MAMMAL BURROW CHARACTERIZATION AND EFFECTIVENESS OF BURROW GROUTING

Size: px
Start display at page:

Download "MAMMAL BURROW CHARACTERIZATION AND EFFECTIVENESS OF BURROW GROUTING"

Transcription

1 MAMMAL BURROW CHARACTERIZATION AND EFFECTIVENESS OF BURROW GROUTING Diego Cobos, Michelle Shriro, Nicholas Sitar, Jonathan Bray University of California, Berkeley 1

2 INTRODUCTION Mammal burrowing activity generates large voids (macropores) which have the potential to generate rapid saturation of embankments, piping, internal erosion and levee collapse (ASDSO, 2002). FEMA 473,

3 OBJECTIVES Assess extents and architecture of burrow networks under different levee materials, maintenance conditions and food sources Study efficacy of current CA Department of Water Resources (DWR) grouting techniques Estimate volumes of voids generated by burrow activity Estimate effects on seepage and piping potential 3

4 TEST 1: SANDY LEVEE SITE Sacramento River 3.3 m m 1 2 Landside ditch Waterside berm 12 m 3 m (10 ft) tall sandy levee No grouting or baiting practices in place Source of food approximately 30 ft from landside toe 4

5 OBSERVED INTRUSIONS - Squirrel Active Squirrel burrows on landside slope 50 cm 50 cm

6 OBSERVED INTRUSIONS - Squirrel Active Squirrel burrows near waterside toe 6

7 LEVEE MATERIALS Cross Section Road base Waterside Landside 2 1 Sand Levee Clay + cemented sand seams 7

8 PRE TEST CONDITIONS WATERSIDE CROWN LANDSIDE Inactive burrows (77) Active burrows (21) Crack (Grid in meters, 1 m: 3.28 ft) 8

9 DWR GROUTING SEPTEMBER 2, 2011 DWR Equipment Mix on site cement truck Presentation to SAFCA 9

10 CHEMICAL GROUTING SEPTEMBER 17,

11 EXCAVATION - WATERSIDE 2.4 m (8 ft)

12 EXCAVATION - WATERSIDE Waterside main burrow was a linear feature, extending several feet from the toe into the levee, finishing in a large den. Location and extent of this burrow was highly dependent on clay/sand interface.

13 EXCAVATION - LANDSIDE 1.2 m (4 ft) Mixed zone Cement grout Urethane grout waterside landside 13

14 EXCAVATION - LANDSIDE Previous image 14

15 EXCAVATION - LANDSIDE 15

16 EXCAVATION - LANDSIDE Levee crown Level 1 (removed) Level 2 Level 3 Clean urethane Landside toe 16

17 River Ditch 17

18 Side View Landside Burrow System Green: cement grout Pink: urethane grout Crown 1 m 3 m 18 Front View

19 Side View 2.6 m Top View 2.4 m Side View (levee removed) 2.4 m (8 ft) Front View Den 2.6 m Waterside Burrow System 19

20 TEST 2: CLAYEY LEVEE SITE 6 5 This site had sand boils and through seepage associated with squirrel burrows in DWR started grouting yearly after 2000 (Photos courtesy Al Romero, DWR). 20

21 (12) (110) 21

22 Landside slope looking south Levee crown Levee toe 22

23 Encountered a squirrel burrow (~10 cm diameter) completely penetrating the embankment, 23 approximately 1.2 m below the crown. Levee crown looking south 10 ft

24 Levee crown looking north landside Waterside 24

25 Landside Waterside 25

26 Plan View Waterside 1 m Crown Landside Green: cement grout Pink: urethane grout 26

27 CEMENT-BENTONITE GROUT EFFICACY STUDY SITE Sandy Levee Clayey Levee Cement-Bentonite Grout, m Urethane Grout, m Total Volume, m % Cement-Bentonite 74% 82% % Urethane 26% 18% % of Levee Removed 0.24% 0.31% Current cement-bentonite grout techniques by DWR fill more than ¾ of the voids created by squirrels and gophers. This percentage appears to increase when a yearly grouting program is in place (clayey site). However, some defects are evident in the grout mix. 27

28 Voids in cement grout Ungrouted holes next to cement Ungrouted holes with no surface expression Cracking and degradation of cement grout 28

29 SUMMARY OF OBSERVATIONS 1. Presence of clay seams directly related to burrows Presentation to SAFCA 29

30 SUMMARY OF OBSERVATIONS 2. Recurrence of burrows Presentation to SAFCA 30

31 SUMMARY OF OBSERVATIONS % of the burrows were filled by DWR cement-bentonite grout Presentation to SAFCA 31

32 SUMMARY OF OBSERVATIONS 4. Discontinuities and defects in DWR grout Presentation to SAFCA 32

33 SUMMARY OF OBSERVATIONS 5. Small number of ungrouted holes

34 SUMMARY OF OBSERVATIONS 6. Effects of regular maintenance Number of Holes # of holes ft3 of grout per hole Year Volume of Grout per Hole (cu.ft) Data courtesy Al Romero and Roy Kroll, DWR 34

35 SUMMARY OF OBSERVATIONS 7. Completely penetrating burrows 35

36 SUMMARY OF OBSERVATIONS 8. Influence of other species Pleasant Grove Creek Canal. Image courtesy Ray Costa Medford Island. Image courtesy MBK Engineers Arcade Creek. Image courtesy Richard Marck, ARFCD 36

SLURRY WALLS FOR SEEPAGE CUTOFF IN LEVEE APPLICATIONS RECENT EXPERIENCE AND CONSTRUCTION CHALLENGES IN THE NORTHERN CENTRAL VALLEY OF CALIFORNIA

SLURRY WALLS FOR SEEPAGE CUTOFF IN LEVEE APPLICATIONS RECENT EXPERIENCE AND CONSTRUCTION CHALLENGES IN THE NORTHERN CENTRAL VALLEY OF CALIFORNIA SLURRY WALLS FOR SEEPAGE CUTOFF IN LEVEE APPLICATIONS RECENT EXPERIENCE AND CONSTRUCTION CHALLENGES IN THE NORTHERN CENTRAL VALLEY OF CALIFORNIA Deep Foundation Institute Slurry Wall Committee July 22,

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION Date: June 12, 2014 To: From: Subject: Governor s Office of Planning and Research/State Clearinghouse Unit, Responsible Agencies, Trustee Agencies, and Interested Parties Announcement

More information

THREE RIVERS LEVEE IMPROVEMENT AUTHORITY 1114 Yuba Street, Suite 218 Marysville, CA Office (530) Fax (530)

THREE RIVERS LEVEE IMPROVEMENT AUTHORITY 1114 Yuba Street, Suite 218 Marysville, CA Office (530) Fax (530) THREE RIVERS LEVEE IMPROVEMENT AUTHORITY 1114 Yuba Street, Suite 218 Marysville, CA 95901 Office (530) 749-7841 Fax (530) 749-6990 November 20, 2013 Mr. Eric Simmons Regional Engineer, FEMA Region IX 1111

More information

Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout

Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout Brendan P. Harkins 1, E.I.T.; Dominic M. Parmantier 2, M. ASCE, P.E. 1 Project Engineer, Condon-Johnson & Associates,

More information

Coal Combustion Facility Assessment Report. October 20, 2010

Coal Combustion Facility Assessment Report. October 20, 2010 Coal Combustion Facility Assessment Report October 20, 2010 Introduction Stantec Consulting Services Inc. North American Consulting Firm 10,000 Engineers, Geologists, Architects, Scientists and Technicians

More information

Flood & Storm Water Emergency Scope of Services

Flood & Storm Water Emergency Scope of Services Flood & Storm Water Emergency Scope of Services EMERGENCY CONTACTS: CHRIS DELLARINGA CELL: 916-340-5600 EMAIL: CHRIS@BLUEIRONINC.COM MELISSA BAKER CELL: 916-825-8261 EMAIL MELISSA@BLUEIRONINC.COM Flood

More information

10.0 References. California Department of Water Resources Feasibility Report, American Basin Conjunctive Use Project. Sacramento, CA.

10.0 References. California Department of Water Resources Feasibility Report, American Basin Conjunctive Use Project. Sacramento, CA. 10.0 References American States Water Company, Wood Rodgers, Inc., Stratecon, Inc., and Hatch & Parent. 2006. Integrated Water Resources Management Plan. Prepared for Natomas Central Mutual Water Company.

More information

Horizontal Borehole Study

Horizontal Borehole Study Horizontal Borehole Study Richard A. Beier a and William A. Holloway b a Mechanical Engineering Technology Department b Electrical Engineering Technology Department Oklahoma State University Stillwater,

More information

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010047 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE

More information

EMBANKMENT DAM SEEPAGE MODIFICATIONS CHOICES AND CONSIDERATIONS. John W. France, PE, D.WRE 1 ABSTRACT INTRODUCTION

EMBANKMENT DAM SEEPAGE MODIFICATIONS CHOICES AND CONSIDERATIONS. John W. France, PE, D.WRE 1 ABSTRACT INTRODUCTION This paper is reproduced from the Proceedings of the 2014 United States Society on Dams (USSD) Annual Conference, with the permission of USSD. EMBANKMENT DAM SEEPAGE MODIFICATIONS CHOICES AND CONSIDERATIONS

More information

Chapter A-9 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (HARLEM AREA)

Chapter A-9 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (HARLEM AREA) Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-9 GEOTECHNICAL

More information

WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIR PROJECT Information Sheet

WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIR PROJECT Information Sheet March 5, 2015 WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIR PROJECT Information Sheet Overview The purpose of this Project is to repair damages to the Waikoloa Reservoir No. 1 which were sustained during

More information

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010047 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

9. Levee Maintaining Agency Projects

9. Levee Maintaining Agency Projects 9. Levee Maintaining Agency Projects 9.1. Overview This chapter summarizes the known deficiencies identified for each local levee maintaining agency (LMA) within the Regions. Note that although the focus

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

River management in Japan With focus on river levee

River management in Japan With focus on river levee River management in Japan With focus on river levee January 2009 Masahiro Atsumi River Bureau, Ministry of Land, Infrastructure, Transport and Tourism, Japan Objectives of river management Article 1 of

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No Environmental Resources Management January 13, 2017 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0352436 CityCentre Four 840 West Sam Houston Parkway North, Suite 600 Houston,

More information

LEVEE DEFICIENCY CORRECTION PROCEDURES

LEVEE DEFICIENCY CORRECTION PROCEDURES LEVEE DEFICIENCY CORRECTION PROCEDURES USACE, LOS ANGELES DISTRICT 24 APRIL 2015 LEVEE SAFETY PROGRAM Deficiencies noted on the inspection checklist portion of the Periodic Inspection Report shall be addressed

More information

DRAFT Sacramento s Comprehensive Flood Risk Reduction Program

DRAFT Sacramento s Comprehensive Flood Risk Reduction Program DRAFT Sacramento s Comprehensive Flood Risk Reduction Program March 20, 2017 1007 7 th St, 7 th Floor Sacramento, CA 95814 Table of Contents 1. Introduction... 2 2. Flood System Management... 6 American

More information

American River Watershed Common Features General Reevaluation Report

American River Watershed Common Features General Reevaluation Report American River Watershed Common Features General Reevaluation Report Final Environmental Impact Statement Environmental Impact Report Cover Photos: American River Parkway Photos Courtesy of Tim Davis Creative,

More information

SANTA ANA RIVER/ SAN TIMOTEO CREEK 1 LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

SANTA ANA RIVER/ SAN TIMOTEO CREEK 1 LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # SANTA ANA RIVER/ SAN TIMOTEO CREEK 1 LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805030015 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE

More information

Sealing Leaking Ponds

Sealing Leaking Ponds 1 of 5 5/21/2004 12:47 PM Sealing Leaking Ponds Excessive seepage in ponds is generally due either to a poor site--that is, one in which the soils in the impounded area are too permeable to hold water--to

More information

SPECIFICATION : BORING AND JACKING

SPECIFICATION : BORING AND JACKING SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in

More information

Temporary Structures. Excavations and Excavation Supports

Temporary Structures. Excavations and Excavation Supports UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Temporary Structures Excavations and Excavation Supports CM 420

More information

NDT in Grouted PT Inspection for Bridges

NDT in Grouted PT Inspection for Bridges NDT in Grouted PT Inspection for Bridges PTI Technical Conference & Exhibition Miami, FL May 8, 2007 Hong-gang gang Cao CTLGroup (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 37

More information

COMPREHENSIVE FOUNDATION REHABILITATION AT BEAR CREEK DAM. Conrad H. Ginther 1 John E. Charlton 2 ABSTRACT INTRODUCTION

COMPREHENSIVE FOUNDATION REHABILITATION AT BEAR CREEK DAM. Conrad H. Ginther 1 John E. Charlton 2 ABSTRACT INTRODUCTION COMPREHENSIVE FOUNDATION REHABILITATION AT BEAR CREEK DAM Conrad H. Ginther 1 John E. Charlton 2 ABSTRACT TVA s Bear Creek Dam is a high hazard embankment dam in northwest Alabama that provides water supply,

More information

FEMA Levee Certification Ventura County, California

FEMA Levee Certification Ventura County, California Ventura County Watershed Protection District FEMA Levee Certification Ventura County, California Ventura River Levee (VR-1) Pacific Ocean to Canada de San Joaquin Evaluation Report February 20, 2009 TETRA

More information

TECHNICAL STANDARDS AND GUIDELINES FOR DESIGN OF FLOOD CONTROL STRUCTURES

TECHNICAL STANDARDS AND GUIDELINES FOR DESIGN OF FLOOD CONTROL STRUCTURES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JAPAN INTERNATIONAL COOPERATION AGENCY TECHNICAL STANDARDS AND GUIDELINES FOR DESIGN OF FLOOD CONTROL STRUCTURES June 2010 Project for the Strengthening of Flood

More information

KEY MAP - SCALE 1:1,500,000 NOTE 1. SLIDE FEATURES RECORDED USING A HAND HELD GPS. SLIDE MOVEMENT DIRECTION 2014 PH26 INSPECTION PLAN

KEY MAP - SCALE 1:1,500,000 NOTE 1. SLIDE FEATURES RECORDED USING A HAND HELD GPS. SLIDE MOVEMENT DIRECTION 2014 PH26 INSPECTION PLAN Z:\\-1-305\\-1-305_PH2-1.dwg - 2-1 - Dec., KEY MAP - 1:1,500,000 NOTE 1. SLIDE FEATURES RECORDED USING A HAND HELD GPS. SLIDE MOVEMENT DIRECTION TEST HOLE LOCATIONS 0 40 0 0 m 1:00 PH2 INSPECTION PLAN

More information

VOTR Site Assessment Victoria on the River

VOTR Site Assessment Victoria on the River i Executive Summary A. Introduction AECOM New Zealand Limited (AECOM) was engaged by Hamilton City Council (HCC) to undertake a geotechnical assessment of the (VOTR) site in Hamilton s central business

More information

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS UTAH COUNTY HEALTH DEPARTMENT Div. of Environmental Health 151 South University Avenue, Provo 84601 (801) 851-7525 FAX 851-7521 GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS This is intended to

More information

KIEWIT FOUNDATIONS GROUP

KIEWIT FOUNDATIONS GROUP KIEWIT FOUNDATIONS GROUP KIEWIT AT-A-GLANCE With a strong local presence and access to a vast network Keeping safety at the forefront, the Kiewit Foundations Group self- OUR MARKETS of industry experts,

More information

Design, Construction, & Verification of a Partial- Depth Seepage Barrier through Glacial Outwash

Design, Construction, & Verification of a Partial- Depth Seepage Barrier through Glacial Outwash Design, Construction, & Verification of a Partial- Depth Seepage Barrier through Glacial Outwash Kenneth Darko, PhD., P.E., P.G. Geotech/Water Resources, LRH Seth Lyle, P.E., P.G. USACE DSMMCX/LRD DSPC

More information

KIEWIT FOUNDATIONS GROUP

KIEWIT FOUNDATIONS GROUP KIEWIT FOUNDATIONS GROUP SAFETY FIRST At Kiewit, nothing is more important than safety. Our craft-led safety programs and commitment at all levels of our operations ensure our focus is on what matters

More information

A.2.a Random Riprap... Table

A.2.a Random Riprap... Table 3601 RIPRAP MATERIAL 3601.1 SCOPE Provide stone and filter layer material for use in random or hand-placed riprap, gabion, and revet mattress construction. 3601.2 REQUIREMENTS A Stones A.1 Quality Provide

More information

SECTION GRAVEL PACKED WATER WELL

SECTION GRAVEL PACKED WATER WELL SECTION 02520 GRAVEL PACKED WATER WELL PART 1 GENERAL 1.01 SECTION INCLUDES A. Gravel packed water well includes drilling, installing, cleaning, developing, testing, videoing, abandoning, and site clean

More information

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe. MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction

More information

HUDSON TUNNEL PROJECT

HUDSON TUNNEL PROJECT HUDSON TUNNEL PROJECT NORTH BERGEN COMMUNITY MEETING Lido Restaurant 2600 Tonnelle Avenue North Bergen, NJ January 30, 2018 6:00-8:00 PM Agenda Project Overview Construction Activities in North Bergen

More information

Dam Safety Inspection Checklist

Dam Safety Inspection Checklist Dam Safety Inspection Checklist Complete All Portions of This Section (Pre-inspection) Date of Inspection: Name of Dam: EAP: (yes, no) OM&I: (yes, no) File Number: Review Inventory - Highlight missing

More information

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to

More information

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission

More information

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS Dipl.-Wirt.Ing. Oliver Freudenreich Friedr. Ischebeck GmbH phone: ++49 2333 8305-0 Loher Str. 31 79 fax: ++49 2333 8305-55 e-mail: freudenreich@ischebeck.de D-58256 Ennepetal www.ischebeck.com INNOVATIVE

More information

SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010031 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE

More information

Soil Permeability Demonstration

Soil Permeability Demonstration Soil Permeability Demonstration Grade Level: 6-12 Subject Area: Soil science, Aquaculture Time: This will take one hour to drill holes in the bucket and acquire the various soils. This will take one hour

More information

Chapter A-8 GEOTECHNICAL ANALYSIS FAIRFAX-JERSEY CREEK (JERSEY CREEK SHEET PILE WALL)

Chapter A-8 GEOTECHNICAL ANALYSIS FAIRFAX-JERSEY CREEK (JERSEY CREEK SHEET PILE WALL) Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-8 GEOTECHNICAL

More information

Effect of Clay Content on Permeability and Compaction Parameters of Sand

Effect of Clay Content on Permeability and Compaction Parameters of Sand Effect of Clay Content on Permeability and Compaction Parameters of Sand Shahid Noor Scientist C, Central Soil and Materials Research Station Amardeep Singh Scientist C, Central Soil and Materials Research

More information

MGF EXCAVATION SUPPORT SYSTEMS MGF EXCAVATION SUPPORT SYSTEMS: Excavation Safety / Temporary Works Presentation

MGF EXCAVATION SUPPORT SYSTEMS MGF EXCAVATION SUPPORT SYSTEMS: Excavation Safety / Temporary Works Presentation MGF EXCAVATION SUPPORT SYSTEMS MGF EXCAVATION SUPPORT SYSTEMS: Excavation Safety / Temporary Works Presentation Our Team Today Joel Clarke Neil Jennings Sales Engineer Technical Sales Who We Are A leading

More information

Final Supplement to the Environmental Impact Report on the Natomas Levee Improvement Program Landside Improvements Project Phase 2 Project

Final Supplement to the Environmental Impact Report on the Natomas Levee Improvement Program Landside Improvements Project Phase 2 Project Final Supplement to the Environmental Impact Report on the Natomas Levee Improvement Program Landside Improvements Project Phase 2 Project State Clearinghouse # 2007062016 Prepared for: January 2009 Final

More information

Updated Local Funding Mechanisms for Sacramento Area Flood Control Improvements

Updated Local Funding Mechanisms for Sacramento Area Flood Control Improvements Final Subsequent Program Environmental Impact Report Updated Local Funding Mechanisms for Sacramento Area Flood Control Improvements State Clearinghouse No. 2006072098 Prepared for: Prepared by: April

More information

KIEWIT FOUNDATIONS GROUP

KIEWIT FOUNDATIONS GROUP KIEWIT FOUNDATIONS GROUP KIEWIT ADVANTAGE LOCAL CONTRACTOR, EXPANSIVE REACH With a strong local presence, access to a vast network of resources throughout North America and a focus on self-performing work,

More information

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow Straw Bale Barrier SE-9 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

The effects of flood fighting and emergency measures on the reliability of flood defences

The effects of flood fighting and emergency measures on the reliability of flood defences Comprehensive Flood Risk Management Klijn & Schweckendiek (eds) 2013 Taylor & Francis Group, London, ISBN 978-0-415-62144-1 The effects of flood fighting and emergency measures on the reliability of flood

More information

Saturated Buffer. Subsurface Drainage PURPOSE N REDUCTION LOCATION COST BARRIERS

Saturated Buffer. Subsurface Drainage PURPOSE N REDUCTION LOCATION COST BARRIERS Saturated Buffer To intercept tile drainage prior to discharging to surface waters and redistribute the water laterally in the soil profile of the streamside buffer. Subsurface drainage, also known as

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

Mr. Paul Dunlap, California Department of Water Resources

Mr. Paul Dunlap, California Department of Water Resources Memorandum To: From: Mr. Paul Dunlap, California Department of Water Resources Oroville Dam Spillway Incident Independent Forensic Team Date: September 5, 2017 Re: Interim Status Memorandum Introduction

More information

Annual Inspection Report Lawrence Energy Center

Annual Inspection Report Lawrence Energy Center Annual Inspection Report Lawrence Energy Center Inactive Units - Ash Pond Area 2, Ash Pond Area 3, and Ash Pond 4 Prepared for: Westar Energy Lawrence Energy Center Lawrence, Kansas Prepared by: CB&I Environmental

More information

Marysville Levee Commission

Marysville Levee Commission Marysville Levee Commission Outline CVFPP Goals & Objectives Highlights of Draft Feather River RFMP Integration between Flood Protection, Agriculture and Wildlife and Floodplain Uses Proposed Projects

More information

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

DRAFT VEGETATION VARIANCE REQUEST Natomas Levee Improvement Program

DRAFT VEGETATION VARIANCE REQUEST Natomas Levee Improvement Program DRAFT VEGETATION VARIANCE REQUEST Natomas Levee Improvement Program Prepared by: Sacramento Area Flood Control Agency 1007 7th Street, 7th Floor Sacramento, CA 95814 and Central Valley Flood Protection

More information

is a possibility of the existence of permafrost as a result

is a possibility of the existence of permafrost as a result 111.2 CERTAIN ASPECTS OF ALASKA DISTRICT ENGINEERS EXPERIENCE IN AREAS OF MARGINAL PERMAFROST E. L. Long In nearly twenty years of engineering and construction experience in Alaska, the Alaska District

More information

Effective Stress Design For Floodwalls on Deep Foundations

Effective Stress Design For Floodwalls on Deep Foundations Effective Stress Design For Floodwalls on Deep Foundations Glen Bellew, PE Geotechnical Engineer USACE-Kansas City 23 April 2015 Contributors James Mehnert, PE USACE-Kansas City Paul Axtell, PE, D.GE Dan

More information

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable

More information

LEVEE DEFICIENCY CORRECTION PROCEDURES

LEVEE DEFICIENCY CORRECTION PROCEDURES LEVEE DEFICIENCY CORRECTION PROCEDURES USACE, LOS ANGELES DISTRICT 26 JANUARY 2016 LEVEE SAFETY PROGRAM Revised 26 MARCH 2018 Deficiencies noted on the inspection checklist portion of the Periodic Inspection

More information

Earthquake Reinforcement Using Jet Grouting for a Factory in Operation

Earthquake Reinforcement Using Jet Grouting for a Factory in Operation 6 th International Conference on Earthquake Geotechnical Engineering 1-4 November 2015 Christchurch, New Zealand Earthquake Reinforcement Using Jet Grouting for a Factory in Operation J. Kawamura 1 ABSTRACT

More information

TRENCHING AND EXCAVATION

TRENCHING AND EXCAVATION TRENCHING AND EXCAVATION The following guide is an aid intended for students who have completed the ClickSafety training course or module associated with Trenching and Excavation. This guide is a resource

More information

Ground Improvement for Mitigation of Failure Risks to Existing Embankment Dams

Ground Improvement for Mitigation of Failure Risks to Existing Embankment Dams Ground Improvement for Mitigation of Failure Risks to Existing Embankment Dams by James K. Mitchell, Sc.D., P.E., Dist. M.ASCE University of Alberta, Edmonton, Alberta October 6, 2010 1 SCOPE OF THE LECTURE

More information

HIGH BRIDGE AREA ROADWAY SLIDE, LETCHWORTH STATE PARK PORTAGEVILLE, NEW YORK

HIGH BRIDGE AREA ROADWAY SLIDE, LETCHWORTH STATE PARK PORTAGEVILLE, NEW YORK HIGH BRIDGE AREA ROADWAY SLIDE, LETCHWORTH STATE PARK PORTAGEVILLE, NEW YORK INTRODUCTION Letchworth State Park is located along the Genesee River about 35 miles south of Rochester, New York. The Genesee

More information

SECTION RIPRAP, BOULDERS, AND BEDDING

SECTION RIPRAP, BOULDERS, AND BEDDING SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and

More information

CW 3615 RIPRAP TABLE OF CONTENTS

CW 3615 RIPRAP TABLE OF CONTENTS December 2014 SPECIFICATION CW 3615 R4 CW 3615 RIPRAP TABLE OF CONTENTS 1. GENERAL CONDITIONS... 1 3. DESCRIPTION... 1 5. MATERIALS... 1 5.1 General... 1 5.2 Rock... 1 5.3 Random Stone Riprap... 1 5.4

More information

APPENDIX A. Project Scoping

APPENDIX A. Project Scoping APPENDIX A Project Scoping Notice of Preparation To: From: Agencies and Interested Parties Paul Brunner, Executive Director, Three Rivers Levee Improvement Authority Date: June 13, 2006 Subject: Notice

More information

Weekly Safety Talks: Excavation & Trenching Application

Weekly Safety Talks: Excavation & Trenching Application Weekly Safety Talks: Excavation & Trenching Application Review when we need to go into a trench. Ask can we do it any other way? Review soil types in the area and prevention methods preferred. Discuss

More information

EXPERIENCE WITH BACKFILLING UNDERGROUND VOIDS AND SHAFTS DURING MINE CLOSURE

EXPERIENCE WITH BACKFILLING UNDERGROUND VOIDS AND SHAFTS DURING MINE CLOSURE EXPERIENCE WITH BACKFILLING UNDERGROUND VOIDS AND SHAFTS DURING MINE CLOSURE ABSTRACT YURIY N. SPYCHAK Donbas Special Grouting Co., Ltd., Antratsit, Lugansk region, Ukraine; E-mail: watercon@an.lg.ua This

More information

INVESTIGATION RESULTS

INVESTIGATION RESULTS September 13, 2011 Burt Fleischer, R.E.A., R.E.P. Director, Environmental Affairs Hilmar Cheese Company 9001 N. Lander Avenue Hilmar, CA 95324 Subject: Revised Work Plan for Supply Well IN 1 Destruction

More information

SECTION2 Drainage Control for Surface Mines

SECTION2 Drainage Control for Surface Mines SECTION2 Drainage Control for Surface Mines 11 Horizontal Drains-Their Use in Open Pit Mine Dewatering by Ben L. Seegmiller, Principal, Seegmiller Associates, Salt Lake City, Utah, USA INTRODUCTION Horizontal

More information

Single Post Anchor Part Number Spectrum Lane ~ Missoula MT ~

Single Post Anchor Part Number Spectrum Lane ~ Missoula MT ~ Single Post Anchor Part Number 21700 7100 Spectrum Lane ~ Missoula MT 59808 800.791.8056 ~ www.spectrumproducts.com 21700 Man Rev B You have purchased a Spectrum Aquatics Single Post Anchor. Providing

More information

Ground Improvement. Martin G. Taube, P.E., P.G. February 4, 2003

Ground Improvement. Martin G. Taube, P.E., P.G. February 4, 2003 ODOT Geotechnical Information Exchange Seminar Ground Improvement Martin G. Taube, P.E., P.G. February 4, 2003 Nicholson Construction Company 12 McClane Street Cuddy, PA 15031 ph. (412) 221-4500 fax (412)

More information

Peninsula Drainage District #2 Encroachment Evaluation Summary Report

Peninsula Drainage District #2 Encroachment Evaluation Summary Report Peninsula Drainage District #2 Encroachment Evaluation Summary Report Levee Ready Columbia / Peninsula Drainage District #2 / 1880 NE Elrod Drive, Portland, Oregon 97211 Table of Contents Contents Summary...

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

DISPERSIVE SOILS. Dispersive soils are those in which the clay content has a high percentage of sodium.

DISPERSIVE SOILS. Dispersive soils are those in which the clay content has a high percentage of sodium. DISPERSIVE SOILS Dispersive soils are those in which the clay content has a high percentage of sodium. This clay fraction readily breaks down to form a suspension in water. 1 Some types of clay minerals

More information

Prof. B.S. Thandaveswara. The various types of linings can be grouped into two categories: (i) Exposed and Hard

Prof. B.S. Thandaveswara. The various types of linings can be grouped into two categories: (i) Exposed and Hard Types of Linings The various types of s can be grouped into two categories: (i) Exposed and Hard Surface Linings, and (ii) Buried Membrane Linings. The advantages and disadvantages of various types of

More information

CONSTRUCTION COST ESTIMATE FOR SOUTHWESTERN ILLINOIS LEVEE CERTIFICATION DESIGN IMPROVEMENTS

CONSTRUCTION COST ESTIMATE FOR SOUTHWESTERN ILLINOIS LEVEE CERTIFICATION DESIGN IMPROVEMENTS CONSTRUCTION COST ESTIMATE FOR SOUTHWESTERN ILLINOIS LEVEE CERTIFICATION DESIGN IMPROVEMENTS PREPARED FOR SOUTHWESTERN ILLINOIS FLOOD PREVENTION DISTRICT COUNCIL PREPARED BY AMEC EARTH & ENVIRONMENTAL,

More information

Scope of Discussion. Foundation Related Issues. Foundation Preparation and Treatment During Dam Construction 10/14/2014

Scope of Discussion. Foundation Related Issues. Foundation Preparation and Treatment During Dam Construction 10/14/2014 Foundation Preparation and Treatment During Dam Construction John W. France, PE, D.WRE URS Corporation Denver, Colorado October 14, 2014 1 Scope of Discussion Broad discussion of treatment of foundations

More information

DFI DEEP FOUNDATIONS. Brazil s Megaproject Shipyard Winner of the 2010 Outstanding Project of the Year

DFI DEEP FOUNDATIONS. Brazil s Megaproject Shipyard Winner of the 2010 Outstanding Project of the Year U N DAIONS IN O F P D DFI S I U DP FOUNDAIONS Fall 2010 he Magazine of the Deep Foundations Institute Brazil s Megaproject Shipyard Winner of the 2010 Outstanding Project of the Year Aerial view of the

More information

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL Submission for Hulme Prize 2017 LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL F. Saffiyah BADURDEEN 1, G. T. SENTHILNATH 2, 1 Ed. Zublin AG Singapore 2 Geoconsult Asia Singapore

More information

Upper San Joaquin River Regional Flood Management Plan Flood Management Operations and Maintenance

Upper San Joaquin River Regional Flood Management Plan Flood Management Operations and Maintenance DRAFT Upper San Joaquin River Regional Flood Management Plan Operations and Maintenance September 2013 Prepared by: San Joaquin River Flood Control Project Agency Table of Contents 4.0 Operations and

More information

Water Budget IV: Soil Water Processes P = Q + ET + G + ΔS

Water Budget IV: Soil Water Processes P = Q + ET + G + ΔS Water Budget IV: Soil Water Processes P = Q + ET + G + ΔS Infiltration Infiltration capacity: The maximum rate at which water can enter soil. Infiltration capacity curve: A graph showing the time-variation

More information

Integral Waterproofing

Integral Waterproofing BCBEC Luncheon June 14, 2012 Integral Waterproofing Presented by Joel Schwartz, P.Eng, FEC, BEP Background Case study of two large high-rise projects at False Creek in Vancouver, BC Case Study 1: Site

More information

Chapter A-15. CID-MO Structural Analysis

Chapter A-15. CID-MO Structural Analysis Kansas Citys, Missouri and Kansas Flood Risk Management Feasibility Study Engineering Appendix to the Final Feasibility Study Chapter A-15 CID-MO Structural Analysis Chapter A-15 CID-MO Structural Analysis

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Milepost 210 to 218 Drainage Structure Pipe Jacking Creek County, Oklahoma July 1, 2016 Terracon Project No. 04165017 Prepared for: Benham Tulsa,

More information

Dewatering & Foundations. Water. Low tech

Dewatering & Foundations. Water. Low tech Dewatering & Foundations Water It seems every time we dig a hole it fills up with rainwater, or groundwater.if we re lucky we hit an underground river or spring that keeps the hole nice and wet. But a

More information

Bi-Directional Static Load Testing of Driven Piles

Bi-Directional Static Load Testing of Driven Piles Bi-Directional Static Load Testing of Driven Piles Paul J. Bullock, PhD Fugro Consultants Inc. Loadtest Bi-Directional Osterberg Cell Testing Specialized jack in pile uses bearing to mobilize side shear

More information

Niagara Falls Storage Site Safety Measures During Remediation

Niagara Falls Storage Site Safety Measures During Remediation Niagara Falls Storage Site Safety Measures During Remediation On-Site Worker Protection Community and Environmental Protection Transportation and Disposal Safety Fully enclosed Retrieval Facility Regular

More information

Sewer System- Pipes Material and Loads

Sewer System- Pipes Material and Loads The Islamic University of Gaza Faculty of Engineering Civil Engineering Department Sanitary Engineering (ECIV 4325) Instructor: Dr. Abdelmajid Nassar Lect. W4 Sewer System- Pipes Material and Loads Pipes

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

Technical Bulletin No. MK3176. PREPARED: July, 2010

Technical Bulletin No. MK3176. PREPARED: July, 2010 Geoprobe DT45 Dual Tube Sampling System Standard Operating Procedure Technical Bulletin No. MK3176 PREPARED: July, 2010 A. B. C. D. E. A. Assembled outer casing with sample sheath and liner driven to collect

More information

LAST UPDATED NAME OF SOP

LAST UPDATED NAME OF SOP NAME OF SOP LAST UPDATED Backfill of Borings in or near levees 18 Nov 2013 Poles - Penetrations - Levees 06 Sep 2013 Repair of Monolith Joint Material 13 Jun 2013 Pressure Pipes - Up and Over Existing

More information

Project Photo Tour Updated July 15, Tom Blackman Project Lead. Gary Cambre Senior Communications Manager 1

Project Photo Tour Updated July 15, Tom Blackman Project Lead. Gary Cambre Senior Communications Manager 1 Soil Remedial Actions Planned at Middle River Complex - 2015 Project Photo Tour Updated July 15, 2015 Tom Blackman Project Lead Gary Cambre Senior Communications Manager 1 This Project is composed of: