CENTRAL COAST REGIONAL WATER PROJECT

Size: px
Start display at page:

Download "CENTRAL COAST REGIONAL WATER PROJECT"

Transcription

1 CENTRAL COAST REGIONAL WATER PROJECT DeepWater Desal, LLC Project Description Prepared For: The California Public Utilities Commission

2 TABLE OF CONTENTS 1. PROJECT OVERVIEW SITE LOCATION, EXISTING LAND USES, and PROPERTY OWNERSHIP STRUCTURES, FOOTPRINTS, AND SITE ORIENTATION Seawater RO Plant Data Center SEAWATER REVERSE OSMOSIS DESALINATION SYSTEM Process Description Overview DeepWater Ocean-Sited Intake Submerged Intake Pipeline Onshore Wet Well and Pump Station Source Water Conveyance System Source Water Characterization SWRO Pretreatment System Cartridge Guard Filters Reverse Osmosis System Chemical Storage and Feed Facilities Energy Recovery Devices Permeate Post Treatment Final Product Water Storage and High Service Pump Station Waste Management Filter Backwash Disposal Alternative On-Site Residual's Management System Concentrate Disposal and Conveyance System Non-Process Facilities - Electrical Power Facility Operation and Maintenance DATA CENTER USE OF CO-JOINED TECHNOLOGIES TO MINIMIZE CARBON FOOTPRINT ONGOING AND PROPOSED STUDIES PROJECT SCHEDULE REGULATORY INFORMATION Lead Agencies Agency Review, Permits, and Approvals Water Rights Policy Considerations OWNERSHIP DeepWater Desal i Response to CPUC

3 List of Tables Table 1. CCRWP design flows Table 2. Source Water Intake Pump Station Preliminary Design Details Table 3. SWRO System Preliminary Design Details Table 4. Permeate Post Treatment Preliminary Design Details Table 5. Energy Recovery Preliminary Design Details Table 6. Product Water Post Treatment, On-Site Storage, and High Service Pump Station Preliminary Design Details Table 7. Backwash Supply and Concentrate Discharge Basin Preliminary Design Details Table 8. On-site Residual Waste Management System Preliminary Design Details Table 9. RO System Concentrate Specification Preliminary Design Details Table 10a. SWRO plant power consumption estimate Phase 1 10,000 acre feet per year permeate capacity Table 10b. SWRO plant power consumption estimate Phase 2 (full build-out) 25,000 acre feet per year permeate capacity Table 11. List of agencies expected to use the CCRWP EIR List of Figures Figure 1. The Monterey Bay submarine canyon near Moss Landing, California Figure 2a. Location of easement containing the abandoned fuel oil pipeline (cyan lines). The proposed brine discharge pipeline is shown in red and the proposed feedwater intake pipeline is shown in white Figure 2b. Close up of the western border of the easement containing the abandoned fuel oil pipeline. The screened intake and discharge diffuser will be located within this portion. Refer to Figure 2a Figure 2c. Information regarding the offshore grant boundary and judgment of condemnation for the easement containing the abandoned fuel oil pipeline DeepWater Desal ii Response to CPUC

4 Figure 2d. Information regarding the judgments of condemnation for the easement containing the abandoned fuel oil pipeline that will contain the proposed feedwater intake and brine discharge pipelines Figure 3. Aerial view of the Central Coast Regional Water Project feedwater intake and brine discharge piping and footprint of the Tank Farm Parcel that will contain the Saltwater Reverse Osmosis plant and data center Figure 4. Site footprint showing placement of the SWRO (Desal) and data center campus located on the Tank Farm Parcel Figure 5. Plan view layout of the SWRO Figure 6. a) Cut out view of a typical cylindrical wedge-wire intake screen showing V shaped screen and b) photograph of wedgewire screen Figure 7. Depiction of method proposed for deployment of the intake and discharge pipelines Figure 8. Intake pipe segment site plan showing construction methods (Alternative 1) Figure 9. Intake pipe segment site plan showing construction methods (Alternative 2) Figure 10. Partial plan view of the existing wet well showing source water pump station modifications Figure 11. SWRO process flow diagram Figure 12. SWRO backwash reclaim system Figure 13. Examples of offshore diffusers Figure 14. Total CCRWP energy consumption in megawatts per hour (MW/hr) Figure 15. Comparison of tons of CO 2 generated between normal evaporative cooling vs. and seawater cooling Figure 16. Example of a high level co-joined active cooling engineering concept Figure 17. Preliminary timeline for the Central Coast Regional Water Project Phase DeepWater Desal iii Response to CPUC

5 1. PROJECT OVERVIEW Deepwater Desal LLC ("DWD") is developing the Central Coast Regional Water Project ("CCRWP") at Moss Landing, California. The CCRWP will consist of a number of coastaldependent industrial uses that will utilize the water of the Monterey submarine canyon at Moss Landing to benefit the regional community. The Monterey submarine canyon at Moss Landing (Figure 1) is one of the deepest and closest to shore submarine canyons in the world. Ecologically sensitive access to deep ocean water from below the euphotic zone will allow consistent quality and temperature, and relatively pure ocean water for various beneficial uses in the CCRWP, including cooling for data centers and source water for desalination. The deep ocean water could also find uses in the production of farmed fish and the cooling of vegetable and fruit packing facilities at Moss Landing. Potable water produced by the seawater reverse osmosis desalination ("SWRO") plant at the CCRWP will be made available to both public water agencies and regulated private water utility companies, including California Water Service Company, serving the Salinas area, and California American Water (CalAm), serving the Monterey area. DWD understands that CalAm presently has an application pending before the CPUC for approval of a relatively small, dedicated desalination plant to be built near the Monterey Peninsula, as an alternative to purchasing potable water from our regional plant. In the event that CalAm is unable to timely proceed with construction of its proposed desalination project to provide replacement water to serve the citizens of the Monterey Peninsula, such replacement water would be available from the CCRWP. The CCRWP has partnered with the City of Salinas to form a municipal power utility that will purchase wholesale electrical power, and re-sell it to the several coastal-dependent businesses at Moss Landing. The power utility will have the flexibility to purchase from any power generator, including power from both traditional and renewable sources; thereby providing a mix of power that will significantly reduce the project's carbon footprint yet provide a reliable uninterrupted power supply. Due to the power demand associated with the new multiple businesses, the combined electrical usage of the multiple entities, especially the data centers, make the formation of the municipal power utility economically attractive. As a result, the desalination component of our project will benefit from the lowest cost for power of any desalination plant in California. The desalination plant component of the CCRWP will be developed in phases to accommodate both immediate and near-term demand for high purity water. The initial Phase 1 is designed at a DeepWater Desal 1 Response to CPUC

6 capacity of 10,000 acre feet per year (AF/Y) with an ultimate build-out capacity of up to 25,000 AF/Y, sufficient to supply potable water to alleviate critical shortages in both Santa Cruz and Monterey counties. Because certain fixed costs will be spread over a larger volume of water, the availability of relatively inexpensive electrical power, and the benefit of heating the SWRO feedwater from data center cooling, the cost of potable water produced from the plant will be significantly lower than the cost of potable water from any smaller dedicated plants such as those proposed in Santa Cruz or Monterey. Figure 1. The Monterey Bay submarine canyon near Moss Landing, California. Source: Smith, D.P., R. Kvitek, P.J. Iampietro, and K. Wong. Twenty-nine months of geomorphic change in upper Monterey Canyon ( ). Marine Geology. Volume 236, Issues 1 2, 5 January Due to over drafting of the tributary basins draining into Monterey Bay, saltwater intrusion is adversely affecting all the coastal aquifers even as far inland as the wells serving the City of Salinas, which have additional water quality problems associated with high nitrate concentrations in the aquifers. Adding to the looming water crisis on the central coast, the decimation of the ecological productivity and diversity of the riverine species in the coastal tributaries has lead to one order from the State Water Resources Control Board (SWRCB) to stop pumping from the Carmel River Basin by CalAm by 2017 (Order WR 95-10). DeepWater Desal 2 Response to CPUC

7 The CCRWP will intake seawater for the multiple uses from a depth of approximately 100 feet from a screened intake located approximately 1.1 miles offshore at the neck of the Monterey Bay submarine canyon. Detailed studies on the potential effects of the intake on fish larvae (ichthyoplankton) and selected macroinvertebrate larvae are being conducted in partnership with local oceanographic institutions and industrial concerns. These studies include collection of data over an entire year on ichthyoplankton and selected macroinvertebrate abundance and composition, coastal ocean currents, and ocean water quality. DWD has met with Coastal Commission and Central Coast Regional Water Quality Board staff regarding the location and design of the intake, and have solicited their input on the design of these studies and the analysis of the resulting data. The ichthyoplankton and macroinvertebrate study began in March 2012 and will be completed in June Preliminary results of the studies already show that the ichthyoplankton abundances offshore in Monterey Bay are much lower than the abundances inside Moss Landing Harbor, one of the intake locations considered earlier for a desalination intake. One of the purposes of the studies is to determine whether the location of the intake in deeper water will result in much lower levels of entrainment than an intake in shallower water. The design and location of the intake will represent best technology available for reducing environmental effects, and has a number of benefits over subsurface intake designs. The CCRWP will utilize an existing intake pipeline easement for the Moss Landing Power Plant (MLPP) (Figure 2a-d) for placement of a submerged pipeline from the offshore intake location to an existing onshore wet well located at the MLPP. From the wet well the source water will be pumped to an approximately 110-acre site (referred to as the Tank Farm Parcel ) located along Dolan Road, east of the MLPP, where the SWRO plant and data centers will be constructed (see Figure 3). Figure 3 also shows an aerial view of the proposed route of the intake pipeline. The discharge pipeline for brine concentrate from the SWRO plant and raw seawater from other uses in the Project, will be routed via a new pipeline from the site to a submerged discharge below the euphotic zone using the same approximate route within the existing easement as the intake pipeline. The brine concentrate will be discharged via diffusers to assure rapid and thorough mixing with ambient seawater. Diffusers are in wide-spread use world-wide for the safe discharge of concentrate from seawater RO desalination plants and are considered to be one of the "best available technologies" for direct undiluted brine discharge into the ocean. Additionally, the concentrate discharge temperature will be warmer than ambient seawater at the discharge site, which will cause the discharged concentrate to rise in the water column, thereby further enhancing rapid mixing. DeepWater Desal 3 Response to CPUC

8 The CCRWP has initiated the EIR process under CEQA with the State Lands Commission. The NEPA lead agency will be selected after the SLC application and project description are submitted to the SLC. DWD will seek input from SLC to identify the NEPA lead agency. A joint EIR/EIS will be produced and certified by both agencies. 2. SITE LOCATION, EXISTING LAND USES, and PROPERTY OWNERSHIP The SWRO plant and data center components of the CCRWP will be constructed on an approximately 110-acre site known as the Tank Farm Parcel (APN ), which is located off Dolan Road in Moss Landing east of the MLPP (See Figure 3). The Tank Farm Parcel is presently owned by Dynegy Moss Landing, LLC. DeepWater Desal will acquire fee title to the Tank Farm Parcel. Appendix A provides a copy of the Assessor s Parcel Maps for the Tank Farm Parcel and the Moss Landing Power Plant (APN ). Previously the site was used by MLPP as a tank farm to store fuel oil in five above ground storage tanks. The fuel oil was used as a back-up fuel to natural gas several weeks each year when there was a limited amount of natural gas pipelines coming into California. The fuel oil and natural gas were used in boilers to produce steam to turn steam turbines connected to generators for power production. As more natural gas pipelines were built into California this tank farm was no longer needed. The five above ground storage tanks were removed in Following demolition of the storage tanks approximately 30,000 tons of tank base gravel was removed. Also, 18,501 cubic yards of non-hazardous sediment from dredging in the Moss Landing Harbor were disposed of in this area which was then graded and hydro-seeded. Today the Tank Farm Parcel is undeveloped except for a small area that contains a 1 milliongallon water tank, small building, and parking lot that is currently occupied by the non-profit Marine Mammal Center and used as a rehabilitation facility. The subsurface feedwater and discharge pipelines will be located in an existing offshore easement owned by Dynegy Moss Landing, LLC. Fee title to most of the nearshore portion of the offshore easement area is owned by the Moss Landing Harbor District. Fee title to the nearshore portion of the offshore easement area that passes over the north jetty of Moss Landing Harbor is owned by the State of California and administered by its State Parks Department. Fee title to the balance of the offshore easement area is owned by the State of California and administered by its State Lands Commission. DeepWater Desal will acquire all of Dynegy Moss Landing, LLC's right, title and interest in and to the offshore easement areas, DeepWater Desal 4 Response to CPUC

9 together with requisite permissions from the Moss Landing Harbor District, the California State Parks Department as well as the California State Lands Commission to replace the existing fuel oil pipeline and anchorage facilities now located in the offshore easement areas with feedwater intake and discharge lines necessary for the operation of the Central Coast Regional Water Project, including requisite permissions to utilize, maintain, and repair those pipelines for project purposes. The onshore feedwater and discharge pipelines outside of the Tank Farm Parcel will be located primarily on land owned by Dynegy Moss Landing, LLC, (collectively, the MLPP parcel). DeepWater Desal will acquire sufficient easement interests from Dynegy Moss Landing, LLC for the installation, use and maintenance of the intake and discharge pipelines over and under the MLPP parcel (Figure 3), including the right to use the existing wet well facility now located on the MLPP parcel. Alternatively, intake and discharge lines could be routed along Dolan Road to California State Highway 1, through public utility easements held by the County of Monterey. A portion of the feedwater and discharge pipelines will pass under California State Highway 1. DeepWater Desal will obtain sufficient permissions from CalTrans to install, use, and maintain these pipelines running under Highway 1. A short section of the onshore feedwater and discharge pipelines will be located in an easement owned by Dynegy Moss Landing, LLC which runs between the Tank Farm Parcel and the MLPP parcel. DeepWater Desal will acquire sufficient rights from Dynegy Moss Landing, LLC to install, use and maintain feedwater and discharge pipelines through this onshore easement area. The portion of the Tank Farm Parcel on which the data center campus and SWRO facilities will be constructed is presently unimproved. The subsurface easement area is presently improved with a fuel oil pipeline which is being maintained in caretaker status under rules promulgated by the United States Coast Guard. DeepWater Desal plans to remove the existing fuel oil pipeline and replace it with the feedwater and discharge pipelines described above. The MLPP parcel is presently used for the purpose of generating electrical power. The short section of the onshore feedwater and discharge pipelines running between the MLPP parcel and the Tank Farm Parcel will be located on an existing pipe rack. DeepWater Desal 5 Response to CPUC

10 Under the terms of the existing MOU between DWD and Dynegy, the parties have identified the Tank Farm Parcel as the suitable location on Dynegy s property for the desalination plant and other coastal dependent facilities. The parties have also identified easement paths over the MLPP site and other property owned by Dynegy for an intake pipeline, the wet well and a discharge pipeline to transport seawater to and from facilities on the Tank Farm Parcel. Dynegy and DWD are presently in the process of negotiating the terms of an option agreement giving DWD the right to purchase the Tank Farm Parcel together with the associated easements. The site was previously identified by CalAm as the proposed site for its desalination plant and was described in a certified FEIR (CalAm 2009). 1 1 California American Water (CalAm) Coastal Water Project Final Environmental Impact Report. Prepared by ESA. October DeepWater Desal 6 Response to CPUC

11 Figure 2a. Location of easement containing the abandoned fuel oil pipeline (cyan lines). The proposed brine discharge pipeline is shown in red and the proposed feedwater intake pipeline is shown in white. DeepWater Desal 7 Response to CPUC

12 Figure 2b. Close up of the western border of the easement containing the abandoned fuel oil pipeline. The screened intake and discharge diffuser will be located within this portion. Refer to Figure 2a. DeepWater Desal 8 Response to CPUC

13 Figure 2c. Information regarding the offshore grant boundary and judgment of condemnation for the easement containing the abandoned fuel oil pipeline. DeepWater Desal 9 Response to CPUC

14 Figure 2d. Information regarding the judgments of condemnation for the easement containing the abandoned fuel oil pipeline that will contain the proposed feedwater intake and brine discharge pipelines. DeepWater Desal 10 Response to CPUC

15 Figure 3. Aerial view of the Central Coast Regional Water Project feedwater intake and brine discharge piping and footprint of the Tank Farm Parcel that will contain the Saltwater Reverse Osmosis plant and data center. DeepWater Desal 11 Response to CPUC

16 3. STRUCTURES, FOOTPRINTS, AND SITE ORIENTATION 3.1 Seawater RO Plant The SWRO plant and associated offices and lab facilities will be housed in a new purpose built building located along Dolan Road in the southwestern portion of the tank farm (Figure 4). Pretreatment media filters and product water storage tank will be located adjacent to the building as shown in the attached preliminary layout depicted in Figure 5. The total site including building, parking, tankage, etc. will occupy approximately seven acres. No existing structures will be demolished or removed during construction or operation of the SWRO. Construction will not occur in wetlands. 3.2 Data Center The data center campus will be housed in new purpose built structures constructed adjacent to the SWRO plant as generally shown in Figure 4. The data center campus will occupy approximately 25-acres at full build out. No existing structures will be demolished or removed during construction or operation of the data center campus. Construction will not occur in wetlands. 4. SEAWATER REVERSE OSMOSIS DESALINATION SYSTEM 4.1 Process Description Overview The SWRO plant will be constructed in phases to accommodate both immediate and regional demand. Phase 1 will be sized to produce 10,000 AF/Y (8.9 MGD) of product water. However, the seawater intake, intake pipeline and the concentrate brine discharge pipeline will be sized and constructed to accommodate the full build-out capacity of 25,000 AF/Y (22.3 MGD). The project's design flows are provided in Table 1. DeepWater Desal 12 Response to CPUC

17 Figure 4. Site footprint showing placement of the SWRO (Desal) and data center campus located on the Tank Farm Parcel. DeepWater Desal 13 Response to CPUC

18 Figure 5. Plan view layout of the SWRO. DeepWater Desal 14 Response to CPUC

19 Table 1. CCRWP design flows. The desalination plant will consist of the following major components: 1. Screened, passive, deep-water intake located below the euphotic zone at a depth of approximately 100 feet, 2. Intake pipeline, 3. Intake pump station to convey seawater to the desalination facility, 4. Pretreatment media filtration system, 5. 10,000 AF/Y capacity (Phase 1), reverse osmosis seawater desalination system (SWRO); with infrastructure in-place to ultimately produce 25,000 AFY, 6. Energy recovery system, 7. Chemical conditioning facilities, 8. Post-treatment facilities, 9. High service product water pump station, 10. Residuals management system solids settling and filter presses, 11. Electrical power supply, and 12. Concentrate conveyance pipeline and diffuser discharge system. 4.2 DeepWater Ocean-Sited Intake The deep-water ocean-sited intake consists of a passive seawater withdrawal system containing a 2-mm wedge-wire screened intake, submerged supply pipeline, and an onshore pump station. Source water will be withdrawn at low velocity from a new 54-in. diameter high density polyethylene (HDPE) submerged pipe that will replace an existing carbon steel pipeline previously used by PG&E for offloading fuel oil for the MLPP during the time the MLPP was DeepWater Desal 15 Response to CPUC

20 owned and operated by PG&E. The pipeline will be routed within an existing easement previously granted for the oil supply pipeline (see Figure 2a-d). The intake structure is mounted at the terminus of a newly constructed submerged source water conveyance pipeline located approximately 1.1 miles offshore at a depth of approximately 100 feet, a depth that is below the euphotic zone. The depth is critically important to minimize entrainment of planktonic organisms and to provide high quality, low turbidity water for desalination by reverse osmosis. The euphotic zone is the depth of a water column that is exposed to sufficient sunlight for photosynthesis to occur and extends from the surface to a depth where light intensity is reduced to 1% of the surface intensity. Approximately 90% of all marine life is confined within the euphotic zone which varies in depth from 10 to 250 ft depending upon water quality and location. Therefore, locating the source water intake below the euphotic zone greatly reduces adverse environmental impacts due to both impingement and entrainment of marine organisms. These impacts are further reduced by the design of the intake with respect to both the intake velocity and by incorporated engineered screens into the intake structure. The intake structure is constructed with a pipe riser that will place the intake approximately 30 feet above seabed floor with a large diameter T that is capped with cylindrical wedge-wire screens. The screens are designed with "V" shaped wires with 2.0 mm (0.08 in.) slot openings that preclude the entrainment of organisms of a size greater than the 2-mm screen slots. The "T" structure is designed with a cross sectional area that will restrict the intake velocity of seawater to a maximum intake velocity of <0.5 feet per second (fps) to minimize impingement. The maximum intake velocity of <0.5 fps has been validated through numerous studies to be sufficiently low to minimize impingement of marine organisms against the screen, particularly when sited in locations where currents provide ambient cross flow velocities ( 1 fps) to continually sweep screens. Figure 6 shows examples of cylindrical wedge-wire screens for seawater intake. DeepWater Desal 16 Response to CPUC

21 a) b) Figure 6. a) Cut out view of a typical cylindrical wedge-wire intake screen showing V shaped screen and b) photograph of wedgewire screen. Source: b) Tenera Environmental, Inc Open Ocean Intake Effects Study. Prepared for City of Santa Cruz Water Department & Soquel Creek Water District scwd 2 Desalination Program. DeepWater Desal 17 Response to CPUC

22 4.3 Submerged Intake Pipeline A submerged 54-in. intake pipeline will be constructed to convey source water from the offshore intake to the onshore pump station. The pipeline will be constructed from HDPE. Construction of the pipeline will involve developing a detailed pipeline design, including specific deployment planning, and will generally be carried out as follows: Step 1 HDPE pipe is delivered to the site in 40 ft 55 ft lengths. The pipe lengths are then fused into longer lengths and temporarily stored in a protected area, likely in the Moss Landing Harbor. As the pipe sections are air filled they float on the surface. Next, precast concrete ballast weights are mounted on the pipeline using a floating barge. The weights serve as the primary anchors to stabilize the pipe on the seafloor. Step 2 When pipe assembly and staging activities are complete, the entire pipeline is towed to the site, aligned and submerged along the pipe path, typically in a single 24-hr. period. The pipeline is deployed and submerged in one continuous operation lasting approximately seven hours once flooding is initiated. The pipeline is flooded with a nearshore pump system and slowly submerged to the seafloor under controlled conditions. Air is released at the offshore end during submergence. Figure 7 illustrates the shape of the pipe during the submergence process. Figure 7. Depiction of method proposed for deployment of the intake and discharge pipelines. Source: Illustration provided by Makai Ocean Engineering, Inc. During submergence, an offshore tugboat provides tension to the pipeline to control bending of the pipe as it is submerged and to accurately place the pipeline in position. DeepWater Desal 18 Response to CPUC

23 The pipeline will be anchored in place with concrete saddles. The actual number and placement of the concrete saddles will be determined prior to deployment once site-specific studies relative to wave forces, currents, etc. are completed. Two pipeline routings and construction techniques are being evaluated to connect the offshore pipeline to the wet well (Figures 8 and 9). 4.4 Onshore Wet Well and Pump Station The onshore source water pump station will be constructed in an existing wet well located at the MLPP, which is no longer in use (see Figure 10). No existing structures will be demolished or removed during construction or operation of the onshore wet well and pump station. The existing wet well will be rebuilt in place. The wet well depth is below sea level and is filled by gravity flow from the passive intake. The pump station will contain three high-service pumps (two operating and one stand-by) each with a rated capacity of 6,870 gpm and with a discharge pressure of 55 psig to forward the source water to the site for data center cooling and desalination. While the intake pipeline will be sized for the total build-out capacity of 25,000 AF/Y (22.3 MGD), the high service pumps will be installed in phases to accommodate the initial Phase 1 demand and the subsequent phased build-out requirements. The preliminary design details for the source water pump station are provided in Table 2. Table 2. Source Water Intake Pump Station Preliminary Design Details. DeepWater Desal 19 Response to CPUC

24 Figure 8. Intake pipe segment site plan showing construction methods (Alternative 1). DeepWater Desal 20 Response to CPUC

25 Figure 9. Intake pipe segment site plan showing construction methods (Alternative 2). DeepWater Desal 21 Response to CPUC

26 Figure 10. Partial plan view of the existing wet well showing source water pump station modifications. DeepWater Desal 22 Response to CPUC

27 4.5 Source Water Conveyance System The source water conveyance system includes piping and valves to transport source water from the pump station to the SWRO and data center facilities at the Phase 1 flow of 13,740 gpm. A 48-in. diameter pipe will be constructed from the pump station to the east side of Highway 1, south to Dolan Road and east on Dolan Road to the tank farm property, to convey the source water to the site (Figure 3). The pipe will be buried in a trench on easements provided by the Moss Landing Power Plant until the pipeline is routed north off of Dolan Road where it will be above ground on an existing pipe rack, except where the easement crosses the Granite Rock parcel and the pipe rack is below grade level. 4.6 Source Water Characterization Monitoring equipment was deployed in June 2012 at the approximate location and depth of the proposed intake to continuously monitor critically important water quality data for temperature, conductivity, and turbidity. Grab samples are collected approximately once every three months for full mineral analysis by an EPA certified lab. Ongoing source water characterization will continue through June 2013 to provide a 12-month set of data to enable assessment of seasonal variations, if any. These data are critically important to establish key criteria for the design of the pretreatment and reverse osmosis membrane systems. Accordingly, DWD has high confidence in the accuracy of key water quality parameters on which our designs are predicated. Because DWD has continuous access to source water for monitoring and assessment, the Project's design conditions are based on long-term data and not on assumptions. 4.7 SWRO Pretreatment System High quality, low turbidity source water supplied from the deep-water intake, will be pre-treated with reliable, cost effective granular media filtration, a robust and proven technology to protect the integrity and reliability of the SWRO membrane system. The pretreatment system will consist of single-stage, deep-bed, dual media granular media system with sufficient redundancy to ensure a reliable, sustainable supply to the downstream desalination process. Coagulant and filter aid polymer systems will be integrated to improve the efficiency of the pretreatment system during system operation, if required. The media filters are designed to utilize filtered seawater DeepWater Desal 23 Response to CPUC

28 as a source of backwash water or alternatively, RO concentrate. The filters will be fully automated and monitored to assure trouble-free operation. 4.8 Cartridge Guard Filters Following pretreatment, filtered water will pass through 5-micron cartridge filters that will serve as guard filters to capture any residual solids that are not removed in the media filters and then forwarded to the high-pressure pumps to supply the SWRO with pressurized feedwater. Chemical dosing for ph adjustment and scale control will be implemented prior to feedwater entering the SWRO membrane elements. 4.9 Reverse Osmosis System Reverse osmosis desalination is a cross-flow separation process using polymeric membranes to separate and concentrate dissolved minerals (salts) from seawater. In RO desalination, the feed stream is split into high quality permeate and concentrated brine. Permeate is produced by passing water through a semi-permeable membrane that has the ability to effective reject all of the dissolved minerals (99.85% or greater) leaving the salts on the feed side of the membrane. As permeate is produced, the volume of the feed is reduced and the concentration of salts increases until the concentrated brine is discharged from the RO membrane trains. For seawater, the ratio of the volume of desalted water to the volume of the feedwater is typically 45%. In other words, for every 100 gallons of feed introduced into the RO system, approximately 45 gallons of high quality permeate are produced and 55 gallons of concentrated brine are produced. Seawater reverse osmosis desalination is a mature technology with thousands of plants in successful operation around the world and the technology has made a major contribution to alleviating water scarcity around the world. During Phase 1, the feed flow rate to the SWRO system will be 6,352 gpm (at 45% recovery); producing 8.9 MGD of high quality drinking water. The system will be designed with redundant capacity to ensure a reliable, sustainable source of desalted water for post-treatment conditioning. High pressure feed pumps will produce approximately 800 1,000 psi (pounds per square inch) of pressure to drive the seawater through the reverse osmosis membrane elements. An integrated energy recovery system will recapture approximately 30% of the energy consumed for the high-pressure feed pumps and apply the energy into the feed stream, effectively reducing the energy needed for the treatment process. The entire membrane system DeepWater Desal 24 Response to CPUC

29 will be automated and continuously monitored using state-of-the-art sensors and computer control systems. Permeate produced by the SWRO will require post-treatment conditioning with lime and/or carbon dioxide for ph adjustment; followed by disinfection and treatment for corrosion control to protect the distribution pipeline. The plant will supply product water of a quality that fully complies with all regulatory requirements of the California Department of Public Health, the Safe Drinking Water Act, and the California Title 22 code for drinking water standards. Product water quality can be achieved to accommodate differing specifications required by different purchasers. The finished product water from the desalination plant will be compatible with the water quality of the other sources of potable water delivered to the same distribution system. Preliminary design details for the SWRO are shown in Table 3 and a process flow diagram is shown in Figure 11. The design projections for the SWRO are provided in Appendix B. Table 3. SWRO System Preliminary Design Details. DESCRIPTION 10, mgd 25, mgd UNITS VALUE VALUE NOTES SEAWATER REVERSE OSMOSIS SYSTEM TYPE: ONE STAGE, 45% AVERAGE RECOVERY (43-47%) 4 X 25% DUTY + 10 X 10% DUTY + PRETREATMENT CARTRIDGE FILTERS (INLINE) NO. 1 SPARE 1 SPARE PRETREATMENT CARTRIDGE FILTER RATED FLOW (EACH) GPM 3,450 3,446 PRETREATMENT CARTRIDGE FILTER NOMINAL PORE SIZE MICRON SWRO FEED PUMPS NO. 5 (4 DUTY; 1 STANDBY) 11 (10 DUTY; 1 STANDBY) VARIABLE RECOVERY IS CONSERVATIVE AND MOST VERSATILE ALTERNATE - HIGH PRESSURE SWRO PUMP ISLAND WITH MUCH LARGER CAPACITY PUMPS (AND FEWER TOTAL REQUIRED) SWRO FEED PUMP FLOW (EACH) GPM 1,588 1,588 MGD SWRO FEED BHP (GROSS IN-SERVICE) HP 4,300 10,300 SWRO FEED PUMP PRESSURE PSIG LOWEST TEMP, 3 YEAR, 10% SAFETY SWRO MEMBRANE SKIDS NO. 5 (4 DUTY; 1 11 (10 DUTY; 1 STANDBY) STANDBY) ONE COMPLETE STANDBY SKID SWRO SKID PERMEATE DESIGN FLOW (EACH) GPM 1,550 1,550 MGD AVERAGE FLUX AT DESIGN FLOW (1 UNIT OUT OF SERVICE GFD SWRO 8-INCH DIAMETER PRESSURE VESSELS (EACH SKID NO. 79; ; 869 INCLUDES SPARE SKID. 315:0 ARRAY MIN FOR 10k ac-ft and 788:0 ARRAY MIN FOR 25k ac-ft W/OUT SPARE SWRO MEMBRANE ELEMENTS (EACH PRESSURE VESSEL) NO. 7 7 SWRO MEMBRANE ELEMENTS SURFACE AREA (EACH) SF OR EQUIVALENT DeepWater Desal 25 Response to CPUC

30 Figure 11. SWRO process flow diagram. DeepWater Desal 26 Response to CPUC

31 4.10 Chemical Storage and Feed Facilities Chemicals, safe and certified for use in drinking water treatment, will be used in the desalination process to optimize pretreatment filtration, ensure the correct water quality, and maintain the RO membrane elements in a clean condition; and also for stabilization and disinfection of the desalted water for distribution in a regulated potable water supply. The chemicals used will be delivered to the site in bulk quantities and stored in fully contained bulk storage tanks prior to being used in the process. All chemical storage, handling, and feed facilities will be designed, constructed, and maintained in compliance with all applicable governmental codes and regulations, OSHA requirements, and best practices to ensure safe storage and handling. Preliminary design details for permeate post treatment are provided in Table 4. Table 4. Permeate Post Treatment Preliminary Design Details Energy Recovery Devices Pumped energy will be recovered from the RO system concentrate using pressure exchange type energy recovery devices. The integrated energy recovery system will recapture approximately 30% of the energy consumed by the high-pressure feed pumps and apply the energy into the feed stream, effectively reducing the energy needed for the treatment process. Please refer to the RO system design projections in Appendix B for additional information. Preliminary design details are provided in Table 5. DeepWater Desal 27 Response to CPUC

32 Table 5. Energy Recovery Preliminary Design Details. DESCRIPTION 10, mgd 25, mgd UNITS VALUE VALUE NOTES ENERGY RECOVERY DEVICES (ERD) TYPE: PRESSURE EXCHANGERS; ERI (ERD) MODEL PX-300 ERD'S NO COMMON ERT ISLAND DESIGN WITH ONE SPARE ERD EFFICIENCY % ERD BOOSTER PUMPS NO. 5 (4 DUTY; 1 1 (10 DUTY; 1 STANDBY) STANDBY) ONE COMPLETE STANDBY BOOSTER ERD BOOSTER PUMP FLOW (EACH) GPM ERD BOOSTER PUMP BHP (GROSS IN-SERVICE) HP ERD BOOSTER PUMP PRESSURE PSIG Permeate Post Treatment RO permeate will require post treatment for ph adjustment and stabilization prior to distribution Final Product Water Storage and High Service Pump Station Product water will be temporarily stored on site prior to being forwarded to the distribution pipeline. The storage facilities will be comprised of a single above ground tank (Phase 1) with a capacity of 5.5 million gallons to provide sufficient retention time to satisfy disinfection requirements prior to distribution. For Phase 1, a single tank will be constructed. The second tank will be constructed when necessary to accommodate the phased build-out capacity. The product water pump station will provide high quality drinking water to the distribution pipeline at the flow and pressure required for distribution. Preliminary design details for product water post treatment, on-site storage, and high service pump station are provided in Table 6. DeepWater Desal 28 Response to CPUC

33 Table 6. Product Water Post Treatment, On-Site Storage, and High Service Pump Station Preliminary Design Details. Because the project is designed to support regional needs with multiple purchasers of water, DWD anticipates that each water purchaser will provide its transmission pipeline for connection at the plant site fence line. Therefore, the project does not include construction of conveyance pipelines at this time Waste Management The desalination plant will generate waste streams consisting of concentrate from the SWRO process, sludge from media filter backwash, sanitary wastewater from bathrooms, spent membrane cleaning solution, solid waste, and surface runoff. The plant will be designed and constructed to handle all waste streams generated in an environmentally sound manner and in compliance with all applicable codes and regulatory requirements Filter Backwash Disposal Filter backwash will be collected and discharged into the RO concentrate line, or alternatively treated on site via the solids handling system. DeepWater Desal 29 Response to CPUC

34 If filter backwash water is discharged to the concentrate return line, the flow will be regulated so that the suspended solids will mix with and be diluted by the particle free RO concentrate so that the total suspended solids (TSS) in the concentrate stream at the point of discharge will not exceed the TSS of the incoming source water and therefore will not exceed the turbidity of ambient seawater. Spent or used cleaning chemicals will be collected and treated prior to discharge into the brine discharge line or alternatively in the solids handling system as later determined by applicable regulatory authority. Treatment will include ph neutralization. Residual surfactants, if any, will be of low concentration and small volume and it is not anticipated that any further treatment will be required prior to discharge. A flow diagram of backwash reclaim system is provided in Figure 12 and preliminary design details are provided in Table 7. DeepWater Desal 30 Response to CPUC

35 Figure 12. SWRO backwash reclaim system. DeepWater Desal 31 Response to CPUC

36 Table 7. Backwash Supply and Concentrate Discharge Basin Preliminary Design Details Alternative On-Site Residual's Management System In the event that regulatory authorities will not permit disposal of waste residuals in the concentrate discharge, an on-site residuals management system will be provided to concentrate and dewater residual solids for disposal in a sanitary landfill and recycle the filtered water. Table 8 provides preliminary design details for the on-site residual waste management system, if required. Table 8. On-site Residual Waste Management System Preliminary Design Details Concentrate Disposal and Conveyance System Concentrated brine will be generated by the reverse osmosis desalination process with a flow and composition as shown in Table 9. DeepWater Desal 32 Response to CPUC

37 Table 9. RO System Concentrate Specification Preliminary Design Details. Phase 1: 10,000 AF/Y (8,904,110 GPD) Permeate Capacity Parameter Value Comment Flow 7,560 gpm Based on 45% SWRO feed Total dissolved solids (TDS) never to exceed 65,000 mg/l water recovery. Temperature 29 C TSS <1 mg/l Build-Out Capacity: 25,000 AF/Y (27,255,000 GPD) Permeate Capacity Parameter Value Comment Flow 18,930 gpm Based on 45% SWRO feed Total dissolved solids (TDS) never to exceed 65,000 mg/l water recovery. Temperature 29 C TSS <1 mg/l RO concentrate will be collected and piped by a separate dedicated 36-in. brine pipeline from the desalination plant site to the deep-water offshore site for disposal (see Figure 2a). The approximate salinity of the modeled discharge concentrate (see Appendix B for TDS value) is anticipated to range from practical salinity units (PSU). The natural variation in feedwater water quality, which is currently under investigation, will inform the final stages of plant process design, and in turn the concentrate water quality and discharge salinities. Monterey Bay ambient nearshore surface salinities vary from psu 2 and average Monterey Bay temperature is approximately 57 F (13.9 C). 3 Concentrate will be discharged via 38:1 diffuser nozzles to ensure rapid mixing of concentrate with ambient ocean waters so that the discharge will be within 2% of the salinity of the ambient seawater. The discharge site is also located below the euphotic zone to minimize effects on aquatic organisms. DWD recognizes that significant work is required; including near-field modeling, to validate the diffuser design; such work is scheduled to commence in the relatively near term. Examples of diffuser structures are provided in Figure 13. Construction of new ocean outfalls incorporating diffuser structures are in common use worldwide for disposal of concentrate from large capacity SWRO plants. In Australia, this method of concentrate disposal is the preferred method and is being employed at Perth I, Perth II, Gold Coast, Melbourne, and Sydney with a combined discharge of more than 400 MGD. Additionally, 2 Source: 3 Source: DeepWater Desal 33 Response to CPUC

38 many SWRO plants in Spain, the Caribbean, the Middle East, Africa, and South America use this method of concentrate disposal. Figure 13. Examples of offshore diffusers. Source: WaterReuse Association Seawater Concentrate Management. White Paper. DeepWater Desal 34 Response to CPUC

39 4.18 Non-Process Facilities - Electrical Power The SWRO plant will consume 110,662 k Wh/day for Phase 1 and 276,443 kwh/day for Phase 2, inclusive of SWRO plant operation, source water transmission, concentrate disposal to the offshore discharge and pressurized transmission of product water to water purchaser's distribution pipeline (Table 10a and b). The CCRWP has partnered with the City of Salinas to form a municipal power utility that will purchase wholesale electrical power, and re-sell it to the several coastal-dependent businesses at Moss Landing. The power utility will have the flexibility to purchase from any power generator, including power from both traditional and renewable sources; thereby providing a mix of power that will significantly reduce the project's carbon footprint yet provide a reliable, uninterrupted power supply. Due to the power demand associated with the new multiple businesses, the combined electrical usage of the multiple entities, especially the data centers, make the formation of the municipal power utility economically attractive. As a result, the desalination component of our project will benefit from the lowest cost for power of any desalination plant in California. Table 10a. SWRO plant power consumption estimate Phase 1 10,000 acre feet per year permeate capacity. DeepWater Desal 35 Response to CPUC

40 Table 10b. SWRO plant power consumption estimate Phase 2 (full build-out) 25,000 acre feet per year permeate capacity Facility Operation and Maintenance The seawater desalination facility will be designed and constructed for continuous operation (24 hours per day and seven days per week) and will be adequately staffed to support continuous operations in accordance with California and Federal Law. The plant will be fully automated and will have operations and maintenance staff of approximately 12 full-time employees for Phase 1. Additionally, outside services will be required from electrical, equipment, and instrumentation contractors, and the service industry. 5.0 DATA CENTER The Project includes development of a data center campus that will benefit from low cost power and reduced electrical power consumption for cooling as a result of closed-loop cooling from cold seawater. The combined effect will result in the data center being one of the most efficient in the world and with a greatly reduced carbon footprint. The seawater cooling loop will have the added benefit of warming the cold seawater to reduce the power consumption required for reverse osmosis desalination. 6.0 USE OF CO-JOINED TECHNOLOGIES TO MINIMIZE CARBON FOOTPRINT By co-joining DeepWater Desal s (DWD) technology with Data Center (DC) technology partners on site, the large stand-alone DC heat load normally discharged to the atmosphere will be efficiently captured and used to preheat the cool seawater intake prior to the final desalination DeepWater Desal 36 Response to CPUC

41 SWRO process. The reduction in co-joined baseline energy will result in a World Class CO 2 negative footprint when compared to current best in class, stand-alone SWRO and DC installations now in place. This connection concept, with control system theory, has been patented by DWD and licensed to CCRWP for deployment on the Moss Landing site. The concept of using deep source water cooling, below the euphotic zone, has been proven at multiple locations worldwide. Recent relevant examples being the Deep Lake Water Cooling Project, Toronto, Ontario, Canada, the Cornell Lake Source Cooling Project at Lake Cayuga New York, and most closely aligned, by Deepgreen Data Center AG near Lake Walensee Switzerland. All projects use cold freshwater sources for energy efficient cooling, but only in Deepgreen s case study is the sole purpose for cooling a DC. An ocean water source cooled DC precedent has been built by Google at Hamina, Finland, however, Google keeps the critical technical data details confidential. Further, there are no known projects that co-join ocean source deep water-cooling for both the purposes of providing DC cooling and fulfilling a large region-wide need for potable water via desalination with requirements driven control systems in place to easily adjust to variations in environmental input. The information conveyed by Deepgreen to CCRWP validates the Moss Landing site thermodynamics. Deepgreen has an intake temperature of 6 C (42.8 F) and volume of 27.5K GPM to cool a 50 MW, 15,000 m 2 DC providing 3 KW/m 2 -cooling capacity and output flow temperature at 23 C (73.4 F). Reserved intake flow is used to remix the lake discharge back to 17 C (62.6 F) as required by Swiss regulations for that lake. CCRWP s optimal water feed temperature for SWRO energy efficiency is 29 C (84.2 F). The Monterey Canyon deep-water temperature varies over a known 12-hour upwelling cycle from 6 C (42.8 F) to 12 C (53.6 F) with a rough average of 9 C (48.2 F). As CCRWP Phase 1 intake volume is 36.2K GPM for desalination, which exceeds the 27.5K GPM planned at Deepgreen DC cooling as closest comparison, which implies validation of the CCRWP model. As CCRWP s desired delta temperature is 6 C (10.8 F) higher out of the DC heat exchanger loop, through optimized heat exchanger design, the required GPM volume can be reduced; if more heat is required to meet optimal SWRO feed, it can be drawn from heat exchangers placed upon both the main seawater and DC feed pumps as well, further reducing flow requirements. Further, to compensate for the intake temperature fluctuations driven by the Monterey Canyon natural cycling, there will be a majority of constant flow pumps that are DeepWater Desal 37 Response to CPUC

42 augmented by a minimal number of variable speed pumps tied to a full active temperature control feedback loop, to ensure steady state system performance. Critical Notes: 1. There is no SWRO output capacity by combining the DC as the heat exchanger design will ensure no mixing of the seawater with the DC s internal cooling water system. 2. The DC side of the project is expected to be online before the SWRO is functional, requiring the water intake pipes to be in place and active. When the SWRO is ready to go online, the cross-connected control systems should then make full system activation seamless. While the modeling boundary numbers submitted here are based upon a 50 MW DC, it easily scales to 150 MW. DC load scaling will further ease the site thermal load balancing through both enhanced active controls and a mix of other advanced DC technologies which are anticipated to be deployed, giving added Green benefits to the site. The energy consumed by a SWRO desalination plant sized for 25,000 AF/Y is approximately rated at MW. The data center modules consume as much as 150 MW at full build-out. As a result of using a seawater cooling methodology, the power consumption will be reduced dramatically through a heat exchange module. Figure 14 shows total site demand for power by quarter measured in MW. Figure 15 indicates the savings realized in CO 2 gas emissions using seawater cooling versus normal evaporative cooling measured in tons CO 2 per quarter. A high level co-joined active cooling engineering concept is shown in Figure 16. The site layout supporting both SWRO and data centers is shown previously in Figure 4. For DC on-site employment numbers, it is anticipated that a 50 MW DC would employ 80 people for the main shift, with a for the off shift in support of 24/7 operations. As the site DC capacity scales to 150 MW, the employee count does not scale in a linear way; for example, at 150 MW the 1st shift on-site personnel could rise to 200, but permanent (not visiting) employees being 150 and somewhat less on 2nd and 3rd shifts. DeepWater Desal 38 Response to CPUC

43 Figure 14. Total CCRWP energy consumption in megawatts per hour (MW/hr). DeepWater Desal 39 Response to CPUC

44 Figure 15. Comparison of tons of CO 2 generated between normal evaporative cooling vs. and seawater cooling. DeepWater Desal 40 Response to CPUC

45 Figure 16. Example of a high level co-joined active cooling engineering concept. DeepWater Desal 41 Response to CPUC

46 7.0 ONGOING AND PROPOSED STUDIES DWD does not believe that pilot testing is technically required for our project and we do not anticipate conducting pilot testing. The source water is being comprehensively characterized as to its mineral composition, turbidity, and temperature and prior to construction we will have at least 12 months of data, including up to eight sets of full mineral analyses. Therefore, the source water specifications for the RO system design will be developed based on historical data that will account for any seasonal variations. Further, the intake location is completely isolated from contamination from storm water run-off or sanitary outfalls that might otherwise pose a risk of contamination from chemicals or other contaminants that are not present in normal seawater. Stable, high-quality (low turbidity) source water enables the use of conventional media filtration for pretreatment. Given that our project will be designed based on thoroughly characterized seawater using conventional media filtration for pretreatment there is no technical reason to conduct pilot testing. Marine biological sampling designed to assess impacts to larval fishes and macroinvertebrates began in March 2012 and will be completed in June Data collected during source water sampling from September 1999 May 2000 as part of the MLPP 316(b) study were reanalyzed by Tenera Environmental for DeepWater Desal. The purpose of the assessment was to examine the potential impacts of operating a desalination feedwater intake in Monterey Bay. The report, Preliminary Modeling of Potential Impacts from Operation of a Desalination Facility Ocean Intake, dated August 22, 2012 was provided to the Monterey Bay National Marine Sanctuary and informally reviewed with the California Coastal Commission, the State Lands Commission, and other jurisdictions within Monterey County. A copy of the report is found in Appendix C. Terrestrial plant surveys of the project area were conducted by Denise Duffy and Associates in April Results of spring surveys are anticipated in May Additional summer surveys are planned. Cultural resources surveys, geotechnical investigations, power demand estimates, and traffic impact, noise impact, aesthetic impact, and air quality impact analyses will be conducted. 8.0 PROJECT SCHEDULE A copy of DWD s project schedule is found in Figure 17. DeepWater Desal 42 Response to CPUC

47 Figure 17. Preliminary timeline for the Central Coast Regional Water Project Phase 1. DeepWater Desal 43 Response to CPUC

JOINT MANAGEMENT PLAN REVIEW DRAFT ACTION PLAN: Coastal Development: Desalination

JOINT MANAGEMENT PLAN REVIEW DRAFT ACTION PLAN: Coastal Development: Desalination JOINT MANAGEMENT PLAN REVIEW DRAFT ACTION PLAN: Coastal Development: Desalination REVISED: May 13, 2003 Please Note: The MBNMS and the Sanctuary Advisory Council have tasked the management plan working

More information

Desalination Intake Approaches: Open Ocean Intake vs Subsurface. Monterey Bay Water Works Association

Desalination Intake Approaches: Open Ocean Intake vs Subsurface. Monterey Bay Water Works Association Desalination Intake Approaches: Open Ocean Intake vs Subsurface Monterey Bay Water Works Association 16 October 2008 Todd Reynolds, PE Michael Maley, PE, PG, CHg Presentation Outline Introduction to Desalination

More information

Desalination. Section 10 SECTION TEN. Desalination

Desalination. Section 10 SECTION TEN. Desalination SECTION TEN Desalination Section 10 Desalination SECTION 10 Desalination West Basin s experience in recycled water treatment includes substantial knowledge on methods used for the removal of salt from

More information

AlChE Conference 2015

AlChE Conference 2015 AlChE Conference 2015 International Society for Water Solutions Mark Lambert/ November 2015 1 If we could produce fresh water from salt water at a low cost, that would indeed be a great service to humanity,

More information

400,000. MILLION GALLONS of water per day. The Desalination Plant and Process Locations. Welcome and Overview. people in San Diego County

400,000. MILLION GALLONS of water per day. The Desalination Plant and Process Locations. Welcome and Overview. people in San Diego County The Carlsbad Desalination Plant is capable of delivering more than 50 million gallons of fresh, desalinated drinking water per day enough to serve approximately 400,000 people in San Diego County. Commercial

More information

Montecito Water District Desalination Facilities Status Update. Board of Directors Meeting March 17, 2015

Montecito Water District Desalination Facilities Status Update. Board of Directors Meeting March 17, 2015 Montecito Water District Desalination Facilities Status Update Board of Directors Meeting March 17, 2015 Desalination Studies Update 1) Desalination Feasibility Study 2) Desalination Technical Support

More information

SeaSMART* SWRO desalination concept

SeaSMART* SWRO desalination concept Water Technologies & Solutions capability profile SeaSMART* SWRO desalination concept proven experience and sustainable solutions you expect why choose SUEZ water technologies & solutions? With over 50

More information

WATER RECYCLING PLANT IN WAFRA. Feras Al Salem

WATER RECYCLING PLANT IN WAFRA. Feras Al Salem WATER RECYCLING PLANT IN WAFRA Feras Al Salem Introduction 2 The Joint Operations (JO) was born in 1960 when the two oil companies formed a joint committee to oversee and supervise their operations with

More information

Got Desalination. In Your Water Portfolio? Mark Lambert, CEO IDE Americas. Texas Desalination Association, 2016

Got Desalination. In Your Water Portfolio? Mark Lambert, CEO IDE Americas. Texas Desalination Association, 2016 Got Desalination In Your Water Portfolio? Mark Lambert, CEO IDE Americas Texas Desalination Association, 2016 IDE Technologies Industrial Water Treatment Seawater Desalination Wastewater Reuse 2 A Full

More information

Appendix A: Project Characteristics

Appendix A: Project Characteristics Gorgon Fourth Train Expansion Proposal Appendix A: Project Characteristics Appendices Project Characteristics A Key Characteristics table has been prepared to describe the elements of the Foundation Project

More information

SEAWATER DESALINATION Seawater Desalination: The King Abdullah Economic City Experience

SEAWATER DESALINATION Seawater Desalination: The King Abdullah Economic City Experience Subscribe to HDR Publications SEAWATER DESALINATION Seawater Desalination: The King Abdullah Economic City Experience By Pierre Kwan, PE - Senior Project Manager, Seattle, WA Satellite view of the Kingdom

More information

MAKING THE SWITCH FROM LIME TO MEMBRANE SOFTENING: WHEN IS IT THE RIGHT TIME? Introduction

MAKING THE SWITCH FROM LIME TO MEMBRANE SOFTENING: WHEN IS IT THE RIGHT TIME? Introduction MAKING THE SWITCH FROM LIME TO MEMBRANE SOFTENING: WHEN IS IT THE RIGHT TIME? Joseph R. Elarde CH2M HILL 5801 Pelican Bay Blvd., Suite 505 Naples, FL 34108 joe.elarde@ch2m.com 239-431-9225 Jeff Poteet,

More information

Why Desalination? Q A Q A

Why Desalination? Q A Q A Why Desalination? Why do we need a desalination facility? Fresh water makes it possible to undertake the developments needed for a sustainable Lāna i. If the island stays as it is, without any additional

More information

Notice of Preparation of an Environmental Impact Report and Scoping Meeting

Notice of Preparation of an Environmental Impact Report and Scoping Meeting Notice of Preparation of an Environmental Impact Report and Scoping Meeting Date: August 15, 2017 To: Project Sponsor and Lead Agency: Staff Contact: Project Title: Location: General Plan Designation:

More information

EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY

EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY Frank A. Brinson, P.E., DEE, CDM, Fort Lauderdale, FL

More information

Sulaibiya world s largest membrane water reuse project

Sulaibiya world s largest membrane water reuse project Water Technologies & Solutions technical paper Sulaibiya world s largest membrane water reuse project background In May 2001, a consortium including Mohammed Abdulmohsin Al-Kharafi and Sons (The Kharafi

More information

Management of Desalination Plant Concentrate. Nikolay Voutchkov, PE, BCEE

Management of Desalination Plant Concentrate. Nikolay Voutchkov, PE, BCEE Management of Desalination Plant Concentrate by Nikolay Voutchkov, PE, BCEE 1. Introduction Desalination of brackish water and seawater (collectively referred to as saline water) is becoming increasingly

More information

Proven Solutions for the Most Challenging Wastewaters

Proven Solutions for the Most Challenging Wastewaters Proven Solutions for the Most Challenging Wastewaters Fluid Technology Solutions, Inc. Fluid Technology Solutions (FTS) is a global leader in water treatment technology, providing innovative and proven

More information

Key words: Integrated Membrane System, IMS, Seawater Reverse Osmosis, SWRO, SW30HRLE- 400, Ultrafiltration, UF, ZeeWeed 1000

Key words: Integrated Membrane System, IMS, Seawater Reverse Osmosis, SWRO, SW30HRLE- 400, Ultrafiltration, UF, ZeeWeed 1000 Yuhuan Power Plant Seawater Desalination System: Integrated Membrane System Introduction and Operation Performance Analysis Jinsheng Liu a, Shenglin Pang a, Minjia Zhao b, Zhuodan Liao b, Jia Ning b a

More information

TO: DESALINATION TASK FORCE FROM: PROGRAM MANAGERS SUBJECT: SWRO DESALINATION FACILITY DESALINATION PROCESS CONFIGURATION DATE: MAY 18, 2011

TO: DESALINATION TASK FORCE FROM: PROGRAM MANAGERS SUBJECT: SWRO DESALINATION FACILITY DESALINATION PROCESS CONFIGURATION DATE: MAY 18, 2011 DESALINATION TASK FORCE MEMORANDUM TO: DESALINATION TASK FORCE FROM: PROGRAM MANAGERS SUBJECT: SWRO DESALINATION FACILITY DESALINATION PROCESS CONFIGURATION DATE: MAY 18, 2011 RECOMMENDATION: That the

More information

FILMTEC Membranes How FILMTEC Seawater Membranes Can Meet Your Need for High-Pressure Desalination Applications

FILMTEC Membranes How FILMTEC Seawater Membranes Can Meet Your Need for High-Pressure Desalination Applications Tech Fact FILMTEC Membranes How FILMTEC Seawater Membranes Can Meet Your Need for Desalination Higher pressure operation of seawater desalination plants can deliver many benefits, including higher recoveries,

More information

Committee on Water. Desalination as a Water Source

Committee on Water. Desalination as a Water Source Committee on Water Committee on Water Desalination as a Water Source Water Supply Reliability for San Diego County NARUC Summer Policy Summit July 17, 2017 Bob Yamada Director of Water Resources San Diego

More information

Saline Water - Considerations for Future Water Supply. Bruce Thomson Water Resources Program UNM

Saline Water - Considerations for Future Water Supply. Bruce Thomson Water Resources Program UNM Saline Water - Considerations for Future Water Supply Bruce Thomson Water Resources Program UNM (bthomson@unm.edu) 1 Objectives Provide overview of Reverse Osmosis (RO) technology Identify differences

More information

Tampa Bay Water (TBW) is a regional

Tampa Bay Water (TBW) is a regional FWRJ Enhanced Residuals Treatment Helps Tampa Bay Water Regional Surface Water Treatment Plant Achieve Total Recycling Tony Pevec and Richard D. Moore Tampa Bay Water (TBW) is a regional water supply authority

More information

Forward Osmosis Applied to Desalination and Evaporative Cooling Make-up Water

Forward Osmosis Applied to Desalination and Evaporative Cooling Make-up Water Forward Osmosis Applied to Desalination and Evaporative Cooling Make-up Water 3 rd Osmosis Summit 26/27 April 2012 Bringing new technology to the water industry Outline What use is Forward Osmosis? Forward

More information

Desalination Technology Overview James C. Lozier, P.E. CH2M HILL, Tempe, AZ

Desalination Technology Overview James C. Lozier, P.E. CH2M HILL, Tempe, AZ Desalination Technology Overview James C. Lozier, P.E. CH2M HILL, Tempe, AZ Water Resources Research Center Conference Yuma, AZ Presentation Outline Introductory Concepts Desalination Processes Reverse

More information

Reclaimed Waste Water for Power Plant Cooling Tower Water & Boiler Feed Make-up. Richard Coniglio, Business Product Manager

Reclaimed Waste Water for Power Plant Cooling Tower Water & Boiler Feed Make-up. Richard Coniglio, Business Product Manager Reclaimed Waste Water for Power Plant Cooling Tower Water & Boiler Feed Make-up Richard Coniglio, Business Product Manager 70% Covered with Water 3% is Fresh Water 1% of the Fresh Water is only accessible.

More information

Design Advantages for SWRO using Advanced Membrane Technology

Design Advantages for SWRO using Advanced Membrane Technology Design Advantages for SWRO using Advanced Membrane Technology Presenter Craig Bartels Hydranautics Author 1 Craig R Bartels, PhD Hydranautics Author 2 Rich Franks Hydranautics Author 3 Wayne Bates Hydranautics

More information

Bay Water SWRO Desalination: Challenges and Solutions

Bay Water SWRO Desalination: Challenges and Solutions Advanced Membrane Technologies Stanford University, May 07, 2008 Bay Water SWRO Desalination: Challenges and Solutions Val S. Frenkel, Ph.D. All text, image and other materials contained or displayed in

More information

New concept of upgrade energy recovery systems within an operating desalination plant.

New concept of upgrade energy recovery systems within an operating desalination plant. New concept of upgrade energy recovery systems within an operating desalination plant. Authors: Avner Hermony, Global Environmental Solutions, Ltd., avnerh@viamaris-desal.com Juan Miguel Pinto, Energy

More information

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS: FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:

More information

Citizen s Guide: A Handbook to the Draft Environmental Impact Report and Review Process

Citizen s Guide: A Handbook to the Draft Environmental Impact Report and Review Process West Basin Municipal Water District Proposed Ocean Water Desalination Project Citizen s Guide: A Handbook to the Draft Environmental Impact Report and Review Process March 2018 2018 West Basin Municipal

More information

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed

More information

FINAL REPORT Evaluation of Seawater Desalination Projects Proposed for the Monterey Peninsula

FINAL REPORT Evaluation of Seawater Desalination Projects Proposed for the Monterey Peninsula FINAL REPORT Evaluation of Seawater Desalination Projects Proposed for the Monterey Peninsula Submitted to: Monterey Peninsula Water Management District Prepared By: GEI/Bookman Edmonston Separation Processes

More information

Brackish Desalination: Zero Discharge. Thomas F. Seacord, P.E.

Brackish Desalination: Zero Discharge. Thomas F. Seacord, P.E. Brackish Desalination: Zero Discharge Thomas F. Seacord, P.E. ewithlogo.pptx Topics covered include Background Current Disposal Options Zero Discharge In Practice Case Studies Emerging Technologies 2 April

More information

Wastewater Master Facility Report. (Project Name) (Project Basin Location)

Wastewater Master Facility Report. (Project Name) (Project Basin Location) Wastewater Master Facility Report For (Project Name) (Project Basin Location) The Wastewater Master Facility Report for (Project name) dated (Date); located in the (Basin Name) Basin has been completed

More information

Reclamation of Sand Filter Backwash Effluent using HYDRAcap LD Capillary UF Membrane Technology

Reclamation of Sand Filter Backwash Effluent using HYDRAcap LD Capillary UF Membrane Technology Reclamation of Sand Filter Backwash Effluent using HYDRAcap LD Capillary UF Membrane Technology By Mark Wilf, Ph. D., Graeme Pearce Ph. D., of Hydranautics, Oceanside, CA, and Julie Allam MSc., Javier

More information

Depth Filtration with Microfiber Cloth Enhances Performance of Ultrafiltration as Pretreatment to Seawater Desalination Systems

Depth Filtration with Microfiber Cloth Enhances Performance of Ultrafiltration as Pretreatment to Seawater Desalination Systems Depth Filtration with Microfiber Cloth Enhances Performance of Ultrafiltration as Pretreatment to Seawater Desalination Systems Emerging Technologies in Filtration October 6, 2015 David Holland, Terence

More information

CHANGING THE GAME FOR DESAL

CHANGING THE GAME FOR DESAL CHANGING THE GAME FOR DESAL Texas Desal 2016 Extracting Minerals From Waste Water ZERO LIQUID DISCHARGE DESALINATION EWM s clean technology desalinates salty water, producing drinking water and extracting

More information

Beneficial Use of Produced Water: A Case Study of Projects in Colorado and Wyoming

Beneficial Use of Produced Water: A Case Study of Projects in Colorado and Wyoming Beneficial Use of Produced Water: A Case Study of Projects in Colorado and Wyoming D. R. Stewart, PhD, PE* and L. Takichi, PE Review This paper discusses our combined experience in the beneficial use of

More information

Desalination of Sea Water

Desalination of Sea Water Desalination of Sea Water A presentation on Desalination: The Quest to Quench India s Thirst for Drinking Water was made at our Chapter by K. K. Mehrotra, Former Chairman-cum-Managing Director, MECON Limited,

More information

Lowering The Total Cost Of Operation

Lowering The Total Cost Of Operation Lowering The Total Cost Of Operation The system removes more solids than conventional clarification, so filters can run longer between backwash cycles. Fewer backwash cycles means less backwash water,

More information

Innovative Desalination Design: Location, Pre-treament, Intake and Outfall. 7 December 2018

Innovative Desalination Design: Location, Pre-treament, Intake and Outfall. 7 December 2018 Innovative Desalination Design: Location, Pre-treament, Intake and Outfall 7 December 2018 Today Desalination Plant Evaluation Procurement FIDIC Gold Book Risk Allocation Summary Desalination Plant 1.

More information

Slant Well Desalination Feedwater Supply

Slant Well Desalination Feedwater Supply Slant Well Desalination Feedwater Supply Comparison Between Dana Point Test Slant Well and CEMEX Test Slant Well CalAm 9 Oct 14 Doheny Ocean Desalination Project Dana Pt. Project Location & Layout 30 mgd

More information

AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal

AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal Technical Bulletin 2004-02 rev0707 Q: What is the AdEdge AD26 System? A: The AD26 system is a pre-engineered, packaged treatment system specifically

More information

Energy Considerations in Membrane Treatment and Brine Disposal

Energy Considerations in Membrane Treatment and Brine Disposal Energy Considerations in Membrane Treatment and Brine Disposal Energy Requirements Membrane treatment systems require significant energy inputs. Therefore, energy consumption is one of the major cost considerations

More information

NGWA INFORMATION BRIEF

NGWA INFORMATION BRIEF Brackish Groundwater What is brackish water? Brackish water does not have an exact definition, but it is typically defined as distastefully salty but less saline than seawater (between 1,000 to 10,000

More information

Soquel Creek Water District s Groundwater Recharge Feasibility Study. Lydia Holmes

Soquel Creek Water District s Groundwater Recharge Feasibility Study. Lydia Holmes Soquel Creek Water District s Groundwater Recharge Feasibility Study Lydia Holmes Soquel Creek Water District (SqCWD) Filename.ppt/2 Small beach community east of Santa Cruz 37,000 residents 100% reliant

More information

Water Solutions for the Mining Industry

Water Solutions for the Mining Industry Water Solutions for the Mining Industry Resourcing the world WATER TECHNOLOGIES Creating water solutions for the mining industry Veolia Water Technologies can provide specialised water systems thanks to

More information

YOUR WATER PARTNERS. Innovations in Desalination. Mark Lambert February, 2015

YOUR WATER PARTNERS. Innovations in Desalination. Mark Lambert February, 2015 YOUR WATER PARTNERS Innovations in Desalination Mark Lambert February, 2015 1 Overall Agenda IDE Technologies Overview Carlsbad Desalination Plant Overview Common Objections to Desalination and How They

More information

WATER STORIES WEST BASIN, CA

WATER STORIES WEST BASIN, CA WATER STORIES WEST BASIN, CA CHALLENGES PAGE 5 SOLUTIONS PAGE 7 RESULTS PAGE 9 INNOVATION & TECHNOLOGY PAGE 11 COMMUNITY INVOLVEMENT PAGE 13 THE FUTURE PAGE 15 THE RIGHT MOVE FOR SOUTHERN CALIFORNIA It

More information

Brian Villalobos, CHG, CEG GEOSCIENCE Support Services, Inc. American Water Works Association California-Nevada Section Reno, Nevada

Brian Villalobos, CHG, CEG GEOSCIENCE Support Services, Inc. American Water Works Association California-Nevada Section Reno, Nevada Subsea Groundwater for Desalination Feedwater Supply Case Study: Feasibility of Using Subsurface Intake Systems in the Marina/Moss Landing Area of California Brian Villalobos, CHG, CEG GEOSCIENCE Support

More information

Membrane Filtration Technology: Meeting Today s Water Treatment Challenges

Membrane Filtration Technology: Meeting Today s Water Treatment Challenges Membrane Filtration Technology: Meeting Today s Water Treatment Challenges Growing global demand for clean water and increasing environmental concerns make membrane filtration the technology of choice

More information

Mountainview Generating Station (MVGS)

Mountainview Generating Station (MVGS) Mountainview Generating Station (MVGS) A Southern California Edison Company (SCE) 2492 West San Bernardino Avenue Redlands, CA 92374 Steve Johnson, Technical Manager Wastewater Adjudicated water rights

More information

Membrane Systems. Featuring Aqua MultiBore Membranes

Membrane Systems. Featuring Aqua MultiBore Membranes Membrane Systems Featuring Aqua MultiBore Membranes Aqua-Aerobic Membrane Systems Featuring Aqua MultiBore Membranes For nearly 50 years, Aqua-Aerobic Systems has provided thousands of customers with adaptive

More information

REACTION TANKS BUILD OWN OPERATE WATER MANAGEMENT PROGRAM

REACTION TANKS BUILD OWN OPERATE WATER MANAGEMENT PROGRAM REACTION TANKS BUILD OWN OPERATE WATER MANAGEMENT PROGRAM EVOQUA YOUR SERVICE PARTNER FOR INDUSTRY With more than 3,000 dedicated service engineers, technicians, and professionals across the country, we

More information

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado JUST ADD WATER Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado Thomas M. Getting, P.E., DEE, Filtration Product Manager John Geibel, P.E., Chief Engineer Michael

More information

Your Water Treatment Technology Partners for Wash Water & Industrial Water Treatment. Design Supply Integration Installation Maintenance

Your Water Treatment Technology Partners for Wash Water & Industrial Water Treatment. Design Supply Integration Installation Maintenance Your Water Treatment Technology Partners for Wash Water & Industrial Water Treatment Design Supply Integration Installation Maintenance The Challenge for Businesses that Use Water PUBLIC HEALTH EPA state

More information

CH2M Hill, Inc.7600 West Tidwell, Suite 600, Houston, Texas 77040, USA

CH2M Hill, Inc.7600 West Tidwell, Suite 600, Houston, Texas 77040, USA 450 Int. J. Nuclear Desalination, Vol. 1, No. 4, 2005 Advances in desalination technology Tom M. Pankratz CH2M Hill, Inc.7600 West Tidwell, Suite 600, Houston, Texas 77040, USA E-mail: tpankrat@ch2m.com

More information

Beer Filtration Solutions Your Partner for All Your Filtration Needs

Beer Filtration Solutions Your Partner for All Your Filtration Needs Beer Filtration Solutions Your Partner for All Your Filtration Needs Advanced Filtration for Enhanced Quality and Increased Sustainability TM Filtration for a Better Future... How can KMS help you? Over

More information

Improved Membrane Design Addresses Integrity Issues for the City of Yuba City Water Treatment Plant

Improved Membrane Design Addresses Integrity Issues for the City of Yuba City Water Treatment Plant Improved Membrane Design Addresses Integrity Issues for the City of Yuba City Water Treatment Plant Richard Stratton, PE HDR Engineering Acknowledgements City of Yuba City - John Westhouse, Plant Supervisor

More information

Florida s Diverse Use of Class I injection Wells

Florida s Diverse Use of Class I injection Wells Florida s Diverse Use of Class I injection Wells Presented to: GWPC 2013 Underground Injection Control Conference Sarasota, Florida January 23, 2013 Presented by: Mark B. McNeal P.G. Tampa, Florida 1 Injection

More information

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS DESIGN STANDARDS SECTION 2 INDEX ITEM DESCRIPTION 2.00 GENERAL STATEMENT 2.01 WATER DISTRIBUTION

More information

OriginClear Water Treatment with Innovative Desalination Techniques High TDS Water Treatment for Oil & Gas Markets in Oman

OriginClear Water Treatment with Innovative Desalination Techniques High TDS Water Treatment for Oil & Gas Markets in Oman OriginClear Water Treatment with Innovative Desalination Techniques High TDS Water Treatment for Oil & Gas Markets in Oman A Technology & A Process Electro Water Separation (EWS) A first stage technology

More information

Desalination Plants. IMIA Conference, Gleneagles, 2008 WG 57 (08) Prepared by:

Desalination Plants. IMIA Conference, Gleneagles, 2008 WG 57 (08) Prepared by: IMIA Conference, Gleneagles, 2008 WG 57 (08) Desalination Plants Prepared by: Hans Mahrla, Infrassure (Chairman) Jürg Buff, Partner Re Robert Glynn, Benfield Silvio Fischer, Partner Re Jean-Paul Perrin,

More information

Use of Spiral Wound UF in RO Pretreatment

Use of Spiral Wound UF in RO Pretreatment Use of Spiral Wound UF in RO Pretreatment Authors: Harry Dalaly, Asia Pacific Sales Manager, Hydranautics and Yeoh Cheik How, Facilities Senior Engineer, Hewlett-Packard Singapore The Hewlett-Packard Singapore

More information

Issue paper: Aquifer Water Balance

Issue paper: Aquifer Water Balance Issue paper: Aquifer Water Balance 1. Introduction And Background 1.1. Purpose and Scope The population in Kitsap County has grown rapidly in recent years and is expected to increase substantially in the

More information

INNOVATIVE WATER/ENERGY NEXUS: OPTIMIZING RENEWABLES BY COMBINING SEAWATER PUMPED STORAGE, HYDROPOWER, AND DESALINATION

INNOVATIVE WATER/ENERGY NEXUS: OPTIMIZING RENEWABLES BY COMBINING SEAWATER PUMPED STORAGE, HYDROPOWER, AND DESALINATION INNOVATIVE WATER/ENERGY NEXUS: OPTIMIZING RENEWABLES BY COMBINING SEAWATER PUMPED STORAGE, HYDROPOWER, AND DESALINATION Mark Allen, Oceanus Power & Water, LLC, 900 High St, Palo Alto, CA 94301 mark@oceanus.pw;

More information

Altela, Inc. Treating water naturally

Altela, Inc. Treating water naturally Altela, Inc. Treating water naturally A Novel Solution for the Energy/Water Nexus: Low-cost Water Desalination Using Waste Heat from CSP 23 October 09 Water and Land for Renewable Energy in the Southwest

More information

China s Mega-Desalination Plant Experience

China s Mega-Desalination Plant Experience SERVICE REGION Far East ERI PRODUCT DIVISION Desalination China s Mega-Desalination Plant Experience A white paper on the long-term energy efficiency of China s largest desalination plants. AUTHOR: Rodney

More information

Chapter 2: Description of Treatment Facilities

Chapter 2: Description of Treatment Facilities 2020 Facilities Plan Treatment Report 2.1 Introduction Chapter 2: Description of Treatment Facilities This chapter defines the Milwaukee Metropolitan Sewerage District (MMSD) service area. It also describes

More information

Dow Water Solutions. FILMTEC Membranes. Product Information Catalog

Dow Water Solutions. FILMTEC Membranes. Product Information Catalog Dow Water Solutions Product Information Catalog For more information contact: info@lenntech.com www.lenntech.com Tel. +31-15-2610900 Fax. +31-15-261 Form No. 609-00204-1108 1. Product Overview 2. Tapwater

More information

SPIRITWOOD REGIONAL WATER REUSE FACILITY PROJECT

SPIRITWOOD REGIONAL WATER REUSE FACILITY PROJECT SPIRITWOOD REGIONAL WATER REUSE FACILITY PROJECT March 2015 Project Information North Dakota SPIRITWOOD REGIONAL WATER REUSE FACILITY PROJECT Industry and future development in and around Spiritwood, North

More information

Aquifer Storage and Recovery Using Reclaimed Water: Successful Applications and Critical Opportunities

Aquifer Storage and Recovery Using Reclaimed Water: Successful Applications and Critical Opportunities Aquifer Storage and Recovery Using Reclaimed Water: Successful Applications and Critical Opportunities Agenda Benefits Water Resource Water Quality Improvement Energy Savings Existing Applications Around

More information

CeraMem. Ceramic Membrane Technology. Advanced Heavy Metals Removal System WATER TECHNOLOGIES

CeraMem. Ceramic Membrane Technology. Advanced Heavy Metals Removal System WATER TECHNOLOGIES CeraMem Ceramic Membrane Technology Advanced Heavy Metals Removal System WATER TECHNOLOGIES Key System Features CeraMem UF membranes act as an absolute barrier to oils, suspended solids, and precipitated

More information

Are micro-porous pipes able to eliminate environmental concerns when installing intakes? Anthony T. Jones, Ph.D.

Are micro-porous pipes able to eliminate environmental concerns when installing intakes? Anthony T. Jones, Ph.D. Are micro-porous pipes able to eliminate environmental concerns when installing intakes? Anthony T. Jones, Ph.D. Agenda The Context The Problem A Solution Describe Neodren Neodren installation Neodren

More information

Low Fouling and Energy Consumption two-stage Forward and Reverse Osmosis desalination Process

Low Fouling and Energy Consumption two-stage Forward and Reverse Osmosis desalination Process Low Fouling and Energy Consumption two-stage Forward and Reverse Osmosis desalination Process Malak Hamdan Energy and Water Security Workshop, 15-17 February 2015, (Doha) Qatar 1 Overview of Presentation

More information

HTI - Forward Osmosis Overview MSSC 2012

HTI - Forward Osmosis Overview MSSC 2012 HTI - Forward Osmosis Overview MSSC 2012 Introduction to Forward Osmosis at HTI Founded in 1987 as Osmotek, Inc., HTI is located in Albany, OR A new R & D facility was opened in August, 2010 and is located

More information

Water Utility Science Water Math and Hydraulics 050. Name: Date:

Water Utility Science Water Math and Hydraulics 050. Name: Date: Water Utility Science Water Math and Hydraulics 050 Name: Date: Note: Please show all of your calculations for each problem no matter how simple the problem may seem. Please use the accompanying pieces

More information

CONCENTRATE AND BRINE MANAGEMENT THROUGH DEEP WELL INJECTION. Abstract

CONCENTRATE AND BRINE MANAGEMENT THROUGH DEEP WELL INJECTION. Abstract CONCENTRATE AND BRINE MANAGEMENT THROUGH DEEP WELL INJECTION M.S. Bruno and J. Couture, GeoEnvironment Technologies LLC J.T. Young, Terralog Technologies USA, Inc. Abstract The Reverse Osmosis (RO) process

More information

Water Talk. Volume 8, Issue 8 August 2008 Zero Blowdown, Reality or Fantasy? A Critical Look at the Claims and Possibilities

Water Talk. Volume 8, Issue 8 August 2008 Zero Blowdown, Reality or Fantasy? A Critical Look at the Claims and Possibilities Water Talk Volume 8, Issue 8 August 2008 Zero Blowdown, Reality or Fantasy? A Critical Look at the Claims and Possibilities Discussion of Reality With the ever-increasing need to conserve water, the cooling

More information

Nomination for 2014 Hardrock Mining Reclamation Awards Colorado Mined Land Reclamation Board Colorado Mining Association

Nomination for 2014 Hardrock Mining Reclamation Awards Colorado Mined Land Reclamation Board Colorado Mining Association Nomination for 2014 Hardrock Mining Reclamation Awards Colorado Mined Land Reclamation Board Colorado Mining Association Nominee: Permit: Climax Molybdenum Company Climax Mine Highway 91 Fremont Pass Climax,

More information

SEWER SYSTEM DESIGN GUIDELINES

SEWER SYSTEM DESIGN GUIDELINES SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

MEMCOR MEMBRANES FOR DRINKING WATER APPLICATIONS

MEMCOR MEMBRANES FOR DRINKING WATER APPLICATIONS MEMCOR MEMBRANES FOR DRINKING WATER APPLICATIONS WHY CHOOSE MEMBRANE FILTRATION? As ever-tightening water regulations continue to challenge the limits of conventional filtration methods, municipalities

More information

Tuas Seawater Desalination Plant - Seawater Reverse Osmosis (SWRO), Singapore

Tuas Seawater Desalination Plant - Seawater Reverse Osmosis (SWRO), Singapore Tuas Seawater Desalination Plant - Seawater Reverse Osmosis (SWRO), Singapore Completed some three months ahead of schedule, Singapore's first desalination plant the largest of its kind in Asia ranks among

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information

The Use of Walnut Shell Filtration with Enhanced Synthetic Media for the Reduction and/or Elimination of Upstream Produced Water Treatment Equipment

The Use of Walnut Shell Filtration with Enhanced Synthetic Media for the Reduction and/or Elimination of Upstream Produced Water Treatment Equipment Siemens Water Solutions The Use of Walnut Shell Filtration with Enhanced Synthetic Media for the Reduction and/or Elimination of Upstream Produced Water Treatment Equipment White Paper January 2016 Researchers

More information

Residents of drought-stricken communities in the South didn t

Residents of drought-stricken communities in the South didn t Hold the Salt, Please Is Desalination a Viable Answer to America s Potential Water Crisis? By Geoff Bilau Residents of drought-stricken communities in the South didn t need a government report to tell

More information

National Marine Sanctuaries Coordination Report

National Marine Sanctuaries Coordination Report Office of National Marine Sanctuaries National Oceanic and Atmospheric Administration Agenda Item C.1.a Supplemental ONMS PPT (Douros) March 2017 National Marine Sanctuaries Coordination Report William

More information

Wastewater ENVIRONMENTAL SETTING. Wastewater Collection

Wastewater ENVIRONMENTAL SETTING. Wastewater Collection 4.15.3.1 ENVIRONMENTAL SETTING Wastewater Collection The City owns, operates, and maintains the local sewer lines that collect wastewater generated within the City. The existing sewer lines include a gravity

More information

Types of Hydropower Facilities

Types of Hydropower Facilities Types of Hydropower Facilities 1 Impoundment Hydropower- uses a dam to store water. Water may be released either to meet changing electricity needs or to maintain a constant water level. 2 Run-of-River

More information

NIPPON PAPER RO SYSTEM + 2 Others

NIPPON PAPER RO SYSTEM + 2 Others NIPPON PAPER RO SYSTEM + 2 Others 1 March 2014 Greg Wyrick District Account Manager John Zora District Account Manager 2 Purpose: Review the design, function, layout, and operation of the RO system. Process:

More information

Desalination: A Global Perspective. Craig R. Bartels, PhD HYDRANAUTICS

Desalination: A Global Perspective. Craig R. Bartels, PhD HYDRANAUTICS Desalination: A Global Perspective Craig R. Bartels, PhD HYDRANAUTICS 1 Desalination Growth: Installed Capacity, 1980 2010 (cumulative) Desal(ng Technology Mul(ple Effect Dis(lla(on Mul(ple Stage Flash

More information

DRAFT Master Water Reclamation Plan. City Council Meeting March 28, 2017

DRAFT Master Water Reclamation Plan. City Council Meeting March 28, 2017 DRAFT Master Water Reclamation Plan City Council Meeting March 28, 2017 Presentation Overview Tonight s Overall Goals Acknowledge Input City has Received Reminder: Where We are in the Process Present the

More information

CHAPTER 4 MINIMUM DESIGN CRITERIA

CHAPTER 4 MINIMUM DESIGN CRITERIA 4.1 INTRODUCTION CHAPTER 4 MINIMUM DESIGN CRITERIA Establishing realistic design criteria is paramount to evaluation of the existing water system s adequacy and planning for future water system improvements.

More information

SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN

SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN 3.1 GENERAL SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN 3.1.1 The following specifications cover the general design, review of plans and specifications, and acceptance of

More information

Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities

Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities 147 Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities Todd Stong PE 1, Ron R. Jorgenson 2, and Jacob Sauer 3 1 Senior Engineer,

More information

Operation of Hydranautics New ESNA Membrane at St. Lucie West, FL Softening Plant

Operation of Hydranautics New ESNA Membrane at St. Lucie West, FL Softening Plant Ilan Wilf & Scott Rappoport, Operation of Hydranautics New ESNA Membrane at St. Lucie West, FL Softening Plant Introduction St. Lucie West, Florida Service Distrcit employed the first large scale reverse

More information

AS-H Iso-Disc Cloth Media Filter

AS-H Iso-Disc Cloth Media Filter AS-H Iso-Disc Cloth Media Filter Tertiary filtration and final polishing of wastewaters in municipal and industrial applications Toby.Sedgwick@AlfaLaval.com Slide 2 Typical Performance Range Influent Average

More information