1 Archer Daniels Midland Contractor Safety Verna Elliott Safety Director
2 Overview Three manufacturing facilities in SW Cedar Rapids covering more than 2 square miles of real estate. Wet Mill Corn Processing facility Dry Grind Corn Processing facility CoGeneration Power plant ADM labor hours in FY 2011 were 1,024,000 and contractor labor hours were 1,074,000
3 Types of Contractors Owner Controlled Insurance Program (OCIP) Long term contractors Vendors Employees of contract companies who are onsite on a regular basis but who have little direct impact to the process Off-Site Contractors Non-routine; 1 day several months in duration
4 OCIP Contractors Long term contractors Electricians Pipefitters Scaffold builders General purpose contractors Vested interest in the success of ADM Pre-qualification process
5 Why Does it Work? Long term employees If more than 20 people are onsite, a safety professional is required by ADM Inclusion in all Safety programs Contractor Safety Committees Audit Incident Investigation Rules and procedures Contract companies are required to provide training to all employees and provide documentation of the training
6 Vendors Companies who have employees onsite on a regular basis Little or no impact on the process Required to attend a forty-five minute presentation on general rules, PPE etc. Retrained annually
7 Off-site Contractors Temporary jobs when specific expertise is required Paving companies Projects requiring additional manpower New equipment installation Rail repair contractors Equipment service companies
8 Biggest Opportunity Off-site contractors Traditionally would go through the 45 minute vendor training OCIP contractors and engineering staff developed training program in addition to the 45 minute vendor training
9 Training Requirements The Project Manager for the contract group does additional training to include: Where to enter/exit the plant and pick up emergency pager Review the work area including exit routes and safety showers as well as any specific requirements pertaining to the area (ie. Combustible dust; Lower Explosive Limit) Emergency procedures to include the location of the nearest storm shelter and muster location.
10
11 Training Requirements (Cont.) Job Hazard Analysis procedures and form if not available Personal Protective Equipment SOP Good Manufacturing practices Company vehicle policy Plant emergency phone # s as well as verbiage and channel to announce an emergency on the radio Use of permits (ie. Confined Space, Hot Work etc.) Fall protection SOP Scaffolding SOP White board procedures
12 Training Requirements (Cont.) Rail Safety Barricades and signage SOP Ladder usage Any other applicable SOP s with regards to their scope of work
13 These plant safety rules have been reviewed with my ADM contact. I have read and understand the above safety rules and agree to abide by these rules while on ADM Cedar Rapids, Iowa plant premises. Date ADM Contact Authorized Contractor Name and Signature Contractor Crew Signatures: Job Hazard Assessment ADM JHA Contractor Company JHA **JHA must be turned in to ADM contact each day** ADM radio required YES NO Please check any SOP listed below to receive a printed copy for your review as needed for the job task. CWD-SAF-SOP-003 Barrier Tape CWD-SAF-SOP-002 Personal Protective Equipment (PPE) CWD-SAF-SOP-007 Vehicle Safety CWD-SAF-SOP-012 Rail Crossing and Signals CWD-SAF-SOP-033 White Board Sign SOP-105 Good Manufacturing Practices (GMP) CWD-SAF-SOP-024 Severe Weather CWD-SAF-SOP-031 Plant Emergency Reporting CWD-SAF-SOP-001 Hotwork Permit CWD-SAF-SOP-004 Ladders CWD-SAF-SOP-008 Crane Usage CWD-SAF-SOP-011 Roof Access Permit CWD-SAF-SOP-014 Line Break Procedure CWD-SAF-SOP-015 Confined Space Radio Check CWD-SAF- SOP-018 Compressed Gas Cylinders CWD-SAF-SOP-019 Permit Required Confined Space CWD-SAF-SOP-020 Single and Multiple Lock Box Lockouts CWD-SAF-SOP-022 Powered Industrial Truck Use and Inspections CWD-SAF-SOP-023 Scaffolding CWD-SAF-SOP-025 Fall Protection Equipment Inspections CWD-SAF-SOP-026 Fall Prevention and Protection CWD-SAF-SOP-028 Cleaning with Air CWD-SAF-SOP-029 Aerial Lifts CWD-SAF-SOP-030 Proper Use of Hoists CWD-SAF-SOP-034 Hand Tools, Jigs and Small Equipment CWD-SAF-SOP-035 Portable Heater Usage CWD-SAF-SOP-036 Working Over or Near Bodies of Water SOP-021 Single Point Lockout Contractor SOP 112 Chemgrate Contractor SOP 115 Contractor Owned Industrial Powered Equipment Use and Inspections Contractor SOP 116 Demolition Return this sheet to the Engineering Department: Pat Walthart or Brent Culver when complete.
14 Communication Radios Intranet SOP s Safety Observation Report s White Boards Allows operators to see who is working in their department and in what area
15
16 Information Required Date Company performing the work and phone number Contact name (for radio communication) Specific location Description of work Permits obtained for work
17 ADM/Contractor Partnership ADM views the relationship with our contract groups as a partnership. We are all responsible for our own safety as well as everyone around us no matter what the name on their hard hat happens to be. With everyone working together we can achieve the ultimate goal of zero injuries.
18 Questions?
Site Specific Safety Plans (SSSP)
1.0 SCOPE/PURPOSE 1.1 The guidelines in this document provide a minimum framework for the development of a Site- Specific Safety Plan. They are not meant to supersede or replace regulatory requirements,
More informationContractor EHS Program Attachments
Contractor EHS Program Attachments Contractor Environmental Health & Safety Program Safety Work Permit Attachments Attachment 1- Contractor Safety Work Permit The Contractor Safety Work Permit Checklist
More informationMVDC F041 Safety Inspection Checklist
MVDC F041 Safety Inspection Checklist JOB TITLE: DEPARTMENT: JOB NO.: DATE: LEGEND 1 Satisfactory 2 Requires Improvement 3 Non Existent 4 Not Applicable EMERGENCY PREPAREDNESS Emergency procedure is posted
More informationLockheed Martin Space Systems Company (LMSSC) Contractor Environment, Safety & Health (ESH) Site Briefing - Boulder, Colorado
Lockheed Martin Space Systems Company (LMSSC) Contractor Environment, Safety & Health (ESH) Site Briefing - Boulder, Colorado The purpose of the Contractor ESH briefing is for LMSSC to provide information
More informationSafe Work Method Statement. 14/4/16 Approved by (Snr Management Rep):
ABN 39 137 318 873 Unit 2, 36 Lidco St Arndell Park NSW 2148 QAC swms2 Phone: 1300 121 544 Fax 1300 078 877 Safe Work Method Statement SWMS No: 1 Revision Date: 14/4/16 Approved by (Snr Management Rep):
More informationLockheed Martin Space (LMS)
Lockheed Martin Space (LMS) Contractor Environment, Safety & Health (ESH) Site Briefing Valley Forge site, King of Prussia, PA The purpose of the Contractor ESH briefing is for LM Space to provide site
More informationEnvironmental, Health and Safety Policy for Contractors
Environmental, Health and Safety Policy for Contractors The attached policy is a tool to help contractors understand and comply with RBC's Environmental, Health and Safety rules. The information that follows
More informationDoc No: SUBCON Midland Engineering Co., Inc. Initial Issue Date 12/04/15 Safety Management System
Revision Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 6 PURPOSE Define subcontractor responsibility for developing, implementing and adhering to their own environmental,
More informationUNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW
PROCEDURE Contractor Safety Issued with the authority of the Chief Commissioner and General Manager of Chief Commissioner signature Chief Executive Officer signature Sponsor Head of Risk Document type
More informationHealth & Safety Plan DEMOLITION WORKS: No 2 Substation
DEMOLITION WORKS: No 2 Substation Revision History Revision Date Section Detail of Amendment By r3a 09/10/14 First Issue JH 17 October 2014 Page 2 Revision 4 Contents 1. Description of Project 1.1. Introduction
More informationThis document sets out the rules applicable to all contract companies and their personnel when working on a CF Fertilisers UK Limited (CF) site.
CONTRACTOR EHS REQUIREMENTS FOR ON-SITE WORK Issued by:: EHS Page No: Issue No: Issue Date: Authorised By: Review date: 1 of 8 3 July 2016 N Cook July 2020 1. INTRODUCTION This document sets out the rules
More informationContractor EHS Program Attachments
Procedure: HS210 DONNELLEY FINANCIAL SOLUTIONS - Version: 3.3 Att Page 1 of 21 Contractor Environmental Health & Safety Program Attachments Date:12/04/2009 Contractor EHS Program Attachments Download:
More informationProject Safety Orientation and Procedures
www.oakmaninc.com Project Safety Orientation and Procedures Compliance with Project Procedures Oakman believes that sites under our control must be as safe as we can make them not only for our employees,
More informationBIDDER INFORMATION QUESTIONNAIRE:
ONE CORPORATE DRIVE, SUITE 600, SHELTON, CONNECTICUT 06484-6211 Susan M. DeLeon Legal Administrator & Compliance Specialist (203) 925-7260 (203) 926-8829 FAX e-mail: susan_deleon@iroquois.com Type of work
More informationOverhead Power Lines. Corporate Safety Policy Overhead Power Lines. (Cont.)
Corporate Safety Policy Overhead Power Lines Last Modified: JAN 2013 1 of 6 Overhead Power Lines I Purpose To provide procedures, for working on overhead power lines or in their vicinity on COMPANY sites,
More informationSAMPLE PAGES. Construction Safety and Health Program. [Company name]
The safety and health of our employees is our top priority. Everyone goes home safe and healthy every day. Construction Safety and Health Program [Company name] [Date Authorized] [Version} 0 Contents Mission
More informationYour Company Name. Hospital Phone: (318) Do cell phones work at the site? Yes No If no, location of the nearest landline:
Your Company Name JOB HAZARD ANALYSIS (JHA) FORM (No elevated work 6 feet or more AGL) Complete daily before beginning work and review when work is complete. A copy of a site evaluation report shall remain
More informationContractors Safety Code of Practice
Document Control Revision No. Date Document Reviewed 8 October 2017 Publication on Web Site November 2017 Date of next Review October 2019 or following any changes Summary of main changes Change in format
More information!!!!!!!!!!!!!!!!!!!!
Jefferson Energy Companies Contractor Pre-Qualification Form (PQF) Fill out this form and send to: Jefferson Energy Companies Attention: Calvin Bates 350 Pine St Edison Plaza, 10 th Floor Beaumont, TX
More informationCHAPTER 10: FALL PROTECTION
CHAPTER 10: FALL PROTECTION PURPOSE The fall protection program provides information and procedures to minimize the occurrence of an accidental fall or falling object, resulting in injuries on a job site.
More informationBASF Contractor Pre-Access Checklist
BASF Contractor Pre-Access Checklist Purpose The purpose of this document is to ensure that BASF communicates all EHS requirements and expectations to each contractor company and that each contractor company
More informationContractor / Subcontractors Work Plan
Document: FMW-585 Revision: 8 Date: January 11. 2013 EMS CONTROL PROCEDURE REV: 8 Page 1 of 20 REV DATE DETAILS Page Para. DESCRIPTION OF CHANGE 0 01/19/2007 All All Original Issue 1 02/22/2007 2 All visitors,
More informationWORKING AT HEIGHT PROCEDURE
Page 1 of 8 AL-Yamama Engineering Company HSSE Department (s) WORKING AT HEIGHT PROCEDURE Page 1 of 8 Page 2 of 8 Introduction Work at height is any work activity that is performed where the work is to
More informationEmerg. Contact: EMERGENCY CONTACT INFORMATION Fire Department Info: Municipal Police Info: County Sheriff Info: Dept Name: Dept Name: Dept Name:
JOB DETAILS Company Name: Customer: Project Manager: Job Address: Nearest Intersection: Latitude: Date: Job Name: Job Supervisor: Emerg. Contact: Longitude: EMERGENCY CONTACT INFORMATION Fire Department
More informationCover Page / Revision Status
EFFECTIVE DATE: April 4, 2011 REVISION: 1 Page 1 of 18 Cover Page / Revision Status Rev Date Description 0 4/4/11 Original Issue signed 1 4/4/14 Revisions to contractor roles and responsibilities. Revisions
More informationMcCarl s Safety & Health Procedures UNIFORM WORK RULES
McCarl s afety & Health Procedures UNIFORM WORK RULE able of Contents 1.0 PURPOE 1 2.0 COPE 1 3.0 REPONIBILIIE 1 4.0 APPENDIX 1 5.0 UNIFORM WORK RULE GENERAL INFORMAION 1 6.0 UNIFORM WORK RULE 3 APPENDIX
More informationApply for Working at Heights Permit
Apply for Working at Heights Permit Details of revisions Level Details Date Initial 1 Creation of initial document for use 05/09/2017 MW 2 Amendment to implement time frames 23/03/2018 MW Title: Apply
More informationLAUSD Construction Safety Program Safety Boot Camp
LAUSD Construction Safety Program Safety Boot Camp 2018 John E. McEvoy, CHST Facilities Services Division Construction Safety Office 333 Beaudry Ave, 19 th Floor, Room 19-116, Los Angeles, CA 90017 Office:
More informationConstruction Environmental, Health & Safety Plan (CEHSP)
Construction Environmental, Health & Safety Plan (CEHSP) INSTRUCTIONS This Construction Environmental, Health & Health Plan (CEHSP) is required of each construction project at the Sanford Underground Research
More informationIndividual Unit Function: Safety Procedure No.: SOP-0138 Page: 1 of 10
Procedure No.: SOP-0138 Page: 1 of 10 1. PURPOSE To ensure work is performed in a safe manner by: Ensuring clear communications about the work to be accomplished. Providing approval from the equipment
More informationPre-Qualification Questionnaire Checklist
Pre-Qualification Questionnaire Checklist Thank you for your interest in becoming an Approved Contractor with Christchurch Airport. To ensure efficient processing of your application please utilise the
More informationMANAGING PROJECT SAFETY. Alternatives in a Changing Market
MANAGING PROJECT Alternatives in a Changing Market SHIFTING THE BURDEN Clients reduce their costs by increasing safety requirements of contractors working on their property. Clients shift the burden of
More informationContractor Health, Safety and Environment Guidelines (Pacific Region)
Contractor Health, Safety and Environment Guidelines (Pacific Region) Table of Contents Introduction and Overview Page CBRE Health and Safety Policy 3 Introduction 4 General Contractor Requirements 4 Induction
More informationXXVI. Contractor Safety & Environmental Guidelines (For General Contractors and Sub-Contractors)
XXVI. Contractor Safety & Environmental Guidelines (For General Contractors and Sub-Contractors) 1. PURPOSE 1.1 This procedure highlights minimum safe working practices required for all contractors working
More informationThe Hong Kong Polytechnic University Facilities Management Office
The Hong Kong Polytechnic University Facilities Management Office Safety Precautions and Requirements The Contractor shall ensure as a priority in all activities connected with the Works, the safety and
More informationINTERNAL USE ONLY- REQUIRED DOCUMENTATION SUBMITTED:
PART 1. ACCEPTANCE & QUALIFICATIONS I,, an authorized representative of (OCWD PROJECT MANAGER) OCWD have reviewed the Contractors Safety Guide with the contractor representative named below. I,, an authorized
More informationSTATEMENT OF BIDDER S QUALIFICATIONS
STATEMENT OF BIDDER S QUALIFICATIONS Eastside Trail Extension This Statement is to accompany bids submitted for the project identified above. Bidders must meet the minimum qualification criteria set forth
More informationFASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIRONMENT, HEALTH AND SAFETY (EHS) PLAN
FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIRONMENT, HEALTH AND SAFETY (EHS) PLAN Before commencing work on site at FIT, Contractor shall prepare a work-specific EHS Plan and
More informationAdelaide Airport Limited
Induction Pack for Contractors Site Rules and Conditions for Contractors Revision: 7 November 2015 Site Rules and Conditions-Adelaide:Legal 42723757_1 1. GENERAL 1 2. BUILDING CONSENT AND APPROVAL 1 3.
More informationI. Introduction/Welcome to MAPP
I. Introduction/Welcome to MAPP II. Company Policy HSE POLICY It is the commitment of MAPP to perform ALL work in the safest manner possible, while maintaining the highest level of construction practices.
More informationFASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIROMENT, HEALTH AND SAFETY (EHS) PLAN
FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIROMENT, HEALTH AND SAFETY (EHS) PLAN Before commencing work on site at FIT, Contractor shall prepare a work-specific EHS Plan and
More informationSUBCONTRACTOR MANAGEMENT PLAN
SUBCONTRACTOR MANAGEMENT PLAN Purpose The purpose of this program is to improve subcontractor health, safety and environmental performance and establish a standard for pre-qualification, evaluation/selection
More informationJOB SAFETY ANALYSIS PROGRAM. Owner: Risk Management Revision No: 01. Document number: Q-001 Date last revised:
Table of Contents 1.0 Applicability...2 2.0 Scope...2 3.0 Definitions...2 4.0 Core Information and Requirements...2 5.0 Roles and Responsibilities...6 6.0 Goals, Objectives and Performance Measures...7
More informationWork Health & Safety Procedure
1 PURPOSE This procedure explains the process for qualification of Contractors at Port of Newcastle (PON). It outlines the responsibilities for PON Representatives and Contractors. It also provides a system
More informationENVIRONMENTAL, HEALTH AND SAFETY INFORMATION FOR CONTACTORS. Rules of the House
ENVIRONMENTAL, HEALTH AND SAFETY INFORMATION FOR CONTACTORS Rules of the House Revision Date: July 23, 2014 INDEX Page No. INTRODUCTION...3 Emergency Telephone Numbers...4 SECTION 1...5 1.1 Definitions...5
More informationIPRF FIRE SERVICE GAP ANALYSIS OUTLINE
IPRF FIRE SERVICE GAP ANALYSIS OUTLINE 1. MANAGEMENT LEADERSHIP/ACCOUNTABILITY YES NO a. Is there a Fire Department Mission Statement? b. Is risk management incorporated into your operations/plans/procedures?
More informationCAL/OSHA ELECTRICAL HIGH VOLTAGE
Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to electrical exposure to high voltage for employees and contractors
More informationSUBCONTRACTOR MANAGEMENT
Doc : Revision. 0 Preparation: Safety Mgr Authority: Director Issuing Dept: Safety Page: Page 1 of 9 Purpose The purpose of this program is to ensure that ANC Foster continues to improve subcontractor
More informationCherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12
SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and
More informationSafety, Health and Environmental Essentials for Contractors Working at Daresbury Laboratory
Safety, Health and Environmental Essentials for Contractors Working at Daresbury Laboratory DL Contractors SHE Booklet v1 (Nov 2016) Page 1 of 28 Contents Page Introduction 3 Before Work Starts 4 Fire
More informationSafety, Health and Environmental Essentials for Contractors Working at the Rutherford Appleton Laboratory
Safety, Health and Environmental Essentials for Contractors Working at the Rutherford Appleton Laboratory SHE Booklet for Contractors at RAL July 2016 Page 1 of 28 1 1 ROAD 18 ROAD 7 ROAD 8 ROAD 6 ROAD
More informationProperty and Public Protection Plan
Property and Public Protection Plan OTTO CONSTRUCTION PROPERTY AND PUBLIC PROTECTION PLAN Otto Construction s pre-planning of construction activities includes procedures to protect the general public and
More informationSUBCONTRACTOR SAFETY PRE-QUALIFICATION FORM
SUBCONTRACTOR SAFETY PRE-QUALIFICATION FORM GENERAL INFORMATION 1. Subcontractor Information Subcontractor Name: Street Address: Telephone Number: Fax Number: City: Website Address: State: Zip Code: 2.
More informationDaily Work Permit and Safety Checklist (C7007) Purpose. Scope. Roles and Responsibilities. Colonial Pipeline Company Safety Awareness Manual
Daily Work Permit and Safety Checklist (C7007) Purpose This section provides instruction for completing Colonial Pipeline Company s Daily Work Permit and Safety Checklist (Form C7007) at CPC facilities
More informationSECTION 1: APPLICANT INFORMATION. 1. Have you contacted your local Chapter regarding their established submission process or procedure?
2018 CONSTRUCTION SAFETY EXCELLENCE AWARDS APPLICATION INSTRUCTION STEPS: 1. DOWNLOAD FORM 2. FILL OUT 3. SUBMIT DEADLINE FEBRUARY 2, 2018 SECTION 1: APPLICANT INFORMATION 1. Have you contacted your local
More informationContractor and Visitor Safety
Contractor and Visitor Safety Objectives The Objectives of this section are to establish minimum requirements to assure outside contractors are fully advised of requirements regarding safe work practices
More informationApache / Contractor X. Contractor/Vendor Bridging Document
Operator Contractor/Vendor Operator Apache Contractor Contractor X Address Phone 2000 Post Oak Blvd., Suite 100 Houston, TX 056 Phone: (13)296-6000 Toll free: (00)22-2434 Address Phone *** Phone: Fax:
More informationDocument Revision Change Table Revision Number
Beaumont Site Procedure No.: BMEHS-002.025 Reviewed: 01/17 Page: 1 of 7 Document Revision Change Table Revision Number Revision Description Revised By Revision Date Rev. 03 Considered as starting document
More informationCONSTRUCTION SAFETY MANUAL 1
DOCUMENT NO. 23347-CON-PEP-002 Revision No. 0 Page 1 of 11 CONSTRUCTION SAFETY MANUAL Revision Date: 26/11/2012 Initial issue date: 27/11/2012 Issuer: B. Wright, Project Construction Manager Approval:
More informationSUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS)
Title: Subcontractor Control Document Effective Date: 2/3/2012 Control Number: THG_0007 Revision Number: 1 Date: 10/6/2015 Annual Review Completed: 5/13/2015 CONTENTS SUBCONTRACTOR SAFETY, HEALTH, AND
More informationDemolition Contractor Skilled Support Personnel Pre-Qualification
16 N. Franklin Street, Suite 203 Doylsetown, PA 18901-3536 Ph: 215-348-4949 Fax: 215-348-8422 www.demolitionassociation.com Demolition Contractor Skilled Support Personnel Pre-Qualification First Responders
More informationRisk Assessment & Safe Working Practice
RA Ref Number: 01f Revision: 2 Project/Job Number Reference Insert Job Number Approval Date: 30/03/2018 RA Description: Working at Heights Fixed Tubular Scaffolds Next Review Date: 01/04/2019 Notes: Please
More informationBP OIL -- TOLEDO REFINERY
BP OIL -- TOLEDO REFINERY Document Type: Program Effective Date: September 1, 2017 Owner: Robert Myak Toledo Refinery Contractor Management Program Auth. By: (Signature on file) Reference No.: Rev. No.:
More informationApache / Contractor X. Contractor/Vendor Bridging Document
Operator Contractor/Vendor Operator Apache Contractor Contractor X Address Phone 2000 Post Oak Drive. Suite 100 Houston, TX 056 Phone: (13)296-6000 Toll free: (00)22-2434 Address Phone *** Phone: Fax:
More information2014 SAFETY EXCELLENCE AWARD SAFETY SURVEY FORM FINAL EVALUATION FOR GENERAL & HARD/SOFT CRAFT CONTRACTORS
2014 SAFETY ECELLENCE AWARD SAFETY SURVEY FORM FINAL EVALUATION FOR GENERAL & HARD/SOFT CRAFT CONTRACTORS SCORING: For each item listed below, decide if the entry meets the criteria as follows: 0 = Below
More informationCONTRACTOR SAFETY PRE-QUALIFICATION CHECKLIST. Name of Contractor: Date: Business Address: Telephone No.:( ) Fax No.:( )
CONTRACTOR SAFETY PRE-QUALIFICATION CHECKLIST 1. CONTRACTOR INFORMATION of Contractor: Date: _ Business Address: _ Telephone No.:( ) Fax No.:( )_ Contact Person: Company SIC Code: Years in Business: Date
More informationBuilding 27 Roof Safety Assessment
Roof Safety Survey GENERAL INFORMATION Building 27 Roof Safety Assessment CAMPUS: Wollongong Campus BUILDING: Education Movement Laboratory (27) Small single storey metal roof building with 30 degree pitched
More informationNetwork Rail Project No: Issue: 002 Date 11/07/2017 Work Package Plan Arena Tunnel LSM773 Prepared by: Start Date: 15/07/17 Finish Date: 23/07/17
Work Package Plan Arena Tunnel LSM773 Prepared by: Jimmy Galbraith (Print Name)..... (Signature) Works Manager (Job Title) Approved by the Contractor s Engineering Manager (CEM):...... (Print Name).....
More informationQUORUM MINING & RELINING SERVICES HEALTH AND SAFETY MANAGEMENT
SCAFFOLDING AND ELEVATED WORK PROCEDURE STATEMENT OF PROCEDURE: This procedure reviews the hazards associated with the use of scaffolds and how to control or minimize those hazards. This procedure also
More informationPROCEDURE FOR IDENTIFICATION OF ENVIRONMENTAL ASPECTS, HAZARDS, EVALUATION OF IMPACTS, RISKS AND DETERMINATION OF CONTROL MEASURES
Consolidated Construction Consortium Ltd. PROCEDURE NO. : CSP- 4.3.1 ENVIRONMENTAL ASPECTS, HAZARDS, DETERMINATION OF CONTROL MEASURES REV.NO. 0 DATE: 02-09-2011 PAGE 1 OF 10 ENVIRONMENTAL ASPECTS, HAZARDS,
More information... Think safety! Working at heights. HSE in general. Environment. Health. Safety
... Think safety! Working at heights HSE in general Environment Health Safety 1 Working at heights Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety
More informationEmployee Safety Training Program
Employee Safety Training Program Line of Business: Workers Compensation, General Liability Risk Control Strategy/Key Issues: Employee training to improve job safety knowledge and reduce the number and
More informationHEALTH AND SAFETY CONTRACT BETWEEN EMPLOYER AND MANDATORY (CONTRACTOR) SECTION 37(2) OF THE OHS ACT, ACT 85 OF 1993
P a g e 1 SUBJECT ISSUED BY APPROVED BY CONTRACT CONTRACT BETWEEN EMPLOYER AND MANDATORY SAFETY MANAGER: SUN CITY RESORT DIRECTOR OF OPERATIONS PAGE 1 OF 15 EFFECTIVE: REVISION NO: 1 HEALTH AND SAFETY
More informationSHOP SAFETY AUDIT AND INSPECTIONS
SHOP SAFETY AUDIT AND INSPECTIONS The following are examples of three different general shop safety inspection forms. Keep in mind they do not list all the possible items for maintenance and manufacturing
More informationSafety and Environmental Orientation and Practices for Contractors
Safety and Environmental Orientation and Practices for Contractors Welcome to the University of California, Irvine. Some University facilities are unique and the practices listed here are for your safety
More informationcare statutory compliance system gap analysis part of the iris care support programme
care statutory compliance system gap analysis part of the iris care support programme statutory compliance system statutory compliance system a tailored control system that handles compliance for you.
More informationFCX Department of Occupational Health and Safety. Contents. Open-Hole Policy
FCX Department of Occupational Health and Safety Open-Hole Policy Approval Date: 12/09/13 Original Date: 03/30/09 SOP # FCX-01 Revision # 6 Supersedes X High Medium Task Risk Low NA Contents 1.0 Policy...2
More informationConstruction Method Statement
Construction Method Statement Planning Application Phase 17 October 2014 for 79-85 Monier Road London E3 2PS Penten Group Ltd 816 Garratt Lane London SW17 0LZ Tel: 020 8772 4040 Description Contents Page
More informationHealth Safety, & Environment
GROUP SAFETY HEALTH AND ENVIRONMENT MANUAL R.G. Carter Construction Ltd Integrated Management System Section 7 Health Safety, & Environment Issue Manual No. Holders Name: Issue Date: GROUP HEALTH AND SAFETY
More informationRISK ASSESSMENT SHEET
Task Generic install telecoms equipment Assessment date 3rd October 2017 Location Various Review date 2nd October 2018 Number of staff at work Various Signature 1 Selected locations Works carried out during
More informationWork Permit Auditing Standard
Valero CTEMS Standard Effective Date: Approved Awaiting Implementation 1/1/2012 CTEMS Section 4.1.2 Standard Owner: Corporate Safety Director 1.0 PURPOSE AND SCOPE 1.1 This standard defines the minimum
More informationPetro-Chemical Facility Visual Checklist
Petro-Chemical Facility Visual Checklist Is your facility visually instructive? Use the checklist below to evaluate how visual your facility is and to identify target opportunities for improvement. Rating
More informationSection Safety Section Cleanup. None Required
January 2000 Page 1 of 6 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED SECTIONS PART 2 PRODUCTS The General Conditions of the Contract, General Requirements, and Supplemental
More informationBarricades. Preparer: Owner: Approver: EHS Specialist EHS Team Leader Site Director J. Walker (Electronic Signature on File)
Number: HAN-EHS-SPI-0274 Page: e 1 of 6 Preparer: Owner: Approver: EHS Specialist EHS Team Leader Site Director J. Walker (Electronic Signature on File) J. Hooker (Electronic Signature on File) P. Waddington
More informationJobsite Specifications The A standard provides jobsite specifications for each of the following hazards:
Overview of American National Standard A10.34-2001 Protection of the Public on or Adjacent to Construction Sites American National Standard for Construction and Demolition Operations The A10.34-2001 standard
More informationSUBCONTRACTOR MANAGEMENT PLAN
Doc : SMP Revision. 0 Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 10 Purpose The purpose of this program is to improve subcontractor health, safety and environmental
More informationRequest for quotation
Request for quotation Request: Destination NSW is seeking an itemised quotation for the provision of Plant Operator/Production Crew Services for Vivid Sydney 2019. For the avoidance of doubt, Destination
More informationDoes the applicant have a permanent yard? Does the applicant provide 24 hour services? What is the radius of operations: Usual: miles Maximum: miles W
Contractor EZ Quote Form New Mexico Mutual 3900 Singer Blvd. NE Albuquerque NM 87109 * Please complete the General Information, Employee Information and Safety Information sections, along with the Risk
More informationCampbell Arnott s Contractor Management
Campbell Arnott s Contractor Management Registration process The Campbell Arnott s Contractor Management process is completed in two parts: online company registration and online employee registration
More informationSafetyVideos Topic Name Run Time
SafetyVideos Topic Name Run Time Back Safety Construction Back Safety 10:00 Bloodborne Pathogens Bloodborne Pathogens 24:00 Carbon Monoxide Tool Box Safety Talks: Carbon Monoxide Safety 5:20 Concrete Erwin
More informationIron Ore Company of Canada Health, Safety & Environment
Barricading 1 PURPOSE To protect personnel by preventing or controlling access to hazards in work areas by the installation and maintenance of barricades, demarcation and restricting access. This work
More informationSAFE WORK METHOD STATEMENT
SAFE WORK METHOD STATEMENT Principal Contractor: ROBERT LIVINGSTONE Project Address: 123 SYDNEY ROAD SYDNEY NSW 2000 High Risk Work Hazards and Risks Identified Control Measures Persons working at a height
More informationChapter 26. Tim Foster - dba MPC (Maintenance Projects & Construction) Company Policy for Subcontractor Management Plans & Management of Change
Chapter 26 Tim Foster - dba MPC (Maintenance Projects & Construction) Company Policy for Subcontractor Management Plans & Management of Change Tim Foster - dba MPC (Maintenance Projects & Construction)
More informationCritical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice)
Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice) Version 3 June 2014 Authorised by Arrium Safety Council TOOL75.WHS.COP.001 Critical Elements from the Code
More informationTAMKO s Statement of Policy on Safety
TAMKO s Statement of Policy on Safety 2006 TAMKO Building Products, Inc. Table of Contents TAMKO s Statement of Policy on Safety 4-6 INTRODUCTION 7 Management Responsibility & Leadership 8-12 Leadership
More informationSubcontractor Project Management Plan
Subcontractor Project Management Plan FOR LAYTON PROJECT: COMPANY: CONTACT NAME: ACTIVITY: Signed Date Written by: Reviewed by: Accepted by: Issue Date Description of Revisions Change Introduced by Change
More informationREFURBISHMENT DEMOLITION
CONTRACTOR WHS HAZARD STANDARD REFURBISHMENT DEMOLITION EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition
More informationLOADING UNLOADING OPERATIONS
CONTRACTOR WHS HAZARD STANDARD LOADING UNLOADING OPERATIONS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION
More informationBuilding 15 Roof Safety Assessment
Roof Safety Survey GENERAL INFORMATION CAMPUS: Wollongong Campus BUILDING: Austin Keane Building (15) DESCRIPTION: Three storey H - shaped building with flat metal roof. The eastern end of the southern
More informationTABLE OF CONTENT: ACOP NO. ALBA SAFETY, HEALTH & ENVIRONMENT MANAGEMENT SYSTEM. ALBA Code of Practice (ACOP) Subject PAGE
Contractors Safety Health and Environment Management 1 OF 13 TABLE OF CONTENT: 1.0 Introduction... 3 2.0 Purpose... 3 3.0 Responsibilities... 3 4.0 General Requirements... 3 5.0 Training... 4 6.0 Other
More information