1 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING October 19, 2017 This pamphlet is issued solely for the purpose of circulating advance information pertaining to proposed Highway improvements and the Department does not guarantee the correctness of any information printed herein. See Back Cover for District Information An Equal Opportunity Employer

2 Thursday, October 19, 2017 Index of Projects Project No. PID No. County Route/Section Project Type Page Federal D Belmont SR PREVENTIVE MAINTENANCE 1 D Columbiana SR PREVENTIVE MAINTENANCE 3 D Lawrence US GAP FY18 MISCELLANEOUS 6 D Highland CR & SR MINOR WIDENING 8 D Jefferson SR SIGNALIZATION 14 D Shelby SR 571/SR /11.04 BRIDGE REPAIR 18 D Ottawa /SAN Deck Sealing FY18 BRIDGE REPAIR 22 D Portage MCRO FY2018(A) PREVENTIVE MAINTENANCE 23 D Ross Industrial Parkway Phase 1 NEW CONSTRUCTION 26 D Scioto US TWO LANE RESURFACING 30 D Summit MCRO FY2018(B) PREVENTIVE MAINTENANCE 33 D Union US-US 33/SR 287/SR 739- FOUR LANE RESURFACING /00.00/00.28 D Warren /GRE-US 42-Culverts MISCELLANEOUS 41 D Wyandot SR BRIDGE REPAIR 47 D Wyandot US PREVENTIVE MAINTENANCE 51 D Mahoning SR BRIDGE REPAIR 69 State E Ashland TSG FY2018 (B) MISC. TRAFFIC CONTROL MAINT/UPGRADE Clark Urban HS 4 Lane FY18 HERBICIDAL SPRAYING Ashland GR FY2018 GUARDRAIL REBUILDING Ashland PR FY2018 (B) PRUNING/OR TREE/BRUSH REMOVAL E Ashland PR FY2018 PRUNING/OR TREE/BRUSH REMOVAL Erie SR-SR MISCELLANEOUS

3 Thursday, October 19, 2017 Index of Projects Project No. PID No. County Route/Section Project Type Page ODOT = Ohio Department of Transportation CFR = Code of Federal Regulations O.R.C. = Ohio Revised Code D E Disadvantaged Business Enterprise (DBE) Requirement. DBE participation goals (subcontracts, materials, supplies) have been set on this project for those certified as DBE s in accordance with the TEA - 21(1998) and 49 CFR, Part 26, and qualified to bid with ODOT under Chapter 5525 of the O.R.C. EDGE Requirement. An EDGE participation goal has been established (subcontracts, materials, supplies) on this project for those certified as EDGE firms in accordance with O.R.C. Section and qualified to bid with ODOT pursuant to O.R.C. Chapter 5525.

4 Project Number: PID: Belmont SR E161(657) DBE Goal: 3.0% Date Set for Completion: 9/30/2018 Type: PREVENTIVE MAINTENANCE Plan Cost: $5.00 FOR IMPROVING VARIOUS SECTIONS IN THE VILLAGE OF MORRISTOWN, BELMONT COUNTY, OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY MICROSURFACING EXISTING ROADWAYS AND RELATED WORK Ref. No. Item Code Item Description Section 0001 EROSION CONTROL 0001 Project Length: 6.41 Miles Work Length: 6.41 Miles Pavement Width: 20 Feet Unit of Measure Approx. Quantity 832E30000 EROSION CONTROL (WT: 08) EACH 1, EROSION CONTROL Section 0002 PAVEMENT E01042 PARTIAL DEPTH PAVEMENT REPAIR CY (ASPHALT CONCRETE BASE) (WT: 16) 421E10011 MICROSURFACING, SURFACE COURSE, AS PER PLAN (WT: 11) SY 94, PAVEMENT Section 0003 TRAFFIC CONTROL E00100 RPM (WT: 41) EACH E54000 RAISED PAVEMENT MARKER REMOVED (WT: EACH NR) 646E10010 EDGE LINE, 6" (WT: 45) MILE E10200 CENTER LINE (WT: 45) MILE E10400 STOP LINE (WT: 45) FT E50100 REMOVAL OF PAVEMENT MARKING (WT: 45) FT E50300 REMOVAL OF PAVEMENT MARKING (WT: 45) MILE TRAFFIC CONTROL Section 0004 MAINTENANCE OF TRAFFIC Page 1

5 E12460 WORK ZONE MARKING SIGN (WT: 39) EACH E21500 WORK ZONE CENTER LINE, CLASS II, 642 MILE PAINT (WT: 39) 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT (WT: 39) MILE MAINTENANCE OF TRAFFIC Section 0005 INCIDENTALS E06000 PREMIUM FOR CONTRACT PERFORMANCE BOND, PAYMENT BOND AND MAINTENANCE BOND (WT: NR) 614E11000 MAINTAINING TRAFFIC (WT: 39) 624E10000 MOBILIZATION (WT: NR) 0005 INCIDENTALS Page 2

6 Project Number: PID: Columbiana SR E170(349) DBE Goal: 3.0% Date Set for Completion: 9/30/2018 Type: PREVENTIVE MAINTENANCE Plan Cost: $5.00 FOR IMPROVING VARIOUS SECTIONS IN COLUMBIANA COUNTY, OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY PERFORMING PAVEMENT REPAIRS, MICROSURFACING AND RESURFACING ASPHALT PAVEMENT, APPLYING PAVEMENT MARKINGS, AND PERFORMING ALL RELATED WORK. Ref. No. Item Code Section 0001 ROADWAY Item Description Project Length: 4.85 Miles Work Length: 4.85 Miles Pavement Width: 36 Feet Unit of Measure Approx. Quantity 201E11000 CLEARING AND GRUBBING (WT: 01) 209E60500 LINEAR GRADING (WT: 06) MILE E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLAN (WT: 06) MILE ROADWAY Section 0002 EROSION CONTROL E30000 EROSION CONTROL (WT: 08) EACH 1, EROSION CONTROL Section 0003 PAVEMENT E01010 PARTIAL DEPTH PAVEMENT REPAIR (441) CY (WT: 16) 254E01000 PAVEMENT PLANING, ASPHALT SY 12, CONCRETE, 1 1/2" (WT: 13) 407E10000 TACK COAT (WT: 10) GAL 1, E10001 PRIME COAT, AS PER PLAN (WT: 10) GAL E10011 MICROSURFACING, SURFACE COURSE, AS SY 211, PER PLAN (WT: 11) 421E10021 MICROSURFACING, LEVELING COURSE, AS SY 174, PER PLAN (WT: 11) Page 3

7 E50101 ASPHALT CONCRETE SURFACE COURSE, CY TYPE 1, (448), AS PER PLAN(PG70-22M) (WT: 10) 617E10100 COMPACTED AGGREGATE (WT: 06) CY E20000 SHOULDER PREPARATION (WT: 06) SY 2, PAVEMENT Section 0004 TRAFFIC CONTROL E00100 RPM (WT: 41) EACH E54000 RAISED PAVEMENT MARKER REMOVED (WT: EACH NR) 646E10010 EDGE LINE, 6" (WT: 45) MILE E10110 LANE LINE, 6" (WT: 45) MILE E10310 CHANNELIZING LINE, 12" (WT: 45) FT 3, E10400 STOP LINE (WT: 45) FT E20300 LANE ARROW (WT: 45) EACH E20504 DOTTED LINE, 6" (WT: 45) FT 3, E50100 REMOVAL OF PAVEMENT MARKING (WT: 45) FT 7, E50300 REMOVAL OF PAVEMENT MARKING (WT: 45) MILE TRAFFIC CONTROL Section 0005 MAINTENANCE OF TRAFFIC E11110 LAW ENFORCEMENT OFFICER WITH HOUR PATROL CAR FOR ASSISTANCE (WT: 39) 614E12460 WORK ZONE MARKING SIGN (WT: 39) EACH E12484 WORK ZONE INCREASED PENALTIES SIGN EACH (WT: 39) 614E12500 REPLACEMENT SIGN (WT: 39) EACH E12600 REPLACEMENT DRUM (WT: 39) EACH E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY SNMT (WT: 39) 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 MILE PAINT (WT: 39) 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 MILE PAINT (WT: 39) 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, FT 10, ", 642 PAINT (WT: 39) 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT (WT: 39) FT MAINTENANCE OF TRAFFIC Section 0006 INCIDENTALS Page 4

8 E06000 PREMIUM FOR CONTRACT PERFORMANCE BOND, PAYMENT BOND AND MAINTENANCE BOND (WT: NR) 614E11001 MAINTAINING TRAFFIC, AS PER PLAN (WT: 39) 624E10000 MOBILIZATION (WT: NR) 0006 INCIDENTALS Page 5

9 Project Number: PID: Lawrence US GAP FY18 E171(007) DBE Goal: 5.0% Date Set for Completion: 8/31/2018 Type: MISCELLANEOUS Plan Cost: $5.00 FOR IMPROVING VARIOUS SECTIONS THROUGHT FAYETTE, SOUTH POINT, AND UNION TOWNSHIPS, WITHIN LAWRENCE COUNTY, OF OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS REPAIRING AND IMPROVING THE SPECIFIED SECTIONS OF ROADWAY, EITHER BY REMOVING AND REPLACING THE PAVEMENT, INCLUDING ALL RELATED WORK. PROJECT ALSO INCLUDES PLACING MICROSURFACE AT THE APPROACHES TO INTERSECTIONS TO IMPROVE TRACTION. Ref. No. Item Code Item Description Section 0001 EROSION CONTROL 0001 Project Length: 4.16 Miles Work Length: 4.16 Miles Pavement Width: Varies Unit of Measure Approx. Quantity 832E30000 EROSION CONTROL (WT: 08) EACH 1, EROSION CONTROL Section 0002 PAVEMENT E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), SY 2, AS PER PLAN (WT: 16) 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL SY 1, AND FLEXIBLE REPLACEMENT, AS PER PLAN (WT: 16) 252E01500 FULL DEPTH PAVEMENT SAWING (WT: 16) FT 8, E01000 PAVEMENT PLANING, ASPHALT CONCRETE, SY 3, " (WT: 13) 407E10000 TACK COAT (WT: 10) GAL E10010 MICROSURFACING, SURFACE COURSE (WT: SY 9, ) 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (448), PG70-22M (WT: 10) CY PAVEMENT Section 0003 TRAFFIC CONTROL Page 6

10 E00100 RPM (WT: 41) EACH E54000 RAISED PAVEMENT MARKER REMOVED (WT: EACH NR) 642E00094 EDGE LINE, 6" (WT: 45) MILE E00194 LANE LINE, 6" (WT: 45) MILE E00394 CHANNELIZING LINE, 12" (WT: 45) FT 3, E00490 STOP LINE (WT: 45) FT E30000 REMOVAL OF PAVEMENT MARKING (WT: 45) FT 3, E30030 REMOVAL OF PAVEMENT MARKING (WT: 45) MILE TRAFFIC CONTROL Section 0004 MAINTENANCE OF TRAFFIC E11110 LAW ENFORCEMENT OFFICER WITH HOUR PATROL CAR FOR ASSISTANCE (WT: 39) 614E12460 WORK ZONE MARKING SIGN (WT: 39) EACH E18601 PORTABLE CHANGEABLE MESSAGE SIGN, SNMT AS PER PLAN (WT: 39) 614E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY SNMT (WT: 39) 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 MILE PAINT (WT: 39) 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 MILE PAINT (WT: 39) 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, FT 7, ", 642 PAINT (WT: 39) 614E26610 WORK ZONE STOP LINE, CLASS III, 642 FT PAINT (WT: 39) 616E10000 WATER (WT: NR) MGAL MAINTENANCE OF TRAFFIC Section 0005 INCIDENTALS E06000 PREMIUM FOR CONTRACT PERFORMANCE BOND, PAYMENT BOND AND MAINTENANCE BOND (WT: NR) 614E11000 MAINTAINING TRAFFIC (WT: 39) 619E16000 FIELD OFFICE, TYPE A (WT: NR) MNTH E10000 MOBILIZATION (WT: NR) 0005 INCIDENTALS Page 7

11 Project Number: PID: Highland CR & SR E130(772) DBE Goal: 8.0% Date Set for Completion: 6/30/2019 Type: MINOR WIDENING Plan Cost: $79.00 FOR IMPROVING VARIOUS SECTIONS IN WASHINGTON AND MARSHALL TOWNSHIPS, HIGHLAND COUNTY, OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY WIDENING AN EXISTING ROADWAY, IMPROVING DRAINAGE AND A VERTICAL PROFILE, AND RELATED WORK Ref. No. Item Code Section 0001 ROADWAY Item Description Project Length: 0.00 Miles Work Length: 0.00 Miles Pavement Width: 0 Feet Unit of Measure Approx. Quantity E11000 CLEARING AND GRUBBING (WT: 01) 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (WT: NR) 202E20010 HEADWALL REMOVED (WT: NR) EACH E23000 PAVEMENT REMOVED (WT: NR) SY E23010 PAVEMENT REMOVED, ASPHALT (WT: NR) SY 20, E35100 PIPE REMOVED, 24" AND UNDER (WT: NR) FT 3, E35200 PIPE REMOVED, OVER 24" (WT: NR) FT E38000 GUARDRAIL REMOVED (WT: NR) FT E38200 GUARDRAIL REMOVED FOR REUSE (WT: NR) FT E38800 GUARD POST REMOVED (WT: NR) EACH E42000 ANCHOR ASSEMBLY REMOVED, TYPE A (WT: EACH NR) 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T (WT: NR) 202E42806 ANCHOR ASSEMBLY REMOVED FOR REUSE EACH (WT: NR) 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED EACH FOR REUSE (WT: NR) 202E53100 MAILBOX REMOVED (WT: NR) EACH Page 8

12 E58100 CATCH BASIN REMOVED (WT: NR) EACH E75000 FENCE REMOVED (WT: NR) FT 25, E75250 GATE REMOVED (WT: NR) EACH E98100 REMOVAL MISC.:BOULDER REMOVED (WT: EACH NR) 202E98100 REMOVAL MISC.:STONE DRIVE ENTRANCE EACH REMOVED (WT: NR) 203E10000 EXCAVATION (WT: 04) CY 73, E10001 EXCAVATION, AS PER PLAN (WT: 04) CY E20000 EMBANKMENT (WT: 04) CY 10, E10000 SUBGRADE COMPACTION (WT: 04) SY 48, E13000 EXCAVATION OF SUBGRADE (WT: 04) CY 17, E20000 EMBANKMENT (WT: 04) CY 17, E45000 PROOF ROLLING (WT: NR) HOUR E15050 GUARDRAIL, TYPE MGS (WT: 36) FT E16000 GUARDRAIL REBUILT (WT: 36) FT E25550 ANCHOR ASSEMBLY, MGS TYPE A (WT: 36) 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (WT: 36) EACH E26550 ANCHOR ASSEMBLY, MGS TYPE T (WT: 36) EACH E27800 ANCHOR ASSEMBLY REBUILT, TYPE A (WT: EACH ) 606E27900 ANCHOR ASSEMBLY REBUILT, TYPE T (WT: EACH ) 606E32170 BRIDGE TERMINAL ASSEMBLY REBUILT, EACH TYPE TST (WT: 36) 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 (WT: 36) 607E15000 FENCE, TYPE 47 (WT: 37) FT 4, E15100 FENCE, TYPE 47RA (WT: 37) FT 14, E98000 FENCE, MISC.: 3-RAIL WOOD HORSE FENCE FT 1, (WT: 37) 607E98000 FENCE, MISC.: 4-RAIL WOOD HORSE FENCE FT (WT: 37) 608E " CONCRETE WALK (WT: 38) SF E40500 REFERENCE MONUMENT (WT: NR) EACH E50000 SPECIAL - MAILBOX SUPPORT (WT: NR) EACH E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATERIALS (WT: NR) 0001 ROADWAY Section 0002 EROSION CONTROL Page 9

13 E21050 TIED CONCRETE BLOCK MAT, TYPE 1 (WT: SY ) 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH CY FILTER (WT: 35) 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH CY FILTER (WT: 35) 659E00300 TOPSOIL (WT: 46) CY 16, E10000 SEEDING AND MULCHING (WT: 46) SY 148, E14000 REPAIR SEEDING AND MULCHING (WT: 46) SY 7, E20000 COMMERCIAL FERTILIZER (WT: 46) TON E31000 LIME (WT: 46) ACRE E35000 WATER (WT: 46) MGAL E00700 DITCH EROSION PROTECTION (WT: 46) SY 6, E00710 DITCH EROSION PROTECTION MAT, TYPE A SY 5, (WT: 46) 832E15000 STORM WATER POLLUTION PREVENTION PLAN (WT: NR) 832E30000 EROSION CONTROL (WT: 08) EACH 230, E10000 SEEDING AND EROSION CONTROL WITH SY 2, TURF REINFORCING MAT, TYPE 1 (WT: 46) 836E10020 SEEDING AND EROSION CONTROL WITH TURF REINFORCING MAT, TYPE 2 (WT: 46) SY EROSION CONTROL Section 0003 DRAINAGE E20000 CONCRETE MASONRY (WT: 35) CY E31100 AGGREGATE DRAINS (WT: 35) FT 2, E " CONDUIT, TYPE B (WT: 35) FT E " CONDUIT, TYPE E (WT: 35) FT E " CONDUIT, TYPE F (WT: 35) FT E " CONDUIT, TYPE B (WT: 35) FT E " CONDUIT, TYPE C (WT: 35) FT E " CONDUIT, TYPE D (WT: 35) FT E " CONDUIT, TYPE B (WT: 35) FT E " CONDUIT, TYPE D (WT: 35) FT E " CONDUIT, TYPE B (WT: 35) FT E " CONDUIT, TYPE C (WT: 35) FT E " CONDUIT, TYPE D (WT: 35) FT E " CONDUIT, TYPE A, , (0.079) FT GALVANIZED, (0.064) ALUMINIZED, (WT: 35) Page 10

14 E " CONDUIT, TYPE D (WT: 35) FT E " CONDUIT, TYPE A, , (0.079) FT GALVANIZED, (0.064) ALUMINIZED, (WT: 35) 611E97400 CONDUIT, MISC.: INSTALLATION ONLY (WT: FT 1, ) 611E98150 CATCH BASIN, NO. 3 (WT: 35) 611E98470 CATCH BASIN, NO. 2-2B (WT: 35) EACH E99574 MANHOLE, NO. 3 (WT: 35) EACH DRAINAGE Section 0004 PAVEMENT E01500 FULL DEPTH PAVEMENT SAWING (WT: 16) FT 36, E01000 PAVEMENT PLANING, ASPHALT SY 29, CONCRETE(VARIABLE THICKNESS, 0" MIN. TO 5 3/4" MAX.) (WT: 13) 301E46000 ASPHALT CONCRETE BASE, PG64-22 (WT: 10) CY 5, E20000 AGGREGATE BASE (WT: 09) CY 4, E10000 TACK COAT (WT: 10) GAL 5, E10000 PRIME COAT (WT: 10) GAL 8, E10000 STABILIZED CRUSHED AGGREGATE (WT: NR) CY 4, E10000 SINGLE CHIP SEAL, TYPE A (WT: 11) SY 1, E50000 ASPHALT CONCRETE SURFACE COURSE, CY 2, TYPE 1, (448), PG64-22 (WT: 10) 441E50300 ASPHALT CONCRETE INTERMEDIATE CY 3, COURSE, TYPE 2, (448) (WT: 10) 609E24510 CURB, TYPE 4-C (WT: 38) FT PAVEMENT Section 0005 LIGHTING E75401 LIGHT POLE REMOVED, AS PER PLAN (WT: NR) EACH LIGHTING Section 0006 TRAFFIC CONTROL E00100 RPM (WT: 41) EACH E54000 RAISED PAVEMENT MARKER REMOVED (WT: EACH NR) 626E00100 BARRIER REFLECTOR (WT: NR) EACH E02100 GROUND MOUNTED SUPPORT, NO. 2 POST FT (WT: 42) 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST FT (WT: 42) Page 11

15 E04100 GROUND MOUNTED SUPPORT, NO. 4 POST FT (WT: 42) 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST FT (WT: 42) 630E08600 SIGN POST REFLECTOR (WT: 42) EACH E80100 SIGN, FLAT SHEET (WT: 42) SF E80510 SIGN, STREET NAME (WT: 42) EACH E84900 REMOVAL OF GROUND MOUNTED SIGN AND EACH DISPOSAL (WT: NR) 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND EACH REERECTION (WT: 42) 630E86002 REMOVAL OF GROUND MOUNTED POST EACH SUPPORT AND DISPOSAL (WT: NR) 644E00100 EDGE LINE, 4" (WT: 45) MILE E00300 CENTER LINE (WT: 45) MILE E00500 STOP LINE (WT: 45) FT TRAFFIC CONTROL Section 0007 MAINTENANCE OF TRAFFIC E46000 ASPHALT CONCRETE BASE, PG64-22 (WT: 10) CY E20000 AGGREGATE BASE (WT: 09) CY E10000 TACK COAT (WT: 10) GAL E10000 PRIME COAT (WT: 10) GAL E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR CY B (WT: NR) 441E50000 ASPHALT CONCRETE SURFACE COURSE, CY TYPE 1, (448), PG64-22 (WT: 10) 614E11110 LAW ENFORCEMENT OFFICER WITH HOUR PATROL CAR FOR ASSISTANCE (WT: 39) 614E12420 DETOUR SIGNING (WT: 39) 614E12600 REPLACEMENT DRUM (WT: 39) EACH E10000 WATER (WT: NR) MGAL E00300 CENTER LINE (WT: 45) MILE MAINTENANCE OF TRAFFIC Section 0008 RETAINING WALLS E11100 COFFERDAMS AND EXCAVATION BRACING (WT: 34) 610E60000 RETAINING WALL, MISC.: NON-CELLULAR RETAINING WALL SYSTEM (WALL 1) (WT: 34) 610E60000 RETAINING WALL, MISC.: NON-CELLULAR RETAINING WALL SYSTEM (WALL 2) (WT: 34) 0008 RETAINING WALLS Page 12

16 Section 0009 INCIDENTALS E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND (WT: NR) 108E10000 CPM PROGRESS SCHEDULE (WT: NR) 111E10000 SPECIAL - DEPARTMENTS SHARE FACILITATED PARTNERING COSTS (WT: NR) 614E11000 MAINTAINING TRAFFIC (WT: 39) 619E16010 FIELD OFFICE, TYPE B (WT: NR) MNTH E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING (WT: NR) 624E10000 MOBILIZATION (WT: NR) 0009 INCIDENTALS Page 13

17 Project Number: PID: Jefferson SR E150(720) DBE Goal: 5.0% Date Set for Completion: 10/31/2018 Type: SIGNALIZATION Plan Cost: $9.00 FOR IMPROVING SECTIONS IN ISLAND CREEK TOWNSHIP, JEFFERSON COUNTY, OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY UPGRADING EXISTING SIGNAL HARDWARE, AND ADDING A LEFT TURN LANE. Ref. No. Item Code Section 0001 ROADWAY Item Description Project Length: NA Miles Work Length: NA Miles Pavement Width: NA Feet Unit of Measure Approx. Quantity 201E11000 CLEARING AND GRUBBING (WT: 01) 202E23000 PAVEMENT REMOVED (WT: NR) SY E30700 CONCRETE BARRIER REMOVED (WT: NR) FT E10000 SUBGRADE COMPACTION (WT: 06) SY E60028 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL), (55 MPH), (24 INCHES) (WT: 36) 622E24840 CONCRETE BARRIER END SECTION, TYPE B (WT: 38) 0001 ROADWAY Section 0002 EROSION CONTROL E30000 EROSION CONTROL (WT: 08) EACH 1, EROSION CONTROL Section 0003 PAVEMENT E01500 FULL DEPTH PAVEMENT SAWING (WT: 16) FT E20000 AGGREGATE BASE (WT: 09) CY E " REINFORCED CONCRETE PAVEMENT, CLASS QC1 (WT: 12) SY PAVEMENT Page 14

18 Section 0004 TRAFFIC CONTROL E00102 BARRIER REFLECTOR, TYPE 1, ONE-WAY EACH (WT: NR) 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST FT (WT: 42) 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED EACH (WT: 42) 630E80100 SIGN, FLAT SHEET (WT: 42) SF E10010 EDGE LINE, 6" (WT: 45) MILE E10200 CENTER LINE (WT: 45) MILE E10310 CHANNELIZING LINE, 12" (WT: 45) FT E10400 STOP LINE (WT: 45) FT E20300 LANE ARROW (WT: 45) 646E20320 WRONG WAY ARROW (WT: 45) 646E20504 DOTTED LINE, 6" (WT: 45) FT TRAFFIC CONTROL Section 0005 TRAFFIC SIGNALS E " CONDUIT, TYPE E (WT: 35) FT E25500 CONDUIT, 3", (WT: 43) FT E29000 TRENCH (WT: 43) FT E30700 PULL BOX, , 18" (WT: 43) EACH E32000 GROUND ROD (WT: 43) EACH E05007 VEHICULAR SIGNAL HEAD, (LED), 3- EACH SECTION, 12" LENS, 1-WAY, POLYCARBONATE, AS PER PLAN (WT: 44) 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5- EACH SECTION, 12" LENS, 1-WAY, POLYCARBONATE, AS PER PLAN (WT: 44) 632E25000 COVERING OF VEHICULAR SIGNAL HEAD EACH (WT: 44) 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" FT DIAMETER WITH ACCESSORIES (WT: 44) 632E30600 TETHER WIRE, WITH ACCESSORIES (WT: 44) FT E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG FT 2, (WT: 44) 632E64000 STRAIN POLE FOUNDATION (WT: 44) EACH E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG FT (WT: 44) 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG FT (WT: 44) 632E70001 POWER SERVICE, AS PER PLAN (WT: 44) Page 15

19 E83200 STRAIN POLE, TYPE TC-81.10, DESIGN 12 EACH (WT: 44) 632E83300 STRAIN POLE, TYPE TC-81.10, DESIGN 13 EACH (WT: 44) 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION (WT: 44) 633E65532 CABINET, TYPE 336L (WT: 44) 633E67100 CABINET FOUNDATION (WT: 44) 633E67200 CONTROLLER WORK PAD (WT: 44) 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS PER PLAN (WT: 44) 633E99000 CONTROLLER ITEM, MISC.: CONTROLLER UNIT, INSTALLATION (WT: 44) 809E69000 ADVANCE RADAR DETECTION (WT: 55) EACH E69100 STOP-BAR RADAR DETECTION (WT: 55) EACH TRAFFIC SIGNALS Section 0006 MAINTENANCE OF TRAFFIC E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR CY B (WT: NR) 614E11110 LAW ENFORCEMENT OFFICER WITH HOUR PATROL CAR FOR ASSISTANCE (WT: 39) 614E12338 WORK ZONE IMPACT ATTENUATOR EACH (BIDIRECTIONAL) (WT: 39) 614E13000 ASPHALT CONCRETE FOR MAINTAINING CY TRAFFIC (WT: 39) 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY EACH (WT: NR) 614E13312 BARRIER REFLECTOR, TYPE 2, ONE WAY EACH (WT: NR) 614E13350 OBJECT MARKER, ONE WAY (WT: NR) EACH E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 MILE PAINT (WT: 39) 614E26610 WORK ZONE STOP LINE, CLASS III, 642 FT PAINT (WT: 39) 616E10000 WATER (WT: NR) MGAL E41000 PORTABLE BARRIER, 32" (WT: 39) FT MAINTENANCE OF TRAFFIC Section 0007 INCIDENTALS E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND (WT: NR) 614E11000 MAINTAINING TRAFFIC (WT: 39) Page 16

20 E16010 FIELD OFFICE, TYPE B (WT: NR) MNTH E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING (WT: NR) 624E10000 MOBILIZATION (WT: NR) 0007 INCIDENTALS Page 17

21 Project Number: PID: Shelby SR 571/SR /11.04 E150(089) DBE Goal: 9% Date Set for Completion: 10/1/2018 Type: BRIDGE REPAIR Plan Cost: $17.00 FOR IMPROVING SECTIONS OF SR 571 AND SR 721 IN THE TOWNSHIPS OF UNION AND NEWTON, MIAMI COUNTY, OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY PERFORMING BRIDGE REPAIRS. Ref. No. Item Code Section 0001 ROADWAY Item Description Project Length: 0.11 Miles Work Length: 0.11 Miles Pavement Width: Varies Unit of Measure Approx. Quantity 201E11000 CLEARING AND GRUBBING (WT: 01) 202E23010 PAVEMENT REMOVED, ASPHALT (WT: NR) SY E23500 WEARING COURSE REMOVED (WT: NR) SY E38000 GUARDRAIL REMOVED (WT: NR) FT E47000 BRIDGE TERMINAL ASSEMBLY REMOVED EACH (WT: NR) 204E10000 SUBGRADE COMPACTION (WT: 06) SY E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, FT AS PER PLAN (WT: 36) 690E50350 SPECIAL - MAILBOX REMOVED AND RESET (WT: NR) 0001 ROADWAY Section 0002 EROSION CONTROL E30000 EROSION CONTROL (WT: 08) EACH 1, EROSION CONTROL Section 0003 PAVEMENT E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1 1/2" (WT: 13) SY E46000 ASPHALT CONCRETE BASE, PG /2" CY (WT: 10) Page 18

22 E20000 AGGREGATE BASE, 6" (WT: 09) CY E10000 TACK COAT (WT: 10) GAL E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG64-22 (WT: 10) CY PAVEMENT Section 0004 TRAFFIC CONTROL E54001 RAISED PAVEMENT MARKER REMOVED, AS EACH PER PLAN (WT: NR) 646E10010 EDGE LINE, 6" (WT: 45) MILE E10110 LANE LINE, 6" (WT: 45) MILE E10200 CENTER LINE (WT: 45) MILE TRAFFIC CONTROL Section 0005 MAINTENANCE OF TRAFFIC E11110 LAW ENFORCEMENT OFFICER WITH HOUR PATROL CAR FOR ASSISTANCE (WT: 39) 614E12338 WORK ZONE IMPACT ATTENUATOR EACH (BIDIRECTIONAL) (WT: 39) 614E12351 WORK ZONE IMPACT ATTENUATOR, AS PER EACH PLAN (WT: 39) 614E12420 DETOUR SIGNING (WT: 39) 614E12500 REPLACEMENT SIGN (WT: 39) EACH E12600 REPLACEMENT DRUM (WT: 39) EACH E13310 BARRIER REFLECTOR, TYPE 1, TYPE 1 (ONE- EACH WAY) (WT: NR) 614E13350 OBJECT MARKER, ONE WAY (WT: NR) EACH E21550 WORK ZONE CENTER LINE, CLASS III, 642 MILE PAINT (WT: 39) 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 MILE PAINT (WT: 39) 622E41000 PORTABLE BARRIER, 32" (WT: 39) FT 1, MAINTENANCE OF TRAFFIC Section 0006 STRUCTURE OVER 20 FOOT SPAN (MIA ) E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN (WT: NR) 202E22900 APPROACH SLAB REMOVED (WT: NR) SY E21300 UNCLASSIFIED EXCAVATION (WT: 29) 509E10000 EPOXY COATED REINFORCING STEEL (WT: LB 2, ) 509E20001 REINFORCING STEEL, REPLACEMENT OF LB 1, EXISTING REINFORCING STEEL, AS PER PLAN (WT: 23) Page 19

23 E10000 DOWEL HOLES WITH NONSHRINK, EACH NONMETALLIC GROUT (WT: 29) 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE CY (WT: 29) 511E34446 CLASS QC2 CONCRETE WITH QC/QA, CY BRIDGE DECK (WT: 29) 511E34450 CLASS QC2 CONCRETE WITH QC/QA, CY BRIDGE DECK (PARAPET) (WT: 29) 512E10100 SEALING OF CONCRETE SURFACES (EPOXY- SY URETHANE) (WT: 57) 514E00050 SURFACE PREPARATION OF EXISTING SF 3, STRUCTURAL STEEL (WT: 26) 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL SF 3, STEEL, PRIME COAT (WT: 26) 514E00060 FIELD PAINTING STRUCTURAL STEEL, SF 3, INTERMEDIATE COAT (WT: 26) 514E00066 FIELD PAINTING STRUCTURAL STEEL, SF 3, FINISH COAT (WT: 26) 514E00504 GRINDING FINS, TEARS, SLIVERS ON MNHR EXISTING STRUCTURAL STEEL (WT: 26) 514E10000 FINAL INSPECTION REPAIR (WT: 26) EACH E11211 STRUCTURAL EXPANSION JOINT INCLUDING FT ELASTOMERIC STRIP SEAL, AS PER PLAN (WT: 27) 516E " DEEP JOINT SEALER, AS PER PLAN (WT: FT ) 516E46700 RESET BEARING (WT: 29) EACH E46900 BEARING DEVICE, MISC.:KEEPER PLATE EACH INSTALLATION (WT: 29) 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, AS PER PLAN (WT: 29) 519E11101 PATCHING CONCRETE STRUCTURE, AS PER SF PLAN (WT: 29) 530E01100 SPECIAL - STRUCTURES:APPROACH SLAB VOID REPAIR (WT: 29) CY STRUCTURE OVER 20 FOOT SPAN (MIA ) Section 0007 STRUCTURE OVER 20 FOOT SPAN (MIA ) E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN (WT: nr) 509E10000 EPOXY COATED REINFORCING STEEL (WT: LB 14, ) 512E10100 SEALING OF CONCRETE SURFACES (EPOXY- SY URETHANE) (WT: 57) Page 20

24 E10400 TREATING OF CONCRETE BRIDGE DECK SY WITH SRS (WT: 29) 516E " DEEP JOINT SEALER, AS PER PLAN (WT: FT ) 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING FT (WT: 29) 518E62100 STRUCTURE DRAINAGE, MISC.: STEEL DRIP FT STRIP, AS PER PLAN (WT: 29) 530E00600 SPECIAL - STRUCTURES: BONDING GROUT SF 4, (WT: 29) 844E10001 CONCRETE PATCHING WITH GALVANIC SF ANODE PROTECTION, AS PER PLAN (WT: 29) 847E10201 SUPERPLASTICIZED DENSE CONCRETE SY OVERLAY, AS PER PLAN, ( 4" THICKNESS ) (WT: 29) 847E20201 SUPERPLASTICIZED DENSE CONCRETE CY OVERLAY (VARIABLE THICKNESS), MATERIAL ONLY, AS PER PLAN (WT: 29) 847E30000 TEST SLAB (WT: 29) 847E30301 WEARING COURSE REMOVED, ASPHALT, AS PER PLAN (WT: 29) SY STRUCTURE OVER 20 FOOT SPAN (MIA ) Section 0008 INCIDENTALS E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND (WT: NR) 614E11000 MAINTAINING TRAFFIC (WT: 39) 619E16010 FIELD OFFICE, TYPE B (WT: NR) MNTH E10000 MOBILIZATION (WT: ) (WT: NR) 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING (WT: NR) 0008 INCIDENTALS Page 21

25 Project Number: PID: Ottawa /SAN Deck Sealing FY18 E161(218) DBE Goal: 8.0% Date Set for Completion: 10/1/2018 Type: BRIDGE REPAIR Plan Cost: $5.00 FOR IMPROVING VARIOUS SECTIONS OF VARIOUS ROUTES THROUGHOUT OTTAWA AND SANDUSKY COUNTIES, OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY BRIDGE SEALING. Ref. No. Item Code Item Description Project Length: NA Miles Work Length: NA Miles Pavement Width: NA Feet Section 0001 STRUCTURE OVER 20 FOOT SPAN 0001 Unit of Measure Approx. Quantity 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RESIN (WT: 29) SY 40, STRUCTURE OVER 20 FOOT SPAN Section 0002 INCIDENTALS E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND (WT: NR) 614E11000 MAINTAINING TRAFFIC (WT: 39) 624E10000 MOBILIZATION (WT: NR) 832E30000 EROSION CONTROL (WT: 08) EACH 1, INCIDENTALS Page 22

26 Project Number: PID: Portage MCRO FY2018(A) E161(350) DBE Goal: 3% Date Set for Completion: 8/1/2018 Type: PREVENTIVE MAINTENANCE Plan Cost: $5.00 FOR IMPROVING VARIOUS SECTIONS IN THE TOWNSHIPS OF EDINBURG, PALMYRA, ATWATER, AND DEERFIELD, IN PORTAGE COUNTY, OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY PERFORMING PAVEMENT REPAIRS, MICROSURFACING ASPHALT PAVEMENT, APPLYING PAVEMENT MARKINGS, AND PERFORMING ALL RELATED WORK. Ref. No. Item Code Item Description Section 0001 EROSION CONTROL 0001 Project Length: Miles Work Length: Miles Pavement Width: 38 Feet Unit of Measure Approx. Quantity 832E30000 EROSION CONTROL (WT: 08) EACH 1, EROSION CONTROL Section 0002 DRAINAGE E98630 CATCH BASIN ADJUSTED TO GRADE (WT: 35) EACH E99654 MANHOLE ADJUSTED TO GRADE (WT: 35) EACH DRAINAGE Section 0003 PAVEMENT E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) SY 1, (WT: 16) 421E10010 MICROSURFACING, SURFACE COURSE (WT: SY 412, ) 421E10020 MICROSURFACING, LEVELING COURSE (WT: SY 286, ) 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE) (WT: NR) MILE PAVEMENT Section 0004 WATER WORK E10800 VALVE BOX ADJUSTED TO GRADE (WT: 35) EACH Page 23

27 0004 WATER WORK Section 0005 TRAFFIC CONTROL E00100 RPM (WT: 41) EACH 1, E54000 RAISED PAVEMENT MARKER REMOVED (WT: EACH 1, NR) 644E30000 REMOVAL OF PAVEMENT MARKING (WT: 45) FT E30030 REMOVAL OF PAVEMENT MARKING (WT: 45) MILE E10010 EDGE LINE, 6" (WT: 45) MILE E10110 LANE LINE, 6" (WT: 45) MILE E10200 CENTER LINE (WT: 45) MILE E10310 CHANNELIZING LINE, 12" (WT: 45) FT 4, E10400 STOP LINE (WT: 45) FT E20500 DOTTED LINE (WT: 45) FT 4, E50100 REMOVAL OF PAVEMENT MARKING (WT: 45) FT 8, E50300 REMOVAL OF PAVEMENT MARKING (WT: 45) MILE TRAFFIC CONTROL Section 0006 MAINTENANCE OF TRAFFIC E11110 LAW ENFORCEMENT OFFICER WITH HOUR PATROL CAR FOR ASSISTANCE (WT: 39) 614E12460 WORK ZONE MARKING SIGN (WT: 39) EACH E18601 PORTABLE CHANGEABLE MESSAGE SIGN, SNMT AS PER PLAN (WT: 39) 614E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY SNMT (WT: 39) 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 MILE PAINT (WT: 39) 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 MILE PAINT (WT: 39) 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, FT 12, ", 642 PAINT (WT: 39) 614E26610 WORK ZONE STOP LINE, CLASS III, 642 FT PAINT (WT: 39) 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" (WT: 39) MILE MAINTENANCE OF TRAFFIC Section 0007 INCIDENTALS E06000 PREMIUM FOR CONTRACT PERFORMANCE BOND, PAYMENT BOND AND MAINTENANCE BOND (WT: NR) 614E11000 MAINTAINING TRAFFIC (WT: 39) Page 24

28 E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING (WT: NR) 624E10000 MOBILIZATION (WT: ) (WT: NR) 0007 INCIDENTALS Page 25

29 Project Number: PID: Ross Industrial Parkway Phase 1 E160(105) DBE Goal: 8% Date Set for Completion: 7/31/2018 Type: NEW CONSTRUCTION Plan Cost: $5.00 FOR IMPROVING SECTIONS IN THE CITY OF CHILLICOTHE, ROSS COUNTY, OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY EXTENDING AN EXISTING DRIVE, AND INSTALLING INCIDENTAL DRAINAGE AND STORM SEWER SYSTEMS. Ref. No. Item Code Section 0001 ROADWAY Item Description Project Length: 0.16 Miles Work Length: 0.16 Miles Pavement Width: NA Feet Unit of Measure Approx. Quantity 201E11000 CLEARING AND GRUBBING 202E32600 GUTTER REMOVED FT E35100 PIPE REMOVED, 24" AND UNDER FT E35200 PIPE REMOVED, OVER 24" FT E58000 MANHOLE REMOVED 203E10000 EXCAVATION CY 3, E20000 EMBANKMENT CY 1, E10000 SUBGRADE COMPACTION SY 2, E13000 EXCAVATION OF SUBGRADE CY E30020 GRANULAR MATERIAL, TYPE C CY E45000 PROOF ROLLING HOUR E50000 GEOTEXTILE FABRIC SY 1, E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATERIALS 0001 ROADWAY Section 0002 EROSION CONTROL E21050 TIED CONCRETE BLOCK MAT, TYPE 1 SY E32000 ROCK CHANNEL PROTECTION, TYPE A WITH CY FILTER Page 26

30 E32100 ROCK CHANNEL PROTECTION, TYPE B WITH CY FILTER 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH CY FILTER 601E38100 PAVED GUTTER, TYPE 1-6 FT E00100 SOIL ANALYSIS TEST EACH E00300 TOPSOIL CY E10000 SEEDING AND MULCHING SY 5, E14000 REPAIR SEEDING AND MULCHING SY E20000 COMMERCIAL FERTILIZER TON E31000 LIME ACRE E35000 WATER MGAL E00500 SLOPE EROSION PROTECTION SY 1, E00700 DITCH EROSION PROTECTION SY E15000 STORM WATER POLLUTION PREVENTION PLAN 832E30000 EROSION CONTROL EACH 13, EROSION CONTROL Section 0003 DRAINAGE E20000 CONCRETE MASONRY CY E " UNCLASSIFIED PIPE UNDERDRAINS FT E " BASE PIPE UNDERDRAINS FT 1, E " CONDUIT, TYPE F FOR UNDERDRAIN FT OUTLET 611E " CONDUIT, TYPE B FT E " CONDUIT, TYPE E FT E " CONDUIT, TYPE F FT E " CONDUIT, TYPE A, , , FT (0.5"), , (0.5") 611E " CONDUIT, TYPE B FT E " CONDUIT, TYPE C FT E " CONDUIT, TYPE C FT E " CONDUIT, TYPE A, , , FT (0.5"), , (0.5") 611E " CONDUIT, TYPE C FT E " X 60" CONDUIT, TYPE B, FT E98150 CATCH BASIN, NO. 3 EACH E98180 CATCH BASIN, NO. 3A EACH E99574 MANHOLE, NO. 3 EACH Page 27

31 E99710 PRECAST REINFORCED CONCRETE OUTLET EACH E10010 MANUFACTURED WATER QUALITY STRUCTURE, TYPE DRAINAGE Section 0004 PAVEMENT E46000 ASPHALT CONCRETE BASE, PG64-22 CY E20000 AGGREGATE BASE CY E10000 TACK COAT GAL E50000 ASPHALT CONCRETE SURFACE COURSE, CY TYPE 1, (448), PG E50300 ASPHALT CONCRETE INTERMEDIATE CY COURSE, TYPE 2, (448) 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 FT 1, PAVEMENT Section 0005 WATER WORK E " WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, MECHANICAL JOINTS AND FITTINGS FT WATER WORK Section 0006 SANITARY SEWER E99654 MANHOLE ADJUSTED TO GRADE 0006 SANITARY SEWER Section 0007 TRAFFIC CONTROL E02100 GROUND MOUNTED SUPPORT, NO. 2 POST FT E80100 SIGN, FLAT SHEET SF E00300 CENTER LINE MILE TRAFFIC CONTROL Section 0008 MAINTENANCE OF TRAFFIC E10000 WATER MGAL MAINTENANCE OF TRAFFIC Section 0009 STRUCTURE 20 FOOT SPAN AND UNDER E11100 COFFERDAMS AND EXCAVATION BRACING 601E11000 RIPRAP, TYPE D SY E20000 CONCRETE MASONRY CY E73600 CONDUIT, TYPE A, STRUCTURAL PLATE CORRUGATED STEEL PIPE ARCH, 15?-10? X 9?-10? (0.109) WITH CONCRETE INVERT PAVING FT STRUCTURE 20 FOOT SPAN AND UNDER Page 28

32 Section 0010 INCIDENTALS E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND 614E11000 MAINTAINING TRAFFIC 619E16000 FIELD OFFICE, TYPE A MNTH E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING 624E10000 MOBILIZATION 0010 INCIDENTALS Page 29

33 Project Number: PID: Scioto US E161(534) DBE Goal: 6.0% Date Set for Completion: 10/31/2018 Type: TWO LANE RESURFACING Plan Cost: $5.00 FOR IMPROVING SECTIONS OF US 52 IN THE CITY OF PORTSMOUTH, VILLAGE OF NEW BOSTON, SCIOTO COUNTY, OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY RESURFACING. Ref. No. Item Code Section 0001 ROADWAY Item Description Project Length: 3.93 Miles Work Length: 3.93 Miles Pavement Width: Varies Unit of Measure Approx. Quantity 202E23010 PAVEMENT REMOVED, ASPHALT (WT: NR) SY E30000 WALK REMOVED (WT: NR) SF 5, E32000 CURB REMOVED (WT: NR) FT 1, E32500 CURB AND GUTTER REMOVED (WT: NR) FT E " CONCRETE WALK (WT: 38) SF E52000 CURB RAMP (WT: 38) SF 5, ROADWAY Section 0002 EROSION CONTROL E10000 WATER (WT: NR) MGAL E10000 SEEDING AND MULCHING (WT: 46) SY E30000 EROSION CONTROL (WT: 08) EACH 1, EROSION CONTROL Section 0003 DRAINAGE E98630 CATCH BASIN ADJUSTED TO GRADE (WT: 35) EACH E99150 INLET ADJUSTED TO GRADE (WT: 35) EACH E99654 MANHOLE ADJUSTED TO GRADE (WT: 35) EACH DRAINAGE Section 0004 PAVEMENT Page 30

34 E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), SY AS PER PLAN (WT: 16) 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, SY 95, AS PER PLAN 1.5" MAX (WT: 13) 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, SY 3, AS PER PLAN 3.25" (WT: 13) 254E01601 PATCHING PLANED SURFACE, AS PER PLAN SY 9, (WT: 16) 255E10501 FULL DEPTH PAVEMENT REMOVAL AND SY RIGID REPLACEMENT, CLASS RRCM, AS PER PLAN (WT: 17) 255E20000 FULL DEPTH PAVEMENT SAWING (WT: 15) FT 24, E13900 TACK COAT, (WT: 10) GAL E20000 NON-TRACKING TACK COAT (WT: 10) GAL 7, E20000 ASPHALT CONCRETE SURFACE COURSE, CY 3, MM, TYPE A (448)1.5" (WT: 10) 442E20200 ASPHALT CONCRETE INTERMEDIATE CY COURSE, 19 MM, TYPE A (448) (WT: 10) 609E24511 CURB, TYPE 4-C, AS PER PLAN (WT: 38) FT 1, PAVEMENT Section 0005 TRAFFIC CONTROL E00104 EDGE LINE, 6" (WT: 45) MILE E00204 LANE LINE, 6" (WT: 45) MILE E00400 CHANNELIZING LINE, 8" (WT: 45) FT 1, E00500 STOP LINE (WT: 45) FT E00600 CROSSWALK LINE (WT: 45) FT 4, E01300 LANE ARROW (WT: 45) EACH E01410 WORD ON PAVEMENT, 96" (WT: 45) EACH TRAFFIC CONTROL Section 0006 MAINTENANCE OF TRAFFIC E11110 LAW ENFORCEMENT OFFICER WITH HOUR PATROL CAR FOR ASSISTANCE (WT: 39) 614E12460 WORK ZONE MARKING SIGN (WT: 39) EACH E18601 PORTABLE CHANGEABLE MESSAGE SIGN, SNMT AS PER PLAN (WT: 39) 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 MILE PAINT (WT: 39) 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, FT ", 642 PAINT (WT: 39) 614E26610 WORK ZONE STOP LINE, CLASS III, 642 FT PAINT (WT: 39) Page 31

35 E27620 WORK ZONE CROSSWALK LINE, CLASS III, FT 4, PAINT (WT: 39) E30650 WORK ZONE ARROW, CLASS III, 642 PAINT (WT: 39) EACH MAINTENANCE OF TRAFFIC Section 0007 INCIDENTALS E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND (WT: NR) 614E11000 MAINTAINING TRAFFIC (WT: 39) 619E16000 FIELD OFFICE, TYPE A (WT: NR) MNTH E10000 MOBILIZATION (WT: NR) 0007 INCIDENTALS Page 32

36 Project Number: PID: Summit MCRO FY2018(B) E161(333) DBE Goal: 3.0% Date Set for Completion: 7/1/2018 Type: PREVENTIVE MAINTENANCE Plan Cost: $5.00 FOR IMPROVING VARIOUS SECTIONS IN THE CITIES OF AKRON AND FAIRLAWN, SUMMIT COUNTY, OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY MICROSURFACING ASPHALT PAVEMENT, APPLYING PAVEMENT MARKINGS, AND PERFORMING ALL RELATED WORK. Ref. No. Item Code Item Description Section 0001 EROSION CONTROL 0001 Project Length: 2.48 Miles Work Length: 2.48 Miles Pavement Width: 56 Feet Unit of Measure Approx. Quantity 832E30000 EROSION CONTROL (WT: 08) EACH 1, EROSION CONTROL Section 0002 PAVEMENT E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) SY (WT: 16) 421E10010 MICROSURFACING, SURFACE COURSE (WT: SY 227, ) 421E10020 MICROSURFACING, LEVELING COURSE (WT: 11) SY 227, PAVEMENT Section 0003 TRAFFIC CONTROL E00100 RPM (WT: 41) EACH E54000 RAISED PAVEMENT MARKER REMOVED (WT: EACH NR) 644E01510 DOTTED LINE, 6" (WT: 45) FT 7, E30000 REMOVAL OF PAVEMENT MARKING (WT: 45) FT 16, E30020 REMOVAL OF PAVEMENT MARKING (WT: 45) EACH E30030 REMOVAL OF PAVEMENT MARKING (WT: 45) MILE E10010 EDGE LINE, 6" (WT: 45) MILE Page 33

37 E10110 LANE LINE, 6" (WT: 45) MILE E10310 CHANNELIZING LINE, 12" (WT: 45) FT 8, E10400 STOP LINE (WT: 45) FT E10600 TRANSVERSE/DIAGONAL LINE (WT: 45) FT E20300 LANE ARROW (WT: 45) EACH TRAFFIC CONTROL Section 0004 MAINTENANCE OF TRAFFIC E11110 LAW ENFORCEMENT OFFICER WITH HOUR PATROL CAR FOR ASSISTANCE (WT: 39) 614E12460 WORK ZONE MARKING SIGN (WT: 39) EACH E13000 ASPHALT CONCRETE FOR MAINTAINING CY TRAFFIC (WT: 39) 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, SNMT AS PER PLAN (WT: 39) 614E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY SNMT (WT: 39) 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 MILE PAINT (WT: 39) 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, FT 17, ", 642 PAINT (WT: 39) 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT (WT: 39) FT MAINTENANCE OF TRAFFIC Section 0005 INCIDENTALS E06000 PREMIUM FOR CONTRACT PERFORMANCE BOND, PAYMENT BOND AND MAINTENANCE BOND (WT: NR) 614E11000 MAINTAINING TRAFFIC (WT: 39) 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING (WT: NR) 624E10000 MOBILIZATION (WT: NR) 0005 INCIDENTALS Page 34

38 Project Number: PID: Union US-US 33/SR 287/SR /00.00/00.28 E161(392) DBE Goal: 6% Date Set for Completion: 10/15/2018 Type: FOUR LANE RESURFACING Plan Cost: $17.00 FOR IMPROVING VARIOUS SECTIONS IN ALLEN AND PARIS TOWNSHIPS, OF UNION COUNTY, OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY MILLING AND RESURFACING THE SPECIFIED SECTIONS OF US ROUTE 33 AND STATE ROUTES 287 AND 739, INCLUDING ALL RELATED ITEMS OF WORK. PROJECT ALSO INCLUDES MINOR STRUCTURE WORK ON US ROUTE 33. Ref. No. Item Code Section 0001 ROADWAY Item Description Project Length: Miles Work Length: Miles Pavement Width: Varies Unit of Measure Approx. Quantity E38001 GUARDRAIL REMOVED, AS PER PLAN (WT: FT 2, NR) 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS EACH PER PLAN (WT: NR) 202E42041 ANCHOR ASSEMBLY REMOVED, TYPE T, AS EACH PER PLAN (WT: NR) 202E47001 BRIDGE TERMINAL ASSEMBLY REMOVED, EACH AS PER PLAN (WT: NR) 203E20001 EMBANKMENT, AS PER PLAN (WT: 06) CY E60200 LINEAR GRADING (WT: 06) STA E72001 PREPARING SUBGRADE FOR SHOULDER STA PAVING, AS PER PLAN (WT: 06) 606E15050 GUARDRAIL, TYPE MGS (WT: 36) FT 2, E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS FT (WT: 36) 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (WT: 36) EACH E26550 ANCHOR ASSEMBLY, MGS TYPE T (WT: 36) EACH E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 EACH (WT: 36) Page 35

39 E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 EACH (WT: 36) 606E98000 GUARDRAIL, MISC.:ALTERNATE GUARDRAIL FT PLACEMENT (WT: 36) 622E90200 BARRIER, MISC.:VERTICAL EXTENSION OF BARRIER TRANSITIONS (WT: 38) EACH ROADWAY Section 0002 EROSION CONTROL E00300 TOPSOIL (WT: 46) CY E10000 SEEDING AND MULCHING (WT: 46) SY E14000 REPAIR SEEDING AND MULCHING (WT: 46) SY E15000 INTER-SEEDING (WT: 46) SY E20000 COMMERCIAL FERTILIZER (WT: 46) TON E31000 LIME (WT: 46) ACRE E35000 WATER (WT: 46) MGAL E30000 EROSION CONTROL (WT: 08) EACH 1, EROSION CONTROL Section 0003 DRAINAGE E31100 AGGREGATE DRAINS (WT: 35) FT DRAINAGE Section 0004 PAVEMENT E01041 PARTIAL DEPTH PAVEMENT REPAIR SY 2, (ASPHALT CONCRETE BASE), AS PER PLANTYPE A (WT: 16) 251E01041 PARTIAL DEPTH PAVEMENT REPAIR SY 2, (ASPHALT CONCRETE BASE), AS PER PLANTYPE B (WT: 16) 253E02001 PAVEMENT REPAIR, AS PER PLAN (WT: 16) CY E01000 PAVEMENT PLANING, ASPHALT SY 432, CONCRETE1.50" (WT: 13) 254E01000 PAVEMENT PLANING, ASPHALT SY 4, CONCRETE3.25" (WT: 13) 254E01600 PATCHING PLANED SURFACE (WT: 16) SY E20000 NON-TRACKING TACK COAT (WT: 10) GAL 39, E12000 FINE GRADED POLYMER ASPHALT CY CONCRETE, TYPE B (WT: 10) 442E10000 ASPHALT CONCRETE SURFACE COURSE, CY 14, MM, TYPE A (446) (WT: 10) 442E10001 ASPHALT CONCRETE SURFACE COURSE, CY 1, MM, TYPE A (446), AS PER PLANPG76-22M (WT: 10) Page 36

40 E10100 ASPHALT CONCRETE INTERMEDIATE CY COURSE, 19 MM, TYPE A (446) (WT: 10) 617E10101 COMPACTED AGGREGATE, AS PER PLAN CY 1, (WT: 06) 617E25000 WATER (WT: NR) MGAL E40600 RUMBLE STRIPS, (ASPHALT CONCRETE) MILE (WT: NR) 859E10001 ASPHALT CONCRETE WITH VERGLIMIT, AS CY 1, PER PLAN (WT: 10) 875E10000 LONGITUDINAL JOINT ADHESIVE (WT: 10) LB 25, E01010 PAVEMENT PLANING, ASPHALT CONCRETE, SY 28, CLASS A0.75" (WT: 13) 897E02000 PATCHING PLANED SURFACE (WT: 13) SY PAVEMENT Section 0005 TRAFFIC CONTROL E00100 RPM (WT: 41) EACH 1, E54000 RAISED PAVEMENT MARKER REMOVED (WT: EACH 1, NR) 626E00102 BARRIER REFLECTOR, TYPE 11WAY (WT: EACH E00102 BARRIER REFLECTOR, TYPE EACH BIDIRECTIONAL (WT: NR) 626E00110 BARRIER REFLECTOR, TYPE 21WAY (WT: EACH E00110 BARRIER REFLECTOR, TYPE EACH BIDIRECTIONAL (WT: NR) 644E00104 EDGE LINE, 6" (WT: 45) MILE E00204 LANE LINE, 6" (WT: 45) MILE E00300 CENTER LINE (WT: 45) MILE E00400 CHANNELIZING LINE, 8" (WT: 45) FT E00404 CHANNELIZING LINE, 12" (WT: 45) FT 10, E00500 STOP LINE (WT: 45) FT E00600 CROSSWALK LINE (WT: 45) FT E00700 TRANSVERSE/DIAGONAL LINE (WT: 45) FT E00720 CHEVRON MARKING (WT: 45) FT E01300 LANE ARROW (WT: 45) EACH E01510 DOTTED LINE, 6" (WT: 45) FT 8, E40010 SPECIAL - AIR SPEED ZONE MARKING (WT: 45) SF TRAFFIC CONTROL Section 0006 TRAFFIC CONTROL ALTERNATES 0061 AA1 646E10010 EDGE LINE, 6" (WT: 45) MILE Page 37

41 AA1 646E10110 LANE LINE, 6" (WT: 45) MILE AA1 646E10310 CHANNELIZING LINE, 12" (WT: 45) FT AA2 646E10010 EDGE LINE, 6"(POLYCARB MARK 55.4) (WT: MILE ) AA2 646E10110 LANE LINE, 6"(POLYCARB MARK 55.4) (WT: MILE ) 0066 AA2 646E10310 CHANNELIZING LINE, 12"(POLYCARB MARK 55.4) (WT: 45) FT TRAFFIC CONTROL ALTERNATES Section 0007 TRAFFIC SURVEILLANCE E90400 SIGNALIZATION, MISC.:RWIS SENSOR, VX21-2 (WT: 44) 632E90400 SIGNALIZATION, MISC.:RWIS SENSOR, VX21-2, AS PER PLAN (WT: 44) 0007 TRAFFIC SURVEILLANCE Section 0008 MAINTENANCE OF TRAFFIC E11110 LAW ENFORCEMENT OFFICER WITH HOUR PATROL CAR FOR ASSISTANCE (WT: 39) 614E12420 DETOUR SIGNING (WT: 39) 614E12461 WORK ZONE MARKING SIGN, AS PER PLAN EACH (WT: 39) 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, SNMT AS PER PLAN (WT: 39) 614E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY SNMT (WT: 39) 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 MILE PAINT (WT: 39) 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 MILE PAINT (WT: 39) 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, FT 1, ", 642 PAINT (WT: 39) 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, FT 10, ", 642 PAINT (WT: 39) 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT (WT: 39) FT MAINTENANCE OF TRAFFIC Section 0009 STRUCTURE OVER 20 FOOT SPAN ( ) E10050 SEALING OF CONCRETE SURFACES (NON- SY 1, EPOXY) (WT: 57) 516E10000 PREFORMED ELASTOMERIC COMPRESSION FT JOINT SEAL (WT: 27) 519E11100 PATCHING CONCRETE STRUCTURE (WT: 29) SF Page 38

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING March 9, 2018 This pamphlet is issued solely for the purpose of circulating advance information

More information

Bids JANUARY 10, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $29,000,000.00) Miller Bros. Const., Inc. $27,699,031.59

Bids JANUARY 10, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $29,000,000.00) Miller Bros. Const., Inc. $27,699,031.59 General Info Number: PROJECT NO. 43-19-07 Description: BRIDGE REHABILITATION AND 3RD LANE WIDENING OHIO TURNPIKE OVER AI CREEK M.P. 47.4, OHIO TURNPIKE OVER S.R. 64 (N. MAIN ST.) M.P. 47.5 MILEPOST 46.50

More information

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids General Info Number: PROJECT NO. 43-17-04 : BRIDGE DECK REPAIR AND BRIDGE REMOVAL OHIO TURNPIKE OVER QUARRY ROAD, M.P. 138.0 OHIO TURNPIKE OVER INACTIVE RAILROAD, M.P. 138.2 LORAIN COUNTY, OHIO Deadline:

More information

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. April 21, 2016

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. April 21, 2016 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING April 21, 2016 This pamphlet is issued solely for the purpose of circulating advance information

More information

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. December 14, 2018

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. December 14, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING December 14, 2018 This pamphlet is issued solely for the purpose of circulating advance information

More information

Franklin County Engineer's Office - Highway Design FRA-Hamilton Road Bid Tabulation

Franklin County Engineer's Office - Highway Design FRA-Hamilton Road Bid Tabulation 7/07/2015 Page 1 of 20 Group: A Roadway 005 201E11000 Clearing And Grubbing 008 202E20010 Headwall Removed 10.00 EA 010 202E23000 Pavement Removed, 88.00 SQYD Concrete 012 202E23010 Pavement Removed, Asphalt

More information

ADDENDUM #1 ISSUE DATE: WEDNESDAY, MARCH 16, 2016 BID DATE: TUESDAY, MARCH 22, 2016 AT 12:00 PM (NOON)

ADDENDUM #1 ISSUE DATE: WEDNESDAY, MARCH 16, 2016 BID DATE: TUESDAY, MARCH 22, 2016 AT 12:00 PM (NOON) PROJECT #: 150081 CLIENT: PROJECT TITLE: CITY OF WILMINGTON, OH AIRBORNE CONNECTOR ROAD, PHASE 1 ISSUE DATE: WEDNESDAY, MARCH 16, 2016 BID DATE: TUESDAY, MARCH 22, 2016 AT 12:00 PM (NOON) THIS IS TO CERTIFY

More information

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96 General Info Number: PROJECT NO. 43-19-02 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE OVER ABANDONED RAILROAD M.P. 34.2, OHIO TURNPIKE OVER STATE ROUTE 108 M.P. 34.5, COUNTY ROUTE

More information

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. July 2, 2015

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. July 2, 2015 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING July 2, 2015 This pamphlet is issued solely for the purpose of circulating advance information

More information

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. April 9, 2015

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. April 9, 2015 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING April 9, 2015 This pamphlet is issued solely for the purpose of circulating advance information

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. December 14, 2017

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. December 14, 2017 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING December 14, 2017 This pamphlet is issued solely for the purpose of circulating advance information

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018:

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018: ADDENDUM NO. 3 PROJECT NO. 43805 (PART A & B) PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 PM ON MAY 24, 208: Q#32 Addendum # answered Question #7 indicating that an average depth of 3 feet for the

More information

Maine Turnpike Authority

Maine Turnpike Authority PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing

More information

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 22, 2018

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 22, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING March 22, 2018 This pamphlet is issued solely for the purpose of circulating advance information

More information

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 1, 2016

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 1, 2016 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING March 1, 2016 This pamphlet is issued solely for the purpose of circulating advance information

More information

OHIO DEPARTMENT OF TRANSPORTATION JERRY WRAY, DIRECTOR DATE : 02/14/97 PAGE : TABULATION OF BIDS

OHIO DEPARTMENT OF TRANSPORTATION JERRY WRAY, DIRECTOR DATE : 02/14/97 PAGE : TABULATION OF BIDS 047-1 ODOT PROJECT NUMBER : 970047 AWARDED VENDOR NUMBER : 31-0889208 CALL ORDER : 047 CONTRACT ID : CADA16278 COUNTIES : ADAMS LETTING DATE : 02/04/97 10:00 AM DISTRICT : 09 CONTRACT TIME : 10/31/97 COMPLETION

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $3,379,844.00 Scott Construction Corporation - Portland, ME $3,572,184.50 CPM Constructors - Freeport, ME $3,732,667.25 Page 1 of 16 Wyman

More information

MAY 11, 2017 T-MC-107A & T-MC-107B1

MAY 11, 2017 T-MC-107A & T-MC-107B1 Schedule of Bid Items - Part A ROADWAY 107A 201(A) - CLEARING AND GRUBBING - LSUM 1.00 30,000.00 30,000.00 $100,000.00 $100,000.00 $65,000.00 $65,000.00 $120,000.00 $120,000.00 $50,000.00 $50,000.00 $18,262.05

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $13,984,117.36 Reed & Reed, Inc. - Woolwich, ME $14,883,139.00 Page 1 of 11 CPM Constructors Freeport, ME 201.11 Clearing AC 2.00 10000.00

More information

General Info Number: PROJECT NO Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST TRUMBULL COUNTY, OHIO

General Info Number: PROJECT NO Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST TRUMBULL COUNTY, OHIO General Info Number: PROJECT NO. 59-18-03 Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST 209.20 TRUMBULL COUNTY, OHIO Deadline: April 25, 2018 at 2:00 P.M. (Eastern) (Estimated Cost: $3,100,000.00)

More information

SHOULDER DETAIL CONCRETE CURB SHOULDER DETAIL ASPHALT CURB SHOULDER DETAIL PAVEMENT JOINT DETAIL PAVEMENT JOINT DETAIL NORMAL SECTION COMMON AND ASPHALT ALTERNATE NOTES ITEM LEGEND EX. ITEM LEGEND CONCRETE

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,417,760.75 Scott Construction - Falmouth, ME $1,418,884.50 T Buck Construction - Auburn, ME $1,520,203.00 Page 1 of 16 CPM Constructors

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016138 TRACS No. Project No. County District Gross

More information

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. June 4, 2015

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. June 4, 2015 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING June 4, 2015 This pamphlet is issued solely for the purpose of circulating advance information

More information

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015 OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO. 43-16-05 ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015 Q#1 Can Asbury Road (MP 197.8) & State Route 700 (MP

More information

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2 MERCED COUNTY BID LIST CAMPUS PARKWAY SEGMENT 2 CONTRACT 2017191 The bidder must provide unit prices for each bid item listed below, based on the specified unit of measure. The unit price for each item

More information

OKLAHOMA TURNPIKE AUTHORITY JUNE 7, 2018 SCHEDULE OF BID ITEMS EOC JP 26422(10) INTERCHANGE AT I-40

OKLAHOMA TURNPIKE AUTHORITY JUNE 7, 2018 SCHEDULE OF BID ITEMS EOC JP 26422(10) INTERCHANGE AT I-40 PART A - ROADWAY - EOC 2461 201(A) CLEARING AND GRUBBING LSUM 1.00 $500,000.00 $500,000.00 202(A) UNCLASSIFIED EXCAVATION CY 651,706.00 $4.00 $2,606,824.00 202(D) UNCLASSIFIED BORROW CY 7,500.00 $8.00

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON MAY 15, 2018:

ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON MAY 15, 2018: ADDENDUM NO. PROJECT NO. 3-8-0 PAGE ANSWERS TO QUESTIONS RECEIVED THROUGH :00 PM ON MAY 5, 08: Q# PBQs regarding Project 3-8-0: Reference 3 Concrete Walk is,870 SQ YD in the Bid Express file. The quantity

More information

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS.

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS. PAY QUANTITY NOTES (F-1) (F-2) (F-3) (F-4) (F-5) (F-6) (F-7) (F-8) (F-9) (F-10) (F-11) (F-12) (F-13) (F-14) (F-15) (F-16) (F-17) (F-18) (F-19) INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17 Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 6216-127 Contract ID: Contract Description: Contract Location: Recommendation: 170023 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION PURPOSE, INTENT AND INTERPRETATION OF SPECIFICATIONS The purpose of these Specifications is to establish, where applicable, minimum acceptable standards

More information

04/19/2010 NEW YORK STATE DEPARTMENT OF TRANSPORTATION PAGE 1 DIVISION OF CONSTRUCTION CONSTRUCTION CONTRACT ESTIMATE (CONR20)

04/19/2010 NEW YORK STATE DEPARTMENT OF TRANSPORTATION PAGE 1 DIVISION OF CONSTRUCTION CONSTRUCTION CONTRACT ESTIMATE (CONR20) 04/19/2010 NEW YORK STATE DEPARTMENT OF TRANSPORTATION PAGE 1 DOT CONTRACT NUMBER: D261458 NYS PROJECT NUMBER: 1805.81.000 FISCAL SHARE: 01 ENGINEERING SHARE: 001 ENGINEERING SHARE TITLE: BRIDGE SHARE

More information

Page 1 of 7 Contract No.: 0216 OCPW Schedule Of Prices Addendum Date Created 1 07/11/2016 9:28 AM Project Number: SP 055-609-018 Project Title or Road Number: CSAH 9 Mill, Grade, Overlay Work Type: Grading,

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 1 EA 202-00035 Removal of Pipe 30 LF 202-00200 Removal of Sidewalk 431 SY 202-00203 Removal of Curb and Gutter 973 LF 202-00205 Removal of

More information

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS PAGE : 133-1 CONTRACT TIME : 12/20/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-080-5(094) ROUTE 80 BRIDGE OVER ROUTE 287 NORTHBOUND AND SMITH ROAD GRADING, PAVING & STRUCTURRS CONTRACT

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

Kansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max:

Kansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max: Page 1 of 18 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025600 FIELD OFFICE AND LABORATORY (TYPE A) 4 012340 FOUNDATION STABILIZATION (SET PRICE) 5 020100 CONTRACTOR CONSTRUCTION

More information

TABULATION OF BIDS DODGE CITY REGIONAL AIRPORT DODGE CITY, KANSAS RECONSTRUCT RUNWAY 14-32: SUMMARY PROJECT NO.: AIP

TABULATION OF BIDS DODGE CITY REGIONAL AIRPORT DODGE CITY, KANSAS RECONSTRUCT RUNWAY 14-32: SUMMARY PROJECT NO.: AIP RECONSTRUCT RUNWAY 14-32: SUMMARY., BID SUMMARY TOTAL COST TOTAL COST TOTAL COST TOTAL COST TOTAL COST Schedule 1 Cost of Construction $4,717,480.00 $5,106,762.00 $5,697,026.50 $4,430,910.42 $4,640,166.10

More information

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 3690 NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Commissioners Kitsap County 614 Division Street Port

More information

New Jersey Department of Transportation DATE : 05/17/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 05/17/12 PAGE : TABULATION OF BIDS PAGE : 409-1 CONTRACT TIME : 02/28/13 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : STATE ROUTE 45 ROADWAY DRAINAGE IMPROVEMENT CONTRACT DP 12409 BOROUGH OF WESTVILLE, GLOUCESTER COUNTY VENDOR

More information

ODOT District Roadway General Notes R401: LINEAR GRADING R402: ITEM RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS

ODOT District Roadway General Notes R401: LINEAR GRADING R402: ITEM RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS R401: LINEAR GRADING R402: ITEM 209 - RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS R404: DELETED R405: BARRIER REFLECTORS R406: PAVEMENT MARKING LANE WIDTHS R407: TYPE A ANCHOR ASSEMBLY

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

Ohio Department of Transportation

Ohio Department of Transportation Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 Ted Strickland, Governor Jolene M. Molitoris, Director THE DEPARTMENT UTILIZES BID EXPRESS (http://www.bidx.com)

More information

Dial or (800)

Dial or (800) GENERAL NOTES 2 EROSION CONTROL ITEMS TO BE PLACED AS SHOWN ON THE PLAN OR AS DIRECTED BY THE ENGINEER. NO TREES (AND/OR SHRUBS) ARE TO BE REMOVED WITHOUT THE APPROVAL OF THE ENGINEER. 2 EXCAVATION FOR

More information

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : 012777.00 PROJECTS ------------------------------ STP-1277(700)S COUNTY : ANDROSCOGGIN CONTRACT ID : 012777.00 MAINE

More information

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 107-1 CONTRACT TIME : 08/31/12 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-078-5(110) ROUTE I-78 RAMP C OVER BEAVER BROOK DECK REPLACEMENT AND RESURFACING CONTRACT NO.019113160

More information

SUPPLEMENTAL DRAWINGS

SUPPLEMENTAL DRAWINGS CITY OF GREATER SUDBURY SUPPLEMENTAL DRAWINGS TO THE ONTARIO PROVINCIAL STANDARD DRAWINGS Rev: February 2012 CITY OF GREATER SUDBURY STANDARD DRAWINGS TABLE OF CONTENTS Greater Sudbury Standard Drawings

More information

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) 10/16/2014 Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) July 2002 Prepared by Construction Cost Estimating Unit Program Support Services 10/16/2014 Table of Contents

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT MAINE TURNPIKE AUTHORITY ADDENDUM NO. CONTRACT 08.09 BRIDGE REPAIRS RUNNING HILL ROAD UNDERPASS (MILE 5.) BLACKSTRAP ROAD UNDERPASS (MILE 58.3) WEYMOUTH ROAD UNDERPASS (MILE 66.) SUPERSTRUCTURE REPLACEMENT

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P401: ITEM 254 - PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P402: ITEM 254 - PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER PLAN P403: ITEM 304 - AGGREGATE BASE, AS PER PLAN P404: DELETED P405:

More information

Lump Sum L.S. (15") EA

Lump Sum L.S. (15) EA Page of 6 ROADWAY ITEMS 000 000000000-N 800 MOBILIZATION Lump Sum L.S. 000 000000000-N 80 CONSTRUCTION SURVEYING 0003 009000000-N SP REINFORCED BRIDGE APPROACH FILL, STATION ************ (5+6.0) 000 0050000000-E

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and

More information

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. May 19, 2016

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. May 19, 2016 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING May 19, 2016 This pamphlet is issued solely for the purpose of circulating advance information

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1, General Info Number: 316-00-17-47-2 Description: Lake Village Drainage Improvements - N. Pearl Mill & Overlay Deadline: 2017-7-9 2:00 PM CST Bids Business Bid Total McDonald Construction Inc of Slidell

More information

Company Page 1 of 13

Company Page 1 of 13 ITEM NO. REVISION WBS (ITEM) DESCRIPTION UNIT QUANTITY (WRITTEN) MC-001-5.1 Mobilization/Demobilization and Construction Layout Surveying LS 1 MC-003-6.1 Temporary Construction Items LS 1 MC-003-6.2 Taxiway

More information

PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION

PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION SECTION DESCRIPTION PAGE 1 General Quantities 3-1 2 Maintenance of Roadway and Drives 3-1 3 Liquid Asphalt Binder in Paving Mixture

More information

Minimum Sample and Test Requirements (MSTR)

Minimum Sample and Test Requirements (MSTR) South Dakota Department of Transportation Minimum Sample and Test Requirements (MSTR) Table of Contents Page 1. Asphalt Construction:... 1 1.1 Asphalt Concrete, Hot Mix... 3 A. Aggregate, Composite...

More information

Bidder Name: ITEMIZED BID: The bidder should complete the following section in accordance with Sec 102.7. The bidder proposes to furnish all labor, materials, equipment, services, etc. required for the

More information

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH CHAPTER 2 201 ROADS 201.1 General This section is to assist the designer in determining what is needed for the design of roads in public rights-of-way. For these standards, the terms used are: Restricted

More information

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? 102.10 Minimum Rate of Wage Scale Typo. Several paragraphs were repeated. 105.5 Inspection of Work Clarified that the contractor

More information

General Info. Number: PROJECT NO

General Info. Number: PROJECT NO General Info Number: PROJECT NO. 43-16-04 Description: BRIDGE DECK REPLACEMENT AND REHABILITATION, RAKER-BARDEN ROAD (CR. 7-2) OVER OHIO TURNPIKE M.P. 41.9, DELTA-SANTEE ROAD (CR. 7) OVER OHIO TURNPIKE

More information

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION...7-1

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION...7-1 Section 7 Roadway GENERAL REQUIREMENTS...7-1 I. TYPICAL SECTION...7-1 7.1 LANE WIDTHS...7-1 7.2 SHOULDER WIDTHS...7-1 7.3 CROSS SLOPE...7-2 7.4 CURB AND UNDERDRAINS...7-2 7.5 SIDEWALKS AND DRIVEWAYS...7-2

More information

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY May 7, 2002 This page left blank intentionally. May 7, 2002 Preliminary Cost Estimate Summary ESTIMATE TYPE A ABC Consulting Hwy 99:06 ABC Project No. 1234-01-56789

More information

ADVERTISEMENT SET DECEMBER 2013

ADVERTISEMENT SET DECEMBER 2013 Sheet List Table GREELEY CANAL #2 WCR 21 PROJECT AREA N SH-392 ADVERTISEMENT SET DECEMBER 2013 LINE DESCRIPTION PROPOSED LINE POWER / COMMUNICATIONS EXISTING LINE LINE DESCRIPTION PROPOSED LINE BOUNDARY

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Scott Construction Corporation - Portland, ME $918,886.00 CPM Constructors - Freeport, ME $1,059,738.71 Wyman & Simpson Inc. - Richmond, ME $1,084,545.00 Page 1 of 7 Scott

More information

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17 S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00

More information

Significant Changes. 101 Definitions and Terms. 102 Bidding Requirements and Conditions 105 Control of Work

Significant Changes. 101 Definitions and Terms. 102 Bidding Requirements and Conditions 105 Control of Work 1 SIGNIFICANT CHANGES IN CDOT's 2017 STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION The following are significant changes from the 2011 Standard Specifications Book to the new 2017 Standard Specifications

More information

SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION ABSTRACT OF BIDS RECEIVED 06/06/2018 LETTING CONTENTS

SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION ABSTRACT OF BIDS RECEIVED 06/06/2018 LETTING CONTENTS SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION ABSTRACT OF BIDS RECEIVED 06/06/2018 LETTING CONTENTS ITEM PROJECT NO. COUNTY TYPE OF WORK 1. P 0010(00)18 (PCN 04UV) Deuel, Faulk, Roberts, Spink Replace Bridge

More information

CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS

CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS Section Title Page 20.1 General... 20-1 20.2 Units and Costs... 20-1 20.2.1 Erosion Control...20-1 20.2.2 Street Improvements...20-1 20.2.3

More information

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON - April 24, 2017 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 25, 2017 in accordance

More information

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 01/22/02 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 01/22/02 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : GRADING, BIT MILL & SURFACING, LIGHTING AND UTILITIES CONTRACT LOCATION: LOCATED ON TH 210 FROM 100 FT WEST OF GRAND AVE TO SIXTH STREET IN CARLTON RECOMMENDATION: AWARD

More information

14 ITEM GRANULAR EMBANKMENT, A C 7 ITEM 659-6" TOPSOIL 13 NORMAL SECTION 1 (TYP) 1 (TYP) VARIES

14 ITEM GRANULAR EMBANKMENT, A C 7 ITEM 659-6 TOPSOIL 13 NORMAL SECTION 1 (TYP) 1 (TYP) VARIES 3-6" 4 -" RNDG. VARIES SEE CROSS SECTIONS BENCHING AND BACKFILL DESCRIPTION CONSTRUCT THE EXCAVATION FROM THE TOP DOWN. EXCAVATE THREE BENCHES EXTENDING 1.5 FEET INTO THE FOUNDATION BETWEEN STATION 187+

More information

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form 2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form Project Information (\aen i vake.. F;) N0.3-7114117 Project Name Section 1 - Grading and Erosion Control BMPs Quantity Units Price Earthwork

More information

South Dakota Department of Transportation Average Unit Prices from Low Bids

South Dakota Department of Transportation Average Unit Prices from Low Bids Unit Prices from Low s January 0, 0 to December, 0 Office of Project Development - Letting 00E00 Blading Hour.00 $,0. $. 00E000 Construction and Maintenance of Detour(s) LS.00 $0,. $,. 00E000 Maintenance

More information

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result

More information

1.00 LS $150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150,000.

1.00 LS $150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150,000. LAS VEGAS PAVING CORP. CONTRI CONSTRUCTION COMPANY AGGREGATE INDUSTRIES-SWR, INC. TAB CONTRACTORS, INC. ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT

More information

ADDENDUM #3. STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No ; Federal Project No.

ADDENDUM #3. STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No ; Federal Project No. ADDENDUM #3 STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No. 2016-003; Federal Project No. DEM10L-5209(008) November 9, 2017 Addendum for: AND IA STATE ROUTE 60 AT POTRERO

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2018026 TRACS No. Project No. County District Gross

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2017.02 Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 The following changes are made to the Proposal, Specifications and Plans: SPECIFICATIONS:

More information

Figure Inlet protection (Source: Minnesota DOT)

Figure Inlet protection (Source: Minnesota DOT) 3.9 INLET PROTECTION Figure 3.14. Inlet protection (Source: Minnesota DOT) Overview Description: A manufactured protective device or barrier used to trap sediment at a storm drain surface or curb inlet.

More information

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # 2016-04 PROJECT SPECIFICATIONS TABLE OF CONTENTS SECTION 100 GENERAL... 1 SECTION 200 MATERIALS... 1 CONSTRUCTION METHODS... 1 SECTION

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

Ohio Department of Transportation - Prebid Questions

Ohio Department of Transportation - Prebid Questions Project No. 110467 Sale Date - 8/25/2011 HAM-83469 - CR-CR 239-9.49 (WINTON/ S. GILMORE ROAD) 8/22/2011 9:56:54 AM Pole E on plan page 323 shows that 2" anchor bolts should be used for this pole. However,

More information

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority PAY DESCRIPTION GENERAL 1 1200 Construction Traffic Control and Barricading: including any and all access signs and permitting by the City of LS 1 Rio Rancho, 2 1504 Temporary Pollution Control: NPDES

More information

MISSOURI HIGHWAY and TRANSPORTATION COMMISSION

MISSOURI HIGHWAY and TRANSPORTATION COMMISSION MISSOURI HIGHWAY and TRANSPORTATION COMMISSION JEFFERSON CITY, MISSOURI LISTING OF BID ITEMS FOR HIGHWAY CONSTRUCTION EFFECTIVE October 1, 2018 (ISSUED August 1, 2018) MISSOURI DEPARTMENT OF TRANSPORTATION

More information

MISSOURI HIGHWAY and TRANSPORTATION COMMISSION

MISSOURI HIGHWAY and TRANSPORTATION COMMISSION MISSOURI HIGHWAY and TRANSPORTATION COMMISSION JEFFERSON CITY, MISSOURI LISTING OF BID ITEMS FOR HIGHWAY CONSTRUCTION EFFECTIVE January 1, 2019 (ISSUED October 22, 2018) MISSOURI DEPARTMENT OF TRANSPORTATION

More information

LIST OF BID ITEMS STRUCTURAL WIDENING OR REPAIR SUPERSTRUCTURE REFER TO ITEM VDOT QTY. PAY ITEM FOOTNOTE SPECS ROUND- UNIT CODE REF.

LIST OF BID ITEMS STRUCTURAL WIDENING OR REPAIR SUPERSTRUCTURE REFER TO ITEM VDOT QTY. PAY ITEM FOOTNOTE SPECS ROUND- UNIT CODE REF. 1 Adhesive Anchors ATTD 1 EA 68060 Anchor Bolt Replacement PLAN, 412 1 EA 68166 Asphalt Concrete Ty. BM-2 315 1 TON 68213 Asphalt Concrete Ty. BM-2 w/trenching 315 1 TON 68233 Asphalt Concrete Ty. BM-25.0

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA 106-5(a-f) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA These Special Provisions amend, revise, and where in conflict, supersede applicable sections of the 2009 Standard

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/05/17 Comp. Dt: 08/20/20

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/05/17 Comp. Dt: 08/20/20 Letting: 17030800 Letting Dt: March 08, 2017 9:30 A.M. State Proj.: 2515-21 Contract ID: Contract Description: Contract Location: Recommendation: 170019 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS*** 00005B *** *** BOLD ITALICIZED Item is bound within this specification manual. Regular non-italicized Item is not bound within this specification manual, however item is part of the contract. Contents

More information

C. W. Matthews Contracting Co., Inc. (L)

C. W. Matthews Contracting Co., Inc. (L) BID TABULATION Page 1 of 5 E.R. Snell Contractor, 001 Photograph Documentation 8 MO $110.00 $880.00 $250.00 $2,000.00 $97.17 $777.36 $1,250.00 $10,000.00 002 Traffic Control Project No. F-1056 1 LS $192,000.00

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

2008 Interim Standard Sheet List For Use with the 2008 Imperial Road and Bridge Standards July, 2015

2008 Interim Standard Sheet List For Use with the 2008 Imperial Road and Bridge Standards July, 2015 2008 Interim Standard Sheet List For Use with the 2008 Imperial Road and Bridge Standards July, 2015 The following is a complete list of special design IMPERIAL interim standard sheets that will be used

More information

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810 STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS 3 East Pulteney Square Bath, New York 14810 County Route 22 over Canisteo River Bridge Replacement Project BIN 3333290 D035511 PIN 6755.06 ADDENDUM #1 October

More information