Combining System Dynamics And Factory Physics Approach To. Study The Effect Of Continuous Improvement On Lot Size Cycle. Time Relationships

Size: px
Start display at page:

Download "Combining System Dynamics And Factory Physics Approach To. Study The Effect Of Continuous Improvement On Lot Size Cycle. Time Relationships"

Transcription

1 Abstract Number: Combining System Dynamics And Factory Physics Approach To Study The Effect Of Continuous Improvement On Lot Size Cycle Time Relationships Moacir Godinho Filho Universidade Federal de São Carlos- Departamento de Engenharia de Produção Via Washington Luiz, km Caixa Postal São Carlos-SP Brazil moacir@dep.ufscar.br Reha Uzsoy Edward P. Fitts Department of Industrial and Systems Engineering North Carolina State University- Campus Box Raleigh, NC ruzsoy@ncsu.edu POMS 19th Annual Conference La Jolla, California, U.S.A. May 9 to May 12, 2008 Abstract We compare the effect of continuous improvements in six system parameters (arrival and process variability, defect rate, time to failure and repair and setup time) on the relationship between lot size and cycle time in a single stage multi-product environment. We use System Dynamics (SD) to capture the evolution of the system over time and the Factory Physics approach to represent the relationships between system parameters and cycle time. Some results are: i) The positive effect of improvement on setup time and on defect rate increases as lot sizes are shorter; ii) improvements on process variability achieves the best result when lot sizes are large and improvement on setup time achieves the best result when lot sizes are small; iii)

2 simultaneous improvement in all variables outperforms large improvements in any individual variable, except with very small lot sizes Keywords: lot size, cycle time, system dynamics, factory physics, continuous improvement 1. Introduction Day-to-day operations decisions, such as lot sizing, can have major strategic implications for the firm Buffa (1984). An extensive literature on lot sizing problems exists, most of which seeks to find an optimal lot size based on a cost model (called EOQ-Economic Order Quantity or EPQ Economic Production Quantity). For reviews of the lot sizing literature see Drexl and Kimms (1997) and Karimi et al. (2003). Despite its benefits, the EOQ model has received a lot of criticism in the literature, such as failing to consider several effects and costs when it calculates the order quantity of a part. According to Kuik and Tielemans (2004) criticism of cost accounting methods for production planning led to a growing interest on physical measures of manufacturing performance. One of these measures is manufacturing cycle time (also known as lead time or flow time), defined as the mean time required for a part to complete all its processing. TBC (also called Responsive Manufacturing by Kritchanchai and MacCarthy (1998) was initially proposed by Stalk (1988) and focuses on cycle time reduction as a primary manufacturing goal. According to Jayaram et al (1999) many companies pursuing Time-based strategies have experienced big improvements in various dimensions of time-related performance. Hum and Sim (1996) presents a review of the TBC literature. Despite this interest in cycle time reduction, Treville et al.(2004) point out that much of the literature on cycle time reduction has been largely anecdotal and exploratory. Some

3 exceptions are: i) the work of Hopp and Spearman (2001), who compiled a set of mathematical principles determining cycle time based on queueing theory which they refer to as factory physics; and, ii) the work of Suri (1998) on cycle time reduction with his manufacturing strategy (also based on queueing theory) called Quick Response Manufacturing. Both strategies (Factory Physics and Quick Response Manufacturing) present a set of relationships between variables on the shop floor, aiming to increase the manager s understanding of manufacturing dynamics. One of these is the relationship between lot size and average cycle time, which is studied in this paper. According to Vaughan (2006) although the general relationship is widely recognized, only a few authors have addressed the relationship between lot size and job queueing characteristics (cycle time). Karmarkar et al. (1985b) first introduced the convex relationship between lot size and average cycle time. This relationship is derived from Queueing Theory, specifically the Kingman approximation of the expected time in system for the G/G/1 queue, Hopp and Spearman (2001). Figure 1 ilustrates the relationship. Lambrecht and Vandaele (1996) describe this relationship: Large lot sizes will cause long cycle times (the batching effect), as the lot size gets smaller the cycle time will decrease but once a minimal lot size is reached a further reduction of the lot size will cause high traffic intensities resulting in longer cycle times (the saturation effect) Cycle Time (hours) Lot size (pieces) Figure 1: Relationship between lot size and cycle time

4 A number of other papers have used queueing models and simulationto study the relationship between lot size decisions and cycle time. Karmarkar, Kekre et al. (1992) present heuristics for minimizing average queue time. Rao (1992) discusses alternative queuing models in relation to lot sizes and cycle time. Lambrecht and Vandaele (1996) develop approximations for the expectation and variance of the cycle time under the assumption of individual arrival and departure processes. Kuik and Tielemans (2004) develop approximations for the optimal lot size that minimizes the cycle time, focusing mainly on situations where the utilization is low. Kenyon et al. (2005) use simulation to evaluate the impact of lot sizing decisions on cycle time in a semiconductor company. Vaughan (2006) use queueing relationships to model the effects of lot size on cycle time. Other papers relating lot size and cycle times are Kekre (1987), Hafner (1991; Karmarkar et al. (1992; Lambrecht and Vandaele (1996), and Choi and Enns (2004). Although these studies provide a basis for understanding the relationship between lot sizes and cycle times, there is no literature showing the impact of continuous improvement (CI) efforts on this relationship. This is despite the repeated observation that reduction of lot sizes and the resulting reduction of cycle times is a critical component of lean manufacturing and the Toyota Production System (e.g., Liker (2004). This paper examines the effect of six continuous improvement programs on the lot size-cycle time relationship in a multi-product, single-machine environment using a combination of system dynamics and factory physics. The remainder of this paper is organized as follows: the next section gives a short literature review on the two modeling approaches used in this paper (system dynamics and factory physics) and also about CI; section 3 presents the model developed and also the experimental design; section 4 shows the results of the experiments and section 5 presents some conclusions.

5 2. Literature review 2.1 System Dynamics System Dynamics models capture the causal relationships and feedbacks among state and decision variables in the system. System Dynamics has been applied for designing models to understand and solve problems in a variety of areas such as industrial planning (Forrester (1962)), etc); economy (Chen and Jan (2005), Kumar and Yamaoka (2007), etc); among other. However, there is a lack of SD applications to manufacturing systems, even with evidence that this technique is suitable for industrial modeling. According to Baines and Harrison (1999) the computer simulation of manufacturing systems is commonly carried out using Discrete Event Simulation (DES). These authors conclude that manufacturing system modeling represent a missed opportunity for SD modeling. This is also the opinion of Lin et al.(1998), which propose a framework to help industrial managers to apply SD to manufacturing system modeling. This is one of our motivations for the work in this paper. Recent advances in interactive modeling, tools for representation of feedback structure, and simulation software make SD models much more accessible to practitioners than they have been in the past (Sterman (2000)). 2.2 Factory Physics The Factory Physics approach was created by Hopp and Spearman (2001) to provide managers with a science of manufacturing. It is based on a set of mathematical principles derived from Queueing Theory. This approach has, according to Hopp and Spearman (2001), three properties: it is quantitative, simple and intuitive; so it provides managers with valuable insights. The basic approach consists of a set of equations that relate the long-run steady state means and variances of critical performance measures such as cycle time and work in process inventory

6 (WIP) levels to the mean and variance of system parameters such as time between failures, setup times and processing times. 2.3 Continuous Improvement (CI) There is an extensive literature examining various aspects of continuous improvement efforts in industry. Caffyn (1999) defines continuous improvement as a mass involvement in making relatively small changes which are directed towards organizational goals on an ongoing basis. Continuous improvement has been recognized for many years as a major source of competitive advantage, and is inherent in many recent management movements such as the Theory of Constraints (Goldratt and Fox (1986)), Six Sigma (e.g, Pande et al. (2000)) and the Toyota Production System. Inability to effectively implement continuous improvement programs is seen by many scholars and practitioners as one of the reasons why Western firms have not fully benefited from Japanese management concepts (e.g., Berger (1997)). Savolainen (1999) points out that CI is a complex process that cannot be achieved overnight, but involves considerable learning and fine tuning of the mechanisms used (Bessant and Francis (1999)). A number of different aspects of CI have been studied in the literature. However, despite its importance, there are still significant gaps in our understanding of this important area of manufacturing management. In particular, there appears to be a lack of quantitative studies examining how different CI approaches affect manufacturing performance over time. This paper is an attempt to fill this gap by building a quantitative model of the effects of six different CI programs, and then using a SD simulation to examine how these improvements affect the lot size x cycle time relationship over time.

7 3. Modeling and Analysis The use of the factory physics concepts in a system dynamics model may, at first glance, appear to be somewhat contradictory. The factory physics approach as presented in Chapters 8 and 9 of Hopp and Spearman), is based on long-run steady state analysis of the production system, generally derived using the methods of queueing analysis. System dynamics, on the other hand, usually emphasizes the dynamic behavior of complex systems that are not in steady state. However, for our objective in this paper the factory physics equations are unique in providing a systematic mathematical model linking the mean and variance of key system parameters such as setup and repair times to key performance measure such as cycle time and utilization. In order to use these equations as the basis for a system dynamics model, we assume that the time increments that form the basis of the system dynamics model are quite long, corresponding to periods of the order of several months. This is a reasonable assumption in our context, since it generally takes some time to identify opportunities for improvements, implement the necessary changes and obtain the results. We thus assume that within each time period the queue representing the manufacturing system will be in steady state, allowing us to use the factory physics equations to describe the behavior of the system. The assumption of long time periods also allows us to neglect the transient behavior at the boundaries between time periods. Our basic approach then is to model the performance of the system over an extended time horizon of several years using time increments of the order of several months. Continuous improvement policies are modeled as a reduction in the mean or variance of the parameters studied (arrival variability; process variability; quality; time to failure; repair time, and; setup time) obtained in each period. In each period, the new parameter values are calculated based on

8 the improvements implemented in the previous period, and the factory physics equations are used to propagate the effects of these improvements to system performance measures, and then the operating curve can be drawn. Thus we obtain the trajectory of improvements in operation curves due to the improvements in the parameters considered. We assume a completely deterministic model of the effects of continuous improvement on cycle time for simplicity, following the suggestion of Sterman (2000) that a deterministic approach is generally sufficient to capture the principal relationships of interest. Note that the effects of randomness in the operation of the system itself are captured by the variances used in the factory physics equations, and our primary performance measure is the expected cycle time of the system in each period. Surprisingly, given the extensive discussion of continuous improvement and cycle time reduction in the literature and industry, there seems to be very little industrial data available on the rates of improvement realized over time in different industries, which makes it difficult to calibrate models of this type. 3.1 The model We consider a manufacturing system modeled as a single server with arbitrary interarrival and processing time distributions, which we shall represent as a G/G/1 queue. We assume the natural processing time, the time required to process a job without any detractors other than the variability natural to the production process, has a mean of t 0 and a standard deviation of σ 0. We shall denote the mean effective time to process one good part, which is the natural processing time modified by the impacts of disruptions such as setups and machine failures, as t e, and its coefficient of variation as c e. We assume that work arrives at this station in lots consisting of L parts on average, and the interarrival time between lots has mean t a and

9 coefficient of variation c a. The arrival rate λ of lots is the inverse of time between arrivals, giving λ = 1/t a. If we denote the mean annual demand by D, since the system must be in steady state to avoid unbounded accumulation of jobs in the queue, the mean arrival rate to the system must equal the mean demand rate, implying t a = LH/D, where H denotes the total number of hours worked in a year. The mean time to process a lot of L parts is then given by Lt e, and the mean utilization of the server by: u = Lt e t a = Dt e H (1) The other primary performance measure of interest in this study is the mean cycle time. For the G/G/1 queue, no exact analytical expression exists, but the following approximation has been found to work well and is recommended by Hopp and Spearman (2001): CT = (c 2 + c 2 a e ) u ( 2 1 u )Lt + Lt e e (2) where LT e is the mean time to process one lot. The effective time to make one piece is constructed from the natural processing time by adding in first the effects of preemptive disruptions, in our case machine failures, then the effects of nonpreemptive outages, in our case setups; and finally the effect of defective items. Both the mean and the variances of the effective processing times must be calculated, as reflected in the model. Thus we first calculate the mean and variance of the intermediate effective processing time with machine failures, which we shall denote as t f e. Following Hopp and Spearman s treatment, we shall assume that the time between failures is exponentially distributed with mean

10 m f, and that the time to repair has mean m r and variance σ 2 r. Then the mean availability of the server is given by A = m f /(m f + m r ), yielding t e f = t 0 /A, and (σ e f ) 2 = σ 2 0 A 2 + (m 2 + σ 2 r r )(1 A)t 0 Am r (3) We now incorporate the effects of setups, assuming, as in (Hopp and Spearman (2001), that a setup is equally likely after any part is processed, with expected number of parts between setups equal to the specified lot size L. The mean setup time is denoted by t s, and its variance by σ 2 s. We thus obtain the mean of effective processing time with both nonpreemptive and preemptive outages (denoted by t o e )as t o e = t f e + t s /L. Its variance is given by: (4) Finally, incorporating the effect of defective items, we have the overall mean of the effective processing time t e, given by t e = t e o /(1-p), where p denotes the proportion of defective items. The overall variance of the effective processing time is given by: (5) Figure 2 shows all of these relationships.

11 arrival rate Number of pieces on queue throughput ANNUAL DEMAND TIME WORKED DURING THE YEAR production rate Lot Size Utilization Coefficient of variation for effective processing time Overall mean of effective processing time Variance of set up time with improvement Set up Time with improvement Mean of effective processing time with nonpreemptive and preemptive outages Total WIP Queue Time Arrival coefficient of variation with improvement Variance of of effective processing time with nonpreemptive and preemptive outages Overall variance of effective processing time NATURAL PROCESS TIME Cycle Time Variance of natural process time with improvement Variance of effective processing with preemptive outage (machine failures) Defect Rate with improvement Availability Variance of repair time with improvement Mean repair time with improvement Mean time to failure with improvement Figure 2: Main part of the SD model developed in this paper Since our objective is this paper is to examine the effects of continuous improvement in six parameters on the cycle time of the system over time, we need a mechanism to model continuous improvements. We use an exponential model of improvement, where the value of a parameter A at time t is given by: A(t) = (A 0 G)e t/τ (6) where A 0 denotes the initial value of the parameter, and G the minimum level to which it can be reduced. The parameter τ represents the amount of time it takes for the improvement to take place, representing in our case the difficulty of improving the parameter in question. Figure 2 shows the SD structures used to model improvement on mean setup time. This structure is linked

12 into the variable setup time with improvement in Figure 1. Similar structures are used to model the improvements on the other variables studied on this paper (arrival variability, process variability (setup time variability, repair time variability and natural process time variability), quality, mean time to failure and repair time. These structures are linked to the following variables, respectively: arrival coefficient of variation with improvement, variance of setup time with improvement, variance of repair time with improvement, variance of natural process time with improvement, defect rate with improvement, mean time to failure with improvement and repair time with improvement. Improvement on set up time Improvement rate on set up time + B2 - Error on set up time improvement ADJUSTMENT TIME FOR SET UP TIME IMPROVEMENT VARIANCE OF SET UP TIME Set up Time with improvement GOAL REGARDING SET UP TIME IMPROVEMENT Figure 3: SD Structure of improvement on setup time 3.2 Parameters of the model We will vary individual parameters in different experiments to examine their effect on cycle times and utilization. The basic time period in the system dynamics model is assumed to be three months, or 12 weeks. This is a reasonable time incremet or the purposes of this paper, since it is likely to require several months to develop and implement the improvements needed to make a significant reduction in repair or setup times. We simulate the operation of the system over a period of ten years, or 40 quarters. Since our objective is to study the effects of continuous improvement in repair and setup times, the annual demand is held constant at D = parts per year. We assume an initial lot size of 200 parts, and that the plant operates a total

13 of H = 1920 hours per year. The interarrival times are assumed to be exponentially distributed (c a = 1), as is the natural processing time per part, with t 0 = 6 minutes and c 0 = 1. At the start of the simulation, the mean time between failures m f = 9600 minutes, the mean time to repair is m r = 480 minutes, and the mean setup time is t s = 180 minutes. Also, the parameter τ of the improvement process was chosen to provide a half life for the exponential decay of 1 year. The proportion of defective items p = 5%. We also vary the lot size in order to examine the effect of lot sizes on cycle time. This is done for all improvement policies tested: (i) No improvement; (ii) 50% improvement in arrival variability; (iii) 50% improvement in process variability (natural process variability, repair time variability and setup time variability); (iv) 50% reduction on defect rate; (v) 50% increase in time between failures; (vi) 50% improvement in repair time; (vii) 50% improvement on setup time; (viii) 5% improvement in all variables; (ix) 10% improvement in all variables; (x) % improvement in all variables; (xi) 20% improvement in all variables. 4. Experimental Results Figure 4 shows the effect on mean cycle time of all 50% improvements over the time period (cases (i) to (vii)) for a lot size of 200 parts. Figures similar to this are also draw for the other lot size values tested (600, 400, 170, 150, 130, 100, 80, 70, 60, 40, 30). From these figures, lot size x cycle time curves are drawn for each improvement policy. This is done by getting the cycle time and after these curves become stable. The resulting lot size x cycle time curves for the large improvement programs are discussed in Section 4.1. The same procedure is performed for the small improvement program and reported in Section 4.2).

14 600 Graph for Cycle Time Time (months) Improvement in Process variability Improvement in Arrival cv Improvement in Time to failure Improvement in defect rate Improvement in repair time Improvement in set up time No improvement hour/batch hour/batch hour/batch hour/batch hour/batch hour/batch hour/batch Figure 4: Behavior (regarding cycle time) of all 50% improvements over time for a lot size of 200 parts 4.1 Effect of large improvements in just one variable on lot size x cycle time relationship Figure 5 presents an overview of the effect of each of the six 50% improvement policies on the mean cycle time (cases (ii) to (vii)). In this figure it can be seen that: - 50% improvement in arrival cv has slight effect on cycle time reduction for given lot size. This effect remains small when lot sizes are decreased; - 50% improvement in defect rate, repair time, time to failure, setup time and process variability shift the lot size x cycle time curve down and left, reducing the optimal lot size for cycle time. Hence these improvements help the production system to reduce cycle time over the no improvement case (for the same lot size used); - The cycle time benefit of 50% improvement in setup time and in defect rate increase as lot sizes are reduced. The cycle time reduction from 50% improvement in repair time and time to failure increase at extreme values of the lot sizes (very small or very large lot sizes are used);

15 - 50% improvement in setup time achieves the best cycle time reduction for small lot sizes. Improvement in setup time is the only improvement that allows production system to set really small lot sizes (e.g. 30 or 40 parts); - 50% improvement in process variability achieves the best cycle time reduction for large lot sizes Lead Time (hours) No improvement Improvement in set up Improvement in defect rate Improvement in arrival cv Improvement in repair time Improvement in time to failure Improvement in process variability Lot Size (pieces) Figure 5: Overview of the effect of all 50% improvements on lot size x cycle time curve 4.2 Effect of small improvements in several variables on lot size x cycle time relationship Figure 6 presents a comparison between the two large improvements that achieves the best results on the last section and a small (5%, 10%, 15% or at most 20%) improvement in all variables simultaneously. In this figure a 15% simultaneous improvement in all variables outperforms all the large individual improvements, except for very small lot sizes are used (large improvements on setup time achieves the best result in this case).

16 Lead Time (hours) % improvement in all variables 10% improvement in all variables 15% improvement in all variables 20% improvement in all variables 50% Improvement in set up % improvement in process variability Lot Size (pieces) Figure 6: Comparison between the large improvement on setup and process variabilities and small combined improvements on all variables 5. Conclusions We combine System Dynamics (SD) and Factory Physics approaches to study the effect of six continuous improvement programs (arrival variability, process variability (natural process time variability, repair time variability and setup time variability), quality (defect rate), time to failure, repair time and setup time) on lot size -cycle time relationship in a multi-product, singlemachine environment. Two sets of experiments were performed: a) A large (50%) improvement in each parameter separately, as might be obtained by a significant one-time investment; b) a small improvement in all parameters simultaneously. Some insights from this study can be summarized as follows: - All 50% improvements studied, except arrival cv, shift the lot size - cycle time curve down and to the left, reducing the optimal lot size for cycle time. Thus these improvements help the production system to reduce cycle time relative to the no improvements case (for the same lot size used). These results provide support for the CI literature, which argues that the need to continuously improve became imperative for companies nowadays. 50% improvement on arrival cv showed just a little effect on cycle time reduction. This effect is still small when lot sizes are

17 decreased. This result shows that efforts for reducing the variability of the arrival orders does not have a lot of effect on cycle time reduction; so it is possible to reduce cycle time by means of the implementation of other CI programs even in an environment when arrival cv is high. Another conclusion that can be drawn from these results is that a pull production control system (like kanban), which is advocated in the Lean Manufacturing literature as an important means to achieve flow standardization (and therefore reducing the arrival cv), is not vital to achieving cycle time reduction. This conclusion supports the Quick Response Manufacturing (QRM) theory, proposed by Suri (1998), which claims that kanban is not the best production control system for cycle time reduction. - The reduction in cycle time by 50% improvement in setup time and defect probability increase as lot sizes decrease. These results provide support for all the modern manufacturing management theories, such as Lean Manufacturing and QRM, which advocates the need for lot size reduction. Despite this result it is interesting that the convex relationship between lot size and cycle time implies that reducing the lot size (without knowing exactly the shape of this convex relationship) by itself does not guarantee cycle time reduction. Huge reduction of lot sizes (in our case for 40 or 50 pieces), even with some kind of improvement (for example variability reduction, improvement on quality or time to failure) can have worse cycle time performance than a more smooth reduction on lot size (in our case for about 150 pieces) and no continuous improvement program. This result supports the Quick Response Manufacturing (QRM) theory, which claims that a lot size of one piece, contrary to what is advocated by Lean Manufacturing, actually contributes to increased cycle time. Thus it is important to know exactly the relationship between lot size and cycle time before deciding the amount of lot size reduction to be performed;

18 - The cycle time reduction from 50% improvement in repair time and time to failure increases as lot sizes take extreme values. Thus when a firm sets its lot size for a value near the optimal lot size for cycle time (the minimal value on the lot size x cycle time curve), the need for improvement programs in machine availability decreases. - Setup time reduction achieves the best cycle time reduction when lot sizes are small. Therefore, when improvement in setup time is performed, the amount of lot size reduction can be greater (in our case for 30 or 40 parts). This result supports the literature which advocates the need for setup reduction, like those achieved by the SMED (Single Minute Exchange of Die) system (Shingo (1986)); - Improvement in process variability achieves the best cycle time reduction when lot sizes are large. This implies that efforts to reduce process variability can be an alternative way to reduce cycle times in companies where the process itself prevents the use of small lot sizes. - Investing in small, combined improvements in all shop floor variables yields better cycle time reduction than a single large, high-investment improvement. 15% simultaneous improvement in all variables outperforms all the large individual improvements, except where very small lot sizes are used (large improvements on setup time achieves the best result in this case). These results provide a lot of support for Lean Manufacturing practice, which believes in small continuous improvements in all areas and parameters of the company. Finally, we can say that the SD/factory physics combined model proposed in this paper can have a practical use for companies to simulate the impact of alternative continuous improvement programs on manufacturing performance measures. The natural extension of this paper is to evaluate the result of such improvements for other performance measures, such as Work In Process and Utilization, and to enlarge the model to encompass more workstations.

19 6. References Baines, T. S. and D. K. Harrison (1999). "An Opportunity For System Dynamics In Manufacturing System Modeling." Production Planning and Control 10: Berger, A. (1997). "Continuous Improvement And Kaizen: Standartization And Organizational Designs." Integrated Manufacturing Systems 8(2): Bessant, J. and D. Francis (1999). "Developing Strategic Continuous Improvement Capability.." International Journal of Operations & Production Management 19(11): Buffa, E. S. (1984). Meeting the Competitive Challenge. Homewood - IL, Irwin. Caffyn, S. (1999). "Development Of A Continuous Improvement Self-Assessment Tool." International Journal of Operations & Production Management 19(11): Chen, J. H. and T. S. Jan (2005). "A System Dynamics Model Of The Semiconductor Industry Development In Taiwan." Journal of the Operational Research Society 56(10): Choi, S. and S. T. Enns (2004). "Multi-product capacity-constrained lot sizing with economic objectives." International Journal of Production Economics 91: Drexl, A. and A. Kimms (1997). "Lot Sizing and Scheduling - Survey and Extensions." European Journal of Operational Research 99: Forrester, J. W. (1962). Industrial Dynamics. Cambridge, MA, MIT Press. Goldratt, E. and R. E. Fox (1986). The Race, North River Press. Hafner, H. (1991). "Lot sizing and throughput times in a job shop." International Journal of Production Economics 23: Hopp, W. and M. L. Spearman (2001). Factory Physics. Boston, Irwin. Hum, S. and H. Sim (1996). "Time-Based Competition: Literature Review And Implications For Modeling." International Journal of Operations & Production Management 16(1): Karimi, B., et al. (2003). "The capacitated lot sizing problem: A review of models and algorithms." Omega - International Journal of Management Science 31: Karmarkar, U. S., et al. (1992). "Multi-Item Batching Heuristics for Minimization of Queues." European Journal of Operational Research 58: Karmarkar, U. S., et al. (1985b). "Lot Sizing and Lead Time Performance in a Manufacturing Cell." Interfaces 15(2): 1-9.

20 Kekre, S. (1987). "Performance of a Manufacturing Cell with Increased Product Mix." IIE Transactions 19(3): Kenyon, G., et al. (2005). "The impact oflot-sizing on net profits and cycle times in the n-job, m- machine job shop with both discrete and batch processing." International Journal of Production Economics 97: Kritchanchai, D. and B. L. MacCarthy (1998). Responsiveness and strategy in manufacturing. Proceedings of the workshop Responsiveness in Manufacturing. Kuik, R. and T. F. J. Tielemans (2004). "Expected time in system analysis of a single-machine multi-item processing center." European Journal of Operational Research 156: Kumar, S. and T. Yamaoka (2007). "System Dynamics Study Of The Japanese Automotive Industry Closed Loop Supply Chain." Journal of Manufacturing Technology Management 18(2): Lambrecht, M. R. and N. J. Vandaele (1996). "A General Approximation for the Single Product Lot Sizing Model with Queueing Delays." European Journal of Operational Research 95: Liker, J. (2004). The Toyota Way: 14 Management Principles from the World's Greatest Manufacturer. New York, McGraw-Hill. Lin, C., et al. (1998). Generic methodology that aids the application of system dynamics to manufacturing system modeling. IEE Conference Publication. 457: Pande, P., et al. (2000). The Six Sigma Way: How GE, Motorola and Other Top Companies are Honing Their Performance. McGraw-Hill, New York. Rao, S. (1992). "The relationship of work-in-process inventories, manufacturing lead times and waiting line analysis." International Journal of Production Economics 26: Savolainen, T. I. (1999). "Cycles of continuous improvement: Realizing competitive advantages through quality " International Journal of Operations & Production Management 19(11): Shingo, S. (1986). A Revolution in Manufacturing: The SMED System. Cambridge, Productivity Press. Sterman, J. D. (2000). Business Dynamics: Systems Thinking and Modeling for a Complex World. New York, McGraw-Hill. Suri, R. (1998). Quick Response Manufacturing: A Companywide Approach to Reducing Lead Times. Portland, Productivity Press.

21 Treville, S. D., et al. (2004). "From supply chain to demand chain: the role of lead time reduction in improving demand chain performance." Journal of Operations Management 21: Vaughan, T. S. (2006). "Lot Size Effects On Process Lead Time, Lead Time Demand, And Safety Stock.." International Journal of Production Economics 100: 1-9.

A COMPARATIVE STUDY OF POLCA AND GENERIC CONWIP PRODUCTION CONTROL SYSTEMS IN ERRATIC DEMAND CONDITIONS. Ozgur Kabadurmus

A COMPARATIVE STUDY OF POLCA AND GENERIC CONWIP PRODUCTION CONTROL SYSTEMS IN ERRATIC DEMAND CONDITIONS. Ozgur Kabadurmus A COMPARATIVE STUDY OF POLCA AND GENERIC CONWIP PRODUCTION CONTROL SYSTEMS IN ERRATIC DEMAND CONDITIONS Ozgur Kabadurmus Department of Industrial and Systems Engineering, Auburn University Abstract The

More information

Simulation of Lean Principles Impact in a Multi-Product Supply Chain

Simulation of Lean Principles Impact in a Multi-Product Supply Chain Simulation of Lean Principles Impact in a Multi-Product Supply Chain M. Rossini, A. Portioli Studacher Abstract The market competition is moving from the single firm to the whole supply chain because of

More information

A Hit-Rate Based Dispatching Rule For Semiconductor Manufacturing

A Hit-Rate Based Dispatching Rule For Semiconductor Manufacturing International Journal of Industrial Engineering, 15(1), 73-82, 2008. A Hit-Rate Based Dispatching Rule For Semiconductor Manufacturing Muh-Cherng Wu and Ting-Uao Hung Department of Industrial Engineering

More information

RE-EXAMINING THE PERFORMANCE OF MRP AND KANBAN MATERIAL CONTROL STRATEGIES FOR MULTI-PRODUCT FLEXIBLE MANUFACTURING SYSTEMS

RE-EXAMINING THE PERFORMANCE OF MRP AND KANBAN MATERIAL CONTROL STRATEGIES FOR MULTI-PRODUCT FLEXIBLE MANUFACTURING SYSTEMS RE-EXAMINING THE PERFORMANCE OF MRP AND KANBAN MATERIAL CONTROL STRATEGIES FOR MULTI-PRODUCT FLEXIBLE MANUFACTURING SYSTEMS Ananth Krishnamurthy Department of Decision Sciences and Engineering Systems,

More information

Re-Examining the Performance of MRP and Kanban Material Control Strategies for Multi-Product Flexible Manufacturing Systems

Re-Examining the Performance of MRP and Kanban Material Control Strategies for Multi-Product Flexible Manufacturing Systems The International Journal of Flexible Manufacturing Systems, 16, 123 150, 2004 c 2004 Kluwer Academic Publishers. Manufactured in The Netherlands. Re-Examining the Performance of MRP and Kanban Material

More information

PLANNING AND CONTROL FOR A WARRANTY SERVICE FACILITY

PLANNING AND CONTROL FOR A WARRANTY SERVICE FACILITY Proceedings of the 2 Winter Simulation Conference M. E. Kuhl, N. M. Steiger, F. B. Armstrong, and J. A. Joines, eds. PLANNING AND CONTROL FOR A WARRANTY SERVICE FACILITY Amir Messih Eaton Corporation Power

More information

Paired-cell Overlapping Loops of Cards with Authorization Simulation In Job shop Environment

Paired-cell Overlapping Loops of Cards with Authorization Simulation In Job shop Environment International Journal of Mechanical & Mechatronics Engineering IJMME-IJENS Vol:15 No:03 68 Paired-cell Overlapping Loops of Cards with Authorization Simulation In Job shop Environment Chong Kuan Eng, How

More information

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Atanu Mukherjee, President, Dastur Business and Technology Consulting,

More information

Numerical investigation of tradeoffs in production-inventory control policies with advance demand information

Numerical investigation of tradeoffs in production-inventory control policies with advance demand information Numerical investigation of tradeoffs in production-inventory control policies with advance demand information George Liberopoulos and telios oukoumialos University of Thessaly, Department of Mechanical

More information

PERFORMANCE MODELING OF AUTOMATED MANUFACTURING SYSTEMS

PERFORMANCE MODELING OF AUTOMATED MANUFACTURING SYSTEMS PERFORMANCE MODELING OF AUTOMATED MANUFACTURING SYSTEMS N. VISWANADHAM Department of Computer Science and Automation Indian Institute of Science Y NARAHARI Department of Computer Science and Automation

More information

A System Dynamics Model for a Single-Stage Multi-Product Kanban Production System

A System Dynamics Model for a Single-Stage Multi-Product Kanban Production System A System Dynamics Model for a Single-Stage Multi-Product Kanban Production System L. GUERRA, T. MURINO, E. ROMANO Department of Materials Engineering and Operations Management University of Naples Federico

More information

PULL REPLENISHMENT PERFORMANCE AS A FUNCTION OF DEMAND RATES AND SETUP TIMES UNDER OPTIMAL SETTINGS. Silvanus T. Enns

PULL REPLENISHMENT PERFORMANCE AS A FUNCTION OF DEMAND RATES AND SETUP TIMES UNDER OPTIMAL SETTINGS. Silvanus T. Enns Proceedings of the 2007 Winter Simulation Conference S. G. Henderson, B. Biller, M.-H. Hsieh, J. Shortle, J. D. Tew, and R. R. Barton, eds. PULL REPLENISHMENT PERFORMANCE AS A FUNCTION OF DEMAND RATES

More information

Little s Law 101. Tathagat Varma, PMP, Six Sigma Green Belt, Certified Scrum Master, Lean Certified, Kaizen Certified

Little s Law 101. Tathagat Varma, PMP, Six Sigma Green Belt, Certified Scrum Master, Lean Certified, Kaizen Certified Little s Law 101 Tathagat Varma, Tathagat.varma@gmail.com PMP, Six Sigma Green Belt, Certified Scrum Master, Lean Certified, Kaizen Certified Abstract Little s Law states that inventory in a process is

More information

Allocating work in process in a multiple-product CONWIP system with lost sales

Allocating work in process in a multiple-product CONWIP system with lost sales Allocating work in process in a multiple-product CONWIP system with lost sales S. M. Ryan* and J. Vorasayan Department of Industrial & Manufacturing Systems Engineering Iowa State University *Corresponding

More information

1. For s, a, initialize Q ( s,

1. For s, a, initialize Q ( s, Proceedings of the 2006 Winter Simulation Conference L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, eds. A REINFORCEMENT LEARNING ALGORITHM TO MINIMIZE THE MEAN TARDINESS

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION 1 CHAPTER 1 INTRODUCTION 1.1 MANUFACTURING SYSTEM Manufacturing, a branch of industry, is the application of tools and processes for the transformation of raw materials into finished products. The manufacturing

More information

ROOT CAUSE ANALYSIS USING INTERNAL BENCHMARKING

ROOT CAUSE ANALYSIS USING INTERNAL BENCHMARKING ROOT CAUSE ANALYSIS USING INTERNAL BENCHMARKING Maleewan Sapcharoenkul Faculty of Engineering, Kasetsart University, Thailand Pornthep Anussornnitisarn Faculty of Engineering, Kasetsart University, Thailand

More information

Make It Specialized or Flexible?

Make It Specialized or Flexible? Make It S~ecialized or Flexible? Make It Specialized or Flexible? Ick-Hyun Nam College of Business Administration, Seoul National University Abstract Throughput time, the time duration from customer arrival

More information

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds Proceedings of the 0 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds OPTIMAL BATCH PROCESS ADMISSION CONTROL IN TANDEM QUEUEING SYSTEMS WITH QUEUE

More information

JUST IN TIME APPROACH IN INVENTORY MANAGEMENT

JUST IN TIME APPROACH IN INVENTORY MANAGEMENT JUST IN TIME APPROACH IN INVENTORY MANAGEMENT Abdul Talib Bon (Corresponding author) Faculty of Technology Management, Business and Entrepreneurship Universiti Tun Hussein Onn Malaysia, 86400 Batu Pahat,

More information

turning data into dollars

turning data into dollars turning data into dollars Tom s Ten Data Tips August 2012 Kanban Kanban is a relatively new party to the Agile family, a process improvement method aimed at making work flow more efficiently. You enhance

More information

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations JIT and Lean Operations Outline Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations Eliminate Waste Remove Variability Improve

More information

THE BENEFITS THAT THE VISUAL MANAGEMENT CAN BRING FOR THE COMPANIES

THE BENEFITS THAT THE VISUAL MANAGEMENT CAN BRING FOR THE COMPANIES THE BENEFITS THAT THE VISUAL MANAGEMENT CAN BRING FOR THE COMPANIES Alessandro L. da Silva 1 ; Edwin Cardoza2 Sao Carlos Engineering School University of Sao Paulo. Production Engineering Department. Av.

More information

MIT Manufacturing Systems Analysis Lecture 1: Overview

MIT Manufacturing Systems Analysis Lecture 1: Overview 2.852 Manufacturing Systems Analysis 1/44 Copyright 2010 c Stanley B. Gershwin. MIT 2.852 Manufacturing Systems Analysis Lecture 1: Overview Stanley B. Gershwin http://web.mit.edu/manuf-sys Massachusetts

More information

Class 19: Course Wrap-up

Class 19: Course Wrap-up Class 19: Course Wrap-up 1. Course Main Concepts and Simulation Debriefing 2. Sloan Evaluation Forms 3. Final Feedback Survey after class Intro to Ops At-a-Glance # Day Date Contents Readings Assignments

More information

OPERATING SYSTEMS. Systems and Models. CS 3502 Spring Chapter 03

OPERATING SYSTEMS. Systems and Models. CS 3502 Spring Chapter 03 OPERATING SYSTEMS CS 3502 Spring 2018 Systems and Models Chapter 03 Systems and Models A system is the part of the real world under study. It is composed of a set of entities interacting among themselves

More information

STATISTICAL TECHNIQUES. Data Analysis and Modelling

STATISTICAL TECHNIQUES. Data Analysis and Modelling STATISTICAL TECHNIQUES Data Analysis and Modelling DATA ANALYSIS & MODELLING Data collection and presentation Many of us probably some of the methods involved in collecting raw data. Once the data has

More information

COMPUTATIONAL ANALYSIS OF A MULTI-SERVER BULK ARRIVAL WITH TWO MODES SERVER BREAKDOWN

COMPUTATIONAL ANALYSIS OF A MULTI-SERVER BULK ARRIVAL WITH TWO MODES SERVER BREAKDOWN Mathematical and Computational Applications, Vol. 1, No. 2, pp. 249-259, 25. Association for cientific Research COMPUTATIONAL ANALYI OF A MULTI-ERVER BULK ARRIVAL ITH TO MODE ERVER BREAKDON A. M. ultan,

More information

A Kaizen Based Approach for Cellular Manufacturing System Design: A Case Study Joseph C. Chen, John Dugger, and Bob Hammer

A Kaizen Based Approach for Cellular Manufacturing System Design: A Case Study Joseph C. Chen, John Dugger, and Bob Hammer A Kaizen Based Approach for Cellular Manufacturing System Design: A Case Study Joseph C. Chen, John Dugger, and Bob Hammer Organizations are currently encountering a necessity to respond to rapidly changing

More information

Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds.

Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds. Proceedings of the Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds. DYNAMIC ADJUSTMENT OF REPLENISHMENT PARAMETERS USING OPTIMUM- SEEKING SIMULATION

More information

CUWIP: A modified CONWIP approach to controlling WIP

CUWIP: A modified CONWIP approach to controlling WIP CUWIP: A modified CONWIP approach to controlling WIP Jules Comeau, professor at Université de Moncton, NB Uday Venkatadri, professor at Dalhousie University, Halifax, N.S. Cahier électronique de la Faculté

More information

Matching Supply with Demand

Matching Supply with Demand Matching Supply with Demand An Introduction to Operations Management Third Edition Gerard Cachon The Wharton School, University of Pennsylvania Christian Terwiesch The Wharton School, University of Pennsylvania

More information

Sven Axsäter. Inventory Control. Third Edition. Springer

Sven Axsäter. Inventory Control. Third Edition. Springer Sven Axsäter Inventory Control Third Edition Springer Contents 1 Introduction 1 1.1 Importance and Objectives of Inventory Control 1 1.2 Overview and Purpose of the Book 2 1.3 Framework 4 2 Forecasting

More information

Analyzing Controllable Factors Influencing Cycle Time Distribution in. Semiconductor Industries. Tanushree Salvi

Analyzing Controllable Factors Influencing Cycle Time Distribution in. Semiconductor Industries. Tanushree Salvi Analyzing Controllable Factors Influencing Cycle Time Distribution in Semiconductor Industries by Tanushree Salvi A Thesis Presented in Partial Fulfillment of the Requirements for the Degree Master of

More information

Chapter 11. In-Time and Lean Production

Chapter 11. In-Time and Lean Production Chapter 11 Just-In In-Time and Lean Production What is JIT? Producing only what is needed, when it is needed A philosophy An integrated management system JIT s mandate: Eliminate all waste Basic Elements

More information

Ph.D. Defense: Resource Allocation Optimization in the Smart Grid and High-performance Computing Tim Hansen

Ph.D. Defense: Resource Allocation Optimization in the Smart Grid and High-performance Computing Tim Hansen Ph.D. Defense: Resource Allocation Optimization in the Smart Grid and High-performance Computing Tim Hansen Department of Electrical and Computer Engineering Colorado State University Fort Collins, Colorado,

More information

LITTLE S LAW FOR THE US HOUSE BUILDING INDUSTRY

LITTLE S LAW FOR THE US HOUSE BUILDING INDUSTRY LITTLE S LAW FOR THE US HOUSE BUILDING INDUSTRY ABSTRACT Ehsan Gharaie 1, Nick Blismas 2 and Ron Wakefield 3 Although the housebuilding industry is a significant player in the housing supply pipeline,

More information

Allocating work in process in a multiple-product CONWIP system with lost sales

Allocating work in process in a multiple-product CONWIP system with lost sales Allocating work in process in a multiple-product CONWIP system with lost sales Sarah M. Ryan* and Jumpol Vorasayan Department of Industrial & Manufacturing Systems Engineering Iowa State University *Corresponding

More information

Organisation Staffing Optimisation Using Deterministic Reneging Queuing Model

Organisation Staffing Optimisation Using Deterministic Reneging Queuing Model 2011 International Conference on Innovation, Management and Service IPEDR vol.14(2011) (2011) IACSIT Press, Singapore Organisation Staffing Optimisation Using Deterministic Reneging Queuing Model Trong

More information

Copyright Infor. All Rights Reserved.

Copyright Infor. All Rights Reserved. 1 SYSi 2983 XA Best Practices in Manufacturing Execution Mike Canik Sr. Manufacturing Consultant Paper-Less, LLC 2 An excellent source of information to help Cope with a changing landscape Demand Management

More information

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 2/30 People Philosophy Basic Issues Industry Needs Uncertainty, Variability, and Randomness

Copyright c 2009 Stanley B. Gershwin. All rights reserved. 2/30 People Philosophy Basic Issues Industry Needs Uncertainty, Variability, and Randomness Copyright c 2009 Stanley B. Gershwin. All rights reserved. 1/30 Uncertainty, Variability, Randomness, and Manufacturing Systems Engineering Stanley B. Gershwin gershwin@mit.edu http://web.mit.edu/manuf-sys

More information

Industrial Design and Simulation of a JIT Material Handling System

Industrial Design and Simulation of a JIT Material Handling System Industrial Design and Simulation of a JIT Material Handling System Chukwuedozie N. Ezema, Eric C. Okafor and Christiana C. Okezie Abstract A JIT Material Handling System attempts to manufacture products

More information

Just-In-Time (JIT) Manufacturing. Overview

Just-In-Time (JIT) Manufacturing. Overview Just-In-Time (JIT) Manufacturing Overview The Just-in-Time (JIT) Manufacturing Philosophy Prerequisites for JIT Manufacturing Elements of JIT Manufacturing Benefits of JIT Manufacturing Success and JIT

More information

Cooperation of Lean Enterprises Techniques used for Lean Supply Chain.

Cooperation of Lean Enterprises Techniques used for Lean Supply Chain. Cooperation of Lean Enterprises Techniques used for Lean Supply Chain. Wroclaw University of Technology, adress: ul. Lukasiewicza 5 50-371 Wroclaw, Poland email: marek.eisler@pwr.wroc.pl, remigiusz.horbal@pwr.wroc.pl,

More information

Mass Customized Large Scale Production System with Learning Curve Consideration

Mass Customized Large Scale Production System with Learning Curve Consideration Mass Customized Large Scale Production System with Learning Curve Consideration KuoWei Chen and Richard Lee Storch Industrial & Systems Engineering, University of Washington, Seattle, U.S.A {kwc206,rlstorch}@uw.edu

More information

MODELING AND SIMULATION OF A LEAN SYSTEM. CASE STUDY OF A PAINT LINE IN A FURNITURE COMPANY

MODELING AND SIMULATION OF A LEAN SYSTEM. CASE STUDY OF A PAINT LINE IN A FURNITURE COMPANY MODELING AND SIMULATION OF A LEAN SYSTEM. CASE STUDY OF A PAINT LINE IN A FURNITURE COMPANY Quynh-Lam Ngoc LE 1, Ngoc-Hien DO 2, Ki-Chan NAM 3 1 Ho Chi Minh City University of Technology, 268 Ly Thuong

More information

/10/$ IEEE

/10/$ IEEE Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds. APPLICATION OF ERLANG DISTRIBUTION IN CYCLE TIME ESTIMATION OF TOOLSETS WITH

More information

A Conceptual Model for Production Leveling (Heijunka) Implementation in Batch Production Systems

A Conceptual Model for Production Leveling (Heijunka) Implementation in Batch Production Systems A Conceptual Model for Production Leveling (Heijunka) Implementation in Batch Production Systems Luciano Fonseca de Araujo and Abelardo Alves de Queiroz Federal University of Santa Catarina, Department

More information

Value Stream Analysis of Manufacturing Engineering New Product Introduction Processes

Value Stream Analysis of Manufacturing Engineering New Product Introduction Processes Value Stream Analysis of Manufacturing Engineering New Product Introduction Processes Malachy Maginness a,, Essam Shehab b,1 and Chris Beadle c a, b Decision Engineering Centre, Manufacturing Department,

More information

Lean Production and Modern Socio- Technology (MST) Design principles compared: MST as the science of lean?

Lean Production and Modern Socio- Technology (MST) Design principles compared: MST as the science of lean? Lean Production and Modern Socio- Technology (MST) Design principles compared: MST as the science of lean? 1 OST and MST Old sociotechnology (OST/Tavistock Institute) : Its origin: the Durham case Its

More information

Assessing Lean Systems Using Variability Mapping

Assessing Lean Systems Using Variability Mapping Available online at www.sciencedirect.com Procedia CIRP 3 (2012 ) 2 7 45 th CIRP Conference on Manufacturing Systems 2012 Assessing Lean Systems Using Variability Mapping A. Deif a, * a Industrial and

More information

Optimizing Capacity Utilization in Queuing Systems: Parallels with the EOQ Model

Optimizing Capacity Utilization in Queuing Systems: Parallels with the EOQ Model Optimizing Capacity Utilization in Queuing Systems: Parallels with the EOQ Model V. Udayabhanu San Francisco State University, San Francisco, CA Sunder Kekre Kannan Srinivasan Carnegie-Mellon University,

More information

Finished goods available to meet Takt time when variations in customer demand exist.

Finished goods available to meet Takt time when variations in customer demand exist. Delaware Valley Industrial Resource Center 2905 Southampton Road Philadelphia, PA 19154 Tel: (215) 464-8550 Fax: (215) 464-8570 www.dvirc.org Term Batch-and-Queue Processing Buffer Stock Catchball Cell

More information

Improving maintenance by profit indicators

Improving maintenance by profit indicators Improving maintenance by profit indicators H. Rødseth 1, O. Myklebust 2,R.Eleftheradis 1 & P. Schjølberg 1 1 Department of Production and Quality Engineering, Norwegian University of Science and Technology,

More information

Abstract number: SUPPORTING THE BALANCED SCORECARD FROM THE MANUFACTURING SYSTEM

Abstract number: SUPPORTING THE BALANCED SCORECARD FROM THE MANUFACTURING SYSTEM Abstract number: 002-0538 SUPPORTING THE BALANCED SCORECARD FROM THE MANUFACTURING SYSTEM Second World Conference on POM and 15 th Annual POM Conference Cancun, Mexico, April 30 May 3, 2004 Authors Rafael

More information

Lean and Agile Systems. Rajiv Gupta FORE School of Management October 2013 Session 6

Lean and Agile Systems. Rajiv Gupta FORE School of Management October 2013 Session 6 Lean and Agile Systems Rajiv Gupta FORE School of Management October 2013 Session 6 Module 1 Recap of Session 5 Module 2 Pull Production Rules of Kanban Module 3 Small Batch Production Level Production

More information

Cover-Time Planning, An alternative to Material Requirements Planning; with customer order production abilities and restricted Work-In-Process *

Cover-Time Planning, An alternative to Material Requirements Planning; with customer order production abilities and restricted Work-In-Process * International Conference on Industrial Engineering and Systems Management IESM 2007 May 30 - June 2, 2007 BEIJING - CHINA Cover-Time Planning, An alternative to Material Requirements Planning; with customer

More information

OPTIMAL ALLOCATION OF WORK IN A TWO-STEP PRODUCTION PROCESS USING CIRCULATING PALLETS. Arne Thesen

OPTIMAL ALLOCATION OF WORK IN A TWO-STEP PRODUCTION PROCESS USING CIRCULATING PALLETS. Arne Thesen Arne Thesen: Optimal allocation of work... /3/98 :5 PM Page OPTIMAL ALLOCATION OF WORK IN A TWO-STEP PRODUCTION PROCESS USING CIRCULATING PALLETS. Arne Thesen Department of Industrial Engineering, University

More information

PLUS VALUE STREAM MAPPING

PLUS VALUE STREAM MAPPING LEAN PRINCIPLES PLUS VALUE STREAM MAPPING Lean Principles for the Job Shop (v. Aug 06) 1 Lean Principles for the Job Shop (v. Aug 06) 2 Lean Principles for the Job Shop (v. Aug 06) 3 Lean Principles for

More information

PLANNING FOR PRODUCTION

PLANNING FOR PRODUCTION PLANNING FOR PRODUCTION Forecasting Forecasting is the first major activity in the planning, involving careful study of past data and present scenario to estimate the occurence, timing or magnitude of

More information

Simulation of an Order Picking System in a Pharmaceutical Warehouse

Simulation of an Order Picking System in a Pharmaceutical Warehouse Simulation of an Order Picking System in a Pharmaceutical Warehouse João Pedro Jorge 1,5, Zafeiris Kokkinogenis 2,4,5, Rosaldo J. F. Rossetti 2,3,5, Manuel A. P. Marques 1,5 1 Department of Industrial

More information

Discrete Event Simulation

Discrete Event Simulation Chapter 2 Discrete Event Simulation The majority of modern computer simulation tools (simulators) implement a paradigm, called discrete-event simulation (DES). This paradigm is so general and powerful

More information

Scheduling and Coordination of Distributed Design Projects

Scheduling and Coordination of Distributed Design Projects Scheduling and Coordination of Distributed Design Projects F. Liu, P.B. Luh University of Connecticut, Storrs, CT 06269-2157, USA B. Moser United Technologies Research Center, E. Hartford, CT 06108, USA

More information

ProcessModel Simulation to Show Benefits of Kanban/Pull System

ProcessModel Simulation to Show Benefits of Kanban/Pull System ProcessModel Simulation to Show Benefits of Kanban/Pull System Nicholas Loyd Michael McNairy Alabama Technology Network University of Alabama in Huntsville Huntsville, AL 35899 loydn@uah.edu mcnairm@uah.edu

More information

Optimizing Inventory Control at PT. Total Pack Indonesia by Using Kanban System

Optimizing Inventory Control at PT. Total Pack Indonesia by Using Kanban System ISSN 1816-6075 (Print), 1818-0523 (Online) Journal of System and Management Sciences Vol. 5 (2015) No. 1, pp. 52-66 Optimizing Inventory Control at PT. Total Pack Indonesia by Using Kanban System Leonardo

More information

OPTIMIZATION AND OPERATIONS RESEARCH Vol. IV - Inventory Models - Waldmann K.-H

OPTIMIZATION AND OPERATIONS RESEARCH Vol. IV - Inventory Models - Waldmann K.-H INVENTORY MODELS Waldmann K.-H. Universität Karlsruhe, Germany Keywords: inventory control, periodic review, continuous review, economic order quantity, (s, S) policy, multi-level inventory systems, Markov

More information

Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization

Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar L9: Lean synchronization 1 Lean operations Operations strategy Design Improvement Lean operations Planning and control The market requires

More information

Agile & Lean / Kanban

Agile & Lean / Kanban Agile & Lean / Kanban 0 What is Lean? 1 Agile Development Methods (Dogma) extreme Programming (XP) Scrum Lean Software Development Behavior Driven Development (BDD) Feature Driven Development (FDD) Crystal

More information

Chapter C Waiting Lines

Chapter C Waiting Lines Supplement C Waiting Lines Chapter C Waiting Lines TRUE/FALSE 1. Waiting lines cannot develop if the time to process a customer is constant. Answer: False Reference: Why Waiting Lines Form Keywords: waiting,

More information

PULL PRODUCTION CYCLE-TIME UNDER VARYING PRODUCT MIXES

PULL PRODUCTION CYCLE-TIME UNDER VARYING PRODUCT MIXES Proceedings of the 2006 Winter Simulation Conference L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, eds. PULL PRODUCTION CYCLE-TIME UNDER VARYING PRODUCT MIXES Chakkaphan

More information

Autonomous Shop Floor Control Considering Set-up Times

Autonomous Shop Floor Control Considering Set-up Times Autonomous Shop Floor Control Considering Set-up Times B. Scholz-Reiter, T. Jagalski, C. de Beer, M. Freitag Department of Planning and Control of Production Systems, University of Bremen, Germany Abstract

More information

A STUDY OF QUEUING THEORY IN LOW TO HIGH REWORK ENVIRONMENTS WITH PROCESS AVAILABILITY

A STUDY OF QUEUING THEORY IN LOW TO HIGH REWORK ENVIRONMENTS WITH PROCESS AVAILABILITY University of Kentucky UKnowledge Theses and Dissertations--Manufacturing Systems Engineering Manufacturing Systems Engineering 01 A STUDY OF QUEUING THEORY IN LOW TO HIGH REWORK ENVIRONMENTS WITH PROCESS

More information

Kanban Applied to Reduce WIP in Chipper Assembly for Lawn Mower Industries

Kanban Applied to Reduce WIP in Chipper Assembly for Lawn Mower Industries Kanban Applied to Reduce WIP in Chipper Assembly for Lawn Mower Industries Author Rahman, A., Chattopadhyay, G., Wah, Simon Published 2006 Conference Title Condition Monitoring and Diagnostic Engineering

More information

Make-to-Stock under Drum-Buffer-Rope and Buffer Management Methodology

Make-to-Stock under Drum-Buffer-Rope and Buffer Management Methodology I-09 Elyakim M. Schragenheim Make-to-Stock under Drum-Buffer-Rope and Buffer Management Methodology WHY MAKE-TO-STOCK? At least from the theory of constraints (TOC) perspective this is a valid question.

More information

Set Up Change Time Optimization Using Single Minute Exchange of Die (SMED) Methodology

Set Up Change Time Optimization Using Single Minute Exchange of Die (SMED) Methodology International Journal of Research in Electronics ISSN : 2348-9065 (Online) Set Up Change Optimization Using Single Minute Exchange of Die (SMED) Methodology I Pankajkumar. J. Mistry, II Mukesh Desai I

More information

Exam Inventory Management (35V5A8) Part 1: Theory (1 hour)

Exam Inventory Management (35V5A8) Part 1: Theory (1 hour) Exam Inventory Management (35V5A8) Part 1: Theory (1 hour) Closed book: Inspection of book/lecture notes/personal notes is not allowed; computer (screen) is off. Maximum number of points for this part:

More information

Allocating work in process in a multiple-product CONWIP system with lost sales

Allocating work in process in a multiple-product CONWIP system with lost sales Industrial and Manufacturing Systems Engineering Publications Industrial and Manufacturing Systems Engineering 2005 Allocating work in process in a multiple-product CONWIP system with lost sales Sarah

More information

Bottleneck Detection of Manufacturing Systems Using Data Driven Method

Bottleneck Detection of Manufacturing Systems Using Data Driven Method Proceedings of the 2007 IEEE International Symposium on Assembly and Manufacturing Ann Arbor, Michigan, USA, July 22-25, 2007 MoB2.1 Bottleneck Detection of Manufacturing Systems Using Data Driven Method

More information

ALLOCATING SHARED RESOURCES OPTIMALLY FOR CALL CENTER OPERATIONS AND KNOWLEDGE MANAGEMENT ACTIVITIES

ALLOCATING SHARED RESOURCES OPTIMALLY FOR CALL CENTER OPERATIONS AND KNOWLEDGE MANAGEMENT ACTIVITIES ALLOCATING SHARED RESOURCES OPTIMALLY FOR CALL CENTER OPERATIONS AND KNOWLEDGE MANAGEMENT ACTIVITIES Research-in-Progress Abhijeet Ghoshal Alok Gupta University of Minnesota University of Minnesota 321,

More information

The Preemptive Stocker Dispatching Rule of Automatic Material Handling System in 300 mm Semiconductor Manufacturing Factories

The Preemptive Stocker Dispatching Rule of Automatic Material Handling System in 300 mm Semiconductor Manufacturing Factories Journal of Physics: Conference Series PAPER OPEN ACCESS The Preemptive Stocker Dispatching Rule of Automatic Material Handling System in 300 mm Semiconductor Manufacturing Factories To cite this article:

More information

Hybrid Model applied in the Semiconductor Production Planning

Hybrid Model applied in the Semiconductor Production Planning , March 13-15, 2013, Hong Kong Hybrid Model applied in the Semiconductor Production Planning Pengfei Wang, Tomohiro Murata Abstract- One of the most studied issues in production planning or inventory management

More information

An Adaptive Kanban and Production Capacity Control Mechanism

An Adaptive Kanban and Production Capacity Control Mechanism An Adaptive Kanban and Production Capacity Control Mechanism Léo Le Pallec Marand, Yo Sakata, Daisuke Hirotani, Katsumi Morikawa and Katsuhiko Takahashi * Department of System Cybernetics, Graduate School

More information

EXPONENTIAL SMOOTHING FOR MULTI-PRODUCT LOT-SIZING WITH HEIJUNKA AND VARYING DEMAND

EXPONENTIAL SMOOTHING FOR MULTI-PRODUCT LOT-SIZING WITH HEIJUNKA AND VARYING DEMAND Volume5 Number2 June2014 pp.20 26 DOI: 10.2478/mper-2014-0013 EXPONENTIAL SMOOTHING FOR MULTI-PRODUCT LOT-SIZING WITH HEIJUNKA AND VARYING DEMAND PrzemyslawKorytkowski 1,FrédéricGrimaud 2,AlexandreDolgui

More information

JIT and Lean Operations. JIT/Lean Operations

JIT and Lean Operations. JIT/Lean Operations 5/7/2011 16 JIT and Lean Operations By : Sa Ed M. Salhieh, Salhieh, Ph.D. 16-1 JIT/Lean Operations Good production systems require that managers address three issues that are pervasive and fundamental

More information

Flowshop Scheduling Problem for 10-Jobs, 10-Machines By Heuristics Models Using Makespan Criterion

Flowshop Scheduling Problem for 10-Jobs, 10-Machines By Heuristics Models Using Makespan Criterion Flowshop Scheduling Problem for 10-Jobs, 10-Machines By Heuristics Models Using Makespan Criterion Ajay Kumar Agarwal Assistant Professor, Mechanical Engineering Department RIMT, Chidana, Sonipat, Haryana,

More information

Operations Management - 5 th Edition

Operations Management - 5 th Edition Chapter 15 Lean Production Operations Management - 5 th Edition Roberta Russell & Bernard W. Taylor, III Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lecture

More information

arxiv: v1 [math.oc] 27 Nov 2012

arxiv: v1 [math.oc] 27 Nov 2012 Simulation model for assembly lines with heterogeneous workers Pedro B. Castellucci and Alysson M. Costa arxiv:1211.6406v1 [math.oc] 27 Nov 2012 Instituto de Ciências Matemáticas e de Computação, Universidade

More information

COMPARISON OF BOTTLENECK DETECTION METHODS FOR AGV SYSTEMS. Christoph Roser Masaru Nakano Minoru Tanaka

COMPARISON OF BOTTLENECK DETECTION METHODS FOR AGV SYSTEMS. Christoph Roser Masaru Nakano Minoru Tanaka Roser, Christoph, Masaru Nakano, and Minoru Tanaka. Comparison of Bottleneck Detection Methods for AGV Systems. In Winter Simulation Conference, edited by S. Chick, Paul J Sanchez, David Ferrin, and Douglas

More information

Axiomatic Design of Manufacturing Systems

Axiomatic Design of Manufacturing Systems Axiomatic Design of Manufacturing Systems Introduction to Manufacturing System "What is a manufacturing system?" "What is an ideal manufacturing system?" "How should we design a manufacturing system?"

More information

Outline. Pull Manufacturing. Push Vs. Pull Scheduling. Inventory Hides Problems. Lowering Inventory Reveals Problems

Outline. Pull Manufacturing. Push Vs. Pull Scheduling. Inventory Hides Problems. Lowering Inventory Reveals Problems Outline Pull Manufacturing Why Pull Manufacturing? The Problem of Inventory Just In Time Kanban One Piece Flow Demand / Pull Standard Work & Takt Time Production Smoothing 1 2 Why Pull Manufacturing? Push

More information

Motivating Examples of the Power of Analytical Modeling

Motivating Examples of the Power of Analytical Modeling Chapter 1 Motivating Examples of the Power of Analytical Modeling 1.1 What is Queueing Theory? Queueing theory is the theory behind what happens when you have lots of jobs, scarce resources, and subsequently

More information

Dynamic Lead Time Based Control Point Policy for Multi Stage Manufacturing Systems

Dynamic Lead Time Based Control Point Policy for Multi Stage Manufacturing Systems Dynamic Lead Time ased Control Point Policy for Multi Stage Manufacturing Systems Marcello Colledani (1), Stanley. Gershwin (2) 11 th Conference on Stochastic Models of Manufacturing and Service Operations,

More information

INDIAN INSTITUTE OF MATERIALS MANAGEMENT Post Graduate Diploma in Materials Management PAPER 18 C OPERATIONS RESEARCH.

INDIAN INSTITUTE OF MATERIALS MANAGEMENT Post Graduate Diploma in Materials Management PAPER 18 C OPERATIONS RESEARCH. INDIAN INSTITUTE OF MATERIALS MANAGEMENT Post Graduate Diploma in Materials Management PAPER 18 C OPERATIONS RESEARCH. Dec 2014 DATE: 20.12.2014 Max. Marks: 100 TIME: 2.00 p.m to 5.00 p.m. Duration: 03

More information

Lean manufacturing concept: the main factor in improving manufacturing performance a case study

Lean manufacturing concept: the main factor in improving manufacturing performance a case study Int. J. Manufacturing Technology and Management, Vol. 17, No. 4, 2009 353 Lean manufacturing concept: the main factor in improving manufacturing performance a case study N. Zakuan* Lecturer, UTHM, Parit

More information

PERFORMANCE EVALUATION OF DEPENDENT TWO-STAGE SERVICES

PERFORMANCE EVALUATION OF DEPENDENT TWO-STAGE SERVICES PERFORMANCE EVALUATION OF DEPENDENT TWO-STAGE SERVICES Werner Sandmann Department of Information Systems and Applied Computer Science University of Bamberg Feldkirchenstr. 21 D-96045, Bamberg, Germany

More information

- Title: Value of Upstream Information in a Two-Stage Supply Chain with Random

- Title: Value of Upstream Information in a Two-Stage Supply Chain with Random - Abstract Number: 002-0365 - Title: Value of Upstream Information in a Two-Stage Supply Chain with Random Yields - Name of the Conference: Second World Conference on POM and 15 th Annual POM Conference,

More information

JAN VAVRA JAN SUCHY ONDREJ SLEZAK MEASURING PRODUCTION EFFECTIVENESS: INDUSTRIAL CASE FROM ELECTRONIC INDUSTRY

JAN VAVRA JAN SUCHY ONDREJ SLEZAK MEASURING PRODUCTION EFFECTIVENESS: INDUSTRIAL CASE FROM ELECTRONIC INDUSTRY JAN VAVRA Unversity of Pardubice, Czech Republic JAN SUCHY University of Pardubice, Czech Republic ONDREJ SLEZAK Hermetic Pumpen, Czech Republic MEASURING PRODUCTION EFFECTIVENESS: INDUSTRIAL CASE FROM

More information

Chapter 13. Lean and Sustainable Supply Chains

Chapter 13. Lean and Sustainable Supply Chains 1 Chapter 13 Lean and Sustainable Supply Chains 2 OBJECTIVES Lean Production Defined The Toyota Production System Lean Implementation Requirements Lean Services Lean Production 3 Lean Production can be

More information

Effective Business Management in Uncertain Business Environment Using Stochastic Queuing System with Encouraged Arrivals and Impatient Customers

Effective Business Management in Uncertain Business Environment Using Stochastic Queuing System with Encouraged Arrivals and Impatient Customers Proceedings of International Conference on Strategies in Volatile and Uncertain Environment for Emerging Markets July 14-15, 2017 Indian Institute of Technology Delhi, New Delhi pp.479-488 Effective Business

More information

Evaluation of Value and Time Based Priority Rules in a Push System

Evaluation of Value and Time Based Priority Rules in a Push System Evaluation of Value and Time Based Priority Rules in a Push System Dr. V. Arumugam * and Abdel Monem Murtadi ** * Associate Professor, Business and Advanced Technology Center, Universiti Teknologi Malaysia,

More information