1 Reform Update- Dealing with Construction Permits India (Both Delhi and Mumbai) Delhi Specific Reforms 1. Reform: MCD issued a circular on for reducing the number of procedures for construction permits for building plan approval till issuance of Occupancy-cum-Completion Certificate (OCC) from 29 (as noted in last year) to 8 Impact: The number of procedures for obtaining construction permit and all other clearances has been reduced from 29 (as observed last year) to 8 and timeframe has been reduced from 238 days (as observed last year) to 60 days. The following procedures listed in last year s report have been eliminated: i. Obtain a certified copy of the property record ( e-9d77-41ce-a56be48a08c441f1&filename=circular%20reg%20requirement%20of%20documentsonline%20sanction%20of%20building%20plans-eodb%20dated% ) ii. Request and obtain consent to establish from Delhi Pollution Control ( d-ce3e-4124-a3dd- 6526a037b02c&fileName=Office%20Memorandum%20of%20DPCC%20regarding%20EODB% 20dated%2008/02 iii. Obtain no objection certificate regarding land use per the zoning plan ( e-9d77-41ce-a56be48a08c441f1&filename=circular%20reg%20requirement%20of%20documentsonline%20sanction%20of%20building%20plans-eodb%20dated% ) iv. Request and obtain approval of the water and sewer connection plans (This has been integrated in CAF) v. Obtain certificate of no tax due ( e-9d77-41ce-a56be48a08c441f1&filename=circular%20reg%20requirement%20of%20documentsonline%20sanction%20of%20building%20plans-eodb%20dated% ) vi. Notarize the affidavit/undertaking ( c b87-ac399debebef&fileName=Circular%20reg.%20eundertaking%20under%20EODB%20Dated% ) vii. Request no objection certificate from Electricity Department (This is not required as per MCD circular dated available at d-4281-b28f- 4e52051df666&fileName=Circular%20regarding%20No%20Requirement%20of%20NOC%20fr om%20djb%20&%20discom%20for%20online%20plans%20dated% ) viii. Obtain no objection certificate from Planning Department within the Municipal Corporation of Delhi (This is not required as per MCD circular dated available at e-9d77-41ce-a56b- Page 1 of 13

2 e48a08c441f1&filename=circular%20reg%20requirement%20of%20documentsonline%20sanction%20of%20building%20plans-eodb%20dated% ) ix. Receive inspection from the Electricity Department (This is not required as per MCD circular dated available at d-4281-b28f- 4e52051df666&fileName=Circular%20regarding%20No%20Requirement%20of%20NOC%20fr om%20djb%20&%20discom%20for%20online%20plans%20dated% ) x. Request and obtain building plans approval from the Director of Factories of Labor Department (This is integrated with CAF and the applicant is not required to apply separately) xi. Obtain NOC from the Forest Department. (This has been integrated with CAF). xii. Request and obtain no objection certificate from Fire Department (This has been integrated with CAF and the applicant is not required to apply separately) xiii. Receive inspection by building section (This requirement has been done away with in UBBL 2016). xiv. Submit commencement notice to the Municipal Corporation of Delhi (This has been done away with in UBBL 2016) xv. Submit Notice of commencement and completion to Labour Inspector (This requirement has been done away with in UBBL 2016 and required to give notice separately. MCD informs Labour Department online). xvi. Submit notice of completion upto the plinth level (This has been made online as part of CAF). xvii. Request and receive inspection upto the plinth level (This has been made online as part of CAF). xviii. Request water and sewer connection approval (This is integrated with COCCRF and the applicant is not required to apply separately). xix. Receive on-site inspection for water and sewer connection and receive approval (This is made part of COCCRF and not to be done separately) xx. Request final no objection certificate from the Fire Department (Fire department is integrated with the MCD online system and made part of COCCRF. The applicant is not required to apply separately) xxi. Notarize the affidavit/undertaking to request the occupancy permit (The process is now integrated with the online system under COCCRF) Effective Date: 3 January ec97-4c84-bc42-9a38bb093b0c&filename=circular%20regarding%20reduction%20in%20the%20number%20of% 20procedures%20and%20Time%20in%20EODB%20Dated%2003/01 2. Reform: Qualification of professionals and accreditation to Professional Bodies for sanction of building plan was notified by MCD through circular dated Impact: Defining the criteria of qualification and certification requirement of professionals (Architect, Engineer, Structural engineers) engaged in building plan approval process has positive impact on the building quality control index Effective Date: 30 January Page 2 of 13

3 384d-46dd ad01287cb&fileName=Circular%20regarding%20Qualification%20of%20Professionals%20for %20sanction%20of%20Building%20Plans%20dated%2030/01 3. Reform: Inspection for plinth level was fast-paced through risk based classification MCDs through circular dated Impact: The recent notification by the MCD on risk based classification and fast pacing building plan approval, inspection and OCC has resulted in positive impact on Building Quality Control Index. It has reduced the time taken for obtaining building plan and OCC significantly. In case of warehouse which falls under the category of low and low risk buildings, the architect/ engineer/ supervisor shall conduct inspection for OCC and shall submit the inspection report to the sanctioning authority. No inspection is conducted by any agency (Clause of UBBL 2016 available at %205th%20April% pdf) Effective Date: 30 January b4863fecea32&filename=circular%20regarding%20risk%20based%20inspection%20for%20plint h%20level%20intimation%20dated%2030/01 4. Reform: Requirement of documents for sanction of building plan was reduced by MCD through circular dated Effective Date: 23 February d77-41ce-a56be48a08c441f1&fileName=Circular%20reg%20Requirement%20of%20documentsonline%20Sanction%20of%20Building%20Plans-EODB%20dated% Reform: An amendment of UBBL was notified on This amendment has introduced various new provisions for Ease of Doing Business in construction permits including those which have already come in force through MCD circulars listed above from 2 to 5 Effective Date: 5 April Reform: As per amended UBBL, complete process of building plan approval up to issuance of Occupancy-cum-Completion certificate (OCC) is to be completed in following 8 procedures: i. Submission of application for sanction of building plan in Common Application Form (CAF) along with building permit fees, drawings and documents ii. Grant of sanction within stipulated period iii. Payment of requisite fees & charges, as applicable, and release of sanctioned building plan iv. Intimation of completion of work up to plinth level v. Plinth level inspection followed by issue of plinth level inspection certificate. Page 3 of 13

4 vi. Submission of application for issue of Occupancy-cum-Completion Certificate (OCC) in Common-Occupancy-cum-Completion Certificate Request Form (COCCRF) along with requisite fees, drawings and documents vii. Inspection by all concerned departments viii. Intimation of compounding fee and charges, if applicable, and release of OCC and completion plan Impact: The number of procedures for obtaining construction permit and all other clearances has been reduced from 29 (as observed last year) to 8 and timeframe has been reduced from 238 days (as observed last year) to 60 days. Effective Date: 5 April Reform: As per amended UBBL, building plan approval has to be mandatorily granted within 30 days, else deemed approval is to be granted Impact: This has streamlined the process and ensured fixed timeline for granting approvals. Effective Date: 5 April Reform: As per amended UBBL the plinth level inspection has to be mandatorily completed within 07 days, else deemed approval is to be granted Impact: This has streamlined the process and ensured fixed timeline for granting approvals. Effective Date: 5 April Reform: Common application form (CAF) capturing all requirements for building plan approval for the Municipal Corporation and also for all internal/external agencies for granting No Objection Certificate (NOC)/clearances such as Airports Authority of India (AAI), National Monuments Authority (NMA), Delhi Urban Arts Commission (DUAC), Heritage Conservation Committee (HCC), Delhi Metro Rail Corporation (DMRC), Delhi Pollution Control Committee (DPCC) etc. has been operationalized. CAF also includes an online calculator, for building proponents to calculate fees/charges online and make payment online at one place which is transferred to concerned agencies by MCD by using e-payment system Impact: This has streamlined the process thereby reducing procedures and manual intervention. Effective Date: 31 March 2015, 20 March Page 4 of 13

5 1eaf-4fcc-af8ec5b2398a7494&fileName=Circular%20regarding%20Integration%20of%20NOC%20Departments %20%20Dated%2031/03/ e0-4f35-9a3a- 2c2b95877fea&fileName=Circular%20regarding%20Integration%20of%20DPCC%20&%20Forest %20Deptt.%20with%20CAF%20of%20MCD%20Dated% Reform: Municipal Corporation has operationalized online single window system for complete process, i.e. building plan approval, plinth level inspection and Occupancy-cum-Completion Certificate (OCC) which integrates seamlessly with all internal/external agencies Impact: This has streamlined the process thereby reducing procedures and manual intervention Effective Date: 31 March 2015, 30 January 2017, 20 March eaf-4fcc-af8ec5b2398a7494&fileName=Circular%20regarding%20Integration%20of%20NOC%20Departments %20%20Dated%2031/03/ b4863fecea32&filename=circular%20regarding%20risk%20based%20inspection%20for%20plint h%20level%20intimation%20dated%2030/01/ e0-4f35-9a3a- 2c2b95877fea&fileName=Circular%20regarding%20Integration%20of%20DPCC%20&%20Forest %20Deptt.%20with%20CAF%20of%20MCD%20Dated% Reform: There is an online common occupancy-cum-completion requirement form (COCCRF) which captures requirement of all agencies for granting OCC. This certificate is to be granted mandatorily within 22 days (15 days for inspection + 07 days for processing by MCD) Impact: This has streamlined the process and ensured fixed timeline for granting approvals Effective Date: 3 January 2017 and 5 April %20sanction%20of%20Building%20Plans%20dated%2030/01 Page 5 of 13

6 12. Reform: Therefore, maximum time in completing all the processes from building plan approval till issuance of OCC has been restricted to less than 60 days under bye-laws Impact: This has streamlined the process and ensured fixed timeline for granting approvals Effective Date: 3 January %20sanction%20of%20Building%20Plans%20dated%2030/ Reform: MCD has defined the criteria of qualification/certification/experience requirement of professionals (architects, engineers, structural engineers, etc. - engaged in building plan approval process) Impact: Defining the criteria of qualification and certification requirement of professionals (Architect, Engineer, Structural engineers) engaged in building plan approval process will have positive impact on the index of quality of regulations. A score of 2 should be assigned to question "What are the qualification requirements for the professional who supervises the construction on the ground?" Effective Date: 30 January %20sanction%20of%20Building%20Plans%20dated%2030/ Reform: MCD has introduced system of risk based classification in the amended UBBL for all categories. These classifications are used for fast-pacing the building plan approval, inspection and grant of occupancy-cum-completion certificate (OCC) Impact: The recent notification by the MCD on risk based inspection is expected to result in a positive score on the Quality control during construction index and reduce the time taken for obtaining completion/occupancy certificate. A score of 2 should be assigned for the question "What types of inspections (if any) are required by law to be carried out during construction?" Effective Date: 22 March 2016 and 5 April 2017 UBBL-2016 is available on the link: f52b-4a03-a96c- 8c067191ff3e&fileName=Unified%20Building%20Bye%20Laws%20for%20Delhi% Amended UBBL is available on the link: 15. Reform: In the amended UBBL, there is a provision for latent defect liability for architects/structural engineers/site engineers/construction company for structural flaws found after the building is brought into use Page 6 of 13

7 Impact: A score of 1 should be assigned to question "Which parties (if any) are held liable by law for structural flaws or problems in the building once it is in use (Latent Defect Liability or Decennial Liability)?" Effective Date: 5 April 2017 Clause 2.10(a) of the amended UBBL, available on the link: 16. Reform: The amended UBBL has made provision for requirement of decennial professional indemnity insurance to cover for structural flaws after use for different professionals engaged in building construction, i.e. architects/contractors/structural engineers, etc. Impact: A score of 1 should be assigned to question "Which parties (if any) are required by law to obtain an insurance policy to cover possible structural flaws or problems in the building once it is in use (Latent Defect Liability Insurance or Decennial Insurance)? " Effective Date: 5 April 2017 Clause 2.10(b) of the amended UBBL, available on the link: 17. Reform: Delhi Jal Board (DJB) has revised infrastructure charges for commercial/industrial connections thereby reducing the cost burden on the applicant very significantly Impact: The recent notification has abolished infrastructure costs for water/sewer and clarifies that there are no development charges for water and sewer. Consequently, the costs for the water and sewer approval have reduced. Effective Date: 18 January aeabf78752&fileName=Circular%20of%20DJB%20Regarding%20Reduction%20in%20Connecti on%20charges%20dated%2018/ Reform: No NOC is required from DJB for building plan approval Impact: Delhi Jal Board has eliminated the requirement to request and obtain an approval (NOC). This has reduced the total number of procedures in obtaining construction permit in Delhi. Consequently, the procedure stands eliminated. Effective Date: 30 March d-4281-b28f- 4e52051df666&fileName=Circular%20regarding%20No%20Requirement%20of%20NOC%20from %20DJB%20&%20DISCOM%20for%20Online%20Plans%20Dated% Page 7 of 13

8 19. Reform: Now, there is no requirement for getting NOC from Delhi Pollution Control Committee (DPCC) for installing DG sets Impact: This has eliminated the procedure 2 of applying for a NOC for DG sets. This has reduced the procedure by 1 and associated cost to 0. Effective Date: 8 February ce3e-4124-a3dd- 6526a037b02c&fileName=Office%20Memorandum%20of%20DPCC%20regarding%20EODB%20d ated%2008/ Reform: NOC requirement of different external agencies like Airports Authority of India (AAI), National Monuments Authority (NMA), Delhi Metro Rail Corporation (DMRC), Delhi Urban Art Commission (DUAC), etc. have been mapped as Colour-Coded Zonal Map (CCZM) on GIS platform superimposed on Delhi s GIS Map. Therefore, now building proponent can find out their NOC requirements online for the building falling in particular Colour-coded Zone. NOC is not required from such agencies for which building falls outside their Colour-coded Zones Effective Date: 31 January %20of%20the%20NOC%20Departments%20dated%2031/ Reform: Whole process has been significantly simplified and made user friendly. Requirement of affidavits has been done away with. There is no need of submitting notarized certificates Impact: Eliminated procedure 6, to notarize the affidavit/undertaking Effective Date: 6 March Reform: Building proponents are being issued approved building plans online with digital signature, which is available online in downloadable format Impact: This has streamlined the process and certificate can be download online without requirement of physical visit to the office. Effective Date: 4 April e f-8e &filename=circular%20regarding%20caf%20&%20digital%20signatures%20in%2 0EODB%20dated%2004/04/ Reform: Certified/licensed architect, engineer, private and external firm of certified architects and/or civil engineers are required to verify the compliance of the building plans with existing building regulations Page 8 of 13

9 Impact: A score of 1 should be assigned for the question "Which third-party entities are required by law to verify that the building plans are in compliance with existing building regulations? " Effective Date: 22 March 2016 As per Chapter-3 of UBBL-2016, on basis of the risk based classification, the power of sanction / plinth inspection / completion has been delegated to the Architect / Engineer for certain type of buildings Mumbai Specific Reforms 1. Reform: Municipal Corporation of Greater Mumbai (MCGM) has and made provision for completing the whole process from building plan approval to issuance of Occupancy-cum- Completion Certificate (OCC) in following 08 procedures: i. Submit Online application in Common Application Form(CAF) along with Extract property Register Card (P.R. Card) downloading from Integrated Revenue Department Application & Design Plan, Pay Online Scrutiny Fee, Apply for NOC from Tree Authority, Storm Water Drain (SWD), Sewerage Operation (SO), Hydraulic Engineering (HE), Traffic & Coordination (T & C), Chief Fire Officer (CFO) and Electric Department (Parallel Online Processes) ½ Day ii. Receive Inspection and obtain NOC: Receive Inspection from Tree Authority, SWD, SO, T&C, HE Department, Obtain NOC Tree, SWD, SO, HE, CFO, Electric Department, Receive Concessions Approvals (Parallel online process) 22 days iii. IOD Process: Receive IOD and payment to be paid for CC 07 days iv. Obtain Plinth CC: Request and receive plinth inspection, obtain further C.C. ½ day v. Further CC: Request and receive plinth inspection, obtain further C.C. 7 Days vi. Common Completion Request Form (CCRF): Request completion NOC from Tree, SWD, SO, T & C, CFO 15 days vii. Request for OC/BCC: Request for an Occupancy Certificate (OC) and Building Completion Certificate (BCC) 1 day viii. Obtain OC/BCC: Receive Final Inspection and OB and BCC - 7 days Impact: The total number of procedures have been reduced from 42 (as noted last year) to 08 under the law and is being followed through online building plan approval system by MCGM. Following 36 procedures, listed in the last year s Doing Business Report, have now been eliminated: i. Obtain an extract of the Property Register Card (P.R. Card) from the Revenue Department (This has been integrated online with Single Window Clearance System) ii. Receive site inspection from building proposal office iii. Apply for NOC from Tree Authority iv. Apply for NOC from Storm Water and Drain Department v. Apply for NOC from Sewerage Department vi. Apply for NOC from Hydraulic Engineer Department (water-supply) vii. Receive inspection from Tree Authority viii. Receive inspection from Storm Water and Drain Department ix. Receive inspection from Sewerage Department x. Receive inspection from Hydraulic Engineer Department (water-supply) xi. Obtain NOC from Tree Authority xii. Obtain NOC from Storm Water and Drain Department xiii. Obtain NOC from Sewerage Department xiv. Obtain NOC from Hydraulic Engineer Department (water-supply) Page 9 of 13

10 xv. Request and obtain NOC from Electric Department xvi. Request and obtain NOC from Traffic and Coordination Department xvii. Request and obtain NOC from Chief Fire Office xviii. Labour NOC xix. Request and receive inspection of plinth xx. Request completion NOC from the Storm Water and Drain Department xxi. Request completion NOC from the Sewerage Department xxii. Apply for provisional water connection from Hydraulic Engineer xxii. Request completion NOC from Traffic and Coordination Department xxiii. Request completion NOC from Chief Fire Office xxv. Receive inspection from Storm Water and Drain Department xxvi. Receive inspection from Sewerage Department xxvii. Obtain water connection from Hydraulic Engineer xxviii. Receive inspection from Traffic and Coordination Department xxix. Receive inspection from Chief Fire Office xxx. Obtain completion certificate from Storm Water and Drain Department xxxi. Obtain completion NOC from Sewerage Department xxxii. Obtain completion NOC from Traffic & Coordination Department xxxiii. Obtain completion NOC from Chief Fire Office xxxiv. Receive final inspection from Building Proposal Office xxxv. Obtain occupancy certificate from Building Proposal Office (sub-engineer) xxxvi. Obtain final NOC from Hydraulic Engineer (Water) Department Effective Date: 6 March Engineer%20(Development%20Plan)/Docs/EODB%20Construction%20Permit%20Circular/Ease% 20of%20Doing%20Business/8%20Process%20Circular.pdf 2. Reform: MCGM has operationalized online building plan approval system with integration of all internal/external agencies from April Applicant is only required to submit common application form (CAF) which captures the requirements of Municipal Corporation and that of all internal/external agencies like AAI, NMA, Fire, storm water drain, sewage, Tree Authority, Revenue Department, etc. Impact: Average time being taken in granting building plan approval in last 6 months is around 10 days, due to integration of online system Effective Date: 1 April Reform: CAF also provides an online calculator on the website to calculate fees and charges for the building proponent. Provision has been made for online payment of all fees/charges to MCGM. This is transferred to concerned agencies through e-payment Impact: Enables reduced physical touch points due to online fee calculation and payment Effective Date: 8 September Reform: Timeframe for building plan approval has been fixed for 30 days, inspection for 07 days and OCC for 22 days, in all less than 60 days. There is a provision under Maharashtra State Right Page 10 of 13

11 to Service Act, 2015 to ensure that such time commitments are adhered to else the concerned officers is to be penalized under law Impact: The total time taken in complete process, i.e. building plan approval till OCC has been reduced from 164 days (as recorded last year) to 60 days Effective Date: Reform: Earlier, occupancy certificate was granted under Mumbai Municipal Act, 1888 and the completion certificate was granted under Maharashtra Regional Town Planning Act, 1966 thereby two certificates were being issued. Now, MCGM has merged both and only one certificate OCC is being issued online with digital signature Impact: The decision to merge completion and occupancy certificate has reduced the total time taken by 14 days and procedure by one 6. Reform: Government of Maharashtra (GoM) has amended DCR vide their notification under Section 154 of MR & TP Act dated for incorporation of Risk-Based Classifications in the DCR thereby fast-pacing building plan approval inspection and grant of OCC Impact: A score of 2 should be assigned for the question "What types of inspections (if any) are required by law to be carried out during construction?" Effective Date: 2 March Engineer%20(Development%20Plan)/Docs/EODB%20Construction%20Permit%20Circular/Ease% 20of%20Doing%20Business/Risk%20base%20approval.pdf 7. Reform: GoM has issued notification dated for providing latent defect liability and decennial professional indemnity insurance to cover infrastructure flaws found after the building is brought into use for the professionals who are held liable for such defects Impact: Now, provision has been made under law for latent defect liability after building is brought into use. Also, provision has been made for Decennial Professional Indemnity Insurance to the professionals to cover the liability for such flaws, if detected after use. A score of 1 should be assigned to question "Which parties (if any) are held liable by law for structural flaws or problems in the building once it is in use (Latent Defect Liability or Decennial Liability)?" and a score of 1 should be assigned to question "Which parties (if any) are required by law to obtain an insurance policy to cover possible structural flaws or problems in the building once it is in use (Latent Defect Liability Insurance or Decennial Insurance)? " Effective Date: 8 march Engineer%20(Development%20Plan)/Docs/EODB%20Construction%20Permit%20Circular/Ease% 20of%20Doing%20Business/Latent%20Defect%20Liabilty%20%20notification%20dt.8%20march % pdf 8. Reform: MCGM has amended online submission of site inspection video clip at various stages of building construction, thereby obviating the requirement of on-site inspection Impact: Submission of site videos has eliminated the requirement for site inspections reducing total time considerably Page 11 of 13

12 Effective Date: 23 February Engineer%20(Development%20Plan)/Docs/EODB%20Construction%20Permit%20Circular/Ease% 20of%20Doing%20Business/Online%20Submission%20of%20Site%20Inspection%20site%20inspe ction%20video%20clip%20at%20various%20stages%20of%20building%20proposal.pdf 9. Reform: MCGM has issued directive vide notification dated for incorporating online Common Completion Request Form (CCRF), which has been made operational through online building permission system Impact: Provision of Common Completion Request Form (CCRF) and making that available online has cut down time in getting occupancy-cum-completion certificate very significantly. Effective Date: 6 march Engineer%20(Development%20Plan)/Docs/EODB%20Construction%20Permit%20Circular/Ease% 20of%20Doing%20Business/8%20Process%20Circular.pdf 10. Reform: The requirement of Labour Department has been integrated in CAF Impact: This has eliminated procedure 21 Effective Date: 10 April Reform: Building permits are being issued online by MCGM with digital signature Impact: This has streamlined the process and certificate can be download online without requirement of physical visit to the office Effective Date: 9 September Reform: The Development Plan of Mumbai along with all plots has been mapped on GIS platform and the requirement for NOC from different agencies like AAI, NMA, etc. as Colour Coded Zonal Maps (CCZM) and have been superimposed on GIS Map of Mumbai. Hence, for every plot, building proponent can know which parts of common application form (CAF) is to be filled up. No NOC is required if the building area falls outside CCZM of any agency Impact: This has streamlined the process as no NOC is required if the building area falls outside CCZM of any agency Effective Date: 13 October Reform: Development charges payable for development of any land or building proposed for warehouse have been exempted to the extent of 90% Impact: Costs associated with development charges for warehouse reduced upto 90% Effective Date: 13 May eer%20(development%20plan)/docs/eodb%20construction%20permit%20circular/ease%20of% 20Doing%20Business/Exemption%20in%20Development%20Charges/Notification%20dt.13%20 Page 12 of 13

13 may%202015%20for%20waving%20of%2090development%20charges%20for%20warehouse_29.pdf 14. Reform: Certified/licensed architect, engineer, private and external firm of certified architects and/or civil engineers are required to verify the compliance of the building plans with existing building regulations Impact: A score of 1 should be assigned for the question "Which third-party entities are required by law to verify that the building plans are in compliance with existing building regulations? " Effective Date: 29 December _(1.1).pdf 15. Reform: Cost of obtaining construction permits from building plan approval to OCC has reduced to INR 4,35,062 compared to INR 12,78,937 as observed in DBR 2017 Impact: The cost has reduced to 8.5% of warehouse value compared to 25% of warehouse value as observed in DBR 2017 Effective Date: 13 May 2015 Page 13 of 13

Managing PTC Creo Parametric Data with PTC Windchill PDMLink 11.0

Managing PTC Creo Parametric Data with PTC Windchill PDMLink 11.0 Managing PTC Creo Parametric Data with PTC Windchill PDMLink 11.0 Overview Course Code Course Length TRN-4770-T 8 Hours In this Process-based course, you will learn about the Windchill PDMLink Creo Parametric

More information

The PTC Windchill PDMLink 11.1 MCAD Data Management Process for PTC Creo Parametric

The PTC Windchill PDMLink 11.1 MCAD Data Management Process for PTC Creo Parametric The PTC Windchill PDMLink 11.1 MCAD Data Management Process for PTC Creo Parametric Overview Course Code Course Length TRN-5230-T 8 Hours In this Process-based course, you will learn about the Windchill

More information

SENIOR COMMUNICATIONS OPERATOR, 1467

SENIOR COMMUNICATIONS OPERATOR, 1467 2-22-91 SENIOR COMMUNICATIONS OPERATOR, 1467 Summary of Duties: A Senior Communications Operator assigns, reviews, and evaluates the work of Communications Operators who operate private branch exchange

More information

Business Administration of PTC Windchill 11.0

Business Administration of PTC Windchill 11.0 Business Administration of PTC Windchill 11.0 Overview Course Code Course Length TRN-4810-T 16 Hours In this course, you will gain an understanding of basic Windchill business administration tasks. You

More information

The. Extraordinary Published by Authority ASVINA 3] MONDAY, SEPTEMBER 25, 2017 [SAKA PART III Acts of the West Bengal Legislature.

The. Extraordinary Published by Authority ASVINA 3] MONDAY, SEPTEMBER 25, 2017 [SAKA PART III Acts of the West Bengal Legislature. Registered No. WB/SC-247 The No. WB(Part-III)/2017/SAR-46 Kolkata Gazette Extraordinary Published by Authority ASVINA 3] MONDAY, SEPTEMBER 25, 2017 [SAKA 1939 PART III Acts of the West Bengal Legislature.

More information

Finance Manager Corporate & UK Full-time, Permanent appointment Oxford, UK

Finance Manager Corporate & UK Full-time, Permanent appointment Oxford, UK Finance Manager Corporate & UK Full-time, Permanent appointment Oxford, UK SAE is part of the Navitas Group, which is a diversified global education provider that offers an extensive range of educational

More information

SINGLE STAGE TWO ENVELOPE SYSTEM

SINGLE STAGE TWO ENVELOPE SYSTEM TENDER FOR SUPPLYING, INSTALLATION & COMMISSIONING OF GODREJ SINGLE BED FIONA FOR DOUBLE OCCUPANCY ROOM ALONG WITH GODREJ MATTRESSES IN HOSTEL ROOMS AT STATE BANK ACADEMY, "GURUKUL", GURGAON To, M/S INVITATION

More information

Tavua to Volivoli- Stage 3, 5 (Pole 50 to Pole 93)

Tavua to Volivoli- Stage 3, 5 (Pole 50 to Pole 93) Construction of 33kV Double Circuit Tavua to Volivoli- Stage 3, 5 (Pole 50 to Pole 93) TENDER NO: MR19/2015 33kV DOUBLE CIRCUIT-TAVUA TO VOLIVOLI Page 1 Bidder s Name: Bidder s Address: Bidder s Telephone

More information

Office of the President of Brazil Office of the Chief of Staff Office of the Deputy Chief for Legal Matters LAW No DATED AUGUST 5, 2003

Office of the President of Brazil Office of the Chief of Staff Office of the Deputy Chief for Legal Matters LAW No DATED AUGUST 5, 2003 Office of the President of Brazil Office of the Chief of Staff Office of the Deputy Chief for Legal Matters LAW No. 10711 DATED AUGUST 5, 2003 Provides for the National Seeds and Seedlings System and other

More information

Workflow Administration of PTC Windchill 11.1

Workflow Administration of PTC Windchill 11.1 Workflow Administration of PTC Windchill 11.1 Overview Course Code Course Length TRN-5266-T 16 Hours In this course, you will learn about Windchill workflow features and how to design, configure, and test

More information

Introduction. There are two primary schools of thought in developing an audit approach:

Introduction. There are two primary schools of thought in developing an audit approach: Introduction There are two primary schools of thought in developing an audit approach: One viewpoint is to assume that everyone is looking for ways to beat the system ; therefore, the auditors devise audit

More information

MANUAL OF ENVIRONEMT LAWS INPAKSITAN

MANUAL OF ENVIRONEMT LAWS INPAKSITAN [Contents] Manual of Environment Laws in Pakistan 1 MANUAL OF ENVIRONEMT LAWS INPAKSITAN ******* CONTENTS ******* PAKISTAN ENVIRONMENTAL PROTECTION ACT, 1997 Preamble. 1 1. Short title, extent and commencement.

More information

STANDARD OPERATING PROCEDURE

STANDARD OPERATING PROCEDURE STANDARD OPERATING PROCEDURE Consent to Established/Operate Procedural Guidelines Consent to Establish NOC Check List Consent to Operate NOC Check List Renewal to Consent to Operate Check List Time Frame

More information

Article II Definitions Section 200 Interpretation II Definitions II-1

Article II Definitions Section 200 Interpretation II Definitions II-1 CHAPTER 27 ZONING TABLE OF CONTENTS Page Article I Introductory Provisions Section 100 Short Title I-1 101 Purpose I-1 102 Interpretation I-1 103 Scope I-1 104 Conflict I-2 105 Validity I-2 106 Repealer

More information

Web Portal: Submit A Locate Request

Web Portal: Submit A Locate Request Web Portal: Submit A Locate Request Rev. 1/21/2016 Page 1 of 14 Table of Contents A. Sign-up... 3 B. Searching for Tickets... 3 C. Viewing Positive Response... 5 D. Submitting a Locate Request... 7 1.

More information

SECTION -2 QUALIFICATION INFORMATION, FORMS OF BID AND CONTRACT

SECTION -2 QUALIFICATION INFORMATION, FORMS OF BID AND CONTRACT SECTION -2 QUALIFICATION INFORMATION, FORMS OF BID AND CONTRACT 30 INFORMATION REGARDING QUALIFICATION OF BIDDERS The following information shall be furnished by duly filled in prescribed forms by the

More information

6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA

6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA 6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA As on 01.04.2014 General Condition: Sl No. CONDITIONS COMPLIANCE I. The project authorities must strictly adhere to the stipulations made by the

More information

National Maintenance Agreement Features

National Maintenance Agreement Features National Maintenance Agreement Features Article I Recognition: All Employers are required to conduct Pre-Job Conferences before commencing with work (See Policy Decision I-3) Employers are required to

More information

LEED Reference Guide for Green Building Operations and Maintenance For the Operations and Maintenance of Commercial and Institutional Buildings 2009

LEED Reference Guide for Green Building Operations and Maintenance For the Operations and Maintenance of Commercial and Institutional Buildings 2009 LEED Reference Guide for Green Building Operations and Maintenance For the Operations and Maintenance of Commercial and Institutional Buildings 2009 Edition COPYRIGHT DISCLAIMER ii LEED REFERENCE GUIDE

More information

31. POLLUTION CONTROL COMMITTEE

31. POLLUTION CONTROL COMMITTEE 31. POLLUTION CONTROL COMMITTEE 90 31.1 Consent to A Duly filled in application Form Establish XIII under Water Act. * days an Industry B Duly filled in application FORM 1 under Air Act * C Consent fee

More information

Continuous Improvement Policy

Continuous Improvement Policy Continuous Improvement Policy Approved by: RTO Administrator UNCONTROLLED IN HARD COPY FORMAT Intentionally left Blank Contents Purpose... 1 Policy Statement... 1 Policy Principles... 1 Underpinning Principles...

More information

During the discussions, the Committee finalized the following additional TOR for further study:

During the discussions, the Committee finalized the following additional TOR for further study: Finalization of ToR for development of Visakhapatnam?Kakinada Corridor for the Establishment of Petroleum, Chemicals and Petrochemicals Investment Region (VK- PCPIR), Andhra Pradesh by M/s VK- PCPIR Special

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT GENERAL ADMINISTRATION ADMINISTRATIVE CODE

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT GENERAL ADMINISTRATION ADMINISTRATIVE CODE Environmental Management Chapter 335-1-7 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT GENERAL ADMINISTRATION ADMINISTRATIVE CODE CHAPTER 335-1-7 AIR DIVISION OPERATING PERMIT FEES TABLE OF CONTENTS 335-1-7-.01

More information

ELDORADO GOLD CORPORATION BOARD OF DIRECTORS TERMS OF REFERENCE

ELDORADO GOLD CORPORATION BOARD OF DIRECTORS TERMS OF REFERENCE ELDORADO GOLD CORPORATION BOARD OF DIRECTORS TERMS OF REFERENCE I. ROLES AND RESPONSIBILITIES The principal role of the Board of Directors ( Board ) is stewardship of Eldorado Gold Corporation (the Company

More information

As part of this process you are responsible for:

As part of this process you are responsible for: Section 104 application for the adoption of a new sewer The process In order to progress a sewer for adoption you are required to complete the application form following the principles set out in the current

More information

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL 2013 TO SEPTEMBER M/s. Subham Planners Ltd.

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL 2013 TO SEPTEMBER M/s. Subham Planners Ltd. COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL 2013 TO SEPTEMBER 2013 Name of The Company : M/s. Subham Planners Ltd. Project : Construction of group housing project at Village Betkuchi,

More information

Request for Proposal Corrigendum 02. Selection of Service Provider for User Acceptance Test (UAT) & Automation Testing

Request for Proposal Corrigendum 02. Selection of Service Provider for User Acceptance Test (UAT) & Automation Testing Request for Proposal Corrigendum 02 Dated: 07 th November, 2015 Selection of Service Provider for User Acceptance Test (UAT) & Automation Testing RFP Tender Number: 05-2015/16 Dated: 15 th October, 2015

More information

GOVERNMENT OF TAMIL NADU INDUSTRIES DEPARTMENT. Notification

GOVERNMENT OF TAMIL NADU INDUSTRIES DEPARTMENT. Notification GOVERNMENT OF TAMIL NADU INDUSTRIES DEPARTMENT Notification Chennai dated, 2017 In exercise of the powers conferred by Section 34 (1) of the Tamil Nadu Business Facilitation Act 2017, (Tamil Nadu Act......

More information

PRESS STATEMENT BY HON. MINISTER FOR LANDS & NATURAL RESOURCES ON ENQUIRY REPORT ON MULTIPLE FATALITY ACCIDENT AT NEWMONT AHAFO MILL EXPANSION (A.M.

PRESS STATEMENT BY HON. MINISTER FOR LANDS & NATURAL RESOURCES ON ENQUIRY REPORT ON MULTIPLE FATALITY ACCIDENT AT NEWMONT AHAFO MILL EXPANSION (A.M. PRESS STATEMENT BY HON. MINISTER FOR LANDS & NATURAL RESOURCES ON ENQUIRY REPORT ON MULTIPLE FATALITY ACCIDENT AT NEWMONT AHAFO MILL EXPANSION (A.M.E.) PROJECT ON 7 TH APRIL 2018 BACKROUND On 7 th April

More information

Chhattisgarh State Electricity Regulatory Commission

Chhattisgarh State Electricity Regulatory Commission Chhattisgarh State Electricity Regulatory Commission Irrigation Colony, Shanti Nagar, Raipur Raipur, Dated September 18, 2013 No. 48/CSERC/2013 - Section 86(1)(e) of the Electricity Act, 2003 (the Act)

More information

NetSuite SuiteFoundation Sample Test: March 2018

NetSuite SuiteFoundation Sample Test: March 2018 1 NetSuite SuiteFoundation Sample Test March 2018 2 Contents About this Sample Test... 4 I. Identify the general functionality that can be controlled under Enable Features.... 5 II. Identify the general

More information

PONDICHERRY UNIVERSITY SCHOOL OF LIFE SCIENCES DEPARTMENT OF BIOCHEMISTRY & MOLECULAR BIOLOGY (R.V.NAGAR, KALAPET, PUDUCHERRY

PONDICHERRY UNIVERSITY SCHOOL OF LIFE SCIENCES DEPARTMENT OF BIOCHEMISTRY & MOLECULAR BIOLOGY (R.V.NAGAR, KALAPET, PUDUCHERRY Tender Document PONDICHERRY UNIVERSITY SCHOOL OF LIFE SCIENCES DEPARTMENT OF BIOCHEMISTRY & MOLECULAR BIOLOGY (R.V.NAGAR, KALAPET, PUDUCHERRY 605 014) Ref: DST sanction order no. SB/SO/HS/002/2014/dt.

More information

CITY OF TORONTO. BY-LAW No (OMB)

CITY OF TORONTO. BY-LAW No (OMB) CITY OF TORONTO BY-LAW No. 364-2010(OMB) To amend the General Zoning By-law No. 438-86 of the former City of Toronto with respect to the lands municipally known as 1201 Dundas Street East. WHEREAS the

More information

DELHI METRO RAIL CORPORATION LTD. Contract No: - AMCC-02

DELHI METRO RAIL CORPORATION LTD. Contract No: - AMCC-02 DELHI METRO RAIL CORPORATION LTD. Contract No: - AMCC-02 Contract: AMCC-02: Part design and construction of elevated viaduct (chainage km 1.338 1.458 to km 6.577 6.546) and five elevated stations viz.,

More information

J.K. Cement WORKS, MANGROL (RAJ) 25 MW Captive Power Plant & 10 MW Waste Heat Recovery Boiler

J.K. Cement WORKS, MANGROL (RAJ) 25 MW Captive Power Plant & 10 MW Waste Heat Recovery Boiler J.K. Cement WORKS, MANGROL (RAJ) 25 MW Captive Power Plant & 10 MW Waste Heat Recovery Boiler Compliance report of Environment Clearance from SEIAA, Rajasthan, Letter No. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project/Cat8(b)B1/(484)/12-12

More information

New Balance Athletic Shoe, Inc.

New Balance Athletic Shoe, Inc. New Balance Athletic Shoe, Inc. Case Writeup Individual Case #1 The George Washington University Executive MBA Program EMBA 220: Operations Management Professor Sanjay Jain, Ph.D. February 6, 2010 Robert

More information

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011 Ref.No:POL/U-II/EC/12-13/176 Date : 23.11.2012 To, Dr. A. Mehrotra, Director (S) Ministry of Environment & Forests, Regional Office, Western Region, Kendriya Paryavaran Bhavan Link Road No.3, E-5, Ravi

More information

L.20; L.25; L.9; L.12;M.1; K; A]...

L.20; L.25; L.9; L.12;M.1; K; A]... GSA FAS Office of Integrated Technology Services Network Services 2020 (NS2020) Enterprise Infrastructure Solutions (EIS) RFP # QTA0015THA3003, Volume 4 Business Final Proposal Revision, March 31, 2017

More information

Form -VI APPLICATION FOR OBTAINING DISABILITY CERTIFIATE BY PERSONS WITH DISABILITIES. [ See rule 34 (1)]

Form -VI APPLICATION FOR OBTAINING DISABILITY CERTIFIATE BY PERSONS WITH DISABILITIES. [ See rule 34 (1)] Form -VI APPLICATION FOR OBTAINING DISABILITY CERTIFIATE BY PERSONS WITH DISABILITIES [ See rule 34 (1)] 1. Name : --------------------------------- ----------------------------------- --------------------------------

More information

DELHI METRO RAIL CORPORATION LTD. Contract No: - AMCC-01

DELHI METRO RAIL CORPORATION LTD. Contract No: - AMCC-01 DELHI METRO RAIL CORPORATION LTD. Contract No: - AMCC-01 Contract: AMCC-01: Part design and construction of elevated viaduct (chainage km 6.577 6.546 to km 12.689), depot connection and six elevated stations

More information

POLICY & PROCEDURES MEMORANDUM

POLICY & PROCEDURES MEMORANDUM Policy No. BA-1260.1 POLICY & PROCEDURES MEMORANDUM TITLE: INTERNAL CONTROL SYSTEM EFFECTIVE DATE: February 13, 1996* (*Procedural/Title Updates 1/12/16, 1/27/15; CANCELLATION: CATEGORY: none Business

More information

CROSS CONNECTION AND BACKFLOW PREVENTION BY-LAW BY-LAW #

CROSS CONNECTION AND BACKFLOW PREVENTION BY-LAW BY-LAW # CROSS CONNECTION AND BACKFLOW PREVENTION BY-LAW BY-LAW #1204-08 Page 1/13 The Council of The Town of Sussex, under authority vested in it by Section 189 of the Municipalities Act R.S.N.B. (1973), chapter

More information

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION (A Government Of Maharashtra Undertaking) CIRCULAR

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION (A Government Of Maharashtra Undertaking) CIRCULAR MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION (A Government Of Maharashtra Undertaking) CIRCULAR No. MIDC/CP/ C55174 /2017 Date : 13.07.2017 Subject : Guidelines for Inspection while issuing Completion

More information

Monitoring PTC Windchill 11.0 Performance Using the PTC System Monitor

Monitoring PTC Windchill 11.0 Performance Using the PTC System Monitor Monitoring PTC Windchill 11.0 Performance Using the PTC System Monitor Overview Course Code Course Length TRN-4832-T 8 Hours In this course, you will learn how to use PTC System Monitor to manage and troubleshoot

More information

Windchill PDMLink Curriculum Guide

Windchill PDMLink Curriculum Guide Windchill PDMLink 10.2 Curriculum Guide Live Classroom Curriculum Guide Update to Windchill PDMLink 10.2 from Windchill PDMLink 9.0/9.1 for the End User Introduction to Windchill PDMLink 10.2 for Light

More information

Tolerance and Classification

Tolerance and Classification Tolerance and Classification As per ISI-IS: 2296-1982, the tolerance limits of parameters are specified as per classified use of water (Table 1,2,3,4,5 below) depending on various uses of water. The following

More information

Demolition Permit Requirements

Demolition Permit Requirements Demolition Permit Requirements Prior to Issuance of a Demolition Permit, the following is required: 1 - Planning Department Requirements/Approvals: Confirmation that there are no active Land Use Entitlement

More information

Water Cycle Study Appendix A Water Quality Assessment

Water Cycle Study Appendix A Water Quality Assessment Central Bedfordshire Council www.centralbedfordshire.gov.uk Water Cycle Study Appendix A Water Quality Assessment July 2017-1 - A Appendix: Water Quality Assessment 2016s4180 - Central Bedfordshire Council

More information

Pondicherry University Centre for Nanoscience and Technology Tender Document

Pondicherry University Centre for Nanoscience and Technology Tender Document Pondicherry University Centre for Nanoscience and Technology Tender Document Sealed tenders are invited under two-bid system for the supply and installation of the following Scientific Equipment under

More information

ANNEX 1: OUTLINE TERMS OF REFERENCE FOR CONSULTANTS INDICATIVE OUTLINE TERMS OF REFERENCE FOR DESIGN AND SUPERVISION CONSULTANTS

ANNEX 1: OUTLINE TERMS OF REFERENCE FOR CONSULTANTS INDICATIVE OUTLINE TERMS OF REFERENCE FOR DESIGN AND SUPERVISION CONSULTANTS ANNEX 1: OUTLINE TERMS OF REFERENCE FOR CONSULTANTS INDICATIVE OUTLINE TERMS OF REFERENCE FOR DESIGN AND SUPERVISION CONSULTANTS 1.Background By a framework financing agreement dated 08th August, 2013

More information

Contract workers and labour standards: Experiences from India

Contract workers and labour standards: Experiences from India Contract workers and labour standards: Experiences from India What is contract labour? Definition as per law A workman is deemed to be employed as Contract Labour when he is hired in connection with the

More information

RFP FOR SUPPLY, INTEGRATION, OPERATIONALISATION & MAINTENANCE OF CASH ACCEPTOR CUM ATM (CAA)

RFP FOR SUPPLY, INTEGRATION, OPERATIONALISATION & MAINTENANCE OF CASH ACCEPTOR CUM ATM (CAA) Corrigendum Notice Annexure-I This is with reference to the RFP FOR SUPPLY, INTEGRATION, OPERATIONALISATION & MAINTENANCE OF CASH ACCEPTOR CUM ATM (CAA). In this regard, all the prospective bidders are

More information

APPENDIX-I {See regulation 5} Form for first application to erect, re-erect, demolish or to make material alteration in a building

APPENDIX-I {See regulation 5} Form for first application to erect, re-erect, demolish or to make material alteration in a building APPENDIX-I {See regulation 5} Form for first application to erect, re-erect, demolish or to make material alteration in a building To, The Chief Executive Officer, Yamuna Expressway Industrial Development

More information

NetSuite Financial User Sample Test: April 2018

NetSuite Financial User Sample Test: April 2018 1 NetSuite Financial User Sample Test 2018 2 Contents About this Sample Test... 3 I. Recognize what a subsidiary is, types of subsidiaries, and how they are used.... 4 II. Identify the general functionality

More information

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 690. WATER QUALITY STANDARDS IMPLEMENTATION SUBCHAPTER 1. INTRODUCTION

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 690. WATER QUALITY STANDARDS IMPLEMENTATION SUBCHAPTER 1. INTRODUCTION TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 690. WATER QUALITY STANDARDS IMPLEMENTATION SUBCHAPTER 1. INTRODUCTION 252:690-1-4. Incorporation of EPA regulations by reference The following federal

More information

MUMBAI METRO RAIL CORPORATION LTD (MMRC)

MUMBAI METRO RAIL CORPORATION LTD (MMRC) MUMBAI METRO RAIL CORPORATION LTD (MMRC) E-TENDER REQUEST FOR PROPOSAL FOR APPOINTMENT OF INTERNAL AUDITOR FOR FY 2016-17 FOR MUMBAI METRO RAIL CORPORATION LIMITED (A 50:50 JOINT VENTURE OF GOVT. OF INDIA

More information

From : April 2015 To : October 2015 Status of conditions stipulated in Environmental and CRZ clearance. Adani Vizag Coal Terminal Private Limited

From : April 2015 To : October 2015 Status of conditions stipulated in Environmental and CRZ clearance. Adani Vizag Coal Terminal Private Limited Page 1 of 27 Half yearly Compliance report for Environment and CRZ Clearance for development of East quay -1 (EQ-l) by replacing the existing EQ-l berth and part of EQ-2 berth. Sr. No. Conditions Compliance

More information

Legal Considerations in Selection for France

Legal Considerations in Selection for France Legal Considerations in Selection for France In France, it might easily be thought that legislation is not concerned about recruitment and selection, and with reason, because little attention is paid to

More information

VACANCY ANNOUNCEMENT

VACANCY ANNOUNCEMENT REPUBLIC OF KENYA TANA RIVER COUNTY GOVERNMENT OFFICE OF THE COUNTY PUBLIC SERVICE BOARD P.O.BOX 181-70101, HOLA VACANCY ANNOUNCEMENT The County Public Service Board of Tana River wishes to recruit competent

More information

Training Scheme FAQs

Training Scheme FAQs Training Scheme FAQs Questions Answers 1. I registered as Student with the Students registered prior to 1.1.2008 the and opting to switch over to Revised Institute before 1 st January 2008 for Syllabus,

More information

PROMOTION INDEX CODE: EFFECTIVE DATE:

PROMOTION INDEX CODE: EFFECTIVE DATE: PROMOTION INDEX CODE: 700.2 EFFECTIVE DATE: 11-21-17 Contents: I. Purpose II. Equal Employment Opportunity III. Legal Authority & Responsibilities IV. Anne Arundel County Charter & Code V. Promotion Manual

More information

Uttar Pradesh Electricity Regulatory Commission. No. UPERC/Secy/Regulation/ Dated: 23 March, 2006

Uttar Pradesh Electricity Regulatory Commission. No. UPERC/Secy/Regulation/ Dated: 23 March, 2006 Uttar Pradesh Electricity Regulatory Commission No. UPERC/Secy/Regulation/06-1288 Dated: 23 March, 2006 In exercise of powers conferred under section 181 read with section 9, 61, 86 (1) (a), 86 (1) (b)

More information

PRACTICAL TRAINING. (Or)

PRACTICAL TRAINING. (Or) PRACTICAL TRAINING 1. Objectives of the Practical Training To develop among the students the necessary skill required to apply theoretical knowledge of cost and management accounting to practical situations

More information

Informal note by the co chairs

Informal note by the co chairs Draft elements for SBSTA agenda item 11 (c) Draft decision on the work programme under the framework for non market approaches referred to in Article 6, paragraph 8, of the Paris Agreement Informal note

More information

SUPPLIER POLICIES AND PROCEDURES

SUPPLIER POLICIES AND PROCEDURES SUPPLIER POLICIES AND PROCEDURES Contents i. New Item Introduction... 3 ii. Return Privileges... 3 iii. Stock Issues... 3 iv. Pricing... 3 v. Invoice Payment & Reconciliation... 3 vi. Date Codes... 4 vii.

More information

A-6 BOARD GUIDELINES. a) on-going reports by the CEO; b) the strategic planning process; and c) the Audit Committee.

A-6 BOARD GUIDELINES. a) on-going reports by the CEO; b) the strategic planning process; and c) the Audit Committee. 1. INTRODUCTION Primero Mining Corp. ( Primero Mining or the Company ) Board of Directors (the Board ) believes the principal objective of the Company is to generate acceptable returns to its security

More information

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs)

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) Policy Resolution for Promotion of Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) POLICY OBJECTIVES 1. The Petroleum, Chemicals and Petrochemical industry in India is well established

More information

INDEPENDENT ELECTRICAL CONTRACTORS SAFETY PROGRAM AWARENESS & RETENTION KIT

INDEPENDENT ELECTRICAL CONTRACTORS SAFETY PROGRAM AWARENESS & RETENTION KIT INDEPENDENT ELECTRICAL CONTRACTORS SAFETY Deadline to complete is July 15, 2018 Contact Information Company Name: Address: City/State/Zip: Phone: Fax: E-mail: Chapter Name: Date Completed: Preparer s Name:

More information

Detail Tender Notice (Second Call)

Detail Tender Notice (Second Call) MUMBAI HOUSING & AREA DEVELOPMENT BOARD (MHADB) (A Regional Unit of MHADA) Detail Tender Notice (Second Call) Request for Proposal (RFP) for selection as a Consultant for Providing Planning, Designing

More information

All the members shall be financially literate and at least one (1) member of the ARC:

All the members shall be financially literate and at least one (1) member of the ARC: JOBSTREET CORPORATION BERHAD 1. COMPOSITION The Audit and Risk Committee ( ARC ) shall be appointed by the Directors from among their number (pursuant to a resolution of the Board of Directors) and shall

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,

More information

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests

State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests State Level Environment Impact Assessment Authority, Punjab Government of India Ministry of Environment and Forests No.SEIAA/2009/ Dated. REGISTERED To M/s C & C Towers Ltd., Plot no.70, Institutional

More information

SAM Supplement Representations, Certifications and Other Statements of Offerors for Government Related Orders

SAM Supplement Representations, Certifications and Other Statements of Offerors for Government Related Orders PRIME Contractor/Offeror System Studies and Simulation Inc, 615 Discovery Drive, Huntsville, AL 35806 (256) 539-1700 SAM Supplement Representations, Certifications and Other Statements of Offerors for

More information

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF MARCH TO AUGUST -2013

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF MARCH TO AUGUST -2013 COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE Name of Company : FOR THE PERIOD OF MARCH -2013 TO AUGUST -2013 M/s. GNRC Institute of Medical Sciences (a unit of GNRC Ltd). Project : Construction of Medical

More information

IAF Mandatory Document. Accreditation Assessment of Conformity Assessment Bodies with Activities in Multiple Countries. Issue 2 IAF MD 12:2016

IAF Mandatory Document. Accreditation Assessment of Conformity Assessment Bodies with Activities in Multiple Countries. Issue 2 IAF MD 12:2016 IAF Mandatory Document Accreditation Assessment of Conformity Assessment Bodies with Activities in Multiple Countries Issue 2 IAF MD 12:2016 2016 Issue 2 Accreditation Assessment of Conformity Page 2 of

More information

ASBESTOS DEMOLITION/RENOVATION NOTIFICATION FORM GENERAL INFORMATION

ASBESTOS DEMOLITION/RENOVATION NOTIFICATION FORM GENERAL INFORMATION ASBESTOS DEMOLITION/RENOVATION NOTIFICATION FORM GENERAL INFORMATION The asbestos NESHAP, 40 CFR, Part 61, Subpart M, requires written notification of demolition or renovation operations under Section

More information

Chairman Vice-Chairman Member Ex-Officio Member Ex-O.ffi cio I 1ember. FINDINGS OF FACT, CONCLUSIONS OF h\vl AND ORDER

Chairman Vice-Chairman Member Ex-Officio Member Ex-O.ffi cio I 1ember. FINDINGS OF FACT, CONCLUSIONS OF h\vl AND ORDER 133J A-1377 BEFORE THE MlJNICIPAL COiviJ.VIISSION OF THE STATE OF 1\JliNNESOTA Robert Wo\ Johnson Robert J.. Ford Arthur R.. Swan Idor Ao Pederson A. B.. Schaefer IN THE IJIATTER OF 'fhe PETITION OF )

More information

No.CCIC/G.A./Cartridge/ /05. (A Govt. of India Undertaking, Ministry of Textiles) RATE CONTRACT FOR SUPPLY OF TONER/INK CARTRIDGES FOR PRINTERS

No.CCIC/G.A./Cartridge/ /05. (A Govt. of India Undertaking, Ministry of Textiles) RATE CONTRACT FOR SUPPLY OF TONER/INK CARTRIDGES FOR PRINTERS No.CCIC/G.A./Cartridge/2015-16/05 CENTRAL COTTAGE IINDUSTRIIES CORPORATIION OF IINDIIA LTD.. (A Govt. of India Undertaking, Ministry of Textiles) RATE CONTRACT FOR SUPPLY OF TONER/INK CARTRIDGES FOR PRINTERS

More information

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR 99.0 PUBLIC AND PRIVATE IMPROVEMENTS CODE 99.0 PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR TABLE OF CONTENTS 99.1. ADMINISTRATION AND GENERAL REGULATIONS...2 99.1.1. Title...2

More information

NOTICE FOR SELECTION OF ARCHITECT FOR ALTERATION / ADDITIONAL CONSTRUCTION WORK ON THE EXISITING BUILDING OF BHUBANESWAR CHAPTER OF ICSI

NOTICE FOR SELECTION OF ARCHITECT FOR ALTERATION / ADDITIONAL CONSTRUCTION WORK ON THE EXISITING BUILDING OF BHUBANESWAR CHAPTER OF ICSI NOTICE FOR SELECTION OF ARCHITECT FOR ALTERATION / ADDITIONAL CONSTRUCTION WORK ON THE EXISITING BUILDING OF BHUBANESWAR CHAPTER OF ICSI The Institute of Company Secretaries of India (ICSI) has its own

More information

AGENDA V OF R.T.I. UNDER SECTION 19 (8)(a)

AGENDA V OF R.T.I. UNDER SECTION 19 (8)(a) AGENDA V OF R.T.I. UNDER SECTION 19 (8)(a) I. Objective/Purpose of the Public Authority NSIC since, its establishment in 1955 has been working to fulfill its mission of promoting, aiding and fostering

More information

FITBIT, INC. CORPORATE GOVERNANCE GUIDELINES. As adopted on February 17, 2015 and amended on October 26, 2016

FITBIT, INC. CORPORATE GOVERNANCE GUIDELINES. As adopted on February 17, 2015 and amended on October 26, 2016 FITBIT, INC. CORPORATE GOVERNANCE GUIDELINES As adopted on February 17, 2015 and amended on October 26, 2016 The following Corporate Governance Guidelines have been adopted by the Board of Directors (the

More information

Table of Contents Foreword... iii Legend...v UCP600 Article 1 Application of UCP... 1 UCP600 Article 2 Definitions: 1 Advising Bank...

Table of Contents Foreword... iii Legend...v UCP600 Article 1 Application of UCP... 1 UCP600 Article 2 Definitions: 1 Advising Bank... Table of Contents Foreword... iii Legend...v UCP600 Article 1 Application of UCP... 1 A. Introduction... 1 4: UCP600 Defined Terms Used in UCP600 Article 1 5: UCP600 Interpretations Generally C. Standby

More information

Telefax : 011: Dated 1 st November, 2011

Telefax : 011: Dated 1 st November, 2011 Drilling of Development Well (17 Nos.) and Exploratory Well (14 Nos.) at Tengakhat Kathaloni Dikom Area, District Dibrugarh, Assam by M/s Oil India Limited Environmental Clearance reg. ***********************

More information

NJ Local Plan Guidance WDB DIRECTORS MEETING SEPTEMBER 29, 2016

NJ Local Plan Guidance WDB DIRECTORS MEETING SEPTEMBER 29, 2016 NJ Local Plan Guidance WDB DIRECTORS MEETING SEPTEMBER 29, 2016 Submissions Public Comment Period Preceding Submission: Both Regional and Local Plan (30 days) Due Date: December 15, 2016 Send to SETC Liaison

More information

Urban Redevelopment and Assembly Bill 440 the New Polanco Act

Urban Redevelopment and Assembly Bill 440 the New Polanco Act Urban Redevelopment and Assembly Bill 440 the New Polanco Act Thursday, September 4, 2014 General Session; 8:00 9:30 a.m. Leah S. Goldberg, Senior Deputy City Attorney, San Jose DISCLAIMER: This paper

More information

Law March 4, 2009, (The Gas Act) Decree 7382 December 2, 2010

Law March 4, 2009, (The Gas Act) Decree 7382 December 2, 2010 Law 11909 March 4, 2009, (The Gas Act) Decree 7382 December 2, 2010 Law 11909 deals with the activities related to the transport of natural gas, dealt with in Article 177 of the Federal Constitution, as

More information

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Sr.No Condition Status A. SPECIFIC CONDITIONS: J.K. CEMENT WORKS, MANGROL (RAJ.) Compliance report of Mangrol Lime stone mine (For the period from April 2011 to September 2011) Sub:- Conditions of Environment Clearance from MOEF, New Delhi Letter No.

More information

PERMIT AND INSPECTIONS

PERMIT AND INSPECTIONS Chapter 3 PERMIT AND INSPECTIONS 3.1 PERMITS No building or structure regulated by this Code shall be erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished

More information

Contract Labour (Regulation & Abolition) Act, 1970 &Tamil Nadu Contract Labour Rules, 1975 (PRINCIPAL EMPLOYER)

Contract Labour (Regulation & Abolition) Act, 1970 &Tamil Nadu Contract Labour Rules, 1975 (PRINCIPAL EMPLOYER) Contract Labour (Regulation & Abolition) Act, 1970 &Tamil Nadu Contract Labour Rules, 1975 (PRINCIPAL EMPLOYER) Particulars of the Establishment 1 Name & l o c a t i o n o f t h e Establishment 2 Name

More information

REQUEST FOR PROPOSALS: CEO COMPENSATION AND EVALUATION SERVICES. Issue Date: April 30, Due Date: June 6, 2014

REQUEST FOR PROPOSALS: CEO COMPENSATION AND EVALUATION SERVICES. Issue Date: April 30, Due Date: June 6, 2014 REQUEST FOR PROPOSALS: CEO COMPENSATION AND EVALUATION SERVICES Issue Date: April 30, 2014 Due Date: June 6, 2014 In order to be considered, proposals must be signed and returned via email to rwhitmore@wested.org

More information

ORGANIC LAW OF THE NATIONAL INSTITUTE FOR ANTHROPOLOGY AND HISTORY. New Law, published in the Official Gazette of the Federation on February 3rd, 1939

ORGANIC LAW OF THE NATIONAL INSTITUTE FOR ANTHROPOLOGY AND HISTORY. New Law, published in the Official Gazette of the Federation on February 3rd, 1939 ORGANIC LAW OF THE NATIONAL INSTITUTE FOR ANTHROPOLOGY AND HISTORY New Law, published in the Official Gazette of the Federation on February 3rd, 1939 CURRENT TEXT Last amendment published OGF 23-01-1998

More information

Dated: 18th June, 2015

Dated: 18th June, 2015 F.No.21-149/2014-IA.I11 Government of India Ministry of Environment, Forests & Climate Change (IA.II1Section) Indira Paryavaran Bhawan, Jor Bagh Road, New Delhi - 110 003 Dated: 18th June, 2015 To The

More information

No. SEIAA/M.S./2015/3809 Registered Dated

No. SEIAA/M.S./2015/3809 Registered Dated STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment, Forests and Climate Change, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala

More information

WORKDAY, INC. CORPORATE GOVERNANCE GUIDELINES (September 6, 2018)

WORKDAY, INC. CORPORATE GOVERNANCE GUIDELINES (September 6, 2018) WORKDAY, INC. CORPORATE GOVERNANCE GUIDELINES (September 6, 2018) The following Corporate Governance Guidelines have been adopted by the Board of Directors (the Board ) of Workday, Inc. ( Workday ) to

More information

NetSuite ERP Consultant Sample Test: April 2018

NetSuite ERP Consultant Sample Test: April 2018 NetSuite ERP Consultant Sample Test April 2018 Contents About this Sample Test... 4 Notes about the actual Exam:... 4 I. Identify Accounting Preferences to be configured to support a customer specific

More information

TERMS AND CONDITIONS Annexure "B" Major terms and conditions for concurrent audit assignment are stated as under. However, the Bank reserves its

TERMS AND CONDITIONS Annexure B Major terms and conditions for concurrent audit assignment are stated as under. However, the Bank reserves its TERMS AND CONDITIONS Annexure "B" Major terms and conditions for concurrent audit assignment are stated as under. However, the Bank reserves its right to amend / modify any condition and Bank s decision

More information

GOVERNMENT OF RAJASTHAN URBAN DEVELOPMENT DEPARTMENT

GOVERNMENT OF RAJASTHAN URBAN DEVELOPMENT DEPARTMENT GOVERNMENT OF RAJASTHAN URBAN DEVELOPMENT DEPARTMENT SECTION 5 - TERMS OF REFERENCE Background Information and Outline Terms of Reference for consulting firms for Construction Supervision & Design Consultancy

More information