1 A PROJECT FOR DEVELOPMENT OF GRAPE ORCHARD PROJECT REPORT SUBMITTED TO SUBMITTED BY
2 PROMOTERS PROFILE PROJECT A Project for Development of a Grape orchard CONTENTS FOR PROJECT WRITEUP The project envisages establishment of a grape garden of 'Saritha Krishna' and 'Red Globe' varieties. As a prerequisite for establishment of a grape orchard of there is need for developing basic infrastructure, taking up the required farm constructions, installation of drip irrigation system and purchase of farm machinery/equipments and a farm vehicle PROJECT LOCATION (Rs.in lakhs) OUTLAY AND BANK LOAN Particulars Cost Loan Margin Basic infrastructure Construction Drip system Machinery & equipment Farm vehicle Development of horticulture crops Total PROJECT INVESTMENTS Basic infrastructure The farm requires barbed wire fencing. There is need for land development works in terms of making plots of suitable size and providing farm roads as per requirement. Two borewells have been recently completed to meet the water requirements of the farm. The details of the borewells are as follows: Depth (ft) Casing (ft) Yield (GPH) SIP (HP) Borewell borewell The farm requires a sump tank of 1.5 lakh liter capacity to ensure adequate water storage. Pipelines are required to pump the water from borewells to the water tank. The farm electrification works including the departmental charges has also been included in the infrastructure development. The supporting estimates/quotations/bills for the above items is given under Appendix Drip irrigation The proposed grape orchard of acres will be under overhead drip irrigation as shown in the design and the estimate given under Appendix Constructions The housing to be provided on the farm includes a farm managers quarters, supervisors quarters and lanbour quarters. In addition there is need for a store room/godown for farm inputs. there is need for a grading/packing hall for handling the grapes and packaging it for market. There is also need for a power room. The plan and estimate for these constructions are given in Appendix Machinery and equipments The farm needs a 30 HP MF tractor which will be used in the proposed grape garden. There is also need for a power tiller for soil working and other operations as also for transportation of inputs within the orchard. It is also proposed to purchase an tiller mounted sprayer along with hose pipe, lance and accessories for plant protection operations. A mono submersible pump set is required for the sump tank. As maintenance of grape orchards involves pruning and training operations requiring garden tools and equipments the same have also been included in the project cost. In the bearing stage the grape crop is to be protected through use of bird net and the cost of the same is also included. The crates required for harvesting and handling of grapes is also a requirement. The quotation for these items are given under Appendix
3 Farm vehicle: The farm supervisor is to be provided with a two wheeler for operational convenience and the quotation for the same is given under Appendix Development of grapes It is proposed to develop seedless grapes in an area of acres. The basic requirement for developing grapes is a pendal or a trelli system. In the present project a hut system trelli design with granite pole and GI wire has been proposed. The cost of trelli system including the labour requirement for errection is given in Annexure -21. The grape orchard layout map, the trelli design and related workings are given under Annexure -17 to 20. It can be seen that the per acre cost of trellis works out to Rs.1.27 lakhs. The unit cost for development of grapes including plant material, planting, training, and other expenses for the first year works out to Rs.1.76 lakhs per acre as shown in Annexure - 3 & 4. The total cost including the maintenance for second year works out Rs.2.32 lakhs per acre. The cost of cultivation/maintenance and the details of yield/income are given in page two of the subject Annexure. SUITABILITY OF THE AREAThe area is traditionally well known for grape and horticulture crops. Lands are suitable for grape cultivation as per soil and water test reports given under Appendix Specific amendments/recommendations of soil and water test reports if any Deficiency of major nutrients Deficiency of micro nutrients Any other problem Phosphorus Some nutrients are in excess Soil slightly acidic Note:Suitable ameliorative measures suggested by experts will be adopted LAND RECORDS Whether own land (ancestral) - Whether own land (purchased) Yes Whether lease/tenancy/contract - Proof of title/land record enclosed Yes Legal scrutiny report enclosed Yes PROJECT ECONOMICS TECHNICAL FEASIBILITY FINANCIAL VIABILITY TECHNICAL GUIDANCE MANAGEMENT/ SUPERVISION AVAILABILITY OF INPUTS MARKETING ARRANGEMENTS LENDING NORMS EXISTING STATUS OF PROJECT IMPLEMENTATION SCHEDULE The economics is worked out based on unit cost and economics for development of grape garden as given under Annexure 3 & 4. Suitability of soil Suitability of water Agro climatic conditions Use of drip Margin, ROI, Repayment and Security As per test report the soils are suitable for seedless grapes subject to amendments suggested As per test report the water is suitable for irrigation The conditions are suitable for grapes Drip will help better water use efficiency The income expenditure statement, repayment chart, cash flow statement, discounted cash flow and DSCR calculation are given under Annexure The payback period, profitability, funds flow and projected balance sheet are given under Annexure 13 to 16.
4 LIST OF ANNEXURES 1 Project outlay 2 Disbursement schedule 3 Development of seedless grape - Saritha Krishna 4 Development of seedless grape - Red Globe 5 Income and expenditure statement 6 Repayment schedule 7 Cash flow statement 8 Discounted cash flow statement 9 Sensitivity analysis - 10% increase in cost 10 Sensitivity analysis - 10% decrease in returns 11 DSCR calculation 12 DSCR on 5% reduction in surplus for repayment 13 Payback period 14 Profitability statement 15 Projected fund flow statement 16 Projected balance sheet 17 Grape orchard layout map 18 Requirement of pillars and trelliwire 19 Blockwise estimation of trelliwire requirement 20 Trelli design 21 Trellis cost (Rs.per acre)
5 ANNEXURE - 1 PROJECT FOR DEVELOPMENT OF GRAPE ORCHARD Project outlay Nos Particulars Unit Qty No. Rate Amt Cost 1.0 BASIC INFRASTRUCTURE (Rs.in lakhs) Loan Margin 75% 25% 1.1 Fencing rft Stone slab Compound rft Land levelling hr Borewell Nos SIP set Nos Sump tank li Pipeline (70 m per ac.) m Electrification works CONSTRUCTIONS 2.1 Farm manager quarters sft Supervisor quarters sft Store room/godown sft Labour quarters sft Grading/packing hall sft Power room sft DRIP IRRIGATION SYSTEM ac MACHINERY/EQUIPMENTS HP Tractor Power tiller Monoblock pumpset Tiller mounted sprayer Garden tools/equipments Bird net kg Crates No FARM VEHICLE 5.1 Two weeler No DEVELOPMENT OF GRAPES 6.1 Saritha Krishna vareity ac ##### Red globe ac TOTAL H.S.Subramanya, Project consultant & Approved valuer, # 71, 5th main, 2nd 'A' Cross, Ags colony Anandanagar, Bangalore , Tele: , Mobile:
6 Project for development of grape orchard Disbursement schedule ANNEXURE - 2 PARTICULARS 1 year Rs.in lakhs) Total 1.0 Basic Infrastructure Constructions Drip Irrigation System Machinery/ Equipments Farm vehicle Development of Grapes 6.1 Saritha Krishna Red Globe TOTAL COST BANK LOAN 1.0 Basic Infrastructure Constructions Drip Irrigation System Machinery/ Equipments Farm vehicle Development of Grapes Saritha Krishna Red Globe TOTAL LOAN MARGIN H.S.Subramanya, Project consultant & Approved valuer, # 71, 5th main, 2nd 'A' Cross, Ags colony Anandanagar, Bangalore , Tele: , Mobile:
7 Farm ANNEXURE - 3 Page - 1 Project Project for development of grape orchard Version Source file 1 Ref.Code Unit cost & Economics of Unit cost Development of Grapes NABARD SOF Current file Other sources Actual cost Unit area Acres 1 Variety Saritha Krishna Planting material Grafts Proposed area Acres 9.00 Crop status New Existing Age Spacing ft 9 x 6 Plant per ac. per ha. Development cost per Years 2 m 2.74 x 1.83 density 812 acre Amount Cost particulars Amount in Rs Total 1.0 Pendal for grapes Preparation of pits for planting Planting material Manure and Fertilisers Plant protection Irrigation Cultural operations Harvest & post harvest operations Total Proposed area Total cost (Rs. In lakhs) H.S.Subramanya, Project consultant & Approved valuer, # 71, 5th main, 2nd 'A' Cross, Ags colony Anandanagar, Bangalore - 24, Tele: , Mobile:
8 Farm ANNEXURE - 3 Page - 2 Ref.code Project Unit cost & Economics of Project for development of grape orchard Development of Grapes PART B - COST OF CULTIVATION / MAINTENANCE Proposed area Cost of cultivation /maintenance Cost of maintenance (Rs.in lakhs) PART C - YIELD / INCOME Projected yield Yield starts in year Unit Yield per tree/plant kg. Yield per acre kg Total yield kg Rate Rs.per kg Total returns/income (Rs.in lakhs) H.S.Subramanya, Project consultant & Approved valuer, # 71, 5th main, 2nd 'A' Cross, Ags colony Anandanagar, Bangalore - 24, Tele: , Mobile:
9 Farm ANNEXURE - 4 Page - 1 Project Project for development of grape orchard Version Source file 1 Ref.Code Unit cost & Economics of Unit cost Development of Grapes NABARD SOF Current file Other sources Actual cost Unit area Acres 1 Variety Red Globe Planting material Grafts Proposed area Acres 1.76 Crop status New Existing Age Spacing ft 9 x 6 Plant per ac. per ha. Development cost per Years 2 m 2.74 x 1.83 density 812 acre Amount Cost particulars Amount in Rs Total 1.0 Pendal for grapes Preparation of pits for planting Planting material Manure and Fertilisers Plant protection Irrigation Cultural operations Harvest & post harvest operations Total Proposed area Total cost (Rs. In lakhs) H.S.Subramanya, Project consultant & Approved valuer, # 71, 5th main, 2nd 'A' Cross, Ags colony Anandanagar, Bangalore - 24, Tele: , Mobile:
10 Farm ANNEXURE - 4 Page - 2 Ref.code Project Unit cost & Economics of Project for development of grape orchard Development of Grapes PART B - COST OF CULTIVATION / MAINTENANCE Proposed area Cost of cultivation /maintenance Cost of maintenance (Rs.in lakhs) PART C - YIELD / INCOME Projected yield Yield starts in year Unit Yield per tree/plant kg. Yield per acre kg Total yield kg Rate Rs.per kg Total returns/income (Rs.in lakhs) H.S.Subramanya, Project consultant & Approved valuer, # 71, 5th main, 2nd 'A' Cross, Ags colony Anandanagar, Bangalore - 24, Tele: , Mobile:
11 Grape orchard layout map ANNEXURE - 17 N 580' Farm road Plot - A1 Plot - A2 Farm entrance Barbed wire fencing Compound Trellies Plot - B 200' Plot - C 800' 350' Plot - D BW-1 BW-2 Raja kaluve Farm entrance 10' width farm road 15' width farm road 20' width farm road Plot area, trelli lines and plant density Plot Sy.no. Dimension (ft) Area (sft) Area (acres) Cropped area (acres) Trelli length (ft) Trelli lines (nos) Total trelli length (ft) Poles (no.) Plants (no.) plants per ac. A1 A2 B C D x 290 x 650 x 650 x 350 x H.S.Subramanya, Project consultant & Approved valuer, # 71, 5th main, 2nd 'A' Cross, Ags colony Anandanagar, Bangalore - 24, Tele: , Mobile:
12 A PROJECT FOR DEVELOPMENT OF GRAPE ORCHARD ANNEXURE - 18 Requirement of pillars and trelliwire Pillar specifications End pillars Trelli pillars Support pillars (EP) Height (ft) 10 Grouting (ft) (TP) 8 2 (SP) Wiring clearance (ft) 2 2 Ground clearance (ft) Wire specifications Boundary wire (BW) Centre line wire (CLW) Trelli line wire (TLW) Drip line wire (DLW) Anchor wire (AW) Gauge GI rope GI rope Length(ft)/kg Ft Wire kgs Trelli design ANNEXUR - 19 TLW CLW BW SP EP Gripper DLW TP AW Grouting 5.0' 4.5' 2' 4.5' ground clearance 9' H.S.Subramanya, Project consultant & Approved valuer, # 71, 5th main, 2nd 'A' Cross, Ags colony Anandanagar, Bangalore - 24, Tele: , Mobile:
13 ANNEXURE- 21 A PROJECT FOR DEVELOPMENT OF GRAPE ORCHARD Trellis cost (Rs.per acre) Stone pillars No. of stone Pillars Cost of stone pillars Rs./pillar GI wire GI wire quantity kg GI wire - rate Rs./kg Cost of GI wire GI wire gripper No./acre 64 Rate Rs/gripper 40 Cost Rs Labour cost Labour cost for errection of trellis 5000 Total trelli cost Rs.per ac Width Depth Trench dimensions Trelli length m) Volumn of earth work Earth work rate -Rs./m3 Total trenching cost Cost of trenching work-rs./ac ft 2.75 m ft m
14 APPENDIX Supporting documents APPENDIX - A Estimates/plans/quotations Enclosed Required A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 A21 A22 A23 A24 APPENDIX - B APPENDIX - C APPENDIX - D APPENDIX - E APPENDIX - F APPENDIX - G Estimate for fencing Estimate for stone slab compound Estimate for land levelling Estimate for sump tank Bill/rate quotation for borewell Quotation for SIP set Plan for sump tank Estimate for pipelines Estimate/bill for electrification works Plan and estimate for manager quarters Plan and estimate for supervisor quarters Plan and estimate for store room/godown Plan and estimate for labour quarters Plan and estimate for grading/packing hall Plan and estimate for power room Drip Design Quotation for drip irrigation system Quotation for tractor Quotation for power tiller Quotation for monoblock pumpset Quotation for sprayer & garden tools Quotation for bird net Quotation for crates Quotation for farm vehicle Soil & water test report Legal scrutiny report Village key map Copies of land records Promoters credentials Photo documentation
ECONOMICS OF MANGO CULTIVATION IN TIRUNELVELI DISTRICT
I General Information APPENDIX ECONOMICS OF MANGO CULTIVATION IN TIRUNELVELI DISTRICT QUESTIONNAIRE FOR THE MANGO GROWER 1. Name of the Cultivator : 2. Village : 3. Block : 4. Taluk : 5. Age of the cultivator
More informationSITE OF THE PROJECT :
BENEFICIARY DETAILS NAME - S/D/W/O - VILLAGE - G.P. - P.O. - P.S. - BLOCK - DIST - PH - AGE - CATEGORY - xxxxxxxxxxxxxx FINANCING INSTITUTION BANK- BRANCH - SITE OF THE PROJECT : Plot no - Khata no - Type
More informationGOVERNMENT OF ODISHA DEPARTMENT OF AGRICULTURE AND FARMERS EMPOWERMENT
GOVERNMENT OF ODISHA DEPARTMENT OF AGRICULTURE AND FARMERS EMPOWERMENT PROJECT PROPOSAL FOR DEVELOPMENT OF FRUIT NURSERY KALIKAPRASAD FARM OF JASHIPUR BLOCK, MAYURBHANJ, ODISHA SUBMITTED BY: DEPUTY DIRECTOR
More informationINVESTMENT PATTERN AND MAINTENANCE COST IN SWEET ORANGE ORCHARD: AN ECONOMIC ANALYSIS
IJABR, VOL.7 (1) 2017: 150-155 ISSN 2250 3579 INVESTMENT PATTERN AND MAINTENANCE COST IN SWEET ORANGE ORCHARD: AN ECONOMIC ANALYSIS a Sidramayya, b Goudappa, S.B., c Suresh, S. Patil and d Hiremath, G.M.
More informationDAIRY FARMING REPORT. Project Report on 50 Murrah Buffalos DAIRY FARM
DAIRY FARMING REPORT DAIRY FARM Project Report on 50 Murrah Buffalos We advise entrepreneurs in setting up New Dairy Farm Shed & Infrastructure Building Designs for 50 Murrah Buffalos animals. We offer
More informationAGRICULTURE DEPARTMENT
AGRICULTURE DEPARTMENT AIM & OBJECTIVES. Rising agriculture production and productivity through wider adoption of appropriate eco-specific and cost effective technology. Bringing more area under high yielding
More informationECONOMICS OF DIFFERENT SCALES OF REARING AND COST BENEFIT RATIO
UNIT 2 Structure ECONOMICS OF DIFFERENT SCALES OF REARING AND COST BENEFIT RATIO 2.0 Objectives 2.1 Introduction 2.2 Meaning of Cost 2.3 Classification of Costs 2.4 Relationship of Fixed and Variable Costs
More informationImplementation Guidelines
Implementation Guidelines 2016-17 CREATION OF WATER RESOURCES Construction of Farm ponds for individual farmers Introduction: Farm ponds are the man made tanks constructed for storage of water in the farmers
More informationGRAND TOTAL - AGRICULTURE (A + B + C+D+E)
Agriculture Department - Karur District ABSTRACT Sl. No. Plan Schemes Progress (Financial Rs. In lakhs) - 2012-2013 SCHEMES Target BE/RE. 31.3.2013 of w.r.t R.E A) STATE SCHEMES Part I Schemes 1 Plan Schemes
More informationTURN THE PAGE FARMING NON-HERBICIDE NOTILL FARMING METHOD
TURN THE PAGE FARMING NON-HERBICIDE NOTILL FARMING METHOD 1. No-till farming without herbicides 2. Potential for organic farming systems 3. Not currently used for large scale production 4. 3rd Weed Science
More informationPROJECT REPORT 5MT COOL CHAMBER
PROJECT REPORT ON 5MT COOL CHAMBER 1 INTRODUCTION PROJECT REPORT ON COOL CHAMBER 5 MT India is the largest producer of fruits and vegetables in the world scenario but the availability of fruits and vegetables
More informationIn-situ plantation and moisture conservation techniques for replantation of old orchards of stone fruits under rainfed conditions of Himachal Pradesh
In-situ plantation and moisture conservation techniques for replantation of old orchards of stone fruits under rainfed conditions of Himachal Pradesh Situation and Background: Importance: Growing of stone
More informationDirectorate of Horticulture Odisha, Bhubaneswar
PROPOSED PROJECT PLAN FOR DEVELOPING DERAS HORTICULTURE FARM AS TECHNOLOGY DISSEMINATION CENTRE Under RKVY for the Year 2017-18 Project Cost: Rs. 154.750 Lakh. Submitted by: Asst. Director of Horticulture,
More informationEconomics of Saskatoon Berry Production
Economics of Saskatoon Berry Production A Ten Acre Enterprise AGDEX 238/82-2 MARCH 2008 Economics of Saskatoon Berry Production: A Ten Acre Enterprise Alberta Agriculture and Rural Development Sharon Faye
More informationAn Economic Evaluation of Investment on Aonla (Emblica officinalis G.) in Gujarat*
Agricultural Economics Research Review Vol. 20 July-December 2007 pp 385-394 Research Note An Economic Evaluation of Investment on Aonla (Emblica officinalis G.) in Gujarat* V.K. Gondalia 1 and G.N. Patel
More informationEconomic Analysis of Sub-Surface Drainage under Indira Gandhi Nahar Priyojna Command Area A Case Study
Agricultural Economics Research Review Vol. 20 July-December 2007 pp 361-374 Economic Analysis of Sub-Surface Drainage under Indira Gandhi Nahar Priyojna Command Area A Case Study R.S. Shekhawat 1 Abstract
More informationBank of Baroda Baroda Corporate Centre, B.K.C., Bandra (East),Mumbai Web site: //
Bank of Baroda Baroda Corporate Centre, B.K.C., Bandra (East),Mumbai 400 051. Web site: //www.bankofbaroda.com Bank invites applications from competent agencies for Digging the Bore well and related installation
More informationModel Lift Irrigation Scheme
Model Lift Irrigation Scheme (Lecture notes by Dr.S.S.Rao) Contents 1. Introduction... 2 2. Guideline lines for small lift irrigation schemes.... 3 2.1. Lift irrigation on surface water... 3 2.1.1 Size
More informationPROPOSAL For. An Integrated Project On Water and Natural Resource Management. KOLAGHAT LOKE SIKSHA NIKETAN.
PROPOSAL For An Integrated Project On Water and Natural Resource Management. SUBMITED BY KOLAGHAT LOKE SIKSHA NIKETAN. Registered under the West Bengal Societies Registration Act, 1961. WEST BENGAL, INDIA.
More informationSEED $ LBS $ $ NITROGEN (N) $ LBS $24.75 $24.75 PHOSPHATE (P205) $ LBS $56.00 $56.00 SUBTOTAL $ $260.
TABLE 6. Alfalfa establishment, sprinkler-irrigated, budgeted per acre costs and returns for a 480 acre farm with above average management, Lea County, Planting dates: August 15 - September 1 SEED $6.00
More informationFARM MECHANIZATION GUIDE LINES ANDHRA PRADESH
2013-14 FARM MECHANIZATION GUIDE LINES ANDHRA PRADESH The demand for modern farm implements and machinery is increasing year by year. The usage of improved implements played a major role in improvement
More informationCompetency Standards
Competency Standards Table of contents Module 1: Citrus Orchard Management 3 Module 2: Citrus Harvesting... 6 Module 3: Citrus Handling on the Farm 8 List of Tools and Equipment.. 9 List of consumables
More informationTender form along with drawings for executing Rainwater Harvesting Resource Center works at Utthan, Allahabad, Uttar Pradesh.
A.R. Shivakumar Principal Investigator RWH Tender Notification Tender form along with drawings for executing Rainwater Harvesting Resource Center works at Utthan, Allahabad, Uttar Pradesh. Duly filled
More informationNADEP COMPOST TANK TO ENHANCE FERTILITY OF FARM LAND
NADEP COMPOST TANK TO ENHANCE FERTILITY OF FARM LAND COMPOSTING: Composting is the process of reducing vegetable and animal refuses to quickly utilisable condition for maintaining soil fertility. NADEP
More informationCHAPTER VII. Tamil Nadu Watershed Development Agency
CHAPTER VII Tamil Nadu Watershed Development Agency 1. Distribution of Government Wasteland to Landless Agricultural Labourer Families The Government has announced this massive scheme during 2006-07and
More informationCompetency Standards. Citrus Production (NVQF Level 1) National Vocational & Technical Training Commission March 2014
Competency Standards for Citrus Production (NVQF Level 1) National Vocational & Technical Training Commission March 2014 1 Table of contents Module 1: Citrus Orchard Management 3 Module 2: Citrus Harvesting...
More informationECONOMICS OF GOAT FARMING UNDER STALLFED SYSTEM PROJECT OF GOAT UNIT 100 DOES + 4 BUCKS DR. SACHIN TEKADE
ECONOMICS OF GOAT FARMING UNDER STALLFED SYSTEM PROJECT OF GOAT UNIT 100 DOES + BUCKS DR. SACHIN TEKADE ASSISTANT DIRECTOR MAHARASHTRA SHEEP AND GOAT DEVELOPMENT CORPORATION PUNE 1 Dr. Sachin Tekade ECONOMICS
More informationAn Implication of Groundwater Institutions on Reducing Negative Externality, Enhancing Economic Efficiency and Welfare in Karnataka
Ind. Jn. of Agri. Econ. Vol.70, No.3, July-Sept. 2015 SUBJECT II ROLE OF TECHNOLOGY, INSTITUTIONS AND IRRIGATION IN AGRICULTURAL DEVELOPMENT An Implication of Groundwater Institutions on Reducing Negative
More informationCHAPTER VI. Agricultural Engineering
CHAPTER VI Agricultural Engineering 1. Introduction The Agricultural Engineering Department has been constantly engaged in the conservation, development and management of the agricultural land and water
More informationTransforming agriculture through the power of the sun
www.sunculture.com SunCultureKenya Transforming agriculture through the power of the sun Our Financing Partner The Game-Changing SunCulture AgroSolar Irrigation Kit The AgroSolar Irrigation Kit combines
More informationRE-VISITING AGRICULTURAL POLICIES IN THE LIGHT OF GLOBALISATION EXPERIENCE: THE INDIAN CONTEXT
Special volume published March 2016 containing selected papers from the IAAE-ISAE Inter-Conference Symposium on Re-visiting Agricultural Policies in the Light of Globalisation Experience: The Indian Context.
More informationItem 35 ACRES FLOOD NUMBER OF CROPS 4. Labor Wage Rate: Equipment operators $/hour $7.20 WATER USE. General & Irrigators $/hour $7.
TABLE 1. Acreage Summary, Lincoln County, TABLE 2. Basic cost information for Lincoln County, BUDGET AREA HONDO VALLEY, LINCOLN COUNTY FARM SIZE... IRRIGATION TYPE 35 ACRES FLOOD Item NUMBER OF CROPS 4
More informationSEED $ LBS $ $ HERBICIDE $ ACRE $32.40 $32.40 SUBTOTAL $ $ ACCOMPLISHMENT RATE
TABLE 6. Alfalfa establishment, flood-irrigated, budgeted per acre costs and returns for a 500 acre farm with Planting dates: September 1 - September 30 SEED $6.00 20 LBS $120.00 $120.00 HERBICIDE $32.40
More informationItem. Labor Wage Rate: Equipment operators $/hour $8.55 WATER USE
TABLE 1. Acreage Summary, Union County, TABLE 2. Basic cost information for Dry Cimarron area, Union County, BUDGET AREA FARM SIZE. IRRIGATION TYPE NUMBER OF CROPS DRY CIMARRON AREA, UNION COUNTY 80 ACRES
More informationTotal 2, ,519
TABLE 1. Basic cost information for San Juan County Actual 2014 BUDGET AREA... SAN JUAN COUNTY Actual 2014 FARM SIZE...... 20 ACRES Item IRRIGATION TYPE... FLOOD NUMBER OF CROPS... 2 Labor Wage Rate: Equipment
More informationLCA questionnaire - AGROSTRAT LIFE11 ENV/GR/951
LCA questionnaire - AGROSTRAT LIFE11 ENV/GR/951 Α. GENERAL CHARACTERISTICS https://www.agrostrat.gr/en 1. Please specify the cultivated area of pistachio trees in your orchard (in hectares or m 2 )? 2.
More informationECONOMIC ANALYSIS OF FARM PONDS IN TUNGABHADRA PROJECT COMMAND AREA OF KARANATAKA, INDIA
International Journal of Agricultural Science and Research (IJASR) ISSN(P): 2250-0057; ISSN(E): 2321-0087 Vol. 5, Issue 3, Jun 2015, 193-198 TJPRC Pvt. Ltd. ECONOMIC ANALYSIS OF FARM PONDS IN TUNGABHADRA
More informationGuidelines for Paddy Mission under NADP
Guidelines for Paddy Mission under NADP-2014-15 Components 1. Distribution subsidy for Certified Paddy seeds 2. Popularization of Machine transplanting Paddy 3. Promotion of weedcides 4. Promotion of application
More informationNC Farm School Take Home Assignment: What to do for Ag Plan Session 3
NC Farm School Take Home Assignment: What to do for Ag Plan Session 3 For Chapter 3 of the NC Farm School curriculum we want you to be able to develop the startup cost for your business. To do this you
More informationComposite Fish Culture
Composite Fish Culture Introduction Fish is the cheapest and most easily digestible animal protein and was obtained from natural sources from time immemorial for consumption by human beings. However, due
More informationAnnual Chestnut Orchard Cost Per Acre at Production (>5years)
Commercial Chestnut Cost of Production and Comparative Analysis with Tart Cherry Production December 2013 Dr. Roy Black 1, Roger Betz 2, Erin Lizotte 2, Dr. Dennis Fulbright 3 1. Dept. of Agricultural,
More informationCOMPLETE PADDY PACKAGE FOR FARMERS BY VST SHAKTI VST SHAKTI
COMPLETE PADDY PACKAGE FOR FARMERS BY VST SHAKTI VST SHAKTI INDEX INTRODUCTION 01 Field Preparation [Cultivator] 02 Puddling [with Rotary Drum / Lugged Wheels] 03 Transplanting [VST Shakti Rice Transplanter]
More informationThe demand for the bricks will increase in line with the demand for construction.
CONVENTIONAL BRICKS A. INTRODUCTION The construction activity is one of the vital sectors of the economy. There is hardly any sector in the economy where there is no construction involved. There has been
More informationEconomics of Commercial Grape Production PRESENTED BY: BEN BEALE SLIDES ADAPTED FROM: SHANNON DILL
Economics of Commercial Grape Production PRESENTED BY: BEN BEALE BBEALE@UMD.EDU SLIDES ADAPTED FROM: SHANNON DILL 410 822 1244 SDILL@UMD.EDU Objectives Grower Goals Budgeting Financial Analysis Sample
More informationAEB 0022 April 2011 Blueberry Economics: The Costs of Establishing and Producing Blueberries in the Willamette Valley
AEB 0022 April 2011 Blueberry Economics: The Costs of Establishing and Producing Blueberries in the Willamette Valley James W. Julian, Bernadine C. Strik, and Wei Yang Blueberry Economics: The Costs of
More informationBUDGET AREA... FARM SIZE IRRIGATION TYPE NUMBER OF CROPS.. Item
TABLE 1. Acreage Summary, Quay County, TABLE 2. Basic cost information for the San Jon-Nara Visa area, Quay County, SAN JON-NARA VISA AREA, QUAY COUNTY 800 ACRES DRYLAND Item BUDGET AREA... FARM SIZE IRRIGATION
More informationO N. Income Generation for Asha Deepa School for the Blind through Integrated Dairy Farm
P R O J E C T P R O P O S A L O N Income Generation for Asha Deepa School for the Blind through Integrated Dairy Farm Aprilr-2011 Submitted to: Asha-wide-USA Submitted by: Asha Deepa School for the Blind,
More informationCredit Absorption Capacity of Farmers in Uttar Pradesh
Ind. Jn. of Agri.Econ. Vol.65, No.4, Oct.-Dec. 2010 Credit Absorption Capacity of Farmers in Gyanendra Mani and Vivek K. Sinha* I INTRODUCTION AND OBJECTIVES The policy on agricultural credit in India
More informationWATER USE. Employee Liability Insurance $/$1,000 wages $ Employee Benefits percent/wages 18.00% Labor Downtime percent 25.
TABLE 1. Acreage Summary, Valencia and Souther Bernalillo Counties, TABLE 2. Basic cost information for Valencia and Southern Bernalillo Counties, BUDGET AREA VALENCIA & SOUTHERN BERNALILLO COUNTIES FARM
More informationDRIP IRRIGATION PIPE
Profile No.: 33 NIC Code: 24311 DRIP IRRIGATION PIPE 1. INTRODUCTION Drip irrigation is a technique in which the water is filtered, conveyed through PVC or HDPE mainlines, LLDPE lateral lines and then
More informationFinancial feasibility of drip irrigation system in grape cultivation
International Journal of Agriculture, Environment and Biotechnology Citation: IJAEB: 9(4): 617-624 August 2016 DOI Number: 10.5958/2230-732X.2016.00080.2 2016 New Delhi Publishers. All rights reserved
More informationTABLE 1. Acreage Summary, San Juan County, TABLE 2. Basic cost information for San Juan County, Projected 2017 Projected 2017.
TABLE 1. Acreage Summary, San Juan County, TABLE 2. Basic cost information for San Juan County, BUDGET AREA... SAN JUAN COUNTY FARM SIZE 80 ACRES Item IRRIGATION TYPE FLOOD NUMBER OF CROPS.. 3 Labor Wage
More informationModels Scheme on Combine Harvesters
Models Scheme on Combine Harvesters 1. Harvesting is one of the most labour intensive operations in agriculture, which is required to be done at appropriate time so as to obtain optimum yield. Delay in
More information$1,600 $1,143 $565 $953 $6,541 $1,181 $768 $0 $6,010 $591 $292 $191
TABLE 1. Acreage Summary, San Juan County, BUDGET AREA... SAN JUAN COUNTY, 2002. FARM SIZE 80 ACRES IRRIGATION TYPE SPRINKLER NUMBER OF CROPS.. 1 WATER USE LAND USE AC.IN. ACREAGE SUMMARY: (ACRES) PER
More informationSCOPE OF WORK FOR ELECTRICAL WORK
Sl.Pg.No.552 SCOPE OF WORK FOR ELECTRICAL WORK GENERAL 1.0 The scope of work in general consists of Construction of Fire Station in Sector 19A at Ulwe Node, Navi Mumbai. 2.0 The work includes:- a) Preparing
More information$3,048 $1,524 $1,873 $2,800 $12,700 $2,502 $2,007 $0 $0 $1,657 $457 $191. Total $28,759
TABLE 1. Acreage Summary, Curry County, BUDGET AREA CURRY COUNTY FARM SIZE 520 ACRES IRRIGATION TYPE... FLOOD NUMBER OF CROPS 2 WATER USE LAND USE AC.IN. ACREAGE SUMMARY: (ACRES) PER AC. AC.IN. WHEAT 255
More informationModel project report for goat farming. with 100 female & 5 male goats
Model project report for goat farming with 100 female & 5 male goats India has a very large and diverse genetic resource of goats. Goat plays a significant role in economic upliftment of rural poor. Consumption
More information- PEO Study No.68 EVALUATION STUDY OF THE HIGH YIELDING VARIETIES PROGRAMME - REPORT FOR THE KHARIF, 1967
- PEO Study No.68 1. The Study EVALUATION STUDY OF THE HIGH YIELDING VARIETIES PROGRAMME - REPORT FOR THE KHARIF, 1967 At the instance of the Planning Commission the PEO carried out detailed evaluation
More informationWINE GRAPE ESABLISHMENT PER ACRE FOR 2015
Crop budgets vary greatly! Prices and cost estimates are averages collected from retailers across the state. Input prices will vary by vine training, management, region, variety and other criteria and
More informationAREA: 12,571 Ha. Plus Addl. 11,429 Ha Total 24,000 Ha Hungund Taluk Bagalkot District Karnataka 1
RAMTHAL (MAROL) COMMUNITY DRIP IRRIGATION PROJECT FOR 24,000 Ha. OF COMMAND IN HUNGUND TALUK OF BAGALKOT DISTRICT, KARNATAKA AREA: 12,571 Ha. Plus Addl. 11,429 Ha Total 24,000 Ha Hungund Taluk Bagalkot
More informationTABLE OF CONTENTS. Para No. Contents Page No
TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report
More informationManaging Capital Needs
Managing Capital Needs Warm-Up Activity Write a brief description of your enterprise. Include the factors you believe will make it feasible. Feel free to refer to your business plan. List a few things
More informationBUILDING ENTERPRISE BUDGETS FOR INDIANA SPECIALTY CROP GROWERS
BUILDING ENTERPRISE BUDGETS FOR INDIANA SPECIALTY CROP GROWERS Andres Gallegos and Ariana Torres Financial tools can help farmers improve farm s performance and assure profitability. Enterprise budgets,
More informationSpecial Crop Production Costs
Guidelines for Estimating Special Crop Production Costs 2018 in Manitoba ................................................. Guidelines For Estimating Special Crop Production Costs - 2018 Date: January,
More informationFinancial and Economic Analysis of Producing Commercial Tomatoes for Fresh Market in the Georgia
Financial and Economic Analysis of Producing Commercial Tomatoes for Fresh Market in the Georgia By Esendugue Greg Fonsah and Joel E. Hudgins Abstract This study examines the financial and economic viability
More informationPROJECT FOR A MODEL COPRA UNIT
PROJECT FOR A MODEL COPRA UNIT 1 PROJECT AT A GLANCE Objective: Establishment of a Coconut Processing Unit for production of high quality copra Promoters: Federation of Coconut Producers No. of nuts processed
More information`AMENDMENT No. 4 TO TENDER DOCUMENTS. Tender No.: RITES/CO/B&A/EE/DTEH-Rohtak Air Cooled Chiller System of HVAC work
`AMENDMENT No. 4 TO TENDER DOCUMENTS Tender No.: RITES/CO/B&A/EE/DTEH-Rohtak Air Cooled Chiller System of HVAC work S.No. Clause of tender 1 1) S.H A, Fashion Design BOQ Item no. 1 a.iii), 2) S.H A, Film
More informationTotal PRODUCTION Units Price Quantity $/Acre Pecans Lbs. $ $ 1, Other Income Acre $ - Total Receipts $ 1,160.00
Irrigated Improved Pecan Enterprise Budget 40 acres farmed. Total PRODUCTION Units Price Quantity $/Acre Pecans Lbs. $ 1.16 1000 $ 1,160.00 Other Income Acre 0 Total Receipts $ 1,160.00 OPERATING INPUTS
More informationDETAILED GUIDLINES FOR CULTIVATION OF DIFFERENT MEDICINAL PLANT SPECIES UNDER NMMP & ONWARD
DETAILED GUIDLINES FOR CULTIVATION OF DIFFERENT MEDICINAL PLANT SPECIES UNDER NMMP- 2011-12 & ONWARD (Aonla / Bael /Ashok/ Ashwagandha / Sarpgandha / Ghrit Kumari / Pipali /Shatavari / Tulasi /Giloe )
More informationVERSION 1.0. COPYRIGHT (C) 1984 by NEW MEXICO STATE UNIVERSITY BOARD OF REGENTS
MICROCOMPUTER CROP AND RETURN GENERATOR BUDGET AREA.. FARM SIZE.... IRRIGATION TYPE NUMBER OF CROPS VIRDEN AREA, HIDALGO COUNT 200.00 ACRES FLOOD 4 VERSION 1.0 COPYRIGHT (C) 1984 by NEW MEXICO STATE UNIVERSITY
More informationHarnessing Wind Energy through Windmill for Sustainable Livelihood
Harnessing Wind Energy through Windmill for Sustainable Livelihood Village Sawan ji Dhani, Tehsil Chachro, District Tharparkar Progress Report December 08 - May 2009 Project funded By: Dr. Nighat Afza
More informationPROJECT REPORT 2 MT COOL CHAMBER
PROJECT REPORT ON 2 MT COOL CHAMBER 1 INTRODUCTION PROJECT REPORT ON COOL CHAMBER 2 MT India is the largest producer of fruits and vegetables in the world scenario but the availability of fruits and vegetables
More informationEnterprise Budget. Sweet Corn, Willamette Valley Region. EM 8376, Revised August 1995
Enterprise Budget Sweet Corn, Willamette Valley Region Bob Lisec, Former Extension agent, Polk County, Dan McGrath, Extension agent, Marion County, and Loren Kerns, student assistant, Oregon State University
More informationTarget. Target Amt % 3 Total Agri NFS / MSME
EXECUTIVE SUMMARY I Theme of the The development of the economy or sector depends upon capital formation. India is an agrarian country. However, the contribution to national GDP is not in proportion to
More informationORGANIC PGS EVALUATION
0 POINTS 1. RECORDS 1.1 No activity records 1.2 No financial records 1.3 No farm map 2. ORGANIC INPUTS 2.1 2.2 2.3 Evidence of synthetic fertilizer application in designated organic Evidence of prohibited
More informationCREATION OF WATER RESOURCES Construction of Farm ponds for individual farmers
CREATION OF WATER RESOURCES Construction of Farm ponds for individual farmers Introduction: Farm ponds are the man made tanks constructed for storage of water in the farmers field during rainy season from
More information3 Labor Wage Rate: Equipment operators $/hour $8.55 WATER USE
TABLE 1. Acreage Summary, Lea County, TABLE 2. Basic cost information for Lea County, SOUTHERN HIGH PLAINS, LEA COUNTY 480 ACRES Item SPRINKLER BUDGET AREA FARM SIZE... IRRIGATION TYPE NUMBER OF CROPS
More informationTOTAL $ PURCHASED INPUTS PRICE SEED $ LBS $45.00 $45.00 MANURE $ TON $21.60 $21.60 LIVESTOCK FAC & EQUIP $5.00 $5.
TABLE 6. Wheat, sprinkler-irrigated, budgeted per acre costs and returns for a 1,280 acre farm with above average management, Union County, Planting dates: August 15 - November 15 Harvesting dates: July
More informationNABARD s Experience in Climate Finance
NABARD s Experience in Climate Finance Dr. B. G. Mukhopadhyay Chief General Manager National Bank for Agriculture and Rural Development Head Office, Mumbai (INDIA), www.nabard.org About NABARD Development
More information2012 Strategic Planning Initiative Proposal. Sustainable Student Run Campus Farm
2012 Strategic Planning Initiative Proposal Sustainable Student Run Campus Farm SAVE: Stanley Baguchinsky and Kelsey Watkins, students; Patrick Hossey, advisor Overview: The current garden on campus has
More informationName of the farmer: Mr.Singaram. Village: Vallakundapuram. Udumalpet Block. Thiruppur District. Mobile Number:
Name of the farmer: Mr.Singaram Village: Vallakundapuram Udumalpet Block Thiruppur District Mobile Number: Total area : 120 ac (20ac in Vallakundapuram and 100ac in Dhali) Cropping system: Coconut+celosia
More informationModel Curriculum. Micro Irrigation Technician SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL:
Model Curriculum Micro Irrigation Technician SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: AGRICULTURE & ALLIED AGRICULTURE CROP PRODUCTION PRECISION FARMING AGR/Q1002, V1.0 4 147 148 TABLE OF CONTENTS
More informationSHALLOW TUBEWELLS WITH PUMPSETS IN ALLUVIAL AREAS REQUIREMENTS OF A MODEL SCHEME FOR FORMULATION BY BANKS
SHALLOW TUBEWELLS WITH PUMPSETS IN ALLUVIAL AREAS CHAPTER I REQUIREMENTS OF A MODEL SCHEME FOR FORMULATION BY BANKS 1.1 General Given in this document are the salient features which the banks should incorporate
More informationPROFORMA FOR WEBSITE OF AGRICULTURE, DAMAN
WEBSITE Of AGRJ PROFORMA FOR WEBSITE OF AGRICULTURE, DAMAN 1. Name of the Department 2. He(ld of the department / Contact Person Agriculture Department, U.T. Administration of Daman & Diu, Daman. Shri
More informationComparative economics of Banana cultivation in Anand district of Gujarat
Comparative economics of Banana cultivation in Anand district of Gujarat A.K. Dave 1, Y.C. Zala 2 and R.S. Pundir 3 * 1 Department of Agricultural Economics, B.A. College of Agriculture, Anand Agricultural
More informationGuidelines for Estimating Crop Production Costs. in Manitoba
Guidelines for Estimating Crop Production Costs in Manitoba ................................................. Guidelines For Estimating Crop Production Costs - 2017 Date: January, 2017 The following budgets
More informationOntario Tender Fruit Establishment & Production Costs
2 0 1 6 Ontario Tender Fruit Establishment & Production Costs ECONOMIC REPORT IN PARTNERSHIP WITH Ontario Tender Fruit Establishment and Production Costs 2016 Economic Report Editors: John Molenhuis, Business
More informationScilly Organics Emissions. Sequestration. Carbon Balance. Published on Farm Carbon Cutting Toolkit (
Published on Farm Carbon Cutting Toolkit (https://farmcarbontoolkit.org.uk) Scilly Organics 2018 Emissions Sequestration C02e (kg/year) % total emissions C02 % total (kg/year) sequestration Fuel 1,148
More informationThe Tall Spindle system planted at 3ft x 12ft has become the
Measuring and Extending the Benefits of Orchard Mechanization in High Density Orchards in Western NY Mario Miranda Sazo 1 and Terence L. Robinson 2 1 Cornell Cooperative Extension, Lake Ontario Program,
More informationCOST AND RETURNS ESTIMATES
CHAPTER - VII COST AND RETURNS ESTIMATES 208 COST AND RETURNS ESTIMATES Introduction: Estimate of farm (Agriculture) based on the cost of production of different crops are basic to formulate measures for
More informationEconomic Appraisal of Kinnow Production and its Marketing in Sirsa District of Haryana, India
International Journal of Current Microbiology and Applied Sciences ISSN: 2319-7706 Volume 6 Number 11 (2017) pp. 4045-4053 Journal homepage: http://www.ijcmas.com Original Research Article https://doi.org/10.20546/ijcmas.2017.611.473
More informationNCERT Class 9th Social Science Economics Chapter 1: The Story of Village Palampur
NCERT Class 9th Social Science Economics Chapter 1: The Story of Village Palampur Question 1. Every village in India is surveyed once in ten years during the census and some of the details are presented
More informationTENDER FOR PREMISES AND FACILITY MANAGEMENT SERVICES CONTRACT FOR SIDBI S OFFICE BUILDING AT BKC, MUMBAI. (PART III- Financial Bid)
TENDER FOR PREMISES AND FACILITY MANAGEMENT SERVICES CONTRACT FOR SIDBI S OFFICE BUILDING AT BKC, MUMBAI (PART III- Financial Bid) LAST DATE OF SUBMISSION April 13, 2017 UPTO 1500 HRS. Issued to :- The
More informationAmendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:
Amendment -1 Date: 17.02.2017 NIT No. RECPDCL/CSR/CWC/2016-17/3368 dt: 20.01.2017 Notice Inviting Tender (Bid Invited through e Tendering mode only) From Implementing Agencies for Turnkey execution of
More informationBUDGET AREA.. DRY CIMARRON AREA, UNION COUNTProjected 2018 FARM SIZE ACRES IRRIGATION TYPE FLOOD NUMBER OF CROPS 2 VERSION 1.
MICROCOMPUTER CROP AND RETURN GENERATOR BUDGET AREA.. DRY CIMARRON AREA, UNION COUNT FARM SIZE.... 80.00 ACRES IRRIGATION TYPE FLOOD NUMBER OF CROPS 2 VERSION 1.0 COPYRIGHT (C) 1984 by NEW MEXICO STATE
More informationTable 5A. Income and Cash Operating Cost Summary, Alfalfa Hay, 1996 Page 14
Table 5A. Income and Cash Operating Cost Summary, Alfalfa Hay, 1996 Page 14 Item Unit Quantity Price Budgeted Total Your Farm /Unit /Acre /Acre Budget INCOME -> Alfalfa Ton 5.10 $82.0000 $418.20 $418.20
More informationELECTRICAL WORKS RELATED TO AC & UPS OF CMP GOC & IAD, LINGAMPALLY, HYDERABAD IN TWO BID SYSTEM THROUGH E-TENDER PRICE BID
SBI INFRA MANAGEMENT SOLUTIONS PVT.LTD. 3 rd Floor, Local Head Office,Bank Street, Koti, Hyderabad- 500095 On behalf of On behalf of On behalf of Cash Management Product GOC (CMP GOC) & Internal Audit
More informationMICROCOMPUTER CROP COST AND RETURN GENERATOR
MICROCOMPUTER CROP COST AND RETURN GENERATOR BUDGET AREA... ARTESIA-LAKE ARTHUR AREAProjected 2014 FARM SIZE...... 500 ACRES IRRIGATION TYPE... SPRINKLER NUMBER OF CROPS... 6 VERSION 1.0 COPYRIGHT (C)
More informationONION STORAGE STRUCTURES
ONION STORAGE STRUCTURES 1. Introduction India is one of the largest producers of onion in the world second only to China, accounting for 16 percent of world area and 10 percent of production. In India,
More informationResource use efficiency in Alphonso mango production in Sindhudurg district (M.S.)
28 Internat. J. agric. Sci. Vol.3 1 January 2007 : 28-34 Resource use efficiency in Alphonso mango production in Sindhudurg district (M.) A. Wagale, J.M. Talathi*, V.G. Naik and D.B. Malave Department
More information