1 1. INTRODUCTION CASITAS MUNICIPAL WATER DISTRICT REQUEST FOR PROPOSAL PIPING, FITTINGS AND VALVES July 23, 2012 The Casitas Municipal Water District (Casitas) is requesting proposals to provide and deliver piping, fittings and valves to the Upper Ojai Reservoir site. It is Casitas intent to receive proposals and cost statements that include all services, including labor, materials, testing and equipment necessary to provide the material described by this request for proposal. All work shall be proposed to be performed in accordance with State, Federal and local County laws and codes. 2. PROPOSAL SUBMITTAL The proposal should be submitted in written form to Casitas Municipal Water District, 1055 North Ventura Avenue, Oak View, California 93022, Attention: Neil Cole. Proposals will be accepted until Thursday, August 23, 2012, by 4:00 P.M. No proposals will be accepted after that time and date. The firm shall submit one copy of the proposal. The proposal may be faxed to or ed to 3. BACKGROUND Casitas Municipal Water District would like to complete maintenance to the Upper Ojai Reservoir. In order to provide water to the area while the maintenance is occurring, temporary tanks with sufficient volume and elevation to provide adequate flow are required. Casitas has purchased sixteen 12,500 gallon tanks that will be delivered to the site in September. This project is to provide all of the necessary components to connect the temporary tanks to the existing system. 4. PROJECT AND SCOPE The goal of the project is provide and deliver all requested piping, fittings and valves to the Upper Ojai Reservoir Site. The required piping, fittings and valves are listed on Attachment A. All piping, fittings and valves shall comply with the following: (a) (b) (c) NSF 61 approved for potable water FOB destination (Ojai, California). Minimum 1 year warranty. (d) Delivery to Assessor s Parcel Number (Latitude , Longitude ) near 9739 Ojai-Santa Paula Road, Ojai, CA.

2 Request for Proposal Piping, Fittings and Valves The scope of work does not include installation of the piping. The delivery time for the materials shall be included in the proposal. Casitas desires delivery to occur before September 25, CONTRACT DOCUMENTS: The contract documents shall consist of the (1) Firm s Proposal, (2) Casitas Request for Proposal, (3) Agreement of changes to the Proposal or Request for Proposal and Purchase Order issued by Casitas. 6. SPECIAL CONDITIONS (a) Project Location and Access. The Upper Ojai Reservoir site is located between the towns of Ojai and Santa Paula in Ventura County, California. The site is at Latitude , Longitude near 9739 Ojai-Santa Paula Road, Ojai, CA. There is no site address. (b) Firm Requirements. The selected firm will provide all labor, materials, equipment, administration and other work necessary to provide and deliver the material. The following requirements are to be applied to the project: (1) Firm shall repair any damage to utilities caused by this project. (2) The predetermined liquidated damages for failure to deliver the materials on the agreed upon date will be $75 per calendar day. 7. FIRM S PROPOSAL CONTENT It is the intent of this Request for Proposal to seek only those proposals that will directly address the particular project of Casitas Municipal Water District. The Firms submitting proposals need not provide any general information about the firm, but only that particular information that specifically addresses the needs of this proposal. The scope provided by the proposal should address not only the details in the request for proposal, but should also address those issues and relative points that may not have been described in the Request For Proposal, which the provider believes to be pertinent to this particular project specified. The proposal should contain the following elements: (a) Material specifications. The proposal content should begin with the specifications for all of the proposed material. (b) Work Plan and Time Frame. The proposal should include a delivery time frame for the material. G:\ENGR.WKS\RFP\Upper Ojai Reservoir-temp tanks-see reservoir too\rfp-temporarypiping doc 2

3 Request for Proposal Piping, Fittings and Valves (c) Lump Sum Fee. The proposal shall include the lump sum fee to provide and deliver the material. (d) Conflicts. The firm shall identify any conflicts which they believe could affect the project work and the ability to complete on schedule. 8. SELECTION The selection of the provider to complete the work will be based upon the following criteria: (a) Material specifications and the ability of the proposed piping, fittings and valves to meet the needs of Casitas. (b) (c) (d) The warranty provided. The fee proposal specified. The proposed time and schedule required to complete the project. Casitas reserves the right to reject any and all proposals that are considered unacceptable by Casitas or to waive any minor irregularities if so deemed by Casitas for any reason. If Casitas is unable to enter into agreement with the selected provider for any reason, it reserves the right to award the contract to the next most qualified provider who submitted a proposal. The same selection process would be used to select the alternate provider. Casitas reserves the right to retain all proposals for a period of forty five (45) days and to reject any and all proposals for any reason at the sole discretion of Casitas, with or without cause. 9. CONTRACT It is expected that the selected provider will enter into a Purchase Order agreement with Casitas to provide the temporary piping materials. 10. CASITAS CONTACTS Neil Cole Principal Civil Engineer 1055 N. Ventura Avenue Oak View, California (805) , Ext. 107; FAX # (805) ncole@casitaswater.com G:\ENGR.WKS\RFP\Upper Ojai Reservoir-temp tanks-see reservoir too\rfp-temporarypiping doc 3

4 PIPELINE MATERIALS 1. General. (a) In addition to the joints indicated on the Drawings, Contractor shall furnish and install unions, flexible couplings, flanged joints, and other types of joints necessary to allow ready assembly and disassembly of the piping. The joints and other means shall be compatible with and suitable for the piping system in which it was used. (b) Piping shall be assembled without distortion or stresses caused by misalignment. 2. Main Line Pipe. (a) PVC Piping. PVC piping shall be schedule 40 unless otherwise noted. PVC pipe shall be manufactured in accordance with the AWWA Standard Specifications for Polyvinyl Chloride (PVC) Pressure Pipe, AWWA C900, latest revision. PVC shall be pressure class 150 unless otherwise indicated and conform to the outside diameter dimensions of cast-iron pipe (CI) with a dimension ratio (DR) of 18 as specified in the drawings. The pipe shall be of the diameter and pressure classification shown in the drawings. Standard sections shall be twenty feet (20') in nominal length. Short sections for making connections to valves, fittings, and structures, and for making closures, shall be furnished, as required, to conform with the drawings. (2) The pipe shall not be exposed to prolonged periods of sunlight. If the pipe is discolored due to sunlight, it shall be rejected and removed from the job site. (3) Identification and Markings. Pipe shall have the following information printed indelibly in ink, or molded thereon: manufacturer's lot or control number, manufacturer's name or trade mark, material, type, grade and size. All markings shall be of sufficient permanence to withstand normal handling before and during installation. (4) Storing and Handling Plastic Pipe. Care shall be exercised in handling, loading, unloading and storing pipe to avoid distortion, scratches, gouges, dents and in particular, scuffing of the ends. All plastic pipe shall be stored under cover in a flat, horizontal position, and protected from the sun and all elements until ready for installation. Plastic pipe shall be transported in a vehicle having a bed long enough to provide support for the full length of the pipe. Any length of pipe or fitting that has been damaged or distorted shall be replaced. (5) Certificate from Manufacturer. The successful bidder shall furnish a sworn certificate from the pipe manufacturer that the pipe materials to be furnished are in full compliance with these specification requirements. (6) Fittings for PVC pipe shall be ductile iron unless otherwise indicated. All pipe and fittings shall be dimensionally true, homogeneous, and free from visible cracks, holes, blister, indentations, wrinkles and foreign inclusions. 1

5 (b) PVC (less than 4" diameter). All PVC piping under 4" diameter shall be Schedule 40 PVC conforming to the requirements of ASTM D 1785 with glued joints and threaded joints for valving connections. Fittings shall be socket solvent welding type unless otherwise specified and only solvent cement specified and furnished by the manufacturer of the PVC pipe and fittings shall be used. Solvent for solvent welded fittings shall conform to ASTM D (c) PVC (4" and larger diameter). All PVC 4" and greater diameter shall conform to AWWA C900 with bell and spigot joints. The compound from which the pipe and fittings shall be made shall conform to the requirements of ASTM Standard D1784, Type 1 Grade 1, or Grade 2 and shall provide normal impact strength. Dimensions and tolerances shall be in accordance with the requirements of ASTM D2464 or D2467. PVC shall be JM Pipe Blue Brute or approved equivalent. PVC pipe which connects directly with valves shall be supplied with threaded or union ends. 5. Valves. Prior to delivery, three certified copies of shop test reports shall be submitted to the Engineer for review. Acceptance or rejection of each item for delivery shall be based upon the results of these tests and no valve shall be released for shipment except after acceptance by the Engineer of test reports. (a) Coating Finished Surfaces. (1) All machined parts of equipment furnished which are to be assembled in contact with other finished surfaces after delivery, shall be protected with a heavy coat of suitable, easily removable, rust-preventing compound. (2) All machined surfaces which are in sliding contact with other finished surfaces during operation shall be coated with a grease or shall be immersed in oil which will provide adequate lubrication and prevent corrosion of said parts during shipping, storage and installation. (b) Installation and Protective Coating. Installation of valve shall be in accordance with the manufacturer's recommendations, details shown on the drawings, and the section contained herein titled, Pipeline Tests and Disinfection. (c) Contractor Submittals. Prior to procurement of valves, the Contractor shall submit to Casitas for approval, complete sets of shop drawings of the equipment as required in Division 1, General Requirements, of these specifications. Required drawings shall include complete outline drawings showing overall dimensions, the space requirements for installation and net weight of each valve. There shall be included section assembly drawings showing the general assembly of the valves and operators. Materials of component parts shall be identified by referring to standards of ASTM. (d) Materials and Equipment. (1) Materials. All internal working parts (excluding wedge) shall be all bronze containing not more than 11 percent aluminum or more than 5 percent zinc. All internal working parts shall be lead free. Valve stems shall be cast or forged from bronze having a tensile strength of not less than 60,000 psi, a yield point of 2

6 C509. (e) (f) not less than 30,000 psi and an elongation of not less than 10 percent in 2 inches. Stem nuts shall be of bronze having a tensile strength of not less than 30,000 psi and a yield point of not less than 14,000 psi. Stem seals shall be of the O ring type, providing at least two o-rings in grooves; at least one above the thrust collar and one below in such a manner that the valve may be repacked under pressure in the full open position. Rubber for the resilient seat shall be new, natural or synthetic of a compound designed for water service application, and shall be resistant to microbiological attack, copper poisoning, and ozone attack. Rubber sets shall be bonded to the wedge and fully encapsulated in accordance with ASTM D429 with a peel strength of not less than 75 pounds per inch. (2) End Fittings and Operators. The end flanges for valves shall be flat-faced and shall conform in dimensions and drilling to ANSI B16.1 for cast-iron flanges and flanged fittings, Class 125. Flanges shall be back-faced or spot-faced at the bolt holes. Faces of flanges shall have serrated finish of approximately 32 serrations per inch and approximately 1/64 inch deep. Serrations may be either spiral or concentric. Testing. All valves shall be tested in conformance with the requirements of AWWA Resilient Wedge Gate Valve General. (1) Resilient wedge valves shall be cast or ductile iron body, with non-rising stem and 2" square operating nut. Valves above ground shall have handwheels. The wedge shall be of cast or ductile iron with guide bars or channels. (2) Resilient wedge gate valves shall comply with AWWA C509, except as specifically modified or supplemented by these specifications. (3) Shop Prime Coat. (i) (ii) Exposed ferrous metal surfaces designated for buried service, other than valves, stainless steel and equipment with coatings otherwise specified, shall be covered with a heavy coat of suitable temporary, easily removable, rust-preventing compound. All exposed ferrous metal surfaces, other than stainless steel, which are to be installed in open air shall be shop painted or coated immediately following the cleaning and surface moisture removal. The shop coating shall consist of a priming paint applied to two or more coats by brushing or rolling as required to produce a minimum dry film thickness of 4 mils. Each coat of paint shall be allowed to dry or harden before the succeeding coat is applied. The priming paint shall be Porter's U-Prime, Kopper's Pug Primer, or approved equivalent. 3

7 (iii) All exposed ferrous metal surfaces, other than stainless steel, which are to be installed within concrete structures shall be shop painted or coated immediately following cleaning and surface moisture removal. The shop coating shall consist of one or more coats of RustOleum 9100 High Performance Epoxy, Tnemec Series 66 Epoxoline or Kop Coat 340 Gold Primer as required to achieve a dry film thickness of 3 mils, or an approved equivalent. Primer shall be applied in accordance with the paint manufacturer's directions. (g) Epoxy Resin or Fusion-Bonded Epoxy Coating. (1) All ferrous metal surfaces, other than stainless steel within water passages including, but not limited to valves, pipe, flanges, and couplings shall be coated immediately following cleaning and surface moisture removal. The epoxy resin shall be of the catalyst cured type and shall be non-hydroscopic, non-water soluble, non-toxic, and shall not impart taste or color to drinking water. The minimum film thickness of the cured coating shall be 15 mils for catalyst cured types. (2) The coating shall be of the hard high impact type that has resistance to impact and adhesive qualities so that it will not bruise or lose its adhesion to metal as the result of a blow of a wood, rubber or plastic hammer. Coating material shall have sufficient pigmentation to show evenness and thickness of coating application and the coating shall be applied in strict conformance with the manufacturer's recommendations, and in a manner which will produce molecular bond with the metal and between coats. (3) Epoxy resin coating of the catalyst cured type shall be Keysite - 750", as manufacturer by Soc-Co-Plastic Coating Company, Paramount, California, Tnemec Potapox II No.139 or Induron Ruff Stuff 3300 HMW epoxy. (4) As an alternative to the catalyst cured type epoxy resin, fusion-bonded epoxy coating in conformance with the requirements for materials and application of AWWA C213 shall be allowed. (5) Coating shall be applied in not less than two coats. The completed coating shall be checked for thickness by means of a non-destructive dry film gauge tester, and for pinholes by use of a high frequency spark test at approximately 5,000 volts. All defects in the coating shall be repaired by application of another coat of similar coating material over the same area, and after the coating on the corrected area has properly cured, the area shall again be tested until found acceptable. 4

8 (h) Reference Documents - Commercial Standards. 6. Gaskets. AWWA C509 ASTM D424 ASTM B16.1 Resilient Wedge Gate Valve Rubber Seats Cast Iron Flanges. (a) Gaskets for Flanged Joints. Gaskets for flanged joints shall be 1/8-inch thick, clothinserted rubber. Gaskets shall be suitable for a water pressure of 350 psi at a temperature of 180 F. (b) Full Face Type Gaskets for Flanged Joints. Full face type gaskets with pre-punched holes shall be used where both flanges are flat face, conforming to ASTM D Ring gaskets extending to the inner edge of the bolts may be used where a raised face flange is present. (c) Gaskets for Push-on, Mechanical, and Restrained Joints. Gaskets for push-on, mechanical, and restrained joints shall be synthetic or natural rubber in accordance with AWWA C Flange Bolts. (a) Bolts and nuts for buried flanges, flanges located outdoors above ground, flanges located in open vaults and structures, and submerged flanges shall be Type 316 stainless steel conforming to applicable ASTM standards. Typical underground applications shall be a standard Grade 8 for bolts, and ASTM A 194, Grade 8M for nuts. Hexagonal dimension bolt heads and nuts shall be utilized. Studs shall be of such length that not less than 3 inch or more than 2 inch will project through the nut when drawn tight. All stainless steel bolt threads shall be coated with an approved anti-sieze lubricant prior to installation. A washer shall be provided for each nut. Washers shall be of the same material as the nuts and bolts. (b) Bolt Projection. The length of each bolt or stud shall be such that between 1/4 inch and 3/8 inch will project through the nut when drawn tight. G:\ENGR.WKS\RFP\Upper Ojai Reservoir-temp tanks-see reservoir too\pipelinematerials-modifiedfortemppiping doc 5

9 ATTACHMENT A PIPELINE MATERIALS LIST TEMPORARY PIPING & VALVES Item No. Item description Quantity 1 3" cast or DI AWWA gate valve " 90 deg long radius PVC elbow (sockets) " x 8" x 12" x 8" cross PVC (sockets) 1 4 8" x 8" x 12" bullhead tee PVC " slip socket 150 psi van stone flange PVC 5 6 8"x3"x8"x3" cross PVC "x8"x8" Tee PVC 1 8 1/2" ball valve PVC " threaded by slip (glue) coupling PVC " slip socket 150 psi van stone (floating) flange PVC " gate valve AWWA Class " valve AWWA Class " slip van stone flange Class " 90 deg elbow Class " Flange bolt kit (includes bolts, nuts, washers) Zinc Plated " Flange Bolt Kit (includes bolts, nuts, washers) Zinc Plated " Flange Bolt Kit (includes bolts, nuts, washers) Zinc Plated 3 18 EDPM Gasket for 3" Flange EDPM Gasket for 8" Flange 3 20 EDPM Gasket for 12" Flange 3 21 Spears low VOC Cement PVC-19 or EQ 3 gallons 22 Spears PVC Primer 70 or EQ 2 gallons 23 Spears PVC Cleaner 65 or EQ 1 gallon Pipe 24 3" schedule 40 PVC pipe 50 ft 25 8" schedule 40 PVC pipe 220 ft 26 12" schedule 40 PVC pipe 80 ft 1A Alternate Item for Item No.1 3" threaded PVC ball valve Equivalent to Spears with threaded ends, 150 psi rating 16 All piping, valves and fittings shall be for a minimum working pressure of 150 psi, schedule 40 8" and 12" valves shall be by AVK, Mueller, Pratt or other Casitas approved manufacturer. All components shall be NSF 61 approved for use with potable water Piping, fittings and valves shall meet the attached specifications unless specified differently above. Piping and fittings shall be compatible. G:\ENGR.WKS\RFP\Upper Ojai Reservoir-temp tanks-see reservoir too\pipelinemateriallist-temporarypiping&valves

All definitions are defined according to ANSI/AWWA C

All definitions are defined according to ANSI/AWWA C SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR REDUCED-WALL, RESILIENT-SEATED GATE AND TAPPING VALVES FOR WATER SUPPLY SERVICE 4 IN. THROUGH 48 IN. ANSI/AWWA C515-01 July 2017 1. SCOPE This product specification

More information

All definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10.

All definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10. 21-02 SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR RESILIENT-SEATED GATE AND TAPPING VALVES FOR WATER SUPPLY SERVICE ANSI/AWWA C509-01 3 IN., 4 IN., 6 IN., 8 IN., 10 IN., 12 IN., 16 IN., & 20 IN. Revised

More information

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. NORTH MARIN WATER DISTRICT STANDARD SPECIFICATIONS SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and

More information

SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE SECTION 02622 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE PART 1 - GENERAL 1.1 SCOPE A. The work covered by this section includes furnishing all labor, equipment, and materials required to install and test

More information

INVITATION TO BID. August 3, Dear Vendor,

INVITATION TO BID. August 3, Dear Vendor, INVITATION TO BID August 3, 2016 Dear Vendor, Enclosed you will find a bid package for a Route 13 Water Main Project Materials for the City of Seaford. All pertinent information is contained within. The

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 11294 - Stainless Steel Sluice Gates C O N T E N T S PART 1 - GENERAL... 1 1.01 SUMMARY... 1 1.02 REFERENCES... 1 1.03 DEFINITIONS... 1 1.04 DESIGN REQUIREMENTS...

More information

SECTION FIRE HYDRANTS

SECTION FIRE HYDRANTS SECTION 02080 FIRE HYDRANTS PART 1 - GENERAL 1.01 DESCRIPTION A. Work Specified The work specified shall include all labor, material, equipment, tools, services and incidentals necessary to furnish and

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Plastic (PVC) Pressure Water Pipe & Fittings C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Plastic (PVC) Pressure Water Pipe & Fittings C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 15064 - Plastic (PVC) Pressure Water Pipe & Fittings C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 DELIVERY... 1 1.03 QUALITY ASSURANCE...

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

REGIONAL CONSTRUCTION STANDARDS

REGIONAL CONSTRUCTION STANDARDS REGIONAL CONSTRUCTION STANDARDS SIXTH EDITION Publication Update 6.1 (Full Committee Approved Proposed Revision 6.1 Ductile Iron Pipe Protections - Section 200 As Publication Update 6.1) March 27, 2018

More information

CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION

CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION ADDENDUM #4 DATE: 02/08/2016 PROJECT: CONTRACT No: 40604 BID DATE, TIME: 02/11/2016, 2:00PM NOTICE TO ALL CONTRACTORS

More information

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,

More information

SECTION TAPPING SLEEVES AND VALVES

SECTION TAPPING SLEEVES AND VALVES SECTION 33 12 16.17 TAPPING SLEEVES AND VALVES PART 1: GENERAL 1.01 SCOPE Furnish, install and test all tapping sleeves, tapping valves, and tapping saddles as shown on the Drawings. 1.02 RELATED WORK

More information

American Flow control 2-12 Series 2500

American Flow control 2-12 Series 2500 American Flow control 2-12 Series 2500 Resilient wedge gate valve FLOW CONTROL Construction Ductile iron operating nut Provides strength and durability. Upper O-ring seals Can be replaced while the valve

More information

CALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No ADDENDUM 2

CALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No ADDENDUM 2 CALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No. 11078 ADDENDUM 2 Date Issued: December 2, 2015 **** Receipt of addenda must be acknowledged

More information

AMERICAN DARLING MARK

AMERICAN DARLING MARK 2 12 250 p.s.i.g. SERIES 2500 RESILIENT WEDGE GATE VALVE AMERICAN FLOW CONTROL AMERICAN DARLING MARK 73 2 FIRE HYDRANT It s What We Know. CONSTRUCTION UPPER O-RING SEALS can be replaced while the valve

More information

DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS

DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS General All Materials shall be EN, ISO or equivalent standard and shall be supplied from approved manufacturers. According to the International

More information

AMERICAN FLOW CONTROL 2"-12" SERIES 2500 RESILIENT WEDGE GATE VALVE

AMERICAN FLOW CONTROL 2-12 SERIES 2500 RESILIENT WEDGE GATE VALVE AMERICAN FLOW CONTROL 2"-12" SERIES 2500 RESILIENT WEDGE GATE VALVE CONSTRUCTION DUCTILE IRON OPERATING NUT Provides strength and durability. UPPER O-RING SEALS Helps isolate the lubrication chamber as

More information

SECTION FIRE HYDRANTS

SECTION FIRE HYDRANTS SECTION 21 11 10 PART 1. GENERAL 1.1 SUMMARY: A. Work consists of furnishing and installing new fire hydrants, (boot with ductile iron retainer gland, standpipe and hydrant complete) plus constructing

More information

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE PART 1 - GENERAL 1.1 DESCRIPTION A. This section designates the requirements for the manufacture and installation of polyvinyl chloride, abbreviated PVC, pressure pipe. 1.2 RELATED WORK SPECIFIED ELSEWHERE

More information

D-1 FIRE PROTECTION PRODUCTS TAPPING VALVE. MUELLER Tapping Valves. MUELLER Tapping Sleeves and Crosses. MUELLER Stainless Steel Tapping Sleeves

D-1 FIRE PROTECTION PRODUCTS TAPPING VALVE. MUELLER Tapping Valves. MUELLER Tapping Sleeves and Crosses. MUELLER Stainless Steel Tapping Sleeves TAPPING VALVE MUELLER Tapping Sleeves and Crosses Full range of Tapping Sleeves and Crosses to fit most types of pipe including cast iron, ductile iron, A-C, and cast iron O.D. PVC--Also outlet sealed

More information

SECTION ALUMINUM GATES

SECTION ALUMINUM GATES P.O. Box 1058 370 South Athol Rd. Athol, Massachusetts 01331 Phone: (978) 249-7924 Fax: (978) 249-3072 SECTION ALUMINUM GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The CONTRACTOR shall furnish all labor,

More information

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction. General: 1. Construct utilities in accordance to TWA approved plans and shop drawings. Any deviation from the approved plans shall be approved by the DEVELOPER S ENGINEER and TWA 2. A preconstruction meeting

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

SECTION 027 SPECIFICATIONS - PIPE MATERIALS FOR SEWERS

SECTION 027 SPECIFICATIONS - PIPE MATERIALS FOR SEWERS SECTION 027 SPECIFICATIONS - PIPE MATERIALS FOR SEWERS Pipe material used to construct, repair or modify sewers shall conform to the specifications within this Section. 1.0 Clay Pipe Construction of clay

More information

SECTION ROLLER GATES

SECTION ROLLER GATES GENERAL SUMMARY A. The Contractor shall provide all labor, materials, equipment, and incidentals required to furnish and install roller gates, complete and operational with all necessary accessories as

More information

C900/RJ. CertainTeed. PVC Pipe. with CertainTeed s proven Certa-Lok restrained joint system. Directional Drilling

C900/RJ. CertainTeed. PVC Pipe. with CertainTeed s proven Certa-Lok restrained joint system. Directional Drilling 1 1 CertainTeed C900/RJ PVC Pipe with CertainTeed s proven Certa-Lok restrained joint system Directional Drilling Underground Water Mains and Restrained, Non-Metallic Change-of-Direction Fittings (No Thrust

More information

ARTICLE 26 UTILITY LINE INSTALLATION REQUIREMENTS

ARTICLE 26 UTILITY LINE INSTALLATION REQUIREMENTS UTILITY LINE INSTALLATION REQUIREMENTS Index 26.01 JACK AND BORE OPERATIONS 26.02 PRESSURE PIPE RESTRAINT 26.03 PRESSURE CONNECTION BACK TO TABLE OF CONTENTS Section 26.01 JACK AND BORE OPERATIONS 26.01.01

More information

SUPPLEMENTAL SPECIFICATIONS TO STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION NO. 2611

SUPPLEMENTAL SPECIFICATIONS TO STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION NO. 2611 Revised October 10, 2014 SUPPLEMENTAL SPECIFICATIONS TO STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION NO. 2611 Water Main and Service Line Installation shall be in accordance with

More information

UL / FM D-1 FIRE PROTECTION PRODUCTS TAPPING VALVE. MUELLER Tapping Sleeves and Crosses. MUELLER Tapping Valves

UL / FM D-1 FIRE PROTECTION PRODUCTS TAPPING VALVE. MUELLER Tapping Sleeves and Crosses. MUELLER Tapping Valves UL / FM TAPPING VALVE SECTION Rev. 2-15 MUELLER Tapping Sleeves and Crosses Full range of Tapping Sleeves and Crosses to fit most types of pipe including cast iron, ductile iron, A-C, and cast iron O.D.

More information

12.1 MUELLER TAPPING MATERIALS AND SPECIALTY VALVES. MUELLER Tapping Sleeves and Crosses. MUELLER Tapping Valves. MUELLER Stainless Steel Tapping

12.1 MUELLER TAPPING MATERIALS AND SPECIALTY VALVES. MUELLER Tapping Sleeves and Crosses. MUELLER Tapping Valves. MUELLER Stainless Steel Tapping MUELLER TAPPING MATERIALS AND SPECIALTY VALVES 12.1 Shaded area indicates change Rev. 7-16 MUELLER Tapping Sleeves and Crosses Full range of Tapping Sleeves and Crosses to fit most types of pipe including

More information

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1 GENERAL: The scope of this document is to provide instruction for the installation and testing of chilled water piping installed for the University of Missouri. DESIGN GUIDELINES: 1. Materials 1.1. Pipe

More information

Water & Industrial Products Catalog

Water & Industrial Products Catalog Water & Industrial Products Catalog www.smith-blair.com info@smith-blair.com Phone: 800..9705 or 870.77.527 After Hours Number: 90.277.998 Fax: 800.8.792 or 870.77.52 EMERGENCY PHONE 90.277.998 In the

More information

SECTION VALVES. This section includes materials, testing, and installation of manually operated valves.

SECTION VALVES. This section includes materials, testing, and installation of manually operated valves. PART 1 GENERAL 1.1 DESCRIPTION This section includes materials, testing, and installation of manually operated valves. Manual valves to be supplied and installed per ANSI/AWWA C504, C507, and C509, unless

More information

MATERIAL/MANUFACTURER SPECIFICATIONS FOR DISTRIBUTION WATER MAINS AND APPURTENANCES

MATERIAL/MANUFACTURER SPECIFICATIONS FOR DISTRIBUTION WATER MAINS AND APPURTENANCES MATERIAL/MANUFACTURER SPECIFICATIONS FOR DISTRIBUTION WATER MAINS AND APPURTENANCES REVISION April 2008 1 MATERIAL SPECIFICATIONS T.S. 1 GENERAL Materials incorporated in the finished work and used during

More information

KENT COUNTY WATER AUTHORITY. ERRATUM to Rules and Regulations of the Kent County Water Authority

KENT COUNTY WATER AUTHORITY. ERRATUM to Rules and Regulations of the Kent County Water Authority KENT COUNTY WATER AUTHORITY ERRATUM to Rules and Regulations of the Kent County Water Authority Section 4.9.1.1 Resilient Seat Gate 4 inch to 12 inch: Replace with the attached. Section 4.9.1.3 Tapping

More information

C900/RJ. CertainTeed. PVC Pipe. with CertainTeed s proven Certa-Lok restrained joint system. Directional Drilling

C900/RJ. CertainTeed. PVC Pipe. with CertainTeed s proven Certa-Lok restrained joint system. Directional Drilling 1 CertainTeed C900/RJ PVC Pipe with CertainTeed s proven Certa-Lok restrained joint system Directional Drilling Underground Water Mains and Restrained, Non-Metallic Change-of-Direction Fittings (No Thrust

More information

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL SECTION 02610 PIPE & PIPE FITTINGS PART 1 GENERAL 1.01 DESCRIPTION A. This Section includes the material and bedding requirements for all pipe and pipe fittings for underground pressure and non-pressure

More information

Section FLUSHING HYDRANTS

Section FLUSHING HYDRANTS STANDARD SPECIFICATION Section 02520 PART 1 GENERAL 1.01 SUMMARY This Section includes: A. Flushing hydrants. B. Adjustment of flushing hydrants and gate valves. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices.

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section DUCTILE IRON PIPE AND FITTINGS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section DUCTILE IRON PIPE AND FITTINGS Section 02501 PART 1 GENERAL 1.01 SUMMARY This Section includes ductile iron pipe and fittings for water lines, wastewater force mains, gravity sanitary sewers, and storm sewers. 1.02 MEASUREMENT AND PAYMENT

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS ITEM NO. 848 SANITARY SEWERS 848.1 DESCRIPTION: This item shall govern the furnishing, installation and jointing of sanitary sewer pipe of the size and type specified by the project's plans and specifications.

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

PART 2 SECTION 9 WATERLINES

PART 2 SECTION 9 WATERLINES PART 2 SECTION 9 WATERLINES 9-1 General - All pipe, pipeline installations and facilities related thereto, shall be as specified herein. All pipe installation shall be in accordance with the manufacturers

More information

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. PART 1 - GENERAL 1.1 DESCRIPTION A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 01300 Record

More information

Stainless Steel Aeration Equipment Specification

Stainless Steel Aeration Equipment Specification Section 15 Stainless Steel Aeration Equipment Specification Part 1 - General 1.01 Description A. Scope of Work 1. Furnish, install and test aeration system including air mains, drop pipes, valves, expansion

More information

CVO/169897A OCTOBER 29, CONVEYANCE PIPING GENERAL

CVO/169897A OCTOBER 29, CONVEYANCE PIPING GENERAL SECTION 02500 CONVEYANCE PIPING - GENERAL PART 1 GENERAL 1.1 REFERENCES A. The following is a list of standards which may be referenced in this section: 1. American Concrete Institute (ACI): 301, Standard

More information

SECTION SLUICE GATES

SECTION SLUICE GATES SECTION 11100 SLUICE GATES PART 1--GENERAL Fill in the blank with a short description of sluice gate usage, i.e., for isolation of wastewater, or for tank drainage, or for control of water surface. 1.01

More information

SECTION WATER DISTRIBUTION

SECTION WATER DISTRIBUTION SECTION 33 10 00 WATER DISTRIBUTION PART 1 GENERAL 1.01 SUMMARY 1.02 CODES A. Section Includes: 1. Underground water service piping, watermains and appurtenances. A. All work shall comply with the most

More information

SECTION 401 WATER PIPE AND FITTINGS 2.2 POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS

SECTION 401 WATER PIPE AND FITTINGS 2.2 POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS SECTION 401 PIPE AND FITTINGS PART 2 MATERIALS 2.2 POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS A. PVC Pressure Pipe sizes 4 inch through 12 inch: ANSI/AWWA C 900 1. DR18 B. PVC Pressure Pipe sizes 14 inch

More information

SECTION LAYING AND JOINTING BURIED PIPELINES

SECTION LAYING AND JOINTING BURIED PIPELINES SECTION 02650 LINES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Installation of all underground pipelines. Provide pipeline materials, coatings and linings as specified and pipe of the types, sizes

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances

More information

SECTION PIPING SPECIALTIES AND ACCESSORIES

SECTION PIPING SPECIALTIES AND ACCESSORIES SECTION 15120 PIPING SPECIALTIES AND ACCESSORIES PART 1 - GENERAL 1.01 DESCRIPTION A. Work Specified 1. CONTRACTOR shall provide all labor, materials, equipment, tools, services, and incidentals necessary

More information

DUCTILE IRON PIPE AND FITTINGS

DUCTILE IRON PIPE AND FITTINGS Section 02501 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Ductile iron pipe and fittings for water lines, wastewater force mains, gravity sanitary sewers, and storm sewers. 1.02 MEASUREMENT AND PAYMENT

More information

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces. SECTION 05500- METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns. PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION SECTION 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 - GENERAL 1.1 SUMMARY A. This section supplements all sections in this division, including pipe, fittings, valves, and connections for sprinkler

More information

APPENDIX C TECHNICAL SPECIFICATIONS HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS

APPENDIX C TECHNICAL SPECIFICATIONS HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION: C TECHNICAL SPECIFICATIONS HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS Scope This section specifies high density polyethylene pipe (HDPE) and fittings for water

More information

SECTION 13. A. Extent of Work: The requirements of this section apply to the piping systems specified elsewhere in these specifications.

SECTION 13. A. Extent of Work: The requirements of this section apply to the piping systems specified elsewhere in these specifications. SECTION 13 PIPE, TUBE AND PART 1 - GENERAL 1.01 DESCRIPTION A. Extent of Work: The requirements of this section apply to the piping systems specified elsewhere in these specifications. 1.02 QUALITY ASSURANCE

More information

Wide-Range Restraint Solutions

Wide-Range Restraint Solutions HYMAX GRIP Wide-Range Restraint Solutions HYMAX GRIP. THE TEETH MAKE THE DIFFERENCE. There are many situations that require couplings with additional restraining power. HYMAX restraint products combine

More information

SEWER FORCE MAIN HDPE PIPE

SEWER FORCE MAIN HDPE PIPE SECTION 15150 SEWER FORCE MAIN HDPE PIPE PART 1: GENERAL 1-1 DESCRIPTION: This specification governs the material, pipe, fittings, joining methods and general construction practice for High Density Polyethylene

More information

CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER

CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER WATER MAIN 1. All open cut water main shall be polyvinyl chloride plastic (PVC) pressure pipe per AWWA specification

More information

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS SECTION 02670 UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of containment

More information

SECTION PIPING SPECIALS

SECTION PIPING SPECIALS PART 1 GENERAL 1.01 DESCRIPTION A. Work Included The Contractor shall furnish, install, and test the miscellaneous pipeline equipment, complete with accessories, and special equipment as shown on the Contract

More information

Request for Bids Water Department. City of Portsmouth, New Hampshire Water Inventory Bid #33-08

Request for Bids Water Department. City of Portsmouth, New Hampshire Water Inventory Bid #33-08 Request for Bids Water Department City of Portsmouth, New Hampshire Water Inventory Bid #33-08 1 Bid #33-08 Portsmouth, New Hampshire Public Works Department Water Inventory INVITATION TO BID Sealed bid

More information

CHINO VALLEY FIRE DISTRICT FIRE PROTECTION STANDARD

CHINO VALLEY FIRE DISTRICT FIRE PROTECTION STANDARD CHINO VALLEY FIRE DISTRICT FIRE PROTECTION STANDARD SPECIFICATIONS Establishing Minimum Standards for as Related To Fire Protection STANDARD # 103 REVISED 04/01/19 PAGES 7 SCOPE: These specifications shall

More information

C. The internal seal may be interlocked with adjoining seals to provide a continuous interlocking sleeving system.

C. The internal seal may be interlocked with adjoining seals to provide a continuous interlocking sleeving system. PART 1 GENERAL 1.1 SUMMARY A. The work covered under this specification includes the furnishing of all materials, tools, equipment, and labor related to operations in connection with the repair and rehabilitation

More information

UNI-BELL PVC PIPE ASSOCIATION UNI-B-15-10

UNI-BELL PVC PIPE ASSOCIATION UNI-B-15-10 UNI-BELL PVC PIPE ASSOCIATION UNI-B-15-10 RECOMMENDED STANDARD SPECIFICATION FOR POLYVINYL CHLORIDE (PVC) FABRICATED PRESSURE FITTINGS November 2010 UNI-BELL PVC PIPE ASSOCIATION 2711 LBJ Freeway, Suite

More information

DIVISION 5 METALS SECTION STRUCTURAL STEEL

DIVISION 5 METALS SECTION STRUCTURAL STEEL DIVISION 5 METALS SECTION 05 12 00 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: All labor and materials required to furnish and install the structural steel shown on the Drawings and required by these

More information

PVC PRESSURE FITTINGS

PVC PRESSURE FITTINGS GUIDE FOR PVC PRESSURE FITTINGS TABLE OF CONTENTS Introduction 3 Standards and Specifications 3 Products 4 Manufacturing Methods 8 Fabricated Fittings 8 Injection-Molded Fittings 9 Machined Couplings 9

More information

STANDARD SPECIFICATION FOR ALUMINUM FRAMING FOR RAILROAD PASSENGER SHELTERS

STANDARD SPECIFICATION FOR ALUMINUM FRAMING FOR RAILROAD PASSENGER SHELTERS SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 STANDARD SPECIFICATION FOR ALUMINUM FRAMING FOR RAILROAD PASSENGER SHELTERS REVISION DATE SPECIFICATION # F-S-304_

More information

Available End Connections & Size Range

Available End Connections & Size Range ECCENTRIC PLUG VALVES Size Range 3"-24" Water Working Hydrostatic Size Range Pressure psi Test psi 3"-12" 175 350 14"-24" 150 300 Available End Connections & Size Range Figure No. Flanged 3"-24" F-5412

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION Request for Offer (RFO) SUPPLY AND DELIVERY OF DUCTILE IRON CEMENT LINED PRESSURE PIPES AND FITTINGS FOR HURSLEY ROAD AND TOOWOOMBA CECIL PLAINS ROAD (GREENWATTLE

More information

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B SECTION 05 5213 - PIPE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION of GENERAL. A. Description

SECTION of GENERAL. A. Description SECTION 15210-1 of 10 15210.01 GENERAL A. Description This section includes requirements for interior piping and fittings, buried and interior valves and specialty items used in conjunction with piping

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

INTERNAL MECHANICAL JOINT SEAL FOR INDUSTRIAL & MUNICIPAL PIPING

INTERNAL MECHANICAL JOINT SEAL FOR INDUSTRIAL & MUNICIPAL PIPING INTERNAL MECHANICAL JOINT SEAL FOR INDUSTRIAL & MUNICIPAL PIPING PART 1 GENERAL 1.1 SUMMARY A. The work covered under this specification includes the furnishing of all materials, tools, equipment, and

More information

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 7

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 7 September 2013 Page 1 of 7 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of a wetwell as shown on the Plans and in accordance with Section 01001,

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

SECTION WASTEWATER FORCE MAINS

SECTION WASTEWATER FORCE MAINS SECTION 02732 WASTEWATER FORCE MAINS PART - GENERAL 1.01 GENERAL: A. This section includes the general requirements for design and installation of force main systems serving wastewater lift stations. B.

More information

SECTION 716 SIGN MATERIALS SCOPE

SECTION 716 SIGN MATERIALS SCOPE 716 716.01.01 MATERIALS COVERED SECTION 716 SIGN MATERIALS SCOPE A. This specification covers the kind and quality of materials used in the construction and fabrication of traffic control devices used

More information

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. POLYURETHANE COATING ON STEEL PIPE PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2 REFERENCE SPECIFICATIONS,

More information

SECTION STRUCTURAL METAL FRAMING

SECTION STRUCTURAL METAL FRAMING SECTION 05100 STRUCTURAL METAL FRAMING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Structural steel framing including lintels, shelf angles, bearing plates, anchor bolts and other items as shown on

More information

Davis and Weber Counties Canal Company

Davis and Weber Counties Canal Company PRESSURIZED SECONDARY WATER CONSTRUCTION SPECIFICATIONS For Davis and Weber Counties Canal Company January 2016 1 SECTION 1: GENERAL QUALITY CONTROL REQUIREMENTS 1.1 SCOPE: This section defines the general

More information

SECTION PLUMBING PIPING

SECTION PLUMBING PIPING SECTION 22 1000 PLUMBING PIPING PART 1 GENERAL 1.1 QUALITY ASSURANCE A. Perform Work in accordance with authority having jurisdiction standards. Utilize products as indicated in drawings and as allowed

More information

STANDARD SPECIFICATION SECTION POLYVINYL CHLORIDE (PVC) DISTRIBUTION PIPE (AWWA C905)

STANDARD SPECIFICATION SECTION POLYVINYL CHLORIDE (PVC) DISTRIBUTION PIPE (AWWA C905) STANDARD SPECIFICATION SECTION 15293 POLYVINYL CHLORIDE (PVC) DISTRIBUTION PIPE (AWWA C905) PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, installation, and testing of PVC distribution

More information

Testing. Test drainage products according to the applicable AASHTO or ASTM specification, except as otherwise noted.

Testing. Test drainage products according to the applicable AASHTO or ASTM specification, except as otherwise noted. 909.01 Section 909. DRAINAGE PRODUCTS 909.01 General Requirements. If only the size and class are specified for a culvert or sewer, use the pipe materials as shown in Table 401-1 and 402-1 respectively.

More information

PIPE AND FITTINGS. Submit product information sheet for joint restraint system to be used.

PIPE AND FITTINGS. Submit product information sheet for joint restraint system to be used. PIPE AND FITTINGS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe B. Fittings C. Special Fittings D. Pipeline Accessories 1.02 DESCRIPTION OF WORK Construct water mains and building service pipes. 1.03

More information

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections. SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity

More information

SECTION 200 SANITARY SEWER MATERIAL SPECIFICATIONS

SECTION 200 SANITARY SEWER MATERIAL SPECIFICATIONS SECTION 200 SANITARY SEWER MATERIAL SPECIFICATIONS 200-1 MATERIAL SPECIFICATION LIST Rev. May 2011 SEWER UTILITY General: 1. All manufacturers products listed are preferred. Others may be submitted to

More information

SECTION CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION

SECTION CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION SECTION 22 11 16.13 CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION PART 1: GENERAL 1.01 SUMMARY A. This Section includes water-distribution backflow prevention products and installation specifications.

More information

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS [OR WOOD] PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION MISCELLANEOUS METALS

SECTION MISCELLANEOUS METALS PART 1 GENERAL 1.1 WORK OF THIS SECTION A. Contractor shall provide all labor, materials, equipment and incidentals as shown, specified and required to furnish and install all miscellaneous metal fabrications

More information

GUJARAT NARMADA VALLEY FERTILIZERS & CHEMICALS LIMITED

GUJARAT NARMADA VALLEY FERTILIZERS & CHEMICALS LIMITED CONTENTS 1. Scope 2. Referenced Documents 3. Abbreviations 4. Materials and Manufacture 5. Dimensions 6. Inspections and Tests 7. Markings 8. Preparation for Shipment - 1 - 1. Scope 1.1 This specification

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

FABRICATED STEEL PIPE AND SPECIALS

FABRICATED STEEL PIPE AND SPECIALS SECTION 02420 - PART 1 -- GENERAL 1.1 WORK OF THIS SECTION A. The WORK of this Section includes providing fabricated steel pipe, specials and connections to new and existing piping. Polyurethane and fusion

More information

SECTION WATER DISTRIBUTION SYSTEM

SECTION WATER DISTRIBUTION SYSTEM Conditions of Use/ Responsibility of Data Montgomery County Public Schools Facilities Guide DIVISION 2 - SITE WORK These guideline specifications are to be used by the A/E as a base document in the development

More information

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION POLYETHYLENE PRESSURE PIPE

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION POLYETHYLENE PRESSURE PIPE SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 33 11 13.24 POLYETHYLENE PRESSURE PIPE PART 1 GENERAL... 2 1.1 Description... 2 1.2 Reference Specification... 2 1.3

More information

1. Required Minimum Flow:

1. Required Minimum Flow: SECTION 6 6. 6.01 General The City of Castle Rock Water System Minimum Standards and Specifications are minimum base level performance, design, and construction standards used to maintain uniformity of

More information

University of Central Florida Main Campus. Domestic Water. Service and Meter Installations Requirements. Issued January 26 th, 2017.

University of Central Florida Main Campus. Domestic Water. Service and Meter Installations Requirements. Issued January 26 th, 2017. University of Central Florida Main Campus Domestic Water Service and Meter Installations Requirements Issued January 26 th, 2017 1 P a g e Table of Contents 1. GENERAL INFORMATION... 3 2. DEFINITIONS...

More information