1 Noise Control Study Proposed Mixed-use Development 112 Montreal Road City of Ottawa Prepared for: DCR Phoenix Developments August N01

2 August 28, N01 Michael Boucher Manager of Planning DCR Phoenix Developments 18A Bentley Avenue, Ottawa, ON K2E 6T8 Dear Mr. Boucher: Subject: Noise Control Study Proposed Mixed-use Development 112 Montreal Road City of Ottawa We are pleased to submit the following Noise Control Study for the proposed mixed-use development to be situated at 112 Montreal Road in the City of Ottawa. Issues related to transportation noise generated by Vanier Parkway and Montreal Road are addressed in this study. Based on the projected future road traffic volumes, it is concluded that the control of sound levels within outdoor and indoor living areas of the development is feasible. Providing that the noise control measures recommended in this report are implemented, the issue of excess road traffic noise does not pose any constraint to this development proposal. Should you have any comments or questions, or require clarification, please contact us at your earliest convenience. Sincerely, Bill Hoogeveen, P. Eng. Senior Project Manager & Associate Noise and Vibration Section Transportation Planning J:\01 PROJECTS\2013 jobs\ bph (112 Montreal Road)\Report\Cover Letter.doc

3 PROJECT TEAM MEMBER LIST Senior Project Manager: Bill Hoogeveen, P.Eng. Senior Project Engineer: Tony Chiu, M.A.Sc., P.Eng. Designer: Samson Wat, M.Sc.,P.Eng.

4 TABLE OF CONTENTS 1. SUMMARY INTRODUCTION SOUND LEVEL ANALYSIS ASSUMPTIONS AND BASIS OF ANALYSIS Sound Sources Estimation Procedures Setbacks, Elevations and Receptor Heights NOISE ASSESSMENT CRITERIA IN LAND USE PLANNING UNATTENUATED FUTURE SOUND LEVELS OUTDOOR NOISE CONTROL MEASURES INDOOR NOISE CONTROL MEASURES Building Treatments Ventilation Requirements FORMAL NOTIFICATION IMPLEMENTATION PROCEDURES CONCLUSIONS AND RECOMMENDATIONS CONCLUSIONS RECOMMENDATIONS Noise Control Measures Implementation Procedures APPENDICES Appendix A Background Information and Data Appendix B Noise Analysis Appendix C Site Plan

5 Noise Control Study Page 1 Proposed Mixed-use Development 112 Montreal Road, City of Ottawa N01 1. SUMMARY DCR Phoenix Developments is proposing to develop a mixed-use development on the southwest quadrant of Vanier Parkway and Montreal Road, in the City of Ottawa. The proposed mixed-use development consists of four 18-storey condominium buildings (Buildings A, B, C and D) along with a three storey high amenity building (Building E), a six storey high mixed-use residential/commercial building (Building F) and a four storey high condominium building (Building G). Vehicular traffic on Vanier Parkway and Montreal Road has been identified as the dominant source of transportation noise in the vicinity of the proposed development. Traffic projection information for Vanier Parkway and Montreal Road was obtained from the City of Ottawa Environmental Noise Control Guidelines. Based on our review of the study area, the stationary noise impact is not expected to be significant and the stationary noise assessment is not required. The findings of this study conclude that the proposed development will not be constrained by future traffic noise from Vanier Parkway and Montreal Road provided the following recommendations are implemented. In accordance with the MOE Publication NPC-300 Environmental Noise Guideline, Stationary and Transportation Sources Approval and Planning and the City of Ottawa Environmental Noise Control Guidelines the following are the required noise attenuation measures for the subject development. Ventilation Requirements All dwellings units in Buildings A, B, D, F and G will require the installation of central air conditioning system. All dwelling units in Building C will require the installation of forced air heating with provisions (i.e. appropriately sized ductwork) for the installation of a future air conditioning system. It is understood that all dwelling units within this development will be air conditioned, which will meet noise ventilation requirement. MMM Group Limited

6 Noise Control Study Page 2 Proposed Mixed-use Development 112 Montreal Road, City of Ottawa N01 Building Requirements Living/Dining rooms and Bedrooms in Building A on the east, north and south sides require upgraded STC 35, 32 and 31 windows, respectively. If fixed and sealed or casement windows are used, this requirement can be reduced to STC 32 on the east side of Building A. Ontario Building Code (OBC) compliant windows will be sufficient for the north and south sides of Building A, if fixed and sealed or casement windows are used. Living/Dining rooms and Bedrooms in Buildings D and G on the east, north and south sides require upgraded STC 35, 31 and 31 windows, respectively. If fixed and sealed or casement windows are used, this requirement can be reduced to STC 32 on the east side of Buildings D and G. Ontario Building Code (OBC) compliant windows will be sufficient for the north and south sides of Buildings D and G, if fixed and sealed or casement windows are used. Living/Dining rooms and Bedrooms in Building F on the north and east sides require upgraded STC 35 and 32 windows, respectively. If fixed and sealed or casement windows are used, this requirement can be reduced to STC 32 on the north side of Building F. Ontario Building Code (OBC) compliant windows will be sufficient for the east sides of Building F, if fixed and sealed or casement windows are used. All directly exposed dwelling units in Buildings A, D and G fronting Vanier Parkway, and Building F fronting Montreal Road require upgraded EW1R, EW4 or EW5 specification exterior walls. All dwelling units in Building A fronting Montreal Road and Building F fronting Vanier Parkway require upgraded EW1R or better specification exterior walls. Noise Warning Clauses All dwelling units requiring indoor noise control measures must have a warning clause indicating the existence of possible excess noise and the measures provided to deal with that excess, included in the offer of the purchase and sale or tenancy agreement. Section 3.6 of this report identifies the specific details. MMM Group Limited

7 Noise Control Study Page 3 Proposed Mixed-use Development 112 Montreal Road, City of Ottawa N01 Implementation Procedures All relevant builder s plans for the dwelling units requiring noise control measures should be certified by an Acoustical Consultant as being in conformance with the recommendations of the approved Noise Control Study. Prior to final inspection and release for occupancy, these dwellings should also be certified by the Acoustical Consultant as being in compliance with the certified builder s plans and the recommendations of the approved Noise Control Study. MMM Group Limited

8 Noise Control Study Page 4 Proposed Mixed-use Development 112 Montreal Road, City of Ottawa N01 2. INTRODUCTION MMM Group Limited was retained by DCR Phoenix Developments to undertake a Noise Control Study for a proposed mixed-use development to be located on the southwest quadrant of Vanier Parkway and Montreal Road, in the City of Ottawa. The proposed mixed-use development consists of four 18-storey condominium buildings (Buildings A, B, C and D) along with a three storey high amenity building (Building E), a six storey high mixed-use residential/commercial building (Building F) and a four storey high condominium building (Building G). The objective of this Noise Study is to provide a detailed evaluation of future vehicular sound levels emanating from the existing roadways and provide recommendations for any indoor and outdoor physical control measures that are necessary to attenuate the excess transportation noise impacting the proposed development. This report provides a description of the noise sources and methods of prediction as well as recommendations to control the vehicular sound in the indoor and outdoor living areas of the development. Based on our review of the study area, the stationary noise impact is not expected to be significant and the stationary noise assessment is not required. MMM Group Limited

9 Noise Control Study Page 5 Proposed Mixed-use Development 112 Montreal Road, City of Ottawa N01 3. SOUND LEVEL ANALYSIS 3.1 Assumptions and Basis of Analysis Sound Sources Vehicular traffic on Vanier Parkway and Montreal Road were identified as the predominant source of transportation noise in the vicinity of the proposed development. Projected traffic information for the roadways was provided in the City of Ottawa Environmental Noise Control Guidelines. Traffic information and road characteristic can be found in Appendix A. The traffic information used in this analysis is shown in Table 3.1 below. TABLE 3.1 ROAD TRAFFIC INFORMATION Road Data Vanier Parkway Montreal Road Implied Roadway Class 6-Lane Urban Arterial Divided (6 UAD) 4-Lane Urban Arterial Undivided (4-UAU) Ultimate AADT, vehicles per day 50,000 30,000 Number of Lanes 6 4 Future Posted speed limit (km/h) 60 50* Percentage of Medium Trucks (Day/Night) 7.0 % / 7.0% 7.0 % / 7.0% Percentage of Heavy Trucks (Day/Night) 5.0 % / 5.0% 5.0 % / 5.0% Typical Day/Night Ratio 92 / 8 92 / 8 Note: *Speed limited on Montreal Road was assumed to be 50km/h. Based on the review of the study area, it was determined that possible sources of stationary sound in the vicinity of the site are not expected to be acoustically significant. Accordingly, it is concluded that there will be no stationary noise impacts on the proposed development Estimation Procedures Ambient sound levels were calculated using the method outlined in the Ontario Ministry of Environment document ORNAMENT, October 1989 and the MOE STAMSON Computer Program for Road and Rail Traffic Noise Assessment (version 5.04 issued in 2000). MMM Group Limited

10 Noise Control Study Page 6 Proposed Mixed-use Development 112 Montreal Road, City of Ottawa N Setbacks, Elevations and Receptor Heights Table 3.2 contains a brief description of points of reception and summarizes receptor location setbacks, elevations and receptors heights used in this analysis. TABLE 3.2 POINTS OF RECEPTION Noise Receptor Outdoor Living Area Facade Day Facade Night Period 07:00 to 23:00 07:00 to 23:00 23:00 to 07:00 Living Space 3 rd Floor on Building E (Terrace) 18 th Floor on Buildings A,B,C and D 6 th Floor on Building F 4 th Floor on Building G 18 th Floor on Buildings A,B,C and D 6 th Floor on Building F 4 th Floor on Building G Receptor Locations Centre of Terrace Immediately adjacent to outside the exposed dwelling façade Immediately adjacent to outside the exposed dwelling facade Receptor Height (metres above grade) 8.7 m 53.4 m for Buildings A,B,C,D 17.2 m for Building F 11.1 m for Building G 53.4 m for Buildings A,B,C,D 17.2 m for Building F 11.1 m for Building G Representative critical noise receptors were selected which experience the greatest noise impact from Vanier Parkway and Montreal Road. The critical noise receptors are shown on the site plan, which is attached in Appendix C. The façade noise receptors are labeled as R1 to R17 on the site plan, and the outdoor noise receptor is labeled as R Noise Assessment Criteria in Land Use Planning The City of Ottawa Environmental Noise Control Guidelines (ENCG) is a tool for implementation of the City policies on environmental noise contained in the Official Plan. The ENCG is primarily based on Ministry of Environmental (MOE) publications such as LU-131 and NPC-205 with additional and enhancement by the City of Ottawa. In 2013, the LU-131 and NPC-205 noise guidelines were replaced by NPC-300. The criteria and MMM Group Limited

11 Noise Control Study Page 7 Proposed Mixed-use Development 112 Montreal Road, City of Ottawa N01 standards described in the document represent the position of the MOE, the Ontario Municipalities environmental and the City of Ottawa ENCG control requirements to establish appropriate noise environments for living spaces and sleeping quarters in new developments. Sound level limits for road traffic in accordance with the MOE Sound Level Criteria (LU- 131) are summarized in Table 3.3. The sound levels are described in terms of the equivalent sound level (L eq ). TABLE 3.3 MOE SOUND LEVEL LIMITS FOR ROAD TRAFFIC Living Space Time of Day Equivalent Sound Level Living/Dining rooms Sleeping quarters 07:00 23:00 23:00 07:00 07:00 23:00 23:00 07:00 L eq (16 hours/8 hours) 45 dba L eq (16 hours) 45 dba L eq (8 hours) 40 dba When the outdoor sound levels exceed the objective level of L eq (16) 55 dba by up to 5 dba, physical noise control measures are not mandatory under MOE policy. However, if physical noise control measures are not implemented then prospective purchases/tenants must be informed of the potential noise disturbance by means of a warning clause registered on offers of purchase and sale or in the tenancy agreement. When the unattenuated sound levels exceed the objective level of L eq (16) 55 dba by more than 5 dba, physical noise control measures are mandatory under MOE policy along with a warning clause included in all offers or agreements of purchase and sale. The warning clause will inform the purchasers or tenants of the potential noise disturbance if the physical noise control measures were removed. If the facade sound levels are more than 65 dba in the daytime or 60 dba in the nighttime, noise control measures such as central air conditioning must be provided. In addition, if the façade sound levels are more than 55 dba in the daytime or 50 dba in the nighttime, air conditioning provisions are required (ie. a forced air heating system with the provision to implement a future central air conditioning system). In MMM Group Limited

12 Noise Control Study Page 8 Proposed Mixed-use Development 112 Montreal Road, City of Ottawa N01 either case, purchasers must be informed of the ventilation provisions by means of a warning clause registered in the offer of Purchase and Sale or tenancy agreement. 3.3 Unattenuated Future Sound Levels Table 3.4 summarizes the predicted unattenuated future sound levels due to vehicular road traffic on Vanier Parkway and Montreal Road. As noted previously, the receptor locations are identified on the proposed site plan attached in Appendix C. Detailed sound level calculations are included in Appendix B. Noise Receptor TABLE 3.4 UNATTENUATED FUTURE SOUND LEVELS Location OLA Leq 16 hours dba Façade - Day Leq 16 hours dba Façade Façade - Night Leq 8 hours dba R1 Building F R2 Building F R3 Building F R4 Building B R5 Building B R6 Building B R7 Building A R8 Building A R9 Building A R10 Building D R11 Building D R12 Building D R13 Building G R14 Building C R15 Building C R16 Building C R17 Building C R18 Building E MMM Group Limited

13 Noise Control Study Page 9 Proposed Mixed-use Development 112 Montreal Road, City of Ottawa N Outdoor Noise Control Measures Based on the results summarized in Table 3.4, the unattenuated daytime outdoor sound levels at the OLA receptor (Receptor 18) within the development is predicted to be 47 dba. The OLA receptor is well below the MOE noise level objective at 55 dba, thus the outdoor living area noise control measure is not required for the proposed development. 3.5 Indoor Noise Control Measures In order to ensure acceptable indoor sound level environments, consideration was given to building treatments required to achieve the necessary acoustic insulation values. The Acoustical Insulation Factor (AIF) needed to control road traffic noise is calculated as follows: AIF = Leq outdoor facade - Leq indoor + 10 log C + 2 where: Leq outdoor facade = Outdoor facade sound level. Leq indoor = Indoor objective sound level (as noted in Section 3.2). C = Number of building components forming envelope of room (typically equals 3 for a corner room and 2 for other rooms). Table 3.5 outlines the Acoustic Insulation Factor (AIF) required for various road traffic sound levels as well as the glazing requirements to meet MOE guidelines. Daytime Façade Sound Level (dba) TABLE 3.5 AIF VALUES AND TYPICAL BUILDING TREATMENTS FOR ROAD TRAFFIC SOUND LEVELS Nighttime Air Facade AIF Window Conditioning Sound Level Required Treatments Requirements (dba) Wall Requirement 55 or less 50 or less None 17 or less None (OBC) None (OBC) 56 to to 60 Provisions 18 to 27 None (OBC) None (OBC) 66 to to 63 Required 28 to 30 None (OBC) None (OBC) Required 31 STC 31 None (OBC) Required 32 STC 32 EW1 or better Required 33 STC 33 EW2 or better Required 34 STC 34 EW2 or better Required 35 STC 35 EW1R or EW4 or EW5 MMM Group Limited

14 Noise Control Study Page 10 Proposed Mixed-use Development 112 Montreal Road, City of Ottawa N01 Notes: 1. Window treatments are written in the form 3 [25] 6 to denote 3 mm glass [25 mm airspace] 6 mm glass. Other glazing combinations are possible to achieve similar AIF. 2. Window treatments are based on operable windows. Windows that are fixed and sealed to the frame have an AIF 3 points greater than the equivalent operable window. 3. AIF requirements are based upon an assumed window/floor ratio of 25% and exterior wall/floor ratio of 80%. 4. AIF is based on 3 components (i.e. corner room location). For 2 components (ie: only one exterior wall) AIF would be 2 points lower. 5. OBC means Ontario Building Code compliant windows (3[13]3 or STC 30), exterior wall (EW1). 6. EW1 wall represents a typical metal or vinyl clad siding exterior wall. EW1R wall represents an EW1 exterior wall with interior drywall mounted on resilient channels. EW2 wall represents an EW1 exterior wall within an additional 25-mm layer of rigid insulation. EW4 wall represents a typical 20-mm stucco clad exterior wall. EW5 wall represents a typical brick veneer clad exterior wall. 7. Source: "Road and Rail Noise: Effects on Housing", NHA 5156, 08/86 CMHC, Building Requirements Living/Dining rooms and Bedrooms in Building A on the east, north and south sides require upgraded STC 35, 32 and 31 windows, respectively. If fixed and sealed or casement windows are used, this requirement can be reduced to STC 32 on the east side of Building A. Ontario Building Code (OBC) compliant windows will be sufficient for the north and south sides of Building A, if fixed and sealed or casement windows are used. Living/Dining rooms and Bedrooms in Buildings D and G on the east, north and south sides require upgraded STC 35, 31 and 31 windows, respectively. If fixed and sealed or casement windows are used, this requirement can be reduced to STC 32 on the east side of Buildings D and G. Ontario Building Code (OBC) compliant windows will be sufficient for the north and south sides of Buildings D and G, if fixed and sealed or casement windows are used. Living/Dining rooms and Bedrooms in Building F on the north and east sides require upgraded STC 35 and 32 windows, respectively. If fixed and sealed or casement windows are used, this requirement can be reduced to STC 32 on the north side of Building F. Ontario Building Code (OBC) compliant windows will be sufficient for the east sides of Building F, if fixed and sealed or casement windows are used. All directly exposed dwelling units in Buildings A, D and G fronting Vanier Parkway, and Building F fronting Montreal Road require upgraded EW1R, EW4 or EW5 specification exterior walls. For dwelling units in Building A fronting Montreal Road and Building F fronting Vanier Parkway require upgraded EW1R or better specification exterior walls. MMM Group Limited

15 Noise Control Study Page 11 Proposed Mixed-use Development 112 Montreal Road, City of Ottawa N01 For the remaining dwelling units in Buildings A, B, C, D, F and G, since noise mitigation from standard OBC building components exceeds the AIF requirements, there will not be any need for architectural noise abatement measures (eg. window or wall design requirements) for these buildings Ventilation Requirements Based on the criteria presented in Section 3.2, and the calculated daytime and nighttime façade sound levels as outlined in Table 3.4, all dwellings units in Buildings A, B, D, F and G will require the installation of central air conditioning systems and all dwelling units in Building C will require the installation of forced air heating with provisions (i.e. appropriately sized ductwork) for the installation of a future air conditioning system. However, it is understood that all building units within this development are planned to be air conditioned, thus the ventilation requirement will be met. 3.6 Formal Notification All dwellings in the development will also warrant formal notification to the purchasers or occupants by means of a warning clause included in the offers of purchase and sale or in the tenancy agreement. Buildings A, B, D, F, and G require the installation of a central air conditioning system, and Building C requires provisions for future air conditioning. According to the City of Ottawa ENCG, the suggested wording of warning clause for these building that requires central air conditioning system is as follows: "This dwelling unit has been supplied with a central air conditioning system which will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the City s and the Ministry of the Environment's noise criteria." 3.7 Implementation Procedures The following implementation procedures are recommended, to ensure that the required noise control measures are implemented. All relevant builder s plans for the dwelling units requiring noise control measures, should be certified by an Acoustical Consultant as being in conformance with the recommendations of the approved Noise Control Study. The acoustic certifications MMM Group Limited

16 Noise Control Study Page 12 Proposed Mixed-use Development 112 Montreal Road, City of Ottawa N01 should be based on final building siting, final grading and required noise control measures. Prior to final inspection and release for occupancy, these buildings should also be certified by the Acoustical Consultant as being in compliance with the certified builder s plans and the recommendations of the approved Noise Control Study. MMM Group Limited

17 Noise Control Study Page 13 Proposed Mixed-use Development 112 Montreal Road, City of Ottawa N01 4. CONCLUSIONS AND RECOMMENDATIONS 4.1 Conclusions The predicted unattenuated daytime road traffic sound levels within the outdoor living area of the development will not exceed the Ontario Ministry of Environment objective sound level. Therefore outdoor noise control measures will not be required for this development. Façade sound levels of dwelling units within this development will exceed the Ministry of the Environment objectives daytime and nighttime sound levels. Accordingly, all dwelling units will require implementation of indoor noise control measures. Provided that the recommended noise control measures of this Noise Study are implemented for this development, the issue of excess transportation noise from road traffic on Vanier Parkway and Montreal Road does not pose any constraint to this development proposal. 4.2 Recommendations Noise Control Measures Ventilation Requirements All dwellings units in Buildings A, B, D, F and G will require the installation of central air conditioning system. All dwelling units in Building C will require the installation of forced air heating with provisions (i.e. appropriately sized ductwork) for the installation of a future air conditioning system. However, it is understood that all dwelling units within this development will be air conditioned, which will meet noise ventilation requirement. Building Requirements Living/Dining rooms and Bedrooms in Building A on the east, north and south sides require upgraded STC 35, 32 and 31 windows, respectively. If fixed and sealed or casement windows are used, this requirement can be reduced to STC 32 on the east MMM Group Limited

18 Noise Control Study Page 14 Proposed Mixed-use Development 112 Montreal Road, City of Ottawa N01 side of Building A. Ontario Building Code (OBC) compliant windows will be sufficient for the north and south sides of Building A, if fixed and sealed or casement windows are used. Living/Dining rooms and Bedrooms in Buildings D and G on the east, north and south sides require upgraded STC 35, 31 and 31 windows, respectively. If fixed and sealed or casement windows are used, this requirement can be reduced to STC 32 on the east side of Buildings D and G. Ontario Building Code (OBC) compliant windows will be sufficient for the north and south sides of Buildings D and G, if fixed and sealed or casement windows are used. Living/Dining rooms and Bedrooms in Building F on the north and east sides require upgraded STC 35 and 32 windows, respectively. If fixed and sealed or casement windows are used, this requirement can be reduced to STC 32 on the north side of Building F. Ontario Building Code (OBC) compliant windows will be sufficient for the east sides of Building F, if fixed and sealed or casement windows are used. All directly exposed dwelling units in Buildings A, D and G fronting Vanier Parkway, and Building F fronting Montreal Road require upgraded EW1R, EW4 or EW5 specification exterior walls. All dwelling units in Building A fronting Montreal Road and Building F fronting Vanier Parkway require upgraded EW1R or better specification exterior walls. Warning Clause All dwelling units require indoor noise control measures and must have a warning clause indicating the existence of possible excess noise and the measures provided to deal with that excess, included in the offer of the purchase and sale or tenancy agreement. Section 3.6 of this report identifies the specific details Implementation Procedures All relevant builder s plans for the dwelling units requiring noise control measures should be certified by an Acoustical Consultant as being in conformance with the recommendations of the approved Noise Control Study. Prior to final inspection and release for occupancy, these dwellings should also be certified by the Acoustical Consultant as being in compliance with the certified builder s plans and the recommendations of the approved Noise Control Study. MMM Group Limited

19 Noise Control Study Page 15 Proposed Mixed-use Development 112 Montreal Road, City of Ottawa N01 Yours very truly, MMM GROUP LIMITED Bill Hoogeveen, P. Eng. Senior Project Manager & Associate Noise and Vibration Section Transportation Planning Tony Chiu, M.A. Sc, P.Eng Senior Project Engineer Noise and Vibration Section Transportation Planning Samson Wat, M. Sc, P.Eng Transportation Designer Noise and Vibration Section Transportation Planning J:\01 PROJECTS\2013 jobs\ bph (112 Montreal Road)\Report\Noise Report.doc MMM Group Limited

20 APPENDIX A Background Information and Data

21 While the use of the AADT for noise assessments is the common practice, special consideration may be given to situations where the weekend traffic or Summer Average Daily Traffic (SADT) may be more dominant. Application of Criteria Recognizing the variation of human response to transportation noise and, at the same time, the possible difficulties of implementing outdoor noise control measures in some situations, the City may allow a certain flexibility in the sound level criteria in the Outdoor Living Areas only. The application and the allowable flexibility of the criteria are described below. In case of a marginal excess over the outdoor criteria, the prospective occupants of the new land use should be notified by means of a warning clause. This clause should be included in the Agreements of Purchase and Sale, and incorporated into the relevant Development Agreements which are registered on title of the property. Row Width (m) TABLE 1.7 Traffic And Road Parameters To Be Used For Sound Level Predictions Implied Roadway Class AADT Vehicles/ Day NA 2 Freeway, Queensway, Highway 18,333 per lane Lane Urban Arterial-Divided (6 UAD) Lane Urban Arterial-Divided (4-UAD) Lane Urban Arterial-Undivided (4-UAU) Posted Speed Km/Hr Day/Night Split % Medium Trucks % Heavy Trucks % / , / , / , / Lane Major Collector (4-UMCU) 24, / Lane Rural Arterial (2-RAU) 15, / Lane Urban Arterial (2-UAU) 15, / Lane Major Collector (2-UMCU) 12, / Lane Outer Rural Arterial (near the extremities of the City) (2-RAU) 10, / Lane Urban Collector (2-UCU) 8, / The MOE Vehicle Classification definitions should be used to estimate automobiles, medium trucks and heavy trucks. 2 The number of lanes is determined by the future mature state of the roadway. City of Ottawa Environmental Noise Control Guidelines 15

22 APPENDIX B Noise Analysis

23 R1_F STAMSON 5.0 NORMAL REPORT Date: :45:48 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: R1_F.te Time Period: Day/Night 16/8 hours Description: Receptor 1 - Facade Road data, segment # 1: Montreal Rd (day/night) Car traffic volume : 24288/2112 veh/timeperiod * Medium truck volume : 1932/168 veh/timeperiod * Heavy truck volume : 1380/120 veh/timeperiod * Posted speed limit : 50 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 1: Montreal Rd (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m -> Actual Distance is 14.2m/14.2m Receiver height : / m Road data, segment # 2: Vanier EB (day/night) Car traffic volume : 20240/1760 veh/timeperiod * Medium truck volume : 1610/140 veh/timeperiod * Heavy truck volume : 1150/100 veh/timeperiod * Posted speed limit : 60 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 2: Vanier EB (day/night) Angle1 Angle2 : deg 8.00 deg Receiver source distance : / m Receiver height : / m Page 1

24 R1_F Road data, segment # 3: Vanier WB (day/night) Car traffic volume : 20240/1760 veh/timeperiod * Medium truck volume : 1610/140 veh/timeperiod * Heavy truck volume : 1150/100 veh/timeperiod * Posted speed limit : 60 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 3: Vanier WB (day/night) Angle1 Angle2 : deg 8.00 deg Receiver source distance : / m Receiver height : / m Results segment # 1: Montreal Rd (day) ROAD ( ) = dba Segment Leq : dba -> with distance adjustment = dba Results segment # 2: Vanier EB (day) ROAD ( ) = dba Segment Leq : dba Results segment # 3: Vanier WB (day) Page 2

25 R1_F ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba -> with distance adjustment = dba Results segment # 1: Montreal Rd (night) ROAD ( ) = dba Segment Leq : dba -> with distance adjustment = dba Results segment # 2: Vanier EB (night) ROAD ( ) = dba Segment Leq : dba Results segment # 3: Vanier WB (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba -> with distance adjustment = dba TOTAL Leq FROM ALL SOURCES (DAY): > with distance adjustment = dba Page 3

26 R1_F (NIGHT): > with distance adjustment = dba Page 4

27 R2_F STAMSON 5.0 NORMAL REPORT Date: :57:46 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: R2_F.te Time Period: Day/Night 16/8 hours Description: Receptor 2 - Facade Road data, segment # 1: Montreal Rd (day/night) Car traffic volume : 24288/2112 veh/timeperiod * Medium truck volume : 1932/168 veh/timeperiod * Heavy truck volume : 1380/120 veh/timeperiod * Posted speed limit : 50 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 1: Montreal Rd (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : / m Road data, segment # 2: Vanier EB (day/night) Car traffic volume : 20240/1760 veh/timeperiod * Medium truck volume : 1610/140 veh/timeperiod * Heavy truck volume : 1150/100 veh/timeperiod * Posted speed limit : 60 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 2: Vanier EB (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : / m Page 1

28 R2_F Road data, segment # 3: Vanier WB (day/night) Car traffic volume : 20240/1760 veh/timeperiod * Medium truck volume : 1610/140 veh/timeperiod * Heavy truck volume : 1150/100 veh/timeperiod * Posted speed limit : 60 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 3: Vanier WB (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : / m Results segment # 1: Montreal Rd (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Vanier EB (day) ROAD ( ) = dba Segment Leq : dba Results segment # 3: Vanier WB (day) Page 2

29 R2_F ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Montreal Rd (night) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Vanier EB (night) ROAD ( ) = dba Segment Leq : dba Results segment # 3: Vanier WB (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): Page 3

30 R2_F (NIGHT): Page 4

31 R3_F STAMSON 5.0 NORMAL REPORT Date: :48:36 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: r3_f.te Time Period: Day/Night 16/8 hours Description: Receptor 3 - Facade Road data, segment # 1: Montreal Rd (day/night) Car traffic volume : 24288/2112 veh/timeperiod * Medium truck volume : 1932/168 veh/timeperiod * Heavy truck volume : 1380/120 veh/timeperiod * Posted speed limit : 50 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 1: Montreal Rd (day/night) Angle1 Angle2 : deg 0.00 deg Receiver source distance : / m Receiver height : / m Results segment # 1: Montreal Rd (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Montreal Rd (night) ROAD ( ) = dba Page 1

32 R3_F Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): Page 2

33 R4_F STAMSON 5.0 NORMAL REPORT Date: :32:26 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: r4_f.te Time Period: Day/Night 16/8 hours Description: Receptor 4 - Facade Road data, segment # 1: Montreal Rd (day/night) Car traffic volume : 24288/2112 veh/timeperiod * Medium truck volume : 1932/168 veh/timeperiod * Heavy truck volume : 1380/120 veh/timeperiod * Posted speed limit : 50 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 1: Montreal Rd (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : / m Road data, segment # 2: Vanier EB (day/night) Car traffic volume : 20240/1760 veh/timeperiod * Medium truck volume : 1610/140 veh/timeperiod * Heavy truck volume : 1150/100 veh/timeperiod * Posted speed limit : 60 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 2: Vanier EB (day/night) Angle1 Angle2 : deg 6.00 deg Receiver source distance : / m Receiver height : / m Page 1

34 R4_F Road data, segment # 3: Vanier WB (day/night) Car traffic volume : 20240/1760 veh/timeperiod * Medium truck volume : 1610/140 veh/timeperiod * Heavy truck volume : 1150/100 veh/timeperiod * Posted speed limit : 60 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 3: Vanier WB (day/night) Angle1 Angle2 : deg 6.00 deg Receiver source distance : / m Receiver height : / m Results segment # 1: Montreal Rd (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Vanier EB (day) ROAD ( ) = dba Segment Leq : dba Results segment # 3: Vanier WB (day) Page 2

35 R4_F ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Montreal Rd (night) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Vanier EB (night) ROAD ( ) = dba Segment Leq : dba Results segment # 3: Vanier WB (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): Page 3

36 R4_F (NIGHT): Page 4

37 R5_F STAMSON 5.0 NORMAL REPORT Date: :53:45 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: r5_f.te Time Period: Day/Night 16/8 hours Description: Receptor 5 - Facade Road data, segment # 1: Montreal Rd (day/night) Car traffic volume : 24288/2112 veh/timeperiod * Medium truck volume : 1932/168 veh/timeperiod * Heavy truck volume : 1380/120 veh/timeperiod * Posted speed limit : 50 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 1: Montreal Rd (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : / m Road data, segment # 2: Vanier EB (day/night) Car traffic volume : 20240/1760 veh/timeperiod * Medium truck volume : 1610/140 veh/timeperiod * Heavy truck volume : 1150/100 veh/timeperiod * Posted speed limit : 60 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 2: Vanier EB (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : / m Page 1

38 R5_F Road data, segment # 3: Vanier WB (day/night) Car traffic volume : 20240/1760 veh/timeperiod * Medium truck volume : 1610/140 veh/timeperiod * Heavy truck volume : 1150/100 veh/timeperiod * Posted speed limit : 60 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 3: Vanier WB (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : / m Results segment # 1: Montreal Rd (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Vanier EB (day) ROAD ( ) = dba Segment Leq : dba Results segment # 3: Vanier WB (day) Page 2

39 R5_F ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Montreal Rd (night) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Vanier EB (night) ROAD ( ) = dba Segment Leq : dba Results segment # 3: Vanier WB (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): Page 3

40 R5_F (NIGHT): Page 4

41 R6_F STAMSON 5.0 NORMAL REPORT Date: :13:10 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: r6_f.te Time Period: Day/Night 16/8 hours Description: Receptor 6 - Facade Road data, segment # 1: Montreal Rd (day/night) Car traffic volume : 24288/2112 veh/timeperiod * Medium truck volume : 1932/168 veh/timeperiod * Heavy truck volume : 1380/120 veh/timeperiod * Posted speed limit : 50 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 1: Montreal Rd (day/night) Angle1 Angle2 : deg 0.00 deg Receiver source distance : / m Receiver height : / m Results segment # 1: Montreal Rd (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Montreal Rd (night) ROAD ( ) = dba Page 1

42 R6_F Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): Page 2

43 R7_F STAMSON 5.0 NORMAL REPORT Date: :21:35 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: r7_f.te Time Period: Day/Night 16/8 hours Description: Receptor 7 - Facade Road data, segment # 1: Montreal Rd (day/night) Car traffic volume : 24288/2112 veh/timeperiod * Medium truck volume : 1932/168 veh/timeperiod * Heavy truck volume : 1380/120 veh/timeperiod * Posted speed limit : 50 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 1: Montreal Rd (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : / m Road data, segment # 2: Vanier EB (day/night) Car traffic volume : 20240/1760 veh/timeperiod * Medium truck volume : 1610/140 veh/timeperiod * Heavy truck volume : 1150/100 veh/timeperiod * Posted speed limit : 60 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 2: Vanier EB (day/night) Angle1 Angle2 : deg 7.00 deg Receiver source distance : / m Receiver height : / m Page 1

44 R7_F Road data, segment # 3: Vanier WB (day/night) Car traffic volume : 20240/1760 veh/timeperiod * Medium truck volume : 1610/140 veh/timeperiod * Heavy truck volume : 1150/100 veh/timeperiod * Posted speed limit : 60 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 3: Vanier WB (day/night) Angle1 Angle2 : deg 7.00 deg Receiver source distance : / m Receiver height : / m Results segment # 1: Montreal Rd (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Vanier EB (day) ROAD ( ) = dba Segment Leq : dba Results segment # 3: Vanier WB (day) Page 2

45 R7_F ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Montreal Rd (night) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Vanier EB (night) ROAD ( ) = dba Segment Leq : dba Results segment # 3: Vanier WB (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): Page 3

46 R7_F (NIGHT): Page 4

47 R8_F STAMSON 5.0 NORMAL REPORT Date: :27:14 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: r8_f.te Time Period: Day/Night 16/8 hours Description: Receptor 8 - Facade Road data, segment # 1: Montreal Rd (day/night) Car traffic volume : 24288/2112 veh/timeperiod * Medium truck volume : 1932/168 veh/timeperiod * Heavy truck volume : 1380/120 veh/timeperiod * Posted speed limit : 50 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 1: Montreal Rd (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : / m Road data, segment # 2: Vanier EB (day/night) Car traffic volume : 20240/1760 veh/timeperiod * Medium truck volume : 1610/140 veh/timeperiod * Heavy truck volume : 1150/100 veh/timeperiod * Posted speed limit : 60 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 2: Vanier EB (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : / m Page 1

48 R8_F Road data, segment # 3: Vanier WB (day/night) Car traffic volume : 20240/1760 veh/timeperiod * Medium truck volume : 1610/140 veh/timeperiod * Heavy truck volume : 1150/100 veh/timeperiod * Posted speed limit : 60 km/h 24 hr Traffic Volume (AADT or SADT): Data for Segment # 3: Vanier WB (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : / m Results segment # 1: Montreal Rd (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Vanier EB (day) ROAD ( ) = dba Segment Leq : dba Results segment # 3: Vanier WB (day) Page 2

49 R8_F ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Montreal Rd (night) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Vanier EB (night) ROAD ( ) = dba Segment Leq : dba Results segment # 3: Vanier WB (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): Page 3

Fayez & Patrizia Ghadban

Fayez & Patrizia Ghadban Noise Impact Assessment Study 826 Pinecrest Road Type of Document Site Plan Submission Project Name 826 Pinecrest Road, Ottawa Project Number Prepared By: 100-2650 Queensview Drive Ottawa, ON K2B 8H6 Canada

More information

Noise Assessment Report

Noise Assessment Report Noise Assessment Report 176 Greenfield Avenue Prepared for: TC United Group Prepared by: Stantec Consulting Ltd. February 8, 2016 NOISE ASSESSMENT REPORT Introduction February 8, 2016 Table of Contents

More information

Mann Avenue Development 87 Mann Avenue Noise Control Study

Mann Avenue Development 87 Mann Avenue Noise Control Study Mann Avenue Development 87 Mann Avenue Noise Control Study Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 August 13, 2013 Novatech File:

More information

Avalon Encore Stage Tenth Line Road Infusion Terrace, Block 233 City of Ottawa Environmental Noise Impact Assessment

Avalon Encore Stage Tenth Line Road Infusion Terrace, Block 233 City of Ottawa Environmental Noise Impact Assessment Avalon Encore Stage 6 2336 Tenth Line Road Infusion Terrace, Block 233 City of Ottawa Environmental Noise Impact Assessment Prepared For: Minto Communities Inc. Prepared By: Robinson Land Development Our

More information

Roadway Traffic Noise Assessment Montreal Road. Ottawa, Ontario

Roadway Traffic Noise Assessment Montreal Road. Ottawa, Ontario Roadway Traffic Noise Assessment 807-825 Montreal Road Ottawa, Ontario REPORT: GWE15-086-TRAFFIC NOISE Prepared For: Anthony Nicolini 183 Michael Cowpland Drive Ottawa, Ontario K2M 0M3 Prepared By: Michael

More information

Table of Contents... ii 1. Introduction... 1

Table of Contents... ii 1. Introduction... 1 316 Somerset Street East SACL Project #SW18098 April 05, 2018 Page ii Table of Contents Table of Contents... ii 1. Introduction... 1 2. Noise Sources... 1 3. Noise Assessment Criteria... 1 3.1 Surface

More information

DCR Phoenix. Type of Document 1st Submission. Project Name 256 Rideau Street Ottawa, Ontario. Project Number OTT A0. Prepared By: Nicole Ruyf

DCR Phoenix. Type of Document 1st Submission. Project Name 256 Rideau Street Ottawa, Ontario. Project Number OTT A0. Prepared By: Nicole Ruyf DCR Phoenix Noise Impact Assessment Study Type of Document 1st Submission Project Name 256 Rideau Street Ottawa, Ontario Project Number OTT-00206641-A0 Prepared By: Nicole Ruyf Reviewed By: Alam Ansari,

More information

Noise Assessment Report

Noise Assessment Report Noise Assessment Report 19 & 23 Bachman Terrace Prepared for: Tega Homes Prepared by: Stantec Consulting Ltd. June 5, 2015 NOISE ASSESSMENT REPORT Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE OF

More information

Noise Control Feasibility Study 173 / 175 / 177 Preston Street Ottawa, Ontario

Noise Control Feasibility Study 173 / 175 / 177 Preston Street Ottawa, Ontario Noise Control Feasibility Study 173 / 175 / 177 Preston Street Ottawa, Ontario Type of Document Site Plan Application Client 1536 Prince of Wales Drive, Ottawa, Ontario K2C 1P1 Project Number Prepared

More information

Roadway Traffic Noise Assessment Chapel Street. Ottawa, Ontario

Roadway Traffic Noise Assessment Chapel Street. Ottawa, Ontario Roadway Traffic Noise Assessment 151-153 Chapel Street Ottawa, Ontario REPORT: GWE14-064 Noise Prepared For: Brad Caco Sun Life Financial Center, East Tower 3250 Bloor Street West, Suite 1000 Toronto,

More information

Prepared for: Gapatas Inc Sherwoodtowne Boulevard, Unit 106 Mississauga, ON L4Z 1Y5. Our File No:

Prepared for: Gapatas Inc Sherwoodtowne Boulevard, Unit 106 Mississauga, ON L4Z 1Y5. Our File No: YARMOUTH HEIGHTS ESTATES PHASE IV PARTS 1,2,4,5 & 6 Plan 11R Being Part of Lot 9 Concession 8 Geographical Township of Yarmouth City of St. Thomas Prepared for: Gapatas Inc. 4255 Sherwoodtowne Boulevard,

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT PROPOSED TOWNHOUSE BLOCKS 273 LIBERTY STREET BLOCKS 197 to 199, INCLUDSIVE REGISTERED PLAN 40M-2332 AND PART OF LOT 10, CONCESSION 2 MUNICIPALITY OF CLARINGTON (BOWMANVILLE)

More information

Noise Assessment Report Riverside Drive Phase I

Noise Assessment Report Riverside Drive Phase I Noise Assessment Report - 2887 Riverside Drive Phase I Project # 160401333 Prepared for: Youth Services Bureau Prepared by: Stantec Consulting Ltd. Introduction Table of Contents 1.0 INTRODUCTION... 1

More information

Traffic Noise Assessment. 333 Montreal Road. Ottawa, Ontario

Traffic Noise Assessment. 333 Montreal Road. Ottawa, Ontario Traffic Noise Assessment 333 Montreal Road Ottawa, Ontario REPORT: GWE17-045 - Traffic Noise Prepared For: Michaela Jones The Salvation Army 2 Overlea Blvd Toronto, ON M4H 1P4 Prepared By: Joshua Foster,

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT 2055 BROCK ROAD PROPOSED TOWNHOUSE DEVELOPMENT PART OF LOT 18, CONCESSION 2 CITY OF PICKERING PREPARED FOR: BROCK ROAD DUFFINS FOREST INC. Revised October 2017 December 2014

More information

Noise Feasibility Study Proposed Residential Building 103 Dundas Street West Oakville, Ontario

Noise Feasibility Study Proposed Residential Building 103 Dundas Street West Oakville, Ontario Noise Feasibility Study Proposed Residential Building 103 Dundas Street West Oakville, Ontario Prepared for: 103 Dundas Corporation Attn: Zaki Wahbeh 2184 Providence Road Oakville, ON L6H 6Z2 Prepared

More information

TRAFFIC NOISE IMPACT ASSESSMENT FOR THE PROPOSED MULTI-UNIT RESIDENTIAL DEVELOPMENT AT 20 MARK AVENUE

TRAFFIC NOISE IMPACT ASSESSMENT FOR THE PROPOSED MULTI-UNIT RESIDENTIAL DEVELOPMENT AT 20 MARK AVENUE Ottawa, Ontario, Canada TRAFFIC NOISE IMPACT ASSESSMENT FOR THE PROPOSED MULTI-UNIT RESIDENTIAL DEVELOPMENT AT 20 MARK AVENUE CITY OF OTTAWA Prepared for Prepared by Freefield Ltd. Issued: Postal Address:

More information

Noise Assessment Report

Noise Assessment Report Noise Assessment Report 19 & 23 Bachman Terrace Prepared for: Tega Homes Prepared by: Stantec Consulting Ltd. March 24, 2014 Draft Mar 7 2014 Final Mar 24, 2014 NOISE ASSESSMENT REPORT Table of Contents

More information

Noise Feasibility Study EMGO (North Oakville I) Ltd., Town of Oakville, Ontario

Noise Feasibility Study EMGO (North Oakville I) Ltd., Town of Oakville, Ontario Noise Feasibility Study EMGO (North Oakville I) Ltd., Town of Oakville, Ontario For Emgo (North Oakville I) Ltd. 2173 Turnberry Road Burlington, ON L7M 4P8 Prepared by Victor Garcia, BASc Reviewed by Sheeba

More information

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON.

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON. NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON. REPORT PREPARED FOR SURFACE DEVELOPMENTS 61 FOREST HILL AVE. OTTAWA, ON, K2C 1P7 March 25, 2015 15078 1 NOISE IMPACT ASSESSMENT

More information

ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED RESIDENTIAL DEVELOPMENT 364 ST. PATRICK STREET

ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED RESIDENTIAL DEVELOPMENT 364 ST. PATRICK STREET Ottawa, Ontario ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED RESIDENTIAL DEVELOPMENT 364 ST. PATRICK STREET CITY OF OTTAWA Prepared for Prepared by Hugh Williamson Associates Inc. 7 th May 2013

More information

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON. REVISED with ADDENDUM for ROOFTOP OUTDOOR LIVING AREA

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON. REVISED with ADDENDUM for ROOFTOP OUTDOOR LIVING AREA NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON. REVISED with ADDENDUM for ROOFTOP OUTDOOR LIVING AREA REPORT PREPARED FOR SURFACE DEVELOPMENTS 61 FOREST HILL AVE. OTTAWA,

More information

Noise Control Study. for. Avalon Public School Portobello Boulevard at Stormwind Avenue in Ottawa, Ontario. Revision 1

Noise Control Study. for. Avalon Public School Portobello Boulevard at Stormwind Avenue in Ottawa, Ontario. Revision 1 REP N45 Avalon School Traffic Noise Study - R1 Noise Control Study for Avalon Public School Portobello Boulevard at Stormwind Avenue in Ottawa, Ontario. Revision 1 Prepared for: N45 Architecture Inc. Prepared

More information

Guelph Curling Club Development Traffic Noise Impact Study

Guelph Curling Club Development Traffic Noise Impact Study Guelph Curling Club Development Traffic Noise Impact Study Development Location Prepared For: Guelph Curling Club Paradigm Transportation Solutions Ltd. 43 Forest Road Cambridge ON N1S 3B4 pgrubb@ptsl.com

More information

Traffic Noise Assessment. 5 Orchard Drive. Stittsville, Ontario

Traffic Noise Assessment. 5 Orchard Drive. Stittsville, Ontario Traffic Noise Assessment 5 Orchard Drive Stittsville, Ontario REPORT: GWE18-014 - Traffic Noise Prepared For: Cody Campanale 1187 Bank Street, Suite 200 Ottawa, Ontario K1S 3X7 Prepared By: Joshua Foster,

More information

671 Victoria Road North City of Guelph Traffic Noise Study. Paradigm Transportation Solutions Limited

671 Victoria Road North City of Guelph Traffic Noise Study. Paradigm Transportation Solutions Limited 671 Victoria Road North City of Guelph Traffic Noise Study Paradigm Transportation Solutions Limited February 2016 Project Summary Project Number 152315 February 2016 Client 1830334 Ontario Limited Client

More information

3.5.1 Outdoor Living Areas (OLAs) Indoor Sound Levels... 8

3.5.1 Outdoor Living Areas (OLAs) Indoor Sound Levels... 8 RWDI was retained by Manor Park Management to conduct a traffic noise feasibility study as part of the Site Plan Approval (SPA) for the proposed development, to be located at the northwest corner of Vanier

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT 3171 LAKESHORE ROAD WEST PROPOSED RESIDENTIAL DEVELOPMENT PART OF LOT 32, CONCESSION 4 SOUTH OF DUNDAS STREET AND BLOCK 79 REGISTERED PLAN M-257 TOWN OF OAKVILLE PREPARED

More information

Merivale Road Residential Development 1683 Merivale Road Noise Control Study

Merivale Road Residential Development 1683 Merivale Road Noise Control Study Merivale Road Residential Development 1683 Merivale Road Noise Control Study Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Submitted:

More information

MINTO COMMUNITIES INC GREENBANK ROAD NOISE CONTROL FEASIBILITY STUDY

MINTO COMMUNITIES INC GREENBANK ROAD NOISE CONTROL FEASIBILITY STUDY MINTO COMMUNITIES INC. 3311 GREENBANK ROAD NOISE CONTROL FEASIBILITY STUDY June 2017 Prepared for: MINTO COMMUNITIES INC. 180 Kent Street, Suite 200 Ottawa, Ontario K1P 0B6 Prepared by: J.L. RICHARDS &

More information

Noise Feasibility Study Proposed Residential Development, 361 Tanbark Road Niagara-on-the-Lake, Ontario

Noise Feasibility Study Proposed Residential Development, 361 Tanbark Road Niagara-on-the-Lake, Ontario Noise Feasibility Study Proposed Residential Development, 361 Tanbark Road Niagara-on-the-Lake, Ontario Prepared for: Blythwood Homes Inc. 7058 Ridgewood Crescent Niagara Falls, Ontario L2J 3H1 Prepared

More information

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 12 HAMILTON AVENUE NORTH OTTAWA, ON.

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 12 HAMILTON AVENUE NORTH OTTAWA, ON. NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 12 HAMILTON AVENUE NORTH OTTAWA, ON. REPORT PREPARED FOR SURFACE DEVELOPMENTS 61 FOREST HILL AVE. OTTAWA, ON, K2C 1P7 September 15, 2016 16419 1 NOISE IMPACT

More information

NOISE CONTROL STUDY FOR PHOENIX HOMES 3654 & 3658 JOCKVALE ROAD APRIL 28, 2011 REV 1 TABLE OF CONTENTS 1.0 INTRODUCTION BACKGROUND...

NOISE CONTROL STUDY FOR PHOENIX HOMES 3654 & 3658 JOCKVALE ROAD APRIL 28, 2011 REV 1 TABLE OF CONTENTS 1.0 INTRODUCTION BACKGROUND... NOISE CONTROL STUDY PHOENIX HOMES 3654 & 3658 JOCKVALE ROAD APRIL 28, 2011 REV 1 NOISE CONTROL STUDY FOR PHOENIX HOMES 3654 & 3658 JOCKVALE ROAD APRIL 28, 2011 REV 1 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

UAL URBAN AERODYNAMICS LTD

UAL URBAN AERODYNAMICS LTD UAL URBAN AERODYNAMICS LTD 23 Waterford Drive Telephone (613) 225-6362 Ottawa, Ontario, Canada Facsimile (613) 225-3022 K2E 7V4 e-mail standen.ual@sympatico.ca website: http://www.urban-noise.ca 1.0 Background

More information

Noise Feasibility Study Stacked Townhouse Development Glenashton Drive (Block 55) Oakville, Ontario

Noise Feasibility Study Stacked Townhouse Development Glenashton Drive (Block 55) Oakville, Ontario Noise Feasibility Study Stacked Townhouse Development Glenashton Drive (Block 55) Oakville, Ontario Prepared for: Nathan Jamieson, P.Eng Senior Principal, Community Development Stantec Consulting Ltd 300W

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT STONEPAY - PICKERING WEST OF BROCK ROAD AND SOUTH OF DERSAN STREET PART OF LOTS 19 AND 20, CONCESSION 3 PLAN 40R-28764 CITY OF PICKERING PREPARED FOR: STONEPAY 7603860 CANADA

More information

ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED HOLIDAY INN DEVELOPMENT LOCATED AT 235 KING EDWARD AVENUE

ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED HOLIDAY INN DEVELOPMENT LOCATED AT 235 KING EDWARD AVENUE Ottawa, Ontario ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED HOLIDAY INN DEVELOPMENT LOCATED AT 235 KING EDWARD AVENUE CITY OF OTTAWA Prepared for Prepared by Hugh Williamson Associates Inc.

More information

Brigil Homes. Noise Impact Assessment. Type of Document Site Plan Submission. Project Name Petrie s Landing, Phase 2. Project Number OTT A0

Brigil Homes. Noise Impact Assessment. Type of Document Site Plan Submission. Project Name Petrie s Landing, Phase 2. Project Number OTT A0 Brigil Homes Noise Impact Assessment Type of Document Site Plan Submission Project Name Petrie s Landing, Phase 2 Project Number Prepared By: exp Services Inc. 100-2650 Queensview Drive Ottawa, ON K2B

More information

Traffic Noise Assessment Baseline Road Ottawa, Ontario

Traffic Noise Assessment Baseline Road Ottawa, Ontario Traffic Noise Assessment 2140 Baseline Road Ottawa, Ontario REPORT: GWE18-047 Traffic Noise Prepared For: Joey Theberge 905 Lady Ellen Place Ottawa, Ontario K1Z 5L5 Canada Prepared By: Omar Daher, B.Eng.,

More information

Place Vanier Édifice AEFO

Place Vanier Édifice AEFO Place Vanier Édifice AEFO Martineau Architecture Inc. + Smith Carter Architects & Engineers Inc. TRAFFIC NOISE ASSESSMENT 250 Montreal Road Gradient Microclimate Engineering Inc. Prepared by Thomas Couper,

More information

REP Fotenn Bank Phase 1 Feasibility Noise Study with Building Component AmendmentPage 1 of 21

REP Fotenn Bank Phase 1 Feasibility Noise Study with Building Component AmendmentPage 1 of 21 REP Fotenn 890-900 Bank Phase 1 Feasibility Noise Study with Building Component AmendmentPage 1 of 21 2018-02-28 Emilie Coyle, M.Pl Planner Fotenn Planning + Design 223 McLeod St, Ottawa, ON K2P 0Z8 Office:

More information

Noise Feasibility Study Proposed Residential Development Old Barber House 5155 Mississauga Road City of Mississauga, Ontario

Noise Feasibility Study Proposed Residential Development Old Barber House 5155 Mississauga Road City of Mississauga, Ontario Noise Feasibility Study Proposed Residential Development Old Barber ouse 5155 Mississauga Road City of Mississauga, Ontario Prepared for: City Park (Old Barber) omes Inc. 950 Nashville Road Kleinburg,

More information

NOISE CONTROL FEASIBILITY STUDY. MINTO COMMUNITIES INC. Clarke Lands CITY OF OTTAWA

NOISE CONTROL FEASIBILITY STUDY. MINTO COMMUNITIES INC. Clarke Lands CITY OF OTTAWA NOISE CONTROL FEASIBILITY STUDY MINTO COMMUNITIES INC. Clarke Lands CITY OF OTTAWA March 2016 Prepared for: Minto Communities Inc. 200-180 Kent Street Ottawa, Ontario K1P 0B6 Prepared by: J.L. RICHARDS

More information

ENVIRONMENTAL NOISE IMPACT ASSESSMENT 1208 OLD MONTREAL ROAD

ENVIRONMENTAL NOISE IMPACT ASSESSMENT 1208 OLD MONTREAL ROAD REPORT 109575-5.2.2.1 ENVIRONMENTAL NOISE IMPACT ASSESSMENT 1208 OLD MONTREAL ROAD CITY OF OTTAWA Prepared for DCR/PHOENIX HOMES by IBI Group February 9, 2018 IBI GROUP REPORT ENVIRONMENTAL NOISE IMPACT

More information

Noise Assessment & Control Transportation Noise Assessment 303 Lebreton Street South, 460 St. Laurent Boulevard Ottawa, Ontario Ottawa, Ontario

Noise Assessment & Control Transportation Noise Assessment 303 Lebreton Street South, 460 St. Laurent Boulevard Ottawa, Ontario Ottawa, Ontario Noise Assessment & Control Transportation Noise Assessment 303 Lebreton Street South, 460 St. Laurent Boulevard Ottawa, Ontario Ottawa, Ontario REPORT: GmE 13-051 - Traffic Noise - Final Prepared For:

More information

Table of Contents. 174 Forward Avenue SACL Project #B7-170 Feb 22, Page ii

Table of Contents. 174 Forward Avenue SACL Project #B7-170 Feb 22, Page ii Page ii Table of Contents 1. Introduction... 1 2. Noise Assessment Criteria... 1 2.1. Surface Transportation Noise Assessment Criteria... 1 2.2. Neighbouring Stationary Source Noise Assessment Criteria...

More information

TABLE OF CONTENTS LIST OF TABLES

TABLE OF CONTENTS LIST OF TABLES TABLE OF CONTENTS INTRODUCTION... NOISE CRITERIA... Transportation Noise Sources... NOISE SOURCES... Transportation Sources... Stationary Noise Sources... PROJECTED SOUND LEVELS... VENTILATION AND WARNING

More information

Roadway Traffic Noise Feasibility Assessment. Ironwood Subdivision. Ottawa, Ontario

Roadway Traffic Noise Feasibility Assessment. Ironwood Subdivision. Ottawa, Ontario Ironwood Subdivision Ottawa, Ontario REPORT: GWE16-085 - Traffic Noise Prepared For: 2356349 Ontario Inc. 301 Moodie Drive, Suite 100 Ottawa, Ontario K2H 9C4 Prepared By: Joshua Foster, P.Eng., Partner

More information

NOISE IMPACT ASSESSMENT STUDY

NOISE IMPACT ASSESSMENT STUDY NOISE IMPACT ASSESSMENT STUDY Development Address: 765 Montreal Road Ottawa, Ontario City of Ottawa File Number: D07-12-18-0059 Client: Shepherds of Good Hope c/o: CSV Architects 402-1066 Somerset Street

More information

Noise Feasibility Study Proposed Hospice 2050 University Avenue East, Waterloo, Ontario

Noise Feasibility Study Proposed Hospice 2050 University Avenue East, Waterloo, Ontario Noise Feasibility Study Proposed Hospice 2050 University Avenue East, Waterloo, Ontario Prepared for: Hospice of Waterloo Region 298 Lawrence Avenue Kitchener, ON N2M 1Y4 Prepared by Sheeba Paul, MEng,

More information

Noise Assessment Report Main Street, Residential Site Cambridge, ON

Noise Assessment Report Main Street, Residential Site Cambridge, ON Noise Assessment Report 825-875 Main Street, Residential Site Cambridge, ON Prepared for: 2536546 Ontario Inc. Prepared by: Stantec Consulting Ltd. 100-300 Hagey Boulevard Waterloo, ON N2L 0A4 Project:

More information

Environmental Noise Assessment 1020, 1024, 1028, 1032 & 1042 Sixth Line Oakville, ON

Environmental Noise Assessment 1020, 1024, 1028, 1032 & 1042 Sixth Line Oakville, ON Environmental Noise Assessment 1020, 1024, 1028, 1032 & 1042 Sixth Line Oakville, ON Novus Reference No. 16-0173 Version No. 1.0 (Final) September 30, 2016 NOVUS PROJECT TEAM: Specialist: Marcus Li, P.Eng.

More information

NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6

NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 RESIDENTIAL / HOTEL DEVELOPMENT 141 GEORGE STREET / 325 DALHOUSIE STREET OTTAWA, ONTARIO Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6

More information

Noise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario

Noise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario Noise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario Prepared for: Madison Brock Limited 369 Rimrock Road Toronto, Ontario M3J 3G2 Prepared by: Jingyi Guo Reviewed by:

More information

REP Atelier 292 OCH Phase 2 Noise Study Page 1 of 26

REP Atelier 292 OCH Phase 2 Noise Study Page 1 of 26 REP Atelier 292 OCH Phase 2 Noise Study Page 1 of 26 2016-10-13 Robert Matta Project Manager Atelier 292 Architect Inc. 292 Main Street, Ottawa, Ontario K1S 1E1 Tel: +1 (613) 231-2245 x154 Fax: +1 (613)

More information

ENVIRONMENTAL NOISE IMPACT ASSESSMENT MCGANN 9a LANDS BANK STREET LEITRIM DEVELOPMENT AREA

ENVIRONMENTAL NOISE IMPACT ASSESSMENT MCGANN 9a LANDS BANK STREET LEITRIM DEVELOPMENT AREA REPORT Project: 105202-5.2.2 ENVIRONMENTAL NOISE IMPACT ASSESSMENT MCGANN 9a LANDS - 4747 BANK STREET LEITRIM DEVELOPMENT AREA Prepared for Claridge Homes by IBI GROUP NOVEMBER 2017 IBI GROUP REPORT ENVIRONMENTAL

More information

Roadway Traffic Noise and Vibration Assessment. The Bridge Wesleyan Church Addition. Ottawa, Ontario

Roadway Traffic Noise and Vibration Assessment. The Bridge Wesleyan Church Addition. Ottawa, Ontario Roadway Traffic Noise and Vibration Assessment The Bridge Wesleyan Church Addition Ottawa, Ontario REPORT: GWE14-103 Traffic Noise and Vibration Prepared For: Alan McCafferty The Bridge Kanata Wesleyan

More information

NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 13 CITY OF OTTAWA

NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 13 CITY OF OTTAWA NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 13 CITY OF OTTAWA February 2014 (Revised October 2014) (Revised December 2015) Prepared for: RIVERSIDE SOUTH DEVELOPMENT CORPORATION 2193 Arch Street Ottawa,

More information

ENVIRONMENTAL NOISE IMPACT ASSESSMENT THE MEADOWS IN HALF MOON BAY PHASE 5

ENVIRONMENTAL NOISE IMPACT ASSESSMENT THE MEADOWS IN HALF MOON BAY PHASE 5 REPORT PROJECT: 115496-5.2.2 ENVIRONMENTAL NOISE IMPACT ASSESSMENT THE MEADOWS IN HALF MOON BAY PHASE 5 Prepared for TAMARACK HOMES by IBI GROUP APRIL 2018 IBI GROUP ENVIRONMENTAL NOISE IMPACT ASSESSMENT

More information

DETAILED NOISE CONTROL STUDY OF PROPOSED PHASE 2 CONDOMINIUMS AT 655 & 755 ANAND PRIVATE OTTAWA Ontario Inc.

DETAILED NOISE CONTROL STUDY OF PROPOSED PHASE 2 CONDOMINIUMS AT 655 & 755 ANAND PRIVATE OTTAWA Ontario Inc. Ottawa, Ontario, Canada DETAILED NOISE CONTROL STUDY OF PROPOSED PHASE 2 CONDOMINIUMS AT 655 & 755 ANAND PRIVATE OTTAWA Prepared for Prepared by Hugh Williamson Associates Inc. 13 August 2015 Postal Address:

More information

ACOUSTIC ASSESSMENT OF TRAFFIC NOISE IMPACTS ON THE PROPOSED AVALON CATHOLIC ELEMENTARY SCHOOL

ACOUSTIC ASSESSMENT OF TRAFFIC NOISE IMPACTS ON THE PROPOSED AVALON CATHOLIC ELEMENTARY SCHOOL Ottawa Ontario Canada ACOUSTIC ASSESSMENT OF TRAFFIC NOISE IMPACTS ON THE PROPOSED AVALON CATHOLIC ELEMENTARY SCHOOL CITY OF OTTAWA Prepared for Bryden Martel Architects Inc. Prepared by Hugh Williamson

More information

Noise Feasibility Study, McGibbon Condominium 71 Main Street South Georgetown, Ontario

Noise Feasibility Study, McGibbon Condominium 71 Main Street South Georgetown, Ontario Noise Feasibility Study, McGibbon Condominium 71 Main Street South Georgetown, Ontario Prepared for: Attn: Don Jackson Silvercreek Commercial Builders Inc. 66 Mill Street Georgetown, Ontario L5C 1V8 Prepared

More information

Transportation Noise & Vibration Assessment Scott Street. Ottawa, Ontario

Transportation Noise & Vibration Assessment Scott Street. Ottawa, Ontario Transportation Noise & Vibration Assessment 1946 Scott Street Ottawa, Ontario REPORT: GWE17 136 Noise & Vibration Prepared For: Michael Martin Construction Manager 88 Spadina Avenue Ottawa, ON K1Y 2C1

More information

SS WILSON ASSOCIATES Consulting Engineers

SS WILSON ASSOCIATES Consulting Engineers SS WILSON ASSOCIATES Consulting Engineers REPORT NO. WA10-089 DETAILED NOISE CONTROL STUDY PROPOSED 6-STOREY APARTMENT BUILDING 17, 19 & 23 ROBINSON AVENUE OTTAWA, ONTARIO SUBMITTED TO: ROBINSON PARK DEVELOPMENT

More information

NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 9-4 CITY OF OTTAWA

NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 9-4 CITY OF OTTAWA NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 9-4 CITY OF OTTAWA November 2013 Prepared for: RIVERSIDE SOUTH DEVELOPMENT CORPORATION 2193 Arch Street Ottawa, Ontario K1G 2H5 Prepared by: J.L. RICHARDS

More information

ENVIRONMENTAL NOISE IMPACT ASSESSMENT CLARIDGE HOMES MAPLE GROVE LANDS 1981 MAPLE GROVE ROAD KANATA WEST

ENVIRONMENTAL NOISE IMPACT ASSESSMENT CLARIDGE HOMES MAPLE GROVE LANDS 1981 MAPLE GROVE ROAD KANATA WEST CLIENT LOGO REPORT PROJECT: 105205-5.2.2 ENVIRONMENTAL NOISE IMPACT ASSESSMENT CLARIDGE HOMES MAPLE GROVE LANDS 1981 MAPLE GROVE ROAD KANATA WEST Prepared for CLARIDGE HOMES by IBI GROUP FEBRUARY 2018

More information

Noise Feasibility Study Proposed 4 Storey Apartment Building 226 Woolwich Street South Breslau, Regional Municipality of Waterloo

Noise Feasibility Study Proposed 4 Storey Apartment Building 226 Woolwich Street South Breslau, Regional Municipality of Waterloo Noise Feasibility Study Proposed 4 Storey Apartment Building 226 Woolwich Street South Breslau, Regional Municipality of Waterloo Prepared for: RHH Rental Properties Inc. 6783 Wellington Road 34, RR22

More information

Noise Feasibility Study 2120 Hurontario Street and Grange Drive City of Mississauga, Ontario

Noise Feasibility Study 2120 Hurontario Street and Grange Drive City of Mississauga, Ontario Noise Feasibility Study 2120 Hurontario Street and Grange Drive City of Mississauga, Ontario For Gordon Woods Developments Limited c/o Edenshaw development Limited 260 Brunel Road Mississuaga, Ontairo

More information

Noise Feasibility Study Proposed Stacked Townhouse Development, 3060 and 3072 Sixth Line, Town of Oakville, Ontario

Noise Feasibility Study Proposed Stacked Townhouse Development, 3060 and 3072 Sixth Line, Town of Oakville, Ontario Noise Feasibility Study Proposed Stacked Townhouse Development, 3060 and 3072 Sixth Line, Town of Oakville, Ontario Prepared for: 2457667 Ontario Inc. 3219 Yonge Street, Suite 365 Toronto, Ontario M4N

More information

Environmental Noise Assessment Montreal Road. Ottawa, Ontario

Environmental Noise Assessment Montreal Road. Ottawa, Ontario Environmental Noise Assessment 1795 Montreal Road Ottawa, Ontario REPORT: GWE18-037 Environmental Noise Prepared For: Samantha Schneider Christopher Simmonds Architect Inc. 45 Eccles Street, The Annex

More information

Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario

Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario Prepared for: Mattamy Homes Ltd. 433 Steeles Avenue East, Suite 110 Milton,

More information

Environmental Noise Assessment Feasibility Assessment 92 Plains Road East

Environmental Noise Assessment Feasibility Assessment 92 Plains Road East Environmental Noise Assessment Feasibility Assessment 92 Plains Road East Novus Reference No. 16-0006 Version No. 1.1 (Final) February 26, 2016 NOVUS PROJECT TEAM: Specialist: Marcus Li, P.Eng. 16/02/26

More information

Transportation Noise & Vibration Assessment. Medical Council of Canada. Ottawa, Ontario

Transportation Noise & Vibration Assessment. Medical Council of Canada. Ottawa, Ontario Transportation Noise & Vibration Assessment Medical Council of Canada Ottawa, Ontario REPORT: GWE13-115 - Traffic Noise & Vibrations Prepared For: Derek Hardy 47 Clarence Street Ottawa, Ontario K1N 9K1

More information

Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario

Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario Prepared for: New Horizon Development Group (Bronte) Inc. 69 John Street South, Suite 400 Hamilton, Ontario L8N 2B9 Prepared by Sheeba Paul,

More information

Noise Feasibility Study Proposed Residential Development Kemsley Farm St. Thomas, Ontario

Noise Feasibility Study Proposed Residential Development Kemsley Farm St. Thomas, Ontario Noise Feasibility Study Proposed Residential Development Kemsley Farm St. Thomas, Ontario Prepared for: Doug Tarry Limited 358 Elm Street St. Thomas, Ontario, N5R 1K1 Prepared by Victor Garcia, PEng Reviewed

More information

Proposed Residential/Institutional Development Independent and Assisted Care Senior s Residence 190 Richmond Road Ottawa, ON K1Z 6W6

Proposed Residential/Institutional Development Independent and Assisted Care Senior s Residence 190 Richmond Road Ottawa, ON K1Z 6W6 PRELIMINARY ENVIRONMENTAL NOISE REPORT Project:. Proposed Residential/Institutional Development Independent and Assisted Care Senior s Residence Richmond Road Ottawa, ON KZ W Prepared for: Choice Properties

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT LAKEVIEW BOULEVARD ENVIRONMENTAL ASSESSMENT LAKEVIEW BOULEVARD BETWEEN POPLAR AVENUE AND MAPLE AVENUE TOWN OF AJAX PREPARED FOR: TMIG February 2017 Y1610 TABLE OF CONTENTS

More information

Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON

Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON Novus Reference No. 12-0292C DRAFT (v2.2) February 7, 2014 NOVUS PROJECT TEAM: Specialist: Marcus Li, B.Sc., B.Eng.Sc.

More information

DRAFT REPORT. Boyne East Catholic Secondary School #3CSS. Noise Impact Study. Louis St. Laurent Avenue, Milton. SACL #SW18060A0 December 11, 2018

DRAFT REPORT. Boyne East Catholic Secondary School #3CSS. Noise Impact Study. Louis St. Laurent Avenue, Milton. SACL #SW18060A0 December 11, 2018 DRAFT REPORT Boyne East Catholic Secondary School #3CSS Louis St. Laurent Avenue, Milton Noise Impact Study SACL #SW18060A0 Submitted to: Jeff Kenny Partner Strategy 4 Inc. 2620 Bristol Circle, Unit 100

More information

Appendix K. Environmental Noise Assessment

Appendix K. Environmental Noise Assessment Appendix K Environmental Noise Assessment ENVIRONMENTAL NOISE ASSESSMENT THORNTON ROAD NORTH TAUNTON ROAD WEST TO WINCHESTER ROAD WEST SCEDULE 'C' MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT CITY OF OSHAWA

More information

TABLE OF CONTENTS 1.0 INTRODUCTION SITE AND AREA DESCRIPTION...1

TABLE OF CONTENTS 1.0 INTRODUCTION SITE AND AREA DESCRIPTION...1 VALCOUSTICS CANADA LTD. File: 12-286-211 Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 SITE AND AREA DESCRIPTION....1 2. ENVIRONMENTAL

More information

18 McArthur Avenue, Ottawa, Ontario Proposed Development Noise Study Report. Prepared for: Takyan Consulting By: ARCH-Nova Design Inc.

18 McArthur Avenue, Ottawa, Ontario Proposed Development Noise Study Report. Prepared for: Takyan Consulting By: ARCH-Nova Design Inc. 18 McArthur Avenue, Ottawa, Ontario Proposed Development Noise Study Report Prepared for: Takyan Consulting By: ARCH-Nova Design Inc. Project # N-01-16 May 2016 18 McArthur Avenue - 1 - N-01-16 TABLE OF

More information

Draft Noise Abatement Guidelines

Draft Noise Abatement Guidelines Document under Separate Cover refer to IMLC01-13 Draft Noise Abatement Guidelines April 2013 Legislative & Planning Services Table of Contents 1.0 Introduction...1 1.1 Key Definitions...1 2.0 Existing

More information

Traffic and Stationary Noise Feasibility Study Proposed Lakeside Village Plaza 5353 Lakeshore Road Burlington, Ontario

Traffic and Stationary Noise Feasibility Study Proposed Lakeside Village Plaza 5353 Lakeshore Road Burlington, Ontario Traffic and Stationary Noise Feasibility Study Proposed Lakeside Village Plaza 5353 Lakeshore Road Burlington, Ontario Prepared for: United Burlington Retail Portfolio Inc. 986 St. Clair Ave. W. Toronto,

More information

Noise Abatement Guidelines. Regional Official Plan Guidelines

Noise Abatement Guidelines. Regional Official Plan Guidelines Noise Abatement Guidelines Regional Official Plan Guidelines Halton Region Official Plan Guidelines The Regional Official Plan (ROP) is Halton s guiding document for land use planning. It contains policies

More information

Burnett Lands Greenbank Road. Noise Impact Feasibility Report

Burnett Lands Greenbank Road. Noise Impact Feasibility Report Burnett Lands - 3370 Greenbank Road Noise Impact Feasibility Report BURNETT LANDS 3370 GREENBANK ROAD NOISE IMPACT FEASIBILITY REPORT Prepared for: Claridge Homes Prepared By: NOVATECH Suite 200, 240 Michael

More information

The content of this supplement is based upon the that described in our letter of May 28, 2012.

The content of this supplement is based upon the that described in our letter of May 28, 2012. September 20, 2012 30 Wertheim Court, Unit 25 Richmond Hill, Ontario, Canada L4B 1B9 email solutions@valcoustics.com web www.valcoustics.com telephone 905 764-5223 fax 905 764-6813 Davis Howe Partners

More information

2.0 April 18, 2017 Final - Issued to Client for Use

2.0 April 18, 2017 Final - Issued to Client for Use VALCOUSTICS CANADA LTD. File: 116-17 Villalago Residences/Bolton Environmental Noise Document Version Index: Version Date Description of Changes 2. April 18, 217 Final - Issued to Client for Use 3 Wertheim

More information

Stationary Noise Assessment. 70 Richmond Road. Ottawa, Ontario

Stationary Noise Assessment. 70 Richmond Road. Ottawa, Ontario Stationary Noise Assessment 70 Richmond Road Ottawa, Ontario REPORT: GWE16 013 Stationary Noise Prepared For: Stephen Job 109 Atlantic Avenue, Suite 302B Toronto, Ontario M6K 1X4 Prepared By: Michael Lafortune,

More information

DRAFT Part 1: ENVIRONMENTAL NOISE CONTROL GUIDELINES FOR LAND USE PLANNING

DRAFT Part 1: ENVIRONMENTAL NOISE CONTROL GUIDELINES FOR LAND USE PLANNING DRAFT Part 1: ENVIRONMENTAL NOISE CONTROL GUIDELINES FOR LAND USE PLANNING For further information please contact: Robin van de Lande, Planner Planning and Growth Management 110 Laurier Avenue West, 4th

More information

Appendix M. Noise Assessment

Appendix M. Noise Assessment Appendix M Noise Assessment 610 Chartwell Road, Suite 300 Oakville, ON Canada L6J 4A5 t: 905.823.8500 f: 905.823.8503 www.mmmgrouplimited.com www.wspgroup.ca MEMO RE: FROM: DATE: March 27, 2017 COPIES:

More information

1. Introduction Site Noise Impact... 1

1. Introduction Site Noise Impact... 1 Mixed Use Development SACL Report #B4-077 April 11, 2014 Table of Contents 1. Introduction... 1 2. Site... 1 3. Noise Impact... 1 3.1. Noise Sources... 1 3.2. Critical Noise Receptors... 1 3.3. Noise Levels...

More information

Appendix F: Noise Report

Appendix F: Noise Report Appendix F: Noise Report HIGHWAY 404 HIGHWAY 407 TO GREEN LANE (W.O. 03-20024) REGIONAL MUNICIPALITY OF YORK NOISE REPORT Preliminary Design and Class Environmental Assessment Study Class Environmental

More information

For The Regional Municipality of Waterloo 150 Frederick Street, 8 th Floor Kitchener, Ontario, N2G 4J3. Prepared by. Sheeba Paul, MEng, PEng

For The Regional Municipality of Waterloo 150 Frederick Street, 8 th Floor Kitchener, Ontario, N2G 4J3. Prepared by. Sheeba Paul, MEng, PEng Noise and Vibration Compatibility Feasibility Assessment Residential Component Proposed RMOW Transit Hub King Street West and Victoria Street North, Kitchener, ON For The Regional Municipality of Waterloo

More information

Noise Feasibility Study Proposed 6-storey Seniors Condominium 7480 Derry Road West Milton, Ontario

Noise Feasibility Study Proposed 6-storey Seniors Condominium 7480 Derry Road West Milton, Ontario Noise Feasibility Study Proposed 6-srey Seniors Condominium 7480 Derry Road West Miln, Ontario Prepared for: FGL Derry Inc. 5400 Yonge Street, Suite 300 Toron, Ontario M2N 5R5 Prepared by Vicr Garcia,

More information

Noise and Vibration Feasibility Study 1 and 15 Stevenson St & 8 William St Guelph, Ontario

Noise and Vibration Feasibility Study 1 and 15 Stevenson St & 8 William St Guelph, Ontario Noise and Vibration Feasibility Study 1 and 15 Stevenson St & 8 William St Guelph, Ontario Prepared for: Jennark Homes 66 Wellington Road 7, Unit #1 Elora, Ontario N0B 1S0 Prepared by Rajjot Arora, BASc

More information

MINTO COMMUNITIES INC. HARMONY STAGE 2 PART OF 4025 STRANDHERD DRIVE NOISE CONTROL FEASIBILITY STUDY

MINTO COMMUNITIES INC. HARMONY STAGE 2 PART OF 4025 STRANDHERD DRIVE NOISE CONTROL FEASIBILITY STUDY MINTO COMMUNITIES INC. HARMONY STAGE 2 PART OF 4025 STRANDHERD DRIVE NOISE CONTROL FEASIBILITY STUDY July 2017 Prepared for: MINTO COMMUNITIES INC. 180 Kent Street, Suite 200 Ottawa, Ontario K1P 0B6 Prepared

More information

NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO

NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO Prepared for: State Building Group Attn.: John Guanti 27 Dufferin Street, Unit 34 Toronto, Ontario M6B 4J3 Prepared

More information

Noise Feasibility Study, Proposed Hotel Development, Living Waters Resort Collingwood, Ontario

Noise Feasibility Study, Proposed Hotel Development, Living Waters Resort Collingwood, Ontario Noise Feasibility Study, Proposed Hotel Development, Living Waters Resort Collingwood, Ontario Prepared for: Law Cranberry Resort Limited 85 Scarsdale Road, Suite 306 Toronto, Ontario M3R 2R2 Prepared

More information

The anticipated critical noise receptors and their locations are identified as follows and are shown on Figure 3:

The anticipated critical noise receptors and their locations are identified as follows and are shown on Figure 3: 177 Cross Ave. B2-065 2 1.0 INTRODUCTION This document is a Noise and Vibration Impact Study regarding the proposed mixed use development at 177 Cross Avenue, Oakville. It is associated with rezoning application