1 PART 1 GENERAL 1.01 DESCRIPTION A. SCOPE ULTRAVIOLET LIGHT CIPP LINING OF EXISTING SEWERS This contract covers the rehabilitation of severely deteriorated existing sanitary and combined sewers by lining using the following approved process: Ultra-violet light cured-in-place pipe (CIPP). The primary contract objective is the structural and hydraulic renewal of the existing sewer main. This specification pertains to the rehabilitation of main line sewers including cleaning and televising of the sewers in addition to the reinstatement of tap connections. The project is composed of approximately 1,153-feet of 12 sanitary and combined sewers. See Appendix A for lining locations and pipe section data. Liner thickness shall be designed by the contractor in accordance with this specification. The contractor shall begin construction within 14 days of issuance of the Notice to Proceed and complete all work no later than December 31, In conjunction with rehabilitating the sewer sections and related appurtenances specified in this project, the contractor shall excavate and repair sewer mains as necessary or specified, clean and televise sewers, reconnect existing sewer service connections, and provide all submittals required by this specification. Television inspection includes televising immediately before lining, televising after lining, televising after making repairs to correct liner defects, and televising after rehabilitating lateral connections. A predetermined, lump sum amount of five hundred dollars ($500.00) is included in the list of bid items to cover the cost of permits that may be required for the contractor to perform work in the public right-of-way. MSD will reimburse the contractor for actual permit fees charged by the various municipalities. Award of the contract will be determined through an evaluation of bids and made in light of the best interest of MSD. The contractor shall furnish all labor, components, materials, tools, and appurtenances necessary for the performance and completion of the contract. Copies of all internal pipe inspection videos, reports and project maps are included in the bid documents. This is considered by MSD to be the best available information; however, there are occasional inaccuracies and errors. As such, the contractor shall bear the ultimate responsibility for verifying actual field conditions and reporting any discrepancies to the MSD Project Manager prior to bid and construction. Change orders will not be issued during construction based solely on inaccurate information in the bid documents. The contractor shall be held fully liable for any damages incurred during the installation of liners that are caused by its negligence or the negligence of its subcontractor(s). The contractor shall hold harmless the City of Cincinnati and the Hamilton County Board of County Commissioners Page 1 of 12

2 and all its representatives from all suits, actions, of claims of any character brought on account of any injuries or damages sustained by any person or persons or property in the performance of this contract. Patents, Trade Secrets and Copyrights. The contractor shall pay all license fees and royalties and assume all costs incidental to the use in the performance of the work or the incorporation in the work of any invention, design, process, product or device which is the subject of patent rights, trade secrets protection rights, or copyrights held by others. The contractor shall indemnify and hold harmless the owner and engineer and anyone directly or indirectly employed by either of them from and against all claims, damages, losses and expenses (including attorney s fees and court and arbitration costs) arising out of any infringement of patent rights, trade secret protection rights, or copyrights incident to the use in the performance of the work or resulting from the incorporation in the work of any invention, design, process, product or device not specified in the contract documents, and shall defend all such claims in connection with any alleged infringement of such rights. B. MSD PROJECT CONTACTS This contract will be administered and performed under the direction and inspection of the MSD Project Engineer/Manager, Michael Stevens, P.E., Wastewater Collection Division, 225 West Galbraith Road, Cincinnati, Ohio 45215, telephone number All technical questions should be directed to the Project Engineer/Manager. All contract-related questions should be directed to Donald Cahill, Wastewater Engineering Division, at C. REQUIREMENTS Contractor shall provide and install a resin impregnated fiberglass material tube with a plastic coated wearing surface in all sewers identified for CIPP lining in accordance with American Society for Testing and Materials ASTM F1216 and ASTM F QUALITY ASSURANCE A. REFERENCES This section contains references to the following documents. They are a part of this section as specified and modified. In case of conflict between the requirements of this section and those of the listed documents, the requirements of this section shall prevail. Reference ASTM D543 ASTM D543 ASTM D790 ASTM D883 ASTM D1600 ASTM F412 Title Test Method for Resistance of Plastics to Chemical Reagents Test Method for Tensile Properties of Plastics Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials Definitions and Terms Relating to Plastics Abbreviations, Acronyms, and Codes for Terms Relating to Plastics Definitions of Terms relating to Plastic Piping Systems Page 2 of 12

3 ASTM F1216 ASTM F 2019 Rehabilitation of Existing Pipelines and Conduits by Inversion and Curing of a Resin Impregnated Tube Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic (GRP) Cured-in-Place Thermosetting Resin Pipe (CIPP) B. CIPP LINER SAMPLES 1. SAMPLE PREPARATION: The Contractor shall prepare samples of the installed CIPP liner for subsequent testing of its physical properties. Samples shall be prepared and tested using the flat plate sampling method in accordance with the procedures in Section 8.1 of ASTM F1216 or ASTM F2019, as is applicable. The sample will be constructed on the same materials (tube and resin/catalyst) as is used for that given liner installation. The flat plate sample shall be large enough to provide five sample specimens for each Short Term Flexural (Bending) properties as per ASTM D790 and ASTM D638 respectively. 2. SAMPLE TESTING. The cured sample shall be tested by an independent testing laboratory, as recommended by the CIPP liner manufacturer and approved by the Engineer, for the bending and tensile properties, as per ASTM D790 and ASTM D638 respectively. Final payment will not be made until test results are received. The Contractor shall be responsible for any deviation from the specified physical properties and those evaluated through testing. Failure to meet the specified physical properties will result in the CIPP liner being considered defective work which will be handled in accordance with MAG Section 106. The Contractor shall be responsible for all costs associated with the testing of the liner physical properties. 3. SAMPLING FREQUENCY: The above-stated sampling shall be performed for each separate installation of CIPP. For example: one flat plate sample from each individual pipeline liner installed. 4. WALL THICKNESS: The wall thickness of the material tube shall be ordered to the next calculated design thickness. Unless otherwise specified to provide for excess resin migration, the gap thickness of the wetting-out equipment shall be sized to allow an excess of 5 to 10 percent resin to pass during impregnation. The minimum wall thickness shall be determined at a minimum of three locations on a cut section of the CIPP flat plate sample using a method of measurement accurate to the nearest inch. The minimum value shall meet the requirements of Section C. CIPP LINER HANDLING Contractor shall exercise adequate care during transportation, handling, and installation to ensure the CIPP material is not torn, cut, or otherwise damaged. If any part or parts of the CIPP materials becomes torn, cut, or otherwise damaged before or during insertion, it shall be repaired or replaced in accordance with the manufacturer s recommendations and approval by the Engineer before proceeding further; and at the Contractor s expense. Page 3 of 12

4 D. WARRANTY: The Contractor shall warrant the completed work against defect in workmanship and material for a period of one year. The Engineer, while not acting as quality control agent for the Contractor, shall be allowed to view and document any portion of this contract, including but not limited to, verifying type and quantities of resin used at any point during this work. Finished and cured CIPP liner properties specified in Part 2 shall be tested as specified. Previous test data will not be acceptable SUBMITTALS The following submittals shall be provided: PART 2 PRODUCTS 2.01 GENERAL 1. Shop drawings which detail short and long term properties (providing all supporting rest data) of all component materials and construction and recommendations for material storage and temperature control, CIPP liner handling, insertion, curing, trimming and finishing. The submittal shall also include structural calculations for each CIPP liner size, the recommended thicknesses, and the method and equipment used to reinstate connecting sewers. 2. Detailed method for addressing sampling requirements. 3. CCTV Inspection reports as specified in Subsection Manufacturer s recommended installation procedures. 5. A safety plan is required prior to construction and shall include any applicable Material Safety Data Sheets (MSDS) sheets. A. All materials and installation procedures provided by the Contractor for use in the CIPP installation process shall be equal to or exceed the requirements of Sections 5 and 7 of ASTM F1216 or ASTM F2019 Section 5 and 6, as is applicable. B. Wrinkles in the finished liner pipe which cause a backwater of one (1) inch or more or reduce the hydraulic capacity of the pipe (wrinkles which exceed five (5) percent of the pipe diameter) are unacceptable and shall be removed or repaired by the Contractor at no additional cost to the Owner. Wrinkles in the finished liner pipe that reduce the structural stability of the pipe are unacceptable. If a void between the wrinkle and the pipe exists, the Contractor shall repair or replace that section of the pipe at no additional cost to the Owner. Methods of repair shall be proposed by the Contractor and submitted to the Engineer for review. C. Contractor shall be responsible for control of all material and process variables to provide a finished CIPP possessing the minimum properties specified in ASTM F1216 or ASTM F2019, as is applicable and supplemented herein. Page 4 of 12

5 2.02 MANUFACTURERS A. Approved CIPP liner manufacturers are LightStream, LP/StreamlinerUV, 2.03 CHEMICAL RESISTANCE A. DOMESTIC SEWAGE The chemical resistance tests should be completed in accordance with Test Method D543. Exposure should be for a minimum of one month at 73.4 degrees F. During this period, the CIPP test specimens should lose no more than 20 percent of their initial flexural strength and flexural modulus when tested in accordance with Section 8 of ASTM F1216 or ASTM F1743, whichever is applicable, when subjected to the following solutions: Chemical Solution Tap Water (ph 6-9) Nitric Acid Phosphoric Acid Sulfuric Acid Gasoline Vegetable Oil Detergent Soap Concentration, percent The Contractor shall be responsible for all costs associated with the chemical resistance tests. Proof of meeting these requirements shall be provided to the engineer for approval at least seven (7) days prior to commencement of work COMPONENT PROPERTIES A. FIBERGLASS TUBING The fiberglass tubing shall be made of non corrosion material and shall be free from tears, holes, cuts, foreign materials and other surface defects. B. RESINS The physical properties quoted in Section 2.05A apply to CIPP manufactured polyester or vinylester resin. Resins should be appropriate for conditions encountered FINISHED AND CURED CIPP LINER PROPERTIES A. The physical properties of the cured CIPP shall have minimum initial test values as given in Table 1 for polyester and vinylester resins. Properties for these or any other enhanced resins shall be substantiated with test data. Table 1. Standard Resin Test Property Test Value Test Method Page 5 of 12

6 Flexural strength Flexural modulus 25,000 psi 1,200,000 psi ASTM D790 ASTM D DIMENSIONS A. Contractor shall make allowances in determining the inliner tube length and circumference for stretch during installation and shrinkage during curing. The minimum length shall be that which continuously spans the distance from the center of the inlet manhole to the center of the outlet manhole. The Contractor shall verify the lengths in the field before the inliner tube is cut and impregnated. Individual installation runs may include one or more manhole-to-manhole sections as approved by the Engineer. Installation of the liner shall be through existing or new manholes. Excavation for liner insertion shall not be permitted except to replace the manhole cones, if necessary and/or required. B. The diameter of the existing pipes may be larger than the nominal inside diameter. It is the Contractor s responsibility to determine the required diameter of the liner. C. The maximum wall thickness shall be at least the calculated design thickness, or the minimum specified, to increase the diameter only as much as necessary DESIGN CRITERIA A. The liner shall be designed for a fully deteriorated pipe condition in accordance with the procedures of ASTM F1216, Appendix XI and these specifications. All material properties used in design calculations shall be long-term (time-corrected) values. The Contractor shall be familiar with the existing site conditions when preparing the liner design. B. Contractor shall prepare design calculations for approval prior to performing the lining work. The submitted design calculations shall provide the following information as a minimum: Project Number 2010UV Manhole to Manhole designation US MH # to DS MH # Pipe Nominal Diameter (inches) Minimum Liner thickness (mm) Proposed Liner Thickness (mm) The Contractor shall note that the actual level of deterioration may vary within any given section of sewer. Pipe ovalities should be, at a minimum, determined from screen measurements off the most recent TV inspection. If more advanced ovality data exists, such as from laser profiling, then this data will be used in lieu of screen measurements. C. The following parameters shall be assumed for the liner design: 1. Modulus of soil reaction, E' S = 700 psi (fully deteriorated) 2. Unit weight of soil = 120 pcf 3. The minimum ovality for straight runs shall be 2.0 percent 4. AASHTO H20 traffic loads 5. AREMA E-80 railroad loads Page 6 of 12

7 2.08 PRODUCT DATA 6. Groundwater elevation can be assumed at 50% of the distance between the pipe invert and the ground surface. 7. Factor of Safety, N= year design life A. Contractor shall provide the following for information only in accordance with Section 1.03: 1. Certification showing the Contractor is currently licensed by the appropriate licensor to perform CIPP installation. Certification shall be given to the Engineer before any materials are delivered to the job site. 2. Certification stating CIPP tube has been manufactured in accordance with ASTM F1216, ASTM F2019 or ASTM F1743, as applicable, is, and resin is, suitable for its intended use. 3. Test report of CIPP sample(s) and tests as specified in paragraph 1.02.B. and 2.04.A. 4. Warranty information. 5. Material safety data sheets for all hazardous chemicals used or expected to be onsite. At a minimum, sheets for the resin, catalyst, cleaners, and repair agents should be submitted. 6. Design calculations per 2.07-B above CIPP TERMINATION POINTS A. The Contractor shall provide shop drawings for approval detailing the proposed CIPP liner terminations in accordance with Specification 1.03: Submittals. Part 3 EXECUTION 3.01 INSTALLATION PROCEDURES A. GENERAL It is forbidden to wet-out inliner at the construction site because of external influences such as heat, no possibilities to control vacuum and correct mixture of resin. The Contractor shall ensure that the pressure inside of the CIPP tube exceeds the pressure due to groundwater. No contractor, or its subcontractor(s), shall perform any work without notifying MSD personnel for inspection. An MSD inspector or designated representative shall be on-site prior to installing lining materials and backfilling excavations. Notification shall be verbally given to the MSD Inspector preferably on the previous working day or no later than 7:30 A.M. on the day the work is to be performed. Daily notification shall include the location of work, nature of work, the crew, and the time it will be on-site. 1. Access to Municipal Water Supplies Page 7 of 12

8 The contractor shall obtain all the necessary permits and pay all fees required to use the various municipal water works supply systems. All costs for water usage shall be included in the various contract items. Water services to residents or other users of the municipal water works system shall not be shut off. Some municipalities may restrict water usage due to outside temperature or other issues. It is the contractor s responsibility to obtain the necessary permits and be aware of any restrictions prior to lining. Failure to comply with the rules for usage of the water works systems may result in denial of any use of the water works system facility. It is recommended that the contractor have other methods of getting water to the jobsite. Time extensions to the contract will not be written solely because of municipal water restrictions due to temperature. 2. Notification of Residents/Businesses It is the responsibility of the contractor to notify all residents and businesses that could be affected by the sewer reconstruction. Notification shall be given at least 36 hours prior to the start of the cleaning and lining operation. This notification shall consist of written information that outlines the process, explains all chemicals that shall be used and their effects and odors, and timing of the project. 3. Bypassing Flow a. Bypassing Sewage Flow. Bypassing sewage flow around the section(s) of sewer to be lined shall be performed by plugging the existing upstream manhole or adjacent sewer system and pumping the sewage to the next unaffected downstream manhole. Pump and bypass lines shall be of adequate capacity and size to handle the flow without sewer backup. Hoses and fittings shall be in good condition, without holes, so as not to cause sewage spills. Sewer service connections within the section to be lined shall be maintained by the contractor as required or temporarily taken out of service to permit lining. The contractor shall be responsible for the continuity of sewage flows and sewer service to each facility connected to the sewer section being lined during the execution of the work. If sewage overflows or backup occurs and enters buildings, the contractor shall notify the MSD Project Manager immediately. The contractor shall be responsible for cleanup, repair, and property damage costs and claims. A copy of a written release shall be furnished to the MSD Project Manager. The contractor and its subcontractor(s) shall coordinate setup to minimize duplicating bypassing efforts. b. Maintaining Flow. It shall be the responsibility of the contractor, throughout the tenure of this contract, to provide and maintain sufficient flow at all times to pass any flash of storm flow of drainage ditches and prevent any backwater flooding due to obstruction caused by construction equipment or materials. The contractor shall be responsible for prohibiting storm or subsurface water from entering the sanitary sewer during lining operations as may be caused by flash floods, high creek waters, heavy rains, etc. B. SEWER CLEANING Page 8 of 12

9 1. The contractor shall attempt to clean every segment of sewer to be lined. 2. In general, protrusions (deposits, break-in taps, roots, etc.) greater than 5% of the host pipe diameter shall be removed. 3. The contractor shall immediately notify the MSD Project Manager if he believes the cleaning will cause a sewer collapse due to the existing deterioration of the host pipe. C. INSTALLATION The liner will be installed by the pull/winch method. It is the contractor s responsibility to ensure that at no time does resin come into contact with the groundwater thus creating an environmental issue. Preparing the old pipe or inversion of a preliner is part of the installation and is included without any additional costs. 1. Pull/Winch Method: Before pulling the inliner in a protective foil has to be installed. The inliner tube shall be impregnated with resin and lowered into the manhole. The tube shall then be pulled into position within the existing pipe with the aid of a power winch that is equipped with a device to monitor the force and prevent excessive tension and tube elongation as determined by the liner manufacturer. The pipe shall then be inflated with air. The inliner has to be inspected immediately before starting the curing process. D. CURING Pre-curing video inspection of the inflated liner must be recorded. Curing must be done under UV Light only. The curing process shall follow a step cure or similar approach recommended by the manufacturer and approved by the Engineer, and shall be held at the top step for an adequate length of time as determined by the liner manufacturer to ensure that the design physical properties are attained. Pressure, temperature and curing process shall be monitored by both, computer and video at any time as determined by the liner manufacturer FINISHED PRODUCT A. FINISH The finished CIPP shall be continuous over the entire length of an installation run. Defects such as foreign inclusions, dry spots, pinholes, delamination, and wrinkling beyond the specification allowances, determined by the Engineer as affecting the integrity or strength of the CIPP, or as adversely affecting the hydraulic capacity of the CIPP, shall be repaired or replaced at the Contractor s expense. B. SERVICE CONNECTIONS After the curing is complete, existing lateral service connections shall be fully re-established. The service opening shall have no jagged edges and shall be sanded smooth. Page 9 of 12

10 C. INSPECTION The Contractor shall inspect the CIPP after installation. The inspection will be performed and recorded using closed circuit television equipment in accordance with the PACP standard. If defects or voids exist as described in Section 2.01, the Contractor shall repair or replace that section of the pipe at no additional cost to the Owner. Methods of repair shall be proposed by the Contractor and submitted to the Engineer for review. All CCTV inspection work shall be performed in accordance with NASSCO s Pipeline Assessment and Certification Program (PACP). The entire inspection survey shall be recorded in MPEG-1 format written to DVD and submitted with digital links to the surveys CLEANUP A. Following inspection, the Contractor shall clean up the entire project area. The Contractor shall dispose of all excess material and debris not incorporated into the permanent installation off-site CONTRACTOR QUALIFICATIONS A. GENERAL The CONTRACTOR shall demonstrate that a minimum of five (5) miles, on a single project, of work similar in scope, has been successfully performed by the CONTRACTOR. The CONTRACTOR s Project Manager and Superintendent shall be assigned full time to this project and be present in the City while WORK is being performed. The proposed Rehabilitation process shall be proven technology, which is defined as a minimum of 25,000 linear feet of successful wastewater or Stormwater collection system installations in the U.S. and must be documented to the satisfaction of the Owner. The Rehabilitation installation work done under this specification shall be subject to inspection by the CONSTRUCTION MANAGER. All parts of the work shall be accessible to the CONTRACT MANAGER. Defective work shall be corrected to the satisfaction of the CONTRACT MANAGER PRE-AWARD SUBMITTALS A. Contractor s Experience Within ten (10) calendar days of issuance of Notice of Apparent Low Bidder, the CONTRACTOR shall submit contractual required documentation that a minimum of five (5) miles, on a single project, of work similar in scope, has been successfully performed by the CONTRACTOR and its personnel assigned to the liner installation and curing, utilizing the CONTRACTOR S proposed rehabilitation system for this project according to the requirements in section The CONTRACTOR shall identify the employees i.e. Project Manager, Superintendent, Foreman, etc.; that will be assigned to this project and provide references. The CONTRACTOR S Project Manager and Superintendent shall be assigned full time to this project and be present in the City while work is being performed. Page 10 of 12

11 B. Past Projects Documentation Within ten (10) calendar days of issuance of Notice of Apparent Low Bidder, the CONTRACTOR shall submit contractual required documentation of 25,000 linear feet of successful wastewater or Stormwater collection system installations in the U.S. of the proposed rehabilitation process to satisfy the contractual requirement of the products commercial viability and CONTRACTOR capability. C. Manufacturer Certification Within ten (10) calendar days of issuance of Notice of Apparent Low Bidder, the CONTRACTOR shall submit manufacturer s certificate(s) indicating that the supplied lining materials for storm drains, sewer mains and sewer lateral connections meet the requirements of the Specifications, ASTM standards and a certificate of compliance from an independent third party lab. D. Manufacturer License The installation of the sewer lining and lining of the service connections shall be performed by a Contractor licensed/certified by the manufacture/owner of the process. The Apparent Low Bidder is required to submit within ten (10) calendar days of receipt of the Notice of Apparent Low Bidder a copy of the license from all manufacturers for which they are licensed/certified and a letter from the manufacturer(s) stating the name, address, point of contact, and telephone number for City s verification. Page 11 of 12

12 Appendix A File # US Manhole DS Manhole Political Subdivision Cincinnati Neighborhood Pipe Size Number of Taps Project Address Slope 001/10U KINDEL AV CINCINNATI WEST END * 002/10U KINDEL AV CINCINNATI WEST END /10U COLERAIN AV CINCINNATI WEST END /10U FORESTOAK CT CINCINNATI HYDE PARK /10U FORESTOAK CT CINCINNATI HYDE PARK /10U FORESTOAK CT CINCINNATI HYDE PARK /10U OLD RED BANK RD CINCINNATI HYDE PARK Lineal Feet *Estimated TOTALS Page 12 of 12

SPECIAL SPECIFICATION 4411 Cured-In-Place Pipe (CIPP) (Drainage Structures)

SPECIAL SPECIFICATION 4411 Cured-In-Place Pipe (CIPP) (Drainage Structures) 2004 Specifications CSJ 6165-86-001 SPECIAL SPECIFICATION 4411 Cured-In-Place Pipe (CIPP) (Drainage Structures) 1. Description. Reconstruct existing cross drainage structures by forming a new pipe within

More information

SPECIFICATIONS FOR PREMIER-PIPE USA CURED-IN-PLACE TECH LINER

SPECIFICATIONS FOR PREMIER-PIPE USA CURED-IN-PLACE TECH LINER SPECIFICATIONS FOR PREMIER-PIPE USA CURED-IN-PLACE TECH LINER 1. General Statement: This specification is for the Cured in Place Pipe process (CIPP) of pipe rehabilitation using a glass fiber reinforced

More information

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction 1.00 DESCRIPTION 1.01 WORK INCLUDED: This work shall include the furnishing of all labor, equipment and materials necessary

More information

TECHNICAL SPECIFICATIONS FIBERGLASS/ULTRAVIOLET LIGHT CURED-IN-PLACE PIPE (CIPP) FOR MAINLINE RENEWAL

TECHNICAL SPECIFICATIONS FIBERGLASS/ULTRAVIOLET LIGHT CURED-IN-PLACE PIPE (CIPP) FOR MAINLINE RENEWAL TECHNICAL SPECIFICATIONS FIBERGLASS/ULTRAVIOLET LIGHT CURED-IN-PLACE PIPE (CIPP) FOR MAINLINE RENEWAL PART 1 - PRODUCTS 1.1 GENERAL It is the intent of this specification to provide for the reconstruction

More information

SPECIAL SPECIFICATION 4631 Cured-In-Place Pipe (CIPP)

SPECIAL SPECIFICATION 4631 Cured-In-Place Pipe (CIPP) 2004 Specifications CSJ 0912-34-171 SPECIAL SPECIFICATION 4631 Cured-In-Place Pipe (CIPP) 1. Description. Reconstruct existing drainage structures by forming a new pipe within an existing deteriorated

More information

SECTION IRRIGATION PIPELINE LINING (CURED-IN-PLACE PIPE)

SECTION IRRIGATION PIPELINE LINING (CURED-IN-PLACE PIPE) SECTION 02518 IRRIGATION PIPELINE LINING (CURED-IN-PLACE PIPE) PART 1 GENERAL 1.01 SECTION INCLUDES A. Irrigation pipeline lining, as herein specified, consists of installing pipe liner by trenchless methods

More information

Special Specification SS1- INTERNAL CIPP POINT REPAIR OF PIPELINES. A. General. 1. Scope

Special Specification SS1- INTERNAL CIPP POINT REPAIR OF PIPELINES. A. General. 1. Scope Special Specification SS1- INTERNAL CIPP POINT REPAIR OF PIPELINES A. General 1. Scope The work covered in this item includes the labor, equipment, materials for performing all work necessary to rehabilitate

More information

GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM

GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM 1. GENERAL 1.01 DESCRIPTION GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM A. The Contractor shall furnish all labor, equipment and materials necessary

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-22 05 83.63 (November 2016) -------------------------------- Preparing Activity: NASA UFGS-22 05 83.63 (November 2013) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

LS 2760 CURED-IN-PLACE SEWER LINING

LS 2760 CURED-IN-PLACE SEWER LINING LS 2760 CURED-IN-PLACE SEWER LINING A. Related Documents B. Summary C. Submittals D. Quality Assurance E. Project Conditions F. Sequencing and Scheduling G. Quantities H. Liner and Resins I. Initial Sewer

More information

SECTION 808 CURED-IN-PLACE-PIPE (CIPP)

SECTION 808 CURED-IN-PLACE-PIPE (CIPP) SECTION 808 CURED-IN-PLACE-PIPE (CIPP) 808-1 DESCRIPTION: This Work consists of providing labor, materials, equipment, and supervision necessary to accomplish the CIPP lining of all sewer mains designated

More information

Installation Practice InnerSeal

Installation Practice InnerSeal Installation Practice InnerSeal Rehabilitation of a Full-Length Sewer Service Lateral using One-Piece Main and Lateral Cured-In-Place Liner Assembly Installed By Means Of Air Inversion 1. Intent This instruction

More information

GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS

GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS AM-LINER II PATENTED GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE AM-LINER II PATENTED (PVC)PIPELINING SYSTEM TRENCHLESS TECHNOLOGY August 16, 2005 1 AMERICAN PIPE & PLASTICS, INC.

More information

Project Specifications

Project Specifications Project Specifications 2016 Work Description - Root remove, clean via hydro-jetting, perform pre-televising and install Cured In Place Pipe liner (CIPP) utilizing either an inverted or pulled in place

More information

CITY OF TAMPA ADDENDUM NO. 1. DATE: September 15, Contract 11-C-00001; Wastewater Sewer Rehabilitation by Cured-in-Place Pipe (C.I.P.P.

CITY OF TAMPA ADDENDUM NO. 1. DATE: September 15, Contract 11-C-00001; Wastewater Sewer Rehabilitation by Cured-in-Place Pipe (C.I.P.P. CITY OF TAMPA Pam Iorio, Mayor CONTRACT ADMINISTRATION DEPARTMENT David L. Vaughn, AIA, Director ADDENDUM NO. 1 DATE: September 15, 2010 Contract 11-C-00001; Wastewater Sewer Rehabilitation by Cured-in-Place

More information

Table 1 Description of Work Pipe Size (mm) 1 Sunshine Way A/C No. A/C Yes

Table 1 Description of Work Pipe Size (mm) 1 Sunshine Way A/C No. A/C Yes March 2, 2018 To: Cured-In-Place Pipe (CIPP) Relining Contractors RE: CITY OF GRAND FORKS REQUEST FOR QUOTE FOR CIPP RELINING CONTRACTORS 1.0 INTRODUCTION The City of Grand Forks is requesting quotes to

More information

ADDENDUM No. 2. City of Joliet, 2017 Spring Creek Interceptor Sewer Lining at CN Railyard

ADDENDUM No. 2. City of Joliet, 2017 Spring Creek Interceptor Sewer Lining at CN Railyard ADDENDUM No. 2 October 19, 2017 TO: PROJECT: All Potential Bidders, 2017 Spring Creek Interceptor Sewer Lining at CN Railyard BID OPENING: Tuesday, October 24, 2017 at 11:00 A.M. The following is a list

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER 834.01 Description 834.02 Materials 834.03 Shipment and Storage 834.04 Submittals 834.05

More information

The Rehabilitation of Existing Building Drains and Building Sewers by the

The Rehabilitation of Existing Building Drains and Building Sewers by the Inversion or Pulled-in-Place Method and Curing of Resin-impregnated Tube Page 1 of 7 www.icc-es.org/pmg (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council PROPOSED PMG LISTING

More information

SECTION 809 CURED-IN-PLACE PIPE (CIPP) LATERALS

SECTION 809 CURED-IN-PLACE PIPE (CIPP) LATERALS SECTION 809 CURED-IN-PLACE PIPE (CIPP) LATERALS 809-1 DESCRIPTION: This Work consists of installing a cured-in-place pipe (CIPP) liner to stabilize structural defects and construction inadequacies in sanitary

More information

SPECIAL SPECIFICATION 5256 Cured-In-Place Pipe (Sanitary Sewer)

SPECIAL SPECIFICATION 5256 Cured-In-Place Pipe (Sanitary Sewer) 2004 Specifications CSJ 0912-71-657 SPECIAL SPECIFICATION 5256 Cured-In-Place Pipe (Sanitary Sewer) 1. Description. Furnish and install cured-in-place pipe. A. Resin-impregnated flexible tubes inserted

More information

TECHNICAL SPECIFICATION FOR CURED-IN-PLACE MANHOLE REHABILITATION LINER SYSTEM

TECHNICAL SPECIFICATION FOR CURED-IN-PLACE MANHOLE REHABILITATION LINER SYSTEM TECHNICAL SPECIFICATION FOR CURED-IN-PLACE SYSTEM PART 1 GENERAL 1.01 SCOPE OF WORK Furnish all materials, labor, equipment, tools and required incidentals for providing and installing a resin impregnated

More information

CIPP REFERENCE SPECIFICATION

CIPP REFERENCE SPECIFICATION CIPP REFERENCE SPECIFICATION This CIPP Reference Specification serves as only a guideline and is not intended to encompass the requirements of every municipality or industrial application. However, the

More information

INTERFIT LATERAL SEALING SYSTEM INSTALLATION GUIDELINE SPECIFICATION

INTERFIT LATERAL SEALING SYSTEM INSTALLATION GUIDELINE SPECIFICATION INTERFIT LATERAL SEALING SYSTEM INSTALLATION GUIDELINE SPECIFICATION INTERFIT LATERAL SEALING SYSTEM SECTION 1: GENERAL 1.1 INTENT 1.2 SCOPE 1.3 REFERENCE DOCUMENTS AND STANDARDS 1.4 SUBMITTALS SECTION

More information

PIPE REHABILITATION. Comply with Division 1 - General Provisions and Covenants, as well as the following:

PIPE REHABILITATION. Comply with Division 1 - General Provisions and Covenants, as well as the following: PIPE REHABILITATION PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sliplining Pipe B. Cured-in-place Pipe Lining C. Deformed/Reformed Pipe Lining D. Folded/Formed Pipe Lining E. Spot Repairs by Pipe Replacement

More information

SECTION XXXXX CHEMICAL GROUTING

SECTION XXXXX CHEMICAL GROUTING SECTION XXXXX CHEMICAL GROUTING PART 1 -- GENERAL 1.01 SCOPE OF WORK A. Provide all labor, materials, accessories, equipment, and tools required for the rehabilitation, infiltration reduction, and root

More information

STANDARD SPECIFICATIONS FOR CONSTRUCTING SANITARY SEWER FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS

STANDARD SPECIFICATIONS FOR CONSTRUCTING SANITARY SEWER FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS STANDARD SPECIFICATIONS FOR CONSTRUCTING SANITARY SEWER FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS SECTION 5 REHABILITATION OF SANITARY SEWER MAINS BY THE CURED-IN-PLACE PIPE (CIPP) METHOD 5.01

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER. April 16, 2010

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER. April 16, 2010 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER 834.01 Description 834.02 Materials 834.03 Shipment and Storage 834.04 Submittals 834.05

More information

CITY OF TAMPA ADDENDUM NO. 3. DATE: February 15, 2017

CITY OF TAMPA ADDENDUM NO. 3. DATE: February 15, 2017 CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM NO. 3 DATE: February 15, 2017 Contract 16-C-00027; Ragan Park Restroom Improvements - Rebid Bidders

More information

SPECIAL SPECIFICATIONS UV CURED IN-PLACE SPIRAL WOUND FIBERGLASSS PIPE LINING

SPECIAL SPECIFICATIONS UV CURED IN-PLACE SPIRAL WOUND FIBERGLASSS PIPE LINING 5101.1 Description This item shall govern approved methods and materials for the rehabilitation of deteriorated gravity sewer and storm water pipes by an Ultra-Violet Light Cured-In-Place Pipe (CIPP) lining

More information

EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: PLUMBING SECTION: SANITARY WASTE AND VENT PIPING

EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: PLUMBING SECTION: SANITARY WASTE AND VENT PIPING ICC-ES Report PMG-1273 Reissued 01/2018 This report is subject to renewal 01/2019 EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: 22 00 00 PLUMBING SECTION: 22 13 16

More information

The Contract Documents for the above project are not modified in any way by this Addendum No. 1 except as provided below.

The Contract Documents for the above project are not modified in any way by this Addendum No. 1 except as provided below. Engineering Department 380 A Avenue P. O. Box 369 Lake Oswego, Oregon 97034 Addendum No. 1 PROJECT: WO NO.: 243 OWNER: Lake Oswego, Oregon LOCATION: Lake Oswego, Oregon DATE: January 16, 2018 The Contract

More information

SPECIFICATIONS. Cured-in-Place Pipe Liner (CIPP Liner). Shall comply with Subsection

SPECIFICATIONS. Cured-in-Place Pipe Liner (CIPP Liner). Shall comply with Subsection PIPELINE SYSTEM REHABILITATION SPECIFICATIONS The intent of the work under this section involves the trenchless rehabilitation of existing sewer pipelines. This lining shall rebuild strength and substantially

More information

CEDAR RAPIDS METROPOLITAN AREA STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS May 2014 SECTION SEWER LINERS

CEDAR RAPIDS METROPOLITAN AREA STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS May 2014 SECTION SEWER LINERS SECTION 02310 SEWER LINERS PART 1 GENERAL 1.01 - References A. American Society for Testing and Materials (ASTM): 1. ASTM D638 Test method for tensile properties of plastics. 2. ASTM D790 Test method for

More information

SECTION 813 SEWER FLOW CONTROL

SECTION 813 SEWER FLOW CONTROL SECTION 813 SEWER FLOW CONTROL 813-1 DESCRIPTION: Sewer flow control is a set of methods to adjust the flow in the sewer system to allow for inspection, maintenance, repair or replacement. This is accomplished

More information

San Antonio Water System Standard Specifications for Construction

San Antonio Water System Standard Specifications for Construction Item No. 905.1 Rehabilitation of Sanitary Sewer By Cured-In-Place Pipe (UV Light Cured) 905.1 DESCRIPTION: This specification includes requirements to rehabilitate existing sanitary sewers by the Ultraviolet

More information

SECTION 063 SPECIFICATIONS - CURED-IN-PLACE PIPE

SECTION 063 SPECIFICATIONS - CURED-IN-PLACE PIPE SECTION 063 SPECIFICATIONS - CURED-IN-PLACE PIPE Cured-in-place pipe (CIPP) construction shall be completed within sewers by either inverting and curing thermosetting, resin-impregnated, flexible, tubes

More information

GENERAL REQUIREMENTS AND TECHNICAL SPECIFICATIONS

GENERAL REQUIREMENTS AND TECHNICAL SPECIFICATIONS 11701 Community Center Dr Northglenn CO 80233 GENERAL REQUIREMENTS AND TECHNICAL SPECIFICATIONS TABLE OF CONTENTS 013300 SUBMITTAL PROCEDURES 013500 SPECIAL CONDITIONS 330140 CURED IN PLACE PIPE (CIPP)

More information

Cured-in-Place Pipe (CIPP) for Pressure Pipe. Presented by: Mike Moore

Cured-in-Place Pipe (CIPP) for Pressure Pipe. Presented by: Mike Moore Cured-in-Place Pipe (CIPP) for Pressure Pipe Presented by: Mike Moore CIPP Proven Technology Introduced over 45 years ago Most used trenchless technology for the rehabilitation of gravity flow pipeline

More information

EVALUATION SUBJECT: PERMA-LATERAL PULLED- IN-PLACE CURED-IN-PLACE PIPE LINING SYSTEM

EVALUATION SUBJECT: PERMA-LATERAL PULLED- IN-PLACE CURED-IN-PLACE PIPE LINING SYSTEM ICC-ES Report PMG-1074 Reissued 11/2017 This report is subject to renewal 11/2018 EVALUATION SUBJECT: PERMA-LATERAL PULLED- IN-PLACE CURED-IN-PLACE PIPE LINING SYSTEM DIVISION: 22 00 00 PLUMBING SECTION:

More information

PERFORMANCE SPECIFICATION GUIDELINE

PERFORMANCE SPECIFICATION GUIDELINE PERFORMANCE SPECIFICATION GUIDELINE FOR THE INSTALLATION OF CURED-IN-PLACE PIPE (CIPP) June, 2011 Thanks to the following participants for the development of this document: Ted DeBoda - NASSCO Steve Gearhart

More information

General Rules and Regulations

General Rules and Regulations General Rules and Regulations City of Hamilton, Ohio Sanitary Sewer Collection and Treatment Revised December 23, 2016 Page 1 of 13 To Our Customers, Sanitary Sewer Collection and Treatment Department

More information

Cured-In-Place-Pipe (CIPP) LATERAL SEALS

Cured-In-Place-Pipe (CIPP) LATERAL SEALS Cured-In-Place-Pipe (CIPP) LATERAL SEALS PERFORMANCE SPECIFICATION GUIDELINE October, 2016 Thanks to the following participants for the development of this document: Brendan Doyle BLD Services LLC (Chair)

More information

AMENDMENT OF SOLICITATION

AMENDMENT OF SOLICITATION Metropolitan Washington Airports Authority PROCUREMENT AND CONTRACTS DEPT. AMENDMENT OF SOLICITATION PAGE 1 Metropolitan Washington Airports Authority 1A. AMENDMENT OF SOLICITATION NO. 1B. DATED Procurement

More information

Mokapu CIPP Case Study & Innovations in Trenchless Technologies for Wastewater System Rehabilitation

Mokapu CIPP Case Study & Innovations in Trenchless Technologies for Wastewater System Rehabilitation Mokapu CIPP Case Study & Innovations in Trenchless Technologies for Wastewater System Rehabilitation Presented by Mike York, Insituform Technologies, Inc. Trenchless v. Dig and Replace What is CIPP? Developed

More information

Infrastructure Point Repair System Technical Specifications

Infrastructure Point Repair System Technical Specifications 4301 A 34 t h Street North St. Petersburg, FL 33714 PH: 877-327-4216 Fax: 727-327- 4118 Web: www.irsi.net Infrastructure Point Repair System 1. Scope: This specification defines the approved methodology

More information

Specifying Trenchless Sewer Rehabilitation Projects. Presented by: Todd Stelmacher Visu-Sewer, Inc.

Specifying Trenchless Sewer Rehabilitation Projects. Presented by: Todd Stelmacher Visu-Sewer, Inc. Specifying Trenchless Sewer Rehabilitation Projects Presented by: Todd Stelmacher Visu-Sewer, Inc. Todd Stelmacher Bio Visu-Sewer Sales Engineer MN, ND, SD, WI 30+ years public utilities experience Municipal

More information

SECTION BORING AND/OR JACKING PIPE

SECTION BORING AND/OR JACKING PIPE 02910-1 of 6 SECTION 02910 BORING AND/OR JACKING PIPE 02910.01 GENERAL A. Description Boring and/or jacking pipe shall include, but not necessarily be limited to, furnishing and installing carrier pipe

More information

SECTION DOWNSTREAM DEFENDER

SECTION DOWNSTREAM DEFENDER SECTION 02631 DOWNSTREAM DEFENDER PART 1 - GENERAL 1.01 SCOPE A. Work described in this section includes furnishing all labor, equipment, materials, tools and incidentals required for a complete and operable

More information

North Pecos Water & Sanitation District Request for Proposal CURED-IN-PLACE-PIPE PROJECT 2015 SANITARY SEWER REHABILITATION

North Pecos Water & Sanitation District Request for Proposal CURED-IN-PLACE-PIPE PROJECT 2015 SANITARY SEWER REHABILITATION North Pecos Water & Sanitation District Request for Proposal CURED-IN-PLACE-PIPE PROJECT 2015 SANITARY SEWER REHABILITATION TABLE OF CONTENTS Request for Sealed Proposal Page 4 Proposal Guidelines and

More information

Job Order Sewer Repair Services

Job Order Sewer Repair Services Job Order Sewer Repair Services Bid Addendum No. 1 October 10, 2018 All Contractual Requirements as defined within the Contract Documents shall remain in full force to the extent that they are not modified

More information

APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES

APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES B-1 General Notes: SACWSD Standard Construction Drawing Notes 1. No work shall begin on any water or wastewater construction project until the construction

More information

STANDARD SPECIFICATIONS SECTION SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT

STANDARD SPECIFICATIONS SECTION SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for rehabilitation of defective mainline

More information

ITEM NO SLIPLINING SANITARY SEWERS

ITEM NO SLIPLINING SANITARY SEWERS ITEM NO. 1100 SLIPLINING SANITARY SEWERS 1100.1 DESCRIPTION: Sliplining is accomplished by pulling or pushing liner pipe into existing sewers by use of mechanical or hydraulic equipment. Once in place,

More information

BIDS WILL BE CONSIDERED NON-RESPONSIVE WITHOUT THE REQUIRED SIGNATURE ACKNOWLEDGING THE FOLLOWING:

BIDS WILL BE CONSIDERED NON-RESPONSIVE WITHOUT THE REQUIRED SIGNATURE ACKNOWLEDGING THE FOLLOWING: BID SHEET FOR CIP 17-101 CIPP LINING OF SANITARY SEWER SYSTEM Item No. 16 17 18 19 20 21 Description and Bid Unit Price Brim Style Service Line Connection Sealing System Temporary Bypass Facilities Set

More information

SECTION TEMPORARY SEWER BYPASS PUMPING

SECTION TEMPORARY SEWER BYPASS PUMPING PART 1 GENERAL 1.1 DESCRIPTION A. The CONTRACTOR shall provide a complete sewer bypassing system including, but not limited to, the following: 1. Developing a sewer bypassing plan 2. Developing a spill

More information

Process Specification. Structural Rehabilitation & Corrosion Protection for Circular Structures in Wastewater Collection and Potable Water Systems

Process Specification. Structural Rehabilitation & Corrosion Protection for Circular Structures in Wastewater Collection and Potable Water Systems Process Specification Structural Rehabilitation & Corrosion Protection for Circular Structures in Wastewater Collection and Potable Water Systems SECTION 1: GENERAL 1.01 DESCRIPTION This specification

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

SECTION 811 PIPE BURSTING

SECTION 811 PIPE BURSTING SECTION 811 PIPE BURSTING 811-1 DESCRIPTION: The Pipe Bursting process is defined as the reconstruction of sewer pipe by installing an approved pipe material, by means of one of the approved processes

More information

OTEC 2017 Spray Applied Pipe Liner Supplemental Specifications 833 Calculations for the Resin Based Liner Presented by Peter Blais, PE

OTEC 2017 Spray Applied Pipe Liner Supplemental Specifications 833 Calculations for the Resin Based Liner Presented by Peter Blais, PE Innovative Solutions through Engineered Products OTEC 2017 Spray Applied Pipe Liner Supplemental Specifications 833 Calculations for the Resin Based Liner Presented by Peter Blais, PE HydraTech Engineered

More information

Specifications. Chapter 13. Specifications (800) CULVERT 96

Specifications. Chapter 13. Specifications   (800) CULVERT 96 Chapter 13 WWW.CULVERT-REHAB.COM (800) CULVERT 96 Material Requirement These specifications cover the purchase of high density polyethylene (HDPE) pipe liners for lining existing culvert pipes. Pipe liners

More information

REGIONAL CONSTRUCTION STANDARDS

REGIONAL CONSTRUCTION STANDARDS REGIONAL CONSTRUCTION STANDARDS SIXTH EDITION Publication Update 6.5 (Full Committee Approved Proposed Revision 6.5 Storm Sewer Joint Wrap - Section 302 As Publication Update 6.5) March 27, 2018 Copyright

More information

NTPEP Evaluation of Spray Applied Non-Structural and Structural Pipe Liners for Storm Water Conveyance

NTPEP Evaluation of Spray Applied Non-Structural and Structural Pipe Liners for Storm Water Conveyance Work Plan for NTPEP Evaluation of Spray Applied Non-Structural and Structural Pipe Liners for Storm Water Conveyance AASHTO Designation: [SAL] (2016) American Association of State Highway and Transportation

More information

FOLDED (THERMOPLASTIC) PIPE (FP) INSTALLATION (HDPE, PVC, AND PVC TYPE A)

FOLDED (THERMOPLASTIC) PIPE (FP) INSTALLATION (HDPE, PVC, AND PVC TYPE A) FOLDED (THERMOPLASTIC) PIPE (FP) INSTALLATION (HDPE, PVC, AND PVC TYPE A) PERFORMANCE SPECIFICATION GUIDELINE August, 2006 Thanks to the following participants for the development of this document: Keith

More information

THE COSTS FOR ACCESSING THE SEWER SHALL BE INCLUDED IN THE VARIOUS UNIT PRICES BID. THE UNIT COSTS SHALL INCLUDE ANY AND ALL ACCESS TO THE SEWER.

THE COSTS FOR ACCESSING THE SEWER SHALL BE INCLUDED IN THE VARIOUS UNIT PRICES BID. THE UNIT COSTS SHALL INCLUDE ANY AND ALL ACCESS TO THE SEWER. Contract Drawings For FY18 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. WCRSA-035 Greenville, South Carolina March 2018 GREENVILLE FIVE FORKS GANTT BASIN 650 SIMPSONVILLE

More information

SECTION 501 GRAVITY SEWERS. U. No pipe length used shall be less than 5 feet.

SECTION 501 GRAVITY SEWERS. U. No pipe length used shall be less than 5 feet. SECTION 501 GRAVITY S PART 2 MATERIALS 2.1 PIPE SIZE, TYPE, AND STRENGTH D. Only concrete or polyvinyl chloride sewer pipe shall be used for sewer line construction unless otherwise approved by the City

More information

SECTION F1 SEWER AND DRAIN PIPE LINING (NON-MAN ENTRY) GENERAL

SECTION F1 SEWER AND DRAIN PIPE LINING (NON-MAN ENTRY) GENERAL SECTION F1 SEWER AND DRAIN PIPE LINING (NON-MAN ENTRY) GENERAL This section describes requirements for furnishing all labor, materials, transportation, and equipment necessary for the rehabilitation of

More information

GENERAL INFORMATION AND REQUIREMENTS

GENERAL INFORMATION AND REQUIREMENTS GENERAL INFORMATION AND REQUIREMENTS 1.0 BOARD S STANDARD SPECIFICATIONS: Copies of these Standard Specifications for Water Mains, Sanitary Sewers and Sewage Pumping Stations may be purchased from the

More information

EXHIBIT A SCOPE OF SERVICES Districtwide Storm Sewer Inspection

EXHIBIT A SCOPE OF SERVICES Districtwide Storm Sewer Inspection EXHIBIT A SCOPE OF SERVICES Districtwide Storm Sewer Inspection 1.0 Objective: The Department desires to obtain services from the Vendor to inspect existing storm sewer systems. This includes the remote

More information

SPECIAL SPECIFICATION 5787 Manhole Rehabilitation

SPECIAL SPECIFICATION 5787 Manhole Rehabilitation 2004 Specifications CSJ 1062-04-047 SPECIAL SPECIFICATION 5787 Manhole Rehabilitation 1. Description. Repair, rehabilitate, or replace deteriorated, leaking, or structurally unsound existing sanitary sewer

More information

City of New Haven 101 FRONT STREET PO BOX 236 NEW HAVEN, MO Phone * * Fax

City of New Haven 101 FRONT STREET PO BOX 236 NEW HAVEN, MO Phone *  * Fax City of New Haven 101 FRONT STREET PO BOX 236 NEW HAVEN, MO 63068 Phone 573-237-2349 * www.newhavenmo.org * Fax 573-237-4696 February 12, 2015 Request for Bids Trenchless Reconstruction of Sanitary Sewers

More information

Method One: Liner/Bladder Assembly-Inversion Method.

Method One: Liner/Bladder Assembly-Inversion Method. CIPP Sectional/Point Repairs Critical Factors Finally Explained By: Shaun M. Flanery Abstract A 1999 report from the American Society of Civil Engineers indicated at that time that the nation s 500,000

More information

SANITARY SEWER CHEMICAL GROUTING

SANITARY SEWER CHEMICAL GROUTING Specification The information contained in the document is property of Avanti International. Avanti offers the following verbiage as a technical reference to assist in the creation of specifications for

More information

REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form

REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form Proposed Revision To: REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form General Provisions (Division 1) Technical Specifications (Divisions 2-8) Standard Details Change No. Hampton Roads Planning

More information

San Antonio Water System Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

San Antonio Water System Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES 853.1 DESCRIPTION: This item shall govern the construction of FRP sanitary sewer manholes, complete in place and the materials

More information

MAIN EXTENSIONS: WATER & SEWER. 7.1 General Provisions

MAIN EXTENSIONS: WATER & SEWER. 7.1 General Provisions SECTION 7 MAIN EXTENSIONS: WATER & SEWER 7.1 General Provisions Persons proposing subdivisions or developments requiring a main extension for sewer or water service shall prepare applications described

More information

SANITARY SEWER CHEMICAL GROUTING

SANITARY SEWER CHEMICAL GROUTING Specifications (As provided by Avanti International) The information contained in the document is property of Avanti International. Avanti offers the following verbiage as a technical reference to assist

More information

SECTION SINGLE-PLY ROOFING SYSTEM

SECTION SINGLE-PLY ROOFING SYSTEM PART 1 - GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals required to provide single-ply adhered roofing system. 1.02 COORDINATION A. The Contractor

More information

GENERAL NOTES REQUIRED NOTES ON ALL PLANS

GENERAL NOTES REQUIRED NOTES ON ALL PLANS GENERAL NOTES REQUIRED NOTES ON ALL PLANS ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION SHALL CONFORM TO THE CURRENT CITY OF SANTA ROSA DESIGN AND CONSTRICTIOIN STANDARDS AND CONSTRUCTION SPECIFICATIONS

More information

HIGH CHEMICAL RESISTANCE LINER (EPOXY RESIN FORMAPOX 301)

HIGH CHEMICAL RESISTANCE LINER (EPOXY RESIN FORMAPOX 301) HIGH CHEMICAL RESISTANCE LINER (EPOXY RESIN FORMAPOX 301) LINING SPECIFICATIONS FOR UNDERGROUND PROCESS PIPING WITH NO-DIG TECHNOLOGIES FORMADRAIN Inc. 09032015 U.S.A. 2915 Ogletown Road - #132 Newark,

More information

ADDENDUM NO. 1 AUGUST 7, The attention of all Bidders is directed to the following additions and/or deletions to the Contract Documents.

ADDENDUM NO. 1 AUGUST 7, The attention of all Bidders is directed to the following additions and/or deletions to the Contract Documents. 2017 SANITARY SEWER IMPROVEMENTS PROJECT ADDENDUM NO. 1 AUGUST 7, 2017 This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents as noted within this Addendum. All

More information

SECTION 920 SANITARY AND STORM SEWER MANHOLES

SECTION 920 SANITARY AND STORM SEWER MANHOLES SECTION 920 SANITARY AND STORM SEWER MANHOLES 920.1 GENERAL This section contains items which are relative to the installation of sanitary and storm sewer manholes. 920.2 REFERENCES 920.2.1 ASTM C 43 C

More information

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1 1.01 GENERAL A. The Contractor shall perform all excavation, backfilling, grubbing and grading required for construction and installation of pipelines, structures and appurtenances. Excavation shall include

More information

CIPMH (Cured-in-Place Manhole) Lining System

CIPMH (Cured-in-Place Manhole) Lining System Product Submittal Document Information CIPMH (Cured-in-Place Manhole) Lining System CIPMH FULL DEPTH-PA For Structural Rehabilitation Updated 9/25/14 Product Submittal Review ITEM 1. Manufacturer Company

More information

MWRD Infiltration and Inflow Control Program Compliance Update. Committee of the Whole Meeting April 3, 2018

MWRD Infiltration and Inflow Control Program Compliance Update. Committee of the Whole Meeting April 3, 2018 MWRD Infiltration and Inflow Control Program Compliance Update Committee of the Whole Meeting April 3, 2018 Presentation Outline Background on MWRD s Watershed Management Ordinance Wastewater, Infiltration

More information

CONSTRUCTION PROCEDURE

CONSTRUCTION PROCEDURE ARTICLE X CONSTRUCTION PROCEDURE Section 1001 General Construction Specifications Sewers shall be constructed in accordance with the requirements of the latest editions of the "State of Ohio, Department

More information

TECHNICAL SPECIFICATIONS FOR INTERCEPTOR AND SIPHON INSPECTION/CLEANING

TECHNICAL SPECIFICATIONS FOR INTERCEPTOR AND SIPHON INSPECTION/CLEANING A. GENERAL TECHNICAL SPECIFICATIONS FOR INTERCEPTOR AND SIPHON INSPECTION/CLEANING Contractor shall furnish all labor, materials, equipment, traffic control, transportation, and supervision necessary for

More information

OTEC 2015 Conduit Renewal

OTEC 2015 Conduit Renewal Innovative Solutions through Engineered Products OTEC 2015 Conduit Renewal Presented by Peter Blais, PE HydraTech Engineered Products, LLC 10448 Chester Road Cincinnati, OH 45215 P 513-827-9169 F 513-827-9171

More information

Clean Water 2020 Program

Clean Water 2020 Program Clean Water 2020 Program INFRASTRUCTURE REHABILITATION PROGRAM (IR Program) November 2016 Updated March 2017 Table of Contents Infrastructure Rehabilitation Program 2016 List of Tables... 2 List of Figures...

More information

Inland Pipe Rehabilitation. August 17 OAWWA Canton, OH

Inland Pipe Rehabilitation. August 17 OAWWA Canton, OH Inland Pipe Rehabilitation August 17 OAWWA Canton, OH Presentation Agenda Introduction to IPR IPR Products & Services RS Technik by HammerHead Advanced CIPP Process Spartanburg, SC project review IPR Overview

More information

CHAPTER 6 - SANITARY SEWER

CHAPTER 6 - SANITARY SEWER CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings

More information

2017 SANITARY SEWER REHABILITATION SPECIFICATIONS SECTION 1.00 SCOPE... 1

2017 SANITARY SEWER REHABILITATION SPECIFICATIONS SECTION 1.00 SCOPE... 1 2017 SANITARY SEWER REHABILITATION SPECIFICATIONS UTABLE OF CONTENTS SECTION 1.00 SCOPE... 1 UPage 1.01 General... 1 1.02 Work Included... 1 1.03 Location of Work... 1 1.04 Coordination of Work... 1 1.05

More information

CIPP Lateral Renewal Connection System

CIPP Lateral Renewal Connection System Product Submittal Document Information CIPP Lateral Renewal Connection System ManEntry Lapel Liner Updated 6/12/14 Product Submittal Review ITEM 1. Manufacturer Company Name: LMK Technologies, LLC Contact

More information

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department Addendum 1 Text 5-9-17 LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA 95825 Phone (916) 568-3071 FAX (916) 568-3145 Purchasing Department Sacramento City College American River College

More information

STANDARD SPECIFICATIONS SECTION TEMPORARY BYPASS PUMPING SYSTEMS

STANDARD SPECIFICATIONS SECTION TEMPORARY BYPASS PUMPING SYSTEMS STANDARD SPECIFICATIONS SECTION 02960 TEMPORARY BYPASS PUMPING SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for implementing a temporary pumping system for the purpose of diverting

More information

Section [ ] Stormwater Catch Basin Filtration Device

Section [ ] Stormwater Catch Basin Filtration Device PART 1 GENERAL Section [ ] Stormwater Catch Basin Filtration Device 01.01.00 Purpose The purpose of this specification is to establish generally acceptable criteria for devices used for filtration of stormwater

More information

BOROUGH OF WESTMONT LUZERNE STREET JOHNSTOWN, PA TELEPHONE: (814) FAX (814) WEBSITE: westmontborough.

BOROUGH OF WESTMONT LUZERNE STREET JOHNSTOWN, PA TELEPHONE: (814) FAX (814) WEBSITE: westmontborough. BOROUGH OF WESTMONT 1000 LUZERNE STREET JOHNSTOWN, PA 15905-2508 TELEPHONE: (814) 255-3865 FAX (814) 255-9580 WEBSITE: westmontborough.com REQUIREMENTS FOR CCTV FOR BUILDING INSPECTIONS PURPOSE AND SCOPE

More information

NTPEP Evaluation of Spray Applied Non-Structural and Structural Pipe Liners for Storm Water Conveyance

NTPEP Evaluation of Spray Applied Non-Structural and Structural Pipe Liners for Storm Water Conveyance Work Plan for NTPEP Evaluation of Spray Applied Non-Structural and Structural Pipe Liners for Storm Water Conveyance AASHTO Designation: [SAL] (2018) American Association of State Highway and Transportation

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution