BT Response 9 November NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 1

Size: px
Start display at page:

Download "BT Response 9 November NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 1"

Transcription

1 Ofcom Consultation Narrowband Market Review Consultation on possible approaches to cost modelling for the Network Charge Control for the period BT Response 9 November 2012 NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 1

2 Contents Executive Summary Page 3 Answers to questions Page 5 Glossary of terms Page 16 NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 2

3 Executive Summary We welcome the opportunity to comment on the NGN cost modelling approach Ofcom propose to take if it is necessary to set a new network charge control (NCC) when the current NCC expires on 30 September We recognise the complexities involved in building such a model and offer the following comments as constructive criticism to assist in this process. TDM, IP and regulation We note that Ofcom places some emphasis on its duty to take the utmost account of the 2009 EC Recommendation, as appears from paragraphs 2.12, and 3.60 of the consultation document. However, it is to be remembered that the Recommendation does not extend so far as to suggest that the cost model should be NGN-based. Rather, it recommends only that it should be based on the efficient technological choices available in the timeframe considered by the model. While it goes on to recognise, in that context, that the core part of a fixed network could therefore in principle be NGN-based, it does not positively advise that national regulatory authorities should in fact adopt a NGN-based costs model. Whether or not the NRA should actually do so will depend firstly on whether or not an NGN is the efficient technological choice available in the timeframe considered by the model, and secondly (even to the extent that it is) whether or not, in the particular circumstances of the market concerned, there is good reason to depart from the Recommendation that the costs model should be based upon such choices. Furthermore, it is essential that Ofcom s response to those issues should not infringe the fundamental principle that BT should have a reasonable opportunity to recover its efficiently incurred costs. In the United Kingdom, for the foreseeable future, the efficient decision for an operator with a TDM network is likely to be to sustain it, rather than to replace it, to provide continuity of service for its voice customers. Practical considerations of equipment availability may drive a new entrant to build an NGN, and to that extent we would agree that a suitably calibrated NGN model may be used to suggest charges for calls, but that does not mean the time is right to base regulation on a presumption that the efficient network is an NGN. We believe that TDM and various IP networks will exist side by side for the foreseeable future. As Ofcom propose, the regulated rate for call origination and termination should be available from the PoI closest to the customer. In BT s case this would be the DLE, a TDM interconnect. The conveyance and interconnection of traffic between PoI is already competitive, as Ofcom concluded in the 2009 NBMR, and IP to TDM conversion is available within this competitive market. Ofcom should not decide where PoIs should be built or the functionality they must provide, but should allow the market to determine the most efficient way of interconnecting between heterogeneous and developing networks. NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 3

4 Pure LRIC We are surprised that the pure LRIC model produces a termination charge of 0.008ppm for 2013/14 which is minute in comparison with the current 24hr rate of ~0.23ppm and much lower than anything suggested by modelling elsewhere in the EC. The model is remarkably insensitive to volume changes and this suggests that the design may not be as efficient as it should be and needs to be revisited along with the application of the decremental approach. LRIC+ The LRIC+ model appears to show that a disproportionate amount of costs are recovered in the early years and in some cases costs appear to be recovered before they have been incurred. On this basis, Ofcom fails its own no retrospection test that the model should not assume that it was possible to charge more in historic periods than envisaged under previous cost models used by the regulator. Therefore Ofcom needs to review how economic depreciation has been applied in their model. It is of the utmost priority for BT that we have a fair opportunity for cost recovery. It is essential that the NGN model for the four hypothetical operators includes provision for the full range of voice services BT is currently expected to provide, taking account of its USO and status as the provider of last resort. NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 4

5 Question 1: Do you agree with our proposal that NGNs can be considered the MEA for the purposes of modelling call origination and call termination services? If not, please explain why. 1.1 We note that Ofcom places some emphasis on its duty to take the utmost account of the 2009 EC Recommendation, as appears from paragraphs 2.12, and 3.60 of the consultation document. However, it is to be remembered that the Recommendation does not extend so far as to suggest that the cost model should be NGN-based. Rather, it recommends only that it should be based on the efficient technological choices available in the timeframe considered by the model. While it goes on to recognise, in that context, that the core part of a fixed network could therefore in principle be NGN-based, it does not positively advised that national regulatory authorities should in fact adopt a NGN-based costs model. Whether or not the NRA should actually do so will depend firstly on whether or not an NGN is the efficient technological choice available in the timeframe considered by the model, and secondly (even to the extent that it is) whether or not, in the particular circumstances of the market concerned, there is good reason to depart from the Recommendation that the costs model should be based upon such choices. Furthermore, it is essential that Ofcom s response to those issues should not infringe the fundamental principle that BT should have a reasonable opportunity to recover its efficiently incurred costs. 1.2 Whilst we agree that a new entrant may be compelled to build a voice network using IP elements, as TDM switches are no longer available, we do not agree that leads to a conclusion that the time is right to base regulation on a presumption that the efficient network is an NGN. 1.3 While other operators have built NGNs of some size in the UK, the primary focus of these networks has been the provision of Broadband services. The growth of these operators on NGNs has been based on Broadband and the provision of bundled products with combinations of Voice, Broadband and Entertainment. This is substantially different from competing directly in the nationwide PSTN market and allows Broadband operators to grow with a network of restricted geographical reach and narrow functionality. Customers who are expensive to serve or with requirements that cannot be satisfied by the NGN can be left to remain on TDM networks, and indeed contracted out to BT as the provider of last resort. There are no NGNs that provide a full range of services nationwide, and we are not aware of any such deployments anywhere in the world at the moment. 1.4 Ofcom state their preference is to base costs and asset values on the most efficient available technology that performs the same function as the current technology. BT has been in the forefront of the move to NGN with its 21CN network and has completed extensive design and customer trials over the last 6 years. This experience has led us to conclude that investment in the refurbishment of our TDM fabric is preferable to the migration of our voice customers onto our NGN. This is the most cost effective method of providing continuity of service to our customers, and we would expect any operator with extensive TDM assets to be in a similar position. 1.5 Practical considerations of equipment availability may drive a new entrant to build an NGN, and to that extent we would agree that a suitably calibrated NGN model, may be used to suggest charges for calls but that does not mean an NGN can be assumed to be the only efficient network for the provision of a voice service. 1.6 The extremely protracted movement of voice services from TDM to NGN may also suggest that the future efficient network for fixed voice may be very different from current designs current designs of NGN. The rollout of fibre and growth of VoIP services could mean that a single MEA network for voice is never established and regulation should be flexible enough to accommodate diverse designs that are efficient for the operators but are very different from one another. NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 5

6 Question 2: Do you agree with our proposal that our NGN model should include PoIs based on IP interconnection? If not, please explain why. 2.1 As we have explained in our response to Question 1, the efficient network for the UK will be based on a mixture of TDM and IP technology for the foreseeable future. Therefore efficient interconnect will be a mixture of IP-IP, TDM-TDM and IP-TDM interworking. Ofcom recognise this reality at para 3.74 in their consultation. BT, as a TDM operator, will continue to provide TDM interconnect where the relevant PoI will be at the DLE where the charge Ofcom determine will apply. This charge should reflect the efficiently incurred costs of interconnect rather than a hypothetical construct where interconnect is exclusively IP-IP. Were BT to be required to offer IP interconnect from 20 PoIs, this would offer a perverse incentive for CPs to convert TDM traffic to IP which BT would then have to convert back to TDM to deliver to TDM lines. Not only would this be inefficient, but there would be a significantly adverse effect on quality. Question 3: Do you agree with our proposal on 20 PoIs for our NGN model? If not, please explain why. 3.1 Our view remains that it is not clear at this stage what the most appropriate interconnect arrangement will be in the future and that these arrangements should be allowed to evolve in relation to market requirements and technological developments. Whilst we recognise that it is necessary to make an assumption about the number of PoIs for the purpose of building a hypothetical model, BT has not moved to an NGN voice network and has no IP Interconnects. In the absence of any actual deployment, it would be disproportionate for Ofcom to intervene by dictating how interconnect takes place, thereby distorting the more efficient investment decisions which might otherwise be taken. In the IP world there is no requirement for signalling and media to be handed over at the same location. Call control can be concentrated at a much smaller number of locations than may be efficient for media exchange. This opens up many permutations of which 20 PoIs is just one. The application of charges should continue to reflect the market boundary i.e. the point nearest the end user where signals can be exchanged. 3.2 In a world where Interconnect is deemed to take place at 20 PoIs, we would expect TDM interconnect to be deregulated, as proposed in Italy, as it would no longer be the efficient interconnect as defined by Ofcom. Question 4: Do you consider that if the MEA is NGN, the costs of conversion from TDM to IP should be excluded from cost-based call origination and call termination rates? If not, please explain why. 4.1 As we have previously explained, we do not agree that an NGN is the MEA. Each network should be allowed to develop in a way that provides the lowest cost PSTN service for their customers. As Ofcom propose, the regulated rate for call origination and termination would be available from the PoI closest to the customer. In BT s case this would be the DLE, a TDM interconnect. The conveyance and interconnection of traffic between PoI is already competitive, as Ofcom concluded in the 2009 NBMR. IP to TDM conversion is available within this competitive market. Ofcom should not decide the location and translation but allow the market to determine the most efficient way of interconnecting between heterogeneous and developing networks. NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 6

7 Question 5: Should we use a bottom-up modelling approach for calculating the efficient costs of call termination and call origination? If not, please explain why. 5.1 As Ofcom states at para 4.9, bottom up modelling can be complex, and the extent to which network assets are shared with other services is often difficult to identify, and will be highly sensitive to volume forecasts and how costs are allocated between the services. This makes any cost estimate crucially dependent on the accuracy of volume forecasts, not only of the voice services, but also of broadband and other services sharing any infrastructure. However, the absence of an existing NGN network with national coverage for the full range of voice services, limits the possibility of developing a top down NGN model. 5.2 The bottom up model should reflect the network choices new entrants are likely to make and use Openreach EOI costs where appropriate. 5.3 Therefore BT strongly supports Ofcom s proposals to verify the cost model outputs and cost recovery. In particular, this will require a top-down fully allocated cost model which looks at the alternative option of keeping a TDM network running over the charge control period. This will necessarily require provision for the additional costs and risks associated with sustaining a TDM network as an alternative to investment in an NGN voice network Question 6: Do you agree that we should use a decremental approach when calculating the pure LRIC of call termination? If not, please explain why. 6.1 We agree in principle that a decremental approach should be used when calculating the pure LRIC of call termination. However, we have noticed that the Ofcom model is relatively insensitive to volume changes. As a consequence the 2013/14 call termination charge output from a Pure LRIC run or the model is 0.008ppm which is minute in comparison with the current 24hr rate of ~0.23ppm and much lower than anything suggested by modelling elsewhere in the EC. This could be because the design used in the model is not as optimal as it could be and therefore service specific costs do not vary as much as they should do in relation to traffic volumes. The design and the application of the decremental approach both need to be revisited. Question 7: Do you agree with our approach to network cost verification? If not, please explain why. 7.1 BT strongly supports the 3 conditions Ofcom propose must be met by the modelling that are outlined at para 4.14 namely No increase in costs compared to an anchor pricing approach based on a hypothetical ongoing TDM network: Specifically, the NGN unit costs are no higher over the period, than if based on a hypothetical ongoing TDM network (i.e. based on the modelling approach of the 2009 NCC); No retrospection: The path of unit costs from the NGN does not depend on an assumption that it was possible to charge more in historic periods than envisaged under previous cost models used by the regulator; and Fair opportunity for cost recovery: The unit costs from the NGN model over the period would not deny BT the opportunity to recover its efficiently incurred costs (in particular those of TDM assets). NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 7

8 7.2 It is of the utmost priority for BT that we have a fair opportunity for cost recovery, and therefore it is essential that the NGN model for the four hypothetical operators includes provision for the full range of voice services BT is currently expected to provide, taking account of its USO and status as the provider of last resort. By definition, this must include the cost of rolling out a national network with full geographic coverage. Provision must be made to give continuity of service to end users including such services as ISDN30. Under the current regulatory model, provision must be made for CPS and IA assuming Ofcom continue to impose these obligations. We also notice that no provision appears to have been made in the model for the intelligent network (IN). Provision does not appear to have been made for the development costs of the full range of voice services on the call server which we estimate to be of the order of 50m. 7.3 Regarding the other comparisons Ofcom proposes against existing sub-national NGNs and other NRA NGN models some care will need to be taken to ensure due account is taken of differences: Figures from network operators need to be treated with caution, as it is vital that cost comparison be made on a like for like basis. For example there are very significant costs attributable to resilience and quality of service, which may distort any simple cost comparisons. Frequently, the purchase cost of hardware is only a small part of the overall cost of investing in a network. There are installation and commissioning costs. In some operators these costs may be treated as current costs, whilst others may capitalise this as labour costs. There are often significant software costs incurred in building a network that is operationally capable of delivering voice services. These may include software license costs whose recovery may vary depending on the purchase contract. (These could be incorporated into the hardware costs or charged on an annual basis, or recovered on the basis of end-users or on volume throughput.) Care is needed to ensure these any cost comparisons are treating like with like. Operating Support Systems costs also need to be included. There is no one technical model for a NGN, and a significant investment in software is needed to ensure that multiple systems are compatible. Operators that just cherry-pick an individual service may be able to avoid these costs hence the need to assume that all 4 operators provide the full range of voice services Question 8: Do you agree with our proposed approach to traffic forecasting and the modelled market share? If not, please explain. 8.1 Our response to this question should be read in conjunction with the attached report produced by Deloittes: Volume forecasts in Ofcom s proposed NGN model. 8.2 The volume trends developed by Ofcom for the model are counterintuitive: The lines forecast is U shaped when the expectation is that they will gradually decline Total minutes of use start to grow whereas a continued gradual decline is expected Broadband household penetration approaches 85% which is not supported by any other source NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 8

9 The growth rate in broadband b/w is shown as increasing whereas the growth rate is expected to decline Broadband volumes over fibre need to be excluded from the model because they use different network elements Broadband usage over fibre needs to be excluded from the usage figure used in the model and excluded from the backhaul requirements. 8.3 Ofcom s forecasts are not based on the latest information available to them in their own reports and the assumptions made regarding dampening and trending have not been justified. The forecasts need to be revisited and we would make the following specific observations in the paragraphs below. 8.4 The model only includes actual data to the 2010/11 financial year. Data is now available for 2011/12 and actual data for this year should be used and forecasts made for 2012/13 onwards. 8.5 The model uses only 3 years of historical data to establish a volume trend. There is no justification given for ignoring earlier years data. Unless there are good reasons, all the historical data should be used to forecast future growth rates. 8.6 The use of a volume dampening factor is unjustified. This has a significant effect as it the dampening factor is compounded every three years. This has the result that eventually volumes become flat in the model. BT suggests that the model uses no dampening factor, or if one is to be applied, it should not result in a compounding of the dampening. 8.7 The model makes little attempt to link volume forecast with changes happening in the marketplace. This is especially true given the potential impact of 4G mobile phones offering high bandwidth broadband which could substitute for fixed broadband. Fibre based broadband will also grow substantially over the period. Already BT has passed more than 12 million premises and has more than 950,000 fibre customers connected 1. This will reduce the volume of copper based broadband users and will act as a brake on the growth in average bandwidth per user as users with very high bandwidth demand chose to take the fibre broadband product. 8.8 A large number of households have no fixed line at present, using mobile only. The proportion of households with fixed lines has been declining gradually over recent years from 87% in 2009 to 84% in This can be expected to decline further and will limit the potential market size for fixed broadband, whereas Ofcom s forecasts imply that a maximum broadband penetration of households of 84.5% is reached. This needs to be reviewed because maximum broadband penetration should be recalculated to reflect historic growth rates and analyst prediction, and be no higher than 82%. 8.9 Ofcom s model makes the following assumptions about peak bandwidth usage which is well in excess of the actual bandwidths BT submitted in response to a S123 on 11 September 2012: Peak average bandwidth per line kb/s 2010/ / / /14 Ofcom's demand file See BT Q2 2012/13 results presentation, slide 15 2 See Figure 5.56, The Communications Market 2012, Ofcom NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 9

10 2010/ / / / / / / / / / / / / / / / / /45 growth rate 2005/ / / / / / / / / / / / / / / / / / / / /46 peak kbit/s 8.10 BT agrees with Ofcom that the broadband bandwidth growth rates will decline over time but believes that a smoother profile is more likely. We have reforecast volumes and the results are shown in the two graphs below: a volume per end user chart and a growth chart Peak broadband capacity per end user Ofcom BT forecast 0 25% Bandwidth per end user growth rate 20% 15% 10% 5% Ofcom BT forecast 0% 8.11 The growth in fibre based broadband can be expected to be considerable over the forecast period. This will reduce volumes on the copper based broadband platform. This migration should be taken into account by excluding the fibre volumes from the volume forecasts. Correspondingly usage on fibre lines should be excluded from the averages used in the model which only uses copper 8.12 Non-geographic voice calls appear to have been omitted from the volume forecast. Many of these calls are to Number Translation Services, where a second geographic call is made following the number translation, which will then require a call termination in the usual way The volume of non-geographic voice calls appears in the traffic input sheet but does not appear to be carried forward in the traffic demand sheet. There is also an understatement of the nongeographic call volumes as the model does not appear to include both business and residential nongeographic calls. NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 10

11 8.14 The 25% market share assumption will mean that around three-quarters of all calls will be terminated on a different network. A much higher proportion of calls will therefore interconnect between networks than is shown in the Ofcom model. This will also increase call termination volumes The model does not appear to identify calls from mobile networks terminating on fixed networks. Ofcom market information 3 shows in 2011 a volume of 31bn minutes from mobile networks to fixed networks compared with 10bn minutes of calls from fixed to mobile. This imbalance between outgoing calls and incoming calls has not been recognised in the volume modelling Question 9: Do you agree with our approach to non-network costs and passive network elements? If not, please explain. 9.1 If BT were to build an NGN voice network, it would rely upon services purchased from Openreach on an EoI basis, as would competing operators entering the market. Any model of NGN voice should therefore include the price of these elements. The price includes the cost of duct and transmission so there is no need for Ofcom to model these separately. 9.2 Where elements not covered by Openreach services are needed, such as Land and Buildings, power, vent and chilling costs, business rates etc. it would be appropriate to take BT s costs as a proxy. 9.3 It is also important to incorporate the operating costs of providing an adequate customer service support, such as order-taking and fault reporting. These costs can be substantial but are frequently overlooked in bottom-up cost builds that focus on network infrastructure. PPP costs 9.4 PPP costs relate to Product Management, Policy and Planning costs. It has been argued by Ofcom that these costs are not volume sensitive, and therefore should not feature in the LRIC of call termination. However, these costs are driven by the existence of the voice TDM interconnect products themselves. Part of the PPP costs relate to the existence of call termination products and therefore should be included within the LRIC of call termination. For example: product management activity relating to call termination; volume measurement systems; call routeing tables (showing where calls to individual numbers must be delivered); tariff-setting systems (e.g. the call termination element of the Element Based Costing matrix); pricing and billing of call termination products. 9.5 All these PPP activities will incur incremental cost as a result of the call termination product and so should be included within the LRIC of call termination even though they do not vary with volume. These costs can be considered to be increment specific fixed costs, meaning that these are volume invariant costs that nevertheless need to be incurred as a consequence of the provision of call termination services and therefore should be included within call termination costs. 3 See Figures 5.29 and 5.37, The Communications Market 2012, Ofcom NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 11

12 Question 10: Do you agree with our proposed approach to cost recovery? If not, please explain why We note the EC Recommendation and Ofcom s view that Original ED mimics a hypothetical competitive market by matching the cost of equipment to its actual and forecast usage over the long term. Consequently, there is relatively little depreciation in years when utilisation is low and relatively high depreciation in years of full, or almost full, equipment utilisation In our view, unit cost calculated from the model is not consistent with this explanation and is in breach of Ofcom s constraint of no retrospection 4 This unexpected outcome may be due to a number of factors. Matching depreciation and utilisation 10.3 Economic depreciation should spread the cost of an asset over the economic benefit derived from using the asset. For a single investment, the cost would be depreciated over the economic lifetime of the asset, and spread over the output produced during the asset s lifetime However, the economic depreciation model has the unexpected effect of applying depreciation for some assets to output that has occurred prior to the investment being made. In other words, the cost of an asset has been applied to past periods before the asset is brought into use. This is contrary to the purpose of depreciation, which is to spread the cost of an asset over services produced using the asset over its useful economic life It is likely that this effect is due to the simplifying assumption of treating all investment in each asset class as a homogeneous investment and performing a single economic depreciation calculation using the NPV of all investment made in the asset class. This distorts the model given the varying outputs in different years in the model, and in practice a more granular treatment is required to ensure each asset is properly matched in cost terms to the output produced using the asset. 4 Ofcom Narrowband Market Review Consultation on possible approaches to cost modelling for the Network Charge Control for the period paragraph 4.17 NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 12

13 Discount rate assumption 10.6 Ofcom has modelled a hypothetical investment in an IP- based network based on a hypothetical operator with a 25% market share. It is therefore questionable whether the discount rate should be based on BT s cost of capital. As the investment is hypothetical and has not actually taken place, BT s historical WACC is neither relevant nor appropriate for cost modelling The appropriate cost of capital to use is the forward-looking financing costs the hypothetical 25% operator will face in making the investment in the 21CN network. It is clear that this WACC will differ from BT s cost of capital. In particular, debt finance is likely to be more difficult to raise compared with BT because a smaller operator is likely to have a lower credit rating. This would lead to a higher cost of debt and it is also likely the gearing ratio would be lower leading to a higher proportion of the business supported by equity. Both these factors raise the cost of capital in comparison with BT, meaning that a real-terms WACC of closer to 8% should be used throughout the cost modelling. Ofcom s WACC Calculations 10.8 BT is also concerned that Ofcom appears to have converted past nominal WACC figures into real terms using a forecast inflation rate. In practice, these values should be derived using the actual inflation rate experienced in the past. This would give the following values for BT s historic WACC expressed in real terms. It is apparent that the Ofcom s model uses an implicit RPI assumption of 2.5%, a much lower figure than the inflation actually experienced over this period The attached table shows BT s historical WACC figures adjusted for the actual inflation experienced. This shows that Ofcom s model should have reduced the past WACC from an average of 8.5% to 7.6% if the discount rate is to be based on BT s real terms WACC. The rapidly changing real-terms BT WACC causes considerable distortion to the Economic Depreciation calculations so it is recommended that a stable hypothetical cost of capital is used to ensure a more reliable result is achieved from the modelling. Conversion of WACC from nominal to real-terms 2005/6 2006/7 2007/8 2008/9 2009/ / / /13 onwards BT WACC - Nominal pre-tax 12.3% 11.4% 11.4% 11.4% 11.0% 11.0% 9.7% 9.7% ONS calendar year average RPI (12 months) 2.8% 3.2% 4.3% 4.0% -0.5% 4.6% 5.2% 3.0% BT WACC - Real Terms 9.2% 7.9% 6.8% 7.1% 11.6% 6.1% 4.3% 6.5% Ofcom Model - Real Terms WACC 8.70% 8.70% 8.70% 8.70% 8.30% 8.30% 8.30% 6.50% Difference -0.5% 0.8% 1.9% 1.6% -3.3% 2.2% 4.0% 0.0% Recommended rate 8.0% 8.0% 8.0% 8.0% 8.0% 8.0% 8.0% 8.0% NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 13

14 Operating Expenditure Operating costs are incurred each year and the cost should be matched with the year in which the expenditure is incurred. There is no reason to apply an Economic Depreciation approach to operating costs, nor is any justification for this approach given. Cost of Capital 10.11The model does not appear to include a return on capital employed or if it does we have been unable to find it. This is a significant element of the total cost base and should be included in the cost modelling. Duration of model The time horizon for the analysis appears to be extremely long (over forty years), beyond any reasonable expectation of accurate forecasts. The volume forecast for broadband, both in terms of end-users taking copper based broadband services, and the volume per end user are both subject to high levels of uncertainty. This could adversely affect the cost allocation. The time horizon should therefore be limited to a maximum of 25years into the future. Indeed over the time horizon other costs need to be incorporated as there will be a need to replace fibre costs as the existing assets will reach the end of the operating lives well before the end of this time horizon. Start date of model All the models being developed in other European countries, and indeed the cost model for mobile termination rates in the UK, use costs which bear some relationship to what has already been deployed. No operator has, as yet, deployed a NGN network with national coverage that can provide the full range of voice services. In the case of the NCC, Ofcom concluded in 2009 that an NGN was not the MEA. It would be consistent with this conclusion if the hypothetical NGN commenced at the start of the next review period Should the model attempt to represent a build initiated in earlier years, the design would have to be modified to include only equipment which was available at the time. Some elements in the proposed model are only becoming available at the current time and a different design would be needed for prior periods. Ethernet technology with synch e has only been available for a couple of years, and in the Core, 100GE is only just starting to be used by operators, but not yet by BT. Neither were available in 20005/6 as shown in the model, and therefore other technologies must be used Roll out period The Ofcom model assumes 62% of users are acquired by the NGN operator in the first year, with the remainder acquired over 10 years. We believe this is unrealistic and that a normal distribution acquiring 25% market share over 5 years would be more appropriate for a new entrant, or for that matter a TDM operator migrating to NGN. This was the plan for mass migration in BT s 21CN. NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 14

15 NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 15

16 Glossary of terms 21CN CP DLE EC ED EOI EU IN IP ISDN LRIC MEA NBMR NCC NGN NRA NTS POI PPP PSTN TDM USO WACC 21 st Century Network Communications Provider Digital Local Exchange European Commission Economics depreciation Equivalence of Input European Union Intelligent network Internet Protocol Integrated Services Digital Network Long Run Incremental Cost Modern Equivalent Asset Narrowband Market Review Network Charge Control Next Generation Network National Regulatory Authority Number Translation Services Point of Interconnect Product Management, Policy and Planning Public Switched Telephony Network Time Division Multiplexing Universal Service Obligation Weighted average cost of capital END NBMR Possible approaches to cost modelling for the NCC BT Response 9 Nov 2012 Page 16

Review of the fixed narrowband services wholesale markets Statement on the markets, market power determinations and remedies including further

Review of the fixed narrowband services wholesale markets Statement on the markets, market power determinations and remedies including further Review of the fixed narrowband services wholesale markets Statement on the markets, market power determinations and remedies including further consultation Statement and consultation Publication date:

More information

Partial Private Circuits Charge Control

Partial Private Circuits Charge Control Consultation document Date of publication: 24 June 2004 The deadline for comments is 30 July 2004 Contents Section Page Summary 1 1 Introduction 5 2 Rationale for charge control 11 3 Construction of baskets

More information

Porting charges under General Condition 18 Consultation document Redacted for publication

Porting charges under General Condition 18 Consultation document Redacted for publication Porting charges under General Condition 18 Consultation document Redacted for publication Redactions are indicated by [ ] Consultation Publication date: 24 March 2014 Closing Date for Responses: 12 May

More information

BoR (15) 143. BEREC Report Regulatory Accounting in Practice 2015

BoR (15) 143. BEREC Report Regulatory Accounting in Practice 2015 BoR () BEREC Report Regulatory Accounting in Practice October BoR () Contents. Executive summary.... Introduction.... Background.... Current report... 7. The data collection process... 7. Outline of the

More information

Local loop unbundling: setting the fully unbundled rental charge ceiling and minor amendment to SMP conditions FA6 and FB6

Local loop unbundling: setting the fully unbundled rental charge ceiling and minor amendment to SMP conditions FA6 and FB6 Local loop unbundling: setting the fully unbundled rental charge ceiling and minor amendment to SMP conditions FA6 and FB6 Consultation document Publication date: 7 September 2005 Closing Date for Responses:

More information

Case SI/2009/0957: Wholesale (physical) network infrastructure access (including shared or fully unbundled access) at a fixed location

Case SI/2009/0957: Wholesale (physical) network infrastructure access (including shared or fully unbundled access) at a fixed location EUROPEAN COMMISSION Brussels, 11/09/2009 C(2009)7007 SG-Greffe (2009) D/5397 Agencija za pošto in elektronske komunikacije Republike Slovenije (APEK) Stegne 7, p.p. 418 1001 Ljubljana Slovenia For the

More information

Redacted for publication

Redacted for publication Porting charges under General Condition 18 Guidance on the setting of porting charges in compliance with GC18 and consultation on a new mobile donor conveyance charges Direction Redacted for publication

More information

Next Generation Networks

Next Generation Networks Responding to recent developments to protect consumers, promote competition and secure efficient investment ( Redacted for publication) Statement Publication date: 28 January 2010 Contents Section Annex

More information

Routing calls to ported telephone numbers Statement. ( Redacted for publication)

Routing calls to ported telephone numbers Statement. ( Redacted for publication) Routing calls to ported telephone numbers Statement ( Redacted for publication) Statement Publication date: 1 April 2010 Contents Section Annex Page 1 Summary 1 2 Introduction and background 4 3 Ofcom

More information

BT s response to Ofcom consultation document. Price Rises in Fixed Term Contracts

BT s response to Ofcom consultation document. Price Rises in Fixed Term Contracts BT s response to Ofcom consultation document Price Rises in Fixed Term Contracts 14 March 2013 1 Executive Summary We welcome the opportunity to comment on this consultation on Price Rises in Fixed Term

More information

RESPONSE THE TELECOMMUNICATIONS REGULATORY AUTHORITY OF BAHRAIN (TRA)

RESPONSE THE TELECOMMUNICATIONS REGULATORY AUTHORITY OF BAHRAIN (TRA) RESPONSE TO THE TELECOMMUNICATIONS REGULATORY AUTHORITY OF BAHRAIN (TRA) MARKET AND COMPETITION REVIEW OF THE RETAIL MARKETS FOR ACCESS TO CALL SERVICES INCLUDING DOMESTIC CALLS FROM A FIXED LOCATION DRAFT

More information

BEREC Opinion on. Phase II investigation. pursuant to Article 7a of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case DE/2014/1642

BEREC Opinion on. Phase II investigation. pursuant to Article 7a of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case DE/2014/1642 BEREC Opinion on Phase II investigation pursuant to Article 7a of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case DE/2014/1642 Call termination on individual public telephone networks provided

More information

LTE NETWORK DESIGN FROM A TECHNO-ECONOMIC PERSPECTIVE

LTE NETWORK DESIGN FROM A TECHNO-ECONOMIC PERSPECTIVE Th. M. Knoll Dr.-Ing., Chair of Communication Networks Chemnitz University of Technology, Chemnitz, Germany LTE NETWORK DESIGN FROM A TECHNO-ECONOMIC PERSPECTIVE Abstract The current roll-out of Long Term

More information

7 Market power assessment

7 Market power assessment Section 7 7 Market power assessment Introduction 7.1 In the preceding sections we set out our proposed definitions of the relevant markets. In this section we present our Significant Market Power (SMP)

More information

BT RFS Attribution Methodology Changes.

BT RFS Attribution Methodology Changes. BT RFS Attribution Methodology Changes. 15 October 2013 This report has been prepared on the basis of the limitations set out in the engagement letter and the matters noted in the Important Notice From

More information

Chapter 19. Cost Analysis and Cost Modelling for Regulatory Purposes: UK Experience. Martin Cave

Chapter 19. Cost Analysis and Cost Modelling for Regulatory Purposes: UK Experience. Martin Cave Chapter 19 Cost Analysis and Cost Modelling for Regulatory Purposes: UK Experience Martin Cave 1.0 Introduction The development of competition in telecom in recent years, and more particularly the decision

More information

experience Principal, International Ofcom April 2008

experience Principal, International Ofcom April 2008 Functional separation: the UK experience Tom Kiedrowski Tom Kiedrowski Principal, International Ofcom April 2008 Agenda Section 1 Background and context Section 2 Approach and rationale Section 3 Taking

More information

May BT Group response to HMG Review of Business Broadband

May BT Group response to HMG Review of Business Broadband BT Group response to HMG Review of Business Broadband May 2016 1 BT RESPONSE TO HMG REVIEW OF BUSINESS BROADBAND CALL FOR EVIDENCE Introduction: BT welcomes the call for evidence on business broadband.

More information

REPUBLIC OF IRAQ COMMUNICATIONS AND MEDIA COMMISSION

REPUBLIC OF IRAQ COMMUNICATIONS AND MEDIA COMMISSION REPUBLIC OF IRAQ COMMUNICATIONS AND MEDIA COMMISSION CONSULTATION DOCUMENT MARKET REVIEWS JUNE 2016 INTRODUCTION The Communications and Media Commission should impose ex-ante regulation only on operators

More information

Introducing Carrier Selection & Carrier Pre- Selection in Malta

Introducing Carrier Selection & Carrier Pre- Selection in Malta Introducing Carrier Selection & Carrier Pre- Selection in Malta Consultative Paper August 2002 Malta Communications Authority "Il-Pjazzetta", Suite 43/44, Tower Road, Sliema SLM 16, Malta, Europe. Tel:

More information

Study prepared for Nkom. Principles for margin squeeze tests for fibre access in Market 4 and 5

Study prepared for Nkom. Principles for margin squeeze tests for fibre access in Market 4 and 5 Study prepared for Nkom Principles for margin squeeze tests for fibre access in Market 4 and 5 Bad Honnef, 9 February 2015 Principles for margin squeeze tests for fibre access in Market 4 and 5 I Contents

More information

AIIP comments on the

AIIP comments on the AIIP comments on the BEREC Common Position on best practice remedies on the market for wholesale broadband access (including bitstream access) imposed as a consequence of a position of significant market

More information

Public consultation on the methodology for cost modeling

Public consultation on the methodology for cost modeling Public consultation on the methodology for cost modeling Contents 1. Introduction... 1 1.1. Status of the paper...3 1.2. Comment on consultation document...4 1.3. Structure of the document...5 2. The use

More information

EUROPEAN COMMISSION. Comments pursuant to Article 7(3) of Directive 2002/21/EC

EUROPEAN COMMISSION. Comments pursuant to Article 7(3) of Directive 2002/21/EC EUROPEAN COMMISSION Brussels, 18.9.2014 C(2014) 6809 final Autorité de Régulation des Communications électroniques et des Postes (ARCEP) 7, square Max Hymans F-75730 Paris-Cedex 15 France For the attention

More information

Improving the way we price our network services. Consultation paper

Improving the way we price our network services. Consultation paper Improving the way we price our network services Consultation paper October 2015 Table of Contents 1 Overview... 4 2 Background... 6 3 Purpose... 7 4 Network tariff strategy... 7 4.1 Network tariff reform

More information

EUROPEAN COMMISSION. Commission Decision concerning Case DK/2014/1665: Review of the LRAIC model on the fixed markets in Denmark for the year 2015

EUROPEAN COMMISSION. Commission Decision concerning Case DK/2014/1665: Review of the LRAIC model on the fixed markets in Denmark for the year 2015 EUROPEAN COMMISSION Brussels, 24.11.2014 C(2014) 9090 final Danish Business Authority (DBA) Dahlerups Pakhus Langelinie Allé 17 DK-2100 Copenhagen Denmark For the attention of: Ms. Betina Hagerup Director

More information

Public Consultation on a Draft Common Position on Next Generation Networks Future Charging Mechanisms / Long Term Termination Issues

Public Consultation on a Draft Common Position on Next Generation Networks Future Charging Mechanisms / Long Term Termination Issues Public Consultation on a Draft Common Position on Next Generation Networks Future Charging Mechanisms / Long Term Termination Issues Wind Telecomunicazioni comments Question 1 (Section 1): Do you agree

More information

The business case for sub-loop unbundling in the Netherlands

The business case for sub-loop unbundling in the Netherlands Final Report for OPTA (public version) The business case for sub-loop unbundling in the Netherlands 26 January 2007 Our ref: 264-483 Analysys Consulting Limited St Giles Court, 24 Castle Street Cambridge,

More information

ReSPONSE by Deutsche Telekom. BEREC Public Consultation on the Draft Review of the BEREC Common Position on geographical aspects of market analysis

ReSPONSE by Deutsche Telekom. BEREC Public Consultation on the Draft Review of the BEREC Common Position on geographical aspects of market analysis ReSPONSE by Deutsche Telekom BEREC Public Consultation on the Draft Review of the BEREC Common Position on geographical aspects of market analysis February 2014 Executive Summary Deutsche Telekom welcomes

More information

Delivering super-fast broadband in the UK BSG Comments

Delivering super-fast broadband in the UK BSG Comments Delivering super-fast broadband in the UK BSG Comments Foreword NGA is at a critical juncture. Over the last year a growing consensus has emerged about the importance and significance of the shift to next

More information

We appreciate your feedback

We appreciate your feedback Publishing date: 03/12/2013 Document title: We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this document Framework Guidelines on rules regarding

More information

Independent Auditor s report

Independent Auditor s report Independent auditor s report to the members of Opinion on the financial statements of In our opinion the consolidated and Parent Company financial statements of : give a true and fair view of the state

More information

Reconciliation Report

Reconciliation Report Reconciliation Report in accordance with Ofcom s Direction under section 49 of the Communications Act 2003 and SMP Services Conditions 13A.4 and 8A.4 setting the requirements in relation to the reconciliation

More information

Introducing Carrier Selection & Carrier Pre- Selection in Malta

Introducing Carrier Selection & Carrier Pre- Selection in Malta Introducing Carrier Selection & Carrier Pre- Selection in Malta Report on Consultation and Decision May 2004 Malta Communications Authority "Il-Pjazzetta", Suite 43/44, Tower Road, Sliema SLM 16, Malta,

More information

Main conclusions of the broadband and superfast broadband market analyses

Main conclusions of the broadband and superfast broadband market analyses Main conclusions of the broadband and superfast broadband market analyses 1 Market analysis: background In mid-2016, Arcep began the process of reviewing its analyses of fixed broadband and superfast broadband

More information

New Zealand Telecommunications Forum. Disconnection Code

New Zealand Telecommunications Forum. Disconnection Code New Zealand Telecommunications Forum Disconnection Code DOCUMENT VERSION: Number and Status: FINAL Date: September 2013 Prepared by: TCF Disconnection Code Working party Code classification Voluntary 2013

More information

Principles of implementation and best practice regarding the application of Retail Minus pricing methodologies IRG (05) 39

Principles of implementation and best practice regarding the application of Retail Minus pricing methodologies IRG (05) 39 Principles of implementation and best practice regarding the application of Retail Minus pricing methodologies IRG (05) 39 IRG PUBLIC CONSULTATION DOCUMENT Principles of Implementation and Best Practice

More information

Telecoms and Pay TV Complaints Q1 (January to March) 2014

Telecoms and Pay TV Complaints Q1 (January to March) 2014 Telecoms and Pay TV Complaints Q1 (January to March) 2014 Publication date: 27 June 2014 About this document This document presents complaints recorded by Ofcom against the largest telecoms and pay TV

More information

ACS Telecommunications Consultants The Future of the Universal Service Obligation

ACS Telecommunications Consultants The Future of the Universal Service Obligation ACS Telecommunications Consultants The Future of the Universal Service Obligation A Discussion Paper Executive Summary Universal Service Obligation - Where Next? The Universal Service Obligation (USO)

More information

Draft Call Termination Regulations Explanatory Note. 05 September 2014

Draft Call Termination Regulations Explanatory Note. 05 September 2014 Draft Call Termination Regulations 2014 Explanatory Note 05 September 2014 Page 1 of 27 Contents 1. Introduction... 4 2. An outline of the process followed... 5 Operator Access to the Top-Down and Bottom-Up

More information

ITU-D Workshop for the Arab region on Interconnection and Next Generation Networks: Addressing the regulatory challenges Manama, Kingdom of Bahrain

ITU-D Workshop for the Arab region on Interconnection and Next Generation Networks: Addressing the regulatory challenges Manama, Kingdom of Bahrain ITU-D Workshop for the Arab region on Interconnection and Next Generation Networks: Addressing the regulatory challenges Manama, Kingdom of Bahrain Interconnection Charges: Bill & Keep, Peering, Transit

More information

Economic benefits from making the GHz band available for mobile broadband services in Pakistan. Report for the GSM Association

Economic benefits from making the GHz band available for mobile broadband services in Pakistan. Report for the GSM Association Economic benefits from making the 2.72.9GHz band available for mobile broadband services in Pakistan Report for the GSM Association Final report 29 July 2014 Benefits from making the 2.72.9GHz available

More information

ERG (09) 21. ERG Report on price consistency in upstream broadband markets

ERG (09) 21. ERG Report on price consistency in upstream broadband markets ERG Report on price consistency in upstream broadband markets June 2009 Contents Executive Summary... 2 1 Introduction... 4 2 Value chain in broadband services and corresponding price regulation across

More information

Reference Offer Schedule 3: Service Descriptions

Reference Offer Schedule 3: Service Descriptions Reference Offer Schedule 3: Service Descriptions Contents SECTION 1. Introduction 2. Definitions of terms in this schedule 3. Sure Services 3.01 Sure On-Island Termination 3.02 Sure On-Island Origination

More information

BoR (14) 73. BEREC Common Position on geographical aspects of market analysis (definition and remedies)

BoR (14) 73. BEREC Common Position on geographical aspects of market analysis (definition and remedies) BEREC Common Position on geographical aspects of market analysis (definition and remedies) 5 June 2014 Contents Executive summary... 3 I. Introduction... 6 II. Basic principles... 7 III. Main cases since

More information

Trends in Telecommunications: Implications for Regulation

Trends in Telecommunications: Implications for Regulation Trends in Telecommunications: Implications for Regulation 20 September 2017 Mark DJ Williams, Managing Director, BRG mark.williams@thinkbrg.com +44 (0) 7825 862 132 Trends in Telecommunications Regulatory

More information

Price regulation of unbundled broadband services

Price regulation of unbundled broadband services Price regulation of unbundled broadband services ARPCE, Brazzaville 19 February 2014 Pedro Seixas, expert ITU International Telecommunication Union Agenda Outline of regulatory issues Price regulation

More information

Demand based network tariffs offering a new choice

Demand based network tariffs offering a new choice Version 1.1 30 September 2015 Demand based network tariffs offering a new choice Consultation paper September 2015 Table of Contents 1 Overview... 5 2 Background... 7 3 Purpose... 8 4 Network tariff strategy...

More information

Regulation of VoIP Services

Regulation of VoIP Services Statement and further consultation Consultation Publication date: 22 February 2006 Closing Date for Responses: 10 May 2006 Contents Section Page 1 Summary 1 2 Introduction and background 5 3 Regulatory

More information

Adam Mantzos Brockley Consulting. Review of cost attribution and cost allocation approaches. A report for Network Rail

Adam Mantzos Brockley Consulting. Review of cost attribution and cost allocation approaches. A report for Network Rail Adam Mantzos Brockley Consulting Review of cost attribution and cost allocation approaches A report for Network Rail 18 March 2015 Contents Summary... 3 Introduction... 8 Cost allocation principles...

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. accompanying the COMMISSION RECOMMENDATION

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. accompanying the COMMISSION RECOMMENDATION EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 7.5.2009 SEC(2009) 600 COMMISSION STAFF WORKING DOCUMENT accompanying the COMMISSION RECOMMENDATION on the Regulatory Treatment of Fixed and Mobile

More information

Position Paper. Cable Europe position paper on the Telecoms Review. Executive Summary. Policy objectives

Position Paper. Cable Europe position paper on the Telecoms Review. Executive Summary. Policy objectives 4 April 2016 Position Paper Cable Europe position paper on the Telecoms Review Executive Summary This Position Paper outlines Cable Europe s response to the Commission s consultation on the revision of

More information

Response to the consultation on the Draft review of the BEREC Common Position on geographical aspects of market analysis (definition and remedies).

Response to the consultation on the Draft review of the BEREC Common Position on geographical aspects of market analysis (definition and remedies). Response to the consultation on the Draft review of the BEREC Common Position on geographical aspects of market analysis (definition and remedies). 7 February 2014 FTTH Council Europe ASBL Rue des Colonies

More information

Comments on the ERG Consultation Document on Bitstream Access

Comments on the ERG Consultation Document on Bitstream Access Comments on the ERG Consultation Document on Bitstream Access DT welcomes the opportunity to comment on the questions raised by the ERG to discuss the regulatory approach put forward in the Consultation

More information

FCC Reporting Requirements for Eligible Telecommunications Carriers Receiving High Cost Support

FCC Reporting Requirements for Eligible Telecommunications Carriers Receiving High Cost Support FCC Reporting Requirements for Eligible Telecommunications Carriers Receiving High Cost Support CHR Solutions. All Rights Reserved. June 26, 2014 Table of Contents Executive Summary... 3 Five-Year Service

More information

Telecoms and Pay TV Complaints Q2 (April to June) 2015

Telecoms and Pay TV Complaints Q2 (April to June) 2015 Telecoms and Pay TV Complaints Q2 (April to June) 2015 Publication date: 22 September 2015 About this document This document presents data for complaints recorded by Ofcom against the largest telecoms

More information

FCC Reporting Requirements for Eligible Telecommunications Carriers Receiving High Cost Support

FCC Reporting Requirements for Eligible Telecommunications Carriers Receiving High Cost Support FCC Reporting Requirements for Eligible Telecommunications Carriers Receiving High Cost Support CHR Solutions. All Rights Reserved. September 19, 2012 Table of Contents Executive Summary... 3 Five Year

More information

Consultation document. 18 th July 2011

Consultation document. 18 th July 2011 Transit services in the public telephone network provided at fixed locations Identification and analysis of markets, determination of market power & the setting of remedies Consultation document 18 th

More information

UKCTA Response to Business Connectivity Market Review

UKCTA Response to Business Connectivity Market Review UKCTA Response to Business Connectivity Market Review Version: 1.0 Date: 27 th March 2008 2 1. Introduction UKCTA is a trade association promoting the interests of competitive fixed-line telecommunications

More information

Frontier Telephone Companies TARIFF FCC NO. 13 Original Page 18-1 ACCESS SERVICE

Frontier Telephone Companies TARIFF FCC NO. 13 Original Page 18-1 ACCESS SERVICE Original Page 18-1 18. ADVANCED COMMUNICATIONS NETWORKS 18.1 (A) General This section contains the rules and regulations pertaining to the provision of Modem Based Data Aggregation service (Modem-Based

More information

SOLUTION DESCRIPTION

SOLUTION DESCRIPTION SOLUTION DESCRIPTION Table of Contents 1. INTRODUCTION 3 2. PROVISIONING 3 3. DEVICE AND ACCESSORY ORDERING 4 4. ACCOUNT DEVELOPMENT 5 5. CUSTOMER AND USER SUPPORT 5 6. BILLING 6 7. MANAGING SERVICE INTERRUPTIONS

More information

GSMA comments on the Draft BEREC Report on OTT services (BoR (15) 142)

GSMA comments on the Draft BEREC Report on OTT services (BoR (15) 142) BoR PC06 (15) 19 GSMA comments on the Draft BEREC Report on OTT services (BoR (15) 142) About the GSMA The GSMA represents the interests of mobile operators worldwide, uniting nearly 800 operators with

More information

Australian Communications and Media Authority s Calling the Emergency Call Service Review of Arrangements Discussion Paper

Australian Communications and Media Authority s Calling the Emergency Call Service Review of Arrangements Discussion Paper Australian Communications and Media Authority s Calling the Emergency Call Service Review of Arrangements Discussion Paper Submission by Communications Alliance and the Australian Mobile Telecommunication

More information

BUSINESS RULES III. Cost Allocation and Determination of the Reference Price

BUSINESS RULES III. Cost Allocation and Determination of the Reference Price Cost Allocation & RP TAR241-14 07/04/1414 DRAFT BUSINESS RULES III Cost Allocation and Determination of the Reference Price ENTSOG AISBL; Av. de Cortenbergh 100, 1000-Brussels; Tel: +32 2 894 5100; Fax:

More information

Part I PRELIMINARY. Part II MARKET DEFINITION ASSESSING SIGNIFICANT MARKET POWER. Part IV IMPOSITION OF OBLIGATIONS UNDER THE REGULATORY FRAMEWORK

Part I PRELIMINARY. Part II MARKET DEFINITION ASSESSING SIGNIFICANT MARKET POWER. Part IV IMPOSITION OF OBLIGATIONS UNDER THE REGULATORY FRAMEWORK 201[ ] ELECTRONIC COMMUNICATIONS (GUIDELINES ON MARKET ANALYSIS AND THE ASSESSMENT OF SIGNIFICANT MARKET POWER FOR NETWORKS AND SERVICES) (ARRANGEMENT OF GUIDELINES) Table of Contents 1. [Short Title]

More information

STANDARD SUPPORT SERVICE FOR LARGE BUSINESS CUSTOMERS SOLUTION DESCRIPTION

STANDARD SUPPORT SERVICE FOR LARGE BUSINESS CUSTOMERS SOLUTION DESCRIPTION STANDARD SUPPORT SERVICE FOR LARGE BUSINESS CUSTOMERS SOLUTION DESCRIPTION Table of Contents 1. INTRODUCTION 3 2. PROVISIONING 3 3. DEVICE AND ACCESSORY ORDERING 4 4. SUPPORTING DEVICE SOFTWARE 5 5. ACCOUNT

More information

VIRTUAL UNBUNDLED ACCESS TO FIBRE-TO-THE-HOME: Implementing the VULA Remedy

VIRTUAL UNBUNDLED ACCESS TO FIBRE-TO-THE-HOME: Implementing the VULA Remedy VIRTUAL UNBUNDLED ACCESS TO FIBRE-TO-THE-HOME: Implementing the VULA Remedy Published: 15 April 2015 Internal Reference: MCA/C/15-2241 Malta Communications Authority Valletta Waterfront, Pinto Wharf, Floriana,

More information

Mobile Call Termination Market Review Draft Statement

Mobile Call Termination Market Review Draft Statement Mobile Call Termination Market Review 2018-2021 Draft Statement Publication Date: 23 February 2018 About this document Mobile call termination is a wholesale service offered by a mobile provider to connect

More information

Attachment 10.8 Transmission price path Access Arrangement Information

Attachment 10.8 Transmission price path Access Arrangement Information Attachment 10.8 Transmission price path Access Arrangement Information 2 October 2017 Access Arrangement Information (AAI) for the period 1 July 2017 to 30 June 2022 Transmission price path Access arrangement

More information

The Total Economic Impact Of Avaya IP Telephony Solutions Within A Branch Environment Multicompany Analysis

The Total Economic Impact Of Avaya IP Telephony Solutions Within A Branch Environment Multicompany Analysis Prepared for Avaya March 31, 2007 The Total Economic Impact Of Avaya IP Telephony Solutions Within A Branch Multicompany Analysis Project Director: Jon Erickson TABLE OF CONTENTS Executive Summary...4

More information

ITU ADVANCED LEVEL TRAINING Strategic Costing and Business Planning for Quadplay

ITU ADVANCED LEVEL TRAINING Strategic Costing and Business Planning for Quadplay ITU ADVANCED LEVEL TRAINING Strategic Costing and Business Planning for Quadplay WINDHOEK, NAMIBIA 6-10 October, 2014 David Rogerson ITU Expert 1 Session 10: Assessing how quad-play demand affects international

More information

Regulation of Broadband access and development of NGA networks in Slovenia

Regulation of Broadband access and development of NGA networks in Slovenia Regulation of Broadband access and development of NGA networks in Slovenia Nataša Vidmar Kraljević, AKOS September 2017, Budva Market development overview Market development Retail market shares by broadband

More information

Frontier Telephone Companies TARIFF FCC NO. 14 Original Page 16-1 FACILITIES FOR INTERSTATE ACCESS

Frontier Telephone Companies TARIFF FCC NO. 14 Original Page 16-1 FACILITIES FOR INTERSTATE ACCESS Original Page 16-1 16. ADVANCED COMMUNICATIONS NETWORKS 16.1 (A) General This section contains the rules and regulations pertaining to the provision of TCP/IP Data Aggregation service (Modem-Based Dial

More information

PENNSYLVANIA PA P.U.C. Tariff No. 11 TELEPHONE ASSOCIATION Cancels & Supercedes PA P.U.C. Tariff No. 9 Original Page 5-1

PENNSYLVANIA PA P.U.C. Tariff No. 11 TELEPHONE ASSOCIATION Cancels & Supercedes PA P.U.C. Tariff No. 9 Original Page 5-1 Original Page 5-1 5. Access Ordering 5.1 General This section sets forth the regulations and order related charges for services set forth in other sections of this tariff. Order related charges are in

More information

Hyperoptic s response to Designing the broadband Universal Service Obligation Call for inputs June 2016

Hyperoptic s response to Designing the broadband Universal Service Obligation Call for inputs June 2016 Hyperoptic s response to Designing the broadband Universal Service Obligation Call for inputs June 2016 Version 1.0 23 June 2016 Registered in England & Wales at Hyperoptic Ltd, Unit C401, Westfield London,

More information

PRESENTATIO N ON TARIFF POLICIES: ZIMBABWE. By: Rumbidzai Panavanhu Brazzaville, Congo 18 February 2014

PRESENTATIO N ON TARIFF POLICIES: ZIMBABWE. By: Rumbidzai Panavanhu Brazzaville, Congo 18 February 2014 PRESENTATIO N ON TARIFF POLICIES: ZIMBABWE By: Rumbidzai Panavanhu Brazzaville, Congo 18 February 2014 BACKGROUND Zimbabwe has a total of 12 licensed telecommunications operators broken down by network

More information

BEREC Opinion on Phase II investigation pursuant to Article 7 of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case NL/2017/1960

BEREC Opinion on Phase II investigation pursuant to Article 7 of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case NL/2017/1960 BoR (17) 53 BEREC Opinion on Phase II investigation pursuant to Article 7 of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case NL/2017/1960 Wholesale high-quality access provided at a fixed

More information

The Price of Copper and the Transition to Fibre

The Price of Copper and the Transition to Fibre The Price of Copper and the Transition to Fibre Workshop n 1 : Wholesale charges: setting methodologies for fixed TERA Consultants 32, rue des Jeûneurs 75002 PARIS Tél. + 33 (0) 1 55 04 87 10 Fax. +33

More information

A Business Guide to Call Accounting. by Trevor Davis, head of product management, call accounting, Enghouse Interactive

A Business Guide to Call Accounting. by Trevor Davis, head of product management, call accounting, Enghouse Interactive A Business Guide to Call Accounting by Trevor Davis, head of product management, call accounting, Enghouse Interactive It s more than Call Logging The term, call accounting (or call logging) system is

More information

In your view, have we adequately defined the scope of our domestic backhaul services study? Please explain your view.

In your view, have we adequately defined the scope of our domestic backhaul services study? Please explain your view. 23 September 2016 EMAIL: telco@comcom.govt.nz ultrafast Commerce Commission PO Box 2351 WELLINGTON 6140 ultrafastfibre.co.nz PRELIMINARY QUESTIONS IN UNDERSTANDING DOMESTIC BACKHAUL SERVICES This submission

More information

Contents. Bitstream access: comments on the draft determination PUBLIC. Report for TelstraClear, 19 May Network Strategies Report Number 25013

Contents. Bitstream access: comments on the draft determination PUBLIC. Report for TelstraClear, 19 May Network Strategies Report Number 25013 Bitstream access: comments on the draft determination Report for TelstraClear, 19 May 2005 Network Strategies Report Number 25013 Contents 1 Introduction 1 2 Differential business and residential pricing

More information

Telecoms and Pay TV Complaints Q3 (July to September) 2016

Telecoms and Pay TV Complaints Q3 (July to September) 2016 Telecoms and Pay TV Complaints Q3 (July to September) 2016 Publication date: 20 December 2016 About this document This document presents data for complaints recorded by Ofcom against the largest telecoms

More information

Business Aspects of WiMAX Technology in Fixed Telecom Market

Business Aspects of WiMAX Technology in Fixed Telecom Market Business Aspects of WiMAX Technology in Fixed Telecom Market Tomislav Majnarić Lator d.o.o. Haulikova 4, Zagreb, Croatia Phone: +38 1 47 3831 Fax: +38 1 47 3883 E-mail: tomislav.majnaric@lator.hr Domagoj

More information

SESSION 4: STRATEGIC COSTING FOR BROADBAND SERVICES

SESSION 4: STRATEGIC COSTING FOR BROADBAND SERVICES SESSION 4: STRATEGIC COSTING FOR BROADBAND SERVICES ITU-D REGIONAL ECONOMIC AND FINANCIAL FORUM OF TELECOMMUNICATIONS/ICTS FOR ASIA AND PACIFIC Yangon, The Republic of the Union of Myanmar, 1 September

More information

Consultation on proposed strategies for Digital Terrestrial Broadcasting, Third-Generation mobile telephony (UMTS), and Fixed Wireless Access (FWA)

Consultation on proposed strategies for Digital Terrestrial Broadcasting, Third-Generation mobile telephony (UMTS), and Fixed Wireless Access (FWA) Consultation on proposed strategies for Digital Terrestrial Broadcasting, Third-Generation mobile telephony (UMTS), and Fixed Wireless Access (FWA) Explanatory memorandum July 2004 Ministry for Competitiveness

More information

ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY

ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY DRAFT Report ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY Navajo Tribal Utility Authority August 2007 DRAFT NAVAJO TRIBAL UTILITY AUTHORITY ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY Table of Contents

More information

Summary: Intervention and Options

Summary: Intervention and Options Title: Energy Bill: Amendment to the Energy Act 2008 powers to implement and direct the rollout of smart meters Lead department or agency: DECC Other departments or agencies: Impact Assessment (IA) IA

More information

REPORT ON PRICING AND METHODOLOGY FOR CURRENT GENERATION ACCESS SERVICES (MARKET 3b)

REPORT ON PRICING AND METHODOLOGY FOR CURRENT GENERATION ACCESS SERVICES (MARKET 3b) REPORT ON PRICING AND METHODOLOGY FOR CURRENT GENERATION ACCESS SERVICES (MARKET 3b) FOR COMREG PUBLIC VERSION February 2017 1 Content CHAPTER 1. INTRODUCTION... 3 Background... 3 Objective of this report...

More information

Next-Generation Networks (NGN) Regulatory Overview

Next-Generation Networks (NGN) Regulatory Overview Next-Generation Networks (NGN) Regulatory Overview Dr.Tracy Cohen Councillor, ICASA The views expressed in this presentation do not necessarily represent the views of ICASA. Defining NGNs Broadband networks

More information

Introduction to Applying IFRS for telecommunications entities

Introduction to Applying IFRS for telecommunications entities 1 of 10 8/15/2008 4:50 PM close window Global home Introduction to Applying IFRS for telecommunications entities Contents Introduction The telecommunications industry Intangible assets Property plant and

More information

INTERCONNECT COMMUNICATIONS

INTERCONNECT COMMUNICATIONS INTERCONNECT COMMUNICATIONS Development of Cost Models and Pricing Framework for ICT Services in Botswana Interim Report Version 1 Merlin House Chepstow NP16 5PB United Kingdom Telephone: +44 1291 638400

More information

Virtual Reverse Flow: at Interconnection Points. Implementing EU Regulations. Code Modification No. A064. Business Rules. Version 2.

Virtual Reverse Flow: at Interconnection Points. Implementing EU Regulations. Code Modification No. A064. Business Rules. Version 2. Virtual Reverse Flow: at Interconnection Points Implementing EU Regulations Code Modification No. A064 Business Rules 16 th January 2015 Version 2.0 i VERSION CONTROL Version Date Description 1.0 19 th

More information

OPERATIONAL CASE STUDY AUGUST 2016 EXAM ANSWERS. Variant 2. The August 2016 exam can be viewed at

OPERATIONAL CASE STUDY AUGUST 2016 EXAM ANSWERS. Variant 2. The August 2016 exam can be viewed at OPERATIONAL CASE STUDY AUGUST 2016 EXAM ANSWERS Variant 2 The August 2016 exam can be viewed at https://connect.cimaglobal.com/resources/operational-case-study-exam/august-2016- operational-case-study-exam---variant-2

More information

LRIC model for access in the fixed network

LRIC model for access in the fixed network LRIC model for access in the fixed network Annex 3 8. november 2013 Innholdsfortegnelse 1 Introduction... 3 2 The LRIC method... 3 3 LRIC model for Market 4 in brief... 5 2 1 Introduction From 2009 to

More information

Methodology for calculating subsidies to renewables

Methodology for calculating subsidies to renewables 1 Introduction Each of the World Energy Outlook scenarios envisages growth in the use of renewable energy sources over the Outlook period. World Energy Outlook 2012 includes estimates of the subsidies

More information

Enterprise Voice Transformation: Migration from TDM to IP

Enterprise Voice Transformation: Migration from TDM to IP White Paper Enterprise Voice Transformation: Migration from TDM to IP Sponsored by: AT&T Amy Lind February 2018 IDC OPINION Voice has been the primary method of business communication for more than a century.

More information

BT Response to Ofcom VULA Margin Consultation ANNEX D MARGIN SQUEEZE TEST IMPLEMENTATION BY OTHER NRAS IN THE EU

BT Response to Ofcom VULA Margin Consultation ANNEX D MARGIN SQUEEZE TEST IMPLEMENTATION BY OTHER NRAS IN THE EU BT Response to Ofcom VULA Margin Consultation ANNEX D MARGIN SQUEEZE TEST IMPLEMENTATION BY OTHER NRAS IN THE EU Introduction and summary 1.1. In this Annex, we review the implementation (or proposed implementation)

More information

OFTA. Report on the Effectiveness of Competition in Hong Kong's Telecommunications Market: An International Comparison. June 2003

OFTA. Report on the Effectiveness of Competition in Hong Kong's Telecommunications Market: An International Comparison. June 2003 OFTA Report on the Effectiveness of Competition in Hong Kong's Telecommunications Market: An International Comparison June 2003 Spectrum Strategy Consultants 2003 Contents Preface 1 1 Introduction 2 1.1

More information

Business Connectivity Market Review: Passive Remedies

Business Connectivity Market Review: Passive Remedies Business Connectivity Market Review: Passive Remedies A report by DotEcon 5 January 2015 DotEcon Ltd 17 Welbeck Street London W1G 9XJ www.dotecon.com Content Content 1 Introduction... 1! 1.1 Background...

More information

Input methodologies review decisions

Input methodologies review decisions ISBN 978-1-869455-43-9 Project no. 17.01/15081 Public version Input methodologies review decisions Summary paper Date of publication: 20 December 2016 Associated documents Publication date Reference Title

More information