1 Environmental Report - Status Week Ending: Thur 12 h May2006 Generated By: Siobhan Quinn/Mairtin Naughton/Sandra Barber Checked By: Leslie Finnegan 1 Monitoring Data 1.1 Monitoring Equipment Axonics System running in automatic mode for the reporting period System now fully housed Discharges occurred to discharge lagoon Flow Weirs Flow weirs installed and running o Telemetry problem resolved, technician was on site and set up the system. PO 4 The PO 4 analyser is not working because of the power supply problem A composite sampler was deployed to collect daily samples for analysis. Site visit by manufacturers technician organised for this week. Sondes Replacement sonde for MP1 arrived, programmed and deployed. DO meter The handheld DO meter was repaired and returned and is now fully functional. 1.2 Rainfall Data 28/04/ /05/ /04/ /05/ /04/ /05/ /05/ /05/ /05/ /05/ /05/ /05/ /05/ /05/ /05/ Total Rainfall = 61.0 mm

2 Environmental Report - Status Week Ending: Thur 12 h May2006 Generated By: Siobhan Quinn/Mairtin Naughton/Sandra Barber Checked By: Leslie Finnegan 1.3 Summary Environment Surface Water Groundwater Dust Weather Comments There were no exceedances of set limits for grab samples taken on site during the reporting period based on results currently available. All in-situ monitoring equipment was within limits, where results were out of range, and were not corroborated by site or lab data, explanations are given below or on the appropriate graphs At D62 for the first part of the reporting period: high readings for conductivity and ph were recorded low dissolved oxygen readings were recorded. These readings are probably due to a reduced flow rate and a build up of material within the sonde housing. The sonde was raised in the water level and the concentrations reverted back to anticipated levels. The sonde data downloaded is shown graphically and is representative of concentrations normally recorded. The sonde at MP6 was removed due to erratic ph readings and recalibrated. MP1 sonde is now fully operational. Awaiting dust results from the Lab There was a total of 61mm of rainfall during the reporting period, with a temperature range of 4.58 to O C. All monitoring data is presented in tabular form, see attached. The sonde and TSS data is presented graphically. All Site data should be considered indicative only. 2 Environmental Incidents/Near misses/complaints There were no incidents on site during the reporting period. and Time Location Nature of Incident Actions Taken Category Status

3 Page 1 of 2 Surface Water Monitoring no Conducted by Approved by Name: Sandra Barber Signed Name Leslie Finnegan Signed Determinant Results Action Limits Target Limits Cond. Temp Turbidity DO ph TSS Ortho-phosphate as P Nitrate as N Nitrate as NO3 Total Phosphorus as P Ammonia as NH 3- N µs/cm o C NTU % Sat mg l -1 µg l -1 mg l -1 mg/l mg l -1 mg l -1 mg l -1 mg l -1 mg/l ug/l ug/l mg/l mg/l <3.5 or > <3 or > Settlement Pond Monitoring SP1 28/04/ < LOD SP1 02/05/ < LOD SP1 03/05/ < LOD < LOD SP1 04/05/ < LOD SP1 05/05/ < LOD SP1 08/05/ < LOD SP1 09/05/ SP1 10/05/ < LOD SP1 11/05/ < LOD SP1 12/05/ SP3 28/04/ SP3 02/05/ < LOD SP3 03/05/ < LOD SP3 04/05/ < LOD SP3 05/05/ < LOD SP3 08/05/ < LOD SP3 09/05/ < LOD 0 SP3 10/05/ < LOD SP3 11/05/ < LOD SP3 12/05/ < LOD SP1 28/04/ I.P. I.P SP1 02/05/ I.P. I.P SP1 03/05/ I.P. I.P SP1 04/05/ I.P. I.P SP1 05/05/ I.P I.P. I.P SP1 08/05/ I.P. I.P SP3 28/04/ I.P. I.P SP3 02/05/ I.P. I.P SP3 03/05/ I.P. I.P SP3 04/05/ I.P. I.P SP3 05/05/ I.P I.P. I.P SP3 08/05/ I.P. I.P Ammonium as NH 4 Nitrite as N Nitrite as NO2 Aluminium (dissolved) Aluminium (total) Phosphate as PO4 Total dissolved solids

4 Page 2 of 2 Surface Water Monitoring no Conducted by Approved by Name: Sandra Barber Signed Name Leslie Finnegan Signed Determinant Results Action Limits Target Limits Cond. Temp Turbidity DO ph TSS Ortho-phosphate as P Nitrate as N Nitrate as NO3 Total Phosphorus as P Ammonia as NH 3- N µs/cm o C NTU % Sat mg l -1 µg l -1 mg l -1 mg/l mg l -1 mg l -1 mg l -1 mg l -1 mg/l ug/l ug/l mg/l mg/l <3.5 or > <3 or > Additional Surface Water Monitoring D22 28/04/ < LOD < LOD D22 03/05/ < LOD < LOD D22 05/05/ < LOD < LOD D22 09/05/ D22 12/05/ < LOD D62 28/04/ < LOD D62 03/05/ D62 05/05/ < LOD < LOD 89.8 D62 09/05/ D62 12/05/ < LOD 40 D22 03/05/ I.P. I.P D22 05/05/ I.P I.P I.P. I.P. I.P. D62 03/05/ I.P. I.P D62 05/05/ I.P. I.P Results detailed above are from on site grab samples only I.P. = In Progress < LOD = Below Limit of Detection Grey shaded areas denote parameters that cannot or were not analysed on-site or the lab. On-Site Analysis Ammonium as NH 4 Nitrite as N Nitrite as NO2 Aluminium (dissolved) Aluminium (total) Phosphate as PO4 Total dissolved solids

5 Page 1 of 1 Axonics Water Monitoring Record Sheet no 1 of Conducted by Approved by Name: Sandra Barber Signed Name Leslie Finnegan Signed Determinant Results Cond. Temp Turbidity DO ph TSS Ortho-phosphate as P Nitrate as N Total Nitrate as NO3 Phosphorus as P Ammonia as NH 3- N Ammonium as NH 4 Nitrite as N Nitrite as NO2 µs/cm o C NTU % Sat mg l -1 µg l -1 mg l -1 mg/l mg l -1 mg l -1 mg l -1 mg l -1 mg/l ug/l ug/l mg/l mg/l Action Limits <3.5 or > Target Limits <3 or > Lagoon 28/04/ Axonics Pre 1 28/04/ < LOD Axonics Post 1 28/04/ Lagoon 02/05/ Axonics Pre 1 02/05/ < LOD Axonics Post 1 02/05/ Axonics Pre 2 02/05/ < LOD Axonics Post 2 02/05/ Lagoon 03/05/ Axonics Pre 1 03/05/ < LOD Axonics Post 1 03/05/ Axonics Pre 2 03/05/ < LOD Axonics Post 2 03/05/ Axonics Pre 1 04/05/ < LOD Axonics Post 1 04/05/ Axonics Pre 2 04/05/ < LOD Axonics Post 2 04/05/ Lagoon 05/05/ Axonics Pre 1 05/05/ < LOD Axonics Post 1 05/05/ < LOD Axonics Pre 2 05/05/ < LOD Axonics Post 2 05/05/ < LOD Lagoon 08/05/ Axonics Pre 1 08/05/ < LOD Axonics Post 1 08/05/ Axonics Pre 2 08/05/ Axonics Post 2 08/05/ Lagoon 09/05/ < LOD 0 Axonics Pre 1 09/05/ Axonics Post 1 09/05/ Axonics Pre 2 09/05/ Axonics Post 2 09/05/ Axonics Pre 1 10/05/ < LOD Axonics Post 1 10/05/ Axonics Pre 2 10/05/ < LOD Axonics Post 2 10/05/ Axonics Pre 1 11/05/ Axonics Post 1 11/05/ Axonics Pre 2 11/05/ < LOD Axonics Post 2 11/05/ < LOD 30 Axonics Pre 1 12/05/ < LOD Axonics Post 1 12/05/ < LOD Axonics Pre 2 12/05/ < LOD Axonics Post 2 12/05/ < LOD Axonics Pre 1 28/04/ <0.005 <0.017 I.P. I.P. <0.03 Axonics Pre 1 02/05/ <0.005 <0.017 I.P. I.P. <0.03 Axonics Pre 1 03/05/ I.P. I.P. <0.03 Axonics Pre 1 04/05/ <0.005 <0.017 I.P. I.P. <0.03 Axonics Pre 1 08/05/ <0.005 <0.01 <0.005 <0.017 I.P. I.P. <0.03 Axonics Post 1 28/04/ I.P. I.P. <0.03 Axonics Post 1 02/05/ I.P. I.P. <0.03 Axonics Post 1 03/05/ I.P. I.P. <0.03 Axonics Post 1 04/05/ <0.005 <0.017 I.P. I.P. <0.03 Axonics Post 1 08/05/ I.P. I.P. <0.03 I.P. = In Progress < LOD = Below Limit of Detection Grey shaded areas denote parameters that cannot or were not analysed on-site or the lab. On-Site Analysis Aluminium (dissolved) Aluminium (total) Phosphate as PO4 Total dissolved solids

6 Groundwater Monitoring Record Sheet no 1 of 1 Conducted by Approved by Name: Sandra Barber Signed Name Leslie Finnegan Signed Determinant Results Location DO Temp Cond. ph TDS BOD TSS Phosphate as Total Nitrate as Phosphate as Nitrite as N0 P Hardness 2 N0 3 PO 4 Arsenic Mercury Lead Aluminium Zinc Chromium Copper Cadmium Iron Tin Ammonia % Sat o C us/cm mg l -1 mg l -1 mg l -1 ug l -1 mg/l CaCO3 mg l -1 mg l -1 mg l -1 ug l -1 ug l -1 ug l -1 ug l -1 ug l -1 ug l -1 ug l -1 ug l -1 ug l -1 ug l -1 mg l -1 MP 1 MP 2 MP 3 MP 4 MP 5 MP 6 MP 7 MP 8 MP 9 MP 10a MEL BR4a MP1 12/04/ <0.017 < I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P MP2 12/04/ I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P MP3 12/04/ < I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P MP4 12/04/ <0.017 < I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P MP5 12/04/ <0.017 < I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P MP6 12/04/ < I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P MP7 12/04/ <0.017 < I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P MP8 12/04/ < I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P MP9 12/04/ I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P MP10a 12/04/ < <0.03 I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P MEL BR4a 12/04/ I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. I.P. <0.005 Note: Results detailed above are from on site grab samples only. Data recorded continuously is shown on the following graphs I.P. = In Progress On-Site Analysis Grey shaded areas denote parameters that cannot or were not analysed on-site or the lab. Graphs provided for MP1, MP2,MP4, MP6 and MP7 for: Temperature, Conductivity, and ph.

7 Noise Monitoring Record Sheet Conducted by Name: Sandra Barber Location Action Limit Target Limit Air Temp. Start Time Duration no 1 of 1 Approved by Signed Name: Leslie Finnegan Signed Determinant Results Wind *Comments Serial No. Speed (m/s)* Results db Direction (Degrees) L Aeq L Amin L Amax * Wind speeds in excess of 5 m/s negatively impact noise readings (as per EPA Guidance Note on Noise Measurement).

8 Dust Monitoring Record Sheet no 1 of 1 Conducted by Approved by Name: Sandra Barber Signed Name: Leslie Finnegan Signed Determinant Results Positioned Removed Ref. Number Dispatched Returned Weight (mg/sq.m/day) Comments Target (Consent) Limit: 350 mg m 2 d -1 on as a 30 day average D1 D2 D3 D4 D1 D2 D3 D4 D1 D2 D3 D4 D1 D2 D3 D4 D1 D2 D3 D4 Monitoring Points are numbered clockwise through the Cardinal Marks (N, E, S, W) Monitoring Results will be presented monthly

9 Vibration Monitoring Record Sheet no 1 of 1 Conducted by Approved by Name: Sandra Barber Signed Name: Leslie Finnegan Signed Determinant Results Location Positioned Removed Event Time Pk Disp (mm) Accel (g) Vibration meter was moved between V1 and V2 daily to provide indicative vibration levels accross the site

10 Flow Weir Record Sheet no 1 of 1 Conducted by Approved by Name: Sandra Barber Signed Name: Leslie Finnegan Signed SP1 SP3 Max (l/s) Min (l/s) Avg (l/s) Max (l/s) Min (l/s) Avg (l/s) 28/04/ /04/ /04/ /05/ /05/ /05/ /05/ /05/ /05/ /05/ /05/ /05/ /05/ /05/ /05/

11 07/05/ /05/ /05/ /05/ /05/ /05/ /05/ /05/ /05/ /05/ Orthophosphate Results at SP1 Week SP1 Composite Action Limit Trigger Limit Orthophosphate analyser malfunctioning, in discussion with manufacturer. Results presented below are lab results for SP1 and the composite sampler 02/04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/ /04/2006 Concentration (ug/l)

12 11/05/06 12/05/06 10/05/06 09/05/ Total Suspended Solids Results at SP1 Week 18-19, 2006 TSS Action Limit Target Limit 03/05/06 04/05/06 05/05/06 06/05/06 07/05/06 08/05/06 02/05/06 01/05/06 30/04/06 28/04/06 29/04/06 Concentration (mg/l)

13 10/05/06 11/05/06 09/05/06 08/05/06 07/05/ Temperature - Surface Waters, Weeks 18-19, 2006 SP1 SP3 D22 D62 04/05/06 05/05/06 06/05/06 03/05/06 02/05/06 01/05/06 30/04/06 29/04/06 28/04/06 Temperature ( O C)

14 10/05/06 11/05/06 09/05/ Conductivity - Surface Waters, Weeks18-19, 2006 SP1 SP3 D22 D62 Action Limit Trigger Limit 02/05/06 03/05/06 04/05/06 05/05/06 06/05/06 07/05/06 08/05/06 01/05/06 30/04/06 29/04/06 28/04/06 Conductivity (us/cm)

15 10/05/06 11/05/06 09/05/ ph - Surface Waters, Weeks 18-19, 2006 SP1 SP3 D22 D62 Lower Limit Upper Limt 02/05/06 03/05/06 04/05/06 05/05/06 06/05/06 07/05/06 08/05/06 01/05/06 30/04/06 29/04/06 28/04/06 ph (ph Units)

16 Turbidity - Surface Waters, Weeks SP1 SP3 D22 D62 Action Limit Trigger Limit Increased concentrations of Turbidity were recorded at D22. These values are not supported by the lab or site samples. Readings were probably high due to a reduced water flow and build up of material around the sonde housing Turbidity (NTU) /04/06 29/04/06 30/04/06 01/05/06 02/05/06 03/05/06 04/05/06 05/05/06 06/05/06 07/05/06 08/05/06 09/05/06 10/05/06 11/05/06

17 Dissolved Oxygen - Surface Waters, Weeks 18-19, 2006 SP1 SP3 D22 D Turbidity (NTU) D62 recalibration was unsuccessful. The probe was checked by insitu reading and was fine, but when donwloaded DO had been reading incorrectly. The sonde has been moved to a new setting in D62 in an attempt to correct the current problems. Graph shows that this was effective /04/06 29/04/06 30/04/06 01/05/06 02/05/06 03/05/06 04/05/06 05/05/06 06/05/06 07/05/06 08/05/06 09/05/06 10/05/06 11/05/06

18 10/05/06 11/05/06 09/05/06 08/05/ Temperature - Groundwaters Weeks MP1 MP2 MP4 MP6 MP7 03/05/06 04/05/06 05/05/06 06/05/06 07/05/06 02/05/06 01/05/06 30/04/06 29/04/06 28/04/06 Temperarture ( o C)

19 10/05/06 11/05/06 09/05/06 08/05/ Conductivity - Groundwaters Weeks MP1 MP2 MP4 MP6 MP7 03/05/06 04/05/06 05/05/06 06/05/06 07/05/06 02/05/06 01/05/06 30/04/06 29/04/06 28/04/06 Conductivity (us/cm)

20 10/05/06 11/05/06 09/05/06 08/05/ ph - Groundwaters Weeks MP1 MP2 MP4 MP6 MP7 MP 6 ph probe was brought in to check ph and then recalibrated. 29/04/06 30/04/06 01/05/06 02/05/06 03/05/06 04/05/06 05/05/06 06/05/06 07/05/06 28/04/06 ph (ph units)

The data used for this reporting period was taken from the on-site meteorological station.

The data used for this reporting period was taken from the on-site meteorological station. Environmental Report - Final Week Ending: Thur 15 th Mar 27 Generated By: Siobhan Quinn/Sandra Barber Checked By: Tony Doyle 1 Monitoring Data. 1.1 Monitoring Equipment Axonics Axonics plant ran for the

More information

TSS The TSS analyser was operational during the reporting period. The composite sampler is in place to cover any shortfalls in the TSS analyser.

TSS The TSS analyser was operational during the reporting period. The composite sampler is in place to cover any shortfalls in the TSS analyser. Interim Environmental Report Period Ending: 28th May 28 Compiled By: Siobhan Quinn & Thomas McGlynn Approved By: Tony Doyle 1 Monitoring Data 1.1 Monitoring Equipment Axonics Axonics plant operated as

More information

TSS The TSS analyser was operational during the reporting period. The composite sampler is in place to cover any shortfalls in the TSS analyser.

TSS The TSS analyser was operational during the reporting period. The composite sampler is in place to cover any shortfalls in the TSS analyser. Interim Environmental Report Period Ending: 3 th April 28 Compiled By: Siobhan Quinn, Aoife Reynolds & Thomas McGlynn Approved By: Tony Doyle 1 Monitoring Data 1.1 Monitoring Equipment Axonics Axonics

More information

Mayo Renewable Power Killala Construction Works Monthly Environmental Report 010 April 2016

Mayo Renewable Power Killala Construction Works Monthly Environmental Report 010 April 2016 Mayo Renewable Power Killala Construction Works Monthly Environmental Report 010 April 2016 Executive Summary John Sisk & Son (Holdings) Ltd. commissioned NVM Ltd. to monitor and report on Noise, Dust

More information

Des Moines River Water Quality Network

Des Moines River Water Quality Network Des Moines River Water Quality Network Monthly Report for December 2014 Donna S Lutz Assistant Scientist/Project Manager 394 Town Eng Bldg Iowa State University (515) 294-9720 dslutz@iastate.edu http://www.ccee.iastate.edu/dmrwqn

More information

SPECIFICATION NO.1197S Addendum No.4 Attachment D. Appendix L- Ground Water Quality Data and Revised Construction Groundwater Discharge Plan

SPECIFICATION NO.1197S Addendum No.4 Attachment D. Appendix L- Ground Water Quality Data and Revised Construction Groundwater Discharge Plan SPECIFICATION NO.1197S Addendum No.4 Attachment D Appendix L- Ground Water Quality Data and Revised Construction Groundwater Discharge Plan Page 1 of 2 Specification No. 1197S Addendum No. 4 ATTACHMENT

More information

Warm Mineral Springs Sampling by Sarasota County

Warm Mineral Springs Sampling by Sarasota County Warm Mineral Springs Sampling by Sarasota County John Ryan, Kathryn Meaux, Rene Janneman and Jon S. Perry Sarasota County Environmental Services Sarasota, Florida September 11 Warm Mineral Springs is a

More information

QUESTIONNAIRE FOR GENERAL WTP REQUESTED DATA FOR THE WATER TREATMENT PLANT (WTP) - Application : groundwater (well pit); urban wastewater;

QUESTIONNAIRE FOR GENERAL WTP REQUESTED DATA FOR THE WATER TREATMENT PLANT (WTP) - Application : groundwater (well pit); urban wastewater; REQUESTED DATA FOR THE WATER TREATMENT PLANT (WTP) - Application : ENVIRONMENTAL DATA - Temperature min. : C - Temperature max. : C - Altitude (m.a.s.l) : m - Plant location (geographic area, seismic zone,

More information

Water Chemistry. Water 101

Water Chemistry. Water 101 Water Chemistry Water 101 I. Introduction A. Water is not pure Many different kinds of chemicals dissolved in it Ions, organic chemicals, organic matter, particulate matter, and gases can all be in water

More information

RECOMMENDED SCOPE OF ACCREDITATION (For Testing Laboratories) * Test Method / Standard against which tests are performed

RECOMMENDED SCOPE OF ACCREDITATION (For Testing Laboratories) * Test Method / Standard against which tests are performed Sl Product / Material of test 1 Wastewater Colour, true colour units, 2 Turbidity, NTU 3 Total dissolved solids mg/1, IS-3025 (Part 4) -1983 2005: 2120 /C IS-3025 (Part 10)-1984 2005: 2130/B IS-3025 (Part

More information

Mount Polley Mining Corporation an Imperial Metals company Box 12 Likely, BC V0L 1N0 T F

Mount Polley Mining Corporation an Imperial Metals company Box 12 Likely, BC V0L 1N0 T F Mount Polley Mining Corporation an Imperial Metals company Box 12 Likely, BC V0L 1N0 T 250.790.2215 F 250.790.2613 November 24, 2016 Ministry of Environment Mining Operations Environmental Protection 2080

More information

ANALYTES available for testing

ANALYTES available for testing ANALYTES available for testing codes WS = water supply, drinking water, potable water WP = wastewater, general water quality, ODA OK = Oklahoma DEQ ODA = Oklahoma Department of Agriculture KS = Kansas

More information

MECON LIMITED RANCHI , INDIA

MECON LIMITED RANCHI , INDIA ORISSA MINING CORPORATION LIMITED BANGUR CHROMITE MINING PROJECT POST CLEARANCE ENVIRONMENTAL MONITORING REPORT FOR THE MONTH OF JULY 2011 MECON LIMITED RANCHI 834 002, INDIA 11.S2.2011 SEPTEMBER, 2011

More information

2016 HLWD WATER QUALITY RESULTS CATHERINE WEGEHAUPT WATERSHED TECHNICIAN JULY 2017 BOARD MEETING

2016 HLWD WATER QUALITY RESULTS CATHERINE WEGEHAUPT WATERSHED TECHNICIAN JULY 2017 BOARD MEETING 2016 HLWD WATER QUALITY RESULTS CATHERINE WEGEHAUPT WATERSHED TECHNICIAN JULY 2017 BOARD MEETING JACK CREEK 1200 2016 JACK CREEK HYDROGRAPH 1.80 1000 1.60 1.40 MEAN DAILY DISCHARGE (CFS) 800 600 400

More information

Comhairle Contae Choreai Cork County Council

Comhairle Contae Choreai Cork County Council Comhairle Contae Choreai Cork County Council Halla an Chontae, Corcaigh, Eire. Fon: (021) 4276891 Faics: (021) 4276321 Suiomh Greasain: www.corkcoco.ie County Hall, Cork, Ireland. TeL (021) 4276891 F=

More information

Sample Point Description Effluent Influent Influent Influent Influent

Sample Point Description Effluent Influent Influent Influent Influent Wastewater Discharge Monitoring Long Report Facility Name: HEART OF THE VALLEY METRO SEWERAGE DISTRICT Contact Address: 801 Thilmany Rd Kaukauna, WI 54130 Facility Contact: Brian Helminger, District Director

More information

Leeper Park Duck Pond Water Sampling. City of South Bend, St. Joseph County, Indiana

Leeper Park Duck Pond Water Sampling. City of South Bend, St. Joseph County, Indiana Leeper Park Duck Pond Water Sampling City of South Bend, St. Joseph County, Indiana 1 Leeper Park Water Sampling Report South Bend Venues Parks and Arts, St. Joseph County, Indiana Document Information

More information

Mahabal Enviro Engineers Pvt. Ltd. Pollution monitoring, Engineers & Contractors in Environmental Management

Mahabal Enviro Engineers Pvt. Ltd. Pollution monitoring, Engineers & Contractors in Environmental Management PROPOSED RESIDENTIAL CUM COMMERCIAL PROJECT WITH MCGM PARKING LOT, AT LOWER PAREL, MUMBAI, MAHARASHTRA GROUND WATER ANALYSIS October, 2017 Parameter Units Sample 1 Source Location Date of collection of

More information

Acidity and Alkalinity:

Acidity and Alkalinity: Evaluation of Pollution Sources to Lake Glenville Quarterly Report December 2018 Kimberlee K Hall, PhD Environmental Health Program, Western Carolina University Summary Chemical and microbial analysis

More information

DROGHEDA LANDFILL SITE COLLON ROAD, MELL, DROGHEDA

DROGHEDA LANDFILL SITE COLLON ROAD, MELL, DROGHEDA GROUNDWATER MONITORING INFORMATION QUARTERLY REPORT FOR PERIOD APRIL TO JUNE 216 BY LOUTH COUNTY COUNCIL TO ENVIRONMENTAL PROTECTION AGENCY FOR WASTE LICENCE REFERENCE: W33-1 DROGHEDA LANDFILL SITE COLLON

More information

French Creek Well # 2 Water Analysis Behind 1221 Ormonde Road

French Creek Well # 2 Water Analysis Behind 1221 Ormonde Road French Creek Well # 2 Water Analysis Behind 1221 Ormonde Road October 27 2010 Inorganics Fluoride 1.5 MAC 0.17 0.13

More information

MECON LIMITED RANCHI , INDIA

MECON LIMITED RANCHI , INDIA ORISSA MINING CORPORATION LIMITED BANGUR CHROMITE MINING PROJECT POST CLEARANCE ENVIRONMENTAL MONITORING REPORT FOR THE MONTH OF SEPTEMBER 2011 MECON LIMITED RANCHI 834 002, INDIA 11.S2.2011 OCTOBER, 2011

More information

Magino Project Environmental Impact Statement. Technical Support Document Environmental Monitoring Plan

Magino Project Environmental Impact Statement. Technical Support Document Environmental Monitoring Plan Magino Project Environmental Impact Statement Technical Support Document 20-13 Rev. No. Revision Date Approved 0 Document issued for EIS Table of Contents SECTION 1.0 Purpose of the Plan... 1 1.1 Scope

More information

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana Last Amended on - Page 1 of 7 I. AIR, GASES & ATMOSPHERE 1. Ambient Air Monitoring RSPM ( PM 10) IS 5182 (Part 23): 2006 (RA ) 5 µg/m 3 to 750 µg/m 3 PM 2.5 SOP 11 dated 17.11.2014 12.5 µg/m 3 to 500 µg/m

More information

by Keith Kennedy Manager of Environmental Programs North Central Texas Council of Governments

by Keith Kennedy Manager of Environmental Programs North Central Texas Council of Governments by Keith Kennedy Manager of Environmental Programs North Central Texas Council of Governments What is NPDES? National Pollutant Discharge Elimination System USEPA outfall permitting program Storm water

More information

Durban Height Waterworks, Design capacity: 615 ML/d, Period: 01 July June 2014

Durban Height Waterworks, Design capacity: 615 ML/d, Period: 01 July June 2014 Durban Height Waterworks, Design capacity: 615 ML/d, Period: 01 July 2013-30 June 2014 Durban Heights WW Raw Durban Heights WW Final Determinands Units Minimum Average Percentile Maximum Minimum Average

More information

CE 370. Wastewater Characteristics. Quality. Wastewater Quality. The degree of treatment depends on: Impurities come from:

CE 370. Wastewater Characteristics. Quality. Wastewater Quality. The degree of treatment depends on: Impurities come from: CE 37 Wastewater Characteristics Quality Wastewater Quality The degree of treatment depends on: Influent characteristics Effluent characteristics Impurities come from: Domestic activities Industrial activities

More information

CERTIFICATE OF ANALYSIS

CERTIFICATE OF ANALYSIS 1 CERTIFICATE OF ANALYSIS ATTENTION: Water Purification Solutions DATE: 29 November 2018 1. GENERAL: Table-1: Tierkloof Borehole & Product - Sampled 1 November 2018 Results expressed in parts per million

More information

SWANA 2017 Leachate Basics and Quality Changes with Organics Removal. Steve Johnson M.Eng., P.Eng.

SWANA 2017 Leachate Basics and Quality Changes with Organics Removal. Steve Johnson M.Eng., P.Eng. SWANA 2017 Leachate Basics and Quality Changes with Organics Removal Steve Johnson M.Eng., P.Eng. May 2017 2 Landfills that take over 10,000 tonnes per year? How many of you have leachate collection systems?

More information

In the fall of 2008, Barr and PolyMet identified four sources of historical Colby Lake water quality data. Those sources are listed below:

In the fall of 2008, Barr and PolyMet identified four sources of historical Colby Lake water quality data. Those sources are listed below: External Memorandum To: Dave Blaha, ERM From: Miguel Wong and Katie Wenigmann Project: 23/69 0862.00 006 001 c: Jim Scott, PolyMet; Stuart Arkley, MDNR; John Borovsky, Barr PolyMet has not been requested

More information

Liddell Coal - Monthly Environmental Summary February 2018

Liddell Coal - Monthly Environmental Summary February 2018 Liddell Coal - Monthly Environmental Summary February. Dust Gauges Table : Dust Deposition Results Jan to Feb ( Days) Site Monthly Insoluble Solids (g/m.month) Monthly Ash Residue (g/m.month) Monthly Combustible

More information

STORMWATER POLLUTANT ASSESSMENT AT THE CITY OF KISSIMMEE

STORMWATER POLLUTANT ASSESSMENT AT THE CITY OF KISSIMMEE STORMWATER POLLUTANT ASSESSMENT AT THE CITY OF KISSIMMEE Eric Gurr and Fidelia Nnadi Department of Civil and Environmental Engineering University of Central Florida, Orlando, FL ABSTRACT Historically,

More information

Table 1: QA/QC Data Comparison Rankings for deployment between June 24 and July 21, 2009.

Table 1: QA/QC Data Comparison Rankings for deployment between June 24 and July 21, 2009. General The Water Resources Management Division staff monitors the real-time web page on a daily basis. This monthly deployment report interprets the data from a water quality monitoring station on Minipi

More information

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017 Georgia Power Plant Bowen NPDES Permit No. GA0001449 Revised December 2017 Purpose This (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures that Georgia Power

More information

Dundalk Wastewater Treatment Plant

Dundalk Wastewater Treatment Plant Township of Southgate Dundalk Wastewater Treatment Plant 2016 Annual Report Jim Ellis Public Works Manager Dundalk Wastewater Treatment Plant 2016 Annual Report Table of Contents Wastewater Treatment Plant

More information

Dundalk Wastewater Treatment Plant

Dundalk Wastewater Treatment Plant Township of Southgate Dundalk Wastewater Treatment Plant 2017 Annual Report Staff Report PW2018-010 - Dundalk Wastewater Treatment Plant 2017 Annual Report Moved by Councillor Pallister, Seconded by Councillor

More information

AIR, WATER AND METEOROLOGICAL MONITORING JUNE 2018 PINE DALE MINE, BLACKMANS FLAT

AIR, WATER AND METEOROLOGICAL MONITORING JUNE 2018 PINE DALE MINE, BLACKMANS FLAT AIR, WATER AND METEOROLOGICAL MONITORING JUNE 2018 PINE DALE MINE, BLACKMANS FLAT Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA Australia RCA ref 6880-1771/0 RCA AUSTRALIA

More information

Globeville Landing Outfall Surface Water. December 12, 2017 Andrew Ross, Jon Novick Denver Department of Public Health & Environment

Globeville Landing Outfall Surface Water. December 12, 2017 Andrew Ross, Jon Novick Denver Department of Public Health & Environment Globeville Landing Outfall Surface Water December 12, 2017 Andrew Ross, Jon Novick Denver Department of Public Health & Environment Introductions Andrew Ross Environmental Program Manager, DDPHE Jon Novick

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA Ash Pond Dewatering Plan. Revised May 2018

Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA Ash Pond Dewatering Plan. Revised May 2018 Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA0001431 Revised May 2018 Purpose This updated (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures

More information

Appendix F Project Environmental Standards

Appendix F Project Environmental Standards Appendix F TABLE OF CONTENTS 1 INTRODUCTION... 1-1 1.2 References... 1-1 1.3 Abbreviations and Definitions... 1-2 2 PROJECT AMBIENT AIR QUALITY STANDARDS... 2-3 3 PROJECT AMBIENT NOISE STANDARDS... 3-4

More information

State of Nevada Department of Conservation and Natural Resources Division of Environmental Protection Laboratory Scope of Accreditation

State of Nevada Department of Conservation and Natural Resources Division of Environmental Protection Laboratory Scope of Accreditation Matrix: CWA (Non Potable Water) Discipline: Chemistry ASTM D516-07 ASTM D6888-09 ASTM D7511-09e2 EPA 160.4 EPA 1631E EPA 1664A EPA 1664A (SGT-HEM) EPA 180.1 Sulfate 8/1/2018 Cyanide, Amenable 8/1/2018

More information

MS4 Assessment Program to Satisfy Part V. Monitoring Requirements

MS4 Assessment Program to Satisfy Part V. Monitoring Requirements MS4 Assessment Program to Satisfy Part V. Monitoring Requirements Submitted by City of Boynton Beach MS4 Permit No. FLS000018-004 The purpose of this document is to outline the City of Boynton Beach Stormwater

More information

Water Quality Permitting Program Monitoring Matrix 1,2,3

Water Quality Permitting Program Monitoring Matrix 1,2,3 State of Oregon Department of Environmental Quality Water Quality Permitting Program Monitoring Matrix 1,2,3 ITEM OR PARAMETER Total Flow (influent and/or effluent) 4 Flow Meter Calibration 5 (influent

More information

Annex 7.1 National Ambient Air Quality Standards for Nepal, 2003

Annex 7.1 National Ambient Air Quality Standards for Nepal, 2003 Annex 7.1 National Ambient Air Quality Standards for Nepal, 2003 Parameters Units Averaging Time TSP (Total Suspended Particulars) Concentration in Ambient Air, maximum Test method µg/m 3 Annual - 24-hours*

More information

Lake Elsinore and Canyon Lake Nutrient TMDL Monitoring Quarter 3 Report (DRAFT)

Lake Elsinore and Canyon Lake Nutrient TMDL Monitoring Quarter 3 Report (DRAFT) Lake Elsinore and Canyon Lake Nutrient TMDL Monitoring 2016-2017 Quarter 3 Report (DRAFT) Prepared for: Lake Elsinore & San Jacinto Watershed Project Authority 11615 Sterling Avenue Riverside, California

More information

State of Nevada Department of Conservation and Natural Resources Division of Environmental Protection Laboratory Scope of Accreditation

State of Nevada Department of Conservation and Natural Resources Division of Environmental Protection Laboratory Scope of Accreditation Matrix: CWA (Non Potable Water) Discipline EPA 120.1 Chemistry Conductivity 8/1/2015 Aluminum 8/1/2015 Antimony 8/1/2015 Arsenic 8/1/2015 Barium 8/1/2015 Beryllium 8/1/2015 Boron 8/1/2015 Cadmium 8/1/2015

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

AIR, WATER AND METEOROLOGICAL MONITORING MAY 2018 PINE DALE MINE, BLACKMANS FLAT

AIR, WATER AND METEOROLOGICAL MONITORING MAY 2018 PINE DALE MINE, BLACKMANS FLAT AIR, WATER AND METEOROLOGICAL MONITORING MAY 2018 PINE DALE MINE, BLACKMANS FLAT Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA Australia RCA ref 6880-1769/0 RCA AUSTRALIA

More information

Concentration of Metals (Cd, Hg, Ag; mean +SD) in sediment samples collected from Pit Specific Sediment Chemistry Monitoring for CMP 1 in May 2014.

Concentration of Metals (Cd, Hg, Ag; mean +SD) in sediment samples collected from Pit Specific Sediment Chemistry Monitoring for CMP 1 in May 2014. Figure 1: Concentration of Metals (Cr, Cu, Ni, Pb, Zn, As; mean +SD) in sediment samples collected from Pit Specific Sediment Chemistry Monitoring for CMP 1 in May 2014. Figure 2: Concentration of Metals

More information

Appendix C: Water Quality Data

Appendix C: Water Quality Data Appendix C: Water Quality Data Your Project #: 111257005 Site: TIM HORTONS SYLVIA LAKE NSD # 16300R Attention: DAVID WHETTER STANTEC CONSULTING LTD 603-386 BROADWAY AVENUE WINNIPEG, MB CANADA R3C

More information

Superintendence Company of India Private Limited, Plot Y-23, Block-EP, Sector-V, Salt Lake City, Kolkata, West Bengal

Superintendence Company of India Private Limited, Plot Y-23, Block-EP, Sector-V, Salt Lake City, Kolkata, West Bengal Last Amended on - Page 1 of 16 I. WATER 1. Drinking Water ph IS 3025 (Part 2): 2004, Colour APHA (22 nd Edition) 2120 B: Turbidity (NTU) IS 3025 (Part 10): 1984 Residual, Free Chlorine IS 3025 Part 26/1986

More information

Lake Elsinore and Canyon Lake Nutrient TMDL Monitoring Quarter 3 Report

Lake Elsinore and Canyon Lake Nutrient TMDL Monitoring Quarter 3 Report Lake Elsinore and Canyon Lake Nutrient TMDL Monitoring 2017-2018 Quarter 3 Report Prepared for: Lake Elsinore & San Jacinto Watershed Project Authority 11615 Sterling Avenue Riverside, California 92503

More information

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT WATER QUALITY ASSESSMENT OF Elk River AT SPARWOOD (2 5) Prepared by: L. G. Swain, P. Eng. B.C. Ministry of Environment Prepared for: B.C. Ministry

More information

SURFACE WATER, DEPOSITIONAL DUST, HVAS AND METEOROLOGICAL MONITORING Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA

SURFACE WATER, DEPOSITIONAL DUST, HVAS AND METEOROLOGICAL MONITORING Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA SURFACE WATER, DEPOSITIONAL DUST, HVAS AND METEOROLOGICAL MONITORING Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA Australia RCA ref 6880-1757/0 January 2018 RCA AUSTRALIA

More information

SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY March, 2016

SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY March, 2016 SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY COASTWIDE CIVIL PTY LTD ADDRESS: 19 CROOME LANE, ALBION PARK, 2527 POSTAL: P.O.BOX 116, KIAMA, 2533 E-MAIL: info@coastwidecivil.com.au ABN: 71

More information

Real-Time Water Quality Deployment Report

Real-Time Water Quality Deployment Report Real-Time Water Quality Deployment Report Iron Ore Company of Canada Lab West Network July to August 31, 1 Government of Newfoundland & Labrador Department of Environment and Climate Change Water Resources

More information

SURFACE WATER, DEPOSITIONAL DUST, HVAS AND METEOROLOGICAL MONITORING Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA

SURFACE WATER, DEPOSITIONAL DUST, HVAS AND METEOROLOGICAL MONITORING Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA SURFACE WATER, DEPOSITIONAL DUST, HVAS AND METEOROLOGICAL MONITORING Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA Australia RCA ref 6880-1733/0 January 2017 RCA AUSTRALIA

More information

44 W E & T w w w. w e f. o r g / m a g a z i n e 2007 Water Environment & Technology All rights reserved

44 W E & T w w w. w e f. o r g / m a g a z i n e 2007 Water Environment & Technology All rights reserved Philadelphia deploys automatic samplers as soon as possible after a rain event. This sampler features a protective fiberglass enclosure, plastic protective pipe for the water sample line, and a cable for

More information

Dundalk Wastewater Treatment Plant

Dundalk Wastewater Treatment Plant Township of Southgate Dundalk Wastewater Treatment Plant 2014 Annual Report Jim Ellis Public Works Manager Dundalk Wastewater Treatment Plant 2014 Annual Report Table of Contents Wastewater Treatment Plant

More information

City of Delray Beach MS4 Assessment Program: Part V. Monitoring Requirements MS4 Permit No. FLS

City of Delray Beach MS4 Assessment Program: Part V. Monitoring Requirements MS4 Permit No. FLS City of Delray Beach MS4 Assessment Program: Part V. Monitoring Requirements MS4 Permit No. FLS 000018 004 The purpose of this document is to outline the assessment program for the City of Delray Beach

More information

Permitting Wastewater Spray Irrigation Systems in Delaware

Permitting Wastewater Spray Irrigation Systems in Delaware Permitting Wastewater Spray Irrigation Systems in Delaware Ronald E. Graeber Program Manager Ground Water Discharges Section Division of Water Resources (302) 739-9948 Ronald.graeber@state.de.us Letter

More information

Holcim (Australia) Pty Limited. Lynwood Quarry Groundwater Monitoring Program Revision 2

Holcim (Australia) Pty Limited. Lynwood Quarry Groundwater Monitoring Program Revision 2 Holcim (Australia) Pty Limited Lynwood Quarry Groundwater Monitoring Program Revision 2 June 2011 Lynwood Quarry Groundwater Monitoring Program Revision 2 Prepared by on behalf of Holcim (Australia) Pty

More information

Appendix B: Proposed trigger levels for groundwater quality and Response to Breach of Trigger Levels

Appendix B: Proposed trigger levels for groundwater quality and Response to Breach of Trigger Levels Appendix B: Proposed trigger levels for groundwater quality and Response to Breach of Trigger Levels Trigger levels Miners Road and Selwyn McLeans Island Suite 1 - All wells ph field measurement

More information

AIR, WATER AND METEOROLOGICAL MONITORING AUGUST 2018 PINE DALE MINE, BLACKMANS FLAT

AIR, WATER AND METEOROLOGICAL MONITORING AUGUST 2018 PINE DALE MINE, BLACKMANS FLAT AIR, WATER AND METEOROLOGICAL MONITORING AUGUST 2018 PINE DALE MINE, BLACKMANS FLAT Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA Australia RCA ref 6880-1775/0 RCA AUSTRALIA

More information

Georgia Power Plant McManus NPDES Permit No. GA Ash Pond Dewatering Plan. Revised April 2018

Georgia Power Plant McManus NPDES Permit No. GA Ash Pond Dewatering Plan. Revised April 2018 Georgia Power Plant McManus NPDES Permit No. GA0003794 Revised April 2018 Purpose This (Plan) describes the procedures, safeguards and enhanced wastewater treatment measures that Georgia Power Company

More information

Environment Protection Licence

Environment Protection Licence Licence Details Number: Anniversary Date: 20001 22-August Licensee CLEARY BROS (BOMBO) PTY LTD PO BOX 210 PORT KEMBLA NSW 2505 Premises PORT KEMBLA OUTER HARBOUR OFF CHRISTY DRIVE PORT KEMBLA NSW 2505

More information

BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT

BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT ENVIRONMENTAL COMPLIANCE APPROVAL: 6801-7VKNAQ ENVIRONMENTAL COMPLIANCE APPROVAL: 6222-AFGSNY (Dec 16 2016) INTRODUCTION The Lagoon Lane Wastewater

More information

W12A Landfill Groundwater, Leachate, Water Well, Landfill Gas and Surface Water Quality Monitoring Program

W12A Landfill Groundwater, Leachate, Water Well, Landfill Gas and Surface Water Quality Monitoring Program W12A Landfill Groundwater, Leachate, Water Well, Landfill Gas and Surface Water Quality Monitoring Program The groundwater, leachate, water well, landfill gas and surface water monitoring programs are

More information

Water Quality Report for ALDERNEY NORTH Monitoring Water Quality. Water Quality Parameters and their Standards

Water Quality Report for ALDERNEY NORTH Monitoring Water Quality. Water Quality Parameters and their Standards Water Quality Report for ALDERNEY NORTH Monitoring Water Quality The Government requires all water companies to comply with the Water Supply (Water Quality) Regulations. These regulations are based upon

More information

SUMMARY REPORT. Brik Zivkovich, M.S., EIT Graduate Engineering Intern, Master Planning Program

SUMMARY REPORT. Brik Zivkovich, M.S., EIT Graduate Engineering Intern, Master Planning Program SUMMARY REPORT BY: Holly Piza, P.E. Project Manager, Master Planning Program Brik Zivkovich, M.S., EIT Graduate Engineering Intern, Master Planning Program SUBJECT: Water quality summary report of the

More information

SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY December, 2016

SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY December, 2016 SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY COASTWIDE CIVIL PTY LTD ADDRESS: 19 CROOME LANE, ALBION PARK, 2527 POSTAL: P.O.BOX 116, KIAMA, 2533 E-MAIL: info@coastwidecivil.com.au ABN: 71

More information

Lynas Advanced Materials Plant. Key Environmental Monitoring Programs

Lynas Advanced Materials Plant. Key Environmental Monitoring Programs Lynas Advanced Materials Plant Key Environmental Monitoring Programs Index 1. Environmental Monitoring Programs at the LAMP 2. Reasons for monitoring 3. Expertise in monitoring programs Environmental Monitoring

More information

El Dorado Hydroelectric Project FERC Project No Water Quality Monitoring Report

El Dorado Hydroelectric Project FERC Project No Water Quality Monitoring Report El Dorado Hydroelectric Project FERC Project No. 184 21 Water Quality Monitoring Report EL DORADO IRRIGATION DISTRICT 289 Mosquito Road Placerville, CA 95667 March 211 1. Introduction The El Dorado Irrigation

More information

How will the new changes affect Solid Waste Companies? By 1

How will the new changes affect Solid Waste Companies? By 1 California State Water Resources Control Board New General Permit For Storm Water Discharges Associated with Industrial Activities Order NPDES No. CAS000001 Effective July 1, 2015 How will the new changes

More information

Notes on Monitoring Data

Notes on Monitoring Data Incitec Pivot Limited Environment Protection Licence: 1181 39 Heron Road, Kooragang Island, NSW Date Data Published: 22 January 215. Date Sampled: December 214 Date Sample Results Obtained: 19 January

More information

Notes on Monitoring Data

Notes on Monitoring Data Incitec Pivot Limited Environment Protection Licence: 11781 Heron Road, Kooragang Island, NSW Date Data Published: October 2014. Date Sampled: August 2014 Date Sample Results Obtained: 24 September 2014.

More information

Stormwater Runoff Water Quality Characteristics From Highways in Lake Tahoe, California

Stormwater Runoff Water Quality Characteristics From Highways in Lake Tahoe, California California State University, Sacramento (CSUS) University of California, Davis (UCD) California Department of Transportation (Caltrans) Stormwater Runoff Water Quality Characteristics From Highways in

More information

SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY November, 2016

SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY November, 2016 SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY COASTWIDE CIVIL PTY LTD ADDRESS: 19 CROOME LANE, ALBION PARK, 2527 POSTAL: P.O.BOX 116, KIAMA, 2533 E-MAIL: info@coastwidecivil.com.au ABN: 71

More information

Bracebridge Wastewater Treatment 2017 Summary Report

Bracebridge Wastewater Treatment 2017 Summary Report Bracebridge Wastewater Treatment 2017 Summary Report Environmental Compliance Approval: 6222-AFGSNY (Dec 16 2016) INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District

More information

EPA Primary. (mg/l as CaCO3) (mg/l as CaCO3)

EPA Primary. (mg/l as CaCO3) (mg/l as CaCO3) NORTH TEXAS MUNICIPAL WATER DISTRICT - Wylie Water Analysis Jan-2018 Mineral Analysis Raw Treated Standards Residue on Evaporation 412 456 500 1000 Silica (SiO2) 3.63 3.41 Iron (Fe) 0.378 0.259 0.3 0.3

More information

AGL UPSTREAM INVESTMENTS PTY LTD GLOUCESTER GAS PROJECT

AGL UPSTREAM INVESTMENTS PTY LTD GLOUCESTER GAS PROJECT AGL UPSTREAM INVESTMENTS PTY LTD GLOUCESTER GAS PROJECT July 2016 Water Monitoring Report Waukivory Pilot Project: Fracture Stimulation and Flow Test EPL 20358 Reporting Period: June 2016 AGL Upstream

More information

GOVERNMENT OF ZAMBIA. The Environmental Protection and Pollution Control Act, 1990 (No. 12 of 1990)

GOVERNMENT OF ZAMBIA. The Environmental Protection and Pollution Control Act, 1990 (No. 12 of 1990) 257 Supplement to the Republic of Zambia Government Gazette dated the 14th may, 1993 GOVERNMENT OF ZAMBIA STATUTORY INSTRUMENT No.72 OF 1993 The Environmental Protection and Pollution Control Act, 1990

More information

MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT

MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-871-88-949 Prepared by: Table of Contents Section 1: Overview...

More information

Leary s Brook at Prince Philip Drive

Leary s Brook at Prince Philip Drive Real-Time Water Quality Report Leary s Brook at Prince Philip Drive Deployment Period January 18, 216 to February 22, 216 Government of Newfoundland & Labrador Department of Environment and Conservation

More information

Appendix I. Agreement on National Environmental Standards of Lao PDR, 2009

Appendix I. Agreement on National Environmental Standards of Lao PDR, 2009 Appendix I Agreement on National Environmental Standards of Lao PDR, 2009 I.1 DRINKING WATER QUALITY STANDARDS Lao PDR current standards for drinking water of the Lao PDR are provided below for reference.

More information

BRACEBRIDGE WASTEWATER TREATMENT

BRACEBRIDGE WASTEWATER TREATMENT 2014 BRACEBRIDGE WASTEWATER TREATMENT ENVIRONMENTAL COMPLIANCE APPROVAL: #6801-7VKNAQ INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District Municipality of Muskoka.

More information

WWD Licence Application

WWD Licence Application Agglomeration details Leading Local Authority North Tipperary County Council Co-Applicants Agglomeration Loughmore Population Equivalent 300 Level of Treatment Preliminary, Secondary, Tertiary Treatment

More information

BC Approved Water Quality Guidelines (updated to 2014) Compendium of Working Water Quality Guidelines (updated to 2006)

BC Approved Water Quality Guidelines (updated to 2014) Compendium of Working Water Quality Guidelines (updated to 2006) 13477-116 Ave Surrey, BC Canada V3R 6W4 April 15, 2014 Web Kassa Environment Canada 401 Burrard Street Vancouver, British Columbia V6C 3S5 Re: Addendum to April 9, 2014 submission: Summary of in situ and

More information

WWD Licence Application. Ballinamore

WWD Licence Application. Ballinamore Agglomeration details Leading Local Authority Leitrim County Council Co-Applicants Agglomeration Ballinamore Population Equivalent 1418 Level of Treatment Secondary with Phosphorus Removal Treatment plant

More information

Environmental Management System

Environmental Management System Environmental Management System Moreton Bay Research Station (MBRS) Water Management Program 1. Program Scope The Water Management Program incorporates all the water used throughout the Moreton Bay Research

More information

Rainbow Creek TMDL Monitoring Program Report for October 2016 through September 2017

Rainbow Creek TMDL Monitoring Program Report for October 2016 through September 2017 Rainbow Creek TMDL Monitoring Program Report for October 2016 through September 2017 Introduction The Rainbow Creek monitoring program has been developed to provide water quality data in support of the

More information

Result data last updated. 10 July Map of Norske Skog Albury Paper Mills Environmental Protection Licence compliance monitoring sites

Result data last updated. 10 July Map of Norske Skog Albury Paper Mills Environmental Protection Licence compliance monitoring sites A full copy of our license can be found on the EPA website under the following address http://www.epa.nsw.gov.au/prpoeoapp/viewpoeolicence.aspx?docid=32757&sysuid=1&licid=1272 Result data last updated

More information

WWD Licence Application

WWD Licence Application Agglomeration details Leading Local Authority Leitrim County Council Co-Applicants Agglomeration Leitrim Village Population Equivalent 1069 Level of Treatment Secondary Treatment plant address Leitrim

More information

Prakruti Environmental Engineers (Environmental Laboratory), 1, Utkanth Society, B/H Alkapuri Club, Alkapuri, Vadodara, Gujarat

Prakruti Environmental Engineers (Environmental Laboratory), 1, Utkanth Society, B/H Alkapuri Club, Alkapuri, Vadodara, Gujarat Prakruti Environmental Engineers (Environmental ), Last Amended on - Page 1 of 7 I. WATER 1. Water (Ground Water/ Surface Water/ Drinking Water/ Treated Water) ph APHA 4500-H + B, Temperature APHA 2550

More information

Albion Park Quarry Annual Environmental Management Report

Albion Park Quarry Annual Environmental Management Report DoP SUBMISSION Cleary Bros (Bombo) Pty Ltd Albion Park Quarry Annual Environmental Management Report Period 1 July 2011 30 June 2012 Reference GEN1208-02 Cleary Bros (Bombo) Pty Ltd 39 Five Islands Road

More information

Parameter monitored Standard methodology used Detection limit

Parameter monitored Standard methodology used Detection limit A. Water sampling and analysis ph Potentiometry 0.0 ph units No Temperature Electrometer probe (in-situ) 0.05 o C No Dissolved oxygen Electrometer probe (in-situ) % No Salinity Electrometer probe (in-situ)

More information

WOLVERINE MINE MONITORING AND SURVEILLANCE PLAN 2011 ANNUAL REPORT

WOLVERINE MINE MONITORING AND SURVEILLANCE PLAN 2011 ANNUAL REPORT WOLVERINE MINE MONITORING AND SURVEILLANCE PLAN 211 ANNUAL REPORT Prepared for: Yukon Energy, Mines and Resources Prepared by: Yukon Zinc Corporation Vancouver, British Columbia March 31, 212 Wolverine

More information

2014 ASSINIBOINE RIVER MONITORING REPORT

2014 ASSINIBOINE RIVER MONITORING REPORT October 15, 2014 Temperature º C 9.7 9.6 9.6 9.6 9.7 9.7 10.1 10.2 10.1 Dissolved Oxygen mg/l 10.3 10.2 10.2 10.3 10.1 10.2 10.2 10.2 10.2 Conductivity ms/cm 1.262 1.235 1.253 1.307 1.315 1.307 1.322 1.32

More information