1 CITY OF ALBANY Public Works Department ADDENDUM #2 WC CROWN ZELLERBACH GATES IMPROVEMENTS In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall be considered part of the contract documents. In order to ensure that all bidders are aware of these provisions, each bidder shall sign this addendum below and attach it to the proposal. IMPORTANT: Failure to include a signed Addendum could result in the disqualification of your bid. The attached specification sections, and 16010, shall be added to the Technical Specifications (Appendix A). Contractor s Signature Date Company Name (please type or print) Addendum #2

2 SECTION FABRICATED ALUMINUM SLIDE GATES PART 1 - GENERAL This section covers Open-Channel Stainless Steel Gates and operators. The equipment provided under this section shall be fabricated, assembled, erected, and placed in proper operating condition in full conformity with the drawings, specifications, engineering data, instructions and recommendations of the equipment manufacturer. Gates and operators shall be supplied with all the necessary parts and accessories indicated on the drawings, specified, or otherwise required for a complete, properly operating installation, and shall be the latest standard product of a manufacturer regularly engaged in the production of fabricated gates. A. APPROVED MANUFACTURERS Gates supplied under this section shall be as manufactured by Golden Harvest Inc. or engineer approved equal. B. GOVERNING STANDARDS Except as modified or supplemented herein, all gates and operators shall conform to the applicable requirements of AWWA-C562 Standards. C. QUALITY ASSURANCE The manufacturer shall have 5 years of experience in the production of substantially similar equipment, and shall show evidence of satisfactory operation in at least 10 installations. The manufacturer s shop welds, welding procedures and welders shall be qualified and certified in accordance with the requirement of the latest edition of AWS Sections D1.1, 1.2 and 1.6. The fully assembled gates shall be shop inspected, tested for operation and leakage, and adjusted before shipping. There shall be no assembling or adjusting on the job sites other than for the lifting mechanism. D. SUBMITTALS 1. The manufacturer shall submit for approval by the purchaser, drawings showing the principal dimensions, general construction and materials used in the gate and lift mechanism. 2. The manufacturer shall submit for approval by the purchaser, complete engineering design calculations in compliance with AWWA standards latest edition. E. LEAKAGE Slide gates shall be substantially watertight under the design head conditions. Under the design seating head, the leakage shall not exceed 0.05 US gallons per minute per foot of seating perimeter. City of Albany WC Canal Diversion Structures

3 PART 2 - MATERIALS AND CONSTRUCTION 2.1 GENERAL DESIGN Gates shall be either self-contained or non-self-contained of the rising stem or non-rising configuration as indicated on the gate schedule. All parts of the gate shall have a minimum thickness of ¼ inch. 2.2 FRAME Gate frame shall be designed for embedding, in-channel or face mounting as shown on the drawings or gate schedule. The gate frame shall be extruded aluminum weighing no less than 4-1/4 pounds per foot and designed for maximum rigidity. The guide grooves in which the head guide angle travel shall contain ultra-high molecular weight polyethylene bearing bars in dovetail slots. Flush-bottom type frame configurations shall allow the replacement of the top and side seals without removing the gate frame from the wall or wall thimble. 2.3 SLIDE The slide shall consist of aluminum plate reinforced with u shaped aluminum extrusion welded to the plate to limit deflection to L/720 of the gate span under the design head. 2.4 GUIDES AND SEALS The guides shall be provided with ultra-high molecular weight polyethylene UHMW seats on both sides of the slide and shall be of such length as to retain and support at least two thirds (2/3) of the vertical height of the slide in the fully open position. Guide frame shall not weigh less than 9 lbs. per foot. Seals shall be frame mounted. Seals shall be resilient neoprene of the J-bulb type with a stainless steel retainer bar. Seals shall be fully adjustable. UHMW seals alone will not be considered. The flush bottom resilient neoprene seal shall be mounted to bottom member of the frame 2.5 YOKE Gates shall be provided with a yoke to support the operating bench stand. The yoke shall be formed by two structural members welded at the top of the guides to provide a one piece rigid frame. The maximum deflection of the yoke shall be L/360 of the gate span. Non-self-contained gates shall be provided with pedestal mounted lifts. Pedestal shall be provided with shop coating. City of Albany WC Canal Diversion Structures

4 2.6 STEM AND COUPLINGS The operating stem shall be of stainless steel designed to transmit in compression at least 2 times the rated output of the operating manual mechanism with a 40 lb effort on the crank or handwheel. Tube or pipe stem sections will not be considered. Gates having a width equal to or greater than two times their height shall be provided with two geared lifting mechanisms interconnected by a tandem shaft. The stem shall have a slenderness ratio (L/R) less than 200. The threaded portion of the stem shall have Acme type cold rolled threads with a maximum surface of 16 micro-inches. Stems requiring more than one piece shall be pinned to an extension tube or joined together by solid stainless steel or bronze couplings. 2.7 STEM GUIDES Stem guides shall be fabricated from stainless steel. Stem guides shall be equipped with a UHMWPE bushing. Guides shall be adjustable and spaced in accordance with the manufacturer s recommendation. The L/R ratio shall not be greater than STEM COVER Rising stem gates shall be provided with a clear butyrate plastic stem cover. The stem cover shall have a cap and condensation vents and a clear Mylar position indicating tape. The tape shall be field applied to the stem cover after the gate has been installed and positioned. 2.9 LIFTING MECHANISM Operators of the types listed in the schedule shall be provided by the gate manufacturer. Each manual operator shall be designed to operate the gate under the maximum specified seating and unseating heads by using a maximum effort of 40 lb on the crank or handwheel, and shall be able to withstand, without damage, an effort of 80 lb. Gearboxes shall be provided when required to maintain the operating force below 40 lb. All bearings and gears shall be totally enclosed in a weather tight housing. Operator housing shall be cast steel or cast iron. The pinion shaft of crank-operated mechanisms shall be supported by roller bearings. The operating shaft shall be fitted with a 2 inch square operating nut and removable crank. The crank shall be fitted with a corrosion-resistant rotating handle. The maximum crank radius shall be 15 inches and the maximum handwheel diameter shall be 24 inches. Remote Actuators: When specified or the yoke height is greater than 54 inches above the operating floor, a remote handwheel or crank with bearing housing and sprocket shall be bolted to the frame at approximately 42 above the operating floor elevations. A removable stainless steel cover shall be provided to protect the extension shaft, drive chain, and/or sprockets. City of Albany WC Canal Diversion Structures

5 2.10 MATERIALS TABLE Part Material Frame, yoke, slide, stem extension Aluminum 6061-T-6 ASTM B-209, ASTM B-211 Side and Top seals Neoprene ASTM D-2000 Bearing bars, Guides, Stem guide liner Ultra-High Molecular Weight Polyethylene ASTM D4020 Bottom seal Neoprene ASTM D-2000 Threaded stem, Stem guides, Hard crank Stainless steel ASTM A-276, Type 304 or 304L Fasteners Stainless steel Type 304 or 304L Pedestal / Wall bracket Cast Iron ASTM A126, class B or Mild Steel A36/A36M Stem Cover Polycarbonate ASTM A-707 Lift Nut, Stop Nut Manganese bronze, ASTM B584, UNS-C86500 PART 3 - EXECUTION (Not Used) **END OF SECTION** City of Albany WC Canal Diversion Structures

6 SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 Description of Work A. The work consists of furnishing all labor, equipment, appliances, materials, transportation, facilities, services, and skilled supervision necessary for the construction, erection, installation, connection, testing, and adjustment of all circuits and electrical equipment specified herein, shown, or noted on the drawings; specified or required in other portions of this specification; and its delivery to the City complete in all respects and ready for use. B. The Contractor shall be responsible for provision of equipment including all enclosures, disconnects, control panels, towering and radio equipment unless otherwise specified. In addition, the Contractor shall be responsible for the following: 1. Visit the site of proposed construction. Verify and inspect the existing site to determine all conditions that affect this work. 2. Investigate and be apprized of the applicable codes, rules, and regulations as enforced by Authorities Having Jurisdiction (AHJs). 3. Use this Specification as a guide for workmanship and materials of construction. C. Costs/charges for installation of all permanent and temporary facilities shall be included in the lump sum bid for each of the pumping stations. This includes any up-front money required by the utility to provide permanent service. D. Electrical Contractor installs and terminates wiring for I&C system 1.2 Related Work A. This specification supplements all sections of the project specifications and applies to all work specified, shown on the drawings, or required to provide a complete installation of approved electrical systems. 1.3 Intent of Drawings and Specifications A. Electrical drawings show only general locations of equipment, devices, and raceway, unless specifically dimensioned. The Contractor shall be responsible for the proper routing of raceway, subject to the approval of the Engineer. City of Albany WC Canal Diversion Structures

7 B. Riser and other diagrams are schematic only and shall not be used for obtaining quantities. C. The electrical drawings do not show complete details of the site conditions. The Contractor shall verify actual conditions at the project site. 1.4 Departures from Contract Documents A. Submit to the Engineer, in writing, details of any proposed departures from these Contract Documents, and the reasons the departures are necessary. Submit such requests as soon as practicable and within 30 days after award of the Contract. Make no such departures without written approval of the Engineer. 1.5 Coordination of Work A. The Contractor shall plan his work in coordination with the power utility authorities, and City Operations, as required. B. The Contractor shall field verify all dimensions of equipment to be installed or provided by others so that correct clearances and connections may be made between the work installed by the Contractor and equipment installed or provided by others. C. The Contractor shall arrange all conduit runs so that they do not interfere with piping, duct work, structural members, etc. D. All working measurements shall be taken from the sites, checked with those shown on the drawings, and if they conflict, reported to the Engineer at once, and before proceeding with the work. Should the Contractor fail to comply with this procedure, he shall alter his work at his own expense as directed by the Engineer. E. No extra payments will be allowed where obstructions in the work of other trades, or work under this contract requires offsets to conduit runs. F. The Contractor is responsible for all alterations in the work to accommodate equipment differing in dimensions or other characteristics from that shown or specified. 1.6 Supervision A. The Contractor shall maintain adequate supervision of the work and shall have a responsible person in charge during all times that work under this contract is in progress, or when necessary for coordination with other work. 1.7 Codes and Standards A. All work and materials shall conform to the applicable current standards (standard rules, regulations, and specifications) of the National Electrical Code (NEC), National Electrical Safety Code (NESC), Institute of Electrical and Electronic Engineers (IEEE), National Electrical Manufacturers' Association (NEMA), American National Standards City of Albany WC Canal Diversion Structures

8 Institute (ANSI), Insulated Cable Engineers Association (ICEA), Occupational Safety and Health Administration Standards (OSHA), State and local electrical codes, and other specifically cited standards, as applicable. All materials unless otherwise approved by local government authorities shall bear the label of, or be listed by, a Nationally Recognized Testing Laboratory (NRTL); the Underwriters' Laboratory, Inc. (UL) is one such NRTL. Where conflicts exist between any of the above standards, the standard which is most stringent shall take precedence. Where the contract documents exceed minimum requirements, the contract documents take precedence. B. Observe where applicable the prevailing rules and requirements of the National Fire Protection Association (NFPA), the State and local fire marshals' regulations, and standards pertaining to adequate protection and/or guarding of any moving parts or otherwise hazardous conditions. C. Resolve at the Contractor's expense all conflicts with applicable standards and provide a complete installation of Electrical Work, approved in all respects. Certain methods and materials for the project may require special approval and it is the Contractor's responsibility to prepare and submit to all approving authorities additional clarifying details, test data, methods and materials as needed to secure the required approval and resolve conflicts. 1.8 Workmanship A. All work shall be performed by personnel skilled in the particular trade. Workmanship shall conform to the standards of the NEC and the installation standards of National Electrical Contractors Association (NECA). B. The Engineer shall be the sole judge as to whether or not the finished work is satisfactory; and if in his judgment any material or equipment has not been properly installed or finished, the Contractor shall replace the material or equipment whenever required and reinstall in a manner entirely satisfactory to the Engineer without any increase in cost to the Owner. C. The following shall be regarded as the minimum standard of quality for materials and workmanship even though not specifically mentioned for each item: 1. Conform to requirements of the NEC, latest adopted version with amendments by local AHJs. a. All work shall meet all requirements of the NEC for wet locations. All wiring methods shall conform to NEC requirements for Wet Locations. 2. Obtain and pay for electrical permits and inspections from local AHJs. 3. Furnish products listed by a Nationally Recognized Testing Laboratory (NRTL), such as UL or other testing firm acceptable to AHJ. 4. Conform to requirements of the serving electric, telephone, and internet utilities as they apply. City of Albany WC Canal Diversion Structures

9 1.9 Permits, Fees and Service Charges A. Contractor shall obtain all electrical permits and pay all related fees Substitution of Materials and Equipment A. In accordance with provisions elsewhere in these Contract Documents, manufacturers' names and catalog numbers stated herein are intended to indicate the type and quality of equipment or materials desired. B. Make requests for approval of alternates in writing to the Engineer. Provide sufficient material or data to allow evaluation of the proposed alternatives and determination of compliance with these Contract Documents. List any proposed deviations from these Contract Documents Submittals After Award of Contract A. The Contractor shall provide complete manufacturer's descriptive information and shop drawings for all equipment, material, and devices furnished under this Division, including certified outline drawings, arrangement drawings, elementary (schematic) diagrams, interconnection diagrams, and connection diagrams, in accordance with provisions in Division 1 of these Contract Documents. Provide the number of copies specified therein for the Engineer, Contractor, and Operation and Maintenance Manuals. B. Submittals shall be made in accordance with the schedule listed hereinafter. Provide certified shop drawings, literature, and requested samples showing items proposed for use, size, dimensions, capacity, special features required, schematic (elementary) control diagrams, equipment schedules, rough-in, etc., as required by the Engineer for complete review and for installation. Use NEMA device designations and symbols for all electric circuit diagrams submitted. Make content of schematic (elementary) connection of interconnection diagrams in accordance with the latest edition of NEMA ICS. C. Contractor shall check submittals for proper number of copies, adequate identification, correctness and compliance with Drawings and Specifications, and initial all copies indicating this has been done. Revise, change, and/or resubmit all submittal information until acceptable to the Engineer. Obtain Engineer's acceptance before commencing fabrication or installation of any materials or equipment. D. Review of submittal information by the Engineer shall not relieve the Contractor from responsibility for deviations from Drawings and Specifications, unless he has requested and received written approval from the Engineer for specific deviations at time of submission. Review of submittal information shall not relieve the Contractor from responsibility for errors and omissions in shop drawings or literature. E. Manufacturer's standardized elementary diagrams shall not be acceptable unless applicable portions of the diagram have been clearly identified and nonapplicable portions deleted or crossed out. F. Submittals shall be made on, but not limited to, the following items: City of Albany WC Canal Diversion Structures

10 1. Main Fused Disconnect 2. Special control panels - outline and schematic drawings, descriptive information, component schedules 3. Control instrumentation 4. Antenna and Tower Equipment 5. Wiring Devices, cabling supports, grips and strut. 6. All conduit types used in project 7. Special pull boxes, junction boxes and seal fittings 8. All conductor/wire types used in project G. Submit a listing of all nameplate data from actual motors provided after delivery to site Contractor's Record Drawings A. The Contractor shall maintain a neatly marked set of record drawings. In addition, the locations of panels, field mounted instruments and panels, terminal boxes, junction boxes and any other materials included in this contract shall be shown. Drawings shall be kept current with the work as it progresses and shall be subject to inspection by the Engineer at any tine. PART 2 - PRODUCTS 2.1 Materials A. Unless otherwise indicated, provide all first-quality, new materials and equipment, free from any defects, in first-class condition, and suitable for the space provided. Provide materials and equipment listed by UL wherever standards have been established by that agency. B. Where two or more units of the same class of material or equipment are required, provide products of a single manufacturer. Component parts of materials or equipment need not be products of the same manufacturer. C. Unless otherwise indicated, provide materials and equipment which are the standard products of manufacturers regularly engaged in the production of such materials and equipment. Provide the manufacturers' latest standard design that conforms to these Specifications. D. Provide material and equipment that is acceptable to AHJ as suitable for the use indicated. For example, provide wet labeled equipment in locations that are wet. 2.2 Portable or Detachable Parts A. The Contractor shall retain in his possession and shall be responsible for all portable and detachable parts or portions of installations such as fuses, key locks, adaptors, blocking chips, and inserts until completion of his work. City of Albany WC Canal Diversion Structures

11 B. These parts shall be delivered to the Engineer and an itemized receipt obtained. This receipt, together with 2 copies of the final inspection certificate, shall be attached to the Contractor's request for final payment. C. All equipment shall be demonstrated to operate in accordance with the requirements of this specification and the manufacturer's recommendation. 2.3 Equipment Finishes A. Provide materials and equipment with manufacturers' standard finish system. Provide manufacturers' standard finish color, except where specific color is indicated. 2.4 Accessories A. Include special features, finishes, accessories, and other requirements as described in the Contract Documents regardless of the item's listed catalog number. B. Provide incidentals not specifically mentioned herein or noted on Drawings, but needed to complete the system or systems, in a safe and satisfactory working condition. PART 3 - EXECUTION 3.1 Examination A. Construction Documents: 1. Drawings are diagrammatic with symbols representing electrical equipment and wiring. 2. Electrical symbols indicating wiring and equipment shown in the Contract Documents are included in the Contract unless specifically noted otherwise. 3. Examine the entire set of Drawings to avoid conflicts with other systems. Determine exact route and installation of electrical wiring and equipment with conditions of construction. B. Clarification: 1. The Drawings govern in matters of quantity, the Specification in matters of quality. In event of conflict on Drawings or in the Specifications, the greater quantity and the higher quality apply. 2. Should the Electrical Documents indicate a condition conflicting with the governing codes and regulations, refrain from installing that portion of the work until clarified by Engineer. City of Albany WC Canal Diversion Structures

12 C. Site Verification 1. Contractor to visit project site and examine existing site conditions before submitting bid. 2. Verify requirements for permanent power and telecommunication services, as required. 3. Verify requirements for temporary electrical power, if required. 4. Identify any conditions that might prevent the installation of equipment in the manner intended and report such findings to the Owner s Representative. 5. Determine requirements for cutting, patching, excavating, trenching, core drilling or similar. 6. Additional cost will not be approved due to Contractor s failure to complete a site examination of existing conditions and include any items necessary for a practical resolution. 3.2 Protection During Construction A. Throughout this Contract, provide protection for materials and equipment against loss or damage in accordance with provisions elsewhere in these Contract Documents. Protect everything from the effects of weather. B. Prior to installation, store items in clean, dry, indoor locations. Store in clean, dry, indoor, heated locations items subject to corrosion under damp conditions, and items containing electrical insulation, such as transformers, and conductors. Energize all space heaters furnished with equipment. C. Following installation, protect materials and equipment from corrosion, physical damage, and the effects of moisture on insulation. Cap conduit runs during construction with manufactured seals. Keep openings in boxes or equipment closed during construction. Energize all space heaters furnished with equipment. 3.3 Installation A. Install electrical equipment complete as directed by manufacturer's installation instructions. Obtain installation instructions from manufacturer prior to rough-in of the electrical equipment, examine the instructions thoroughly. When requirements of the installation instructions conflict with the Contract Documents, request clarification from Engineer prior to proceeding with the installation. B. Do not install electrical equipment in obvious passages, doorways, scuttles or crawl spaces which would impede or block the area passage's intended usage. C. Do not install outlet boxes back to back. Do not use straight through boxes. D. Earthwork: City of Albany WC Canal Diversion Structures

13 1. Perform excavation and backfill for the installation of electrical work. E. Support Backing: 1. Provide any necessary backing required to properly support all fixtures and equipment installed under this contract. 2. All equipment located in wet or moist locations shall use stainless steel hardware for support backing equipment. F. Cutting, Patching, and Framing: 1. The Contractor shall determine in advance the locations and sizes of all sleeves, chases, and openings necessary for the proper installation of his work. 2. Whenever practical, inserts or sleeves shall be installed prior to covering work. Cutting and patching shall be held to a minimum. All required holes in concrete construction shall be made with a core drill and patched with non-shrink grout. 3. Cutting, fitting, repairing, and finishing of carpentry work, metal work, or concrete work, and the like, which may be required for this work shall be done by craftsmen skilled in their respective trades. When cutting is required, it shall be done in such a manner as not to weaken walls, partitions, or floors; and holes required to be cut in floors must be drilled without breaking out around holes. G. Cleaning and Touchup Painting: 3.4 Field Quality Control 1. Keep the premises free from accumulation of waste material or rubbish. Upon completion of work, remove materials, scraps, and debris from premises and from interior and exterior of all devices and equipment. Touch up scratches, scrapes, or chips in interior and exterior surfaces of devices and equipment with finishes matching as nearly as possible the color, consistency, and type of surface of the original finish. A. Inspection B. Tests: 1. All materials, equipment, and workmanship shall be subject to inspection at any time by the Engineer, or his representatives. Correct work, materials, or equipment not in accordance with these Contract Documents or found to be deficient or defective in a manner satisfactory to the Engineer. 1. Conduct tests of equipment and systems to demonstrate compliance with requirements specified in Division 16. Refer to individual Specification Sections for required tests. Document tests and include in Closeout Documents. City of Albany WC Canal Diversion Structures

14 3.5 Cleaning 2. During site evaluations by Engineer provide an electrician with tools to remove and replace trims, covers, devices, and the like, so that a proper evaluation of the installation can be performed. 3. The Contractor shall furnish all labor, material, instruments and tools to make all connections for testing of the electrical and instrumentation installation. All equipment shall be demonstrated as operating properly prior to the acceptance of the work. All protective devices shall be operative during testing of equipment. 4. General: a) Perform the tests as described below. Upon completion of all tests, submit written test results in duplicate for approval by the Engineer prior to acceptance. b) After visual inspection of joints and connections and the application of tape and other insulating materials, all sections of the entire wiring system shall be thoroughly tested for shorts and grounds. A log of results for each circuit shall be kept by the Contractor and presented to the Engineer. c) Equipment shall be tested by operating all electric motors, relays, controls, switches, heaters, etc. sufficiently to demonstrate proper installation and electrical connections. Control and emergency conditions shall be artificially simulated where necessary for complete system or subsystem tests. d) Insulation resistance measurements of each circuit shall be made with loads connected and contactors, if any, blocked closed to give complete circuits. Insulation resistance of complete circuit shall be measured from the circuit breaker load terminals with the breaker open. A log of complete results shall be prepared by the Contractor and presented to the Engineer. Values of resistance shall be 10 megaohms or greater. 5. Promptly correct any failure or defects revealed by these tests as determined by the Engineer. Re-conduct tests on these corrected items as directed by the Engineer. A. Remove dirt and debris caused by the execution of the electrical work. B. Leave the entire electrical system installed under this Contract in clean, dust-free and proper working order. C. Vacuum clean interiors of electrical equipment enclosures. City of Albany WC Canal Diversion Structures

15 3.6 Guarantee A. Materials, equipment, and workmanship shall be guaranteed in accordance with provisions of Section GENERAL REQUIREMENTS, in these Contract Documents. **END OF SECTION** City of Albany WC Canal Diversion Structures

2000-SG STAINLESS STEEL SLIDE GATES

2000-SG STAINLESS STEEL SLIDE GATES 2000-SG STAINLESS STEEL SLIDE GATES 1. GENERAL CONDITIONS 1.1. SCOPE. This section covers Stainless Steel Flow Control Slide Gates and operators. 1.2. GENERAL. Slide gates, including actuation devices,

More information

RB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION

RB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION GENERAL DESCRIPTION The Orbinox model RB Weir Gate is designed for downward opening applications where a more accurate flow control is required. The water flows over the top of the slide permitting a constant

More information

SECTION SLUICE GATES

SECTION SLUICE GATES SECTION 11100 SLUICE GATES PART 1--GENERAL Fill in the blank with a short description of sluice gate usage, i.e., for isolation of wastewater, or for tank drainage, or for control of water surface. 1.01

More information

SECTION ROLLER GATES

SECTION ROLLER GATES GENERAL SUMMARY A. The Contractor shall provide all labor, materials, equipment, and incidentals required to furnish and install roller gates, complete and operational with all necessary accessories as

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS SECTION 11000 MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section contains general information required to install mechanical equipment as shown on the plans and

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

SPECIFICATION: CAST IRON SLUICE GATES

SPECIFICATION: CAST IRON SLUICE GATES SPECIFICATION: CAST IRON SLUICE GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The CONTRACTOR shall furnish all labor, materials, equipment and incidentals required to install, ready for operation and field

More information

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. GORBEL PRODUCT SPECIFICATIONS 2010 Gorbel, Inc., P.O., Box 593, Fisher, New York 14453-0593 PHONE: 800-821-0086, FAX: 585-924-6273; WEBSITE: www.gorbel.com November SECTION 41 22 31PRIVATE FREE STANDING

More information

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

HIGH MAST CAMERA POLE ASSEMBLY GENERAL 10-3.24 HIGH MAST CAMERA POLE ASSEMBLY GENERAL The Contractor must furnish and install the following equipment for high mast camera pole assembly as described herein and as shown on the plans: 1. Camera

More information

Cast Iron Sluice Gates Rugged Dependability in Demanding Applications

Cast Iron Sluice Gates Rugged Dependability in Demanding Applications Cast Iron Sluice Gates Rugged Dependability in Demanding Applications A Proud Tradition Since 1840, the team at Rodney Hunt has pioneered safe and reliable flow control systems to help communities and

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION SECTIONAL OVERHEAD DOORS

SECTION SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Doors B. Track and Framing 1.2 RELATED SECTIONS A. Section 04810 - Unit Masonry Assemblies: Prepared opening in masonry.

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 12 2113 - LOUVER BLINDS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR Section 083713- Four Fold Doors- With Single Overhead Mounted Operator Part 1-General 1.1 Related Document: A. Drawing and general provisions of contract,

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how? SECTION 08360 SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Glazed Aluminum

More information

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS SECTION 270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Communications equipment coordination and installation. 2. Sleeves for pathways and cables. 3. Raceway

More information

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders Welcome to the O Keeffe s Guide Specification System prepared as an aid to specify in preparing written construction documents. For specification assistance with specific product applications, please contact

More information

A. Product Data shall be provided for each type of product indicated.

A. Product Data shall be provided for each type of product indicated. 32 31 13 CHAIN LINK FENCES AND GATES SECTION 1 GENERAL 1.1 SUMMARY This Section includes the following: 1. Chain Link Fences 2. Gates for Chain Link Fences. See electrical specifications for electrical

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products. SECTION 05720 ORNAMENTAL ALUMINUM RAILING ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products. This section is based on the products of Superior Aluminum Products,

More information

Section BUILDINGS, SHELTERS, ENCLOSURES

Section BUILDINGS, SHELTERS, ENCLOSURES Section 13121 BUILDINGS, SHELTERS, ENCLOSURES Part 1 GENERAL 1.1 SECTION INCLUDES 1.2 A. Pre-engineered buildings. B. Pre-engineered shelters. C. Pre-engineered enclosures. D. Electrical wiring and devices

More information

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017 SECTION 055213 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Series - 1

Series - 1 SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual FORM HEADWALL (floating) Installation Manual FORM HEADWALL (floating) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

1. Vertical reciprocating conveyor, Hydraulic straddle VRC. PART 1: GENERAL 1.01 Section Includes: 1. Vertical reciprocating conveyor, Hydraulic straddle VRC. a. Machine, controller, platform, structural steel hoist frame. b. Wire mesh enclosure and gates. Related

More information

DBI-SALA Uni 8 Overhead Horizontal Lifeline Cable System SECTION HORIZONTAL FALL PROTECTION - OVERHEAD CABLE

DBI-SALA Uni 8 Overhead Horizontal Lifeline Cable System SECTION HORIZONTAL FALL PROTECTION - OVERHEAD CABLE SECTION 112429.18 - HORIZONTAL FALL PROTECTION - OVERHEAD CABLE PART 1 - GENERAL 1.1 SECTION INCLUDES A. Provide overhead horizontal cable fall protection system, including end anchors, energy absorbers,

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF WELDED SYSTEM PART 1 GENERAL 1.1 SECTION

More information

EDGEWATER, FLORIDA JUNE 14, 2010

EDGEWATER, FLORIDA JUNE 14, 2010 SECTION 12 2413 - ROLLER WINDOW SHADES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE SECTION 13125 PART 1 - GENERAL 1.1 SUMMARY A. Section includes the design, engineering, fabrication and erection of a frame-supported, tensilemembrane structure complete with entrance and exit doors and

More information

A-Series Aluminum Gantry Crane

A-Series Aluminum Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 A-Series Aluminum Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an A-Series Gantry Crane into a competitive bid project or

More information

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,

More information

Architectural Specifications, Section Phenolic Lockers

Architectural Specifications, Section Phenolic Lockers Architectural Specifications, Section 10500 Phenolic Lockers Hollman, Inc., 1825 W. Walnut Hill Lane, Irving, TX 75038, (972) 815-4000, www.hollman.com 1.0 GENERAL 1.1 SECTION INCLUDES A. Phenolic Lockers.

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification. SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,

More information

Division 11 - Equipment Section 11401

Division 11 - Equipment Section 11401 PART 1 - GENERAL 1.1 GENERAL A. Division 1 General Requirements applies and becomes a part of this Section of the Specification as fully as if repeated herein. B. Items of equipment which are included

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 4000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION CHAIN-LINK FENCES AND GATES 02821/1

SECTION CHAIN-LINK FENCES AND GATES 02821/1 SECTION 02821 - CHAIN-LINK FENCES AND GATES 02821/1 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Chain-Link Fences: 2. Gates: horizontal slide or swing. 3. Fences installed where

More information

800 Series Aluminum Overhead Doors, by Northwest Door Section ALUMINUM SECTIONAL DOORS Digicon Information Inc.

800 Series Aluminum Overhead Doors, by Northwest Door Section ALUMINUM SECTIONAL DOORS Digicon Information Inc. Digicon Information Inc. Page 1 This section includes Model 800 aluminum insulated overhead sectional doors manufactured by Northwest Doors, with manual, chain or electric operation, with our without windows.

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

SECTION TAPPING SLEEVES AND VALVES

SECTION TAPPING SLEEVES AND VALVES SECTION 33 12 16.17 TAPPING SLEEVES AND VALVES PART 1: GENERAL 1.01 SCOPE Furnish, install and test all tapping sleeves, tapping valves, and tapping saddles as shown on the Drawings. 1.02 RELATED WORK

More information

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT SECTION 11322 MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT PART 1 GENERAL 1.01 SCOPE There shall be furnished ( ) Grit Separator Mechanism(s) suitable for installation in (a) concrete tank(s) -ft.

More information

INDUSTRIAL PIPE FITTINGS, LLC

INDUSTRIAL PIPE FITTINGS, LLC Page 1 of 9 SPIROLITE MUNICIPAL AND INDUSTRIAL ODOR CONTROL PIPING Municipal wastewater treatment plants, industrial processes and composting facilities can be assured of trouble free transport of foul

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and

More information

American Metal Specialties, Inc.

American Metal Specialties, Inc. American Metal Specialties, Inc. www.cablerailings.com (253) 272-9344 (253) 627-3843 Fax PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 05 73 00 STAINLESS STEEL ORNAMENTAL HANDRAILS AND RAILINGS For best

More information

Aluminum Component Pipe Railings

Aluminum Component Pipe Railings 1 SECTION 05 7360 ALUMINUM COMPONENT PIPE RAILINGS PART 1 GENERAL 1.01 SECTION INCLUDES A. Aluminum component pipe handrails and railings. 1.02 RELATED REQUIREMENTS A. Section 02 9000: Landscaping: Installation

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists SECTION 412213- BRIDGE CRANES Part 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS PART 1 GENERAL 1.01 DESCRIPTION A. General 1. Furnish SST-II Hydraulic Bi-Fold System complete from one manufacturer. Provide all labor, materials, tools and equipment to furnish the SST-II Bi-Fold System

More information

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. PART 1 - GENERAL 1.1 DESCRIPTION A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 01300 Record

More information

TILE TILE

TILE TILE 09300 - TILE 09300-1 PART ONE: GENERAL 1.1 Description TILE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the requirements

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT SECTION 230548 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Elastomeric Isolation pads. 2. Elastomeric Isolation mounts. 3. [Freestanding] [Restrained] [Freestanding and restrained]

More information

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board. 1.2 RELATED WORK A. Installation of steel framing members for walls, partitions,

More information

Section SECTIONAL INSULATED STEEL DOORS

Section SECTIONAL INSULATED STEEL DOORS 1 GENERAL 1.1 GENERAL REQUIREMENTS General Conditions and Division 01 apply to this section. 1.2 RELATED WORK Section 05500: Miscellaneous Metal Fabrication Section 07900: Joint Sealers Section 09900:

More information

Section [ ] Storm Water Treatment Device

Section [ ] Storm Water Treatment Device PART 1 GENERAL Section [ ] Storm Water Treatment Device 01.01.00 Purpose The purpose of this specification is to establish generally acceptable criteria for Storm Water Treatment Devices (SWTD) that treat

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

Westgate Entrematic, Parking Security Gates Section OVERHEAD SECURITY GATE Prepared by: Digicon Information Inc. Page 1

Westgate Entrematic, Parking Security Gates Section OVERHEAD SECURITY GATE Prepared by: Digicon Information Inc. Page 1 Prepared by: Digicon Information Inc. Page 1 This section includes overhead type Parking Security Gates, as manufactured by Westgate Entrematic, a division of Helton Group of Companies. DISCLAIMER: This

More information

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS Ideal for applications requiring space division, visibility and security Used in bank lobbies, offices, conference areas, interior storefronts and arena skyboxes

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances

More information

PATHWAYS FOR COMMUNICATIONS SYSTEMS

PATHWAYS FOR COMMUNICATIONS SYSTEMS 270528 PATHWAYS FOR PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all labor, materials, and equipment for the complete installation of work called for in the Contract Documents. 1.2 SCOPE OF WORK A. This

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms REV. 9/08 Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms SKYTRON MOUNTING STRUCTURES for Ceiling Mounted Equipment Foreword Skytron s objective is to provide a program and guideline to assist

More information

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products. SECTION 05720 ORNAMENTAL ALUMINUM RAILING ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products. This section is based on the products of Superior Aluminum Products,

More information

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less)

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) SECTION 260523 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) PART 1 - GENERAL 1.1 SUMMARY A. Related Documents: 1. Drawings and general provisions of the Subcontract apply

More information

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) PART 1 GENERAL SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) 1.01 SCOPE This specification includes the materials and procedures required for the internal sealing of the frame-chimney

More information

Therma Series Insulated Overhead Doors, by Northwest Door Section SECTIONAL DOORS Digicon Information Inc.

Therma Series Insulated Overhead Doors, by Northwest Door Section SECTIONAL DOORS Digicon Information Inc. Digicon Information Inc. Page 1 This section includes Model 650, 308, 308TM steel insulated overhead sectional doors manufactured by Northwest Doors, with manual, chain or electric operation, with our

More information

Corium Brick Rainscreen System Specifications

Corium Brick Rainscreen System Specifications CORIUM BRICK RAINSCREEN SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Work Included: The Work of this Section shall include but not be limited to the following: 1. Corium brick plates 2. Galvanized and coated

More information

A. Access doors and frames are part of an access door and frame allowance.

A. Access doors and frames are part of an access door and frame allowance. SECTION 08 31 13 ACCESS DOORS AND FRAMES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions (Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying perforated

More information

SECTION PANEL AND POST AND PYLON SIGNAGE. 1. Non-illuminated Panel and Post signs. 2. Internal illumination Pylon (Cabinet and Post) signs.

SECTION PANEL AND POST AND PYLON SIGNAGE. 1. Non-illuminated Panel and Post signs. 2. Internal illumination Pylon (Cabinet and Post) signs. PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Non-illuminated Panel and Post signs. 2. Internal illumination Pylon (Cabinet and Post) signs. 1.2 PERFORMANCE REQUIREMENTS A. Structural

More information

SECTION RESILIENT SHEET FLOORING

SECTION RESILIENT SHEET FLOORING SECTION 09 65 16 RESILIENT SHEET FLOORING SPEC WRITER NOTE: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1.

More information

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction 1.00 DESCRIPTION 1.01 WORK INCLUDED: This work shall include the furnishing of all labor, equipment and materials necessary

More information

COMPLETE REVISION November Process Industry Practices Structural. PIP STF05530 Grating Fabrication Details

COMPLETE REVISION November Process Industry Practices Structural. PIP STF05530 Grating Fabrication Details COMPLETE REVISION November 2006 Process Industry Practices Structural PIP STF05530 Grating Fabrication Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process

More information

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following:

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following: SECTION 10501 PERSONNEL DUTY LOCKERS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 specifications

More information

E-Series Steel Gantry Crane

E-Series Steel Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 E-Series Steel Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an E-Series Gantry Crane into a competitive bid project or application.

More information

SECTION IMPACT RESISTANT WALL PROTECTION

SECTION IMPACT RESISTANT WALL PROTECTION SECTION 10265 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work under this Section shall include all materials and installation necessary to provide Impact-Resistant Wall Protection including Wall guards,

More information

SECTION DECORATIVE METAL AND GLASS RAILING

SECTION DECORATIVE METAL AND GLASS RAILING SECTION 05 73 00 DECORATIVE METAL AND GLASS RAILING PART 1 GENERAL 1.1 SUMMARY A) This section includes both standard and custom handrails as shown in the contract drawings. B) These include aluminum,

More information

WOOD FLOORING WOOD FLOORING

WOOD FLOORING WOOD FLOORING 09550 - WOOD FLOORING 09550-1 PART ONE: GENERAL 1.1 Description WOOD FLOORING 1.1.1 Work in this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance

More information

PRODUCT SPECIFICATIONS

PRODUCT SPECIFICATIONS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: High density cast resin architectural products, including columns, panels, caps, bases, trim elements and balustrade systems. Specifier Note: Article below

More information

SOLAR SHADING SYSTEMS - Manual Solar Shade SECTION ROLLER WINDOW SHADES

SOLAR SHADING SYSTEMS - Manual Solar Shade SECTION ROLLER WINDOW SHADES PART 1 - GENERAL SECTION 122413 - ROLLER WINDOW SHADES 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

CONDUITS AND FITTINGS

CONDUITS AND FITTINGS CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit

More information

Welcome to Douglas County PUD

Welcome to Douglas County PUD Welcome to Douglas County PUD We are committed to providing the best possible utility services at the lowest possible cost consistent with sound business principles. To better serve you, please fill out

More information

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM PART 1- GENERAL 1.1 SUMMARY A. Section Includes: SECTION 084523 - SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM 1. Flat factory prefabricated structural insulated translucent sandwich panels; with glazed endwalls.

More information