LEVELTON CONSULTANTS LTD. 1.0 Introduction. 2.0 Project Description. December 16, Levelton File # R

Size: px
Start display at page:

Download "LEVELTON CONSULTANTS LTD. 1.0 Introduction. 2.0 Project Description. December 16, Levelton File # R"

Transcription

1 LEVELTON CONSULTANTS LTD. Abbotsford Office Gladys Avenue Abbotsford, BC V2S 2E8 T: F: December 16, 2015 Levelton File # R Keil Street White Rock, BC V4B 4V6 Attention: Mr. Paul Slack Manager of Operations Project: Subject: Gordon Avenue Utility Upgrades, White Rock, BC Geotechnical Engineering Assessment Report Dear Sir, 1.0 Introduction Levelton Consultants Ltd. (Levelton) presents herein the results of our geotechnical site assessment to The Corporation of the (the City) for storm and sanitary utility upgrades on a portion of Gordon Avenue between Anderson Street and Oxford Street in White Rock, BC. The general location of the subject alignment of Gordon Avenue is shown on the attached Figure 1. We understand that replacement of the storm and sanitary sewers is considered necessary due to ground settlement in the area. The Levelton scope of work comprised of a desktop study of available information, subsurface explorations along the portion of Gordon Avenue described above, groundwater pump testing in monitoring wells, analysis of the collected information, and preparation of this report. The Levelton scope of work did not include assessment of the soil or groundwater at the project site with respect to environmental considerations or corrosion potential. 2.0 Project Description Levelton understands that pavement on Gordon Avenue between Anderson Street and Oxford Street (the site), existing utilities under the roadway, and the immediate surrounding area has experienced settlement that has become more pronounced within the last year. Recent surface expressions of differential settlement of up to

2 about 300 mm has occurred at nearby residential properties. The existing utilities along Gordon Avenue include sanitary, storm, and water mains, tie-ins, and manholes. We understand that, at this time, the City plans to replace the settled sanitary and storm mains and manholes at the site. Levelton was provided with civil drawings prepared by R.F. Binnie and Associates Ltd (Binnie drawing , dated October 05, 2015) showing the proposed work. The new sanitary sewer will be a 200 mm diameter PVC main, and the new storm sewer will be a 200 mm diameter PVC main. The drawings indicate that the invert of the planned sanitary main will be situated between 1.8 and 3.3 m below existing grade, and the invert of the planned storm main will be between 0.55 and 1.2 m below existing grade. The location of the planned sanitary and storm sewer main replacements is shown on the attached Figure 2. Profiles of the planned mains are shown on the attached Figures 3 and Field Work 3.1 Subsurface Explorations On October 21, 2015 Levelton advanced 4 (four) auger holes using a truck-mounted drill rig equipped with solidstem continuous flight augers to assess the soil and groundwater conditions at the project site with respect to geotechnical engineering considerations. The approximate locations of the auger holes are shown on the attached Figure 2. The auger holes extended to depths of between 6.1 and 9.1 m below grade. Dynamic Cone Penetration Tests (DCPTs) were conducted at the auger holes to assess the in-situ relative density / consistency of the soils. The soil and groundwater conditions encountered at the auger holes were logged in the field by a member of our geotechnical staff. Representative disturbed soil samples were collected from the auger flights for visual classification and moisture content determination purposes. The auger holes were closed in conformance with provincial groundwater protection requirements immediately upon completion of the investigation, and the asphalt at the auger holes was patched with cold-mix asphalt. Monitoring wells with a diameter of 50 mm were installed at auger holes AH15-01 and AH The monitoring well installation details are indicated on the relevant soil logs attached to this report. Both monitoring wells were equipped with a flush mounted cover to allow for future groundwater level readings and testing. Detailed descriptions of the soil and groundwater conditions encountered at the auger holes are provided on the soil logs attached to this report. The soil logs also graphically illustrate the moisture content of disturbed soil samples obtained from the auger flights and the recorded DCPT blow counts. A summary discussion of the soil and groundwater conditions encountered at the auger holes is provided below. Levelton File # R December 16, 2015 Gordon Avenue Utility Upgrades, White Rock, BC Geotechnical Engineering Assessment Report Page 2

3 3.2 Hydraulic Conductivity Testing Levelton completed a series of hydraulic conductivity (rising head) tests in the monitoring wells at AH15-01 and AH15-03 to determine the potential range of hydraulic conductivities (K) of the local soils for assessment of potential excavation dewatering requirements during construction. Three rising head tests were conducted at each monitoring well. The tests were performed using a Solinst Levelogger, rented from Pine Environmental. During the rising head tests, water was removed from the wells using a disposable PVC bailer to rapidly lower the water level in the wells. The rate at which the water level returned to its pre-test level was recorded. A summary discussion of the rising head test results is provided below. 4.0 Subsurface Conditions 4.1 Surficial Geology The Geological Survey of Canada surficial geology map covering the project area (Map 1484A) indicates that Gordon Avenue is underlain by Pleistocene Vashon Drift lodgement till with a sandy loam matrix, and minor flow till containing lenses and interbeds of glaciolacustrine laminated stony silt. 4.2 Levelton Auger holes The soils encountered in the Levelton auger holes were not consistent with the description provided on the surficial geology map. The following generalized soil profile was encountered at AH15-01 to AH15-04: Asphalt a surface layer of asphalt was encountered at all of the auger holes, ranging in thickness between 76 and 114 mm. Dense to very dense granular fill granular fill comprised of rounded sand and gravel was encountered below the asphalt at all of the auger holes. The granular fill was between 250 and 420 mm thick. Based on the DCPT blow counts, the granular fill was judged to be dense to very dense. The moisture content of a sample of the granular fill was 7 percent. Compact red vesicular pumice fill Red vesicular pumice fill was encountered below the granular fill in all of the auger holes. The pumice fill extended to between 0.9 and 1.0 m below grade, and was between 0.4 and 0.5 m thick. The pumice fill was judged to be compact based on the DCPT blow counts. The moisture content of samples of the red vesicular pumice ranged between 10 and 12 percent. Peat Fibrous peat was encountered at all of the Levelton boreholes ranging from 1.1 to 4.9 m thick. The peat extended to between 2.6 and 6.1 m below grade. The moisture content of samples taken from the peat layer ranged from 140 to 550 percent, indicating highly compressible conditions. Soft or loose silty sand / sandy silt (AH15-01 only) The peat was underlain by silty sand to sandy silt in AH This layer was judged to be soft or loose based on the DCPT blow counts. The thickness of this Levelton File # R December 16, 2015 Gordon Avenue Utility Upgrades, White Rock, BC Geotechnical Engineering Assessment Report Page 3

4 layer was about 2 m. The moisture content of samples taken from the silty sand / sandy silt layer ranged between 28 and 50 percent. A second 0.3 m thick layer of peat was encountered under the silty sand / sandy silt. Firm to stiff clayey silt (AH15-01 only) A 1.5 m thick layer of clayey silt was encountered below the lower peat layer in AH The clayey silt was judged to be firm to stiff based on the DCPT blow counts. The moisture content of a sample taken from the clayey silt was 41 percent. Compact to very dense silty sand / gravelly sand / sand and gravel Granular soils ranging from silty sand to sand and gravel were encountered below the peat in AH15-02, AH15-03 and AH15-04, and below the clayey silt in AH The granular soils extended to the bottom of the auger holes. The granular soils were judged to be compact to very dense based on the DCPT blow counts. Samples taken from these deposits had moisture contents ranging between 14 and 25 percent. All of the Levelton auger holes terminated in the dense mineral soils at depths ranging from 6.1 to 9.1 m below the road surface. 4.3 Groundwater Conditions Groundwater seepage was encountered at all of the auger holes between 1 and 1.2 m below grade at the time of drilling. Prior to conducting the hydraulic conductivity tests, Levelton staff measured the static water level in each well to establish pre-test conditions. Water level measurements are provided in Table 1. Table 1: Static Water Levels and Well Installation Details Well ID Screen Interval (1) (mbgs) Length of screen (1) (m) Depth to water (2) (m) End of hole (2) (m) Length of water column in the well (m) Position of the top of groundwater with respect to the screen AH Above the well screen AH Above the well screen (1) Obtained from monitoring well logs (2) Measured from top of pipe on November 24, 2015 Levelton analyzed the hydraulic conductivity test data using Aquifer Test Pro Ver software developed by Waterloo Hydrogeological Inc. The Hvorslev model was fit to the slug test data. Results of the hydraulic conductivity tests are presented in Table 2. Levelton File # R December 16, 2015 Gordon Avenue Utility Upgrades, White Rock, BC Geotechnical Engineering Assessment Report Page 4

5 Table 2: Results of Hydraulic Conductivity Tests Well ID Screened Soil Type Type of test conducted Hvorslev Method (K) (m/s) 4.5X10-7 AH15-01 (Test 1) AH15-01 (Test 2) AH15-01 (Test 3) Fibrous Peat, some wood fragments Silty Sand to sandy Silt, trace organics Fibrous peat Rising Head 4.5X X10-7 AH15-03 (Test 1) 2.0X10-6 AH15-03 (Test 2) Fibrous Peat, some wood fragments 2.0X10-6 AH15-03 (Test 3) 1.8X10-6 Geometric Mean (K) (m/s) 5.1 X X 10-6 Based on the results presented in Table 2, the hydraulic conductivity of the peat underlying Gordon Avenue ranged from 5 X 10-7 to 2 X 10-6 m/s. These values were similar to other hydraulic conductivity values that Levelton is familiar with, including: 5.5 X 10-7 m/s for undisturbed, amorphous peat around the Vancouver Landfill; and 2.5 X 10-7 and 3.5 X 10-6 m/s in two monitoring wells at the Vancouver Landfill. 5.0 Conclusions and Recommendations 5.1 General It is our opinion that the settlement of the Gordon Avenue roadway between Anderson Street and Oxford Street and the utilities in the roadway in the same area can be attributed to primary and secondary consolidation of the peat deposit of variable thickness located under the roadway. The primary consolidation of the peat in recent years is due to a fluctuating groundwater level resulting in altered effective stress in the soil. The secondary consolidation is due to the degradation / decomposition of the peat structure. It is anticipated that settlement of the peat will continue to occur, with accelerated settlement occurring whenever the groundwater table is lowered due to dewatering or natural groundwater fluctuations. The primary geotechnical challenges related to the installation of the sanitary and storm mains include trench excavation stability, excavation dewatering, and minimizing settlement of the surrounding area during or as a consequence of the planned construction. The fibrous structure of the encountered peats is beneficial from an excavation stability perspective, making it feasible to use conventional trench boxes to support vertical sidewall excavations. Furthermore, the Levelton rising head hydraulic conductivity testing indicates that the permeability of the peat is low (roughly comparable to silt to clayey silt), indicating that the groundwater inflow into the excavation will be limited, allowing the use of conventional sump and pump systems. While the rate of seepage is expected to be low, it is recommended that the duration the excavation remains open be kept to a minimum. This will reduce the potential for causing additional settlement to surrounding Levelton File # R December 16, 2015 Gordon Avenue Utility Upgrades, White Rock, BC Geotechnical Engineering Assessment Report Page 5

6 areas. Notwithstanding, it is strongly recommended that a pre-construction visual condition survey be completed on properties located within 30 m of the planned excavations. 5.2 Temporary Excavations Temporary unsupported excavations should conform to WorkSafe BC requirements where worker access is required. It is our opinion that the sides of unsupported temporary excavations deeper than 1.2 m should not be steeper than 1H:1V (Horizontal:Vertical) in the site soils. Flatter unsupported temporary excavation slopes may be required where groundwater seepage is encountered, or if loose / saturated backfill in existing adjacent utility trenches is exposed by the new excavations. It should also be noted that vibrations induced by adjacent traffic or construction equipment could result in sloughing of unsupported non-cohesive soils. The actual slope inclinations for unsupported excavations should be determined by a Geotechnical Engineer prior to allowing workers to approach or enter the excavation. Levelton anticipates that vertical trench excavations will be required to minimize the amount of disturbance to the adjacent pavement and properties. Levelton recommends that suitable trench shoring cages be used for excavations greater than 1.2 m deep in the site soils. The trench box style shoring cage with fixed bracing spans provides safety to the workers against trench-wall soil collapse, but does not actively shore the excavation sidewalls, unless firmly secured to the sidewalls to a suitable height to prevent sloughing. It has been our experience that failing to provide intimate contact between the trench shoring and the excavation sidewalls will result in an increased risk of nearby pavement distress and soil sloughing. It has also been our experience that Contractors prefer to leave space between the shoring boxes and the trench sidewalls. Failing to provide proper contact between the shoring and the trench-wall will likely result in excessive loss of material between the outside faces of the trench box and the excavation sidewalls, which could undermine the adjacent pavement or nearby underground services and increase the volume of backfill needed to restore grade. Rounded pea gravel, birds-eye gravel, or other materials may be used to backfill any void between the trench boxes and the trench walls to near the top of the trench, where necessary, to provide the stabilizing contact between the trench shoring and the soil sidewalls, immediately after placing the shoring cage. Alternatively, the Contractor should properly implement the use of shoring boxes with adjustable bracing lengths or shoring jacks to actively secure the shoring facing material to the trench sidewalls. The Contractor or the City should carry a contingency to address extra costs associated with reinstating sloughed excavations and repairs to adjacent pavements that result from leaving unsecured open vertical trenches or gaps between trench sidewalls and the shoring during the construction of the proposed sanitary and storm mains. We recommend that soil and material stockpiles be kept away from the edge of the excavation a horizontal distance at least equal to the depth of the excavation. It is expected that conventional excavation equipment can be used to excavate the soils along the length of the planned sanitary and storm mains. Levelton File # R December 16, 2015 Gordon Avenue Utility Upgrades, White Rock, BC Geotechnical Engineering Assessment Report Page 6

7 5.3 Temporary Excavation Dewatering The hydraulic conductivity tests results indicate that the peat encountered below the pavement structure will not transmit large volumes of groundwater under normal groundwater gradients. As such, we expect that surface water and groundwater seepage entering excavations could be adequately controlled using sumps and pumping. Specialized temporary dewatering measures are not expected to be necessary. Seepage pumped from excavations should be disposed of in accordance with requirements. The settlement effects associated with dewatering are time dependent, as it takes time to develop the full cone of depression that defines the drawn-down groundwater level in the soil. The longer the soil remains dewatered, the greater the settlement and footprint of the area impacted by dewatering. Consequently, it is recommended that the utility replacement be conducted over as short a time period as possible by an experienced contractor that understands the need for expediency. Furthermore, we do not recommend that the utility replacements be conducted during the dry summer months (mid-july through early October), as this may further exacerbate construction related settlement. It should be noted that, if excavations are advanced in close proximity to existing underground utility corridors with granular bedding and backfill, heavy groundwater seepage could be encountered from the existing backfill and bedding where exposed below the groundwater table. 5.4 Trench Subgrade Preparation and Trench Bedding Based on the auger holes and the expected depth of excavation required to install the planned sanitary and storm mains, it is anticipated that the soils at the base of the sanitary main trench will generally consist of peat, and the soils at the base of the storm main will generally consist of red vesicular pumice over peat. Where the subgrade consists of peat, we recommend that the subgrade be over-excavated a minimum of 300 mm below the invert of the pipe. The extent of such over-excavation should be confirmed on-site by the Geotechnical Engineer at the time of trench excavation. The over-excavated soils should be replaced with trench bedding comprised of light weight red vesicular pumice fill to minimize further settlement, and to limit disturbance to the subgrade during pipe installation. The light weight pumice fill should be fully wrapped with a non-woven geotextile separator, such as Nilex 4551 or equivalent. The red vesicular basalt pumice should have a maximum moist unit weight of 840 kg/m 3, have a gradation of 19 to 75 mm, and be free of foreign material such as sand, silt, and other fines not of volcanic origin. Where the subgrade consists of existing red vesicular pumice, the subgrade should be over-excavated a minimum of 150 mm below the invert of the pipe followed by reinstating with the same type of lightweight fill. The exposed pumice subgrade should be nominally compacted with light compaction equipment such as a 500 pound vibratory plate tamper. Levelton File # R December 16, 2015 Gordon Avenue Utility Upgrades, White Rock, BC Geotechnical Engineering Assessment Report Page 7

8 5.5 Trench Backfill The trench backfill should also consist of the imported light weight red vesicular pumice, as described above, fully wrapped with a non-woven geotextile separator such as Nilex 4551 or equivalent. The pumice should be placed in 300 mm thick lifts and be compacted with light weight equipment such as a 500 lb. vibratory plate tamper. A minimum of three passes with the light weight equipment should be made over each lift. Over compaction of the backfill, or the use of heavy compaction equipment, can lead to particle breakage and an increase in fines content without any beneficial gain in compaction levels. 5.6 Pavement Restoration Restoration of the pavement where excavation has been completed should be conducted in accordance with the appropriate road standards. At a minimum, we recommend that the pavement structure at excavations consist of the following: 75 mm of asphalt, underlain by 150 mm of 19 mm minus crushed gravel base course; underlain by 250 mm of 75 mm minus pit run sand and gravel sub-base course; underlain by Light weight red vesicular pumice, fully wrapped with geotextile as described above. We recommend that the base and sub-base courses conform to the specifications for these materials contained in MMCD Volume II. They should be placed in discrete lifts a maximum of 300 mm in thickness at within 2 percent of their optimum moisture content for compaction and be compacted to not less than 95 percent of their Modified Proctor Maximum Dry Density, as confirmed by in-place soil density testing. 5.7 Settlement The peat below the sanitary and storm mains will continue to settle due to secondary consolidation and potential future groundwater fluctuation effects. The thickness of the peat is estimated, based on the Levelton boreholes, to range from 0 m to 4 m under the sanitary main and from 2.8 m to 5.2 m under the storm main. We estimate that the peat could settle up to 200 mm under the sanitary main, and up to 300 mm under the storm main, over 50 years after installation. As complete removal of the peat is not practical, we recommend that the design of the sanitary main account for potential differential settlement of 200 mm over a horizontal distance of 30 m, and the storm main design account for potential differential settlement of 150 mm over a horizontal distance of 20 m. 6.0 Geotechnical Review We recommend that the Geotechnical Engineer review the following during construction: Temporary unsupported excavation slopes; Trench and pavement structure subgrades; Imported pipe bedding and trench backfill materials; Levelton File # R December 16, 2015 Gordon Avenue Utility Upgrades, White Rock, BC Geotechnical Engineering Assessment Report Page 8

9 Pavement sub-base and base course materials; and Placement and compaction of pipe bedding, trench backfill, and pavement sub-base and base courses. As described above, it should be the Contractor s responsibility to design and implement appropriate shoring for trenches. 7.0 Closure This geotechnical engineering assessment report has been prepared by Levelton Consultants Ltd. exclusively for the. The opinions and recommendations provided in this report reflect our judgement in light of the information provided to us at the time that it was prepared. Any use of this report by third parties, or any reliance on or decisions made based on it, are the responsibility of such third parties. Levelton does not accept responsibility for damages suffered, if any, by a third party as a result of their use of or reliance on this report. The soil logs attached to this report provide description of the soil and groundwater conditions encountered at discrete auger hole locations. Actual soil conditions in areas remote from the auger holes may vary along the road alignment. Contractors should make their own interpretation of the soil logs and the site conditions for the purposes of bidding and performing work at the site. The attached Terms of Reference form an integral part of this report. We trust the information provided herein meets your immediate requirements. If you have any questions or require additional information, please contact the undersigned. Levelton Consultants Ltd. ORIGINAL SIGNED BY: ORIGINAL SIGNED BY: Per: Calum Buchan, P.E., P.Eng. Per: Phil VanLaar, EIT Senior Geotechnical Engineer Geotechnical Engineer-in-Training Reviewed by: Michael Gutwein, P.Eng. Senior Geotechnical Engineer Attachments: Terms of Reference Figures 1-4 Soil Logs Levelton File # R December 16, 2015 Gordon Avenue Utility Upgrades, White Rock, BC Geotechnical Engineering Assessment Report Page 9

10 TERMS OF REFERENCE FOR GEOTECHNICAL REPORTS ISSUED BY LEVELTON CONSULTANTS LTD. 1. STANDARD OF CARE Levelton Consultants Ltd. ( Levelton ) prepared and issued this geotechnical report (the Report ) for its client (the Client ) in accordance with generally-accepted engineering consulting practices for the geotechnical discipline. No other warranty, expressed or implied, is made. Unless specifically stated in the Report, the Report does not address environmental issues. The terms of reference for geotechnical reports issued by Levelton (the Terms of Reference ) contained in the present document provide additional information and caution related to standard of care and the use of the Report. The Client should read and familiarize itself with these Terms of Reference. 2. COMPLETENESS OF THE REPORT All documents, records, drawings, correspondence, data, files and deliverables, whether hard copy, electronic or otherwise, generated as part of the services for the Client are inherent components of the Report and, collectively, form the instruments of professional services (the Instruments of Professional Services ). The Report is of a summary nature and is not intended to stand alone without reference to the instructions given to Levelton by the Client, the communications between Levelton and the Client, and to any other reports, writings, proposals or documents prepared by Levelton for the Client relative to the specific site described in the Report, all of which constitute the Report. TO PROPERLY UNDERSTAND THE INFORMATION, OBSERVATIONS, FINDINGS, SUGGESTIONS, RECOMMENDATIONS AND OPINIONS CONTAINED IN THE REPORT, REFERENCE MUST BE MADE TO THE WHOLE OF THE REPORT. LEVELTON CANNOT BE RESPONSIBLE FOR USE BY ANY PARTY OF PORTIONS OF THE REPORT WITHOUT REFERENCE TO THE WHOLE REPORT AND ITS VARIOUS COMPONENTS. 3. BASIS OF THE REPORT Levelton prepared the Report for the Client for the specific site, development, building, design or building assessment objectives and purpose that the Client described to Levelton. The applicability and reliability of any of the information, observations, findings, suggestions, recommendations and opinions contained in the Report are only valid to the extent that there was no material alteration to or variation from any of the said descriptions provided by the Client to Levelton unless the Client specifically requested Levelton to review and revise the Report in light of such alteration or variation. 4. USE OF THE REPORT The information, observations, findings, suggestions, recommendations and opinions contained in the Report, or any component forming the Report, are for the sole use and benefit of the Client and the team of consultants selected by the Client for the specific project that the Report was provided. NO OTHER PARTY MAY USE OR RELY UPON THE REPORT OR ANY PORTION OR COMPONENT WITHOUT THE WRITTEN CONSENT OF LEVELTON. Levelton will consent to any reasonable request by the Client to approve the use of this Report by other parties designated by the Client as the Approved Users. As a condition for the consent of Levelton to approve the use of the Report by an Approved User, the Client must provide a copy of these Terms of Reference to that Approved User and the Client must obtain written confirmation from that Approved User that the Approved User will comply with these Terms of Reference, such written confirmation to be provided separately by each Approved User prior to beginning use of the Report. The Client will provide Levelton with a copy of the written confirmation from an Approved User when it becomes available to the Client, and in any case, within two weeks of the Client receiving such written confirmation. The Report and all its components remain the copyright property of Levelton and Levelton authorises only the Client and the Approved Users to make copies of the Report, but only in such quantities as are reasonably necessary for the use of the Report by the Client and the Approved Users. The Client and the Approved Users may not give, lend, sell or otherwise disseminate or make the Report, or any portion thereof, available to any party without the written permission of Levelton. Any use which a third party makes of the Report, or any portion of the Report, is the sole responsibility of such third parties. Levelton accepts no responsibility for damages suffered by any third party resulting from the use of the Report. The Client and the Approved Users acknowledge and agree to indemnify and hold harmless Levelton, its officers, directors, employees, agents, representatives or sub-consultants, or any or all of them, against any claim of any nature whatsoever brought against Levelton by any third parties, whether in contract or in tort, arising or related to the use of contents of the Report. Version 5 - March 09, 2007 Page 1 of 2

11 TERMS OF REFERENCE FOR GEOTECHNICAL REPORTS ISSUED BY LEVELTON CONSULTANTS LTD. (continued) 5. INTERPRETATION OF THE REPORT a. Nature and Exactness of Descriptions: The classification and identification of soils, rocks and geological units, as well as engineering assessments and estimates have been based on investigations performed in accordance with the standards set out in Paragraph 1 above. The classification and identification of these items are judgmental in nature and even comprehensive sampling and testing programs, implemented with the appropriate equipment by experienced personnel, may fail to locate some conditions. All investigations or assessments utilizing the standards of Paragraph 1 involve an inherent risk that some conditions will not be detected and all documents or records summarizing such investigations will be based on assumptions of what exists between the actual points sampled. Actual conditions may vary significantly between the points investigated and all persons making use of such documents or records should be aware of, and accept, this risk. Some conditions are subject to changes over time and the parties making use of the Report should be aware of this possibility and understand that the Report only presents the conditions at the sampled points at the time of sampling. Where special concerns exist, or when the Client has special considerations or requirements, the Client must disclose them to Levelton so that additional or special investigations may be undertaken, which would not otherwise be within the scope of investigations made by Levelton or the purposes of the Report. b. Reliance on information: The evaluation and conclusions contained in the Report have been prepared on the basis of conditions in evidence at the time of site investigation and field review and on the basis of information provided to Levelton. Levelton has relied in good faith upon representations, information and instructions provided by the Client and others concerning the site. Accordingly, Levelton cannot accept responsibility for any deficiency, misstatement or inaccuracy contained in the report as a result of misstatements, omissions, misrepresentations or fraudulent acts of persons providing information. c. Additional Involvement by Levelton: To avoid misunderstandings, Levelton should be retained to assist other professionals to explain relevant engineering findings and to review the geotechnical aspects of the plans, drawings and specifications of other professionals relative to the engineering issues pertaining to the geotechnical consulting services provided by Levelton. To ensure compliance and consistency with the applicable building codes, legislation, regulations, guidelines and generally-accepted practices, Levelton should also be retained to provide field review services during the performance of any related work. Where applicable, it is understood that such field review services must meet or exceed the minimum necessary requirements to ascertain that the work being carried out is in general conformity with the recommendations made by Levelton. Any reduction from the level of services recommended by Levelton will result in Levelton providing qualified opinions regarding adequacy of the work. 6. ALTERNATE REPORT FORMAT When Levelton submits both electronic and hard copy versions of the Instruments of Professional Services, the Client agrees that only the signed and sealed hard copy versions shall be considered final and legally binding upon Levelton. The hard copy versions submitted by Levelton shall be the original documents for record and working purposes, and, in the event of a dispute or discrepancy, the hard copy versions shall govern over the electronic versions; furthermore, the Client agrees and waives all future right of dispute that the original hard copy signed and sealed versions of the Instruments of Professional Services maintained or retained, or both, by Levelton shall be deemed to be the overall originals for the Project. The Client agrees that the electronic file and hard copy versions of Instruments of Professional Services shall not, under any circumstances, no matter who owns or uses them, be altered by any party except Levelton. The Client warrants that the Instruments of Professional Services will be used only and exactly as submitted by Levelton. The Client recognizes and agrees that Levelton prepared and submitted electronic files using specific software or hardware systems, or both. Levelton makes no representation about the compatibility of these files with the current or future software and hardware systems of the Client, the Approved Users or any other party. The Client further agrees that Levelton is under no obligation, unless otherwise expressly specified, to provide the Client, the Approved Users and any other party, or any or all of them, with specific software and hardware systems that are compatible with any electronic submitted by Levelton. The Client further agrees that should the Client, an Approved User or a third party require Levelton to provide specific software or hardware systems, or both, compatible with the electronic files prepared and submitted by Levelton, for any reason whatsoever included but not restricted to an order from a court, then the Client will pay Levelton for all reasonable costs related to the provision of the specific software or hardware systems, or both. The Client further agrees to indemnify and hold harmless Levelton, its officers, directors, employees, agents, representative or sub-consultant, or any or all of them, against any claim or any nature whatsoever brought against Levelton, whether in contract or in tort, arising or related to the provision or use or any specific software or hardware provided by Levelton. Version 5 - March 09, 2007 Page 2 of 2

12 NORTH SITE LOCATION REVISIONS DESIGN: DATE: ADAPTED FROM: WHITE ROCK ONLINE MAP PROJECT/DWG. NO: TITLE: SITE LOCATION PLAN - CB SEAL: CHECK: - SCALE: DEC 2015 NTS REV Date Issue/Revision Description Drawn Check DATE: 2015 This drawing is the sole property of Levelton Consultants Ltd. and cannot be used or duplicated in any way without the expressed written consent of Levelton Consultants. The general contractor shall verify all dimensions and report any discrepancies to Levelton Consultants Ltd. PROJECT: ADDRESS: CLIENT: GORDON AVENUE ROAD AND UTILITIES REPAIR GORDON AVENUE, WHITE ROCK, BC THE CITY OF WHITE ROCK LEVELTON DRAWN: FIG. NO: PV FILE NO: R

13 NORTH PLANNED SANITARY SEWER AH15-01 AH15-02 AH15-03 AH15-04 PLANNED STORM SEWER LEGEND AH15-02 AUGER HOLE LOCATIONS AH15-01 AUGER HOLE WITH WELL LOCATIONS NOTE: LOCATIONS ARE APPROXIMATE DESIGN: REVISIONS DATE: TITLE: ADAPTED FROM: R.F. BINNIE S1 PROJECT: 10 / 99 REV Date Issue/Revision Description Drawn Check This drawing is the sole property of Levelton Consultants Ltd. and cannot be used or duplicated in any way without the expressed written consent of Levelton Consultants. The general contractor shall verify all dimensions and report any discrepancies to Levelton Consultants Ltd. - SITE AND AUGERHOLE PLAN PROJECT/DWG. NO: DATE: SEAL: ADDRESS: CLIENT: CHECK: CB DRAWN: GORDON AVENUE ROAD AND UTILITIES REPAIR GORDON AVENUE, WHITE ROCK, BC THE CITY OF WHITE ROCK DEC 2015 SCALE: PV FIG. NO: LEVELTON NTS FILE NO: R

14 ELEVATION (m) APPROXIMATE TOP OF PEAT PROFILE (2015) 1.0 PLANNED SANITARY SEWER PROFILE APPROXIMATE BOTTOM OF PEAT PROFILE (2015) -3.0 AH AH15-02 AH DESIGN: REVISIONS AH15-01 DATE: TITLE: ADAPTED FROM: R.F. BINNIE S1 PROJECT: REV Date Issue/Revision Description Drawn Check This drawing is the sole property of Levelton Consultants Ltd. and cannot be used or duplicated in any way without the expressed written consent of Levelton Consultants. The general contractor shall verify all dimensions and report any discrepancies to Levelton Consultants Ltd. - SANITARY SEWER MAIN AND PEAT PROFILE PROJECT/DWG. NO: DATE: SEAL: ADDRESS: CLIENT: CHECK: CB DRAWN: GORDON AVENUE ROAD AND UTILITIES REPAIR GORDON AVENUE, WHITE ROCK, BC THE CITY OF WHITE ROCK DEC 2015 SCALE: PV FIG. NO: LEVELTON NTS FILE NO: R

15 ELEVATION (m) APPROXIMATE TOP OF PEAT PROFILE (2015) PLANNED STORM SEWER PROFILE APPROXIMATE BOTTOM OF PEAT PROFILE (2015) -3.0 AH AH15-02 AH DESIGN: REVISIONS AH15-01 DATE: TITLE: ADAPTED FROM: R.F. BINNIE D1 PROJECT: REV Date Issue/Revision Description Drawn Check This drawing is the sole property of Levelton Consultants Ltd. and cannot be used or duplicated in any way without the expressed written consent of Levelton Consultants. The general contractor shall verify all dimensions and report any discrepancies to Levelton Consultants Ltd. - STORM SEWER MAIN AND PEAT PROFILE PROJECT/DWG. NO: DATE: SEAL: ADDRESS: CLIENT: CHECK: CB DRAWN: GORDON AVENUE ROAD AND UTILITIES REPAIR GORDON AVENUE, WHITE ROCK, BC THE CITY OF WHITE ROCK DEC 2015 SCALE: PV FIG. NO: LEVELTON NTS FILE NO: R

16 Depth (m) (ft) 2 4 Levelton Consultants Ltd. # Gladys Avenue Abbotsford, B.C. V2S 2E8 Tel: Fax: Description ASPHALT - 95 mm thick dense, brown, SAND and GRAVEL, rounded gravel, moist, fill compact, red, sandy gravel VESICULAR PUMICE, moist, fill brown, fibrous PEAT, some wood fragments, wet Gordon Avenue Sewer Replacement Gordon Avenue White Rock Well 1 C N Type/ Sample # G1 G2 G3 Water Level P1 Oct AH15-01 Pg 1 of 1 Project No: R Drilled MC = 140.2% 6 2 G4 MC = 404% 8 10 G5 MC = 520% soft/loose, grey, silty SAND to sandy SILT, trace organics, wet G6 16 G7 18 G brown, fibrous PEAT, wet firm to stiff, grey, clayey SILT, trace sand, trace organics, moist G9 MC = 275.2% 22 G10 1 LOG PER PAGE R SOIL LOGS - OCT GPJ LEVELTON.GDT 15/12/ C: Condition of Sample Good Disturbed No Recovery compact, grey, silty SAND, trace organics, wet dense, brown, SAND and GRAVEL, coarse sand, fine subangular gravel, wet groundwater encountered at 1.2 m below surrounding grade. Bottom of hole at 9.1 metres Type: Type of Sampler SPT : 2 in. standard ST : Shelby G : Grab CORE SOIL CLASSIFICATION IN ACCORDANCE WITH THE CANADIAN FOUNDATION ENGINEERING MANUAL 4TH EDITION THIS LOG IS FOR GEOTECHNICAL PURPOSES ONLY THIS LOG IS THE SOLE PROPERTY OF LEVELTON CONSULTANTS LTD AND CANNOT BE USED OR DUPLICATED IN ANY WAY WITHOUT EXPRESS WRITTEN PERMISSION. N: Number of Blows WH : Weight of Hammer WR : Weight of Rod Standard Penetration Test : ASTM D1586 Hammer Type: Trip Hammer DYNAMIC CONE PENETRATION TEST G11 G12 Plastic Limit (%) PP Liquid Limit (%) Moisture Content (%) Ground Water Level Shear strength in kpa (Torvane) Pocket Penetrometer (compressive strength in kpa) Shear strength in kpa (Unconfined) Shear strength in kpa (Field vane) Remolded strength in kpa Percent Passing # 200 sieve Bentonite/Grout Plug Solid Pipe Cuttings Slotted Pipe Sand/Pea-Gravel Drill Method: Solid Stem Auger / DCPT Date Drilled: 21/10/2015 Logged by: PV Checked by: CB

17 Depth (m) (ft) 2 4 Levelton Consultants Ltd. # Gladys Avenue Abbotsford, B.C. V2S 2E8 Tel: Fax: ASPHALT - 90 mm thick Description dense, brown, SAND and GRAVEL, rounded gravel, moist, fill compact, red, gravel VESICULAR PUMICE, moist, fill very loose, dark brown, PEAT and GRAVEL, well graded gravel, trace to some sand, moist to wet Gordon Avenue Sewer Replacement Gordon Avenue White Rock C N Type/ Sample # G1 Water Level P1 Oct AH15-02 Pg 1 of 1 Project No: R dark brown, fibrous PEAT, some wood fragments, wet G2 MC = 173.1% 8 10 G3 MC = 515.5% soft, brown, organic SILT, moist brown, amorphous PEAT, some silt, trace clay, wet G4 G5 MC = 544.2% MC = 126% 16 G6 MC = 198.2% very loose, dark brown, PEAT and GRAVEL, rounded gravel, trace sand, wet G7 G8 MC = 112.9% MC = 116.9% 22 dense, grey, SAND and GRAVEL, well graded sand, rounded gravel, wet G9 1 LOG PER PAGE R SOIL LOGS - OCT GPJ LEVELTON.GDT 15/12/ C: Condition of Sample Good Disturbed No Recovery groundwater encountered at 0.8 m below surrounding grade. Bottom of hole at 7.6 metres Type: Type of Sampler SPT : 2 in. standard ST : Shelby G : Grab CORE SOIL CLASSIFICATION IN ACCORDANCE WITH THE CANADIAN FOUNDATION ENGINEERING MANUAL 4TH EDITION THIS LOG IS FOR GEOTECHNICAL PURPOSES ONLY THIS LOG IS THE SOLE PROPERTY OF LEVELTON CONSULTANTS LTD AND CANNOT BE USED OR DUPLICATED IN ANY WAY WITHOUT EXPRESS WRITTEN PERMISSION. N: Number of Blows WH : Weight of Hammer WR : Weight of Rod Standard Penetration Test : ASTM D1586 Hammer Type: Trip Hammer DYNAMIC CONE PENETRATION TEST Plastic Limit (%) PP Liquid Limit (%) Moisture Content (%) Ground Water Level Shear strength in kpa (Torvane) Pocket Penetrometer (compressive strength in kpa) Shear strength in kpa (Unconfined) Shear strength in kpa (Field vane) Remolded strength in kpa Percent Passing # 200 sieve Drill Method: Solid Stem Auger / DCPT Date Drilled: 21/10/2015 Logged by: PV Checked by: CB

18 Depth (m) (ft) 2 4 Levelton Consultants Ltd. # Gladys Avenue Abbotsford, B.C. V2S 2E8 Tel: Fax: Description ASPHALT mm thick very dense, brown, SAND and GRAVEL, rounded gravel, moist, fill compact, red, sandy gravel VESICULAR PUMICE, moist, fill dark brown, fibrous PEAT, some wood fragments, wet Gordon Avenue Sewer Replacement Gordon Avenue White Rock Well 1 C N Type/ Sample # G1 G2 Water Level P1 Oct AH15-03 Pg 1 of 1 Project No: R MC = 151.3% 6 2 G3 MC = 387.9% 8 10 G4 MC = 497.3% 12 G5 MC = 541% 4 14 G6 MC = 551.4% G7 MC = 254.4% 6 20 dark brown, PEAT and GRAVEL, subrounded gravel, wet compact to very dense, grey, SAND and GRAVEL, coarse sand, rounded gravel, wet G8 G LOG PER PAGE R SOIL LOGS - OCT GPJ LEVELTON.GDT 15/12/ C: Condition of Sample Good Disturbed No Recovery groundwater encountered at 0.9 m below surrounding grade. Bottom of hole at 7.6 metres Type: Type of Sampler SPT : 2 in. standard ST : Shelby G : Grab CORE SOIL CLASSIFICATION IN ACCORDANCE WITH THE CANADIAN FOUNDATION ENGINEERING MANUAL 4TH EDITION THIS LOG IS FOR GEOTECHNICAL PURPOSES ONLY THIS LOG IS THE SOLE PROPERTY OF LEVELTON CONSULTANTS LTD AND CANNOT BE USED OR DUPLICATED IN ANY WAY WITHOUT EXPRESS WRITTEN PERMISSION. N: Number of Blows WH : Weight of Hammer WR : Weight of Rod Standard Penetration Test : ASTM D1586 Hammer Type: Trip Hammer DYNAMIC CONE PENETRATION TEST Plastic Limit (%) PP Liquid Limit (%) Moisture Content (%) Ground Water Level Shear strength in kpa (Torvane) Pocket Penetrometer (compressive strength in kpa) Shear strength in kpa (Unconfined) Shear strength in kpa (Field vane) Remolded strength in kpa Percent Passing # 200 sieve Bentonite/Grout Plug Solid Pipe Cuttings Slotted Pipe Sand/Pea-Gravel Drill Method: Solid Stem Auger / DCPT Date Drilled: 21/10/2015 Logged by: PV Checked by: CB

19 Depth (m) (ft) 2 4 Levelton Consultants Ltd. # Gladys Avenue Abbotsford, B.C. V2S 2E8 Tel: Fax: ASPHALT - 76 mm thick Description very dense, brown, SAND and GRAVEL, rounded gravel, moist, fill compact, red, sandy gravel VESICULAR PUMICE, moist, fill dark brown, fibrous PEAT, some wood fragments, wet Gordon Avenue Sewer Replacement Gordon Avenue White Rock C N Type/ Sample # G1 Water Level P1 Oct AH15-04 Pg 1 of 1 Project No: R MC = 255.8% 2 6 G2 MC = 154.5% 8 10 dark brown, PEAT and GRAVEL, subrounded gravel, wet compact to very dense, grey, SAND and GRAVEL, coarse sand, rounded gravel, wet compact, grey, gravelly SAND, some silt to silty, wet G3 G4 12 G G dark brown, organic SILT, wet compact to dense, grey, silty SAND, trace to some gravel, fine grained sand, wet groundwater encountered at 1.2 m below surrounding grade. Bottom of hole at 6.1 metres G7 G8 1 LOG PER PAGE R SOIL LOGS - OCT GPJ LEVELTON.GDT 15/12/ C: Condition of Sample Good Disturbed No Recovery Type: Type of Sampler SPT : 2 in. standard ST : Shelby G : Grab CORE SOIL CLASSIFICATION IN ACCORDANCE WITH THE CANADIAN FOUNDATION ENGINEERING MANUAL 4TH EDITION THIS LOG IS FOR GEOTECHNICAL PURPOSES ONLY THIS LOG IS THE SOLE PROPERTY OF LEVELTON CONSULTANTS LTD AND CANNOT BE USED OR DUPLICATED IN ANY WAY WITHOUT EXPRESS WRITTEN PERMISSION. N: Number of Blows WH : Weight of Hammer WR : Weight of Rod Standard Penetration Test : ASTM D1586 Hammer Type: Trip Hammer DYNAMIC CONE PENETRATION TEST Plastic Limit (%) PP Liquid Limit (%) Moisture Content (%) Ground Water Level Shear strength in kpa (Torvane) Pocket Penetrometer (compressive strength in kpa) Shear strength in kpa (Unconfined) Shear strength in kpa (Field vane) Remolded strength in kpa Percent Passing # 200 sieve Drill Method: Solid Stem Auger / DCPT Date Drilled: 21/10/2015 Logged by: PV Checked by: CB

2. BACKGROUND INFORMATION

2. BACKGROUND INFORMATION May 30, 2017 WSP Reference No: 171-05352-00 City of Surrey Engineering Department / Operations Division 6651 148 Street Surrey, BC V3S 3C7 Attention: Mr. Matthew Brown Subject: Geotechnical Review of Large

More information

June i TABLE OF CONTENTS

June i TABLE OF CONTENTS June 2005 - i - 05-526 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 1.1 Purpose of the Investigation... 1 1.2 Description of the Project and Scope of Work... 1 1.3 Site Geology... 1 1.4 Site Description

More information

Foundations, Excavation & Shoring Specialists

Foundations, Excavation & Shoring Specialists Foundations, Excavation & Shoring Specialists July 8, 017 Reference: 17-7 McElhanney Consulting Services Ltd. Suite 00 Central City Tower 10 10 nd Avenue Surrey, BC VT X Via email: mflorendo@mcelhanney.com

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 5-06 Template Version: C40606 - RW APPENDIX A GEOTECHNICAL REPORT AECOM 99 Commerce Drive 04 477 538 tel Winnipeg, MB, Canada R3P 0Y7 04 84 040 fax www.aecom.com

More information

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG.

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG. MEMORANDUM Levelton Consultants Ltd. 150-12791 Clarke Place Richmond, BC V6V 2H9 Canada Tel: 604 278-1411 Fax: 604 278-1042 E-Mail: rhillaby@levelton.com Web Site: www.levelton.com TO: STUART OLSON DOMINION

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

APPENDIX A Reports & Permits

APPENDIX A Reports & Permits APPENDIX A Reports & Permits BOREHOLE GEOTECHNICAL SERVICES 2016 CAPITAL WORKS PENTICTON, BRITISH COLUMBIA PRESENTED TO THE CITY OF PENTICTON JANUARY 25, 2016 ISSUED FOR USE FILE: ENG.KGEO03005-01 Tetra

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

CONTRACT 5E-2 APPENDIX A - TEST HOLE LOGS DYREGROV ROBINSON INC. PORTAGE AVE WINSTON DR BOURKEVALE CAVELL PARKSIDE DR ASSINIBOINE AVE

CONTRACT 5E-2 APPENDIX A - TEST HOLE LOGS DYREGROV ROBINSON INC. PORTAGE AVE WINSTON DR BOURKEVALE CAVELL PARKSIDE DR ASSINIBOINE AVE APPENDIX A - TEST HOLE LOGS PORTAGE AVE TH -9 CONTRACT E- DR DR BOURKEVALE CAVELL WINSTON DR PARKSIDE DR ASSINIBOINE AVE AUTHORIZED BY: DATE: CONSULTING GEOTECHNICAL ENGINEERS AUTHORIZED /0/ CLIENT DRAWING

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 47 Jacksonville, Florida MAE Project No. 0019-0009 April 5, 2017 Revised: April 6, 2017 Prepared for: Prepared by: Jacksonville,

More information

Preliminary Geotechnical Investigation

Preliminary Geotechnical Investigation Preliminary Geotechnical Investigation Urban Centre Wastewater Servicing Class Environmental Assessment Study Town of Erin, Ontario Prepared For: Ainley Group GeoPro Project No.: 16-1 Report Date: January,

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1 1.01 GENERAL A. The Contractor shall perform all excavation, backfilling, grubbing and grading required for construction and installation of pipelines, structures and appurtenances. Excavation shall include

More information

FIGURES Printed By: aday Print Date: 3/23/2011 12:48:08 PM File Name: \\geodesign.local\files\jobs\m-r\penskeauto\penskeauto-1\penskeauto-1-01\figures\cad\penskeauto-1-01-vm01.dwg Layout: FIGURE 1 VICINITY

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784 REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO. 35-55 CLIENT ID: 78 Prepared for: Construction & Engineering Services Consultants, Inc. 93 Baymeadows

More information

Klohn Crippen Berger Ltd Virtual Way Vancouver BC V5M 4X6 CANADA t f

Klohn Crippen Berger Ltd Virtual Way Vancouver BC V5M 4X6 CANADA t f Klohn Crippen Berger Ltd. 500-2955 Virtual Way Vancouver BC V5M 4X6 CANADA 604.669.3800 t 604.669.3835 f www.klohn.com TABLE OF CONTENTS 1 INTRODUCTION... 1 2 BACKGROUND... 2 3 PAVEMENT DESIGN AND RECOMMENDATIONS...

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01

More information

Sent: Friday, June 24, :17 PM. Subject: RE: Southwood 4 - Monitoring Well update

Sent: Friday, June 24, :17 PM. Subject: RE: Southwood 4 - Monitoring Well update Sent: Friday, June 24, 2016 5:17 PM Subject: RE: Southwood 4 - Monitoring Well update Please see attached for a copy of our Draft Borehole Logs, Draft Borehole Location Plan and Interim Ground Water Monitoring

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

Foundations, Excavation & Shoring Specialists

Foundations, Excavation & Shoring Specialists Foundations, Excavation & Shoring Specialists June 13, 2017 Reference: 17-7171 ISL Engineering and Land Services Ltd. #201 8506 200 Street Langley, BC V2Y 0M1 Via email: gngieng@islengineering.com Attn:

More information

J.L. Richards & Associates Limited 864 Lady Ellen Place Ottawa, Ontario K1Z 5M2. April 6, 2015 Project:

J.L. Richards & Associates Limited 864 Lady Ellen Place Ottawa, Ontario K1Z 5M2. April 6, 2015 Project: Houle Chevrier Engineering Ltd. 180 Wescar Lane Ottawa, Ontario K0A 1L0 tel: 613.836.1422 fax: 613.836.9731 info@hceng.ca www.hceng.ca J.L. Richards & Associates Limited 864 Lady Ellen Place Ottawa, Ontario

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.

More information

GEOTECHNICAL INVESTIGATION. Proposed Highway 892 Reconstruction Within Portions of E ½ W4M and W ½ W4M North of Ardmore, Alberta

GEOTECHNICAL INVESTIGATION. Proposed Highway 892 Reconstruction Within Portions of E ½ W4M and W ½ W4M North of Ardmore, Alberta SolidEarth Geotechnical Inc. www.solidearth.ca GEOTECHNICAL INVESTIGATION Prepared for: Municipal District of Bonnyville c/o SE Design and Consulting Inc. Date: October 0 Project File #: PG- Edmonton :

More information

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM DATE: June 3, 2009 EMI PROJECT NO: 01-143 TO: COPY: FROM: SUBJECT: John Chun, P.E. / Port of Long Beach (POLB) Jorge Castillo

More information

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133 GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project

More information

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Engineering, Inspection & Testing

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Engineering, Inspection & Testing Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Engineering, Inspection & Testing August 9, 07 File No. 7--0090- Stoney Creek Office City of Hamilton Waterfront Development

More information

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing. SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom

More information

Site Location. Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe County, Michigan

Site Location. Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe County, Michigan Site Location 0606 1771 North Dixie Highway Monroe, Michigan 48162 Tel: 734-289-2200 Fax: 734-289-2345 www.manniksmithgroup.com Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe

More information

Attention: Mr. Bob Ambardar, P.Eng., Manager of Engineering Mr. Greg St. Louis, P.Eng., Director of Engineering and Municipal Operations

Attention: Mr. Bob Ambardar, P.Eng., Manager of Engineering Mr. Greg St. Louis, P.Eng., Director of Engineering and Municipal Operations LEVELTON CONSULTANTS LTD. Abbotsford Office 110-34077 Gladys Avenue Abbotsford, BC V2S 2E8 T: 604.855.0206 F: 604.853.1186 abbotsford@levelton.com www.levelton.com Revised: October 19, 2015 Levelton File

More information

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and

More information

GEOTECHNICAL INVESTIGATION. 20th Street Connection, Vernon, BC

GEOTECHNICAL INVESTIGATION. 20th Street Connection, Vernon, BC 4 August 2016 GEOTECHNICAL INVESTIGATION 20th Street Connection, Vernon, BC Submitted to: Ministry of Transportation and Infrastructure 447 Columbia Street Kamloops, BC V2C 2T3 Attention: Tom Kneale, PEng

More information

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering DATE: August 31, 2000 Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM EMI PROJECT NO: 99-136 PREPARED FOR: COPIES: PREPARED BY: Tayfun Saglam / Parsons Brinckerhoff Juan

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California Mr. Victor Garcia The Holt Group 1601 N. Imperial Ave. El Centro, California 92243 September 28, 2017 Project No. EC595 SUBJECT: REFERENCE: GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for

More information

For. Report of Geotechnical Exploration. St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St.

For. Report of Geotechnical Exploration. St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St. Report of Geotechnical Exploration For St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St. Johns County, FL MAE Project No. 0106-0005 June 14, 2017 Prepared for: CPH, Inc.

More information

Lantz-Boggio Architects, P.C LBA Project No

Lantz-Boggio Architects, P.C LBA Project No SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely

More information

APPENDIX "H" 4127 Roper Road, Edmonton, AB T6B 3S5 T: F: thurber.ca

APPENDIX H 4127 Roper Road, Edmonton, AB T6B 3S5 T: F: thurber.ca APPENDIX "H" 4127 Roper Road, Edmonton, AB T6B 3S5 T: 780 438 1460 F: 780 437 7125 thurber.ca TABLE OF CONTENTS 1. INTRODUCTION... 1 1.2 Project Details... 1 2. FIELD INVESTIGATIVE WORK... 1 2.1 Site Reconnaissance...

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 310000 PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and perform all excavation, backfill, fill and grading required to complete the work

More information

5.0 SITE CONDITIONS. 5.1 Surface Conditions

5.0 SITE CONDITIONS. 5.1 Surface Conditions 5.0 SITE CONDITIONS 5.1 Surface Conditions The project site is located at approximately along Ashdown Forest Road and Nichols Canyon Road in the Fiddlers Canyon Area of Cedar City, Utah. At the time of

More information

Utility Cut Restoration

Utility Cut Restoration Design Manual Chapter 9 - Utilities 9D - Utility Cut Restoration 9D-1 Utility Cut Restoration A. General Utility cuts are made in existing pavement sections to install a myriad of utilities and to repair

More information

SECTION TRENCH SAFETY PART 1 - GENERAL

SECTION TRENCH SAFETY PART 1 - GENERAL SECTION 31 41 33 - TRENCH SAFETY PART 1 - GENERAL A. This Section is intended to provide specifications for the minimum requirements for trench safety. The Contractor shall endeavor to insure the safety

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E. LD-0 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Revised Soil Survey Report November 2, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia

More information

For. Report of Geotechnical Exploration. Beaver St Lane Ave to Carnegie St Trans Water Main Project Jacksonville, FL

For. Report of Geotechnical Exploration. Beaver St Lane Ave to Carnegie St Trans Water Main Project Jacksonville, FL Report of Geotechnical Exploration For Beaver St Lane Ave to Carnegie St Trans Water Main Project Jacksonville, FL MAE Project No. 0106-0002.02 March 30, 2017 Prepared for: CPH, Inc. 5200 Belfort Road,

More information

Appendix A - Vicinity Map Vicinity Map: Palm Beach Gardens City Hall Additions, 000 N Military Trail, Palm Beach Gardens, FL Proposed Location of Police Dept. Attached Addition Proposed Location of New

More information

Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD 6 inch Reclaimed Water Main Jacksonville, FL

Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD 6 inch Reclaimed Water Main Jacksonville, FL Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD inch Reclaimed Water Main Jacksonville, FL MAE Project No. 0 000 June, 0 Prepared for: CPH, Inc. 00 Belfort Road, Suite 0 Jacksonville,

More information

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199 REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO. 3-6187-A CLIENT ID: 0199 Prepared for: JEA 1 West Church Street Jacksonville, Florida

More information

EXHIBIT G GEOTECHNICAL REPORT (DRAFT)

EXHIBIT G GEOTECHNICAL REPORT (DRAFT) EXHIBIT G GEOTECHNICAL REPORT (DRAFT) APPENDIX 1 PROJECT SITE 'B' B-1 B-2 I-2 B-3 B-4 B-5 I-1 PROJECT LOCATION LEGEND B-1 = APPROXIMATE BORING LOCATION I-1 = APPROXIMATE INFILTRATION

More information

Subsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015

Subsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015 Subsurface Investigations PDCA Professor s Driven Pile Institute Loren R. Anderson Utah State University June 25, 2015 Ralph B. Peck (1962) Subsurface engineering is an art; soil mechanics is an engineering

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

February 12, 2013 Calibre File No.: J

February 12, 2013 Calibre File No.: J February 12, 2013 Calibre File No.: J13-01795 260 Lake Avenue Kelowna, B.C. V1Y 5W7 Attention: Subject: Marianne Hill Geotechnical Assessment for a Proposed Residential Home Lot 5, Block D, DL 14, Plan

More information

Appendix F: Geotechnical Investigation

Appendix F: Geotechnical Investigation Appendix F: Geotechnical Investigation PRELIMINARY GEOTECHNICAL INVESTIGATION CLASS EA PHASE 3 AND 4 FOR BAYVIEW DRIVE AND BIG BAY POINT ROAD IMPROVEMENTS BARRIE, ONTARIO for C.C. TATHAM & ASSOCIATES LTD.

More information

Appendix E: Geotechnical Investigation

Appendix E: Geotechnical Investigation Appendix E: Geotechnical Investigation PRELIMINARY GEOTECHNICAL INVESTIGATION CLASS EA PHASE 3 AND 4 FOR BAYVIEW DRIVE AND BIG BAY POINT ROAD IMPROVEMENTS BARRIE, ONTARIO for C.C. TATHAM & ASSOCIATES LTD.

More information

Sump Pump Feasibility Review Summerside West Residential Development - Phases 4, 5 and 6 Tenth Line Road - Ottawa, Ontario

Sump Pump Feasibility Review Summerside West Residential Development - Phases 4, 5 and 6 Tenth Line Road - Ottawa, Ontario May 24, 2018 File: PG4049-LET.03 Mattamy Homes 50 Hines Road, Suite 100 Ottawa, Ontario K2K 2M5 Consulting Engineers 154 Colonnade Road South Ottawa, Ontario Canada, K2E 7J5 Tel: (613) 226-7381 Fax: (613)

More information

WINDSOR PARK LIBRARY GEOTECHNICAL INVESTIGATION 1201 ARCHIBALD STREET WINNIPEG, MANITOBA

WINDSOR PARK LIBRARY GEOTECHNICAL INVESTIGATION 1201 ARCHIBALD STREET WINNIPEG, MANITOBA WINDSOR PARK LIBRARY GEOTECHNICAL INVESTIGATION 1201 ARCHIBALD STREET WINNIPEG, MANITOBA Prepared for: City of Winnipeg Winnipeg, Manitoba December 2015 File #153919 Table of Contents 1.0 INTRODUCTION...

More information

Report of Exploratory Test Pits

Report of Exploratory Test Pits Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Pavement Coring and Evaluation UNF Parking Lot 3 Jacksonville, Florida CSI Geo Project No.: 71-18-135-23 Prepared by CSI Geo, Inc. 2394 St. Johns Bluff Road

More information

Landfill Expansion Geotechnical Report

Landfill Expansion Geotechnical Report Environment City of Sault Ste. Marie Landfill Expansion Geotechnical Report Prepared by: AECOM 99 Commerce Drive 204 477 5381 tel Winnipeg, MB, Canada R3P 0Y7 204 284 2040 fax www.aecom.com Project Number:

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing GEOTECHNICAL INVESTIGATION PROPOSED HOME FARM RESIDENTIAL DEVELOPMENT TOWN OF THE BLUE MOUNTAINS,

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions

More information

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS Construction Specifications Page 1 of 7 1. GENERAL 1.1 The following specifications apply to compaction of all water, sewer and shallow utility service cuts, repairs, replacements, mainbreaks, extensions,

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL TRENCH EXCAVATION AND BACKFILL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Trench Excavation for Pipe Systems B. Trench Foundation Stabilization C. Pipe Bedding and Backfill 1.02 DESCRIPTION OF WORK A. Excavate

More information

August 3, 2018 TTL Project No Supplemental Test Borings Cleveland Bulk Terminal Cleveland, Ohio

August 3, 2018 TTL Project No Supplemental Test Borings Cleveland Bulk Terminal Cleveland, Ohio 1915 North 12 th Street Toledo, OH 43604-5305 T 419-324-2222 F 419-241-1808 www.ttlassoc.com August 3, 2018 TTL Project No. 1706701 Mr. Vito Melilli Coastal Engineer KS Associates, Inc. 260 Burns Road,

More information

Technical Data Sheet NEC/GRAN/95:01

Technical Data Sheet NEC/GRAN/95:01 Technical Data Sheet NEC/GRAN/95:01 Installation Guidance Notes Granular Surround Note : These guidance notes refer only to the installation of Granular surround underground tanks. These guidance notes

More information

Revised Price Form - May 26, 2017 (Addendum 4)

Revised Price Form - May 26, 2017 (Addendum 4) of Revised Price Form - May, 0 (Addendum ) For the complete supply and installation of five () Static Sign Support Structures; removal of four () existing overhead sign supports, and one () temporary side

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT SHAD 髂髂 July 15, 2011 Attention: Re: 獒獒獒獒 Reference No. : T11284 Royal Park Homes and Century Grove Homes c/o Urbantech Consulting 25 Royal Crest Court, Unit 201 Markham, Ontario L3R 9X4 Dear Mr. Leighton,

More information

August 16, 2012 File: OAK BAY HIGH SCHOOL REPLACEMENT GEOTECHNICAL INVESTIGATION FOR DESIGN-BUILD PROPONENTS

August 16, 2012 File: OAK BAY HIGH SCHOOL REPLACEMENT GEOTECHNICAL INVESTIGATION FOR DESIGN-BUILD PROPONENTS August 1, 212 File: 1-1- Greater Victoria School District #1 Facilities Department 1 Cecelia Street Victoria, BC VT T Attention: Jim Soles Dear Jim: OAK BAY HIGH SCHOOL REPLACEMENT GEOTECHNICAL INVESTIGATION

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF

More information

August 1, 2013 Reference No S048 Page 1 of 5

August 1, 2013 Reference No S048 Page 1 of 5 August 1, 2013 Reference No. 1201-S048 Page 1 of 5 Caledon Villas Corp. 55 Blue Willow Drive Woodbridge, Ontario L4L 9E8 Attention: Mr. John Spina Re: Addendum to Soil Investigation for Proposed Residential

More information

Submitted to: Dehart Properties Limited Partnership th Street Langley, BC V2Y 0E2

Submitted to: Dehart Properties Limited Partnership th Street Langley, BC V2Y 0E2 0 March 07 GEOTECHNICAL AND HYDROGEOLOGICAL ASSESSMENTS Proposed Residential Subdivision, 984 Dehart Road, Kelowna, BC Submitted to: Dehart Properties Limited Partnership 03-8047 99th Street Langley, BC

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

COMPACTED CLAY LINERS

COMPACTED CLAY LINERS Technical Reference Document for Liquid Manure Storage Structures COMPACTED CLAY LINERS Table of Contents SECTION 1 - PURPOSE AND SCOPE 1.1. Purpose of the Technical Reference Document 1.2. Requirement

More information

SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO

SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO Prepared for: G.J. GARDNER HOMES ATTN: DAVE PAGANO 7660 RALEIGH STREET WESTMINSTER, COLORADO 80030 PROJECT NO. 1090

More information

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL GEOTECHNICAL CONSULTANT Prepared by Checked by Approved by Mr. C Allen Dr. Derek Gay Dr. Derek Gay Signature Date Signature Date

More information

patersongroup 1.0 Field Investigation Consulting Engineers December 14, 2015 PG3700-LET.01

patersongroup 1.0 Field Investigation Consulting Engineers December 14, 2015 PG3700-LET.01 December 14, 2015 1828486 Ontario Limited 277 Kirchoffer Avenue Ottawa, ON K2A 1Y1 Attention: Subject: Mr. Rolf Bauman Geotechnical Investigation Proposed Residential Buildings 890 Greenbriar Avenue -

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

GEOTECHNICAL INVESTIGATION REPORT - REVISED PROPOSED KEG RESTAURANT 15 HUNTMAR DRIVE KANATA (OTTAWA), ONTARIO. Submitted to:

GEOTECHNICAL INVESTIGATION REPORT - REVISED PROPOSED KEG RESTAURANT 15 HUNTMAR DRIVE KANATA (OTTAWA), ONTARIO. Submitted to: GEOTECHNICAL INVESTIGATION REPORT - REVISED PROPOSED KEG RESTAURANT 15 HUNTMAR DRIVE KANATA (OTTAWA), ONTARIO Submitted to: Keg Restaurants and Bar 529 Richmond Road Ottawa, Ontario, K2A 0G3 Canada Submitted

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT

PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT Converse Project No. 15-81-177-01 Prepared For: David Evans and Associates, Inc. 17782 17th Street, Suite 200 Tustin, California 92780 Prepared By: 10391

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 May 10, 2016 Banner Associates, Inc. 2307 W. 57 th Street, Suite

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

patersongroup 1.0 Method of Investigation Consulting Engineers July 23, 2013 File: PG3024-LET.01 Sherbrooke Urban Developments 43 Okanagan Drive

patersongroup 1.0 Method of Investigation Consulting Engineers July 23, 2013 File: PG3024-LET.01 Sherbrooke Urban Developments 43 Okanagan Drive July 23, 2013 Sherbrooke Urban Developments 43 Okanagan Drive Ottawa, Ontario K2H 7E9 Attention: Subject: Geotechnical Investigation Proposed Residential Buildings 1111 North River Road - Ottawa Consulting

More information

CHAPTER 4 GEOTECHNICAL SITE CHARACTERIZATION

CHAPTER 4 GEOTECHNICAL SITE CHARACTERIZATION CHAPTER 4 GEOTECHNICAL SITE CHARACTERIZATION Chapter Organization 4.1 Introduction... 4-1 4.2 Applicability... 4-1 4.3 Minimimum Requirements... 4-2 4.3.1 Geotechnical Site Characterization Report... 4-3

More information

Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No G

Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No G Geotechnical Investigation Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No. 40-3264G Laboratory CBR Tests Laboratory CBR tests were performed on samples

More information

B M CIVIL ENGINEERS CLIENT: Warramunda Aged Care

B M CIVIL ENGINEERS CLIENT: Warramunda Aged Care B M B.M PTY.LTD. A.B.N 36 473 826 551 8 Midstar Crescent, Shepparton, 3631 P.O. Box 6577, Shepparton, 3632 David Earl B. Eng. (Civil), M.I.E. (Aus.) EC30953 Peter Willmott B. Eng. (Civil), M.I.E. (Aus.)

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 October 28, 2016 City of Vermillion 25 Center Street 57069 Attn:

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 September 8, 2016 City of Viborg 101 N. Main Street 57070 Attn:

More information

Whiskey Creek. Groundwater Supply Assessment

Whiskey Creek. Groundwater Supply Assessment Whiskey Creek Groundwater Supply Assessment August 2012 GW Solutions Inc. 3591 Ranch Point Road Nanaimo, BC V9R 6W9 phone: (250) 756-4538 cell: (250) 713-4538 email: gwsolutions@shaw.ca RDN Whiskey Creek

More information

August 13, Geotechnical Recommendations, New Physical Education Building, Chabot College, Hayward, California

August 13, Geotechnical Recommendations, New Physical Education Building, Chabot College, Hayward, California August 13, 2008 003-09176-17 Douglas Horner, AIA Chabot Las Positas Community College District 25555 Hesperian Boulevard Hayward, California 94545 Subject: Geotechnical Recommendations, New Physical Education

More information

Woodhaven Retirement Community Addition Wentworth Street Livonia, Michigan 48154

Woodhaven Retirement Community Addition Wentworth Street Livonia, Michigan 48154 Report of Geotechnical Investigation Woodhaven Retirement Community Addition 9 Wentworth Street Livonia, Michigan 81 Latitude.08 N Longitude 8.898 W Prepared for: Fusco, Shaffer & Pappas, Inc. 0 E. Nine

More information

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation. SECTION 312333 TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 SUMMARY A. Excavate trenches for new electric and telephone conduits, gas lines, and their appurtenances from at least 5 feet outside the building

More information

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 00 EXCAVATION AND BACKFILL, GENERAL PART 1 GENERAL... 2 1.1 Description... 2 1.2 Submittals... 2 1.3 Reference

More information