Federal Energy Regulatory Commission
FERC GAS TARIFF of NORTHERN BORDER PIPELINE COMPANY Filed with Federal Energy Regulatory Commission Communications Concerning This Tariff Should Be Addressed To: Joan Collins Manager, Tariffs and Compliance
More informationTransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018
TransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018 Proposing firm service from Empress to the Chicago market area, including
More informationFERC GAS TARIFF. First Revised Volume No. 1 MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF First Revised Volume No. 1 Of MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: John
More informationTable of Contents. Trailblazer Pipeline Company LLC 6th Revised Volume No. 1. Rate Schedules. Rate Schedule FTS. Rate Schedule ITS.
6th Revised Volume No. 1 Table of Contents Rate Schedules Rate Schedule FTS Rate Schedule ITS Rate Schedule FTB Rate Schedule Wheeling Service Rate Schedule PALS Rate Schedules 6th Revised Volume No. 1
More informationRockies Alliance Pipeline. Presentation to the Wyoming Pipeline Authority. May 20, 2008
Rockies Alliance Pipeline Presentation to the Wyoming Pipeline Authority May 20, 2008 Slide 2 Rockies Alliance Pipeline Route RAP New Facilities New Hampto n Proposed Pipeline Facilities Wamsutter to Ventura:
More informationPhiladelphia Gas Works
Philadelphia Gas Works REQUEST FOR PROPOSALS For NATURAL GAS STORAGE ASSET MANAGEMENT RFP NO. 28399 April 1, 2014 through March 31, 2015 The Philadelphia Gas Works ( PGW ) is requesting proposals for asset
More information6th Revised Volume No. 1 Section Version: TABLE OF CONTENTS
Table of Contents TABLE OF CONTENTS Sixth Revised Volume No. 1 Table of Contents Preliminary Statement System Map Section Name Table of Contents Preliminary Statement System Map Currently Effective Rates
More informationFERC GAS TARIFF. Second Revised Volume No. 1 CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF Second Revised Volume No. 1 Of CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: James R. Downs,
More informationHorizon Pipeline Company, L.L.C. First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS
Horizon Pipeline Company, L.L.C. First Revised Sheet No. 100 Superseding Original Sheet No. 100 1. DEFINITIONS 1.1 AGREEMENT "Agreement" shall mean a transportation agreement subject to, as applicable,
More informationPermian to Katy Pipeline. Non-Binding Open Season
August - September 2017 TABLE OF CONTENTS Notice of Open Season and Project Overview...3 P2K Katy Hub...4 Anchor Shipper Status...6 Length of Open Season...6 Participation in the...6 Bid Evaluation Criteria...7
More informationVector Pipeline L.P. Original Sheet No. 30 FERC Gas Tariff First Revised Volume No. 1 v0.0.0 RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE
Vector Pipeline L.P. Original Sheet No. 30 1. AVAILABILITY RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE This FT-1 Rate Schedule is available to any party (hereinafter called "Shipper"), for firm transportation
More informationTable of Contents. Great Lakes Gas Transmission Limited Partnership. Third Revised Volume No. 1. Third Revised Volume No. 1 1 TABLE OF CONTENTS
Great Lakes Gas Transmission Limited Partnership Table of Contents 1 TABLE OF CONTENTS 2 PRELIMINARY STATEMENT 3 MAPS 4 STATEMENT OF RATES 4.1 Rate Schedules FT, LFT & EFT 4.2 Reserved for Future Use 4.3
More informationALLIANCE PIPELINE LIMITED PARTNERSHIP by its General Partner, ALLIANCE PIPELINE LTD. ( Alliance Canada or Alliance )
ALLIANCE PIPELINE LIMITED PARTNERSHIP by its General Partner, ALLIANCE PIPELINE LTD. ( Alliance Canada or Alliance ) BINDING OPEN SEASON March 28 May 30, 2018 For: Capacity Expansion, Capacity Turn Backs,
More informationQuestar Pipeline Current Capacity and Development
Questar Pipeline Current Capacity and Development Gary A. Schmitt Manager, Marketing and Business Development April 27, 2007 Platts Rockies Gas and Oil Conference 1 Agenda Questar Pipeline Overview Basin
More informationOpen Season Market-Based Storage in the Heart of the PA Marcellus Shale Region
Open Season Market-Based Storage in the Heart of the PA Marcellus Shale Region Open Season starts 8:00AM Feb 12, 2018 Open Season bids due 12:00PM Feb 21, 2018 Contracts awarded on 12:00PM Feb 23, 2018
More informationQUESTAR PIPELINE CUSTOMER MEETING MARCH 2017 PARK CITY, UTAH
QUESTAR PIPELINE CUSTOMER MEETING MARCH 2017 PARK CITY, UTAH Ron Jorgensen Vice President Operations & Gas Control, Questar Pipeline 2 Merger Related Update February 1, 2016 Dominion/Questar merger announced
More informationDocket No. CP Responses to OEMR Date Request Issued December 21, 2016
625 Liberty Avenue, Suite 1700 Pittsburgh, PA 15222 844-MVP-TALK mail@mountainvalleypipeline.info www.mountainvalleypipeline.info January 6, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory
More informationSOUTHERN LNG SERVICE REQUEST FORM
SOUTHERN LNG SERVICE REQUEST FORM Southern LNG Company, L.L.C. Post Office Box 2563 Birmingham, AL 35202 Gentlemen: (Customer) hereby requests services from Southern LNG Company, L.L.C. (Southern LNG)
More informationFIRM TRANSPORTATION SERVICE AGREEMENT Rate Schedule KRF-1 CONTRACT NO. 1662
FIRM TRANSPORTATION SERVICE AGREEMENT Rate Schedule KRF-1 CONTRACT NO. 1662 THIS FIRM TRANSPORTATION SERVICE AGREEMENT ( Agreement ) is made and entered into as of this 29th day of November, 2017, by and
More informationCurrently Effective Rates - FTS and FTB Existing System. Currently Effective Rates FTS and FTB Expansion System
6th Revised Volume No. 1 Table of Contents Table of Contents Preliminary Statement System Map Currently Effective Rates Currently Effective Rates - FTS and FTB Existing System Currently Effective Rates
More informationUniversity of Wyoming The 2008 Conference The Wyoming Pipelines: The Territory Ahead
FERC CERTIFICATION University of Wyoming The 2008 Conference The Wyoming Pipelines: The Territory Ahead 1 Robert Cupina, Principal Deputy Director Federal Energy Regulatory Commission Cheyenne, Wyoming
More informationIroquois. Capacity Release. Training Guide
PAGE 1 OF 20 Iroquois Capacity Release Training Guide 10/14/2014 PAGE 2 OF 20 TABLE OF CONTENTS OVERVIEW... 3 DEFINITIONS OF TERMS... 3 INITIAL CONTRACTING REQUIREMENTS FOR RELEASING SHIPPERS... 4 INITIAL
More informationNortheast Energy Direct
Northeast Energy Direct The Northeast Pipeline Expansion Solution for Lower Energy Costs and Enhanced Electric Reliability Open Season for Firm Service www.northeastenergyfuture.com @NEDEnergy Open Season
More informationNOTICE OF NON-BINDING OPEN SEASON Kinder Morgan Texas Pipeline LLC Permian Highway Pipeline Project August 10, 2018
NOTICE OF NON-BINDING OPEN SEASON Kinder Morgan Texas Pipeline LLC Permian Highway Pipeline Project August 10, 2018 Announcement of Open Season In order to serve the growing needs for Permian Basin gas
More informationReforms to Improve Gas-Electric Coordination Mark R. Haskell, Floyd L. Norton, IV, Brett A. Snyder April 29, 2014
Reforms to Improve Gas-Electric Coordination Mark R. Haskell, Floyd L. Norton, IV, Brett A. Snyder April 29, 2014 www.morganlewis.com Presentation Overview Revisions to the operating and scheduling processes
More informationSecond Revised Volume No. 1 Section Version: 5.0.0
Table of Contents Second Revised Volume No. 1 Section Version: 5.0.0 Description Section Preliminary Statement... Preliminary Statement System Maps System Map... System Map CHDP Zone Map... CHDP Zone Map
More informationTable of Contents/Section Index With Links
Boardwalk Storage Company, LLC Third Revised Volume No. 1 Table of Contents/Section Index With Links Third Revised Volume No. 1 1. Table of Contents 2. Preliminary Statement 3. System Map 4. Currently
More informationKinder Morgan Illinois Pipeline LLC Original Sheet No. 15 FERC Gas Tariff First Revised Volume No. 1
Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 RATE SCHEDULE FTS FIRM TRANSPORTATION SERVICE 1. AVAILABILITY This Rate Schedule FTS is available to any entity (hereinafter called Shipper) which:
More informationFERC GAS TARIFF FOURTH REVISED VOLUME NO. 1. (Superseding Third Revised Volume No. 1) COLUMBIA GAS TRANSMISSION, LLC FILED WITH
FERC GAS TARIFF FOURTH REVISED VOLUME NO. 1 (Superseding Third Revised Volume No. 1) of COLUMBIA GAS TRANSMISSION, LLC FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this
More informationEMPIRE PIPELINE, INC. FERC GAS TARIFF FIRST REVISED VOLUME NO. 1
EMPIRE PIPELINE, INC. FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 (Superseding Original Volume No. 1) Communication concerning this tariff should be addressed to: Randy C. Rucinski, Esq. Empire Pipeline,
More informationSNG/EEC Expansion Projects & SNG Seamless Service. WebEx Training November 15, 2016
SNG/EEC Expansion Projects & SNG Seamless Service WebEx Training November 15, 2016 1 Agenda Update on Expansion Status Elba Express Company ( EEC ) Expansion Fuel Southern Natural Gas ( SNG ) Seamless
More informationColumbia Gas Transmission, LLC Section Original Volume No. 1.1 Version Non-Conforming Service Agreement No
Columbia Gas Transmission, LLC Section 4.23 FERC NGA Gas Tariff Non-Conf Neg Rate Svc Agmts Original Volume No. 1.1 Version 0.0.0 Non-Conforming Service Agreement No. 161137 Cabot Oil & Gas Corporation
More informationCarlton Resolution Frequently Asked Questions
What is the? The is a negotiated settlement among Northern s shippers and Northern where the shippers agreed to deliver up to 250,000 Dth/day, upon request by Northern, at the interconnect between Northern
More informationFERC GAS TARIFF FIRST REVISED VOLUME NO. 1. (Superseding Original Volume No. 1) SOUTHERN STAR CENTRAL GAS PIPELINE, INC.
FERC Gas Tariff FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 ( Original Volume No. 1) Of SOUTHERN STAR CENTRAL GAS PIPELINE, INC. Filed With FEDERAL ENERGY REGULATORY COMMISSION Communications Covering Rates
More informationTexas Eastern Appalachiaa to Market Expansion Project (TEAM
Texas Eastern Appalachiaa to Market Expansion Project (TEAM 2014) Moving emerging natural gas supplies from the Appalachian region to diverse market destinations along the existing Texas Eastern footprint
More informationTranscontinental Gas Pipe Line Company, LLC Sentinel Expansion Project - Docket Nos. CP and CP Compliance Rate Filing
Gas Pipelines - Transco 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 713/215-4060 October 1, 2009 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.
More informationNovember 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426
November 20, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Gas Transmission Northwest LLC 700 Louisiana Street, Suite 700 Houston,
More informationTable of Contents Original Sheet No. 0 6 Original Sheet No. 1 7 First Revised Sheet No. 2 8 Original Sheet No. 3 9 First Revised Sheet No.
Table of Contents Original Sheet No. 0 6 Original Sheet No. 1 7 First Revised Sheet No. 2 8 Original Sheet No. 3 9 First Revised Sheet No. 4 10 Sheet Nos. 5-99 11 Third Revised Sheet No. 100 12 Seventh
More informationJanuary 31, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Kimberly D.
Transcontinental Gas Pipe Line Company, LLC 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 (713) 215-2000 Federal Energy Regulatory Commission 888 First Street, N.E. Washington,
More informationShelley Wright Kendrick General Manager, Marketing & Business Development. April 13, 2012 Platt s 6 th Annual Rockies Oil & Gas Conference
Shelley Wright Kendrick General Manager, Marketing & Business Development April 13, 2012 Platt s 6 th Annual Rockies Oil & Gas Conference 1 Questar Pipeline System Overview Overthrust Pipeline Company
More informationNatural Gas Pipelines Deb Macdonald
Natural Gas Pipelines Deb Macdonald Infrastructure Development Need for Natural Gas Infrastructure EIA predicts demand for natural gas to grow at 2% per year from 23 Tcf currently to 34 Tcf by 2020. Foster
More informationWachovia LNG Conference
Wachovia LNG Conference November 13, 007 Forward Looking Statements This presentation contains forward looking statements, including these, within the meaning of Section 7A of the Securities Act of 1933,
More informationAugust 20 th, 2018 Notice of Non-Binding Open Season. CJ Express Pipeline. Midcoast Energy, LLC An affiliate of ArcLight Capital, LLC
1 August 20 th, 2018 Notice of Non-Binding Open Season CJ Express Pipeline Midcoast Energy, LLC An affiliate of ArcLight Capital, LLC 2 Midcoast Energy, LLC Midcoast Energy, LLC is a large-scale natural
More informationFEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426 OFFICE OF ENERGY MARKET REGULATION Northern Natural Gas Company 1111 South 103rd Street Omaha, NE 68124-1000 In Reply Refer To: Letter Order Pursuant
More informationFERC GAS TARIFF FIRST REVISED VOLUME NO. 1 CENTRAL KENTUCKY TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 OF CENTRAL KENTUCKY TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: Stanley
More informationFERC NGA GAS TARIFF. THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) SEA ROBIN PIPELINE COMPANY, LLC.
FERC NGA GAS TARIFF THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) of SEA ROBIN PIPELINE COMPANY, LLC Filed With The Federal Energy Regulatory Commission Communications Concerning
More informationINFORMATION MEMORANDUM AND BINDING OPEN SEASON NOTICE
INFORMATION MEMORANDUM AND BINDING OPEN SEASON NOTICE I. The Rangeland RIO Pipeline On April 12, 2016, Rangeland RIO Pipeline, LLC ( Rangeland ) issued a press release announcing this open season ( Open
More informationColumbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: October 25, 2018 Service Agreement No.
Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective : October 25, 2018 Service Agreement No. 176680 Noble Energy, Inc. Option Code A FTS SERVICE AGREEMENT Service Agreement
More informationFEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC OFFICE OF ENERGY MARKET REGULATION
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426 OFFICE OF ENERGY MARKET REGULATION Northern Natural Gas Company 1111 South 103rd Street Omaha, NE 68124-1000 In Reply Refer To: Letter Order Pursuant
More informationFoothills Pipe Lines Ltd.
Page 1 SERVICE AGREEMENT FIRM TRANSPORTATION SERVICE FOR TRANSPORTATION OF GAS This AGREEMENT made, 20 BETWEEN: AND: FOOTHILLS PIPE LINES LTD., a body corporate having an office and carrying on business
More informationOctober 2010 Open Season Defining the Future of Natural Gas Storage
3 Riverway Suite 1110 Houston, Texas 77056 October 2010 Open Season Defining the Future of Natural Gas Storage RYCKMAN CREEK RESOURCES, LLC OPEN SEASON NOTICE Response Due By November 1, 2010, at 5:00
More informationFEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426 OFFICE OF ENERGY MARKET REGULATION Northern Natural Gas Company 1111 South 103rd Street Omaha, NE 68124-1000 In Reply Refer To: Letter Order Pursuant
More informationNatural Gas Pipelines
Natural Gas Pipelines Tom Martin President Natural Gas Pipeline Group Overview Market Environment Shale activity providing excellent growth opportunities Transport spreads remain flat Storage spreads softer
More informationWyoming Pipelines - The Territory Ahead October 31, 2008 October 15, 2013
Wyoming Pipelines - The Territory Ahead October 31, 2008 October 15, 2013 1 $ per MMBtu Representative Wyoming Natural Gas Price by Month 10.00 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 Jan Feb
More informationColumbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: December 1, 2016 Service Agreement No.
Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: December 1, 2016 Service Agreement No. 183409 Nytis Exploration Company, LLC Option Code A Service Agreement
More informationSheet No. 5 - Currently Effective Rates - Rate Schedules FTS and ITS. Sheet No. 6 - Statement of Negotiated Rate Transactions
Kinder Morgan Illinois Pipeline LLC Table of Contents Sheet No. 1 - Table of Contents Sheet No. 3 - Preliminary Statement Sheet No. 4 - System Map Sheet No. 5 - Currently Effective Rates - Rate Schedules
More informationOPEN SEASON. I. The BKEP Condensate Pipeline Project
OPEN SEASON I. The BKEP Condensate Pipeline Project Blueknight Energy Partners, L.P. ( BKEP ) is pleased to announce the commencement of an Open Season for the BKEP Condensate Pipeline Project. The BKEP
More informationRockies Alliance Pipeline. Presentation to the Wyoming Pipeline Authority. May 20, 2008
Rockies Alliance Pipeline Presentation to the Wyoming Pipeline Authority May 20, 2008 Slide 2 Rockies Alliance Pipeline Route RAP New Facilities New Hamp ton Proposed Pipeline Facilities Wamsutter to Ventura:
More informationTransCanada s GTN System Notice of Available Multi-Month Parking Service. November 17, 2009
TransCanada s GTN System Notice of Available Multi-Month Parking Service November 17, 2009 TransCanada s GTN System ( GTN ) is providing notice of the availability of multi-month Parking Service, offered
More informationKinder Morgan Louisiana Pipeline LLC First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS
Kinder Morgan Louisiana Pipeline LLC First Revised Sheet No. 100 First Revised Volume No. 1 Original Sheet No. 100 1. DEFINITIONS 1.1 AGREEMENT "Agreement" shall mean a transportation agreement subject
More informationJim Cleary President, El Paso Western Pipelines. Platts Conference, Rockies Gas & Oil April 25, 2008
Jim Cleary President, El Paso Western Pipelines Platts Conference, Rockies Gas & Oil April 25, 2008 Cautionary Statement Regarding Forward-looking Statements This presentation includes forward-looking
More informationQ: What do I do if I need more information? A: Check back with this FAQ page periodically. If your question is not here, contact the RFP manager:
FAQs from 2017-08-30 Q: What do I do if I need more information? A: Check back with this FAQ page periodically. If your question is not here, contact the RFP manager: PSCo2017AllSource@xcelenergy.com Q:
More informationMs. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C
February 1, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Northern Border Pipeline Company 700 Louisiana Street, Suite 700 Houston,
More informationKern River Gas Transmission Company. Customer Meetings 2018
Kern River Gas Transmission Company Customer Meetings 2018 1 Exceptional Businesses and Assets 11.6 million customers worldwide Top-rated service provider within the industry 22,700 employees worldwide
More informationTransportation. Tariff. Vector Pipeline Limited Partnership
Transportation Tariff of Vector Pipeline Limited Partnership (Effective April 1, 2004 Unless Indicated Otherwise) Communications Concerning this Tariff Should be Addressed to: Vector Pipeline Limited 38705
More informationNORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 First Revision of Sheet 32-1 Cancels Original Sheet 32-1
P.U.C. Or. 25 First Revision of Sheet 32-1 Cancels Original Sheet 32-1 SERVICE AVAILABILITY: Service under this Rate Schedule is available on the Company s Distribution System to Non-Residential Customers
More informationData Request of FERC Staff OEP/DPC/CB-2 Dated June 11, 2015
Docket No. CP15-93-000 Data Request of FERC Staff OEP/DPC/CB-2 Dated June 11, 2015 8. Rover proposes at Part VI General Terms and Conditions, GT&C Section 1. Definitions, to define Transportation to include
More informationFebruary 28, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.
February 28, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Northern Border Pipeline Company 717 Texas Street, Suite 2400 Houston,
More informationNORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 Original Sheet 32-1
P.U.C. Or. 25 Original Sheet 32-1 SERVICE AVAILABILITY: Service under this Rate Schedule is available on the Company s Distribution System to Non-Residential Customers in all territory served by the Company
More informationFERC GAS TARIFF Volume No. 1 ALLIANCE PIPELINE L.P. Filed with the FEDERAL ENERGY REGULATORY COMMISSION
FERC Gas Tariff First Revised Sheet No. FERC GAS TARIFF Volume No. 1 of ALLIANCE PIPELINE L.P. Filed with the FEDERAL ENERGY REGULATORY COMMISSION Communications Concerning this Tariff Should be addressed
More informationUGI Storage Company Market-Based Storage in the Heart of the PA Marcellus Shale Region
UGI Storage Company Market-Based Storage in the Heart of the PA Marcellus Shale Region Tioga: 3,739,980 Dth of MSQ with 60 day service open April 1, 2019 Meeker: 990,000 Dth of MSQ with 100 day service
More informationMarch 2014
www.kindermorgan.com March 2014 www.kindermorgan.com Francisco Tarin Director Regulatory Affairs DART Tariff Proposal Each of the Rockies Pipelines will submit a tariff filing to the Federal Energy Regulatory
More informationTrailblazer Pipeline Company LLC Docket No. RP Exhibit No. TPC-0072
Trailblazer Pipeline Company LLC Docket No. RP18- -000 Page 1 of 6 Trailblazer Pipeline Company LLC Description of Company Operations Statement O Trailblazer Pipeline Company LLC ( Trailblazer ) is a natural-gas
More informationColumbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: January 1, 2018 Service Agreement No.
Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: January 1, 2018 Service Agreement No. 173446 Kaiser Marketing Appalachian, LLC Option Code A FTS SERVICE AGREEMENT
More informationMarch 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C
March 31, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Northern Border Pipeline Company 700 Louisiana Street, Suite 700 Houston,
More informationNORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 First Revision of Sheet 32-1 Cancels Original Sheet 32-1
P.U.C. Or. 25 First Revision of Sheet 32-1 Cancels Original Sheet 32-1 SERVICE AVAILABILITY: Service under this Rate Schedule is available on the Company s Distribution System to Non-Residential Customers
More informationPLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )
PIPELINE SYSTEMS (as of 8-4-16) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and
More informationWest Region Customer Meeting. September 23, 2015
West Region Customer Meeting September 23, 2015 Gas-Electric Coordination Update September 23, 2015 John Driscoll Manager West Region Transportation/Storage Services CIG CPG KGS Ruby WIC TCGT Young 9/23/2015
More information