1 Emerging ABC Connection Details for High Seismic Areas Connections between precast girders and cap beam Sri Sritharan Wilson Engineering Professor CCEE Department, Iowa State University
2 Collaborator Dr. Jay Holombo TY Lin International
3 Research Objective Establishing reliable moment resisting connections between precast girders and the bent cap, especially for resisting positive moments so that ABC can be utilized in moderate-to-high seismic regions. Negative moment resistance is not of a significant concern (Project Website:
4
5 Design Criteria Fully develop the column plastic hinge capacity Elastic superstructure response under loads due to: Gravity + Column Overstrength Moment capacity (H) + 0.5g Vertical Acceleration Exhibit sufficient ductility
6 Inverted Tee/Rectangular Bent Cap Column plastic hinge
7 As-built detail
8 Precast Construction Monolithic Construction Holombo et al.
9 System Test
10 Negative Moment Resistance
11 Positive Moment Resistance
12 New Connections Six different details were tested Mechanisms shear friction (dowel bars) or shear friction and direction tension force transfer (unstressed strands)
13 Precast I Girder to Precast Inverted-Tee Bent Cap Connections 1-Grouted Unstressed Strand Connection (GUSC) Unstressed strands are placed through ducts in girder and cap and then grouted in place Dowel bars are placed transversely through the web of girder Diaphragm and deck are poured to secure girder to cap and encase dowel bars
14 Precast I Girder to Precast Inverted-Tee Bent Cap Connections 2-Looped Unstressed Strand Connection (LUSC) Looped unstressed strands are placed in bent cap and girder Bent cap looped strands extend from cap into diaphragm region Large-diameter dowel bars are placed through looped strands in girder and cap Diaphragm and deck are poured to secure girder to cap and encase looped strands and dowel bars
15 Precast Bulb-Tee Girder to CIP Bent Cap Connections 3-Extended Strand with a Lap Splice Connection (ESLS) Four girder prestressing strands are extended and lapped with extended strands from opposite girder All extended strands are anchored with plates and anchor chucks. Dowel bars placed transversely through web of girder
16 Precast Bulb-Tee Girder to CIP Bent Cap Connections 4-Extended Strand with Splice and End Plate Connection (ESSP) Five girder prestressing strands are extended from the end of the girder a short distance and then spliced with strand ties Extended strands and strand ties are anchored with plates and anchor chucks. Dowel bars are placed transversely through web of girder
17 Precast Bulb-Tee Girder to CIP Bent Cap Connections 5-Extended Strand Bent with Free End connection (ESBF) Five of the girder prestressing strands are extended from the end of girder and bent at 90 degrees with no end anchorage Dowel bars placed transversely through the web of girder
18 Precast Bulb-Tee Girder to CIP Bent Cap Connections 6-Extended Strand with a Mechanical Splice Connection (ESMS) Four of girder prestressing strands are extended and connected to extended strands from the opposite girder with mechanical splice chucks Dowel bars placed transversely through the web of girder
19 Connection Test
20
21 This video is also available at:
22 This video is also available at:
23 This video is also available at:
24 Experimental Tests Overall Performance (GUSC)
25 Experimental Tests Overall Performance (ESMS & ESLS) Moment vs. Black Actuator Displacement 600 Girder to Bent Cap interface (K-ft) G G+H G+H+0.5G G+H+0.7G G+H+1.0G G+H+1.75G ESMS ESLS Displacement (in.)
26 Positive Moment Resisting Mechanisms Total Strand Shear friction
27 Conclusions All connections exhibited sufficient moment resistance and remained elastic under the design loads that included 0.5g vertical acceleration effects. No structural damage was observed under loads corresponding to design demands. All connections showed considerable ductility under positive and negative moment demands. Precast inverted tee bent cap to provided some benefits over rectangular cast-in-place cap beam
Two integral girder connections for precast concrete bridges in seismic regions utilizing extended prestressing strands
Graduate Theses and Dissertations Iowa State University Capstones, Theses and Dissertations 2014 Two integral girder connections for precast concrete bridges in seismic regions utilizing extended prestressing
More informationSUMMARY SHEETS OF INTEGRAL CONNECTIONS
APPENDIX F SUMMARY SHEETS OF INTEGRAL CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix F F-1 APPENDIX F SUMMARY SHEETS OF INTEGRAL CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix F F-2
More informationUSE OF PRECAST I-GIRDERS FOR ACCELERATED BRIDGE CONSTRUCTION IN HIGH SEISMIC REGIONS. Sri Sritharan 1 Justin Vander Werff 2 Rick Snyder 3
Abstract USE OF PRECAST I-GIRDERS FOR ACCELERATED BRIDGE CONSTRUCTION IN HIGH SEISMIC REGIONS Sri Sritharan 1 Justin Vander Werff 2 Rick Snyder 3 This paper summarizes the experimental investigation of
More informationA cost-effective integral bridge system with precast concrete I-girders for seismic application
Civil, Construction and Environmental Engineering Civil, Construction and Environmental Engineering Publications 9-2015 A cost-effective integral bridge system with precast concrete I-girders for seismic
More informationAccelerated Bridge Construction in High Seismic Regions by Use of Precast Concrete Girders
Accelerated Bridge Construction in High Seismic Regions by Use of Precast Concrete Girders J. Vander Werff Dordt College, Sioux Center, Iowa S. Sritharan Iowa State University, Ames, Iowa R. Snyder University
More informationSeismic Performance of Precast Concrete Bents used for Accelerated Bridge Construction. Bijan Khaleghi 1
Seismic Performance of Precast Concrete Bents used for Accelerated Bridge Construction Bijan Khaleghi 1 Abstract Ductility of precast prestressed girder bridges can be achieved by proper detailing of pier
More informationCONTINUITY OF PRECAST BRIDGE U-GIRDERS CONNECTED TO A CAST-IN-PLACE SUBSTRUCTURE SUBJECTED TO SEISMIC LOADS
October 12-17, 28, Beijing, China CONTINUITY OF PRECAST BRIDGE U-GIRDERS CONNECTED TO A CAST-IN-PLACE SUBSTRUCTURE SUBJECTED TO SEISMIC LOADS K.L. Almer 1 and D.H.Sanders 2 1 Graduate Research Assistant,
More informationRevise Sections through of Part 1 of the 2009 Provisions as follows:
PROPOSAL - (00) SCOPE: Sec.. Concrete Sec... Additional Detailing Requirements for Concrete Piles PROPOSAL FOR CHANGE: Revise Sec... and Sec.... of Part of the 00 Provisions as follows:.. Additional Detailing
More informationBijan Khaleghi, Ph, D. P.E., S.E.
0 Submission date: July, 0 Word count: 0 Author Name: Bijan Khaleghi Affiliations: Washington State D.O.T. Address: Linderson Way SW, Tumwater WA 0 INTEGRAL BENT CAP FOR CONTINUOUS PRECAST PRESTRESSED
More informationDESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY
DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY ABSTRACT Jugesh Kapur, PE, SE 1 The seismic design and detailing of bridges made of precast prefabricated members
More information4.6 Procedures for Connections
4.6 Procedures for Connections This section provides Tier 2 evaluation procedures that apply to structural connections: anchorage for normal forces, shear transfer, vertical components, interconnection
More informationAccelerated Bridge Construction in USA
Accelerated Bridge Construction in USA Abstract Rush hour traffic is a common daily occurrence in the USA. Highway and bridge construction further aggravates the situation. The Federal Highway Administration
More informationSeismic Design and Retrofit. Reginald DesRoches Professor and Associate Chair Georgia Institute of Technology
Seismic Design and Retrofit Detailing Fundamentals Reginald DesRoches Professor and Associate Chair Georgia Institute of Technology Learning Outcomes List the types of detailing that increase a bridges
More informationSUITABILITY OF BRIDGE MADE WITH PRECAST COMPONENTS IN AREAS OF HIGH OR MODERATE SEISMISITY. Bijan Khaleghi 1
SUITABILITY OF BRIDGE ADE WITH PRECAST COPONENTS IN AREAS OF HIGH OR ODERATE SEISISITY Bijan Khaleghi 1 Abstract The need for rapid construction arises from the inevitable increases in traffic congestion
More informationPrecast concrete is significantly being used in earthquake
Structural Connections for Precast Concrete Buildings - Review of Seismic and Other Design Provisions in Various International Codes - An Overview 1 2 C.A Prasad 1, Pavan Patchigolla 2 1 Director, METEY
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2017 to December 31, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT July 1, 2017 to September 30, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,
More informationFlorida DOT efforts toward improving Post Tension Durability
Florida DOT efforts toward improving Post Tension Durability By William Nickas 1 (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 73 Post-Tensioning Strategies Enhanced PT Systems
More informationGirder Load Distribution for Seismic Design of Integral Bridges
Digital Collections @ Dordt Faculty Work: Comprehensive List 1-2015 Girder Load Distribution for Seismic Design of Integral Bridges Justin Vander Werff Dordt College, justin.vanderwerff@dordt.edu Sri Sritharan
More informationSUMMARY SHEETS OF HYBRID CONNECTIONS
APPENDIX E SUMMARY SHEETS OF HYBRID CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix E E-1 APPENDIX E SUMMARY SHEETS OF HYBRID CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix E E-2 Location:
More informationACCELERATED BRIDGE CONSTRUCTION IN WASHINGTON STATE FROM RESEARCH TO PRACTICE
ACCELERATED BRIDGE CONSTRUCTION IN WASHINGTON STATE FROM RESEARCH TO PRACTICE by Bijan Khaleghi 1, Eric Schultz 2, Stephen Seguirant 3, Lee Marsh 4, Marc Eberhard 5 and John Stanton 5. ABSTRACT The Federal
More informationNew Development in Accelerated Bridge Design and Construction in WA
Delivery of Accelerated Bridge Construction WSDOT Workshop Wednesday April 1st, 2015 New Development in Accelerated Bridge Design and Construction in WA Washington State Department of Transportation Bridge
More informationSUMMARY SHEETS OF GROUTED DUCT CONNECTIONS
APPENDIX B SUMMARY SHEETS OF GROUTED DUCT CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix B B-1 APPENDIX B SUMMARY SHEETS OF GROUTED DUCT CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix
More informationBridge PBEE Overview & Pilot Next Generation Bridge Studies
Bridge PBEE Overview & Pilot Next Generation Bridge Studies Kevin Mackie Central Florida BozidarStojadinovic UC Berkeley AdyAviram UC Berkeley PEER Annual Meeting San Francisco, CA 2009/10/15 Next Generation
More informationHIGHWAYS FOR LIFE PROJECTS AND ACCELERATED BRIDGE CONSTRUCTION IN WASHINGTON STATE
HIGHWAYS FOR LIFE PROJECTS AND ACCELERATED BRIDGE CONSTRUCTION IN WASHINGTON STATE ABSTRACT The Federal Highway Administration, as part of the Every Day Counts initiative, is actively promoting accelerated
More informationST7008 PRESTRESSED CONCRETE
ST7008 PRESTRESSED CONCRETE QUESTION BANK UNIT-I PRINCIPLES OF PRESTRESSING PART-A 1. Define modular ratio. 2. What is meant by creep coefficient? 3. Is the deflection control essential? Discuss. 4. Give
More information14. Structural Concrete
14. Structural Concrete 14.1. Materials 14.2. Reinforcement 14.3. Structural Concrete Design 14.4. Prestressed Concrete Girders Section 5 of the LRFD Specifications presents unified design requirements
More informationSEISMIC PERFORMANCE AND RETROFIT OF BRIDGE FOOTINGS. David I. McLean 1
Abstract SEISMIC PERFORMANCE AND RETROFIT OF BRIDGE FOOTINGS David I. McLean 1 This study investigated retrofitting measures for improving the seismic performance of the foundations of existing bridges.
More informationS T R U C T U R. One-of-a-Kind Design The New San Francisco-Oakland Bay Bridge Self-Anchored Suspension Span. magazine. Copyright
One-of-a-Kind Design The New San Francisco-Oakland Bay Bridge Self-Anchored Suspension Span By Marwan Nader, Ph.D., P.E. and Brian Maroney, Dr. Engr., P.E. How do you design a replacement span that is,
More informationCONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG
CONCRETE SPLICED GIRDERS IN TEXAS Nicholas Nemec, P.E. TxDOT-BRG October 15, 2014 What is a Concrete Spliced Girder? 2 What is a Concrete Spliced Girder? What it is NOT : Continuous For Live Load 3 What
More informationQuasi-static cyclic testing of half-scale fully precast bridge substructure system in high seismicity
Quasi-static cyclic testing of half-scale fully precast bridge substructure system in high seismicity M. Mashal & A. Palermo Department of Civil and Natural Resources Engineering, University of Canterbury,
More informationISU Spring Transportation Seminar Series April 1, Mark Mahan, PhD, P.E. Ron Bromenschenkel, P.E. California Department of Transportation
ISU Spring Transportation Seminar Series April 1, 2016 IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel, P.E. California Department
More informationAnalytical Investigations and Design Implications of Seismic Response of a 2-Span ABC Bridge System
Analytical Investigations and Design Implications of Seismic Response of a 2-Span ABC Bridge System Quarterly Progress Report For the period ending February 28, 2018 Submitted by: PI- M. Saiidi and A.
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2016 to December 31, 2016 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,
More informationEXPERIMENTAL INVESTIGATION ON THE INTERACTION OF REINFORCED CONCRETE FRAMES WITH PRECAST-PRESTRESSED CONCRETE FLOOR SYSTEMS
EXPERIMENTAL INVESTIGATION ON THE INTERACTION OF REINFORCED CONCRETE FRAMES WITH PRECAST-PRESTRESSED CONCRETE FLOOR SYSTEMS B.H.H. Peng 1, R.P. Dhakal 2, R.C. Fenwick 3, A.J. Carr 4 and D.K. Bull 5 1 PhD
More informationDS Attachments. Design Specifications
DS Attachments Design Specifications Attachment DS1: Revised Article 2.1 Definitions o Revision of current article to include definitions of emulative and hybrid systems Attachment DS2: Revised Article
More informationPretest 3-D finite element analysis of the girder-tocap-beam connection of an inverted-tee cap beam designed for seismic loadings
Graduate Theses and Dissertations Graduate College 2009 Pretest 3-D finite element analysis of the girder-tocap-beam connection of an inverted-tee cap beam designed for seismic loadings Zachary John-william
More informationABC-UTC. Research Progress Report (Feasibility Study) Title: Alternative ABC Connections Utilizing UHPC. March, 2017
ABC-UTC Research Progress Report (Feasibility Study) Title: Alternative ABC Connections Utilizing UHPC ABSTRACT March, 2017 Accelerated Bridge Construction (ABC) is a method of bridge construction designed
More informationThe Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1
Department of Civil Engineering Lecture 2.1 Methods of Prestressing Advantages of Prestressing Section remains uncracked under service loads Reduction of steel corrosion (increase durability) Full section
More informationby Dr. Mark A. Ketchum, OPAC Consulting Engineers for the EERI 100 th Anniversary Earthquake Conference, April 17, 2006
Principles of Earthquake Engineering of Bridges Part 1: Principles & Approach by Dr. Mark A. Ketchum, OPAC Consulting Engineers for the EERI 100 th Anniversary Earthquake Conference, April 17, 2006 Presentation
More informationPacific Earthquake Engineering Research Center
Pacific Earthquake Engineering Research Center Seismic Performance of Pile-Wharf Connections Charles W. Roeder Robert Graff Jennifer L. Soderstrom Jung Han Yoo University of Washington PEER 2002/07 DECEMBER
More informationBS EN :2004 EN :2004 (E)
Contents List 1. General 1.1 Scope 1.1.1 Scope of Eurocode 2 1.1.2 Scope of Part 1-1 of Eurocode 2 1.2 Normative references 1.2.1 General reference standards 1.2.2 Other reference standards 1.3 Assumptions
More informationEXPERIMENTAL TESTING OF EMULATIVE FULLY PRECAST CONCRETE BRIDGE BENT IN SEISMIC REGIONS
EXPERIMENTAL TESTING OF EMULATIVE FULLY PRECAST CONCRETE BRIDGE BENT IN SEISMIC REGIONS Mustafa Mashal 1, Alessandro Palermo 2 ABSTRACT: Concrete bridge bent also known as multi-column pier support is
More informationDesign & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By:
Design & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By: ABSTRACT Shafi M. Sharifan, Ph.D., P.E. Wei Koo & Associates Orange, California Kosal Krishnan,
More informationChapter 2 Notation and Terminology
Reorganized 318 Chapter Titles Chapter 1 General 1.1 Scope 1.2 Purpose 1.3 Interpretation 1.4 Drawings and Specifications 1.5 Testing and Inspection 1.6 Administatration and Enforcement 1.6.1 Retention
More informationAccelerated Bridge Construction Developments on the Earthquake Frontier
Accelerated Bridge Construction Developments on the Earthquake Frontier John Stanton University of Washington AASHTO SCOBS meeting Spokane WA, 12 June 2017 Outline ABC in Seismic Regions What are the challenges?
More informationDEVELOPMENT OF GUIDE FOR SELECTION OF SUBSTRUCTURE FOR ABC PROJECTS
DEVELOPMENT OF GUIDE FOR SELECTION OF SUBSTRUCTURE FOR ABC PROJECTS Quarterly Progress Report For the period ending August 31, 2018 Submitted by: PIs - Armin Mehrabi, Hesham Ali Graduate Students - Mohamadtaqi
More informationNCHRP Project Michael Culmo, PE CME Associates, Inc.
NCHRP Project 12-102 Michael Culmo, PE CME Associates, Inc. Acknowledgements NCHRP: Waseem Dekelbab Project Panel Ahmad Abu-Hawash Iowa DOT Norman P. Marzano Jr. Rhode Island DOT Carmen Swanwick Utah DOT
More informationCALTRANS SDC PROCEDURE
CALTRANS SDC PROCEDURE Robert Matthews H&N Infrastructure 3/7/2002 CALTRANS SDC PROCEDURE Slide No. 1 OVERVIEW APPLICABILITY OF SDC PRELIMINARY STRUCTURE SIZING LOCAL MEMBER DUCTILITY STAND-ALONE FRAME
More informationTitle. Author(s)KIM, D. W.; SHIM, C. S. Issue Date Doc URL. Type. Note. File Information
Title EVALUATION OF STRUCTURAL PERFORMANCE OF PRECAST MODU Author(s)KIM, D. W.; SHIM, C. S. Issue Date 2013-09-13 Doc URL http://hdl.handle.net/2115/54437 Type proceedings Note The Thirteenth East Asia-Pacific
More informationLARGE-SCALE TESTING OF LOW-DAMAGE SUPERSTRUCTURE CONNECTIONS IN PRECAST BRIDGES Z CHEGINI 1 ; A PALERMO 1
LARGE-SCALE TESTING OF LOW-DAMAGE SUPERSTRUCTURE CONNECTIONS IN PRECAST BRIDGES Z CHEGINI 1 ; A PALERMO 1 1 Department of Civil and Natural Resources Engineering, University of Canterbury, NZ SUMMARY Prefabrication
More informationPACIFIC EARTHQUAKE ENGINEERING RESEARCH CENTER
PACIFIC EARTHQUAKE ENGINEERING RESEARCH CENTER Unbonded Pretensioned Bridge Columns with Rocking Detail Jeffrey A. Schaefer United States Air Force Bryan Kennedy Marc O. Eberhard John F. Stanton Department
More information1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY
Detailing of ABC Bridges for Simplicity and Durability Michael P. Culmo, P.E. CME Associates, Inc. East Hartford, CT DETAILS This presentation contains many preferred details My favorite details will be
More informationMIDAS Training Series
MIDAS midas Civil Title: All-In-One Super and Sub Structure Design NAME Edgar De Los Santos / MIDAS IT United States 2016 Substructure Session 1: 3D substructure analysis and design midas Civil Session
More informationApplications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction
Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction 2018 Virginia Concrete Conference March 2, 2018 Bardia Emami, PE Outline Projects
More informationSEISMIC DESIGN OF PRECAST PIERS WITH POCKET CONNECTIONS, CFRP TENDONS AND ECC/UHPC COLUMNS
International Journal of Bridge Engineering (IJBE), Special Issue 2017, pp. 99-123 SEISMIC DESIGN OF PRECAST PIERS WITH POCKET CONNECTIONS, CFRP TENDONS AND ECC/UHPC COLUMNS Alireza Mohebbi 1, M. Saiid
More informationExperimental assessment of the in-plane lateral drift capacity of precast concrete building cores
Experimental assessment of the in-plane lateral drift capacity of precast concrete building cores Scott J. Menegon Structural Engineer and PhD Candidate Centre for Sustainable Infrastructure Swinburne
More informationDesign of Buchanan County, Iowa, Bridge Using Ultra High Performance Concrete and PI Girders
Design of Buchanan County, Iowa, Bridge Using Ultra High Performance Concrete and PI Girders Brian Keierleber Buchanan County Engineer 1511 First Street Independence, IA 50644 bcengineer@bcch.sbt.net Dean
More informationInternational Journal of Advance Engineering and Research Development REVISION OF IS: A REVIEW (PART 2)
Scientific Journal of Impact Factor (SJIF): 4.72 International Journal of Advance Engineering and Research Development Volume 5, Issue 01, January -2018 REVISION OF IS: 13920 A REVIEW (PART 2) Dr. Archana
More informationDuctile Detailing for Earthquake Resistant R C Structures. Dr. S. K. PRASAD Professor of Civil Engineering S.J. College of Engineering Mysore
Ductile Detailing for Earthquake Resistant R C Structures Dr. S. K. PRASAD Professor of Civil Engineering S.J. College of Engineering Mysore 570 006 1 Ductile Detailing Objective To provide adequate toughness
More informationRetrofit Measures for Superstructures, Bearings, and Seats
Retrofit Measures for Superstructures, Bearings, and Seats Presented by Richard V Nutt Elements to be Retrofitted Bridge Decks and Girders Bearings, Anchorages and Pedestals Expansion Joints 1 Elements
More informationADDENDA #9- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services
ADDENDA #9- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services Addenda Dated: 01/25/2019 PURPOSE: The purpose of this Addenda #9 is to provide a
More informationPRECAST CONCRETE CONNECTIONS FOR ACCELERATED BRIDGE CONSTRUCTION IN REGIONS OF HIGH SEISMICITY
PRECAST CONCRETE CONNECTIONS FOR ACCELERATED BRIDGE CONSTRUCTION IN REGIONS OF HIGH SEISMICITY SAM WHITE 1, MUSTAFA MASHAL 2, ALESSANDRO PALERMO 2 1 Opus International Consultants, formerly College of
More informationExperimental study on the seismic performance of RC moment resisting frames with precast-prestressed floor units.
Experimental study on the seismic performance of RC moment resisting frames with precast-prestressed floor units. B.H.H. Peng, R.C. Fenwick, R.P. Dhakal & D.K. Bull Department of Civil and Natural Resources
More informationQuasi-static cyclic tests of Emulative Precast Segmental Bridge Piers (E-PSBP)
Quasi-static cyclic tests of Emulative Precast Segmental Bridge Piers (E-PSBP) M. Mashal, S. White, & A. Palermo Department of Civil and Natural Resources Engineering, University of Canterbury, Christchurch.
More informationPrestressed Concrete Girder Continuity Connection
Report No: Title: Developing Organization: Precast/Prestressed Concrete Institute Technical Committee Phone - 888-700-5670 Email contact@pcine.org Website- www.pcine.org Report Date: Revision Date: Status
More informationLarge-scale testing of low-damage superstructure connections in precast bridges
Proceedings of the Tenth Pacific Conference on Earthquake Engineering Building an Earthquake-Resilient Pacific 6-8 November 2015, Sydney, Australia Large-scale testing of low-damage superstructure connections
More informationPROGRESS REPORT. Period ending March 31, Submitted by. Ramin Taghinezhad. Department of Civil and Environmental Engineering
Extending Application of Simple for Dead and Continuous for Live Load Steel Bridge System to ABC Applications in Seismic Regions- Phase I- Numerical Study PROGRESS REPORT Period ending March 31, 2016 Submitted
More informationSeismic performance of precast concrete segmental bridges: Summary of experimental research on segmentto-segment
Editor s quick points n Researchers recently completed a three-phase research project to investigate the seismic performance of precast concrete segmental bridges. n The research showed that segment joints
More informationA seismic engineer s note book
A seismic engineer s note book G.R. Houston, A.S. Beer, G.L. Cole & R.D. Jury Beca Ltd, New Zealand. 2014 NZSEE Conference ABSTRACT: The interest in seismic retrofit of buildings stimulated by the Canterbury
More informationMasonry and Cold-Formed Steel Requirements
PC UFC Briefing September 21-22, 2004 Masonry and Cold-Formed Steel Requirements David Stevens, ARA Masonry Requirements Composite Construction Masonry is often used in composite construction, such as
More informationSeismic Design of Precast Concrete Structures
Seismic Design of Precast Concrete Structures S. K. Ghosh S. K. Ghosh Associates Inc. Palatine, IL and Aliso Viejo, CA Instructional Material Complementing FEMA 1052, Design Examples Diaphragms Analysis
More informationDEALING WITH SEISMIC FORCES IN FLOORS OF REAL BUILDINGS: DESIGN ISSUES AND RECOMMENDATIONS.
DEALING WITH SEISMIC FORCES IN FLOORS OF REAL BUILDINGS: DESIGN ISSUES AND RECOMMENDATIONS. Des K. Bull 1, Richard C. Fenwick 2, Debra Gardiner 3 SUMMARY The paper describes the technical challenges of
More informationSUNSHINE SKYWAY BRIDGE
SUNSHINE SKYWAY BRIDGE Retrofit of the Post-Tensioned Precast Transition Pier Columns on the Sunshine Skyway Bridge Presented by: Antonio Ledesma, P.E. May 7, 2012 SUNSHINE SKYWAY BRIDGE, FLORIDA Presentation
More informationBRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.
BRIDGE DESIGN MANUAL UPDATES Jamie F. Farris, P.E. October 2015 Table of Contents 1 BDM Chapter 2 Limit States and Loads 2 BDM Chapter 3 Superstructure Design 3 BDM Chapter 4 Substructure Design 4 Questions
More informationNEWMARKET VIADUCT REPLACEMENT PROJECT END OF AN ERA TED POLLEY *, PETER ELCOCK **
NEWMARKET VIADUCT REPLACEMENT PROJECT END OF AN ERA TED POLLEY *, PETER ELCOCK ** * BEng (Hons), Designer/Design Manager NGA Newmarket Alliance, Beca Infrastrucutre Ltd ** BSc. C.Eng. MICE, Designer (Deconstruction)
More informationLRFD Minimum Flexural Reinforcement Requirements
NCHRP 12-94 1 LRFD Minimum Flexural Reinforcement Requirements Presentation to AASHTO T 10 Committee Spokane, WA June 12, 2017 2 Project Personnel Principal Investigator: Sri Sritharan, Iowa State University
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS
MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS SECTION 1 - MISCELLANEOUS STANDARDS 1.00.01 -.05 Table of Contents 1.11.01 Decimal Parts of a Foot and Inch 1.21.01 Factors
More informationSouthern Cross Hospitals Ltd Endoscopy Consultants PRESSS Building
ENG.HAV.0001.1 Southern Cross Hospitals Ltd Endoscopy Consultants PRESSS Building Gary Haverland BE (Civil)(Hons) Director / Senior Engineer Structex, Christchurch ENG.HAV.0001.2 ENG.HAV.0001.3 ENG.HAV.0001.4
More informationSeismic Analysis and Design of Berth 14 Extension Balboa, Panama. Way, WA ; PH (206) ;
Seismic Analysis and Design of Berth 14 Extension Balboa, Panama J. Paul Smith-Pardo, Ph.D. PE 1 and Christopher B. Cornell, MASCE, PE, SE 2 1 Senior Engineer, BergerABAM, 33301 Ninth Avenue South, Suite
More informationExtending Application of SDCL Steel Bridge System to ABC Applications in Seismic Regions
Extending Application of SDCL Steel Bridge System to ABC Applications in Seismic Regions Graduate Student Seminar: ABC Solutions By: Ramin Taghinezhad, Ph.D. Candidate and FIU Research Assistant Expected
More informationContinuous for Live Load: A Texas Historical Perspective
Continuous for Live Load: A Texas Historical Perspective Scott Walton, M.S.C.E., E.I.T. 1, and Timothy E. Bradberry, M.S.E., P.E. 2 Abstract A significant number of engineers in the United States have
More informationDesign and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.
Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on
More informationAppendix A Proposed LRFD Specifications and Commentary
NCHRP Project 12-71 Design Specifications and Commentary for Horizontally Curved Concrete Box-Girder Highway Bridges Appendix A Proposed LRFD Specifications and Commentary A-1 A-2 4.2 DEFINITIONS (Additional)
More informationEXPERIMENTAL INVESTIGATION OF PRECAST CONCRETE BEAM TO COLUMN CONNECTIONS SUBJECTED TO REVERSED CYCLIC LOADS
6 th International Conference on Seismology and Earthquake Engineering EXPERIMENTAL INVESTIGATION OF PRECAST CONCRETE BEAM TO COLUMN CONNECTIONS SUBJECTED TO REVERSED CYCLIC LOADS H. Shariatmadar 1, E.
More informationSEAU 5 th Annual Education Conference 1. ASCE Concrete Provisions. Concrete Provisions. Concrete Strengths. Robert Pekelnicky, PE, SE
ASCE 41-13 Concrete Provisions Robert Pekelnicky, PE, SE Principal, Degenkolb Engineers Chair, ASCE 41 Committee* *The view expressed represent those of the author, not the standard s committee as a whole.
More informationFEBRUARY 2019 LRFD BRIDGE DESIGN 5-1
FEBRUARY 2019 LRFD BRIDGE DESIGN 5-1 5. CONCRETE STRUCTURES Reinforced and prestressed concrete are used extensively in bridge projects. In addition to general design guidance and information on detailing
More informationPrecast Columns with Mechanically Spliced Connections for Accelerated Bridge Construction in Seismic Zones. Zachary B. Haber 1
Precast Columns with Mechanically Spliced Connections for Accelerated Bridge Construction in Seismic Zones Abstract Zachary B. Haber 1 In recent years, a number of laboratory and analytical studies have
More informationLRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE. Mark S. Mahan 1
LRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE Mark S. Mahan 1 Abstract The newly approved AASHTO Guide Specification for LRFD Seismic Bridge Design (referred to as LRFD Seismic Guide Spec), July 2007,
More informationEurocode 8 Timber and Masonry structures
Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 8 Timber and Masonry structures E C Carvalho, Chairman TC250/SC8 Brussels, 18-20 February 2008 Dissemination of information
More informationJULY 2014 LRFD BRIDGE DESIGN 5-1
JULY 014 LRFD BRIDGE DESIGN 5-1 5. CONCRETE STRUCTURES Reinforced and prestressed concrete are used extensively in bridge projects. In addition to general design guidance and information on detailing practices,
More informationFRP-strengthened RC Structures
FRP-strengthened RC Structures J. G. Teng The Hong Kong Polytechnic University, China J. F. Chen The University of Nottingham, UK S. T. Smith The Hong Kong Polytechnic University, China L. Lam The Hong
More informationThe fib state-of-the-art report on the seismic design of precast concrete building structures
The fib state-of-the-art report on the seismic design of precast concrete building structures R. Park Deputy Chair of fib Commission 7 : Seismic Design, Department of Civil Engineering University of Canterbury,
More informationDeformation Capacity of RC Structural Walls without Special Boundary Element Detailing
Proceedings of the Tenth Pacific Conference on Earthquake Engineering Building an Earthquake-Resilient Pacific 6-8 November 2015, Sydney, Australia Deformation Capacity of RC Structural Walls without Special
More informationBALANCED CANTILEVER GIRDER BRIDGE OVER THE DANUBE-BLACK SEA CHANNEL
DOI: 10.1515/rjti-2015-0017 BALANCED CANTILEVER GIRDER BRIDGE OVER THE DANUBE-BLACK SEA CHANNEL Aldo Giordano, PH.D. Professor of Structural Engineering, ITALROM Inginerie Internationala, e-mail: a.giordano@italrominginerie.com
More informationHyperstatic (Secondary) Actions In Prestressing and Their Computation
5.5 Hyperstatic (Secondary) Actions In Prestressing and Their Computation Bijan O Aalami 1 SYNOPSIS This Technical Note describes the definition, computation, and the significance of hyperstatic (secondary)
More informationSEISMIC DESIGN STRATEGY OF THE NEW EAST BAY BRIDGE SUSPENSION SPAN
SEISMIC DESIGN STRATEGY OF THE NEW EAST BAY BRIDGE SUSPENSION SPAN Marwan NADER 1, Rafael MANZANAREZ 2 And Brian MARONEY 3 SUMMARY The San Francisco Oakland Bay Bridge was closed in 1989 when a 15-m portion
More informationA New Precast Concrete Deck System for Accelerated Bridge Construction
A New Precast Concrete Deck System for Accelerated Bridge Construction George Morcous 1(&), Fouad Jaber 2, and Jason Volz 2 1 University of Nebraska-Lincoln, Omaha, NE, USA 2 Nebraska Department of Roads,
More informationHYBRID MOMENT FRAMES AND UNBONDED PT SHEAR WALLS
HYBRID MOMENT FRAMES AND UNBONDED PT SHEAR WALLS Opportunities Resulting From Recent ACI 318 Code Changes and the Work of ACI ITG s 1 and 5 Neil M. Hawkins, Professor Emeritus, University of Illinois PTI
More information