1 7. Breadth Analysis: Alternate Underpinning System 7.1 MSENT Underpinning Background MSENT is being constructed on a very small site situated between three existing buildings. Construction at this location required the installation of a detailed underpinning system to support the existing foundations. The underpinning system installed on the existing chemistry building failed, cracking the existing foundation, and therefore causing a schedule delay. A structural engineer did not design the underpinning system. The specification section for shoring and underpinning was a performance specification wherein an AE indicated what is required, but does not indicate a specific manufacturer or method. Therefore the specification said to underpin the building, don t let it fail, and the allowable tolerances are. The chemistry building was underpinned using a mine shaft method in the following steps: A pit was excavated next to the building footing A 5 x 5 x 5 hole was dug against the footing Excavation was completed to 4 underneath the footing Wood shoring was installed to shore the inside of the pit Once completely underneath the building, a shaft was dug down to approximately 33 with wood boards at the exterior of all four sides This shaft was then poured solid with concrete up to 2 +/- below the existing footer Once the concrete was cured the 2 gap was dry packed with grout. 75
2 7.2 MSENT Underpinning Constructability Review It is unknown why the building foundation actually cracked. An investigation was conducted by an outside forensic engineering firm who concluded that the design was inadequate and did not comply with project specifications. Yet the contractors who installed and designed the system believe the design was adequate and the building cracked as a result of an unforeseen site condition. There are several different soil/material planes within the height of the excavation. At the intersection of two of the planes there is a slick surface which caused the soil not to be as self supporting as normal and put an unexpected amount of force onto the underpinning pits. This exceeded the values normally used in underpinning design and caused the building to shift and crack. One side claims the failure could have been prevented in either case if the design had been upgraded to comply with the contract documents. Yet the opposing side claims that standard design practice would not have prevented the movement. Currently, it is being accepted that any failure was not the result of faulty installation, but instead of an inadequate design (to support loads under the unforeseen conditions). All required tests were performed on the underpinning system, including the concrete which was tested to ensure it reached the proper compressive strength. The tiebacks (used to resist lateral forces) which were the point of failure were also tested. There were two tests completed, a short test which loaded each tie to alignment, to 0.25 design load, to 0.5 design load, to 0.75 design load, to 1.0 design load, and to 1.2 design load. Each step was tightened, 76
3 held for a specific duration then its movement was recorded (about 10 minutes total). If movement exceeded an allowable standard then a second test was performed with a more complicated stepping process, longer duration for each step and final step of 1.33 design load (total time about one hour). This test was to be done for any failure (there was none on the project) and 5% of the total number of tiebacks on the job. The 5% selected were the ones with the highest strength requirements, the hardest to install and the rest random. Additional tiebacks were installed to make the system stronger, and each was tested to the more stringent one hour test. Then two were randomly selected to be tested at 1.33 design load and this took a total of 8 hours. 77
4 7.3 Factors Affecting Underpinning Selection Foundations need to be underpinned either when a structure is being disturbed by foundation movements or when proposed new works are likely to cause structural failure if the foundations are not improved. There are many factors to consider when deciding how exactly to underpin an existing structure: Size and depth of excavation Soil conditions Ground water Surface drainage conditions Weather and moisture conditions Routes and depths of existing underground services Size and Depth of Excavation The size and depth of excavation needed to support an existing structure needs to be known to avoid any potential failures. These two factors help to decide which approach to take to underpin a building. Soil Conditions A variation of soil conditions can result in the failure of an installed underpinning system. This is a very important factor to investigate prior to selection of the underpinning system to be used. Any pockets of sand, fissures, or results of previous soil disturbances, etc. prove that the soil is unstable and may be unfit for underpinning. Ground Water Ground water is also very important in the determination of how to go about underpinning an existing structure. The location of the water table needs to be known before excavation can begin. The water table indicates the level to which the ground freezes and thaws. This needs to be known because soil tends 78
5 to break down and not be as strong and supportive under extreme weather conditions. Surface Drainage Conditions On site surface drainage is very important when installing an underpinning system. It eliminates any problems with additional moisture or flooding during installation. It also improves soil conditions, making soil stronger and more stable. Weather and Moisture Conditions Weather and moisture conditions in areas where underpinning is to be installed are also important factors when choosing which system to install. Soil strength can break down through heavy rain or frost affecting the system. Also, clay has the possibly of shrinking and drying out during extreme conditions. Routes and Depths of Existing Underground Services It is important to know what is underneath the surface, especially where underground utilities are located. Gas, electricity, and telephone lines, are just a few of the many utilities usually located underground. The location of these utilities needs to be known prior to excavation to eliminate any emergency situations. 79
6 7.4 Construction Management Role in Underpinning A construction management team, including supervisor play a very important role in the installation of any system. An underpinning system may be very detailed or not depending on the location of the construction site and the structure needing support. Regardless of the size or shape of the underpinning system, the project management team has several tasks: Safety is the number one concern when on a jobsite, therefore the number one task is to ensure safety during all times. During installation regular checking is required to ensure the system work is being done correctly. This is also necessary to ensure safety of workers and other people (especially when on a tight site). Consequences of accidental impact need to be thought about to ensure a safety plan goes into action immediately. No possibilities of accidents can be overlooked. The sequence of installation needs to be closely watched to ensure the system is being installed correctly. For example the concrete needs to be poured immediately after excavation is complete. 80
7 7.5 Conclusion After reviewing the existing underpinning I have determined that the best possible underpinning system was installed. The underpinning system is a sensitive subject on the project and is a fairly new issue; therefore I was advised against contacting any party directly involved in the installation or design of the system. The reason the failure occurred is unclear and measures to keep the failure from happening seem to have been unpreventable. I have evaluated the installation of the underpinning system for MSENT and came up with a number of factors that need to be determined prior to installation. These conditions directly affect the selection and installation of any underpinning system. Also, through research of case studies I have developed a set of guidelines construction managers must follow during the design of and installation of an underpinning system. The number one guideline is to ensure that all safety measures possible are being taken. 81
Dewatering & Foundations. Water. Low tech
Dewatering & Foundations Water It seems every time we dig a hole it fills up with rainwater, or groundwater.if we re lucky we hit an underground river or spring that keeps the hole nice and wet. But a
More informationUnderpinning. Underpinning
is the installation of temporary or permanent support to an existing foundation to provide either additional depth or an increase in bearing capacity. There are several existing conditions which may lead
More informationAlexandria Property Inspections Inc.
Alexandria Property Inspections Inc. 14421 Broadwinged Drive Gainesville, VA 20155 Prepared for: Prepared by: National Property Inspections 15 Canterbury Road Great Neck, NY 11021 08:00 July 19, 2012 Page
More informationSECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...
SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...
More informationSECTION SOILS REPORT
SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.
More informationLANDSCAPE RETAINING WALLS
SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls
More informationTemporary Structures. Formwork For Concrete ATCE--II. Advanced Topics in Civil Engineering Formwork for Concrete ATCE-II
Temporary Structures Formwork For Concrete : Temporary Structures The first part of will deal with the materials, methods and techniques associated with temporary structures utilized in various construction
More informationSECTION DRILLED CONCRETE PIERS AND SHAFTS
1 PART ONE - GENERAL 1.1 COORDINATION SECTION 02466 DRILLED CONCRETE PIERS AND SHAFTS A. The General, Supplementary, and Special Conditions of these specifications shall all be considered as a part of
More informationAdvanced Construction Techniques. Underpinning. Underpinning
is the installation of temporary or permanent support to an existing foundation to provide either additional depth or an increase in bearing capacity. There are several existing conditions which may lead
More informationSystem Design & Installation Considerations to Avoid Problems
System Design & Installation Considerations to Avoid Problems Site evaluation should be completed before a building permit is issued and prior to any development or construction. Site Considerations House
More informationSTREET LIGHTING, REGULAR AND ELECTRONIC SIGNS AGRICULTURAL TENTS BOLLARDS SOLAR PANELS STRONGER, FASTER, CLEANER FOUNDATION SOLUTION
SOLID, PROTECTIVE ISO AND, ICC-ES ESR-3726, CWB, AWS D1.1 STRENGTH & KNOW-HOW RESIDENTIAL TODAY S SOLID CHOICE IN SCREW PILES GoliathTech screw piles have revolutionized how builders, contractors and landscapers
More informationREINFORCED CONCRETE MASONRY SECTION
SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification
More informationFoundation/Site Work Code Requirements
Q: What is a Foundation Only permit and why did I receive one when I filed for a full Building Permit? All Building Permits for new construction and additions are reviewed for zoning compliance. This review
More informationSECTION DRILLED CONCRETE PIERS AND SHAFTS
SECTION 31 63 29 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationAre designed to provide a safe working environment, and Govern use of fall protection procedures and equipment.
Fall Protection Plan for Construction OSHA currently regulates fall protection for construction under Part 1926, Subpart M. The standards for regulating fall protection systems and procedures are intended
More informationEXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.
CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related
More informationKORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No
000130 1 PURPOSE: Professional Engineering Consultants, P.A. (PEC) was engaged by University of Kansas Design & Construction Management to perform an assessment of Stouffer Place Apartment Building 20
More informationThis specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations.
SPEC-1100 1/9 1.0 PURPOSE This specification describes the minimum requirements for general grading, excavation of earth, rock and solid slag, embankment construction, ditching, use of explosives, and
More informationA look at 4 types of construction change orders, and how to manage them.
1 of 11 9/15/2017, 7:54 AM Construct-Ed A look at 4 types of construction change orders, and how to manage them. When it comes to managing construction change orders, we re going to start by looking at
More informationCONCRETE PAVEMENT THE INSPECTORS PERSPECTIVE. SWIFT 2015 Workshop - Chris Olidis, P.Eng.
CONCRETE PAVEMENT THE INSPECTORS PERSPECTIVE SWIFT 2015 Workshop - Chris Olidis, P.Eng. PRESENTATION OUTLINE Quality management Concrete pavement distress Select types of premature deterioration What to
More informationRWSSHP Resource Manual # 3b. Spring Development. Construction Manual
RWSSHP Resource Manual # 3b Spring Development Construction Manual Introduction This manual is Part B of Manual#3 Hand Dug Wells and Spring Development Construction, which in turn is part of a series of
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3
CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3
More informationSPECIFICATIONS FOR STRUCTURAL EXCAVATION
SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition
More informationSECTION TRENCH SAFETY PART 1 - GENERAL
SECTION 31 41 33 - TRENCH SAFETY PART 1 - GENERAL A. This Section is intended to provide specifications for the minimum requirements for trench safety. The Contractor shall endeavor to insure the safety
More informationSIKA EGYPT. Injection Systems. Scope: Highly expansion solvent free water-reactive two part Polyurethane foam injection system
Method Statement for Application of Sika Injection 20 SIKA EGYPT Injection Systems Scope: Highly expansion solvent free water-reactive two part Polyurethane foam injection system INTRODUCTION: The water
More informationSECTION STRUCTURE EXCAVATION AND EARTHWORK
SECTION 02200 STRUCTURE EXCAVATION AND EARTHWORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Pavement Removal B. Stripping Topsoil C. Rock Excavation D. Excavation E. Subgrade Preparation F. Filling 1.2 REFERENCES
More informationFormwork being erected
CONCRETE FORMWORK Formwork being erected Most of the pads and concrete footing poured Formwork for the parkade walls is built for each pour Most of the parkade walls been completed 2 TYPES OF FORMWORK
More informationExcavation. Stages. Surprises
Excavation Stages Layout the excavation Strip the topsoil within building lines - store separately Begin excavation Hit water - de-water Slope sides of excavation according to the angle of repose for the
More informationFAILURE AND REMEDIAL MEASURES
FAILURE AND REMEDIAL MEASURES S.RAJENDRAN.B.E, F.I.V, F.I.G.S A Building is conceived when designed, born when built. It is protected by the skin of its façade, supported by the skeleton of its columns,
More informationPublication No. 26: Private Drinking Water Wells Types of Construction
PRIVATE DRINKING WATER IN CONNECTICUT Publication No. 26: Private Drinking Water Wells Types of Construction Publication Date: May 2009 When you turn on the faucet to get a drink or to take a shower, do
More informationAgenda. Agenda. Project Overview. Project Overview. CM In-House Building Commissioning. Virtual MEP Coordination. Virtual MEP Coordination
Pump Truck Materials Science Engineering & Nanotechnology --- Materials Science Engineering & Nanotechnology Depth Analysis: CM In-House Breadth Analysis: Virtual MEP The Pennsylvania State University
More informationDISCUSSION ON UNDERPINNING (28/3/12)
DISCUSSION ON UNDERPINNING (28/3/12) The following are opinions of the writer related to various forms of underpinning and foundation stabilization. It should be noted that every situation requires an
More informationPRECAST CONCRETE GIRDER ERECTION
7.1 Precast Concrete Girder Erection - General Erection of precast concrete girders includes transporting the girders to the site, handling and temporary storage, installing anchor bolts, shear blocks
More informationBASEMENT CONSTRUCTION PREPARED BY PN NOOR AISYAH ASYIKIN
BASEMENT CONSTRUCTION PREPARED BY PN NOOR AISYAH ASYIKIN BASEMENT CONSTRUCTION 01 content 1.DEFINITION 2. CONSTRUCTION CONSIDERATION 3. DESIGN REQUIREMENT 4.METHOD OF CONSTRUCTION a. Open Cut Construction
More informationPervious Pavement Placement
Pervious Pavement Placement Test Panel - Prior to Placement Prior to construction, test panel(s) shall be placed and approved by the Architect/Engineer. 1. The contractor shall place a test panel of at
More informationWaterproofing and Types of Drains
Waterproofing and Types of Drains 4 PVC Downspout Burial w/ Y Fitting for Future Clean-out Yard Drain Box 12 Drain Box 12885 Old Frederick Road Sykesville, MD 21784 Office 410-442-2445 Fax 410-489-4312
More information***************************************************************************************************************
03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************
More informationGeneral Brick Installation Instructions
Excellent Resource for Clay Paver Installation: http://www.bia.org/resources/clay-brick-pavers/clay-paver-informational- Resources These are general guidelines only. Check your paver manufacturer's recommendations
More informationHomeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS
Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS MAINTAINING YOUR HOME BASEMENT FOUNDATION BY HOMEOWNER PREVENTATIVE MAINTENANCE LUX WATERPROOF
More informationUNDERPINNING A CRANE FOUNDATION
UNDERPINNING A CRANE FOUNDATION Donald R. McMahon, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New York, USA Andrew J. Nichols, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New
More informationDraft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS
SECTION 10.1 GENERAL 10.1.1 SCOPE This part of the Manual covers the structural design and installation of reinforced concrete pipe for railway culverts. Pipe geometry may be circular, arch, or elliptical.
More informationPresentation Outline
St. John s Tunnel Rehabilitation A Demonstration of Successful Fast- Track Design and Construction Christopher P. Russell, P.E. Shannon & Wilson Inc., Staff Engineer Gregory R. Fischer, Ph.D., P.E. Shannon
More informationDUAL EXPANSION. facilitate casting and ensure the total filling of voids even in tight or complex spaces and when working on large surfaces.
Fluid expansive mortar for precision anchoring of machinery and structural elements LAYER THICKNESS FROM 1 TO 10 CM REFURBISHMENT and PROTECTION Line Expansive cement-based mortar for anchoring and grouting
More informationFall Protection Plan for Construction
Safety & Health Program 10627 Midwest Industrial Boulevard, St. Louis, MO Phone: 314-785-6425 Fax: 314-785-6426 Fall Protection Plan for Construction OSHA currently regulates fall protection for construction
More informationDry structural excavation is usually done with front-end loaders, bulldozers or backhoes.
1.1 Excavation - General Excavation is the removal of all material (including ice, water, etc.) required for the construction of foundations or substructures as indicated on the drawings or as determined
More informationCSI SPECIFICATIONS SURFACE-APPLIED CRYSTALLINE WATERPROOFING Section
SURFACE-APPLIED CRYSTALLINE WATERPROOFING Section 07 16 16 This section includes Krystol T1 crystalline waterproofing, applied to new or existing concrete substrates, above or below grade, on either dry
More informationCHAPTER 18 - REHABILITATION AND REPAIR OF STRUCTURES
CHAPTER 18 - REHABILITATION AND REPAIR OF STRUCTURES M du Rand 18.1 SCOPE Repair of structures is not defined as reinforced shuttered concrete. Margins for error are smaller and the work must be correct
More informationFIVE STAR PRODUCTS, INC. (800)
FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 11 DESIGN-A-SPEC GUIDELINES FIVE STAR RS ANCHOR GEL CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART
More informationExcavation and Trenching Program. Tampa Electric Company. Energy Supply
Excavation and Trenching Program Tampa Electric Company Energy Supply Creation Date: 12/11/00 Maintained by: Date of last Modification: 05/07/02 Audience: All employees PURPOSE: The following guidelines
More informationMONDO MP 1000 ACRYLIC ADHESIVE DISCLAIMER: Refer to page 5 of this document.
MONDO MP 1000 ACRYLIC ADHESIVE DISCLAIMER: Refer to page 5 of this document. 1.1 DESCRIPTION Mondo MP 1000 is high performance, solvent free acrylic based adhesive, specially designed for the permanent
More informationConcrete Prestressed Concrete Pretensioned Concrete Posttensioned Concrete Typical Tendon Layout
Concrete 45 1.13.0 Prestressed Concrete Concrete in which internal stresses (forces) are induced by means of prestressing steel tendons such that tensile stresses resulting from loads are counteracted
More informationExterior System installation instructions
Exterior System installation instructions 11/20/14 WPS ES-400 & 500 INSTALLATION INSTRUCTION. The WPS ES-400 & 500 systems Façade panels are designed for use as an external wall cladding in conjunction
More informationCONCRETE FORMWORK CHECKLIST AT SITE
CONCRETE FORMWORK CHECKLIST AT SITE Concrete formwork is a temporary supporting structure for concrete when it is placed at the construction site to keep the concrete in position and shape till it gets
More informationB. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.
SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.
More informationCASE STUDY - SALA ARCHITECTS
CASE STUDY - SALA ARCHITECTS ARCHITECT: ERIC ODOR CLIENT: CHARLOTTE FORSYTHE ADDRESS: 4216 VINCENT AVE S. MINNEAPOLIS. MN SQ FTG: BASEMENT - 750 1ST FLOOR - 1040 2ND FLOOR - 860 2 BEDROOMS - 3.5 BATHS
More informationWHITMAN COLLEGE TRENCHING AND SHORING PLAN
Purpose: WHITMAN COLLEGE TRENCHING AND SHORING PLAN This is a statement of official college policy to establish the process for compliance with safety standards as stated in the Washington State Administrative
More informationSparks Engineering, Inc. S T R U C T U R A L E V A L U A T I O N, D E S I G N A N D T E S T I N G
Sparks Engineering, Inc. S T R U C T U R A L E V A L U A T I O N, D E S I G N A N D T E S T I N G February 29, 2008 Ms. Leslie Wolfenden Save Austin's Cemeteries PO Box 41814 Austin, TX 78704 (512) 917-1666
More informationA Solid Foundation Solution for Homeowners. from
A Solid Foundation Solution for Homeowners from Stop the damaging effects of foundation settling... Sinking foundations, cracked and buckled walls and uneven floors are problems commonly faced annually
More informationPart 1 General information. Chapter 1.4. Cold weather working
Part 1 General information Chapter CONTENTS SCOPE DESIGN Clause Page There are no specific Design implications This Chapter gives guidance on meeting the Technical Requirements and recommendations for
More informationContract Specs Version 1 Project XXX. SECTION xxxx STRENGTHENING OF MASONRY WITH FRCM (FABRIC REINFORCED CEMENTITIOUS MATRIX) PART 1 - GENERAL
GENERAL PROVISIONS SECTION xxxx STRENGTHENING OF MASONRY WITH FRCM (FABRIC REINFORCED CEMENTITIOUS MATRIX) PART 1 - GENERAL A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections
More informationSPECIFICATIONS FOR INSTALLATION OF PRECAST PRESTRESSED CONCRETE DECK PANELS
SPECIFICATIONS FOR INSTALLATION OF PRECAST PRESTRESSED CONCRETE DECK PANELS 1.0 DESCRIPTION The Work shall consist of:.1 Transportation, unloading, erection and grouting of precast prestressed concrete
More informationStop the damaging effects of foundation settling...
from Stop the damaging effects of foundation settling... Sinking foundations, cracked and buckled walls and uneven floors are problems commonly faced annually by some quarter-million homeowners. Homes
More informationSTORM DRAINAGE - 1 DETAILED SPECIFICATIONS - STORM DRAINAGE
STORM DRAINAGE - 1 DETAILED SPECIFICATIONS - STORM DRAINAGE 2-7-1 Scope 2-7-2 General 2-7-3 Location and Grade of Sewers 2-7-4 Order of Work 2-7-5 Existing Water, Sanitary Sewer, Gas, and Other Utility
More informationRedi Rock Specification and Installation Manual
Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as
More informationCONSTRUCTION SPECIFICATION FOR TUNNELLING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 415 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR TUNNELLING 415.01 SCOPE 415.02 REFERENCES 415.03 DEFINITIONS TABLE OF CONTENTS 415.04 SUBMISSION AND
More informationIMPORTANT. Use of safety surfacing (wood mulch) in compliance with ASTM specification F1292 is required. WARNING
INSTALLATION DETAILS Recommended crew (Adult): 2-3 Installation time: 8-12 Hours not including concrete cure time User age: 5-12 Use zone: 22 Diameter Weight: 990 Actual Dimension: 120 Diameter MAINTENANCE:
More informationAAG R-MAX. installation & maintenance. knowledge matters world of opportunities safe solutions
AAG R-MAX installation & maintenance knowledge matters world of opportunities safe solutions INTRODUCTION This manual gives the main list of the most important operations to correctly install the AAG bridge
More informationB. All work of the section shall comply with the conditions of the contract, the drawings and any special conditions forming a part of the contract.
SPECIFICATIONS PART ONE - GENERAL ------------------------------------------------------------------------ 1.01 General Description A. The Cementitious capillary waterproofing materials specified herein
More informationDate Prepared: Location: Time: Approximate Temperature (degrees F): Weather Conditions: Project Name:
Appendix C Hazard Assessment and Trench Entry and Authorization Form for regularly scheduled and emergency trenching activities Date Prepared: Location: Time: Approximate Temperature (degrees F): Weather
More informationCedar Flooring Rounds
Cedar Flooring Rounds (Formerly Tree Cookie Flooring) #3902 Installation Instructions Please open and inspect all items upon receipt. If you have any questions or concerns, please contact us immediately.
More informationContents. Before you begin. Introduction: Carrying out concreting to simple forms 1. Element 1: Planning and preparing 3
Contents Contents Before you begin v Introduction: Carrying out concreting to simple forms 1 Element 1: Planning and preparing 3 Section 1.1: Obtaining, confirming and applying work instructions and 4
More informationLoss Control TIPS Technical Information Paper Series
Loss Control TIPS Technical Information Paper Series Innovative Safety and Health Solutions SM Understanding Subsidence Subsidence of the land, which is defined as the loss of surface elevation due to
More informationAssembly and Installation Instructions Grease Separator KLsepa.pop
Assembly and Installation Instructions Grease Separator KLsepa.pop It is imperative to observe the items described in these instructions. In case of noncompliance, all warranty claims shall lapse. For
More informationInstructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000
Instructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000 (How to move your pallet racking using the Link 4 Pallet Rack Lifter) This process is for a typical rack move and reset. Each
More informationInstallation Manual. Foundations. Version 2
Installation Manual Foundations Version 2 Contents Overview...1 Planning the Job... 2 Introducing DMX FlexSheet...2 Supplies Required...3 Tools Required...4 Preparing the Site...4 Where to Start?...5 Installing
More informationSECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES
SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.
More informationMisan University - College of Engineering Civil Engineering Department
CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s
More information-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR
-SQA- SCOTTISH QUALIFICATIONS AUTHORITY Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR -Module Number- 4281010 -Session-1990-91 -Superclass- TH -Title- GAS DISTRIBUTION:
More informationSubpart P. Trenching & Excavating CLIENT SAFETY SERVICES
Subpart P Trenching & Excavating CLIENT SAFETY SERVICES We typically start here 54 CLIENT SAFETY SERVICES Aren t Protective Systems Easier? CLIENT SAFETY SERVICES Begin with another end in mind Experience
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 350 MARCH 1998 CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE 350.01 SCOPE 350.02 REFERENCES 350.03 DEFINITIONS TABLE OF CONTENTS
More informationPacific Polymers Elasto-Deck BT Guide Specification
1 07141-1 August 2016 Pacific Polymers Elasto-Deck BT Guide Specification SECTION 07141 FLUID APPLIED WATERPROOFING 2 07141-2 August 2016 Pacific Polymers Elasto-Deck BT Guide Specification SECTION 07141
More informationFMA / AAMA / WDMA Installation Committee Update. Jim Katsaros / DuPont Building Innovations FMA Installation Committee April 24, 2012
FMA / AAMA / WDMA Installation Committee Update Jim Katsaros / DuPont Building Innovations FMA Installation Committee April 24, 2012 Topics for discussion. Review & Update on FMA/AAMA/WDMA Window & Door
More informationMarshall Municipal Utilities EXCAVATIONS AND TRENCHING Effective August 1, 2011 Revised August 17, 2017
Marshall Municipal Utilities EXCAVATIONS AND TRENCHING Effective August 1, 2011 Revised August 17, 2017 POLICY This policy applies to all open excavations and trenches; including those excavations and
More informationFrequently Asked Questions (FAQ s) about Concrete Driveways
Frequently Asked Questions (FAQ s) about Concrete Driveways What type of concrete mix should be used? Your local ready mix producer and your contractor will assist you in ensuring the proper concrete mix
More informationWATER LINE IN TUNNELS
Section 02517 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Handling, transporting, and installing water line in primary liner tunnels, including invert cleanup and blocking and water line in casings that
More informationNative to China, not Florida. Came into our Southern ports during WWII on wood packing material
Native to China, not Florida Came into our Southern ports during WWII on wood packing material Contain millions of individuals Colonies have caste systems: Worker (Damager) Soldier (Defender) King and
More informationIntegral Waterproofing
BCBEC Luncheon June 14, 2012 Integral Waterproofing Presented by Joel Schwartz, P.Eng, FEC, BEP Background Case study of two large high-rise projects at False Creek in Vancouver, BC Case Study 1: Site
More informationSWH Solar Racking Ground Mount Installation Guide
Version 16.02.v1 SWH Solar Racking Ground Mount Installation Guide Installer responsibility The installer is solely responsible for: Complying with all local or national building codes, including any that
More informationParapet Walls What Are They Good For?
Published By: The Construction Specifier Date: September 2011 Author: John Koester Parapet Walls What Are They Good For? Parapet walls perform a number of important functions: They can be designed in various
More informationCUTTER SOIL MIXED WALL SHORING AND SEEPAGE CUT OFF OFFICE BUILDING NEAR WATERFRONT
CUTTER SOIL MIXED WALL SHORING AND SEEPAGE CUT OFF OFFICE BUILDING NEAR WATERFRONT By John Kvinsland Malcolm Drilling Company, Kent, Washington Bob Plum ASCE, P.E., Principal Kleinfelder Consultants, Seattle
More informationGrouting Bilfinger Spezialtiefbau GmbH
Grouting Bilfinger Spezialtiefbau GmbH Goldsteinstrasse 114 D-60528 Frankfurt Phone: +49 69 6688-345 Fax: +49 69 6688-277 Email: info.spezialtiefbau@bilfinger.com www.foundation-engineering.bilfinger.com
More informationa sustainability upgrade for your new home TERM BARRIER SYSTEM moisture leaks energy leaks and now seals insect leaks
a sustainability upgrade for your new home BARRIER SYSTEM TERM moisture leaks energy leaks and now seals insect leaks www.polyguardbarriers.com Polyguard Products, Inc. is an employee-owned company and
More informationONTARIO PROVINCIAL STANDARD SPECIFICATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 539 NOVEMBER 2003 CONSTRUCTION SPECIFICATION FOR TEMPORARY PROTECTION SYSTEMS TABLE OF CONTENTS 539.01 SCOPE 539.02 REFERENCES 539.03 DEFINITIONS 539.04
More informationSPECIFICATION 1035 M
MAY 1984 SPECIFICATION 1035 M SPECIFICATIONS FOR UNDERWATER CONCRETE 1035. 1. DESCRIPTION The work will consist of the mixing of concrete in accordance with the "Specifications for Reinforced Concrete",
More informationThe Six-Inch Layer Compaction Method
1/7 1.0 PURPOSE This specification describes the minimum requirements for the backfilling of trenches or the construction of berms primarily for the installation of buried pipelines, cables, ducts and
More informationSECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES
SECTION 02215 EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES PART 1 - GENERAL 1.1 DESCRIPTION: This section includes materials, testing, and installation of earthwork for excavations, fills, and
More informationSECTION STORM DRAIN
PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3
CITY OF TORONTO TS 3.70 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS 3.70.01 SCOPE...3 TS
More informationCHAPTER 39 REQUIREMENTS FOR PROPERLY PLUGGING ABANDONED WELLS
IAC 5/12/93, 4/8/98 Environmental Protection[567] Ch 39, p.1 IAC 5/12/93, 4/8/98 CHAPTER 39 REQUIREMENTS FOR PROPERLY PLUGGING ABANDONED WELLS 567 39.1(455B) Purpose. The purpose of this chapter is to
More informationUnit 3: The Traditional Procurement Route
Unit 3: The Traditional Procurement Route 3.1 Introduction This Unit briefly introduces the main features of the traditional procurement route as a widely used route that provides a good basis for examining