4 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $- Other Programs Highway Program
5 $800,000,000 $700,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $450M/year $50M/year $100,000,000 $- Highway Other
6 Bridge, Tunnel & Misc Structure $ % Total Reconstruction $2, % Roadway Safety $1, % Cashless Tolling Conversion $ % Highway Miscellaneous $ % Interchanges $ %
7 110 Construction Contracts 50 Contractors $1.88 Billion Total Contract Value $710 Million Balance Remaining CY 15 to Date Low Bid to Estimate: +2.4% Change Order Review (Feb May 15): -1.9% (149 CO s/53 Contracts)
8 Status as of November 2015 Completed miles Under Construction - 19 miles In Design 126 miles LUZERNE LACKAWANNA LAWRENCE BUTLER CARBON BEAVER LEHIGH ALLEGHENY WESTMORELAND HUNTINGTON DAUPHIN LEBANON BERKS MONTGOMERY BUCKS WASHINGTON CUMBERLAND FAYETTE SOMERSET BEDFORD FULTON FRANKLIN YORK LANCASTER CHESTER
9
10 Milepost 202 to Milepost 206 Release June 8, 2016 Bid July 20, 2016 Excavation 750,000 cy (various classes) Pipe 35,000 lf (various types/sizes) Bituminous Paving Courses 1,500,000 sy 1 Two-Span Prestressed Concrete Box Beam Bridge SR 997 over Turnpike 3 Mainline Single Span Prestressed Concrete Box Beam Bridges Concrete Box Extensions 335 lf CIP Retaining Wall 250 lf and Solider Pile Retaining Wall 250 lf
11 Milepost A31 to Milepost A38 Release September 14, 2016 Bid October 26, 2016 Excavation 997,000 cy (various classes) Pipe 50,000 lf (various types/classes) Bituminous Paving Courses 2,000,000 sy 1 Mainline Single Span Concrete Bulb Tee Bridge 3 Mainline Prestressed Concrete Box Beam Bridges (2 single/1 3-span) Retaining Wall 3,645 lf and Sound Wall 13,675 lf
12 SR 903 Interchange )
13 I-95 Interchange Section D-10 ( ) Section D-20 ( )
14 I-95 Interchange
15 Bridge Program Percentage of Structurally Deficient Bridges (by Count)
16 Bridge Program Percentage of Structurally Deficient Bridges (by Deck Area)
17 Bridge Replacement: Milepost Release November 4, 2015 Bid December 16, 2015 Replacement of PTC owned 3-span 400,000 lbs. Structural Steel PECO relocations Bridge Replacement: Milepost Release December 9, 2015 Bid January 20, 2016
18 Superstructure Replacement: Milepost Accelerated Bridge Construction Release August 3, 2016 Bid September 14, 2016 Bridge Replacement: Milepost A Release August 10, 2016 Bid September 21, 2016
19 Bridge Replacement: Milepost Release September 21, 2016 Bid November 2, 2016 Bridge Replacement: Milepost A44.40 Release October 4, 2016 Bid November 15, 2016
20 Bridge Replacement: Milepost A Release October 26, 2016 Bid December 7, 2016
21 Bridge Program Accelerated Bridge Construction NB-355; MP A57.66 D/B/B Bid in 2016 NB-360; MP A58.88 D/B Bid in 2017 NB-363; MP A ? NB-376; MP A ?
22 Roadway Program Defective Lots 88.5% - 100% Payment 22% 42% Defective 97% Payment 94% Payment 36% 6% 3% 29% 62% Remove & Replace 70% Payment 50% Payment 0% Payment
23 Existing Section Northeast Extension 72 ft. out-to-out
24 Bituminous Overlay: Willow Grove IC; Milepost Clarks Summit IC: Milepost A Gateway IC; Milepost 1.44 Pittsburgh IC; Milepost st and 2 nd Quarters of 2016
25 Bituminous Overlay: Milepost A49 Milepost A59 Milepost 174 Milepost 180 Milepost 192 Milepost 197 Milepost 246 Milepost 255 Milepost 319 Milepost 326 Milepost 109 Milepost th Quarter of 2016
26 173 Active Engineering Services Agreements 76 Different Firms $1.25 Billion Total Contract Value $638 Million Balance Remaining
27
28 Procurement of Professional Services
29
30 Mon-Fayette & Southern Beltway 1. US 22 to I I-79 to Mon-Fayette 3. SR 51 to Duquesne 4. Mon River to I-376
31 Southern Beltway: US 22 to I-79
32 Wetland Mitigation; Section 55W Release November 4, 2015 Bid December 2, 2015 Excavation 45,000 cy (various classes) Topsoil 7,000 cy Temporary Stream Crossing/Access Road
33 Section 55-A1 Release August 17, 2016 Bid September 28, 2016 Excavation 5,400,000 cy (various classes) Pipe 40,000 lf (various types/classes) PCC pavement/shoulders 179,000 sy Inlets 340 ea Bituminous Paving 49,000 sy 6 Mainline and 1 Overhead bridges 1,100,000 lbs. Fabricated Structural Steel 8,110 lf Prestressed Concrete Beams
34 Section 55-B Release September 28, 2016 Bid November 9, 2016 Excavation 4,800,000 cy (various classes) Pipe 26,000 lf (various types/classes) Inlets 230 ea PCC pavement/shoulders 124,000 sy 2 Mainline (Dual bridges 1,500 in length/110 in height) 7,300,000 lbs. Fabricated Structural Steel
35 Section 55-C1-1 Release November 2, 2016 Bid December 14, 2016 Excavation 1,000,000 cy (various classes) Pipe 32,000 lf (various types/classes) PCC pavement/shoulders 105,000 sy Inlets 270 ea Bituminous Paving 52,000 sy 2 Mainline (Dual bridges 1,015 in length/100 in height) 6,500,000 lbs. Fabricated Structural Steel 1560 lf Prestressed Concrete Beams
36 Section 55-C2-2 Bid 2 nd Q of 2017 Section 55-A2 Bid 3 rd Q of 2017 Section C1-2 Bid 4 th Q of 2017 Section C2-1 Section S Bid 1 st Q of 2018 Section T Section M Bid - TBD
37 Mon Fayette: SR 51 to I-376
38 Mon Fayette: SR 51 to I-376
39
SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)
Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is
More informationSUPPLEMENTAL ECMS ADVANCED INFORMATION APRIL 6, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)
Updated March 20, 2017 ALLEGHENY COUNTY SR 3088(05) #106380 PROPOSAL:$23.40 PLANS:$11.88 12X18:$14.58 24X36:$210.60 EXSTRUCT:$3.08 12X18:$3.78 24X36:$54.60 The description and location of the project is
More informationAUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PUB 336 (4-17)
AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PREPARED BY: BUREAU OF MAINTENANCE AND OPERATIONS ASSET MANAGEMENT DIVISION P.O. Box 3437 HARRISBURG, PENNSYLVANIA 17105-3437
More informationBridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE
Bridge Manual - Part I - June 2007 5-1 CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE 5.1 GENERAL This chapter is intended to instruct the Designer in the preparation and submission of Special Provisions and
More informationAccelerated and Innovative Bridge Construction In Washington State
Accelerated and Innovative Bridge Construction In Washington State Bijan Khaleghi Bijan.Khaleghi@WSDOT.WA.Gov Washington State Department of Transportation Bridge and Structures Office Olympia Washington
More informationGREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10
ASSOCIATED PENNSYLVANIA CONSTRUCTORS Update January 3, 2018 GREENE COUNTY - SR 221(J10) #105392 PROPOSAL:$11.76 PLANS:$4.18 12X18:$5.13 24X36:$47.10 The description and location of the project is as follows:
More informationAccelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents
Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Washington State s Skagit River Bridge Emergency Slide Bijan Khaleghi
More informationAn Assessment of the Economic Impacts of the Pennsylvania Dairy Industry 1
An Assessment of the Economic Impacts of the Pennsylvania Dairy Industry 1 Executive Summary Steven Deller, Mark Stephenson and Chuck Nicholson 2 To assess the contribution of dairy to the Pennsylvania
More informationEXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE
EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.
More informationSITE ASSESSMENT SAMPLING REQUIREMENTS AT REGULATED STORAGE TANK SYSTEM CLOSURES
SITE ASSESSMENT SAMPLING REQUIREMENTS AT REGULATED STORAGE TANK SYSTEM CLOSURES Bureau of Environmental Cleanup and Brownfields Division of Storage Tanks November 1, 2016 2630-BK-DEP4699 11/2016 An Equal
More informationENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)
EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY
More informationI-495 HOT LANES PROJECT VIRGINIA CONCRETE CONFERENCE CONCRETE: LEADING THE WAY. Dan Staron, P.E. HNTB Corporation MARCH 4, 2010
VIRGINIA CONCRETE CONFERENCE CONCRETE: LEADING THE WAY Dan Staron, P.E. HNTB Corporation MARCH 4, 2010 PRESENTATION OVERVIEW Project Background/Highlights Design Challenges Technical Details Concrete Applications/Details
More informationOhio Department of Transportation
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 Ted Strickland, Governor Jolene M. Molitoris, Director THE DEPARTMENT UTILIZES BID EXPRESS (http://www.bidx.com)
More informationRe: EX8.12 F.G. Gardiner Expressway Strategic Rehabilitation Plan Procurement Strategy
Re: EX8.12 F.G. Gardiner Expressway Strategic Rehabilitation Plan Procurement Strategy Presentation to Executive Committee September 21, 2015 1 Overview Project Background Procurement Options Analysis
More informationBMI Precast PRECAST & PRESTRESSED CONCRETE PRODUCTS
PRECAST & PRESTRESSED CONCRETE PRODUCTS has over 80 years experience in the building and concrete industry. We manufacture a wide range of precast, prestressed products from boat ramp planks to pilings,
More informationMetals Data. for. Pennsylvania Soils
Metals Data for Pennsylvania Soils by Edward J. Ciolkosz, Richard C. Stehouwer, and Mary Kay Amistadi Agronomy Series Number 140 Agronomy Department The Pennsylvania State University University Park, PA
More informationJANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25
General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO
More informationPROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018
STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING March 9, 2018 This pamphlet is issued solely for the purpose of circulating advance information
More informationItem Name Description Unit of Measure Mobilization Per WSDOT Lump Sum
Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of
More informationLRFD Bridge Manual - Part I 5-1 CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE
5. 1 GEN ERA L LRFD Bridge Manual - Part I 5-1 CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE This chapter is intended to instruct the Designer in the preparation and submission of Special Provisions and Estimate
More informationBids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)
General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER
More informationBrad Hall Midstream & Marketing
Brad Hall Midstream & Marketing October 17, 2012 Overview Lines of Business Marketing Generation Midstream Natural Gas >100 Bcf > 30,000 locations 33 LDCs Power > 2 MM MWhrs > 10,000 locations 19 EDCs
More informationBiosolids Quality. Enhancement Plan. For more information, visit keyword: Biosolids.
Biosolids Quality Enhancement Plan For more information, visit www.dep.state.pa.us, keyword: Biosolids. Biosolids Quality Enhancement Plan INTRODUCTION The beneficial use of biosolids has become a growing
More information21 ST CENTURY CRANE ACCESS TRESTLE
21 ST CENTURY CRANE ACCESS TRESTLE Abstract Over the years, crane access over shallow waters and wetlands has been accomplished by a variety of temporary platforms. In the last decade, temporary bridges
More informationMaine Turnpike Authority FINAL 4-year Capital Investment Plan ( )
Total preliminary Value for Project shown in initial year is for project duration. Projects have been listed in each year there are major Preliminary 4.8 Beech Ridge Road Underpass Repairs York $410,000
More informationAll Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford
Seymour Road Replacement Bridge Addendum #1 April 27, 2015 To: From: Cc: All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford RE: Construction Bid Information
More informationWell Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.
Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan
More informationIronton Russell Bridge Project
Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014
More informationThe Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects
The Chief Estimator Software Item Cost Summary Bridge & Overpass Projects Elevated Transit Guideways Precast Girder Elevated Guideway 10 Abutment Excavation & Backfill 1,500.00 m3 222 10,368 8,634 1,309
More informationSTATE AID GUIDE FOR: Updated: December 16, 2005
STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk,
More informationI-11 Project Nevada Transportation Conference. Ryan Wheeler, P.E. NDOT, Senior Project Manager. Nevada Department of Transportation
I-11 Project 2017 Nevada Transportation Conference Ryan Wheeler, P.E. NDOT, Senior Project Manager Nevada Department of Transportation nevadadot.com About NDOT NDOT Core Values: Respect treating others
More informationJOINT PERMIT APPLICATION INSTRUCTIONS FOR A PENNSYLVANIA WATER OBSTRUCTION AND ENCROACHMENT PERMIT APPLICATION AND A
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION JOINT PERMIT APPLICATION INSTRUCTIONS FOR A PENNSYLVANIA WATER OBSTRUCTION AND ENCROACHMENT PERMIT APPLICATION AND A U.S. ARMY CORPS
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)
More informationCUY-IR MNT FY2018 Tree Removal PRUNING/OR TREE/BRUSH REMOVAL
Notices 181004 Late CUY-IR MNT FY2018 Tree Removal PRUNING/OR TREE/BRUSH REMOVAL FOR IMPROVING VARIOUS SECTIONS IN CUYAHOGA COUNTY, OF OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY REMOVING TREES
More informationGENERAL PERMIT WMGR125 BENEFICIAL USE OF DRY FGD WASTE AND COAL ASH
A. Description. This general permit authorizes the processing and beneficial use of dry flue gas desulfurization waste (FGD waste) and coal ash from coal-fired power plants for reclamation of coal mine
More informationNew Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS
PAGE : 133-1 CONTRACT TIME : 12/20/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-080-5(094) ROUTE 80 BRIDGE OVER ROUTE 287 NORTHBOUND AND SMITH ROAD GRADING, PAVING & STRUCTURRS CONTRACT
More informationLAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR
LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR July 12, 2002 A Paper Submitted for the AREMA Annual Conference by: Paul B. Satterly, P.E. HNTB CORPORATION 111 Monument Circle, Suite 1200 Indianapolis,
More informationADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.
ADDENDUM #2 JUNE 30, 2017 APRON REHABILITATION PHASE 3 HENRY E. ROHLSEN AIRPORT ST. CROIX, U.S. VIRGIN ISLANDS FAA AIP No.: 3-78-0002-037-2017 This addendum modifies or interprets the proposal documents
More informationIronton Russell Bridge Project
Construction Update October 1, 2013 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails
More information1. FROM (Bidder): (Name)
Tender No. [ ] Tender Forms Page 1 1. FROM (Bidder): (Name) (Address) TO: Alberta Transportation, Strategic Procurement Branch Main Floor, Twin Atria Building 4999 Avenue 5000 Edmonton, Alberta, T6B 2X3
More informationAnnual CSAH Needs Update for 2017
Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system.
More informationProject Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce
Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,
More informationAlternative No. 1 Total Cost DRAFT
OPINION OF PROBABLE PROJECT COSTS SUMMARY OF ALL THREE ALTERNATIVE ALIGNMENTS Item Description Alternative No. 1 Total Cost Alternative No. 2 Total Cost Alternative No. 3 Total Cost Design Phase 1. Preliminary
More informationIronton Russell Bridge Project
Construction Update January 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails
More informationTemporary Shoring. Specifications, Applications, & Best Practices. Stephen M. (Matt) Revell, P.E. Assistant Geotechnical Engineer
Temporary Shoring Specifications, Applications, & Best Practices Stephen M. (Matt) Revell, P.E. Assistant Geotechnical Engineer Temporary Shoring Specifications, Applications, & Best Practices Temporary
More informationIronton Russell Bridge Project
Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014
More informationConnecticut DOT 2013 Cost Estimating Guidelines
I. PURPOSE These guidelines provide basic cost estimating information for Department construction projects and recent cost information for several common construction items. The guidelines work in conjunction
More informationDistrict Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016
District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016 Ohio Transportation Engineering Conference 2016 Columbus, Ohio Agenda About
More informationHampton Roads Bridge-Tunnel Expansion Feasibility Study. Design Considerations
Hampton Roads Bridge-Tunnel Expansion Feasibility Study Tunnels Design Considerations The proposed location for the new tunnel crossing is about 250 feet away from the existing westbound tunnel. This matches
More informationMASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK
MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK The professional services to be provided by the Consultant under this Agreement shall be as necessary to complete the required analyses, layouts,
More informationATHABASCA RIVER BRIDGE REHABILITATION PROJECT
ATHABASCA RIVER BRIDGE REHABILITATION PROJECT PROJECT INFORMATION Project Name Athabasca River Bridge Rehabilitation Project Location Highway 40 (over the Athabasca River), Entrance, Alberta Year Completed
More informationHIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA
HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, 2018 5:30 PM 600 S. Commerce Ave. Sebring, FL 33870 AGENDA 1 MEETING CALLED TO ORDER: Invitation to fill out "citizens not on the agenda
More information10:00 AM, Wednesday, April 8, 2015
NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, April 8, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference
More information12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway
in association with Design 151.66 Km (Existing Road Apr. 180 km) 2 OBJECTIVE: The Government of Timor Lestewishes to Engage Consultant to carry out the Preliminary, Detailed Engineering Design and Environment
More informationCost Comparison of AASHTO Type IV and Modified Type IV Bridge Beams with 54- and 63-in. Bulb-Tees
TRANSPORTATON RESEARCH RECORD 1319 109 Cost Comparison of AASHTO Type V and Modified Type V Bridge Beams with 54- and 63-in. Bulb-Tees SHERRELL HELM Standard AASHO precast, prestressed concrete beams are
More informationDESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION
DESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION INTRODUCTION By Dawn Tattle, P. Eng. Anchor Shoring & Caissons Ltd. TTC Yonge Station is the largest and most complicated of the
More informationCost Estimating Guideline February, 2017
Cost Estimating Guideline February, 2017 Procedures are subject to change without notice. Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Section 1 -
More informationVirginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR
Page 1 of 14 0010 00100 MOBILIZATION 0020 00101 CONSTRUCTION SURVEYING (CONSTRUCTION) 0030 00110 CLEARING AND GRUBBING 0040 00120 REGULAR EXCAVATION 0050 00126 EARTHWORK 0060 00140 BORROW EXCAVATION ACRE
More informationEDUCATION DID YOU GRADUATE? WORK LOCATION PREFERENCE. Homewood. Norristown Harrison City. Trevose Breezewood. Greensburg. Donegal
PLEASE PRINT OR TYPE APPLICATION FOR EMPLOYMENT An Equal Opportunity Employer THIS APPLICATION WILL REMAIN ON FILE FOR ONE YEAR 72-26 REV. 3/07 WEB PERSONAL Last First Middle Initial Social Security No.
More informationSustainability Strategies for Highway Construction: A Case Study of ADOT s Piestewa SR51 HOV Widening Project
Sustainability Strategies for Highway Construction: A Case Study of ADOT s Piestewa SR51 HOV Widening Project Jacqueline D. Thompson, M.U.E.P. and Howard H. Bashford, Ph.D., P.E. Arizona State University
More informationPENNSYLVANIA WEEKLY FALL FOLIAGE REPORT
Pennsylvania Department of Conservation and Natural Resources Bureau of Forestry PENNSYLVANIA WEEKLY FALL FOLIAGE REPORT October 26 November 1, 2017 Autumn color in the commonwealth is still good to excellent
More informationPAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV
NORTH SHORE CONNECTOR TUNNELS AND STATION SHELL LIGHT RAIL PROJECT PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV North Shore Connector Alignment 7300 lf Extension to existing 25 mile system 18 Contracts $435
More informationGrade-Separated Trail Crossings How Do We Get Over There?
Grade-Separated Trail Crossings How Do We Get Over There? 2008 National Trails Symposium Rory Renfro, Alta Planning + Design Scott Belonger, Loris and Associates Peter Loris, Loris and Associates PRESENTATION
More informationFor Public Input Period
20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,
More informationNatural Gas Pipelines and New Jersey. Patty Cronheim ReThink Energy NJ Outreach Coordinator
Natural Gas Pipelines and New Jersey Patty Cronheim ReThink Energy NJ Outreach Coordinator 1 Campaign Mission We empower New Jersey citizens by informing them about the need for a swift transition to clean,
More informationI-91 Viaduct Public Information Briefing
I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:
More informationNortheast States Materials Engineers Meeting (NESMEA) October 9, 2006 Newark, DE
Northeast States Materials Engineers Meeting (NESMEA) October 9, 2006 Newark, DE Delaware DOT s Use of Slag Cement Jim Pappas, P.E. Chief Materials & Research Engineer Materials & Research Section Outline
More informationAPPENDIX F: CALTRANS COST ESTIMATE TEMPLATE (included in Appendix AA of the CALTRANS Project Development Procedures Manual)
APPENDIX F: CALTRANS COST ESTIMATE TEMPLATE (included in Appendix AA of the CALTRANS Project Development Procedures Manual) PROJECT DESCRIPTION: (Enter Type of Project Planning Cost Estimate as Title)
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT
MAINE TURNPIKE AUTHORITY ADDENDUM NO. CONTRACT 08.09 BRIDGE REPAIRS RUNNING HILL ROAD UNDERPASS (MILE 5.) BLACKSTRAP ROAD UNDERPASS (MILE 58.3) WEYMOUTH ROAD UNDERPASS (MILE 66.) SUPERSTRUCTURE REPLACEMENT
More informationor (800)
WWW.CELL-CRETE.COM or (800) 669-0433 CALIFORNIA (Lic #243404), OREGON, WASHINGTON, NEVADA, UTAH, IDAHO, MONTANA, ARIZONA, HAWAII, ALASKA, WESTERN CANADA Re: Cellular Concrete as Engineered Fill I m pleased
More informationBoeing North Bridge: Lessons Learned in Accelerated Bridge Construction
Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction Gregory A. Banks, Myles Parrish, Charles W. Spry WSDOT ABC Workshop April 2015 Project Overview Location Located in Renton, WA PROJECT
More informationAlberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.
STANDARD BRIDGE & CULVERT COMPONENTS Alberta Bridge Inventory In Alberta there are about 13,300 bridges. Types of bridges in Alberta: Standard bridges 3521 (26%) Bridge size culverts 8348 (63%) Major bridges
More informationConstruction of the Superstructure of Major Sea Crossings
Construction of the Superstructure of Major Sea Crossings Matt Carter Associate Director 2 nd International Seminar on Design & Construction of Second Penang Bridge 2 Second Penang Bridge Donghai Bridge
More informationStatus Report as of July 31, 2014
Dominion Boulevard Improvements AC # 01-6004-05 UPC: 56187 VDOT Project No: (FO) 6017-131-109, PE-101, RW-201, C-501, B608, B609, B610, B611, B614, B615, B616, D608, & C-502, B612, B613 FHWA No.: HPP-0017-5(023)
More informationSouth Dakota Department of Transportation Average Unit Prices from Low Bids
Unit Prices from Low s January 0, 0 to December, 0 Office of Project Development - Letting 00E00 Blading Hour.00 $,0. $. 00E000 Construction and Maintenance of Detour(s) LS.00 $0,. $,. 00E000 Maintenance
More informationStatewide Waste Composition Study
Final Report Statewide Waste Composition Study Pennsylvania Department of Environmental Protection April 2003 PENNSYLVANIA DEP 2001 STATEWIDE MSW CHARACTERIZATION STUDY Table of Contents EXECUTIVE SUMMARY
More informationSIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE
SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE G. Keith Donington, PE, Parsons Brinckerhoff, Manchester, NH Hany L. Riad, PhD, PE, Parsons Brinckerhoff, Boston, MA
More informationBRIDGE CONSTRUCTION APPROACHES
SYNTHESIS ON THE USE OF ACCELERATED BRIDGE CONSTRUCTION APPROACHES FOR BRIDGE REHABILITATION By: Meghan Cronin July 29 th, 2016 Outline 2 Introduction Deck Joints Decks Girders Piers and Columns Abutments
More informationOKLAHOMA TURNPIKE AUTHORITY STANDARD SPECIFICATIONS PAY ITEM LIST revised 11/27/2012
OKLAHOMA TURNPIKE AUTHORITY STANDARD SPECIFICATIONS -2010 PAY ITEM LIST revised 11/27/2012 Pay Item List includes all of the pay items listed in the 2010 OTA Specifications and Special Provisions. Pay
More informationI-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010
I-405 Sepulveda Pass Widening Project Community Advisory Committee Meeting June 24, 2010 1 MWD LA-29 Project Drilling to install beams for shoring to support excavation at Sunset Bl and Church Ln 2 MWD
More informationStructural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options
Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options A local utility company issued a Request for Proposal to our university s capstone design class for structural improvements
More informationDesign and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.
Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on
More informationFolsom Lake Crossing by Hans Strandgaard, Alex Harrison, Jeff Aldrich, and Jeff Thomure, CH2M HILL
Design and Construction Folsom Lake Crossing by Hans Strandgaard, Alex Harrison, Jeff Aldrich, and Jeff Thomure, CH2M HILL View of the Folsom Dam and the canyon just upstream of construction. The area
More informationDulles Corridor Metrorail Project Phase 1 & Phase 2 Updates
Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates June 30, 2017 Charles W. Stark Executive Project Director Phase 2 Station Tour 2 Phase 1 Phase 1 Cost Summary Quarter Expenditures (Feb, Mar,
More informationMaine Turnpike Authority
Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson
More informationJOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106.
JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106. There are notes in the plans regarding driving the test pile without the use of a follower. The
More informationAGRICULTURAL PLANNING REIMBURSEMENT PROGRAM PENNSYLVANIA S CHESAPEAKE BAY WATERSHED
3020-FM-CBO0003 10/2017 Cover Sheet How the Program Benefits Farmers: PENNSYLVANIA S CHESAPEAKE BAY WATERSHED Agricultural operators/landowners are reimbursed for fees they ve paid to consultants to create
More informationSunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014
Sunnyside Valley Irrigation District Addendum No. 1 Enclosed Lateral Improvements Projects 2010-2011 Issued: 8/30/2010 Contract 10-003: Regions 011, 013 & 014 Page 1 of 7 Sunnyside Valley Irrigation District
More informationMill Creek (HHEI)
Section 401 OEPA Water Quality Certification Application TRU-534-24.32 Transportation Improvements Project PID 23967 2-Aug-12 401 Table A Streams Affected by the Proposed Project Stream STA Description
More informationPROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 22, 2018
STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING March 22, 2018 This pamphlet is issued solely for the purpose of circulating advance information
More informationStatus of ITER Buildings construction and next procurement steps
Status of ITER Buildings construction and next procurement steps Laurent Schmieder Site, Buildings and Power Supplies Project Manager IBF/15 DIRECTORY IBF/15 March 25-27 March 25-27, 2015 Palais du Pharo
More informationIn Service Replacement of Box Girder Bottom Slab
In Service Replacement of Box Girder Bottom Slab WSDOT Bridge No. 5/537S - Span 11 Craig R. Boone, P.E., S.E. Lynn Peterson Secretary of Transportation 2015 Western Bridge Engineers Seminar Reno, Nevada
More informationELANA D. FREEDMAN, P.E. Structural Engineer
, P.E. EDUCATION Bachelor of Science, Civil Engineering (L.C. Smith College of Engineering), Syracuse University, 2007 Bachelor of Arts, Philosophy (College of Arts & Sciences), Syracuse University, 2007
More informationFAST FORWARD. to the FUTURE 2017 PROGRAM REPORT
FAST FORWARD to the FUTURE 2017 PROGRAM REPORT Looking Back, to the Future A 1968 IMPALA. WHITE. WITH A BLUE INTERIOR. That s what is sitting in my garage, a fond reminder of my late father who enjoyed
More informationGeneral Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours
Basic Edition Standard Estimate Report Page 1 Name 1000 General Conditions 1107 Professional Consultant 10 Surveying 1.00 day 600.000 /day 600 - - - - - - 600 Professional Consultant 600 600 8.00 hours
More informationExisting Project Conditions. General Conditions Estimate. Michael Vergari Construction Management Advisor: Dr. Riley
Existing Project Conditions General Conditions Estimate The Center for Health Research and Rural Advocacy is constructed under the supervision of the Geisinger Facilities Division. The project team develops
More informationThe Aizhai Suspension Bridge is
INTERNATIONAL DESIGN & CONSTRUCTION: BRIDGES Mountain grown Hilly terrain contributes mightily to China bridge By Yinbo Liu, Ph.D., P.E., Guoping Chen, Shulong He and Yongjian Zhang, Ph.D. Contributing