1 FEATURES FOR SUCCESS DESIGN-BUILD- OPERATE WASTEWATER PROJECTS Linda Hanifin Bonner, Ph.D., WDBC Mark Halleman, P.E., Parsons Produced by the Water Design-Build Council 1
2 Key Factors Design-Build-Operate Methods U.S. DBO Wastewater Projects Project Priorities Successful Attributes Lessons Learned Key Steps for Success
3 DBB Design-Build Risk Transferred Design-Build-Operate Design-Build Finance O&M Design-Build-Operate Transfer Build Own Operate Transfer Terminology available options Private Sector Participation
4 Defining Design Build-Operate Single contract with Owner/agent for project design construction, operations and management Selection is typically a two-step process: qualifications followed by a competitive technical and price proposals with fixed-price/best value selection DBO firm responsible for overall project performance and if desired, can assign risk to other parties DBO firm integrate risks among all parties for the design-construction-operation of project
5 Typical U.S. DBO Projects Water and Wastewater new (greenfield) projects and plant expansions / refurbishments Treatment process upgrades Storage and supply Residuals/Biosolids management Energy efficiency
6 DBO for Water and Wastewater Treatment Plants Particularly suited for treatment plant projects That want to use new or emerging technology That have limited staff resources That want to transfer risk to a third party Who need to have efficient delivery method for both the project and O&M
7
8
9 DBO Delivery Methods Integrated-Entity Owner/agent contracts with single firm or team (joint venture) to design, construct, operate & maintain wastewater plant DB firm takes lead, presents team members in RFP and allocates risk Operations-Led Entity Owner/agent has contract with Operations, who then contracts with company to perform design engineering & construction Operations firm allocates risks accordingly
10
11 CA DBO WASTEWATER PROJECT 7.5 mgd plant Pacific Ocean coast Project Priorities Accelerated schedule/time constraints (gov. consent order) Public health protection Construction in a sensitive ecological Experience with multi-government and military regulations Flexibility to accommodate innovative technology Contract/Procurement Method Qualifications submittal - experience Proposal with preliminary designs, detailed project approach and pricing
12 CA DBO WASTEWATER PROJECT 7.5 mgd plant Pacific Ocean coast Successful Attributes Unique collaborative partnership with owner/agent & DBO firm Enhanced operations and reliability of system with new recycling systems Project completed 6 weeks ahead of schedule Lessons Learned Team collaborations/communications facilitated meeting owner priorities, protecting sensitive ecology, and working with multi-government agencies
13 FL- DBO WASTEWATER PROJECT Atlantic Ocean discharge Project priorities water quality issues - failing septic systems Comply with government regulations Schedule integration with other organizations Transportation/traffic; environmental/wetlands and protected trees Fixed-Price contract defined conditions and requirements
14 FL DBO WASTEWATER PROJECT Atlantic Ocean discharge Successful Attributes DBO team experience & qualifications Ability to bring needed resources to meet design schedule Lessons Learned Inclusive team from project execution to operations Open honest and frequent communications Dedicated project team focused on project success
15 WA DBO WWT PROJECT - Pacific Ocean Discharge Project Priorities Aligning design/construction to minimize cost Ensure operations staff input Schedule Innovative technologies Incorporating life-cycle costs Assigning risk to best party Contract/Procurement Method 2-step RFQ/RFP Progressive Design-Build One company performing all roles
16 WA DBO WWT PROJECT - Pacific Ocean Discharge Successful Attributes Support services with overall process Well integrated DBO teams (all services) Effective management and leadership Lessons Learned Owner & staff understand how DBO functions Partnering and building trust among teams Dedicated staff, managers, executive leadership Open communication during in contracting phase Clear understanding of expectations (realistic)
17 DBO Delivery Methods Integrated-Entity Owner/agent contracts with single firm that to design, construct, operate & maintain wastewater plant DB Firm selects team members Operations-Led Entity Owner/agent contract with Operations firm, responsible for contracting with DB company to perform design engineering & construction allocating risk
18
19 WA DBO WW PROJECT- 8 mgd Reclamation Facility Project Priorities Water quality protection - growth Regulatory compliance phosphorous reduction Contract: Two step RFQ/RFP procurement process Fixed-Price for design-build services Annual O&M service fee
20 WA DBO WW PROJECT- 8 mgd Reclamation Facility Successful Attributes Transparent problem solving approach Owner and DBO firm alliance developed alternate O&M strategies and techniques to minimize issues Lessons Learned Early consideration of technical innovation of treatment processes Being prepared for an early completion
21 TX DBO Ultra-filtration WTP and Water Supply Priorities Most efficient life cycle cost- limited ability to increase rates Use of Innovative technology Schedule: new water supply needed quickly for population growth Contract/Procurement Method One step Qualifications based Negotiated fixed-price- owner had an maximum limit on affordability
22 TX DBO Ultra-filtration WTP and Water Supply Performance Guarantees Water delivery/quality and quality Price and Schedule Guarantees Consumable efficiency chemicals Power Renewal and replacement of membranes Liquidated damages Performance incentives/penalties
23 TX Bexar Met DBO Ultra-filtration WTP and Water Supply Successful Attributes Single point responsibility for: Capex- $30M - O&M - Renewal and replacement Innovative technology resulted in reduced cost Reduced design/construction period (16-Month) Successful trackrecord: 15-year award winning operating record Lessons Learned -Collaborative owner / DBO relationship owner's priorities achieved
24 CONCLUSIONS: Success starts with Development Clearly defined project priorities Clearly define project scope Schedule Costs Risk Allocation Realistic Expectations Experienced advisors
25 CONCLUSIONS: Clearly Defined Project Priorities What Owners/Agents state they want Project completed on schedule Maintain budget -- less risk of change orders and claims (best value) Achieve reliable operating performance and service Ability to integrate innovative treatment process/technology Have a warranty contract performance Comply with new (emerging) regulations Financial stability predictable and optimal operations & maintenance cost (life cycle) Sometimes specific technology
26 Conclusions: Transparent Communications Clearly defined criteria to select DBO firm or team Request examples of successful DBO Projects Lessons learned Project expectations contract necessities
27 CONCLUSIONS: Important Procurement/Contract Steps Hold review/comment session with proposing firms Present project priorities, schedule, work scope, desired treatment processes Provide draft contract, terms and conditions for design-build and operations & maintenance Offer compensation for new ideas
28 CONCLUSIONS: Important Procurement/Contract Steps Reduce the unknowns that are best managed by the owner and the the private sector will add risk premium, as example: Completed geotechnical, environmental, and cultural reports on project site Reports on pilot testing of new technologies or studies of projects Identify where utilities and other facilities need permit and government approvals Prescriptive or performance-based approach
29 CONCLUSIONS: Important Procurement/Contract Steps Assure that operation contract specifications are complete, accurate and reliable Emissions Odors - Noise Timeframe of repairs/replacement Energy consumption Condition of facility at end of contract operating period Open Communications among all parties Discussions/allocation of risk
30
31 Education Provided by the Water Design-Build Council Trade organization of national (and international) designbuild companies that serve the water and wastewater industry Advocates for the added value and applications of collaborative Design-Build, Design-Build Operate and CMAR delivery Define and develop DB and CMAR best practices for owner planning, procurement and project implementation Promote collaborative relationships between owners and industry practitioners to create innovative and quality solutions -- saving time and cost, with less risk for all parties
32 Mission EDUCATION -- facilitate an understanding of Design-Build (DB) and Operate delivery methods and Construction Management-at-Risk (CMAR) for water and wastewater infrastructure projects Presentation excerpted from the Municipal Water and Wastewater Handbook, produced by the Water Design- Build Council (3 rd Edition 2013) Handbook is available for at no cost, and can be downloaded at or contacting the WDBC office. Training Workshops available at no cost.
33 WDBC Member Companies
34 The Municipal Water and Wastewater Design-Build Handbook (3 rd Ed. 2013) Fact sheets, website and industry articles Monthly E-News on member projects and industry issues Website Market Size Study (Analysis of the Water Design-Build Council s member-firm projects) Owner Satisfaction Survey (2008) Update 2012 Impediments to Using Design-Build (Survey Findings 2013) Comparative Evaluation of Design-Build Versus Design-Bid-Build (2009) AWWA book titled Design-Build for Water and Wastewater Projects (developed by AWWA in conjunction with WDBC, WEF and DBIA in 2011) 2013 Products: Procurement Guide for Progressive Design Build Educational Video Series Additional WDBC Resources
EVOLUTION OF DESIGN BUILD IN THE W/WW INDUSTRY
EVOLUTION OF DESIGN BUILD IN THE W/WW INDUSTRY Thomas O. Crowley, P.E. Carollo Engineers Southwest Section AWWA October 17, 2017 Agenda Project Delivery Overview Oklahoma Legislation Project Delivery Methods
More informationProcurement Documents for Progressive Design-Build Projects
Procurement Documents for Progressive Design-Build Projects March 22, 2013 John Awezec, P.E., DBIA HDR Engineering, Inc. John Doller, P.E. Carollo Engineers, Inc. Peter Hughes Executive Director WDBC Model
More informationProject Delivery Selection Matrix If the Project Delivery Approach Fits, Use It
Project Delivery Selection Matrix If the Project Delivery Approach Fits, Use It Jim Mallorey, P.E. Metro Wastewater Reclamation District Chris Harper - University of Colorado Boulder January 23, 2014 1
More informationTHE MUNICIPAL WATER AND WASTEWATER DESIGN-BUILD HANDBOOK. Third Edition Expanded to Include Design-Build-Operate
THE MUNICIPAL WATER AND WASTEWATER DESIGN-BUILD HANDBOOK Third Edition Expanded to Include Design-Build-Operate ABOUT THE WATER DESIGN-BUILD COUNCIL The Water Design-Build Council seeks to advance the
More informationCommunity Workshop October 17, 2015
Community Workshop October 17, 2015 Goals for Workshop Education for attendees How City builds projects now Why a different method is being pursued for WRF Other workshops (not today) Architecture Treatment
More informationPresented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division
Presented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division Project Delivery Methods Design-Bid-Build (DBB) Indefinite Delivery/Indefinite Quantity (ID/IQ) Construction Management at Risk
More informationIntegrated Project Delivery
2014 HDR Architecture, 2014 HDR, Inc., all all rights reserved. Integrated Project Delivery It s A New World, And How It Can Benefit Municipal Owners Rich Atoulikian, PMP, PE Rich.Atoulikian@hdrinc.com
More informationPhase 1B Report on Water Treatment Plant Improvements Project Delivery Options
56 Exchange Terrace, Fourth Floor Providence, Rhode Island 02903 tel: 401 751-5360 fax: 401 751-5499 October 31, 2008 Ms. Julia A. Forgue, P.E. Director City of Newport Department of Utilities 70 Halsey
More informationDESIGN BUILD: CHARLOTTE-MECKLENBURG UTILITIES DEPARTMENT PROCESS FOR THE MCALPINE CREEK WWMF EFFLUENT FILTER UPGRADE AND EXPANSION
DESIGN BUILD: CHARLOTTE-MECKLENBURG UTILITIES DEPARTMENT PROCESS FOR THE MCALPINE CREEK WWMF EFFLUENT FILTER UPGRADE AND EXPANSION Barry Shearin, P.E. - Charlotte-Mecklenburg Utilities Department Jackie
More informationTHE DESIGN / BUILD / OPERATE PROJECT DELIVERY METHOD
THE DESIGN / BUILD / OPERATE PROJECT DELIVERY METHOD A How to Seminar For Industries and Municipalities ENVIRO EXPO 2000 - Session 18.2 May 11, 2000 1 Presentation Participants Paul B. Doran, P.E., Director
More informationDesign/Build Institute of America Rocky Mountain Region Water/Wastewater Committee. Project Delivery Selection Approach
Design/Build Institute of America Rocky Mountain Region Water/Wastewater Committee Project Delivery Selection Approach Overview This document provides an approach for water and wastewater project delivery
More informationPartnering for Alternative Delivery Projects
Partnering for Alternative Delivery Projects Presented by: Renee L. Hoekstra, CVS Managing Partner RHA, LLC Julie Kliewer, PhD, P.E. State Construction & Materials Engineer - ADOT Training Objectives Understanding
More informationTime to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO
Time to Build! What to Expect On Your Upcoming and Journey PRESENTED TO Christopher is an award-winning architect with more than 20 years of diversified architectural experience in design of projects from
More informationPROGRESSIVE DESIGN-BUILD. Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA
PROGRESSIVE DESIGN-BUILD Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA ADVANTAGES/DISADVANTAGES DESIGN BID BUILD (HARD BID) The traditional project delivery method, which customarily
More informationTampa Bay Water is a wholesale water
FWRJ Utilizing The Engineer-Procure-Construction Management Procurement Process To Get A Bang Without Going Bust Suzannah Folsom, Jonathan Kennedy, Jerry Russell, and Eric Peters Tampa Bay Water is a wholesale
More informationPioneering Alternative Project Delivery in Ohio
Pioneering Alternative Project Delivery in Ohio Ali Bahar, PE Principal Engineer Metropolitan Sewer District of Greater Cincinnati Tim Koch, PE, Vice President, Brown and Caldwell 1 Agenda Construction
More informationSanta Paula Water Recycling Facility A Case Study
Pure Genius Santa Paula Water Recycling Facility A Case Study Innovative Solutions to Municipal Wastewater Problems The City of Santa Paula was required to comply with waste discharge standards mandated
More informationAlternative Delivery for Municipal Water & Wastewater Projects in 2012
Alternative Delivery for Municipal Water & Wastewater Projects in 2012 a OWEA 2012 Making a Pass at Going Green Looking Towards the Future June 20, 2012 Dennis Tinkler, P.E. Agenda Ohio s Methods of Performing
More informationSCADA System Procurement Alternatives
SCADA System Procurement Alternatives 2017 Automation Committee Seminar August 24, 2017 Terry M. Draper, PE, PMP Discussion Topics SCADA Overview System Hardware / Software Procurement Additional System
More informationSeattle Public Utilities. Seattle Public Utilities Design-Build. Build-Operate Treatment Facility Projects
NWCCC Seatac June 27, 2001 Providing water, solid waste, drainage, engineering and customer services Seattle Public Utilities Design-Build Build-Operate Treatment Facility Projects Elizabeth S. Kelly,
More informationCM AT RISK VS. DESIGN BID BUILD
CM AT RISK VS. DESIGN BID BUILD A TEXAS CASE STUDY ON PROCUREMENT AND IMPLEMENTATION September 28, 2010 Acknowledgement Mike Adams, P.E Executive Director of Engineering and Utilities City of Midlothian
More informationComparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013
Comparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013 Outline Alternative Delivery Options Oregon and Washington Legal Context Things an Owner Should
More informationBoard Workshop. March 22, 2016
Food Waste Program Board Workshop March 22, 2016 Agenda Background Food Waste Program Overview Harvest Power Project Design and Implementation Fiscal Impact Harvest Power Risk Summary Program Alternatives
More informationState Revolving Fund Conference Tampa, Florida. Jeff Hughes Environmental Finance Center at the University of North Carolina November 2, 2015
YES SRFs can Participate in Financing Alternative Project Delivery Models (P3 s, DBO, DBOT), but its not always easy State Revolving Fund Conference Tampa, Florida Jeff Hughes Environmental Finance Center
More informationRiverbend Water Reclamation Plant Expansion Using the CMAR Delivery Method
Riverbend Water Reclamation Plant Expansion Using the CMAR Delivery Method AGENDA North Texas History Why Owners Select D/CMAR Owner Benefits Riverbend WRP Expansion Construction Progress Filename.ppt/2
More informationReport on Effectiveness of the Construction Manager at Risk Project Delivery Method
Report on Effectiveness of the Construction Manager at Risk Project Delivery Method The project management plans described below, establish several elements or criteria for university project staff to
More informationFairfax County Government Construction Management At Risk (CMAR)
Fairfax County Government Construction Management At Risk (CMAR) Presented for: CMAA - Owner s Committee Presented by: Matt Doyle Branch Chief, Wastewater Design and Construction Division Department of
More informationSession THREE. Face 2 Face (4 hours) Stage 1 Initial actions & appraisals: Self-directed (6 hours)
Session THREE Face 2 Face (4 hours) Stage 1 Initial actions & appraisals: What type of tendering methods are there? What does qualification mean? Do you (the MC) bid for every job? Do you (the MC) price
More informationPrivate Public Partnerships: Sample Standard Bidding Documents for Design-Build-Operate (DBO) for Solid Waste Management
Partnerships: Sample Standard Bidding Documents for Design-Build-Operate (DBO) for Solid Waste Management Presented by Allan Rotman Sr. Environmental Specialist Context for DBO for SWM in MNA Initiated
More informationDesign-Build Project/Team Awards Submission Details
Design-Build Project/Team Awards Submission Details Deadline: May 22, 2019 Please review this information carefully before beginning your online awards submission and share this document with your team
More informationRisks Associated with Alternative Delivery Methods. Managing Expectations. Presented by Dan Becker, CCM, PMP, CCE
Risks Associated with Alternative Delivery Methods Managing Expectations Presented by Dan Becker, CCM, PMP, CCE 1 3 Primary Methods for Delivering Projects in WA and OR Design/Bid/Build Design/Build CM
More informationProgressive Design Build
Progressive Design Build July 19, 2018 Ash Dhingra P.E.,S.E TRADITIONAL PROCUREMENT Design-Bid-Build (DBB) Design to 100%, procurement (bid), and construction proceed sequentially Construction contract
More informationLessons Learned from Walla Walla: Eastern WA s Largest GC/CM Water Project
Lessons Learned from Walla Walla: Eastern WA s Largest GC/CM Water Project Pierre Kwan, PE HDR Frank Nicholson, PE City of Walla Walla Amy Jenne Apollo, Inc. 2017 PNWS-AWWA Conference Background GC/CM
More informationProgressive Design-Build
Progressive Design-Build A Design-Build Done Right TM Primer Progressive Design-Build 1 What is Progressive Design-build? Progressive Design-Build A DESIGN-BUILD DONE RIGHT TM PRIMER A DESIGN-BUILD INSTITUTE
More informationConstruction Family of Documents
Construction Family of Documents The EJCDC Construction Family Documents (C-Series) is intended for engineered construction projects. The current edition (2013) is endorsed by both the Construction Specifications
More informationTrinity Well Field and Production Facilities Project Management Using CMAR
Trinity Well Field and Production Facilities Project Management Using CMAR Ian Taylor, P.E., PMP New Braunfels Utilities David Bennett, P.E. Freese and Nichols Kirby Anderson MGC Contractors February 27,
More informationThe United States Air Force Design-Build Plus User s Guide
The United States Air Force Design-Build Plus User s Guide Design-Build Plus User s Guide Section I. Introduction II. III. IV. References Executive Summary Roles and Responsibilities V. Project Development
More informationAlternative Project Delivery for America s Water Infrastructure
Alternative Project Delivery for America s Water Infrastructure Cal Rozario PMP Design-Build Chief Engineer HDR Water & Natural Resources Business Group TOPICS Traditional Project Delivery Brief History
More informationAN OVERVIEW OF DESIGN-BUILD. Presented by: David Umstot, PE, CEM Umstot Project and Facilities Solutions, LLC January 20, 2014
AN OVERVIEW OF DESIGN-BUILD Presented by: David Umstot, PE, CEM Umstot Project and Facilities Solutions, LLC January 20, 2014 Design-Build Not a New Concept In California: Multiple statutes govern design-build
More informationALTERNATE FORMS OF PROJECT DELIVERY
ALTERNATE FORMS OF PROJECT DELIVERY 1 INTRODUCTION 1.1 BACKGROUND.1 In the building industry today, conventional methods of project delivery are being challenged by Clients, Consultants and Contractors
More informationAPPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1)
APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter
More informationPublic Building Commission of Chicago Terms and Tools for Public Capital Development and Financing
Project Delivery Methods January 30, 2012 Public Building Commission of Chicago Terms and Tools for Public Capital Development and Financing Terms Capital Project Capital Program Prioritized Capital Plan
More informationEJCDC Contract Documents for America s Infrastructure Buy online at
EJCDC Contract Documents for America s Infrastructure Buy online at www.booksforengineers.com N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction
More informationRapid Alignment Initiated Delivery. A Project Delivery Theory to Enhance Project Outcomes
Rapid Alignment Initiated Delivery A Project Delivery Theory to Enhance Project Outcomes 1 THEDEMATTEIS ORGANIZATIONS Building Tomorrow Today Est. 1918 The DeMatteis Organizations Owner/Developer Building
More informationProgressive Design-Build
November 15,2016 Progressive Design-Build A Smart Alternative to Lease/Lease back? PRESENTERS Praful Kulkarni, AIA Rebekah Gladson, FAIA, DBIA Robynne T. Parkinson, JD, DBIA Presentation Outline Value
More informationAlternate Project Delivery Experience at UOSA and PWCSA
Alternate Project Delivery Experience at UOSA and PWCSA Bob Angelotti, Director of Technical Services at UOSA Samer Beidas, Director of Engineering and Planning at PWCSA Presented at the VWEA 2015 Education
More informationStrategic Funding and Program Implementation Strategies for Large Scale CIP
Strategic Funding and Program Implementation Strategies for Large Scale CIP City of San Mateo League of California Cities Public Works Officers Institute and Exposition 28 March, 2018 Contributing Authors:
More informationEJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center
EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction
More informationForging Successful PPPs in Puerto Rico
Forging Successful PPPs in Puerto Rico Mr. David Alvarez Executive Director Puerto Rico Public-Private Partnerships Authority June 8, 2010 Disclaimer The Studies here presented seek to determine whether
More informationEJCDC Contract Documents for America s Infrastructure Buy online at
EJCDC Contract Documents for America s Infrastructure Buy online at www.booksforengineers.com N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction
More informationSH 183 Managed Lanes Project RFQ Q & A MATRIX #2. (June 4, 2013)
SH 183 Managed Lanes Project RFQ Q & A MATRIX #2 (June 4, 2013) No. Current language states: Project experience provided by a parent or sister company of the Lead Engineering Firm, Lead Contractor or Lead
More informationAdvance Collaborate Enrich
Job Order Contracting 101 A Facilities Management Tool Sponsored by the Center for Job Order Contracting Excellence and The National Association of State Facilities Administrators Job Order Contracting
More informationPreparing for Detroit s Growth
Preparing for Detroit s Growth About VM3 A Strategic Management Consulting firm VM3 leverages over 30 combined years of mixed industry Fortune 100 corporate capital procurement and finance experience to
More informationOverview of Wastewater & Water Treatment Markets in Canada
Overview of Wastewater & Water Treatment Markets in Canada Canada Forum IFAT-Entsorga 2014 May 7, 2014 Munich, Germany Dana M. Hicks President & CEO Huber Technology, Inc. Recent Canadian Experiences Honorary
More informationNew England Environmental EXPO April 29, 30, May 1, 1997 World Trade Center, Boston, MA
New England Environmental EXPO April 29, 30, May 1, 1997 World Trade Center, Boston, MA PROCUREMENT FOR PUBLIC-PRIVATE PARTNERSHIPS FOR WATER AND WASTEWATER FACILITIES: HOW TO ELICIT TOP-QUALITY PROPOSALS
More informationTeam Structures and Project Performance in the Design-Build / Integrated Project Delivery Marketplace. Mark E. Alpert, P.E.
Team Structures and Project Performance in the Design-Build / Integrated Project Delivery Marketplace Mark E. Alpert, P.E., DBIA CH2M HILL Introduction Team Structure Agenda Engineer-lead Integrated design-build
More informationEL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS February 5, 2019
EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS 25-19 February 5, 2019 TO: RE: Invited Firms Request for Submittals to El Paso Water - Public Service Board (EPWater) Statement of Work Professional
More informationRole of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration
ROLE OF OTHERS For the design focus of the project, key partners included:»» Mortenson Construction, Contractor»» Jacobs, Contract Plant Operator»» Portland Engineering and Controls, I&C The City of The
More informationRESOLUTION NO. A RESOLUTION EXEMPTING THE DESIGN AND CONSTRUCTION OF WTP , VINE
RESOLUTION NO. 6583 A RESOLUTION EXEMPTING THE DESIGN AND CONSTRUCTION OF WTP- 17-02, VINE STREET WATER TREATMENT PLANT ( WTP) IMPROVEMENTS PROJECT FROM THE COMPETITIVE BIDDING PROCESS AND APPROVING AN
More informationDESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD
OWNER OWNER OWNER DESIGNER GC DESIGNER DESIGN CONSULTANTS TRADE SUBS DESIGN CONSULTANTS TRADE SUBS DESIGN CONSULTANTS TRADE SUBS DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD Contracts Communications
More informationRequest for Proposals Integrated Strategic-Operational Plan
CANADIAN EVALUATION SOCIETY ONTARIO CHAPTER Request for Proposals Integrated Strategic-Operational Plan Deadline: February 21 st 2018 @ 12:00pm EST Page 2 CANADIAN EVALUATION SOCIETY - ONTARIO CHAPTER
More informationPiloting Procurement Approaches for a $1 Billion Sewer Rehabilitation Program. Richard Stahr, P.E., Brown and Caldwell
Piloting Procurement Approaches for a $1 Billion Sewer Rehabilitation Program Richard Stahr, P.E., Brown and Caldwell 1 Outline HRSD Overview Wet Weather Consent Decree I/I Reduction Program Pilot Projects
More informationIntroduction to FIDIC Conditions of contract OUTLINE. What is FIDIC? Dr. Mirosław J. Skibniewski, A.J. Clark Chair Professor
New tendency in contracts worldwide Introduction to FIDIC Conditions of contract Dr. Mirosław J. Skibniewski, A.J. Clark Chair Professor 1 2 OUTLINE 1. What is FIDIC? 2. Characteristics of FIDIC Conditions
More informationReliable. Affordable. Fast.
Reliable. Affordable. Fast. The Seven Seas Reliable Water Solution At Seven Seas Water Corporation, our sole mission is to deliver highly-reliable water supplies for our municipal, industrial and commercial
More informationImplementing Design-Build On a Small Scale Everett s East Clearwell Roof Replacement
Richard Hefti, P.E., City of Everett, and Patrick Weber, P.E., Brown and Caldwell Implementing Design-Build On a Small Scale Everett s East Clearwell Roof Replacement April 27, 2018 Background: Everett
More informationAPPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1)
APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter
More informationALTERNATIVE PROJECT DELIVERY DIVISION PROGRAM UPDATE
ALTERNATIVE PROJECT DELIVERY DIVISION PROGRAM UPDATE 2018 VTCA VDOT Consultant Forum Shailendra Patel, P.E., DBIA State Engineer APD Division October 2, 2018 Odd Fellows Road Improvements Design-Build
More informationADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW
January 31, 2018 To Whom It May Concern: I. INSTRUCTIONS ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project 18-0018PW A. The following additions, deletions, revisions, and/or
More information2017 STATE OF THE DEMAND FOR DESIGN-BUILD DELIVERY IN THE WATER/WASTEWATER SECTOR
2017 STATE OF THE DEMAND FOR DESIGN-BUILD DELIVERY IN THE WATER/WASTEWATER SECTOR Produced by the Water Design-Build Council In collaboration with 2017 State of the Demand for Design-Build Delivery in
More informationOne Sustainable Water Solution Water Wastewater - Groundwater DAVIS-WOODLAND WATER SUPPLY PROJECT
One Sustainable Water Solution Water Wastewater - Groundwater DAVIS-WOODLAND WATER SUPPLY PROJECT Overview Project Drivers Partnerships Implementation Water Supply Management Tale of Two Cities City of
More informationSchool Construction: Contract Basics OSBA BONDS, BALLOTS AND BUILDINGS CONFERENCE FEBRUARY 09, 2018
School Construction: Contract Basics OSBA BONDS, BALLOTS AND BUILDINGS CONFERENCE FEBRUARY 09, 2018 Who we are Presenters Rob Wilkinson, Partner, Ball Janik LLP Scott Rogers, CPPB, Senior Project Manager,
More informationNaval Support Activity Annapolis (NSAA) Water Reduction and Conservation. Andrew Hood, PE, Director of Engineering
Naval Support Activity Annapolis (NSAA) Water Reduction and Conservation Andrew Hood, PE, Director of Engineering Water Reduction & Conservation Opportunity Plant design capacity of 2.3 Million Gallons
More informationWater Recycling Facility Project
Water Recycling Facility May 15, 2006 How did we get here? December 2002 City facing $8,000,000 fines from the Regional Water Quality Control Board (RWQCB) for Wastewater Discharge Violations. Existing
More informationRFP Restructuring Advisory Committee: Water and Sewer Question and Answer. Question Cut-Off 2/13/17
RFP 2017-0007 Restructuring Advisory Committee: Water and Sewer Question and Answer Question Cut-Off 2/13/17 1. What is the estimated value of the sewer system? Determining an appropriate valuation of
More informationThe Davis Woodland Water Supply Project. W O O D L A N D R O TA RY C L U B D e c e m b e r 1 3,
The Davis Woodland Water Supply Project W O O D L A N D R O TA RY C L U B D e c e m b e r 1 3, 2 0 1 6 Presentation Overview Surface Water Project Overview Project Delivery Method Water Rights & Operations
More informationHead of Diversification and Growth
Position Title: Location: Reporting To: Abt JTA Values: Head of Diversification and Growth Brisbane Chief Executive Officer The incumbent must demonstrate a high level of commitment to following values
More informationStrategic Management. One Team. Infinite Solutions.
Strategic Management One Team. Infinite Solutions. Stantec's Strategic Management team combines business, financial, technical, and operational knowledge to develop solutions for our clients' capital
More informationAlternative Delivery Methods for Construction Projects at WATER AND WASTEWATER SUMMIT 2012 LAS VEGAS, NV MAY 3, 2012
Alternative Delivery Methods for Construction Projects at WATER AND WASTEWATER SUMMIT 2012 LAS VEGAS, NV MAY 3, 2012 Presenter Nilaksh Kothari, P.E. General Manager Manitowoc, Wisconsin Outline of Presentation
More informationChoosing a Project Delivery Method. A Design-Build Done Right Primer
Choosing a Project Delivery Method A Design-Build Done Right Primer DESIGN-BUILD DONE RIGHT PRIMER 1 Choosing a Project Delivery Method A DESIGN-BUILD DONE RIGHT PRIMER A DESIGN-BUILD INSTITUTE OF AMERICA
More informationAn Overview of Design-Build
CCFC Regional Workshops Breaking the Mold of Traditional Construction Delivery: Successfully Using Lease-Leaseback and Design-Build Friday, May 2, 2014 Coast CCD Costa Mesa, California An Overview of Design-Build
More informationPWCSA CONSTRUCTION MANAGEMENT AT RISK (CMAR) PROJECT DELIVERY
PWCSA CONSTRUCTION MANAGEMENT AT RISK (CMAR) PROJECT DELIVERY Outline What is the CMAR Delivery Method? What are the statutory requirements? Why use it at PWCSA? What are the different roles of the project
More informationHow Public Private Partnerships Can Create Real Value in Water Projects
How Public Private Partnerships Can Create Real Value in Water Projects September 30, 2016 Tony Elkins, Commercial Director Cadagua s Valdelentisco desalination plant The Ferrovial Group Development Over
More informationThe Water Resources Utility of the Future: Emergence of an Innovation Ecosystem
The Water Resources Utility of the Future: Emergence of an Innovation Ecosystem Kenneth Rubin, PhD Managing Partner American Infrastructure Holdings 1050 30 th St NW Washington DC 20007 202-652-2650 (o)
More informationEffective Utility Coordination Practices Using Alternative Contract Methods
Effective Utility Coordination Practices Using Alternative Contract Methods Douglas D. Gransberg, PhD, PE, DBIA Gransberg & Associates, Inc. Norman, OK 73070-2395 dgransberg@gransberg.com NCHRP 20-07,
More information46 Fall 2012 A Middle East Point of View
46 Fall 2012 A Middle East Point of View Public Sector Now, where were we? Strategy implementation challenges for public sector organizations in the Middle East Strategy whereby a set of initiatives to
More informationpwc.com.au PwC Infrastructure Advisory (Brisbane) Darren Black November 2013
pwc.com.au Infrastructure Advisory (Brisbane) Darren Black November 2013 Discussion Points Commercial Feasibility Objectives o What is the Point of the Business Case? o Risk Development o Updated Business
More informationAUDIT OF CONTRACTING AT THE CANADIAN INTELLECTUAL PROPERTY OFFICE
AUDIT OF CONTRACTING AT THE CANADIAN INTELLECTUAL PROPERTY OFFICE Final Report December 2005 Tabled and approved by DAEC on April 13, 2006 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY / CONCLUSIONS...1 2.0
More information1/4/2014. Alternative Project Delivery Methods 1. Agenda
Steven. C. Thweatt Assistant Vice Chancellor Facilities Management University of Colorado @ Boulder Steven.thweatt@colorado.edu Introduction Fun in the air More Fun in Chattanooga Licensed Architect Georgia
More informationDTX Project Delivery Methodology and Options. January 9, 2014
DTX Project Delivery Methodology and Options January 9, 2014 1 Outline/Agenda Overview of Common Project Procurement and Delivery Methods Examples of Past Project Delivery Methods ( The Good, The Bad,
More informationStrategic Plan Progress Report
Strategic Plan Progress Report We identified six strategic initiatives with accompanying goals, actions, and measures of success. We believe that these initiatives and actions address each of our strategic
More informationThe Good, The Bad, and The Ugly
Locally Administered Transportation Design-Build The Good, The Bad, and The Ugly APWA Mid-Atlantic Chapter Annual Conference May 9, 2013 North Gayton Road Extension Project Overview First Locally-Administered
More information83D Q & A Set #8. Answer: Please see response to question 117.
83D Q & A Set #8 (15) Section 2.2.1.8 Please confirm that bidding projects are only required to demonstrate the ability to meet the requirements for Forward Capacity Auction Qualification in their proposal.
More informationCONSTRUCTION DOCUMENTS Part 1
Audio Presentation Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org
More informationCity of Columbia South Carolina. Discussion of Public Private Partnership. April 24, 2012
City of Columbia South Carolina Discussion of Public Private Partnership April 24, 2012 1 KEY HISTORICAL DATES Rich 142 Year History 1869-Founded as Hackensack Water Company 1890-Listed on the New York
More informationQualifications Based Selection of Contractors
Qualifications Based Selection of Contractors AGC of America Project Delivery Committee QBS Working Group 1 Table of Contents QBS & The Industry: An Introduction Pages 3-4 Selection Criteria for QBS Page
More informationLittle Patuxent WRP 8 th Addition - Biosolids Processing Facilities Improvements
Little Patuxent WRP 8 th Addition - Biosolids Processing Facilities Improvements CMAA Presentation April 19, 2017 2014 HDR, Inc., all rights reserved. Introductions Joshua Gliptis, P.E. Howard County Bureau
More informationECI: Two-Stage Contracts
ECI: Two-Stage Contracts Client and Contractor Considerations Michael Creedon Special Counsel ECI in Infrastructure and Major Projects Summit 2010 Sydney, 17 June 2010 Sessions Outline Introduction /
More informationPPPs Canada s experience Water sector
PPPs Canada s experience Water sector Mark Hodgson June 21, 2016 Santiago, Chile 1 Canadian PPP overview A growing market since 1993 2 Canadian PPP overview Project status 3 Canadian PPP overview Results
More informationMulti-Family Housing Program Directors, Coordinators, Specialists, State Architects and Engineers
RD AN No. 4795 (1924-A) November 2, 1015 TO: ATTN: State Directors Rural Development Multi-Family Housing Program Directors, Coordinators, Specialists, State Architects and Engineers FROM: Tony Hernandez
More informationALTERNATIVE PROJECT DELIVERY METHODS DO THEY SAVE TIME AND MONEY?
ALTERNATIVE PROJECT DELIVERY METHODS DO THEY SAVE TIME AND MONEY? Gordon Culp Smith Culp Consulting SmithCulp.com INTRODUCTION Are there alternative methods for delivering water and wastewater treatment
More information