1 Page of 8 OPERATIONAL INVESTMENTS AVERAGE COST PER CUSTOMER CONNECTION Customer Costs When THESL receives a request to connect a new customer load or upgrade connection capacity for an existing customer, an Offer to Connect is issued to the customer. The Offer to Connect consists of Basic and Variable Connection Costs, Capital Contribution and Security Deposit. An economic evaluation is carried out to determine if the future revenues from the connected customer(s) will adequately cover the costs pertaining to the new connection or the capacity upgrade. Should the Net Present Value ( NPV ) of the costs and revenues associated with the Expansion be less than zero, a capital contribution in the amount of the shortfall is required. The amount of the capital contribution is set out in THESL s Offer to Connect to the customer The parameters used in the Business Economic Model for the economic evaluation of the expansion project include: New Expansion Costs Basic Connection Costs Operating, maintenance and administration costs ( OM&A Costs ) Estimated Incremental Revenues New Expansion Costs New Expansion Costs are the capital expenditures associated with the installation of new distribution facilities and circuits when these are essential to accommodate new customer loading and which are not used to serve other customers. If within five years from the connection date, non-forecasted customers are connected to this new plant any further capital costs, THESL will rebate the initial customer for that customer s portion of the New Expansion that is shared with non-forecasted customers.

2 Page of Basic Connection Costs The Basic Connection Cost is the cost for connecting the standard 30-metre overhead service including the connection and equipment. The Basic Connection Cost for 0 is $,335. The Basic Connection Cost is recovered through distribution rates. This figure is updated annually Operating, Maintenance and Administration Costs For the purpose of determining OM&A Costs, THESL uses system average operating and maintenance expenditures as a proxy for incremental OM&A expenditures, and apportions them as fixed costs (for residential and general service 0-50kW customers) or as a function of $/kw of demand (for GS kw, GS kw, and GS kw customers). These values are updated annually. 3 4 The average Operating and Maintenance (O&M) costs are summarized in Table. 5 6 Table : Average O&M Costs 009 Actual 00 Bridge 0 Test GS kw $.95 $3.3 $3.4 GS kw $.6 $.3 $.35 Large Use $0.59 $0.59 $ Estimated Incremental Revenues Estimated Incremental Revenues are calculated using the Estimated Incremental Demand, the Fixed Charge and the Variable Charge that have been approved by the OEB for the Rate Class applicable to each individual new meter installed in connection with the expansion project. For existing customers, THESL apportions the Fixed Charge based on the ratio between the incremental load and the combined load.

3 Page 3 of Variable Connection Costs Variable Connection Costs are the firm costs associated with the installation of Connection Assets above and beyond the Basic Connection Cost. The Variable Connection Costs are paid 00 percent by the customer. The Variable Connection Costs are not required for the economic evaluation of the Capital Contribution Table below shows the typical Variable Connection Costs for the different service types in each of the customer classes. 9 0 The actual variable connection costs for the different service types in each customer classes are based on the site-specific requirements.

4 Page 4 of 8 Table : Typical Variable Connection Costs (00) Class Description Type of Service Typical Variable Connection Fee - Residential Single Service Overhead Overhead Service - Residential (A) See Note* below Underground (not requiring facilities on Underground Service - Residential (3A) See Note* below - General Service 0 50kW Overhead - Single Service Overhead Service - Commercial (B) See Note* below Underground - Single Service (not requiring facilities on Underground Service - Commercial (3B) See Note* below 3A - General Service 50kW - 999kW Overhead - Single Service (not requiring facilities on 400A, 0/40V (Requiring new estimate) $00.00

5 Page 5 of 8 Class Description Type of Service Typical Variable Connection Fee 400A, 0/08V, 3P (Requiring new estimate) $, Up to 00A, 347/600V (Requiring new estimate) $ * 00A, 347/600V (Requiring new estimate), applicable $ for upgrades in some area only Underground - Single Service (not 400A, 0/40V $,700 requiring facilities on 400A, 0/08V, 3P $,700 Up to 00A, 347/600V $,900 00A, 347/600V, applicable for upgrades in some area $,900 only 600A, 0/08V, for network system in Toronto $5,300 Downtown area only 800A, 0/08V, for network system in Toronto $7,500 Downtown area only Overhead/Underground Combination (requiring 50 to 000 kva Pad (9A to 9A5 and 9B to 9B3) $46,000 to $68,000 facilities on Modular vault 300 to 000kVA (6) $85,000 to $04,000

6 Page 6 of 8 Typical Variable Class Description Type of Service Connection Fee 3B - General Service 50kW - 999kW 3C - Residential Subdivision 4 - General Service 000kW and Up Underground (Bulk or individual meter) Multi-units or townhouse complex with on private property Underground (Bulk or individual meter) Multi-units or townhouse complex with no on private property Underground Residential 50 to 000 kva Pad (9A to 9A5 and 9B to 9B3) $46,000 to $68,000 Subdivision mini-pad Tx & 4 tap boxes $,600 per lot Subdivision submersible Tx & 4 tap boxes $,600 per lot 400A, 0/40V with tap box $,600 per lot Subdivision mini-pad Tx & 4 tap boxes $,600 per lot Subdivision to individual meter base Subdivision submersible Tx & 4 tap boxes $,600 per lot Overhead/Underground 500kVA Pad (9A6, 9B4) $76,000 to Combination (requiring $78,000

7 Page 7 of 8 Class Description Type of Service facilities on Modular vault 500 to 500kVA (6) Overhead/Underground Customer Owned Substation (7A, 7B, 5) Combination (Customer Owned Substation) 5 - Large Users > 5MW Overhead/Underground Customer Owned Substation (7A, 7B, 5) Combination (Customer Owned Substation) Typical Variable Connection Fee $3,000 to $7,000 $44,000 to $90,000 $44,000 to $90,000 *Note: The Basic Connection Fee of $,335 with is recovered through distribution rates. The typical variable connection fee is zero, however, a fee could be charged based on site specific conditions for connection assets beyond the basic allowance.

8 Page 8 of Average Costs for Customer Connection The average costs for customer connection, including new services and upgrades to existing services, are calculated from the capital expenditures for the different types of services and the number of customer connection of each type per year. These costs are THESL gross capital costs to connect customers to THESL s existing infrastructure (refer to Table 3), before customer capital contributions (refer to,, Schedule 3-) For some large services, the costs to connect the customer may occur over many months, or between fiscal years. The reporting of the physical connection is made when the customer is energized. Therefore, the average cost per customer may be skewed in a given year and is affected by the site specific conditions. 3 4 Table 3 provides historical, bridge and test years Customer Connections and services. 5 6 Table 3: Customer Connections and Costs 008 Historical 009 Historical 00 Bridge 0 Test Customer Connections Total installed cost is expected to rise about 5 percent between the bridge and test years which is attributable to an increase in residential construction activities and the removal of the Enhancement Cost from THESL s economic model. Residential costs are forecast to increase from $9 million to $7 million, and commercial costs are forecast to increase from $3.4 million to $4.8 million in 00 and 0, respectively.

OPERATIONAL INVESTMENTS

OPERATIONAL INVESTMENTS Page of OPERATIONAL INVESTMENTS 0 AVERAGE COST PER CUSTOMER CONNECTION Customer Costs When THESL receives a request to connect a new customer load or upgrade connection capacity for an existing customer,

More information

DISTRIBUTION EXPENSES OPERATIONS AND MAINTENANCE

DISTRIBUTION EXPENSES OPERATIONS AND MAINTENANCE Page of DISTRIBUTION EXPENSES OPERATIONS AND MAINTENANCE 0 INTRODUCTION AND SUMMARY OF DISTRIBUTION OPERATIONS AND MAINTENANCE ( O&M ) EXPENDITURES The Distribution O&M expenditures covered in this exhibit

More information

Economic Evaluation Model for Distribution System Expansion

Economic Evaluation Model for Distribution System Expansion Toronto Hydro Conditions of Service Section 6, Reference #1 Economic Evaluation Model for Distribution System Expansion APPENDIX B Methodology and Assumptions for An Economic Evaluation Last Revised October

More information

INCREMENTAL CAPITAL ELIGIBLE PROJECTS DETAILS Capital Expenditure $3,931,290 ($3,530,841 in 2013) Background:

INCREMENTAL CAPITAL ELIGIBLE PROJECTS DETAILS Capital Expenditure $3,931,290 ($3,530,841 in 2013) Background: EB-0-0 0 IRM Application Filed: September, 0 Page of INCREMENTAL CAPITAL ELIGIBLE PROJECTS DETAILS Program Title: Switching Units and Transformers 0 0 0 Capital Expenditure $,,0 ($,0, in 0) Background:

More information

Understanding How CCRA Financials Work

Understanding How CCRA Financials Work Understanding How CCRA Financials Work 2 Having trouble understanding the financial process in a Capital Cost Recovery Agreement or what is called a CCRA for short? CCRAs are a standard tool in utility

More information

LOADS, CUSTOMERS AND REVENUE

LOADS, CUSTOMERS AND REVENUE Page of LOADS, CUSTOMERS AND REVENUE The purpose of this evidence is to present the Company s load, customer and distribution revenue forecast for the test years. The detailed test year forecasts are shown

More information

CONSERVATION AND DEMAND MANAGEMENT ( CDM ) PLAN

CONSERVATION AND DEMAND MANAGEMENT ( CDM ) PLAN Exhibit G Page of CONSERVATION AND DEMAND MANAGEMENT ( CDM ) PLAN 0 Introduction This CDM Exhibit provides the full scope of Toronto Hydro-Electric System Limited s ( THESL ) CDM programs to be carried

More information

GPI Conditions of Service - Revision History The following is a summary of key changes made to the document.

GPI Conditions of Service - Revision History The following is a summary of key changes made to the document. Identification of Grimsby Power 1.1 Added licence number. and Service Area 1.1.1 Distribution Overview Added Niagara West Municipal Transformer Station. Added section with general information about servicing,

More information

DISTRIBUTION OPERATIONS AND MAINTENANCE

DISTRIBUTION OPERATIONS AND MAINTENANCE EB-00-0 Exhibit F Schedule Page of 0 DISTRIBUTION OPERATIONS AND MAINTENANCE PREVENTIVE MAINTENANCE Preventive Maintenance is intended to maintain or improve customer service reliability, extend equipment

More information

Appendix Distribution System Plan

Appendix Distribution System Plan Page 1 of Exhibit Tab Schedule Appendix Contents Rate Base 1 1 Overview Gross Assets Property Plant and Equipment and Accumulated Depreciation Allowance for Working Capital Treatment of Stranded Assets

More information

Customer Capital Contributions Policy

Customer Capital Contributions Policy TasNetworks Customer Capital Contributions Policy Effective 1 July 2014 Tasmanian Networks Pty Ltd ABN 24 167 357 29 Page 1 of 25 Tasmanian Networks Pty Ltd ABN 24 167 357 299 1-7 Maria Street Lenah Valley

More information

EXTERNAL REVENUE. Updated: EB Exhibit E1 Tab 1 Schedule 2 Page 1 of STRATEGY

EXTERNAL REVENUE. Updated: EB Exhibit E1 Tab 1 Schedule 2 Page 1 of STRATEGY Page of.0 STRATEGY EXTERNAL REVENUE Hydro One Distribution s strategy is to focus on core work and continue to be responsive to external work requests and accommodate customer needs where Hydro One Distribution

More information

Distribution Capital Contribution Policy

Distribution Capital Contribution Policy Distribution Capital Contribution Policy October 2017 to September 2018 First Gas Limited December 2017 First Gas Limited 1 Introduction First Gas operates 2,500km of gas transmission pipelines (including

More information

CONDITIONS OF SERVICE

CONDITIONS OF SERVICE Affiliate Relationships Code means the code, approved by the Board and in effect at the relevant time, which among other things, established the standards and conditions for the interaction between electricity

More information

CONDITIONS OF SERVICE

CONDITIONS OF SERVICE CONDITIONS OF SERVICE REVISION #16 Effective Date: February 15, 2017 Comments to these revisions can be emailed to: ConditionsofService@torontohydro.com Customers without e-mail access can submit inquiries

More information

CONDITIONS OF SERVICE

CONDITIONS OF SERVICE CONDITIONS OF SERVICE REVISION #17 Effective Date: January 1, 2018 Comments to these revisions can be emailed to: ConditionsofService@torontohydro.com Customers without e-mail access can submit inquiries

More information

SUMMARY Table 1 presents the proposed 2010 Smart Grid costs for Operations and Information Technology. Operations Projects 3,

SUMMARY Table 1 presents the proposed 2010 Smart Grid costs for Operations and Information Technology. Operations Projects 3, EB-00-0 Exhibit G Tab Schedule Page of SMART GRID PLAN SUMMARY Table presents the proposed 00 Smart Grid costs for Operations and Information Technology. Table : 00 Smart Grid Projects Smart Grid Projects

More information

SUMMARY OF TRANSMISSION BUSINESS

SUMMARY OF TRANSMISSION BUSINESS Filed: September, 0 EB-0-00 Schedule Page of SUMMARY OF TRANSMISSION BUSINESS.0 INTRODUCTION 0 Hydro One Networks Inc. is licensed by the Ontario Energy Board (the OEB or the Board ) to own, operate and

More information

Hydro One Brampton Networks Incorporated

Hydro One Brampton Networks Incorporated Hydro One Brampton Networks Incorporated Guide to Appendices. Appendix 1: Methodology and Assumptions for an Economic Evaluation. Hydro One Brampton recovers its costs for expansions to its distribution

More information

SUMMARY OF DISTRIBUTION BUSINESS

SUMMARY OF DISTRIBUTION BUSINESS Filed: 0-0- EB-0-0 Schedule Page of SUMMARY OF DISTRIBUTION BUSINESS.0 INTRODUCTION Hydro One Networks Inc. is licensed by the Ontario Energy Board (the Board ) to own, operate and maintain electricity

More information

WATER AND SEWER CAPACITY FEE STUDY

WATER AND SEWER CAPACITY FEE STUDY DRAFT WATER AND SEWER CAPACITY FEE STUDY MCKINLEYVILLE COMMUNITY SERVICES DISTRICT APRIL 4, 2011 OVERVIEW McKinleyville Community Services District (the District) retained Willdan to prepare a capacity

More information

Volume OAKVILLE HYDRO ELECTRICITY DISTRIBUTION INC. Conditions of Service

Volume OAKVILLE HYDRO ELECTRICITY DISTRIBUTION INC. Conditions of Service Volume 1 OAKVILLE HYDRO ELECTRICITY DISTRIBUTION INC. Conditions of Service OAKVILLE HYDRO ELECTRICITY DISTRIBUTION INC. Conditions of Service 861 Redwood Square Oakville Ontario L6K 0C7 Phone (905) 825-9400

More information

TasNetworks Distribution Connection Pricing Policy Final AER approved Commencing 1 July 2017

TasNetworks Distribution Connection Pricing Policy Final AER approved Commencing 1 July 2017 TasNetworks Distribution Connection Pricing Policy Final AER approved Commencing 1 July 2017 Page 1 of 54 Copyright This document is protected by copyright vested in Tasmanian Networks Pty Ltd. No part

More information

WATER AND SEWER CAPACITY FEE STUDY

WATER AND SEWER CAPACITY FEE STUDY DRAFT WATER AND SEWER CAPACITY FEE STUDY MCKINLEYVILLE COMMUNITY SERVICES DISTRICT MAY 5, 2011 OVERVIEW McKinleyville Community Services District (the District) retained Willdan to prepare a capacity fee

More information

Annual Pricing Proposal

Annual Pricing Proposal Annual Pricing Proposal for 1 July 2015 to 30 June 2016 Tasmanian Networks Pty Ltd Who is TasNetworks? Regulation of network charges TasNetworks commenced operations on 1 July 2014. It has been formed

More information

Development Cost Charge (DCC) Update

Development Cost Charge (DCC) Update Development Cost Charge (DCC) Update Purpose Provide developers and other professionals with an overview of Development Cost Charges (DCCs) Review highlights of 2016 DCC program Projected growth and projects

More information

OVERALL EXTERNAL SERVICES COSTS

OVERALL EXTERNAL SERVICES COSTS EB-00-0 Exhibit C Page of OVERALL EXTERNAL SERVICES COSTS 0 INTRODUCTION THESL uses external services to complement its internal capacity to execute work programs. External services comprise those services

More information

Nashville Electric Service Electric Service Policies

Nashville Electric Service Electric Service Policies Nashville Electric Service Electric Service Policies The Electric Power Board of the Metropolitan Government of Nashville and Davidson County TABLE OF CONTENTS New Service Polices 1.0 General Requirements

More information

EE 741. Load Characteristics

EE 741. Load Characteristics EE 741 Load Characteristics Overview Some definitions Relation between load and loss factors Load models Load management Rate structure Metering Load forecasting Definitions Demand curve, maximum demand,

More information

ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY

ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY DRAFT Report ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY Navajo Tribal Utility Authority August 2007 DRAFT NAVAJO TRIBAL UTILITY AUTHORITY ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY Table of Contents

More information

Electricity Distribution Rate Design for Commercial & Industrial Customers

Electricity Distribution Rate Design for Commercial & Industrial Customers Electricity Distribution Rate Design for Commercial & Industrial Customers Consultations Fall 2017 Purpose Why Change Approach Potential Impact 2 Balancing OEB Objectives Connection & capacity Cost shifting

More information

Energy Efficiency and Resource Planning A Municipal Perspective

Energy Efficiency and Resource Planning A Municipal Perspective Energy Efficiency and Resource Planning A Municipal Perspective Gabriel Caunt Colorado Springs Utilities Demand Side Management and Renewable Energy Solutions 1 Colorado Springs, Colorado Colorado Springs

More information

Newfoundland Power Marginal Cost of Electricity Service Study

Newfoundland Power Marginal Cost of Electricity Service Study 12. Marginal Cost Study Newfoundland Power Marginal Cost of Electricity Service Study Newfoundland Power 2008 General Rate Application Newfoundland Power Marginal Cost of Electricity Service Study Prepared

More information

OVERALL EXTERNAL SERVICES COSTS

OVERALL EXTERNAL SERVICES COSTS EB-00-0 Exhibit C Page of OVERALL EXTERNAL SERVICES COSTS 0 INTRODUCTION THESL uses external services to complement its internal capacity to execute work programs. External services comprise those services

More information

CitiPower Connection Policy

CitiPower Connection Policy CitiPower Connection Policy Version control Version Comment 1.0 Published 1 July 2016 1.1 Published 1 January 2017 2 CitiPower Connection policy 1 January 2017 Table of Contents 1 INTRODUCTION... 5 1.1

More information

Grid Connection for Solar PV

Grid Connection for Solar PV Grid Connection for Solar PV Ivan Codd Renewable Planning Manager, Asset Management, ESB Networks Energy Cork Ireland s Solar Energy Future 29 th January 2016 AGENDA Generator Connection Processes The

More information

Policy for determining capital contributions on Vector s electricity distribution networks. From 1 December 2017

Policy for determining capital contributions on Vector s electricity distribution networks. From 1 December 2017 Policy for determining capital contributions on Vector s electricity distribution networks From 1 December 2017 Pursuant to: Electricity Distribution Information Disclosure Determination 2012 1 Table of

More information

AEL.NP.001 New Connections and Extensions Policy

AEL.NP.001 New Connections and Extensions Policy AEL.NP.001 New Connections and Extensions Policy 10 February 2014 Version 3 Contents Introduction... 3 Amendment Record... 5 1. Technical Requirements for New Connections to the Network... 6 1.1 Method

More information

County Service Area 16 Shandon Water Rate Analysis

County Service Area 16 Shandon Water Rate Analysis County Service Area 16 Shandon Water Rate Analysis Prepared By: County Public Works December 2014 December 2014 Water Rate Analysis County Service Area (CSA) 16 Shandon, Water System Purpose The purpose

More information

CONDITIONS OF SERVICE

CONDITIONS OF SERVICE Accounting Procedures Handbook means the handbook approved by the Board and in effect at the relevant time, which specifies the accounting records, accounting principles and accounting separation standards

More information

Table 1: Distribution Revenue at Current Rates. PowerStream Consolidated 2009 OEB Approved PS South 2009 Actual 2010 Actual 2011 Actual

Table 1: Distribution Revenue at Current Rates. PowerStream Consolidated 2009 OEB Approved PS South 2009 Actual 2010 Actual 2011 Actual EB-0-0 Exhibit C Schedule Page of Filed May, 0 0 THROUGHPUT REVENUE OVERVIEW The components that derive revenue at current rates are identified in Exhibit C,, Schedules to. PowerStream has applied current

More information

Electricity Distribution Business Pricing Methodology

Electricity Distribution Business Pricing Methodology Electricity Distribution Business Pricing Methodology 31 March 2014 1. GLOSSARY Commerce Commission (Commission) EDB Electricity Authority (EA) Responsible for the regulation of EDBs as provided for under

More information

Distribution Cost of Supply (DCoS) Model. Methodology and Application. The application of the DCoS Model in the tariff setting process

Distribution Cost of Supply (DCoS) Model. Methodology and Application. The application of the DCoS Model in the tariff setting process Methodology and Application The application of the DCoS Model in the tariff setting process Aurora Energy Pty Ltd ABN 85 082 464 622 Level 2 / 21 Kirksway Place Hobart TAS 7000 www.auroraenergy.com.au

More information

CitiPower Amended Revised Proposed Tariff Structure Statement

CitiPower Amended Revised Proposed Tariff Structure Statement CitiPower Amended Revised Proposed Tariff Structure Statement 2017 2020 This page is intentionally left blank. 2 CitiPower Amended Revised Proposed Tariff Structure Statement 2017 2020 Table of Contents

More information

ELECTRICAL SERVICE EXTENSION POLICY

ELECTRICAL SERVICE EXTENSION POLICY I. OBJECTIVE A. To provide a fair and consistent method of extending, upgrading and downgrading power lines and other service facilities within the Mason County PUD No.1 (PUD 1) service area. B. To encourage

More information

DEPARTMENT SUMMARY. Water and Power

DEPARTMENT SUMMARY. Water and Power Water and Power DEPARTMENT SUMMARY Water and Power Mission Statement As a community-owned utility, it is the mission of Pasadena Water and Power (PWP) to provide superior customer service, reliable electricity,

More information

Submission to the Economic Regulation Authority

Submission to the Economic Regulation Authority Submission to the Economic Regulation Authority APPROVAL OF NEW FACILITIES INVESTMENT Installation of a second 330/132 kv transformer at Kemerton Terminal and construction of a 132 kv transmission line

More information

Policy for determining capital contributions on Vector s electricity distribution networks. From 1 February 2016

Policy for determining capital contributions on Vector s electricity distribution networks. From 1 February 2016 Policy for determining capital contributions on Vector s electricity distribution networks From 1 February 2016 Pursuant to: Electricity Distribution Information Disclosure Determination 2012 1 Table of

More information

Electrical Distribution Capital Plan (EDCP) Toronto Hydro Electric System Limited

Electrical Distribution Capital Plan (EDCP) Toronto Hydro Electric System Limited Toronto Hydro-Electric System Limited EB-2011-0144 Exhibit D1 Tab 7 Schedule 6 ORIGINAL (84 pages) Electrical Distribution Capital Plan (EDCP) 2012 2021 Toronto Hydro Electric System Limited Version 1.42

More information

CONDITIONS OF SERVICE. January 1, 2015 Rev 5. F:\ENG\SPECS\operm\Conditions of Service PDI - Rev 5 January doc

CONDITIONS OF SERVICE. January 1, 2015 Rev 5. F:\ENG\SPECS\operm\Conditions of Service PDI - Rev 5 January doc CONDITIONS OF SERVICE January 1, 2015 Rev 5 PETERBOROUGH DISTRIBUTION INC. Conditions of Service CONDITIONS OF SERVICE Table of Contents SECTION 1.0 INTRODUCTION... 1 1.1 IDENTIFICATION OF DISTRIBUTOR

More information

Distribution Cost of Supply (DCoS) Model Metholology and Application. The application of the DCoS Model in the tariff setting process

Distribution Cost of Supply (DCoS) Model Metholology and Application. The application of the DCoS Model in the tariff setting process Distribution Cost of Supply (DCoS) Model Metholology and Application The application of the DCoS Model in the tariff setting process TasNetworks Pty Ltd PO Box 606 Moonah TAS 7009 ABN 24 167 357 299 Enquiries

More information

TRANSMISSION BUSINESS PERFORMANCE

TRANSMISSION BUSINESS PERFORMANCE Filed: September 0, 009 Exhibit A Tab Schedule Page of.0 INTRODUCTION TRANSMISSION BUSINESS PERFORMANCE 6 7 8 9 Hydro One is focused on the strategic goals and performance targets in the area of safety,

More information

POWERNET LIMITED LINE PRICING METHODOLOGY

POWERNET LIMITED LINE PRICING METHODOLOGY POWERNET LIMITED LINE PRICING METHODOLOGY FOR THE ELECTRICITY INVERCARGILL LIMITED NETWORK AS AT 1 APRIL 2018 THE ELECTRICITY INVERCARGILL LIMITED NETWORK AS AT 1 APRIL 2018 TABLE OF CONTENTS 1. GLOSSARY

More information

Eagle Mountain Pumped Storage Project Draft License Application Exhibit D Project Costs and Financing

Eagle Mountain Pumped Storage Project Draft License Application Exhibit D Project Costs and Financing Eagle Mountain Pumped Storage Project Draft License Application Exhibit D Project Costs and Financing Palm Desert, California Submitted to: Federal Energy Regulatory Commission Submitted by: Eagle Crest

More information

Index January 23, 2015 MANITOBA HYDRO 2015/16 & 2016/17 GENERAL RATE APPLICATION

Index January 23, 2015 MANITOBA HYDRO 2015/16 & 2016/17 GENERAL RATE APPLICATION Tab Index January, 0 MANITOBA HYDRO 0/ & 0/ GENERAL RATE APPLICATION ELECTRIC LOAD FORECAST INDEX.0 Overview.... Electric Load Forecast Summary.... Residential Sector.... General Service Sector.... Gross

More information

Pricing Methodology. For Delivery Prices, effective as at 1 April 2018

Pricing Methodology. For Delivery Prices, effective as at 1 April 2018 Pricing Methodology For Delivery Prices, effective as at 1 April 2018 Pursuant to the requirements of clause 2.4 of the Electricity Information Disclosure Determination 2012 (consolidated in 2015) [Page

More information

2 CDM Adjustment for the Load Forecast for Distributors 2 1 Accuracy of the Load Forecast and Variance Analysis 3 1 Distribution and Other Revenue

2 CDM Adjustment for the Load Forecast for Distributors 2 1 Accuracy of the Load Forecast and Variance Analysis 3 1 Distribution and Other Revenue Page of Exhibit Tab Schedule Appendix Contents Operating Revenue Load and Revenue Forecasts Multivariate Regression Model CDM Adjustment for the Load Forecast for Distributors Accuracy of the Load Forecast

More information

Schedule 2 TECHNICAL INFORMATION

Schedule 2 TECHNICAL INFORMATION Schedule 2 TECHNICAL INFORMATION This document is intended to provide context to the Haida Gwaii Request for Expressions of Interest (RFEOI) for the potential electricity supply opportunity for clean electricity

More information

Long Island Power Authority Seventh Revised Leaf No. 16

Long Island Power Authority Seventh Revised Leaf No. 16 Seventh Revised Leaf No. 16 I. General Information (continued): B. Abbreviations and Definitions (continued): Demand Customer: A Customer who is billed for Demand charges. Demand Meter: The device that

More information

Scanpower Limited. Pricing Methodology Disclosure. For Pricing Effective 1 April 2010 to 31 March 2011

Scanpower Limited. Pricing Methodology Disclosure. For Pricing Effective 1 April 2010 to 31 March 2011 Scanpower Limited Pricing Methodology Disclosure For Pricing Effective 1 April 2010 to 31 March 2011 Page 1 of 7 Introduction 1. The purpose of this document is to describe the methodology used by Scanpower

More information

CONDITIONS OF SERVICE

CONDITIONS OF SERVICE CONDITIONS OF SERVICE Table of Contents CONDITIONS OF SERVICE... 1 1. Introduction... 7 1.1 Identification of Distributor and Service Territory... 7 1.1.1 Distribution System Overview... 7 1.2 Related

More information

SIOUX LOOKOUT HYDRO INC.

SIOUX LOOKOUT HYDRO INC. SIOUX LOOKOUT HYDRO INC. CONDITIONS OF SERVICE 1 P age Table of Contents SECTION 1 INTRODUCTION 6 1.1 Identification of Distributor and Service Area 6 1.2 Related Codes and Governing Laws 6 1.3 Interpretations

More information

GIS at Saint John Energy. Presented by: JP McGrath

GIS at Saint John Energy. Presented by: JP McGrath GIS at Saint John Energy Presented by: JP McGrath The Business Saint John Energy is an electrical distribution utility providing service to approximately 36,000 residential, commercial and industrial customers.

More information

DISTRIBUTION LOSS ADJUSTMENT FACTORS ESB SUBMISSION THE COMMISSION FOR ELECTRICITY REGULATION

DISTRIBUTION LOSS ADJUSTMENT FACTORS ESB SUBMISSION THE COMMISSION FOR ELECTRICITY REGULATION DISTRIBUTION LOSS ADJUSTMENT FACTORS ESB SUBMISSION TO THE COMMISSION FOR ELECTRICITY REGULATION Document No: DOC-140105-AIL 7/02/2000 Introduction: The Commission for Electricity Regulation (CER) have

More information

UK Power Networks. Technology Watch (Smart) Networks Context & Innovation. 28 th April, 2015 David Boyer, Smart Networks Policy Lead

UK Power Networks. Technology Watch (Smart) Networks Context & Innovation. 28 th April, 2015 David Boyer, Smart Networks Policy Lead UK Power Networks Technology Watch (Smart) Networks Context & Innovation 28 th April, 2015 David Boyer, Smart Networks Policy Lead UK Power Networks Total % of industry End customers (millions) Service

More information

Distribution System Operator (DSO) Construct as a Bridge for End-to-End Transactive Operation

Distribution System Operator (DSO) Construct as a Bridge for End-to-End Transactive Operation Distribution System Operator (DSO) Construct as a Bridge for End-to-End Transactive Operation Farrokh Rahimi, Ph.D. Senior Vice President Market Design and Consulting Ali Ipakchi, Ph.D. Senior Vice President

More information

Long Island Power Authority Seventh Revised Leaf No. 16

Long Island Power Authority Seventh Revised Leaf No. 16 Seventh Revised Leaf No. 16 I. General Information (continued): B. Abbreviations and Definitions (continued): Demand Customer: A Customer who is billed for Demand charges. Demand Meter: The device that

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Port Vila Urban Development Project (RRP VAN 42391) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The current state of urban infrastructure and services is one of the major impediments to sustainable

More information

TRANSMISSION BUSINESS PERFORMANCE

TRANSMISSION BUSINESS PERFORMANCE Page of.0 INTRODUCTION TRANSMISSION BUSINESS PERFORMANCE 0 Hydro One is focused on the strategic goals and performance targets in the area of safety, customer satisfaction, reliability, shareholder value,

More information

OVERALL EXTERNAL SERVICES COSTS

OVERALL EXTERNAL SERVICES COSTS EB-00-00 Tab Schedule Filed: 00 Aug Page of OVERALL EXTERNAL SERVICES COSTS INTRODUCTION THESL uses external services to complement its internal capacity to execute work programs. External services represent

More information

DENSITY STUDY. Filed: June 15, 2012 EB Exhibit D Tab 1 Schedule 1 Page 1 of 10

DENSITY STUDY. Filed: June 15, 2012 EB Exhibit D Tab 1 Schedule 1 Page 1 of 10 Filed: June, 0 EB-0-0 Tab Schedule Page of 0 DENSITY STUDY Hydro One has completed a study of the relationship between customer density and cost allocation to satisfy the direction from the Board in their

More information

DISTRIBUTION SYSTEM ASSET CONDITION ASSESSMENT UPDATE

DISTRIBUTION SYSTEM ASSET CONDITION ASSESSMENT UPDATE EB-0-0 Exhibit D Page of DISTRIBUTION SYSTEM ASSET CONDITION ASSESSMENT UPDATE 0 EXECUTIVE SUMMARY Background Over the past number of years, THESL has put considerable effort into its Asset Management

More information

Seattle City Light Outage Management System. May 2014

Seattle City Light Outage Management System. May 2014 Seattle City Light Outage Management System May 2014 1 Objectives for this Presentation Overview of the drivers for the Outage Management System Describe the system and the implementation Summarize the

More information

Joint TSO/DSO Group Processing Approach Pricing Principles Guidelines

Joint TSO/DSO Group Processing Approach Pricing Principles Guidelines Joint TSO/DSO Group Processing Approach Pricing Principles Guidelines Published: 27/02/2007 Table of Contents 1 Introduction...3 2 Connection Method Principles...5 3 Connection Charging Principles...8

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

GREATER LONDON SUB-REGION INTEGRATED REGIONAL RESOURCE PLAN. Part of the London Area Planning Region January 20, 2017

GREATER LONDON SUB-REGION INTEGRATED REGIONAL RESOURCE PLAN. Part of the London Area Planning Region January 20, 2017 GREATER LONDON SUB-REGION INTEGRATED REGIONAL RESOURCE PLAN Part of the London Area Planning Region January 20, 2017 Integrated Regional Resource Plan Greater London Sub-region This Integrated Regional

More information

CEOP CONNECTION POLICY CONNECTION CHARGES. 1 July 2015

CEOP CONNECTION POLICY CONNECTION CHARGES. 1 July 2015 CEOP2513.06 CONNECTION POLICY CONNECTION CHARGES 1 July 2015 Contents 1. Introduction... 3 1.1. General approach to funding connections... 3 1.1.1. Third party fees and charges... 3 1.1.2. Network Augmentations...

More information

Wellington North Power Inc. TARIFF OF RATES AND CHARGES Effective and Implementation Date October 1, 2012

Wellington North Power Inc. TARIFF OF RATES AND CHARGES Effective and Implementation Date October 1, 2012 Page 1 of 10 RESIDENTIAL SERVICE CLASSIFICATION This classification refers to the supply of electrical energy to Customers residing in residential dwelling units. Energy is generally supplied as single

More information

SUPPLY CHAIN SERVICES INVENTORY MANAGEMENT & MATERIALS COSTS

SUPPLY CHAIN SERVICES INVENTORY MANAGEMENT & MATERIALS COSTS EB-00-0 Exhibit C Tab Schedule Page of SUPPLY CHAIN SERVICES INVENTORY MANAGEMENT & MATERIALS COSTS INTRODUCTION Supply Chain Inventory Management plays a key role in supporting THESL s asset modernization

More information

Portland General Electric Company P.U.C. Oregon No E-18 Original Sheet No. L-1 RULE L SPECIAL TYPES OF ELECTRICITY SERVICE

Portland General Electric Company P.U.C. Oregon No E-18 Original Sheet No. L-1 RULE L SPECIAL TYPES OF ELECTRICITY SERVICE P.U.C. Oregon No E-18 Original Sheet No. L-1 RULE L SPECIAL TYPES OF ELECTRICITY SERVICE 1. Service of Limited Duration (Temporary Service) A. Definition "Service of Limited Duration" or "Temporary Service"

More information

CUSTOMER SERVICE POLICIES

CUSTOMER SERVICE POLICIES Resolution U-10670 Effective December 18, 2013 Section Title Page No. 1.0 Statement of General Policy... 2 2.0 Electrical Service... 3 2.1 Electrical Service Availability and Characteristics... 3 2.2 Large-Load

More information

This Rate Schedule applies anywhere the City of Palo Alto provides Water Service.

This Rate Schedule applies anywhere the City of Palo Alto provides Water Service. A. GENERAL: 1. TERRITORY: B. FEES: This Rate Schedule applies anywhere the City of Palo Alto provides Water Service. Plan review fees must be paid prior to permit approval by the Utilities Department.

More information

DISTRIBUTION SYSTEM PLANNING TUTORIAL. MN Power Systems Conference November 6, 2014

DISTRIBUTION SYSTEM PLANNING TUTORIAL. MN Power Systems Conference November 6, 2014 DISTRIBUTION SYSTEM PLANNING TUTORIAL MN Power Systems Conference November 6, 2014 CONNEXUS ENERGY 128,000 customers 1,000 sq. miles territory 44 substations 8,800 miles distribution 12.47 kv Wholesale

More information

SERVICE ENTRANCES. OPPD S Electrical Service Designer (ESD) shall designate the Point Of Entrance.

SERVICE ENTRANCES. OPPD S Electrical Service Designer (ESD) shall designate the Point Of Entrance. SERVICE ENTRANCES 3.01 POINT OF ENTRANCE General Service The customer, or the customer s electrician, should provide OPPD with a site plan, load schedule, and voltage requirements when requesting service.

More information

Telephone Fax April 3, 2017

Telephone Fax April 3, 2017 Damon L. Krieger Assistant General Counsel BGE Legal Department 2 Center Plaza, 12 th Floor 110 West Fayette Street Baltimore, MD 21201 Telephone 410.470.1402 Fax 443.213.3206 www.bge.com damon.krieger@bge.com

More information

NOTICE OF PUBLIC HEARING WATER BUREAU OF THE METROPOLITAN DISTRICT PROPOSED 2019 WATER RATES AND REVISIONS TO WATER ORDINANCES

NOTICE OF PUBLIC HEARING WATER BUREAU OF THE METROPOLITAN DISTRICT PROPOSED 2019 WATER RATES AND REVISIONS TO WATER ORDINANCES NOTICE OF PUBLIC HEARING WATER BUREAU OF THE METROPOLITAN DISTRICT PROPOSED 2019 WATER RATES AND REVISIONS TO WATER ORDINANCES The Metropolitan District 555 Main Street Hartford, Connecticut Pursuant to

More information

Final Report Rate, Charge, and Cost of Service Study. For: Parker Water and Sanitation District. December 2014

Final Report Rate, Charge, and Cost of Service Study. For: Parker Water and Sanitation District. December 2014 Final Report Rate, Charge, and Cost of Service Study For: December December 29, Steve Hellman Chief Financial Officer 18100 E. Woodman Drive Parker, Colorado 80134 On behalf of MWH Global, I d like to

More information

SUMMARY OF SHARED SERVICES OM&A

SUMMARY OF SHARED SERVICES OM&A Filed: May, 0 EB-0-000 Exhibit C Schedule Page of 0 SUMMARY OF SHARED SERVICES OM&A Hydro One Shared Services are comprised of Common Corporate Functions and Services ( CCFS ), Asset Management Services,

More information

INTRODUCTION TO COST ALLOCATION AND RATE DESIGN

INTRODUCTION TO COST ALLOCATION AND RATE DESIGN Tab Page of INTRODUCTION TO COST ALLOCATION AND RATE DESIGN 0 Hydro One Networks Inc. has prepared its cost allocation and rate design evidence in accordance with Chapter of the Board s Filing Requirements

More information

November 7, 2018 NOTICE OF PUBLIC HEARING WATER BUREAU OF THE METROPOLITAN DISTRICT PROPOSED 2019 WATER RATES AND REVISIONS TO WATER ORDINANCES

November 7, 2018 NOTICE OF PUBLIC HEARING WATER BUREAU OF THE METROPOLITAN DISTRICT PROPOSED 2019 WATER RATES AND REVISIONS TO WATER ORDINANCES November 7, 2018 NOTICE OF PUBLIC HEARING WATER BUREAU OF THE METROPOLITAN DISTRICT PROPOSED 2019 WATER S AND REVISIONS TO WATER ORDINANCES The Metropolitan District 555 Main Street Hartford, Connecticut

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION WEST PENN POWER COMPANY DOCKET NO. R Direct Testimony of Thomas J.

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION WEST PENN POWER COMPANY DOCKET NO. R Direct Testimony of Thomas J. West Penn Statement No. BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION WEST PENN POWER COMPANY DOCKET NO. R-0- Direct Testimony of Thomas J. Dolezal List of Topics Addressed Cost of Service Studies

More information

SUPPLY CHAIN SERVICES

SUPPLY CHAIN SERVICES EB-00-0 Tab Page of SUPPLY CHAIN SERVICES INTRODUCTION Supply Chain supports THESL s asset management strategy by ensuring that all required goods and services are available when needed, while at the same

More information

Uncontrolled Document when printed. Refer to internet for latest version. Disclaimer refer

Uncontrolled Document when printed. Refer to internet for latest version. Disclaimer refer Issue June 2013 Page 83 of 91 SA Power Networks 2013 Network Tariff & Negotiated Services Manual No. 18 Issue June 2013 Page 84 of 91 SA Power Networks 2013 Network Tariff & Negotiated Services Manual

More information

2015 RATE DESIGN APPLICATION (RDA) TRANSMISSION EXTENSION POLICY WORKSHOP #1

2015 RATE DESIGN APPLICATION (RDA) TRANSMISSION EXTENSION POLICY WORKSHOP #1 2015 RATE DESIGN APPLICATION (RDA) TRANSMISSION EXTENSION POLICY WORKSHOP #1 18 November, 2014 Agenda Approximate Time Item Presenter(s) 9 :00 10:15 Welcome Background & Legal context Bonbright Criteria

More information

Chapter #2: Cost Concepts and Design Economics

Chapter #2: Cost Concepts and Design Economics ENGINEERING ECONOMY Chapter #2: Cost Concepts and Design Economics By: Eng. Ahmed Y Manama Outline Fixed, Variable, and Incremental Cost Recurring and Nonrecurring Costs Direct, Indirect and Overhead Costs

More information

PV AND OTHER RENEWABLES THE FINANCIAL ADVANTAGE

PV AND OTHER RENEWABLES THE FINANCIAL ADVANTAGE PV AND OTHER RENEWABLES THE FINANCIAL ADVANTAGE Different Types of Renewables Most popular types: Solar, Wind & Biogas. Solar - uses the sun to generate electricity. Advantages: Sun is free. Passive source

More information

Statement of Use of System Charging Methodology for. Western Power Distribution (South Wales) plc. (April 2008)

Statement of Use of System Charging Methodology for. Western Power Distribution (South Wales) plc. (April 2008) Statement of Use of System Charging Methodology for Western Power Distribution (South Wales) plc (April 2008) Western Power Distribution (South Wales) plc Western Power Distribution (South Wales) plc Registered

More information

Newmarket-Tay Power Distribution Ltd. NT POWER COS Conditions of Service. Issue Date: July, Next Review Date: February, 2015

Newmarket-Tay Power Distribution Ltd. NT POWER COS Conditions of Service. Issue Date: July, Next Review Date: February, 2015 Newmarket-Tay Power Distribution Ltd. Number: NT POWER COS 400 00 Conditions of Service Glossary of Terms Issue Date: July, 2007 Next Review Date: February, 2015 1. Preamble These Newmarket-Tay Power Distribution

More information

Public disclosure of WEL Networks 1 April 2012 pricing methodology

Public disclosure of WEL Networks 1 April 2012 pricing methodology Public disclosure of WEL s 1 April 2012 pricing methodology This document relates to WEL s Limited s (WEL) obligations under the Electricity (Information Disclosure) Regulations of the Commerce Commission

More information

DISTRIBUTED ENERGY RESOURCE INTERCONNECTION PROCESS REQUIREMENTS

DISTRIBUTED ENERGY RESOURCE INTERCONNECTION PROCESS REQUIREMENTS DISTRIBUTED ENERGY RESOURCE INTERCONNECTION PROCESS REQUIREMENTS FOR DISTRIBUTED GENERATION AND LARGE MICRO-GENERATION FortisAlberta s Distributed Energy Resource (DER) Process explains what is required

More information