1 Gladiator Gold Mine Project Crown King, Yavapai County, Arizona Overview of Geologic Potential Written By: Damir Cukor, P. Geo. Latest Revised Date: Nov. 10, 2015

2 Gladiator Gold Mine Geological & Resource Overview: 1. Introduction Proposed reopening of the Gladiator Gold Mine Project comprises: Phase 1, surface mining of the crown pillar, remaining from the 1930 s and the 1980 s underground mining; Phase 2, extension of these underground workings to depth; Phase 3, expanding the underground development to adjacent vein structures The Phase 1 mining concept is based on the historic resource estimate made in 1997 by Jim Park (Gladiator Mine geologist during the 1980 s mining), and supported by production figures from past mining activity (directly below the crown pillar). 2. Location and Claims The Gladiator Gold Mine Project Property is located approximately 65 miles NW of Phoenix, in Yavapai County, Arizona. Access is by road to Crown King, from where Crown King Roads Department maintained roads lead to and onto the property. The property comprises 2300 contiguous acres, with 24 patented mining claims and 89 BLM claims. The surface expression of the Gladiator -War Eagle structure lies fully on patented ground. Please see Appendix A and B 3. Infrastructure The nearest supply centres are Prescott and Phoenix; some of the exploration, construction and mining personnel can be sourced locally, but most will be from either Prescott or Phoenix. Housing and Electric power is available in Crown King; diesel generators are required for powering the process facilities, as estimates received from APS (Arizona Public Service) to extend power to the Gladiator millsite have been deemed to be cost prohibitive. Cellular telephone and internet are available most everywhere on the project area and in Crown King. Two wells on the property are capable of supplying a total of 25 gallons per minute; these wells have provided sufficient water for the last cycle of mining in the late 1980 s. 4. Mineralized Structure The Gladiator-War Eagle vein is part of an en-echelon vein system trending approximately 22 degrees and comprising some eight individual vein systems within the boundaries of the project. The currently-mapped mineralized corridor exceeds 11,000 ft in length and is almost 7000 ft wide. Underground workings from past mining on the Gladiator -War Eagle vein extends 2500ft along strike and to a known depth of approximately 600ft below surface; the vein structure dips steeply to the west, at an attitude conducive to narrow-vein underground mining methods. The vein structure is conceptualized as possibly extending at least another 1200ft beyond the currently mined depth, using the Crown King Mine as a model for the area; additional drilling and

3 sampling will be required to test the structure down-dip. Four main ore shoots have been the focus of previous mining, an average ore grade of 0.43 oz/t Au is recorded in archived smelter receipts. 5. Geology and Metalogeny Structures comprising the mineralized corridor are hosted by a package of Proterozoic meta-volcanics and pelitic meta-sediments, overturned into a steeply dipping monocline. Mineralized structures are interpreted to be concordant or semi-concordant with schistosity. Work done by Noranda Explorations in the early 1980 s identifies the first mineralizing event as volcanic exhalative in origin; subsequent events include remobilization of this mineralization. Additionally, several subsequent mineralizing events are suggested from the complex interelemental correlations identified by the Noranda geochemical study. 6. Alteration Extended weathering has zoned the deposit: a deeply weathered horizon, the oxide zone or iron cap is found at surface, and reportedly extends to approximately 200ft below surface; a gradational transition zone gives way to the sulphide zone at depth; the haulage level is fully within the sulphide zone. Phase 1 will be conducted as open cut mining of the crown pillar, fully within the top of the oxide zone. It is important to note that during oxidation, sulphides alter to oxides, and silicates to clay materials; while some of the metals variably dissolve and are remobilized. The result of oxidation is that the rock hardness is diminished and gold previously associated with sulphides appears to have been liberated; thus mining and crushing costs for surface operation in oxides is reduced significantly from that of the underground ores in the sulphide zone, meanwhile gold grade is expected to remain within a range similar to that of the sulphide zone. It is noteworthy that the Noranda geochemical study links enhanced gold values (20% elevation in grade) in iron gossan zones to supergene enrichment; the oxide zone thus could potentially exhibit greater values than those found in the sulphide zones directly below. 7. Phase 1- Mining and Processing: The process circuit designed for the Gladiator- War Eagle oxide zone is based on gravity concentration, specifically centrifugal concentrators, while the sulphide zone circuit is based on both gravity and flotation. Mining is conceptualized to commence with bulldozer stripping of overburden, as well as some cutting of the footwall and hanging wall; an excavator is to perform surface-cut mining generally in 20ft benches and in 400ft alternating cuts. A fleet of 2 or 3 all-wheel drive 7 ton 10 ton dump trucks will be utilised to haul ore to the mill; a 40-ton articulated mining truck will be added to the fleet (once cash-flow is established) to minimize road construction and allow for efficient ore haulage from distal locations on the structure. The crushing and milling circuit comprises a coarse ore bin, jaw crusher, a cone crusher, a -3/8in screen, impact mills and a ball mill. Processing is by gravity circuit: a jig and centrifugal concentrator are planned in a

4 recirculating circuit with oversize material returned to the ball mill for additional grinding until -150 mesh size is achieved all fine material passes through a scavenging circuit comprising of another centrifugal concentrator and jig combination Concentrates, depending on grade go directly to secured storage or are upgraded on a shaker table. Dewatering will take place on the final tails and will comprise of a dewatering cyclone, thickener followed by filtration with the process water then sent to a clarifying circuit for reuse in the circuit; this will eliminate discharge and minimize the make-up water requirements for ongoing operation. Please see Appendix C 8. Phase 2 Conceptualized Mining and Processing: The planned Phase 2 mining comprises deepening the mining conducted in the 1930 s and the late 1980 s; the ore is entirely within the sulphide zone. Historic reserves estimates have been calculated by Jim Park, based on underground sampling, and drilling. Park revised the estimates several times over the years, with additional drilling adding tonnage and ounces; tonnage also varies with different selected mining widths. A comprehensive Historical Reserves Estimate calculated in 2010 from the four ore shoots on the Gladiator vein, and two adjacent veins yields: Proven Ore: 104,302 t at oz/t Au and 2.44 oz/t Ag Probable Ore: 93, 273 at oz/t Au and 2.51 oz/t Ag The current concept is to commence Phase 2 mining on the D-Zone; the D-Zone Historic Estimate numbers from the 2010 calculations: Proven Ore: 23,306 tons at oz/t Au and 1.64 oz/t Ag Probable Ore: 15,214 tons at oz/t Au and 3.49 oz/t Ag Drilling is planned to validate the estimate numbers above, using current industry standards for surveying, sampling QAQC and analysis. The Historic Reserves would thus translate to current resources. Additional engineering work is necessary in order to calculate reserves to current industry standards. Production figures and smelter receipts from the 1930s and 1980 s lend support to the Historic Reserves Estimates, recording similar grades of gold and silver. The planned process circuit is designed generally similar to the 1980 s circuit, with flotation the main method of recovery. Metallurgical consultants have suggested modernizing the circuit: product separation to zinc and copper concentrates as well as the addition of a centrifugal concentrator, potentially the same centrifugal concentrator from Phase 1 process. It has been opined that the 89% recovery, achieved in the 1980 s could be significantly improved. Metallurgical testing is planned to validate these concepts.

5 9. Phase 3 Close-Proximity Vein Structures & Potential Development: From west to east, some of the parallel veins cover former producing mines, including: the Del Pasco Mine, the Crown King Mine north extension, Spring Green vein, Fairview Mine and the Lincoln Mine. Del Pasco Mine was the first mine to be discovered in the Crown King area. Mine grades of $50 per ton were reported in 1880 s; gold was $20 per ounce at the time. Nor-Quest holds over 5000 feet of potential vein strike length within BLM claims on this structure. Crown King Mine north extension Nor-Quest has 4000 feet of potential vein strike length on its patented mine claims. Fairview Mine Soil sample survey indicates 7500 feet of gold anomalies that are on strike and open to the north. 300 feet of underground sampling (26 samples) show an average of 0.5 opt Gold over a 5 ft. width. Outcrop and soil sampling infers a potential additional parallel vein which warrants further exploration. Lincoln Mine Underground maps, smelter receipts and underground sampling of the south end workings indicate an ore shoot 40 feet wide and 350 feet long. Verification sampling will be required along with trenching, drilling and underground rehabilitation of the above structures to validate the historic results above. 10. Environmental and Permitting for Phase 2 : Reported to the author from Blair Carson. Blair has reported meeting with ADEQ (Arizona Department Of Environmental Quality); ADEQ stated that if an inert tailings product can be produced and all water storage facilities were inspectable above ground, that an APP (Aquifer Protection Permit) would not be necessary. Blair has expressed his expectation that the material can be neutralised and returned underground utilizing known paste backfill technology ; this would be dependent on a final bulk sulphide float to create an inert tails product. A permit may be necessary for a tailings impoundment; an old tailings impoundment is currently located on-site; permitting for an expansion of the facility should not be onerous. The key permit to be obtained for long-term operations is the APP; obtaining an APP should be routine. Nor-Quest s environmental consultant estimates it will take about months to obtain, with about 6 months of data-gathering and testing, and 6-12 months of review process and approval. As a comparison, American Bonanza s Copperstone Mine a very similar sized project in Arizona successfully obtained their APP in 12 months. The biggest constraint on the process is associated with lack of manpower in the ADEQ.; Accordingly ADEQ now has a list of pre-approved consultants to help expedite the review and approval process, there is an added cost for this, as they are independent

6 consultants. The Nor-Quest consultants are familiar with the process, and sufficiently well-connected with the relevant authorities to guide permitting to completion. No other permits appear to be serious issues. In Arizona the level of permitting is very localised and county-centric, notably in the Bradshaw Mountains area permitting is much easier than elsewhere in the state. Road upgrade permits are currently easy to obtain (or unnecessary) a bridge takes a couple of months to permit. Road construction and maintenance is viewed favourably as a mechanism of creating employment in a portion of the Yavapai County where the economy is struggling. Public relations and stakeholder liaison has been addressed by the owner, Blair Carson. Nor-Quest Arizona Inc. and the project has been promoted in the local communities, building strong relations with key people, and providing financial and moral support to key issues. Yavapai County officials have been both receptive and supportive of the project thus far. 11. Conclusions and Recommendations: The historic resource estimate for surface mining of the oxides will be augmented by systematic trenching and bulk sampling. Due to grade variability and nugget effect, a robust bulk sampling program is planned: 40-ton composite samples from mined ores are to be processed through the main mill circuit; measured grade will determine if the rest of the mined ore is to be processed or returned to the surface cut. A drill program is to be planned, following compilation of historic drill and sampling data into a modern database and 3D model. Gladiator Gold Mine Project SWOT Analysis Strengths: Arizona is a mining-friendly jurisdiction and the area of the Bradshaw Mountains has had a lengthy mining history since the late 1800's. Gold was mined on the Gladiator and War Eagle at turn of the 20th century, in the 1930's and again in the 1980's. The mine was shut down due to low prices of gold - the mine was not mined-out. The Gladiator War Eagle Project is a small high grade low tonnage narrow-vein gold deposit with accessory silver, copper and zinc. The size is well above that of artisanal mines, but generally below that of projects found in public companies - ideal for a privately run operation. Mineralization averaging approximately 0.43 oz/t Au was found and mined from four ore shoots, along a strike length of roughly 2500ft; mine workings extend from near surface to depths exceeding 600ft below. The structure thus demonstrates continuity both along strike and dip. It is fully expected that similar

7 grades continue into the crown pillar above the mined ore shoots (as well as below the old mine workings). The crown pillar comprises of 'oxide zone' materials; the mineralized structure is characterized by clayey-sandy material with quartz vein and quartz stockwork veinlets. In December 2014 six test pits were dug with an excavator to depths of 20 ft below surface. No drilling and blasting was necessary thus far; mining is thus expected to be simple and cheap in comparison. Mineralized material was delivered to Blue Coast Metallurgical Laboratories for bench-scale testing. A set of samples was run through a gravity circuit comprising a centrifugal concentrator (60% recovery, from a head grade of 0.36 oz/t Au). Conclusion: a centrifugal concentrator successfully recovers gold from the Gladiator War Eagle Phase 1 oxide ore. The mining team comprises highly qualified personnel: the owner and operations manager on the project, Blair Carson, is a seasoned ex-sgs metallurgical pilot plant manager; the project geologist is the author, Damir Cukor, a Qualified Person under NI and JORC regulations and metallurgical support will be provided by Blue Coast Metallurgical - Chris Martin is a highly respected ex-sgs metallurgist. Weakness: Scarcity of surface water; two wells are located on the property one with a capacity of 5gpm and the second at 20gpm. Water has been saved in storage tanks and the lowest portions of the mine below the haulage levels are flooded - if need arises, this water can be pumped to the mill, proximal to the mine haulage level portal. The area of Crown King is recorded as the wettest area in Arizona; there should be sufficient precipitation to recharge the aquifer to sustain the water wells. For Phase 1 there will be sufficient water; for Phase 2, water will have to be considered as a limiting factor when designing mining and milling operations (note that there was sufficient water for operations in the 1980's). The life-of-mine for Phase 1 is extremely short - there may be little time for optimizing recoveries...however the known recovery rate and high grades are projected to be sufficient for supporting a profitable operation. Opportunity: The opportunity in Phase 1 for an early run of gold concentrate is very good; the premium offered, combined with set delivery schedule and equipment collateral make this a very attractive offer. The opportunity for Phase 2 is also very attractive; historic production figures and historic drilling and sampling results will be supported with a planned program of new drilling and sampling.

8 Threats: Water scarcity will be a limiting factor...however the amount of water currently available for Phase 1 is more than adequate (especially at Phase 1 early stages ) Lack of mineralization or problem with recovery - very slim chance of either, since historic operations processed oxide ores in workings directly below the crown pillar Phase 1 target. Testing performed in laboratory with centrifugal concentrators has produced very good gold concentrate. Collapse of commodity price below operational costs: the likelihood is almost nil. Damir Cukor, P.Geo. Nov 10, 2015

9 Appendix A

10 Appendix B

11 Appendix C

Improvements in bi-metal production at the Brunswick plant, Costerfield.

Improvements in bi-metal production at the Brunswick plant, Costerfield. 1 Improvements in bi-metal production at the Brunswick plant, Costerfield. D Buchanan 1, V Cullinan 2 1. MAusIMM, Processing Plant Manager, Mandalay Resources Costerfield Operations, 1024 Heathcote Nagambie

More information

ABM Hits 3000 Ounce Target from Trial Mining

ABM Hits 3000 Ounce Target from Trial Mining ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 12 th December 2013 ABM Hits 3000 Ounce Target from Trial Mining ABM Resources NL ( ABM or The Company ) presents an update on the Trial Mining and Processing at

More information

A.R.S. / Fountainhead Mine Group

A.R.S. / Fountainhead Mine Group A.R.S. / Fountainhead Mine Group Gold, Silver and Rare Earth Mineral - Mining The ARS mining operations claim block consists of two (2) patented mining claims of 40 acres, and 6 Federal Mining Claims (unpatented)

More information

For personal use only

For personal use only RDM ASX Announcement 23 October 2013 ACN 103 367 684 ASX ANNOUNCEMENT 8 MARCH 2016 ASX Code: RDM Red Metal Limited is a minerals exploration company focused on the exploration, evaluation and development

More information

Minerals to Market. September 26 th 2011

Minerals to Market. September 26 th 2011 Minerals to Market Luqman Ahmad September 26 th 2011 Balochistan Mining Sector Technical Assistant Project Workshop on International Norms in Large-Scale Mining September 27 28, 2011 Islamabad Pakistan

More information

PATRICK SCOTT - DIRECTOR TIN CONFERENCE BEER & CO - SECOND ANNUAL WEDNESDAY, 5 NOVEMBER, 2014

PATRICK SCOTT - DIRECTOR TIN CONFERENCE BEER & CO - SECOND ANNUAL WEDNESDAY, 5 NOVEMBER, 2014 BEER & CO - SECOND ANNUAL TIN CONFERENCE WEDNESDAY, 5 NOVEMBER, 2014 PATRICK SCOTT - DIRECTOR SCOTT@AUSTRALIA.ROHSTOFF.DE Disclaimer This presentation has been prepared by and issued by Tin International

More information

Ore mineral: a mineral from which one or more metals can be extracted.

Ore mineral: a mineral from which one or more metals can be extracted. 1 Ore mineral: a mineral from which one or more metals can be extracted. Gangue minerals: minerals that accompany ore minerals but are of little or no worth. Ore: a body of rock containing one or more

More information

LANDORE RESOURCES LIMITED

LANDORE RESOURCES LIMITED LANDORE RESOURCES LIMITED (AIM Ticker: LND.L) PRESS RELEASE PRESS RELEASE PRESS RELEASE PRESS RELEASE PRESS RELEA JUNIOR LAKE PROPERTY IRON ORE DEPOSIT 27 th October 2008 Exploration by Landore has confirmed

More information

Taranis Proves Bulk Grade of SIF Zone Pilot Plant Sample 600 mt at 6.5 g/t Gold

Taranis Proves Bulk Grade of SIF Zone Pilot Plant Sample 600 mt at 6.5 g/t Gold FOR IMMEDIATE RELEASE Taranis Resources Inc. 681 Conifer Lane Estes Park, Colorado 80517 www.taranisresources.com Taranis Proves Bulk Grade of SIF Zone Pilot Plant Sample 600 mt at 6.5 g/t Gold Estes Park,

More information

ASX ANNOUNCEMENT 26 February 2013 ASX Code: BDR. MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 584, g/t for 71,000 oz gold

ASX ANNOUNCEMENT 26 February 2013 ASX Code: BDR. MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 584, g/t for 71,000 oz gold ASX ANNOUNCEMENT 2 February 2013 ASX Code: BDR MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 58,000 tonnes @ 3.8 g/t for 71,000 oz gold MAIDEN DUCKHEAD HANGINGWALL STARTER PIT RESERVE 272,000 tonnes @ 3.2

More information

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY January 29, 2001 Mr. Malcolm Swallow President & CEO Canadian Zinc Corporation Suite 1202-700 Pender Street Vancouver Canada V6C 1G8 By Fax: 604-688-2043 Total Number of Pages: 8 Dear Mr. Swallow: RE:

More information

2014 AGM PRESENTATION

2014 AGM PRESENTATION 2014 AGM PRESENTATION David Mendelawitz Managing Director 1 IMPORTANT INFORMATION Disclaimer This presentation contains certain forward looking statements. All statements, other than statements of historical

More information

For personal use only

For personal use only Positive Scoping Study: Aphrodite Gold Project 9 February 2012 Company Announcements Office Australian Securities Exchange Limited Positive Scoping Study for Aphrodite Gold Project Potential to Become

More information

T S X : R M X N Y S E. M K T : R B Y

T S X : R M X N Y S E. M K T : R B Y T S X : R M X N Y S E. M K T : R B Y News Release A p r i l 1 4, 2015 Rubicon s Phoenix Gold Project Commences Mill Commissioning and Remains on Schedule for Mid-2015 Projected Initial Production TORONTO,

More information

TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME

TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME ASX ANNOUNCEMENT 23 February 2012 (8 pages by email) TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME Sumatra Copper & Gold plc ( Sumatra or the Company ) is pleased to announce that the Prefeasibility

More information

INTEGRA RESOURCES COMMENCES METALLURGICAL TESTWORK PROGRAM AT THE DELAMAR GOLD-SILVER PROJECT

INTEGRA RESOURCES COMMENCES METALLURGICAL TESTWORK PROGRAM AT THE DELAMAR GOLD-SILVER PROJECT 1050 400 Burrard Street Vancouver, British Columbia, Canada V6C 3A6 Email: chris@integraresources.com FOR IMMEDIATE RELEASE September 6, 2018 TSXV:ITR ; OTCQX: IRRZF www.integraresources.com INTEGRA RESOURCES

More information

AMUR MINERALS CORPORATION (AIM: AMC)

AMUR MINERALS CORPORATION (AIM: AMC) 29 June 2015 AMUR MINERALS CORPORATION (AIM: AMC) Operational Blueprint Defined For Kun-Manie Amur Minerals Corporation ( Amur or the Company ) is pleased to present the forward looking Operational Blueprint

More information

Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study

Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study Chalice Gold Mines Limited ABN 47 116 648 956 30 October 2009 Highlights Scoping Study finds Koka deposit at the Zara Project in Eritrea

More information

NEPA & Mining Tribal Lands and Environment Forum. August 17, 2015 Minneapolis, Minnesota

NEPA & Mining Tribal Lands and Environment Forum. August 17, 2015 Minneapolis, Minnesota NEPA & Mining 101 2015 Tribal Lands and Environment Forum August 17, 2015 Minneapolis, Minnesota Cindi Godsey, Permit Writer and Alaska Mining Coordinator Lynne Hood, NEPA Reviewer David Tomten, RPM and

More information

FEASIBILITY STUDY CONFIRMS KALKAROO COPPER-GOLD PROJECT. Highlights

FEASIBILITY STUDY CONFIRMS KALKAROO COPPER-GOLD PROJECT. Highlights FEASIBILITY STUDY CONFIRMS KALKAROO COPPER-GOLD PROJECT Havilah Resources Havilah Resources NL aims to become a significant producer of copper, gold, cobalt and molybdenum from its 100% owned Kalkaroo,

More information

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director Cash flow from gold sales New project developments Exploration success The information in this presentation that relates to

More information

The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR. Authors: A Hoyle, D Bennett, and P Walker

The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR. Authors: A Hoyle, D Bennett, and P Walker The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR Authors: A Hoyle, D Bennett, and P Walker IRP Presentation Summary 1. Phu Kham mineralogy and implications for process design

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 30th September, 2014 ABM s Development Plan & Production Guidance for Old Pirate High-Grade Gold Deposit Highlights: 50,000 to 60,000 ounces of gold production

More information

Technologies for Small Scale Mining

Technologies for Small Scale Mining Technologies for Small Scale Mining Examples of traditional and alternative mining and processing methods Part 1, Department of Mineral Processing RWTH Aachen University of Technology Aachen, Germany Content

More information

Large copper resource inventory Low sovereign risk South Australia Clear development strategy. Havilah s Copper Strategy August 2017

Large copper resource inventory Low sovereign risk South Australia Clear development strategy. Havilah s Copper Strategy August 2017 Large copper resource inventory Low sovereign risk South Australia Clear development strategy Havilah s Copper Strategy August 2017 2 Cautionary Statement The information contained in this presentation

More information

REGISTRATION PURSUANT TO. PART X of THE ENVIRONMENTAL PROTECTION ACT FOR THE NUGGET POND CROWN PILLAR. Newfoundland and Labrador

REGISTRATION PURSUANT TO. PART X of THE ENVIRONMENTAL PROTECTION ACT FOR THE NUGGET POND CROWN PILLAR. Newfoundland and Labrador REGISTRATION PURSUANT TO PART X of THE ENVIRONMENTAL PROTECTION ACT FOR THE NUGGET POND CROWN PILLAR Snook s Arm Area, Baie Verte Peninsula, Newfoundland and Labrador RAMBLER METALS AND MINING CANADA LTD.

More information

2018 Resources and Reserves

2018 Resources and Reserves 2018 Resources and Reserves Aeris Resources Limited has updated its Mineral Resource and Ore Reserves estimates for its Tritton Copper Operations as at 30 June 2018. reported Measured and Indicated Mineral

More information

AGM - Lorena Gold Project

AGM - Lorena Gold Project AGM - Lorena Gold Project For personal use onlynovember 2015 Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk factors

More information

Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold/Moly (Silver) Project Pacific Booker Minerals Inc. Morrison Copper/Gold/Moly (Silver) Project Mr. ERIK TORNQUIST, Executive VP & COO November 2008 Forward Looking Statement This presentation may include forward-looking statements

More information

ASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington

ASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington ASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington ASX Code: WRM Issued Securities Shares: 441.3 million Options: 100.5 million

More information

CORPORATE PRESENTATION JULY 2017

CORPORATE PRESENTATION JULY 2017 CMX GOLD & SILVER CORP. CORPORATE PRESENTATION JULY 2017 www.cmxgoldandsilver.com 1 2 This presentation includes certain forward-looking statements within the meaning of Canadian securities legislation.

More information

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD December 8 th 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD Construction at Gascoyne s

More information

NEW GOLD DISCOVERY REPORTED BY IRELAND INC.

NEW GOLD DISCOVERY REPORTED BY IRELAND INC. For Immediate Release NEW GOLD DISCOVERY REPORTED BY IRELAND INC. BULK LEACH TEST EXTRACTS GOLD AND SILVER METALS; DRILL RESULTS INDICATE LARGE TONNAGE POTENTIAL HENDERSON, Nevada March 19, 2009 Ireland

More information

MINIMUM ENGINEERING STUDY REQUIREMENT. 128 June 2015

MINIMUM ENGINEERING STUDY REQUIREMENT. 128 June 2015 # 128 June 2015 MINIMUM ENGINEERING STUDY REQUIREMENT UPDATE The evaluation of a mining project from exploration through development and production is a lengthy and complicated process. Mine development

More information

MALACHITE RESOURCES L I M I T E D

MALACHITE RESOURCES L I M I T E D MALACHITE RESOURCES L I M I T E D ASX Code: MAR As at 30 September 2012 Issued Shares: 804.3 million ABN: 86 075 613 268 Directors Garry Lowder Russell Meares James Dean Terry Cuthbertson Andrew McMillan

More information

ASX ANNOUNCEMENT 12 MAY 2016

ASX ANNOUNCEMENT 12 MAY 2016 ASX ANNOUNCEMENT 12 MAY 2016 FÄBOLIDEN METALLURGICAL TEST WORK IMPROVES RECOVERY LEVELS Dragon Mining Limited (ASX:DRA) ( Dragon Mining or the Company ) is pleased to announce that the second phase of

More information

Positive Metallurgical and Drill results from the Bondi Project

Positive Metallurgical and Drill results from the Bondi Project Positive Metallurgical and Drill results from the Bondi Project June 4, 2013 - Orezone Gold Corporation (ORE:TSX) is pleased to provide an update on a recently completed metallurgical study and the latest

More information

Welcome to a world class operation

Welcome to a world class operation Boliden Garpenberg Welcome to a world class operation Boliden Garpenberg in Hedemora municipality is now one of the world s most modern mines. At the same time, it is Sweden s oldest mining area that

More information

For personal use only

For personal use only ACN. 000 317 251 Time lodged with ASX: 2.45pm (Brisbane) MARKET RELEASE 8 th September 2014 ROCKLANDS COPPER PROJECT (CDU 100%) DSO READY FOR SHIPMENT BULK TEST OF DSO IN SMELTERS After significant effort

More information

For personal use only

For personal use only 28 November 2017 Corporate Details Ordinary Shares: 780,917,069 Market Capitalisation: ~$156 million Cash and bullion at 30 September 2017: ~$20.1 million Debt: NIL ASX Code: MOY Board of Directors Greg

More information

IDM Mining Updates Pre-Development Engineering and Optimization at Red Mountain Gold Project

IDM Mining Updates Pre-Development Engineering and Optimization at Red Mountain Gold Project IDM Mining Updates Pre-Development Engineering and Optimization at Red Mountain Gold Project November 30 th, 2017, Vancouver, BC IDM Mining Ltd. (TSX.V:IDM) (OTCQB:IDMMF) ( IDM or the Company ) is pleased

More information

FOR IMMEDIATE RELEASE 30 August 2018 TSX-V: AZR

FOR IMMEDIATE RELEASE 30 August 2018 TSX-V: AZR FOR IMMEDIATE RELEASE 30 August 2018 TSX-V: AZR AZARGA METALS ANNOUNCES POSITIVE, INDEPENDENT, PRELIMINARY ECONOMIC ASSESSMENT ( PEA ) ON UNKUR COPPER-SILVER PROJECT HIGHLIGHTS: Positive PEA result achieved

More information

For personal use only

For personal use only ACN. 000 317 251 MARKET RELEASE 4 th March 2013 ROCKLANDS COPPER PROJECT (CDU 100%) DEVELOPMENT UPDATE PICTORIAL UPDATE 10 Development of the Rocklands Group Copper Project, located just outside the major

More information

Great Western Scoping Study Update & Onsite Gold Processing

Great Western Scoping Study Update & Onsite Gold Processing ASX RELEASE 10 August 2017 ABN: 45 116 153 514 ASX: TMX Great Western Scoping Study Update & Onsite Gold Processing Terrain Minerals Limited (ASX: TMX) is pleased to provide the following update on its

More information

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL Head Office 247 Dill Road, RR 1 Windsor, NS, Canada, B0N 2T0 Trading Symbol: TSXV: BMC News Release No. 10-12 Shares Outstanding: 150,898,545 May 3 rd, 2012 T (902) 472 3520 F (902) 472 3521 www.buchansminerals.com

More information

Malachite Resources AGM. November For personal use only. Malachite Resources Limited

Malachite Resources AGM. November For personal use only. Malachite Resources Limited Malachite Resources AGM November 2013 1 Malachite Resources Limited Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk

More information

For personal use only

For personal use only Pre-Feasibility Study Highlights World Class Potential of Mt Lindsay Tin/Tungsten Project ASX Announcement Tuesday, 1 March 2011 Ref: /VMS/606/VMS/0249 Highlights: Project generates substantial revenue

More information

Mahd Ad Dahab Gold Mine

Mahd Ad Dahab Gold Mine Mahd Ad Dahab Gold Mine Mahd Ad Dahab Mine is situated at an elevation of 1,060m above sea level in the Western Region of Saudi Arabia the mine located about 380 Km by road North East of Jeddah. The project

More information

DALGARANGA GOLD PROJECT CONSTRUCTION & OPERATIONAL UPDATE 2 MONTHS TO FIRST GOLD

DALGARANGA GOLD PROJECT CONSTRUCTION & OPERATIONAL UPDATE 2 MONTHS TO FIRST GOLD March 19 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT CONSTRUCTION & OPERATIONAL UPDATE 2 MONTHS TO FIRST GOLD Process plant construction

More information

For personal use only

For personal use only ASX Announcement 19 December 2014 BOARD OF DIRECTORS Paul Murphy (Non-Executive Chairman) Bryan Dixon (Managing Director) Alan Thom (Executive Director) Greg Miles (Non-Executive Director) ASX CODE BLK

More information

NEW MINERAL RESOURCE ESTIMATE ADDS 281 MILLION TONNES OF HIGH-GRADE INFERRED RESOURCES TO THE HUGO NORTH COPPER-GOLD DEPOSIT IN MONGOLIA

NEW MINERAL RESOURCE ESTIMATE ADDS 281 MILLION TONNES OF HIGH-GRADE INFERRED RESOURCES TO THE HUGO NORTH COPPER-GOLD DEPOSIT IN MONGOLIA February 1, 2006 NEW MINERAL RESOURCE ESTIMATE ADDS 281 MILLION TONNES OF HIGH-GRADE INFERRED RESOURCES TO THE HUGO NORTH COPPER-GOLD DEPOSIT IN MONGOLIA ULAANBAATAR, MONGOLIA John Macken, President of

More information

OPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT

OPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT ASX Release 19 February 2010 OPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT HIGHLIGHTS Option to purchase 100% of USA based Buena Vista Iron ore deposit for total consideration of $US8 million over approximately

More information

For personal use only

For personal use only ACN 097 088 689 01 DEFINITIVE FEASIBILITY STUDY SUPPORTS A MAJOR EXPANSION OF THE SYAMA GOLD MINE Definitive Feasibility Study completed for multifaceted expansion of Syama operation confirms its technical

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 5th September, 2012 Old Pirate Metallurgical Test-Work delivers Exceptional Gold Recovery (up to 97.3%) from Two Different Gravity Methods ABM Resources NL ( ABM

More information

For personal use only

For personal use only Mutiny makes substantial metallurgical performance gains Forecast copper recoveries increased from 58.5% to 64% in the oxide zone and copper concentrate grade increased from 21.5% Cu to 35% Cu Forecast

More information

ASCOT INCREASES TOTAL GOLD RESOURCES AT THE PREMIER-DILWORTH PROPERTIES IN BRITISH COLUMBIA

ASCOT INCREASES TOTAL GOLD RESOURCES AT THE PREMIER-DILWORTH PROPERTIES IN BRITISH COLUMBIA Ascot Resources Ltd. Suite 1550-505 Burrard St. Vancouver, B.C., V7X 1M5 T: 778-725-1060 F: 778-725-1070 TF: 855-593-2951 www.ascotgold.com For Immediate Release ASCOT INCREASES TOTAL GOLD RESOURCES AT

More information

Argonaut Gold Announces Q1 Production of 30,963 Gold Equivalent Ounces, an Increase of 4% Over Prior Year

Argonaut Gold Announces Q1 Production of 30,963 Gold Equivalent Ounces, an Increase of 4% Over Prior Year Argonaut Gold Announces Q1 Production of 30,963 Gold Equivalent Ounces, an Increase of 4% Over Prior Year Drilling commences at San Agustín with 11,200 metres (116 holes) completed to date Toronto, Ontario

More information

Eastern Finland Office C/MT/2011/13 Outokumpu. Beneficiation Tests. Taivaljärvi Ore

Eastern Finland Office C/MT/2011/13 Outokumpu. Beneficiation Tests. Taivaljärvi Ore Eastern Finland Office C/MT/2011/13 Outokumpu Beneficiation Tests on Taivaljärvi Ore C/MT/2011/13 GEOLOGICAL SURVEY OF FINLAND DOCUMENTATION PAGE Date / Rec. no. 2 nd May 2011 C/MT/2011/13 Authors Satu

More information

CONTRACT AWARDED FOR TESTWORK AND PURCHASE OF FIRST NATIVE COPPER SHIPMENT NATIVE COPPER IN HIGH DEMAND IN CHINA

CONTRACT AWARDED FOR TESTWORK AND PURCHASE OF FIRST NATIVE COPPER SHIPMENT NATIVE COPPER IN HIGH DEMAND IN CHINA ACN. 000 317 251 Time lodged with ASX: 9.45am (Brisbane) MARKET RELEASE 28 th November 2014 ROCKLANDS COPPER PROJECT (CDU 100%) CONTRACT AWARDED FOR TESTWORK AND PURCHASE OF FIRST NATIVE COPPER SHIPMENT

More information

Maiden Ore Reserve for Camel Creek JV

Maiden Ore Reserve for Camel Creek JV 10 September 2013 Manager Company Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 ABN 85 003 257 556 Maiden Ore Reserve for Camel

More information

Australian gold producer 90, ,000 CY19

Australian gold producer 90, ,000 CY19 Australian gold producer 90,000-100,000 CY19 Rising grades, rising production +100,000ozpa targeted production New discoveries driving growth ------------------------------------------- February 2019 Corporate

More information

ENGINEERING SERVICES

ENGINEERING SERVICES ENGINEERING SERVICES www.elb.co.za Processing Solutions ABOUT ELB ENGINEERING SERVICES ELB Engineering Services (ELB) is an internationally recognised technology driven holistic solutions provider to the

More information

AMUR MINERALS CORPORATION (AIM: AMC) Independent Review of Cost Estimates $1.78 Per Pound Nickel Cost to Deliver to Rail Station

AMUR MINERALS CORPORATION (AIM: AMC) Independent Review of Cost Estimates $1.78 Per Pound Nickel Cost to Deliver to Rail Station 17 July 2017 AMUR MINERALS CORPORATION (AIM: AMC) Independent Review of Cost Estimates $1.78 Per Pound Nickel Cost to Deliver to Rail Station Amur Minerals Corporation ( Amur or the Company ), a mineral

More information

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES July 25 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES The Process

More information

Harte Gold Announces Positive PEA For the Sugar Zone Project

Harte Gold Announces Positive PEA For the Sugar Zone Project HARTE GOLD CORP. 8 King Street East, Suite 1700 Toronto, Ontario, M5C 1B5 Tel: 416-368-0999 Fax: 416-368-5146 Harte Gold Announces Positive PEA For the Sugar Zone Project Toronto May 3, 2018 - HARTE GOLD

More information

For personal use only

For personal use only 4 AUGUST 2017 TROPICANA GOLD MINE UPDATE Independence Group NL ( IGO or the Company ) (ASX: IGO) is pleased to provide a progress report on initiatives to further maximise and optimise the Tropicana Gold

More information

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel: 930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4 Tel: (604) 998-4175 Tel: 1888 648-4218 www.sabinagoldsilver.com April 22, 2014 SBB NR 14-05 SBB TSX SABINA GOLD & SILVER REPORTS SIGNIFICANT

More information

Geology and mineral resources of the Kylylahti Mine

Geology and mineral resources of the Kylylahti Mine Geology and mineral resources of the Kylylahti Mine asenteella - tuurilla törmäillen; harkiten harmitta Jari Juurela Altona Mining Ltd Geology Manager - Finland 24.04.2014 Disclaimer and JORC Compliance

More information

MARKET RELEASE 9 th July 2013

MARKET RELEASE 9 th July 2013 ACN. 000 317 251 MARKET RELEASE 9 th July 2013 ROCKLANDS COPPER PROJECT (CDU 100%) TEST CRUSHING TO INVESTIGATE POSSIBILITY OF PRODUCING PRODUCT SUITABLE FOR DIRECT SHIPPING ORE (DSO) HAS BEGUN INTERIM

More information

For personal use only

For personal use only Bulletin Resources is the 100% owner of the Nicolson s Gold Project located near Halls Creek in the Kimberley region of Western Australia. The project has a combined open pit and underground Mineral Resource

More information

For personal use only

For personal use only 4 APRIL 2013 D Zone Mineral Resource Increases by 34% to 20.7 million tonnes with a significant increase in contained Cu and Fe Highlights Overall D Zone Mineral Resource tonnage has increased by 5.2 million

More information

Forward Looking Statement

Forward Looking Statement Olympias Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation

More information

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces ABN 28 009 174 761 31 March 2011 Manager Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 www.regisresources.com Level 1 1 Alvan

More information

For personal use only

For personal use only Malachite Resources Limited ABN 86 075 613 268 ASX Announcement ASX Code: MAR 12 March 2012 LORENA GOLD PROJECT - UPDATE Summary Malachite s commitment to establish a gold mining and production plant at

More information

For personal use only

For personal use only 11 June 2015 ASX Limited Marked Announcements Platform Exchange Centre 20 Bridge Street Sydney NSW 2000 Preliminary Economic Assessment Delivers Excellent Results at the Fair Bride Deposit Study confirms

More information

Kumtor Gold Company 2018

Kumtor Gold Company 2018 Kumtor Gold Company 2018 Kumtor Gold Company Kumtor is one of the highest gold deposits in the world. The deposit was discovered in the Central Tien Shan at an altitude of 4,200 meters in 1978. The Kumtor

More information

Regulus Announces that Preliminary Metallurgical Results Indicate Good Gold Recovery is Achievable at the Rio Grande Cu-Au-Ag Project, Argentina

Regulus Announces that Preliminary Metallurgical Results Indicate Good Gold Recovery is Achievable at the Rio Grande Cu-Au-Ag Project, Argentina Regulus Announces that Preliminary Metallurgical Results Indicate Good Gold Recovery is Achievable at the Rio Grande Cu-Au-Ag Project, Argentina December 6, 2011, (Waterdown, Ontario) Regulus Resources

More information

Farellon. January 2018

Farellon. January 2018 Farellon January 2018 Disclaimer Except for the statements of historical fact, the information contained herein is of a forward-looking nature. Such forward-looking information involves known and unknown

More information

OTJIKOTO GOLD MINE INTRODUCTION AND PROGRESS UPDATE MAY 2014

OTJIKOTO GOLD MINE INTRODUCTION AND PROGRESS UPDATE MAY 2014 OTJIKOTO GOLD MINE INTRODUCTION AND PROGRESS UPDATE MAY 2014 Who is B2Gold? 2 Who is B2Gold Namibia? B2Gold Namibia: 90% owned by B2Gold 10% owned by EVI Mining Company Ownership is a broad-based economic

More information

Quarterly Activities Report for the Period Ended 30 June 2018

Quarterly Activities Report for the Period Ended 30 June 2018 31 July 2018 Quarterly Activities Report for the Period Ended 30 June 2018 HIGHLIGHTS Planning for a 4,600 metre RC percussion drilling program at the Christiana deposit began during the quarter Preparation

More information

Self Assessment Questionnaire Inrushes and Subsidence Major Hazard Standard

Self Assessment Questionnaire Inrushes and Subsidence Major Hazard Standard WMC Environment, Health & Safety Management System Self Assessment Questionnaire Inrushes and Subsidence Major Hazard Standard MHS-09 DocsOpen : 57250, 11/07/2000 Uncontrolled copy check web for latest

More information

SUITABILITY FOR IN-SITU RECOVERY (ISR) CONFIRMED

SUITABILITY FOR IN-SITU RECOVERY (ISR) CONFIRMED 8 September 2008 Companies Announcement Office Via Electronic Lodgement SUITABILITY FOR IN-SITU RECOVERY (ISR) CONFIRMED Independent review of historical data has confirmed that the Lance Project is suitable

More information

Technical Report ALLIED NEVADA GOLD CORP. Hycroft Mine, Winnemucca, Nevada, USA. April 9, 2012

Technical Report ALLIED NEVADA GOLD CORP. Hycroft Mine, Winnemucca, Nevada, USA. April 9, 2012 9790 Gateway Drive, Suite 200 Reno, NV 89521 Phone: (775) 358-4455 Fax: (775) 358-4458 www.alliednevada.com Technical Report ALLIED NEVADA GOLD CORP. Hycroft Mine, Winnemucca, Nevada, USA Effective Date:

More information

Saracen Mineral Holdings Limited ACN

Saracen Mineral Holdings Limited ACN Saracen Mineral Holdings Limited ACN 009 215 347 ASX Release 25 September 2012 2012 Mineral Resources and Ore Reserves Corporate Details: As at 30 June 2012 ASX codes: Ordinary shares: SAR 30 June 2013

More information

Resource Efficient Mining Processes of Tomorrow

Resource Efficient Mining Processes of Tomorrow Metso Process Technology & Innovation (PTI) Resource Efficient Mining Processes of Tomorrow R&D Project Authors: K Duffy W Valery A Jankovic P Holtham www.metso.com General PTI presentation 2014 2015 A

More information

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015 T S X : R M X N Y S E. M K T : R B Y News Release D e c e m b e r 1 8, 2014 Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015 TORONTO, Ontario Rubicon Minerals Corporation

More information

May 8, 2018 NYSE:HL. Exploration Update. To accompany 05/08/18 news release

May 8, 2018 NYSE:HL. Exploration Update. To accompany 05/08/18 news release May 8, 2018 Update To accompany 05/08/18 news release Cautionary Statements Cautionary Statement Regarding Forward Looking Statements, This presentation contains forward-looking statements within the meaning

More information

Evaluation of Grade Engineering using Enterprise Optimization. Michael Scott, Nick Redwood

Evaluation of Grade Engineering using Enterprise Optimization. Michael Scott, Nick Redwood Evaluation of Grade Engineering using Enterprise Optimization Michael Scott, Nick Redwood Who we are Not for Profit Research Organization Site implementation of stepchange innovation Grade Engineering

More information

PYTHON UNDERGROUND PROCESSING PLANT CRITICAL DESIGN

PYTHON UNDERGROUND PROCESSING PLANT CRITICAL DESIGN PYTHON UNDERGROUND PROCESSING PLANT CRITICAL DESIGN S Gray 1 ABSTRACT The use of continuous gravity recovery in combination with a controlled breakage fine crushing and screening system followed by flash

More information

Highlights. Wa Project. Akoko Project. Scoping studies on the Julie West gold vein were completed with the following outcomes;

Highlights. Wa Project. Akoko Project. Scoping studies on the Julie West gold vein were completed with the following outcomes; 24 th July 2009 June December 2009 Quarterly Report Report 2008 Highlights Wa Project Scoping studies on the Julie West gold vein were completed with the following outcomes; 250,000 tonnes @ 4.9g/t gold

More information

Mt Carlton. May Arlene Rofe General Manager

Mt Carlton. May Arlene Rofe General Manager Mt Carlton May 2014 Arlene Rofe General Manager Disclaimer This presentation has been prepared by Evolution Mining Limited ( Evolution Mining ) and consists of slides for a presentation concerning the

More information

METAL MINING TECHNOLOGY IN JAPAN

METAL MINING TECHNOLOGY IN JAPAN METALMINING TECHNOLOGY IN JAPAN Foreword The Ministry of International Trade and Industry(MITI),the Government of Japan, decided to make Mining Expert Training materials for technical cooperation program

More information

Iron Mountain Mine Superfund Site Long Term O&M Challenges August 12-14, 2014 James Sickles, U.S. EPA Region 9

Iron Mountain Mine Superfund Site Long Term O&M Challenges August 12-14, 2014 James Sickles, U.S. EPA Region 9 Iron Mountain Mine Superfund Site Long Term O&M Challenges August 12-14, 2014 James Sickles, U.S. EPA Region 9 National Conference on Mining-Influenced Waters: Approaches for Characterization, Source Control

More information

For personal use only

For personal use only 19 April 2018 MARCH 2018 QUARTERLY ACTIVITIES REPORT High grade cobalt mineralisation confirmed at Mulligan with rock chip samples grading up to 9.71% Co and 16.5 g/t Au Two new Primary Cobalt Projects

More information

FOR IMMEDIATE RELEASE 31 August 2018 TSX-V: AZR

FOR IMMEDIATE RELEASE 31 August 2018 TSX-V: AZR FOR IMMEDIATE RELEASE 31 August 2018 TSX-V: AZR AZARGA METALS CLARIFIES DISCLOSURE ON PRELIMINARY ECONOMIC ASSESSMENT ( PEA ) ON UNKUR COPPER-SILVER PROJECT AZARGA METALS CORP. ("Azarga Metals" or the

More information

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD November 3 rd 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD Construction work at Gascoyne s 100%

More information

WHAT IS THE SMALL MINE CONCEPT AND THE MAJOR ISSUES?

WHAT IS THE SMALL MINE CONCEPT AND THE MAJOR ISSUES? WHAT IS THE SMALL MINE CONCEPT? BASIS OF STUDY WHAT ARE THE FEATURES OF THIS CONCEPT COMPARED TO ECHO BAY S ORIGINAL CONCEPT? WHAT ARE ISSUES RELATED TO REOPENING THE AJ? THE AJ MINE PRODUCTION RATE MINING

More information

Update on Hammer Mill 3 Commissioning

Update on Hammer Mill 3 Commissioning Update on Hammer Mill 3 Commissioning ASX/Media Release 18 April 2018 Hammer Mill 3 (HM3) production of 131.4 ounces of gold in doré during 7.5-day initial commissioning run-time in March (i.e., average

More information

Positive DFS for Tala Hamza Project

Positive DFS for Tala Hamza Project ASX Shareholder Report 12 October 2010 Enquiries on this Report or the Company Business may be directed to: Ian McAleese Investor Relations Manager + 61 8 8213 1432 + 61 448 880 661 Website Address: www.terramin.com.au

More information

Precious Metals Summit Sept Page 1

Precious Metals Summit Sept Page 1 Precious Metals Summit Sept. 2016 Page 1 Disclaimer and Competent Persons Statement Cautionary Note Whilst this document and presentation is based on information from sources which are considered reliable,

More information