úê üßµö ÖãÆü ü ¾Ö³ÖÖÖ - III
|
|
- Homer Jefferson
- 6 years ago
- Views:
Transcription
1 Subject: Implementation of IS/IEC :2003 due to revision of IS series of specifications as IS/IEC series 1. ETD has informed regarding the publication of the series of specifications of Low-Voltage Switchgear and Controlgear as per IS/IEC S. No. Name of the product Existing ISS New/Revised ISS 1 Low-Voltage Switchgear and Controlgear IS13947(1) IS/IEC : General Rules LOW VOLTAGE SWITCHGEAR AND IS13947(2) IS/IEC : CONTROLGEAR 2003 PART 2 CIRCUIT BREAKERS 2. The above has been intimated to all ROs/BOs/CMD-I/CL vide note dated 05/08/2008 for bringing the same to the notice of all licensees and proposing date of implementation. Reminder was sent on 29/09/2008 & 03/03/2009. Further, FDO was requested to propose revised STI and MF in consultation with the licensees and sent to CMD-3 for consideration of CA along with guidelines required, if any, for the easy implementation of the revised ISS. No comments received from any RO/BO. CL has informed regarding the availability of the test facilities at ERDA and the same has been circulated to all ROs/BOs on 12Nov DRAFT STI prepared by CMD-3 was sent to all ROs/BOs for comments vide note dated Comments on the draft STI as received from ETD were incorporated suitably and revised STI has been prepared as Doc: STI/ /1 February 2010 (posted on Intranet/sent through ) which will come into force along with the revised IS/IEC :2003 with effect from 01Feb The major differences in the IS/IEC series which supersedes IS series, is that requirements for electromagnetic compatibility have been introduced, tests for verification of dielectric properties, have been modified, clarity on equipment suitable for isolation introduced, material tests, that is- resistance to abnormal heat and fire, glow wire test, flammability, hot wire ignition and arc ignition test have been added, requirement for degrees of protection provided by enclosures modified, provision of some tests on separate samples made, general requirements for tests further clarified. Differences are also marked in the standard by side bar. Page 1 of 5
2 5. Following are the Major differences between IS/IEC (Part 1): 2004 & IS (Part 1) 1993 IS/IEC Difference with IS (Part 1): Clause 5.2 Requirement of symbol for isolation specifically mentioned 5.3 Reference to specifying measures w. r. t. EMC for environment A added. 7.1 Details added Materials requirements modified Resistance to abnormal heat and fire added Conditions for verification of compliance for current carrying parts and their connections added Provision for marking the device, where they cannot conform to IEC 60447, added , , Additional requirements for equipment suitable for isolation added & Additional conditions specified for terminals Additional conditions specified for equipment provided with a neutral pole Certain modifications and additions made for Degree of protection Requirement for 'Conduit pull-out, torque and bending with metallic conduits' added , , Tests for Dielectric properties modified, test added for auxiliary and control circuits Test for solid insulation added Requirement for equipment with protective separation added Reference made to respective product standards Test for Leakage currents of equipment suitable for isolation added. 7.3 Test for EMC added Clarification on Test sequence added Test for EMC added in the list. 8.2 Tests on materials added. Test for resistance to abnormal heat and fire, glow wire test, flammability, hot wire ignition and arc ignition test added. Tests on equipment, enclosures, effectiveness of indication of main contact position of equipment suitable for isolation, conduit pull out test, torque test and bending test with metallic conduit added General test conditions clarified further, characteristics of metallic screen elaborated Modification in test for Dielectric properties. Application of test voltage 5 times each polarity against 3 times in old standard. Requirement of foil clarified. Acceptance criteria for verification of impulse withstand voltage added. Power-frequency withstand verification of solid insulation added. Power-frequency withstand after switching and short-circuit tests added Power frequency withstand voltage, combined impulse voltage test modified and power-frequency withstand voltage test added 8.4 Requirement for EMC added. Table 1 Few cross sectional values added Table 4 Few thread sizes added Page 2 of 5
3 Table 12 A Tables 17 to 24 Fig 16 Annex A Annex C Annex L to Annex P Dielectric test voltage corresponding to the rated insulation voltage added. Tables on Limits of actuator test force, test values for conduit pull-out test, test values for conduit bending test, test values for conduit torque test and on acceptance criteria when EM disturbances are present have been added. Figure on actuator test force added. Examples of additional Utilization categories provided. Annex on degrees of protection provided by enclosures modified for further clarification. Now, reference has been made to for tests. These Annexure have been added. These are for the following: Terminal marking and distinctive number Flammability test Requirements and tests for equipment with protective separation Environmental aspects Terminal Lugs for low voltage switchgear and controlgear connected to copper conductors 6. Further following are the Major differences between IS/IEC : 2003 & IS (Part 2): 1993 IS/IEC Difference with IS (Part 2): Clause Changes of Part 1 as applicable 2 Terminology for frame sizes, resetting time & construction break added 4 Characteristics in terms of switching overvoltages and corresponding requirements deleted 5.1 Manufacturer to provide information on typical power losses for various frame sizes 5.2 Marking of following added: Suitability for environment A or Environment B r.m.s. sensing 7.1 Constructional requirements related to Abnormal heat and fire; glow wire test added to Requirements for safety of operator, list of construction breaks, additional requirements for CBs provided with a neutral pole added Use of new CB for test of control circuits added Tests for Dielectric properties modified Test for solid insulation added Requirement for spacing between separate circuits added Requirement for Switching Overvoltages deleted Further clarified. 7.3 Test for EMC added & Routine tests added. Verification of operation of undercurrent releases, additional tests 8.4 for CBRs to Annex B, verification of clearances Provision made for some tests on separate samples. Individual pole short circuit tests for IT systems(annex H), test for indication of main contact position added in the lists of tests. Page 3 of 5
4 Table 9 a Information on Applicability of test sequences added General test conditions clarified further, characteristics of metallic screen elaborated Table 10 Table on Number of samples for test clarified General requirements for Test conditions for short circuit tests clarified. Specification of polythene sheet given Test to be done on adjacent poles, clarity on resetting Information on verification after short circuit test added Information on undervoltages and shunt releases, verification of main contact position for CBs suitable for isolation added in Test sequence I. Requirements for CBs having a neutral pole added. Requirements for various releases and their verification added. Various sub clauses have been modified , Minor modifications Test sequence IV made applicable to CBs of Utilization category A also. Slight changes in sub clauses 8.4 Sub clauses for Routine tests modified. Requirement for additional tests for CRBs added. Test for verification of clearances less than those corresponding to case A of Table 13 of IEC added Annex A Further guidance on coordination provided. Annex E Additional items subject to agreement between manufacturer and user specified. Annex C These Annexure have been added. These are for the following: to Annex P Individual pole short circuit test sequence Additional Tests for circuit breakers with electronic over-current protection Power loss Test sequence for circuit breakers for IT systems EMC Requirements & test methods for CBs Glossary of symbols used CBs not fulfilling the requirement of overcurrent protection Modular residual current devices EMC Additional Requirements & test methods for devices not covered under Annex B, F and M. 7. Changeover for Application/Grant of licence cases a) All new applications are to be recorded as per IS/IEC :2003. b) All pending applications to be processed as per revised standard where samples are to be drawn for testing and also where samples are drawn but, testing has not yet been started. In this case, applicant shall be given option to offer fresh samples as per revised standard and a visit to be paid for verification of capability and availability of test facilities as per revised standard before drawing fresh samples. c) In case, testing of samples are in progress or test reports received, grant of licence as per old version of the standard can be processed but, with an undertaking taken from the firm for changing over to the revised standard w.e.f. the date of implementation given in the circular. In this situation, the case for changeover to the revised standard shall be processed as per guidelines for licences. Page 4 of 5
5 8. Existing Licence cases a) All ROs/BOs are requested to inform the licensees under their jurisdiction about implementation of the IS/IEC : 2003 along with new STI. b) Licensee should submit test reports (in-house or OSL) for the conformity to the additional requirements as per IS/IEC : Types of products which do not conform to the requirements of the specification shall be deleted from the scope of the licence w.e.f. the date of implementation given in the circular and necessary endorsement may be issued for the implementation of the IS/IEC : 2003 along with revised new STI. c) During the periodic visit to the firm, the capability of the firm and availability of test equipment as per revised standard to be verified. Any one type of the product offered may be tested for all possible tests in a day and based on satisfactory inspection one sample of different type to be drawn for independent testing. d) The case to be reviewed on receipt of independent test reports. 9. The standard mark applicable for the circuit devices as per IS/IEC will be as follows: IS/IEC CMD-1 is requested to arrange for gazette notification of the above standard mark. Sc F & Head (CMD III) - Sd/ Sd/ (Kancherla Raja) Scientist-E/CMD3 Circulated to all ROs/BOs/CMD-1/CL/ETD (arranging for gazette notification) Copy to: ITS with a request to host the circular on INTRANET with STI. Page 5 of 5
1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.
DOC: STI//1 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ACCORDING TO IS/IEC:2003 1. LABORATORY A laboratory shall be maintained which shall be suitably equipped and staffed, where different tests
More information1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.
DOC: STI//1 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF According to IS/IEC:2000 (Including Amendment no.2) 1. LABORATORY A laboratory shall be maintained which shall be suitably equipped and
More informationBUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT III
BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT III Our Ref : CMD-III/16: 9857 11 April, 2007 Subject : Implementation of Amendment No.1, January2007 to IS 9857:1990 - welding cables- Specification
More information2. 0 Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.
SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF IRRIGATION EQUIPMENT-EMITTING PIPE SYSTEMS ACCORDING TO IS 13488:2008 (First revision) 1.0 Laboratory - A laboratory shall be maintained which shall
More informationCENTRAL MARKS DEPARTMENT-III
CENTRAL MARKS DEPARTMENT-III Our Ref: CMD-III/16:814 21.12.2004 Subject: Implementation of revised IS 814:2004 Covered electrodes for manual metal arc welding of carbon and carbon manganese steel and revised
More informationBUREAU OF INDIAN STANDARDS (CENTRAL MARKS DEPARTMENT-III)
BUREAU OF INDIAN STANDARDS (CENTRAL MARKS DEPARTMENT-III) Ref: CMD-III/16:710 15 March 2011 Subject: Implementation of revised standard IS 710:2010, for Marine Plywood and revised STI Doc: STI/710/5,.
More informationIMPLEMENTATION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICAL AND ELECTRONIC PRODUCTS
Ref. No. CNCA-01C-011: 2007 IMPLEMENTATION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICAL AND ELECTRONIC PRODUCTS Low-voltage Electrical Apparatus---switch and control Equipment Announced on Aug. 1,
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-26 36 23.00 20 (April 2006) -------------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-16410N (February 2003) UNIFIED FACILITIES GUIDE
More informationTABLE OF CONTENTS INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS... 3
TITLE SPECIFICATION FOR MOULDED CASE REFERENCE REV DATE: JUNE 2012 PAGE: 1 OF 22 TABLE OF CONTENTS Page INTRODUCTION... 3 1 SCOPE... 3 2 NORMATIVE REFERENCES... 3 3 DEFINITIONS AND ABBREVIATIONS... 3 4
More information37-SDMS-01 REV. 03 SPECIFICATIONS FOR
37-SDMS-01 REV. 03 SPECIFICATIONS FOR LOW VOLTAGE MOLDED CASE CIRCUIT BREAKERS FOR SERVICE CONNECTIONS This specification is property of SEC and subject to change or modification without any notice CLAUSE
More informationBUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III
BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III Our Ref: CMD-III/16:814 31 January 2006 Subject: Implementation of Amendment No 1 to IS 814:2004 for Covered Electrodes For Manual Metal Arc Welding
More informationInternational Standard Corresponding Indian Standard Degree of Equivalence
BUREAU OF INDIAN STANDARDS DRAFT FOR COMMENTS ONLY Doc: ET 28 (6756) (Not to be reproduced without the permission of BIS or used as a STANDARD) Draft Indian Standard PHOTOVOLTAIC (PV) ARRAYS DESIGN REQUIREMENTS
More information30-SDMS-01 SPECIFICATIONS FOR LOAD BREAK SWITCH
SPECIFICATIONS FOR LOAD BREAK SWITCH This specification is property of SEC and subject to change or modification without any notice TABLE OF CONTENTS 1.0 SCOPE 3 2.0 CROSS REFERENCES 3 3.0 APPLICABLE CODES
More informationBUREAU OF INDIAN STANDARD (Faridabad Branch Office)
BUREAU OF INDIAN STANDARD (Faridabad Branch Office) Our ref: FRBO/9798:2013 Date- 31-12-2014 Subject: Implementation of IS 9798:2013, Low Pressure Regulators for Use With Liquefied Petroleum Gas (LPG)
More informationCENTRAL MARKS DEPARTMENT II. Subject: Implementation of revised Indian Standard Specification for Nitric Acid
CENTRAL MARKS DEPARTMENT II Our Ref: CMD-II/16:264 22 03 2006 Subject: Implementation of revised Indian Standard Specification for Nitric Acid Indian Standard specification for Nitric Acid as per IS 264:1976
More informationPARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION
E11 : General Electrical Earthing and LIGHTNING Protection PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION 1 2009-05-12 Review of Mechanical / Electrical and Control
More informationIRRIGATION EQUIPMENT- ROTATING SPRINKLER
BUREAU OF INDIAN STANDARDS (Eastern Region Office, Kolkata) DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS Our Ref: DDGE/22/IS 12232(Pt-1) Dated: 20 Feb 2014 Sub: Draft manual for IS 12232(Pt-1) This
More informationPLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
More information1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained.
SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SINGLE PHASE a.c. INDUCTION MOTORS FOR GENERAL PURPOSE ACCORDING TO IS 996:2009 (Including Amendment No.1) 1. LABORATORY A laboratory shall be maintained
More informationभ रत य म नक ब य र (क द र य म हर व भ ग III) सभ श ख क य भलय स अन र ध ह क उपर क त ददश वनद श क अन प लन तत क ल प रभ स स वनव त कर
भ रत य म नक ब य र (क द र य म हर व भ ग III) हम र स दभभ : स एम ड - III/16 : 1180 (Part 1) 17 म र भ 2017 व षय : IS 1180 (Part 1): 2014 क स श धन स ख य -2 क अन प लन ह त ददश वनद श और प नर व त एस ट आई इस उपर
More informationA. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.
16470 PANELBOARDS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 16 An optional keynote to
More informationBUREAU OF INDIAN STANDARDS (Western Region Office, Mumbai) DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS. Our Ref: DDGW Sectt(PCO/RD) 23 Jan 2014
(Western Region Office, Mumbai) DRAFT FOR COMMENTS Our Ref: DDGW Sectt(PCO/RD) 23 Jan 2014 Sub: Preparation & review of draft manuals for product certification This has reference to CMD circular CMD-1/31
More information31-SDMS-03 REV. 01 SPECIFICATIONS FOR
31-SDMS-03 REV. 01 SPECIFICATIONS FOR LOW VOLTAGE CABINET FOR POLE MOUNTED TRANSFORMER This specification is property of SEC and subject to change or modification without any notice CONTENTS Clause Description
More informationHouston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER
PART 1 - GENERAL 1.1 SUMMARY SECTION 26 13 16 MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER A. The scope of this section includes providing and assembling materials and equipment for the dead-front, medium voltage
More informationProduct or Process Modifications Requiring Limited CBTL Retesting to Maintain Safety Certification
Product or Process Modifications Requiring Limited CBTL Retesting to Maintain Safety Certification This document sets forth a uniform approach to maintain the safety certification of products that have,
More informationNEC 2017 Code Changes Chapter 1 - General
NEC 2017 Code Changes Chapter 1 - General Changes from the 2014 code are highlighted in yellow. ARTICLE 110 - Requirements for Electrical Installations Part I. General 110.1 Scope. This article covers
More informationTABLE OF CONTENTS. FOREWORD... Error! Bookmark not defined. INTRODUCTION SCOPE NORMATIVE REFERENCES DRAWING...4
TITLE SPECIFICATION FOR FREE- STANDING 11 DATE: AUGUST 2006 PAGE: 1 OF 15 TABLE OF CONTENTS Page FOREWORD... Error! Bookmark not defined. INTRODUCTION...3 1 SCOPE...3 2 NORMATIVE S...3 3 DRAWING...4 4
More informationSiemens Controls. The power distribution board that sets new standards. SIVACON S4 safe, cost-efficient and flexible SIVACON
SIVACON The power distribution board that sets new standards SIVACON S4 safe, cost-efficient and flexible Siemens Controls Answers for infrastructure. Contents We support you with system 04 05 Maximum
More informationNPS/001/003 Technical Specification for 11kV, 20kV and 33kV Overhead Line Air Break Switch-Disconnectors
Document reference NPS/001/003 Document Type: Section Level Version:- 4.0 Date of Issue:- November 2015 Page 1 of 24 NPS/001/003 Technical Specification for 11kV, 20kV and 33kV Overhead Line Air Break
More informationTECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.
More informationUL TEST REPORT AND PROCEDURE
Issue Date: 2015-09-28 Page 1 of 10 Report Reference # E182560-V4-19 UL TEST REPORT AND PROCEDURE Standard: ANSI/AAMI ES60601-1 (2005/(R) 2012 +A1:2012, C1: 2009/(R) 2012 + A2:2010/(R) 2012) Amendment
More informationINTER PLANT STANDARD STEEL INDUSTRY
INTER PLANT STANDARD STEEL INDUSTRY IPSS SPECIFICATION FOR PROTECTIVE PANELS FOR dc CRANES (Second Revision) Corresponding IS does not exist IPSS:1-10-013-11 Formerly : IPSS: 1-10-013-03 0. FOREWORD 0.1
More informationStandard of Practice - Campus Electrical Distribution System
A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all
More informationSOLARLOK BREEZE Junction Box
SOLARLOK BREEZE Junction Box Table of contents 1. SCOPE... 2 1.1. Content... 2 1.2. Qualification... 3 2. APPLICABLE DOCUMENTS... 3 2.1. TE Connectivity Documents... 3 2.2. Commercial Standard... 3 3.
More informationBUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III
BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III Our Ref: CMD-III/16:2556 13 April 2005 Subject: Implementation revised STI Doc: STI/2556/6,, pertaining to IS 2556 (Part-1 to 17 excluding withdrawn
More informationSUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard
SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard PART 1 GENERAL 1.1 Scope A. The intent of this specification is to provide power control for the parallel operation of generator
More information2. Test Record - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.
SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SALT AND REFINED IODIZED SALT, VACUUM EVAPORATED IODIZED ACCORDING TO IS 7224:2006 (Second Revision) Doc: STI/7224/5 1. Laboratory - A laboratory shall
More informationAccreditation No: LAB 041. Electrical Measurement & Test Laboratory (EMTL), PCSIR Labs. Complex, Lahore Pakistan.
Issue : 10/08/15 Accreditation No: Awarded to al Measurement & Test Laboratory (EMTL), PCSIR Labs. Complex, Lahore Pakistan. The scope of accreditation is in accordance with the standard specifications
More information33-SDMS-02 SPECIFICATIONS FOR
SPECIFICATIONS FOR MV AUTOMATIC LINE SECTIONLIZER UP TO 36 KV This specification is property of SEC and subject to change or modification without any notice TABLE OF CONTENTS SECTION T I T L E PAGE NO.
More informationCENTRAL MARKS DEPARTMENT-II
CENTRAL MARKS DEPARTMENT-II Our Ref.:CMD-II/16:1664 18 Nov 2013 Subject: Implementation of revised Scheme of Testing and Inspection (STI) Doc: STI/1664/8, for Mineral Mixture for Supplementing Cattle Feeds
More informationSubject: Implementation of IS 9798:2013 Low Pressure Regulators for use with Liquefied Petroleum Gas (LPG) Specification (Second Revision).
CENTRAL MARKS DEPARTMENT-II (Legal) Our Ref: CMD-II/16:9798 14 Subject: Implementation of IS 9798:2013 Low Pressure Regulators for use with Liquefied Petroleum Gas (LPG) Specification (Second Revision).
More informationNPS/003/015 Technical Specification for 33kV, 66kV and 132kV Post Insulators
Version:- 3.1 Date of Issue:- June 2014 Page 1 of 13 NPS/003/015 Technical Specification for 33kV, 66kV and 132kV Post Insulators 1. Purpose This document is the technical specification for 33kV, 66kV
More informationENGINEERING SPECIFICATION EE SPEC
/. Company Directive ENGINEERING SPECIFICATION EE SPEC : 84/1 Relating to Surge Arresters EE SPEC : 84/1 20 December 2013-1 of 7 - IMPLEMENTATION PLAN Introduction This document defines the surge arresters
More informationSECTION EARTHING AND EARTH FAULT PROTECTION
SECTION 16660 PART 1 - GENERAL 1.01 DESCRIPTION A. The work to be performed includes, but is not necessarily limited to, all work involved with the construction and assembly of a complete electrical earthing
More informationCapital Projects Group Transfer Switch Specification
Capital Projects Group Specification Specification 26 36 23 Revision 0 Date: August 2018 Specification Specification 26 36 23 Publication Date: August 2018 COPYRIGHT 2018 Metrolinx, an Agency of the Government
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-26 36 00.00 10 (October 2007) ---------------------------------- Preparing Activity: USACE Superseding UFGS-26 36 00.00 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationSECTION BUSWAYS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 25 11 BUSWAYS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable to the section and
More informationFIELD TEST AND OPERATIONAL CHECK SECTION A. Refer to Section 16010, Electrical General Requirements.
FIELD TEST AND OPERATIONAL CHECK SECTION 16080 PART 1 GENERAL 1.1 GENERAL REQUIREMENTS A. Refer to Section 16010, Electrical General Requirements. 1.2 WORK INCLUDED A. General Scope: 1. The Contractor
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD IEC 60974-7 Second edition 2005-07 Arc welding equipment Part 7: Torches This English-language version is derived from the original bilingual publication by leaving out all French-language
More informationSECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number
MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and
More informationSECTION SECONDARY UNIT SUBSTATIONS
SECTION 26 12 16 SECONDARY UNIT SUBSTATIONS PART 1 GENERAL 1.1 SUMMARY This section describes metal-clad, indoor or outdoor, secondary unit substations with integral primary fused disconnect switches,
More information1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained.
SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SHUNT CAPACITORS FOR AC POWER SYSTEMS HAVING A RATED VOLTAGE ABOVE 1000 V GENERAL PERFORMANCE, TESTING AND RATING SAFETY REQUIREMENTS, GUIDE FOR INSTALLATION
More informationBulletin Grounding and bonding of solar photovoltaic systems Rules , , , and
Bulletin 64-2-0 Grounding and bonding of solar photovoltaic systems Rules 64-064, 64-066, 64-068, 64-070 and 64-222 Scope (1) Introduction (2) Grounding of solar photovoltaic system output, ac grounding
More informationPRODUCT SPECIFICATION
Sep., 2005 PAGE / 8 Jan. 20, 2007 PRODUCT NAME : STW-F RATING : 55 C, 000V rms No. Revised Date Revised Details Page Report Jan. 20, 2007 Emendation of Specification All - REPORTED BY: APPROVED BY: Q.M.
More informationNPS/002/023 Technical Specification for 132kV Power Cables.
Version:- 2.2 of Issue:- June 09 Page 1 of 11 NPS/002/023 Technical Specification for 132kV Power Cables. 1. Purpose The purpose of this document is to detail the technical requirements of Northern Powergrid
More informationCENTRAL MARKS DEPARTMENT-II. Our Ref: CMD-II/16: Subject: Information of revised version of Alumino-Ferric as per IS 299.
CENTRAL MARKS DEPARTMENT-II Our Ref: CMD-II/16:299 28 01 2013 Subject: Information of revised version of Alumino-Ferric as per IS 299. Please find enclosed Finalized versions of the above specification
More informationElectrical installations Marinas and boats
AS/NZS 3004.2:2014 Incorporating Amendment No. 1 Australian/New Zealand Standard Electrical installations Marinas and boats Part 2: Boat installations Superseding AS/NZS 3004.2:2008 AS/NZS 3004.2:2014
More informationa) Line and load compartments must be separated by a stable barrier.
1.00 GENERAL 1.01 The electric utility shall furnish and connect all meters, instrument transformers, test switches, and meter control wiring necessary to complete the meter installation. 1.02 The customer
More informationSERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES
SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES MANUALLY OPERATED / REMOTELY OPERATED DEAD FRONT PADMOUNTED SWITCHGEAR WITH VACUUM LOAD INTERRUPTING
More informationExMC/1291/DV August 2017
ExMC/1291/DV August 2017 INTERNATIONAL ELECTROTECHNICAL COMMISSION SYSTEM FOR CERTIFICATION TO STANDARDS RELATING TO EQUIPMENT FOR USE IN EXPLOSIVE ATMOSPHERES (IECEx SYSTEM) Title: Proposed new Edition
More informationNPS/002/017 Technical Specification for 66 kv and 132 kv Cable Accessories
Version:- 4.0 Date of Issue:- October 2016 Page 1 of 21 NPS/002/017 Technical Specification for 66 kv and 132 kv Cable Accessories 1. Purpose The purpose of this document is to detail the technical requirements
More informationMARKS DEPARTMENT-III. ROs/BOs may also propose the implementation date in view of revision of Indian
" /' CENTRAL MARKS DEPARTMENT-III Our Ref: CMD-IiI/16:2830 20062012 IndianStandardIS 2830 : 1992 has been revised and publishedas IS 2830 :. 2012 Carbon Steel Cast Billet Ingots (Pencil Ingots), Billets,
More informationGeneral CIRCUIT BREAKER WITH SF6 GAS
General ETK Type Circuit Breakers: SF6 gas is used as insulating and arc quenching medium within ETK type circuit breakers. ETK breakers are suitable for rapid reclosing. Main Components:» Three separate
More informationELECTRICAL INSTALLATION DESIGN Three Day Course with option to achieve BTEC Advanced Award
ELECTRICAL INSTALLATION DESIGN Three Day Course with option to achieve BTEC Advanced Award INTRODUCTION This course is aimed at the needs of designers, specifiers and others involved in the design and
More informationCOMMERCIAL & INDUSTRIAL AMI METER TESTING SUMMARY
FINAL COMMERCIAL & INDUSTRIAL AMI METER TESTING SUMMARY Black & Veatch Holding Company 2017. All rights reserved. PREPARED FOR SaskPower 19 SEPTEMBER 2017 Commercial & Industrial AMI Meter Testing Summary
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the
More informationDRAFT TANZANIA STANDARD. Part 7: Underground Power Cables for rated voltages 0.6kV/1kV (Um 1.2kV)
EDC3 (5239) P3 Mini-Grid Systems DRAFT TANZANIA STANDARD Part 7: Underground Power Cables for rated voltages 0.6kV/1kV (Um 1.2kV) TANZANIA BUREAU OF STANDARDS TBS 2017 First Edition 2017 Table of Contents
More informationCandidate NICET ID No.: NICET ENGINEERING TECHNICIAN CERTIFICATION Experience Application, Part II: Verifier Data. (Please print legibly or type)
Candidate: Experience Application, Part II: Verifier Data Candidate NICET ID No.: SM Standard Model (Please print legibly or type) To be completed by the Verifier only Name: Title: Current employer: Daytime
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Change History Date Description of Change Pages / Sections Modified Change Approver Initials 6/15/16 Updated division section from 16124 to 2605 - mgl44 13, removed references to other section 10/17/14
More informationSRI LANKA STANDARD SPECIFICATION FOR THREE-PIN PLUGS, SOCKET-OUTLETS AND SOCKET-OUTLET ADAPTORS
AMENDMENT NO. 3 APPROVED ON 2006-11-29 TO SLS 948 : PART 1 : 1991 SRI LANKA STANDARD SPECIFICATION FOR THREE-PIN PLUGS, SOCKET-OUTLETS AND SOCKET-OUTLET ADAPTORS PART 1 : THREE-PIN PLUGS SOCKET-OUTLETS
More informationADDENDUM NO. 1 BID AND CONTRACT DOCUMENTS FOR. BID No. 2019PW299
ADDENDUM NO. 1 BID AND CONTRACT DOCUMENTS FOR BID No. 2019PW299 CHAFFEY COMMUNITY COLLEGE DISTRICT TRANSFORMER REPLACEMENT PROJECT RANCHO CUCAMONGA, CALIFORNIA COUNTY OF SAN BERNARDINO CHAFFEY COMMUNITY
More informationNESC Subcommittee 5 Changes to the 2017 NESC. Joseph Rempe 18 October 2016
NESC Subcommittee 5 Changes to the 2017 NESC Joseph Rempe 18 October 2016 Re-format Rule 241.C. At Crossings 241. Application of grades of construction to different situations 2012 version 2 Re-format
More information2.0 TEST RECORDS - All records of tests and inspection shall be kept in suitable forms approved by the Bureau.
SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF POWER CAPACITORS OF SELF-HEALING TYPE FOR AC POWER SYSTEMS HAVING RATED VOLTAGE UP TO 650 V ACCORDING TO IS 13340:1993 1. LABORATORY A laboratory shall
More informationCENTRAL MARKS DEPARTMENT (FCT) Ref: CMD-II/16:
CENTRAL MARKS DEPARTMENT (FCT) Ref: CMD-II/16:15489 20 03 2014 Subject: Implementation of revised STI for IS 15489 :2013 for Paint Plastic Emulsion - Specification 1. Indian Standard Specification for
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT ADVANCE WORLD LIMITED Lalkha Shair Char, Fatullah, Narayanganj, Dhaka, Bangladesh Factory List: 1.. Inspected by: Sherub Tenzin & Md. Moin Hasan Report Generated by:
More informationBUREAU OF INDIAN STANDARDS (Central Marks Department-III) Our Ref : CMD-III/16: October 2008
BUREAU OF INDIAN STANDARDS (Central Marks Department-III) Our Ref : CMD-III/16:14587 15 October 2008 Subject : REVISED SCHEME OF TESTING AND INSPECTION FOR PRELAMINATED MEDIUM FIBRE DENSITY BOARDS AS PER
More information16300 HIGH VOLTAGE DISTRIBUTION
16300 HIGH VOLTAGE DISTRIBUTION PART 1: GENERAL 1.01 WORK INCLUDED A. Most new loads will be served from the underground electric distribution system. This system is a primary open loop configuration served
More informationBUREAU OF INDIAN STANDARDS (Central Marks Department - III) Our Ref : CMD-III/16: Oct 2006
BUREAU OF INDIAN STANDARDS (Central Marks Department - III) Our Ref : CMD-III/16:8156 18 Oct 2006 Subject : SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF FASTENERS FOR CONSUMER GOODS SYNTHETIC
More informationCENTRAL MARKS DEPARTMENT II. Ref: CMD-II/16:
CENTRAL MARKS DEPARTMENT II Ref: CMD-II/16: 15939 06 09 2013 Subject : Implementation of Scheme of Testing & Inspection, Doc: STI/15939/1, for BIFENTHRIN WP as per IS 15939:2011. The Scheme of Testing
More informationCOMPILED BY APPROVED BY FUNCTIONAL RESP AUTHORISED BY V SINGH. Date: 16/03/2009. Date: 16/03/2009. Date: 19/03/2009 Date: 26/03/2009
SPECIFICATION Document Classification: Controlled Disclosure Title: Distribution Specification: Part 8 Unique Identifier: 34-434 COMMON BASE AND STANDARD Document Type: PASSIVE UNITS FOR SINGLE- PHASE
More informationStandard Development Roadmap
Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:
More informationELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th)
Factory Name Address Joyna Bazer Road, Jamirdia, Valuka Factory ID 9504 Electrical Safety dates Initial Date 06/07/2014 Date of 5 th Follow Up Report Received Date 07/27/2015 Date of 6 th Follow Up Date
More informationBABT Production Scheme 340
BABT Production Scheme 340 The Production Quality Certification Scheme for Manufacturers of Marine, Radio, Telecommunication Terminal Equipment and Electro- Technology Products BABT is the telecommunications
More informationSCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SILVERED GLASS MIRRORS FOR GENERAL PURPOSES ACCORDING TO IS :
Doc. STI 3438/4 December 1995 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SILVERED GLASS MIRRORS FOR GENERAL PURPOSES ACCORDING TO IS : 3438-1994 1. Laboratory A laboratory shall be maintained,
More informationBUREAU OF INDIAN STANDARDS. (Southern Regional Office) Subject: Preparation & Review of Product Manuals for Product
BUREAU OF INDIAN (Southern Regional Office) Our Ref: 60/CM 21 Jan 2014 Subject: Preparation & Review of Product Manuals for Product Certification This has reference to CMD-I s circular CMD-1/31 dated 11
More informationCERTIFICATE OF ACCREDITATION
CERTIFICATE OF ACCREDITATION In terms of section 22(2)(b) of the Accreditation for Conformity Assessment, Calibration and Good Laboratory Practice Act, 2006 (Act 19 of 2006), read with sections 23(1),
More informationMANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS
MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS 1.0 MANUFACTURER'S RESPONSIBILITIES: The manufacturer's responsibilities include, but are not limited to: 1.1 Control of UL Mark - Restrict
More informationCONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION SPECIFICATION EO- 4035 REVISION 12 OCTOBER, 2006 OPERATION AND MAINTENANCE
More informationPOLYMER HOUSED SURGE ARRESTORS
POLYMER HOUSED SURGE ARRESTORS March 2015 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata 700091.
More informationGUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS. 66 kv LIGHTNING ARRESTORS
GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA 390 007. TECHNICAL SPECIFICATIONS FOR 66 kv LIGHTNING ARRESTORS GETCO/ENGG/TECH SPECI.- 66 KV LA/R4/Jan11 Sign
More informationUL TEST REPORT AND PROCEDURE
Issue Date: 2015-12-22 Page 1 of 13 Report Reference # E182560-V4-S35 UL TEST REPORT AND PROCEDURE Standard: ANSI/AAMI ES60601-1 (2005/(R) 2012 +A1:2012, C1: 2009/(R) 2012 + A2:2010/(R) 2012) Amendment
More informationBUREAU OF INDIAN STANDARDS OFFICE ORDER. Subject: Preparation of Product Manuals by RO/BOs by Custodian BOs
BIS/DGO( 428 )/2015 15 January 2015 BUREAU OF INDIAN STANDARDS OFFICE ORDER Subject: Preparation of Product Manuals by RO/BOs by Custodian BOs Attention of RO/BOs is drawn towards Cl.10.1 of DGO(404) whereupon
More informationTECHNICAL SPECIFICATIONS
SPEC.NO. MSEDCL/ DIST:MSC-III/SPRING LOADED CONNECTOR BOX/05/10/R0/ 200510 TECHNICAL SPECIFICATIONS FOR TAMPER PROOF SERVICE CONNECTION BOX FOR L.T. LINES / CONSUMER MAINS (20.05.2010) Page 1 of 14 Clause
More informationSECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph
More informationCENTRAL MARKS DEPARTMENT (FCT) Ref: CMD-II/16:2933 (Part 1)
CENTRAL MARKS DEPARTMENT (FCT) Ref: CMD-II/16:2933 (Part 1) 20 03 2014 Subject: Implementation of revised STI for IS 2933 (Part for ENAMEL, EXTERIOR: (a) UNDERCOATING (b) FINISHING SPECIFICATION PART 1
More informationSECTION SECONDARY UNIT SUBSTATIONS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 11 16 SECONDARY UNIT SUBSTATIONS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable
More information(Condensed from National Electric Code)
WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,
More informationBUREAU OF INDIAN STANDARDS (CMD II)
BUREAU OF INDIAN STANDARDS (CMD II) Our Ref: CMD/16:15477 01 12 2006 Subject: STI for IS 15477:2004. Title: Adhesive for Use with Ceramic Tiles and Mosaics. The Scheme of Testing and Inspection for IS
More informationTucson Electric Power Company Rules and Regulations
Original Sheet No.: 906 A. Priority and Timing of Service Establishments 1. After an Applicant has complied with the Company s application requirements and has been accepted for service by the Company
More informationSECTION AUTOMATIC TRANSFER SWITCH
SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH PART 1: GENERAL 1.01 SCOPE A. Furnish all labor, materials, equipment and appurtenances, install and test electrically operated, automatic transfer switch (ATS)
More information