ELANA D. FREEDMAN, P.E. Structural Engineer

Size: px
Start display at page:

Download "ELANA D. FREEDMAN, P.E. Structural Engineer"

Transcription

1 , P.E. EDUCATION Bachelor of Science, Civil Engineering (L.C. Smith College of Engineering), Syracuse University, 2007 Bachelor of Arts, Philosophy (College of Arts & Sciences), Syracuse University, 2007 PROFESSIONAL REGISTRATIONS Professional Engineer, New York, United States, No Issued: 07/18/2012, Expires: None Listed, Does Not Expire Engineer in Training, New York, United States, No Issued: 06/22/2009, Expires: None Listed, Does Not Expire PROFESSIONAL AFFILIATIONS American Society of Civil Engineers (ASCE), Member, 2006-Present HDR TENURE 7 Years INDUSTRY TENURE 7 Years INDUSTRY AWARDS PRESENTATIONS & PUBLICATIONS Experience Overview Elana Freedman is a structural Engineer with HDR's New York, Manhattan 7th Avenue office with experience in design and construction support services for bridge and infrastructure projects in the New York metropolitan area. As Project Engineer, she has experience with inspection, analysis and design of highway and pedestrian bridges, transportation structures and civil infrastructure. She is experienced working and coordinating with NYSTA, NYCDOT, NPS, NYCDEP, NYCEDC, NYCT, PANYJY throughout the design and construction phases of projects. She also has experience with multiple methods of project delivery, including design-build. HDR Project Experience Tappan Zee Constructors / New York State Thruway Authority, The New NY Bridge (Tappan Zee Hudson River Crossing), Westchester-Rockland County, NY. Miscellaneous Structures Discipline Design Lead. The New NY Bridge will replace the existing Tappan Zee Bridge crossing which handles more than 138,000 vehicles every day far more than its design capacity. The new twin bridgesare over 3 miles long and will cross the Hudson River at one of its widest points to connect Rockland and Westchester counties. Key features of the new bridge include twin iconic cable-stayed main spans with 1,200-foot center spans.each bridge carriesfour general traffic lanes plus shoulders and extra-wide emergency lanes. The bridge will have new temporary tolling facilities with AETC (All Electronic Toll Collection) and a shared-use path (dedicated bicycle and pedestrian) on the northern bridge with scenic overlooks. The project implements Intelligent Traffic Systems (ITS) and Advance Traffic Management Systems (ATMS) to improve the flow of vehicle traffic. The bridge is designed for a 100-year service life and will be masstransit-ready for bus rapid transit without strengthening, or for commuter or light rail on a separate structure constructed between the two highway bridges.the project team will follow strict environmental performance commitments to protect the Hudson River estuary. The New York State Thruway Authority selected design-build as the delivery method for this project to meet an aggressive schedule. HDR is the lead designer, and a subcontractor for Tappan Zee Constructors LLC, a consortium of Fluor Enterprises, American Bridge Company, Granite Construction Northeast, and Traylor Bros. Detailed design includes deep foundations, cablestayed main span and girder/sub-stringer approach span structures, pre-cast substructure and superstructure components and highway design including alignments, AETC tolling, ITS, utilities and facility design. HDR is also leading significant Environmental Compliance activities including underwater noise, water quality and airborne air/noise monitoring. Ms. Freedman s role on the project as the Miscellaneous Structures Design Discipline Lead was to manage the design and construction support of numerous structures including over 20 overhead sign structures on grade and on the bridge; 6,000 linear feet of retaining walls including soldier pile and lagging, MSE, T-walls, and CIP concrete retaining walls; over 5,000 linear feet of concrete and acrylitenoise barrier walls mounted on retaining walls, on (OPTIONAL) PAGE IDENTIFIER 1

2 grade and on the bridge; the SUP prestressed concrete box girder pedestrian bridge; underbridge catwalk and access structures; roadway barriers; movable barrier gates;the AETC Tolling gantries; the 1,300 plus linear foot in-water permanent maintenance platform, and temporary maintenance dock; as well as the various attachments and support structures associated with ITS, utilities, roadway and aesthetic lighting and security related installations. These tasks required extensive interdisciplinary coordination, coordination with the contractor, coordination with the NYSTA, and management of more than 7 subconsultants and internal design teams. (2013-Present, $3.14 billion) Judlau Contracting, Inc./NYCDOT, Design Build and Emergency Contracts Section, Rehabilitation of the Northbound and Southbound Bruckner Expressway Bridges Over CSX and Amtrak Railroads, Bronx, NY. Inspector/Design Engineer. The Bruckner Expressway, Interstate Route I-278, is a major connecting link in the Bronx from the Robert F. Kennedy (Triborough) Bridge/Major Deegan Expressway (I-87) to the New England Thruway (I-95). An oil tanker truck fire on the Northbound Bruckner Expressway Bridge caused a downward deflection of portions of the bridge, resulting in decreased vertical clearances over the Amtrak and CSX tracks underneath the bridge. The New York City Department of Transportation (NYCDOT) selected the design-build project delivery method to meet the accelerated construction schedule. The project involved design, construction, and construction support services for the rehabilitation of the Northbound and Southbound Bruckner Expressway bridges. The Northbound bridge involves the replacement of the multi-girder steel superstructure, bearings, bridge seat, and backwall. The Southbound bridge involved the replacement of the existing deck, bearings, and backwall, as well as steel repairs to the existing truss superstructure, lead paint abatement, and bridge painting. Both bridges also involved approach slab and approach roadway replacement including replacement of barriers and railing, street lighting, frames and grates of drainage structures, and FDNY fire communications facilities. HDR performed the engineering design for the bridges, which included analyzing the existing and proposed structures to account for the contractor s construction means and methods. Prefabricated bridge components, including precast concrete deck slabs, bridge seats, and backwalls, were utilized to eliminate concrete cure times and allow for bridge deck replacement within the night time lane closure durations allowed for by the contract. The design was coordinated with and approved by NYCDOT Design Build, NYCDOT Quality Assurance, 2 (OPTIONAL) PAGE IDENTIFIER

3 NYCDOT OCMC, public and private utilities, Amtrak, and CSX. The construction support services (CSS) included review of shop drawings, requests for information, contractor requests for substitution, and evaluation of and response to field conditions. The CSS was performed in coordination with NYCDOT, the Resident Engineering and Inspection consultant, the contractor, and public and private stakeholders including Amtrak and CSX.The design/build contract for the design, construction and construction support services of the rehabilitation of the Bruckner expressway bridges required the inspection of the existing structure and the preparation of contract plans for the new superstructure and substructure elements. Ms. Freedman, as a structural E.I.T., was a member of the inspection team, and performed the design of the pre-cast concrete deck panels and approach slabs, using finite element analysis programs involving STAAD and LARSA. She aided in the design and detailing of the steel intermediate and end diaphragms, the detailing of the Northbound abutments, including the fixed and expansion joints, the construction staging of the demolition and replacement of the bridge seats and bearings, as well as the detailing of the parapet. She also worked extensively with the preparation of contract drawings for compliance with NYCDOT requirements. Additionally, Elana was involved with the shop drawing review and construction support services. ( , $63M) National Park Service, Stabilization of the Ellis Island Seawall, Statue of Liberty National Monument, NJ. Project Engineer. This ongoing project is a rehabilitation of the historic seawall surrounding Ellis Island and the installation of a pedestrian bridge. The rehabilitation was geared to the structural stabilization and historic preservation of 4 different types of concrete seawalls and required ample coordination between different disciplines including structural, civil and marine engineering and connecting 2 islands with a pedestrian and maintenance vehicle bridge. This ARRA funded project has a limited timeline and strict funding regulations. Ms. Freedman has been involved with this ongoing project during the proposal process, the preliminary schematic design phase and final design phase. During schematic design, Ms. Freedman was a leader of the inspection team and oversaw field operations and coordination between the client and various subcontractors. She was responsible for coordination with the client, subconsultants, subcontractors and internal design team. She was integrally involved with the review and development of the construction documents including plans, sections and design details as well as coordination with specifications. Within the final design phase, Ms. Freedman was also involved with the scheduling and resource management. She also provided information and support material for permits from NJDEP and the Army Corp of Engineers as well as the engineer's cost estimate. ( , $22M) NYCDEP, Reconstruct Concrete Floor Slabs and Beams at Ashokan Fleet Garage. Designer. Ms. Freedman was involved in the 30% progress design of 3 (OPTIONAL) PAGE IDENTIFIER

4 this reconstruction project. She prepared the 30% design plans and details of the floor slab repair as well as the cost estimate and specification selection process. ( , $2M). NYCDOT, Replacement of the 11th Avenue Viaduct, New York. Drawing Coordinator. Final design phase for rehabilitation and partial replacement of a 1600-ft viaduct, including coordination with NYCT for the No. 7 Line subway extension and the Expansion of the Javits Convention Center. Two construction packages will be prepared, for the South and North Sections, Ms. Freedman was involved with the later. She was involved with the coordination and development of plans and sections for the rehabilitation of the existing steel girder viaduct.( , $100M) NYCEDC, Rossville Site Feasibility Study. Team Member. Ms. Freedman participated in the feasibility study at the Rossville site in Staten Island, NY. The study addressed the construction or reconstruction of vessel docking structures. Tasks included site investigations, review of historic documentation, public records, permit related issues and economic and community impacts of various applications, and cost implications. (2010-Present). NYCT Rehabilitation of Nine Stations & Line Structure on the Sea Beach Line, Brooklyn, NY. Inspector/Design Engineer. This project scope includes the rehabilitation of station platforms, canopies and fourteen (14) stations control houses on the Sea Beach Line. As a Structural E.I.T. assigned to this project, Ms. Freedman was involved with inspecting the existing conditions of the open cut subway stations, preparations of plans and structural design of elements of the stations specifically the analysis of existing steel beams under new loading conditions, the design of reinforced concrete stairs and steel stair canopies, as wall as the design of new steel beams to be added to the existing control house structures and reinforced concrete slab design. She was also involved in the coordination with other project disciplines including Architectural. (2007- On-going, $12M) NYCT, Stations Conditions Survey, NY. Structural E.I.T. Ms. Freedman was a member of the inspection team for the station surveys of a total of 146 NYCT Stations in Queens and Lower Manhattan as part of the Indefinite Quantities Contract with NYCT, in compliance with the NYCT Station Inspection Manual. She also developed the station inspection reports, 125 of which were completely and the Final Station Inspection Reports were submitted to NYCT at the end of February The final 21 Station Inspection Reports were submitted to NYCT in September ( , $716K for 125 stations, $141K for the additional 21) NYCT, Stations Conditions Survey, NY. Inspector. Ms. Freedman was a member of the inspection team for the station surveys of a total of 146 NYCT Stations in Queens and Lower Manhattan as part of the Indefinite Quantities Contract with NYCT, in compliance with the NYCT Station Inspection Manual. She also developed the station inspection reports, 125 of which were 4 (OPTIONAL) PAGE IDENTIFIER

5 completed and the Final Station Inspection Reports were submitted to NYCT at the end of February The final 21 Station Inspection Reports were submitted to NYCT in September ( ) PANYNJ, PATH Floor Mitigation at Low Ground Elevations. Design Engineer. Ms. Freedman is involved in this ongoing project to detail construction staging, design of concrete walls, slabs, and stairs as well as the outlining of necessary specifications in accordance with the Port Authority's requirements. (2009, $350K) Randall's Island Pedestrian Bridge, Randall's Island, NY. Team Member. This ongoing project is the development of an existing CONED conduit support structure into a pedestrian bridge and bikeway. Ms. Freedman has performed the design of the deck and bridge railing as well as a check of the retrofit on the existing super structure. She is integrally involved with the development of the contract documents including the drawings and specifications. (2008- Present, $3M) Rustic Rail, Long Island, NY. Team Member. Ms Freedman was involved in the load rating and shoring design of the reinforced concrete culvert supporting Ocean Parkway in Long Island, NY. She designed an emergency stabilization shoring for one of the culvert found to be in poor condition, prepared the construction drawings, and coordinated with the contractor to use readily available materials. Additionally, she performed the load rating of the existing structure for NYSDOT. Non-HDR Project Experience 5 (OPTIONAL) PAGE IDENTIFIER

2-2 ALTERNATIVES CONSIDERED AND ELIMINATED

2-2 ALTERNATIVES CONSIDERED AND ELIMINATED Section 2: Alternatives Development and Evaluation 2-1 INTRODUCTION This section of the Scoping Information Packet describes the alternatives to be evaluated in the Environmental Impact Statement (EIS)

More information

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa 2014 HDR Architecture, 2014 HDR, Inc., all rights reserved. ASCE STRUCTURAL ENGINEERING CONFERENCE Ames Iowa WHAT DO YOU DO IF YOU HAVE MORE PROJECT THAN BUDGET? DESIGN BUILDER SELECTION METHOD Fixed Price

More information

9 Conclusion. 9.1 Introduction

9 Conclusion. 9.1 Introduction 9 Conclusion 9.1 Introduction This final chapter presents a synthesis of the evaluation criteria leading to conclusions and recommendations. Also included is a summary of the current status of the Tappan

More information

Appendix A: Project Planning and Development A-1 White Paper on Transit and the Tappan Zee Hudson River Crossing Project

Appendix A: Project Planning and Development A-1 White Paper on Transit and the Tappan Zee Hudson River Crossing Project Appendix A: Project Planning and Development A-1 White Paper on Transit and the Tappan Zee Hudson River Crossing Project Purpose of White Paper White Paper on Transit and the Tappan Zee Hudson River Crossing

More information

Pattullo Bridge Replacement Project. Cost Report

Pattullo Bridge Replacement Project. Cost Report Pattullo Bridge Replacement Project Cost Report January 2018 Cost Report Page i TABLE OF CONTENTS 1 PURPOSE... 1 2 BASIS FOR THE ESTIMATE... 2 2.1 Scope of the Works... 2 2.2 Scope of Capital Costs...

More information

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN

More information

Solicitation HH-89. Design/Build for Rehabilitation of Skewbacks, Viaduct Piers and Lower Level North Abutment at the Henry Hudson Bridge

Solicitation HH-89. Design/Build for Rehabilitation of Skewbacks, Viaduct Piers and Lower Level North Abutment at the Henry Hudson Bridge March 9, 2016 ADDENDUM NO. 2 Solicitation HH-89 Design/Build for Rehabilitation of Skewbacks, Viaduct Piers and Lower Level North Abutment at the Henry Hudson Bridge To all Prospective Proposers: The due

More information

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures Cumberland Viaduct Rehabilitation Project Contract No. AL4095180R Presenter Bob Bofinger MDSHA Office of Structures Project Justification & Improvements Condition State The deck, superstructure and substructure

More information

STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE

STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE Code Pre/Route AFE Function Part 0 1000 7116 1174 N Hadley Eisenbeisz Bridge Construction Engineer Rick Brandner Mitchell Area Darrell utter Assistant

More information

I-345 Feasibility Study Public Meeting

I-345 Feasibility Study Public Meeting I-345 Feasibility Public Meeting December 11, 2012 December 11, 2012 1 Feasibility Team TxDOT Dallas District & Bridge Division Parsons Brinckerhoff Huitt-Zollars APM Halff Associates Civil Associates

More information

Review of Plans and Specs from a Constructability Perspective

Review of Plans and Specs from a Constructability Perspective Review of Plans and Specs from a Constructability Perspective The Executive Regional Manager and the Project Manager, with approval of the Director of Project Management, may request the Constructability

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update September 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: September

More information

SUMMARY OF MITIGATION OF CONCERNS RAISED IN FINAL ENVIRONMENTAL IMPACT STATEMENT

SUMMARY OF MITIGATION OF CONCERNS RAISED IN FINAL ENVIRONMENTAL IMPACT STATEMENT SUMMARY OF MITIGATION OF CONCERNS RAISED IN FINAL ENVIRONMENTAL IMPACT STATEMENT Summary: Building a new bridge is necessary to replace the aging and obsolete Tappan Zee which serves as a critical Hudson

More information

Design Challenges and Construction Benefits of Precast Segmental Rail Bridges

Design Challenges and Construction Benefits of Precast Segmental Rail Bridges Design Challenges and Construction Benefits of Precast Segmental Rail Bridges by Amy R. Kohls, P.E., S.E. Director Texas Office Figg Bridge Engineers, Inc. 10000 North Central Expressway Suite 1300 Dallas,

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014

More information

Unionport Bridge Replacement Design Twin Single Leaf Bascules

Unionport Bridge Replacement Design Twin Single Leaf Bascules SIXTEENTH BIENNIAL SYMPOSIUM September 19th 22nd, 2016 Unionport Bridge Replacement Design Twin Single Leaf Bascules Rahul P. Shah, PE NYCDOT Division of Bridges William E. Nyman, PE Hardesty & Hanover,

More information

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction

More information

REHABILITATION PACKAGE 4-a

REHABILITATION PACKAGE 4-a 4-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 4-a Rehab option 4-a is a rehabilitation package whereby all spans of the existing steel truss structure would be rehabilitated and strengthened.

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 9 September 13, 2017 Agenda Welcome and Presenter Introductions Update on Construction and Demolition

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2015

More information

The FHWA Long-Term Bridge Performance Program

The FHWA Long-Term Bridge Performance Program The FHWA Long-Term Bridge Performance Program by John M. Hooks, J. M. Hooks & Associates An ever-growing volume of cars and trucks move people and goods on modern bridges spanning highways and topographical

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

extent feasible. Per the and low constructability,

extent feasible. Per the and low constructability, RELEVANT PUBLIC PROJECTS AND REFERENCES TranTech is proud of its accomplishments in structural engineering. Our staff members have provided design servicess to numerous public agencies on very successful

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS SECTION 1 - MISCELLANEOUS STANDARDS 1.00.01 -.05 Table of Contents 1.11.01 Decimal Parts of a Foot and Inch 1.21.01 Factors

More information

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update July 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The entails the construction of a cast in place

More information

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc.

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. Paper prepared for presentation at the Bridges in a Climate of Change

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2016 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016

District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016 District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016 Ohio Transportation Engineering Conference 2016 Columbus, Ohio Agenda About

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

SCCRTC- MP San Lorenzo River Bridge Walkway Widening Feasibility Report

SCCRTC- MP San Lorenzo River Bridge Walkway Widening Feasibility Report SCCRTC- MP 19.43 San Lorenzo River Bridge Walkway Widening Feasibility Report May 19, 2016 INTRODUCTION Jacobs Engineering Group was selected to provide a feasibility report for the Santa Cruz County Regional

More information

Submission Date: November 14, ,114 words (not including Title Page) plus words each = 4,114

Submission Date: November 14, ,114 words (not including Title Page) plus words each = 4,114 Joint-less Continuous Curved Steel Girder Structure Harold Fink, PE New York City Region New York State Department of Transportation 47-40 21 st Street Long Island City, NY 11101 T) 718-482-4725 F) 718-482-6319

More information

Northeast Bridge Preservation Partnership Meeting

Northeast Bridge Preservation Partnership Meeting Northeast Bridge Preservation Partnership Meeting Superstructure Preservation Strategies Aetna Viaduct Superstructure Repairs Route I-84 City of Hartford, CT State Project No. 63-648 David A. Cutler, P.E.

More information

HOAN BRIDGE REHABILITATION

HOAN BRIDGE REHABILITATION 5/11/2013 HOAN BRIDGE REHABILITATION Presentation Overview Project Overview History Project Background In-Depth Inspection Structural Design Elements WSPE Discovery Conference 2013 PROJECT OVERVIEW Project

More information

Red Wing Bridge Alternates

Red Wing Bridge Alternates Alternate 1 Tied Arch Alternate 2 Simple Span Truss Alternate 1 Design Drawing Alternate 2 Design Drawing Similar Bridge Design to Alternate 1 Similar Bridge Design to Alternate 2 Evaluation Matrix for

More information

APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES

APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES Massachusetts Department of Transportation Highway Division I-95 / Whittier Bridge Replacement Type Study Report 6. Evaluation of

More information

THE KOSCIUSZKO BRIDGE PROJECT. The New York State Department of Transportation. Page 1

THE KOSCIUSZKO BRIDGE PROJECT. The New York State Department of Transportation. Page 1 THE KOSCIUSZKO BRIDGE PROJECT The New York State Department of Transportation Page 1 THE KOSCIUSZKO BRIDGE PROJECT Constructed 70 years ago, the existing Kosciusko Bridge serves more than 160,000 vehicles

More information

Steve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) ,

Steve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) , PLACEMENT OF PRECAST PRESTRESSED CONCRETE GIRDER BRIDGE SPANS WITH SELF PROPELLED MODULAR TRANSPORTERS PIONEER CROSSING DESIGN/BUILD PROJECT, AMERICAN FORK, UT Steve Haines, P.E., Parsons, (303) 831-8100,

More information

I-74 over the Mississippi River

I-74 over the Mississippi River I-74 over the Mississippi River Design and Construction of Arch Foundations 104 th Transportation and Highway Engineering Conference Presented by: Andrew J. Keaschall, PE, SE, Alfred Benesch & Company

More information

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan

More information

BQE Atlantic to Sands Project Overview. 1. Project Background 2. Current Conditions & Findings 3. Upcoming Activities

BQE Atlantic to Sands Project Overview. 1. Project Background 2. Current Conditions & Findings 3. Upcoming Activities BQE Atlantic to Sands Project Overview 1. Project Background 2. Current Conditions & Findings 3. Upcoming Activities Commissioner Polly Trottenberg, New York City Department of Transportation June 29,

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2013 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:

More information

Feasibility Assessment Study

Feasibility Assessment Study August 19, 2010 Feasibility Assessment Study Historic Sites Council Meeting Today s Agenda Historic Overview Project Overview Barrier Issues Concrete Parapet Recommendations Steel Parapet Recommendations

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

Cedrick T. Fulton President. Solicitation RK-23C. Design-Build Services for New Harlem River Drive Connector Ramp

Cedrick T. Fulton President. Solicitation RK-23C. Design-Build Services for New Harlem River Drive Connector Ramp 2 Broadway New York, NY 10004 646 252-7000 Tel Cedrick T. Fulton President Bridges and Tunnels December 5, 2018 ADDENDUM NO. 1 To all Prospective Proposers: Solicitation RK-23C Design-Build Services for

More information

A Brief Overview Of Seismic Isolation Bridge Projects

A Brief Overview Of Seismic Isolation Bridge Projects A Brief Overview Of Seismic Isolation Bridge Projects Presented by: Sylvain Montminy, P. Eng., ing. Structures Division Manager and Senior Principal with Delcan May 26 th, 2011 1 Seismically Evaluated

More information

Appendix H: Construction Impacts H-1 Construction of the Feasible Alternatives for the Replacement Tappan Zee Bridge & Landings (TP6/7)

Appendix H: Construction Impacts H-1 Construction of the Feasible Alternatives for the Replacement Tappan Zee Bridge & Landings (TP6/7) Appendix H: Construction Impacts H-1 Construction of the Feasible Alternatives for the Replacement Tappan Zee Bridge & Landings (TP6/7) Peekskill Westchester 9W WY PK ER RIV LL SA W MI Rockland Haverstraw

More information

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE Keith Donington, P.E. October 2012 1 Sibley Pond - Bridge Elevation 2 Bridge Open to Traffic November 2011 3 Bridge Highlights

More information

7 Bridges in 74 Days. NC 12 Detour

7 Bridges in 74 Days. NC 12 Detour 7 Bridges in 74 Days (Or Less) NC 12 Detour Ocracoke NC 12 Bridges Ocracoke NC 12 Bridges Existing 7 bridges built in 1950's Timber structures w/ ACP Clear width 22.5 ft. 36 to 152 ft. long Limited redirective

More information

Executive Summary S-1 INTRODUCTION

Executive Summary S-1 INTRODUCTION Executive Summary S-1 INTRODUCTION This Environmental Impact Statement (EIS) examines the potential environmental effects of proposed alternatives for the Tappan Zee Hudson River Crossing Project, and

More information

Safe, innovative, quality construction since Riding on the Strength

Safe, innovative, quality construction since Riding on the Strength Safe, innovative, quality construction since 1880 Riding on the Strength of EXPERIENCE The Expertise The Experience The People The Equipment The Work Ethic The quality To get your job done safely, on time

More information

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Washington State s Skagit River Bridge Emergency Slide Bijan Khaleghi

More information

Designing Bridges for Inspectability

Designing Bridges for Inspectability Designing Bridges for Inspectability Sreenivas Alampalli 1 and Arthur P. Yannotti 2 1 New York State Department of Transportation 50 Wolf Road, Albany, NY 12232 (518) 457-5498; salampalli@dot.state.ny.us

More information

Highway Bridge Structure Components

Highway Bridge Structure Components Highway Bridge Structure Components Basic Bridge Components 1 Deck and 2 Stringer 3 Bearing 4 Pedestal 5 Footing 6 Piles 7 Underpass 8 Embakment 9 Live Loading Basic Bridge Components 1-Deck & wearing

More information

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION PRELIMINARY DESIGN SUBMISSION REPORT For U.S. Route 130 Over Raccoon Creek Bridge Township of Logan Gloucester County, New Jersey Prepared By: Structural

More information

ITS Projects. Page 1 of 5. Project Name Project Status Timeframe Project Description

ITS Projects. Page 1 of 5. Project Name Project Status Timeframe Project Description NYSDOT-X80599-NYC TIP ID: Traffic Management NYSDOT R11 Advanced Traffic and Demand Management NYSDOT - Island Expy and Brooklyn Queens Expy Travel Time Systems MTA Bridges and Tunnels - VN-03 NYCDOT-X80674-NYC

More information

Last Mile Freight Delivery: Cities and Logistics

Last Mile Freight Delivery: Cities and Logistics Last Mile Freight Delivery: Cities and Logistics Presented October 4, 2013 to University Transportation Research Center Region II Presented by Stacey D. Hodge, NYCDOT Office of Freight Mobility Outline

More information

ATHABASCA RIVER BRIDGE REHABILITATION PROJECT

ATHABASCA RIVER BRIDGE REHABILITATION PROJECT ATHABASCA RIVER BRIDGE REHABILITATION PROJECT PROJECT INFORMATION Project Name Athabasca River Bridge Rehabilitation Project Location Highway 40 (over the Athabasca River), Entrance, Alberta Year Completed

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION Sheet 1 of 8 VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: State of Good Repair Bridge Project Selection and Eligible Work

More information

Appendix A. Sample Inspection Report

Appendix A. Sample Inspection Report Appendix A Sample Inspection Report This page intentionally left blank. PORT AUTHORITY OF ALLEGHENY COUNTY PITTSBURGH, PENNSYLVANIA REPORT ON THE INITIAL NBIS INSPECTION OF CHARTIERS CREEK BRIDGE BMS No.

More information

Final Estimates Level 2

Final Estimates Level 2 Florida Department of TRANSPORTATION Final Estimates Level 2 Module 6: Structures 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 6 1 6-1 Module Content Concrete Structures Bridges Substructure

More information

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work Background MnDOT, Metro Transit, Hennepin County, and the City of Minneapolis are in the process of developing a project for Interstate 35W between 43 rd Street in Minneapolis and 15 th Street in Minneapolis.

More information

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK The professional services to be provided by the Consultant under this Agreement shall be as necessary to complete the required analyses, layouts,

More information

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE HISTORIC BRIDGE REHABILITATION AND MAINTENANCE CASE STUDY

More information

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure. Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE

More information

PHASING CONSIDERATIONS FOR BRIDGES

PHASING CONSIDERATIONS FOR BRIDGES PHASING CONSIDERATIONS FOR BRIDGES Christopher Miller, P.E. 6/11/18 Table of contents 1 What Not to Do 3 2 Span Arrangement 4-9 3 4 5 6 Superstructure Geometric Considerations Superstructure Structural

More information

SEGMENTAL CONTRUCTION IN THE INNER CITY: THE BQE CONNECTOR RAMP TO WILLIAMSBURG BRIDGE

SEGMENTAL CONTRUCTION IN THE INNER CITY: THE BQE CONNECTOR RAMP TO WILLIAMSBURG BRIDGE SEGMENTAL CONTRUCTION IN THE INNER CITY: THE BQE CONNECTOR RAMP TO WILLIAMSBURG BRIDGE Paul Gauvreau University of Toronto, Canada (formerly J. Muller International) Thomas E. Kelly, Jr. Earth Tech/J.

More information

NEW MEXICO LAND OF ENCHANTMENT

NEW MEXICO LAND OF ENCHANTMENT Bridges CENTENNIAL 1912-2012 NM C - NEW MEXICO LAND OF ENCHANTMENT Las Cruces viaduct; finishing floor. Source: NM Department of Transportation New Mexico Infrastructure Report Card 2012: 34 Overview:

More information

Airborne Noise and The New NY Bridge Project

Airborne Noise and The New NY Bridge Project Airborne Noise and The New NY Bridge Project Photo Courtesy of New York State Thruway Authority Presented by: Kenneth Avery, PE DISCLAIMER Video or photography is not allowed during this presentation.

More information

Plessis Road Twinning and Grade Separation at CN Redditt Subdivision: Design Challenges and Innovative Solutions

Plessis Road Twinning and Grade Separation at CN Redditt Subdivision: Design Challenges and Innovative Solutions Plessis Road Twinning and Grade Separation at CN Redditt Subdivision: Design Challenges and Innovative Solutions Tanya D. Worms, P.Eng. M.Sc., Project Manager, M.D. Steele Construction Ltd. Paper prepared

More information

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center Traffic Management Guide to Concrete Overlay Solutions December 5, 2014 ACPA Annual Meeting Dale S. Harrington P.E. Representing CP Tech Center Traffic Management- Concrete Overlays Traffic Management

More information

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring Location of Project Introduction» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring Existing Bridge» Built in 1928» 255-foot Open Spandrel Concrete Arch Bridge» 24-foot

More information

STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY

STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY NEWINGTON-DOVER, 11238S August 15, 2016 Vanasse Hangen Brustlin, Inc.

More information

CUY-480-Valley View Bridge. Matchmaker April 20, 2017 Bureau of Workers Compensation 4800 E. 131 st Street

CUY-480-Valley View Bridge. Matchmaker April 20, 2017 Bureau of Workers Compensation 4800 E. 131 st Street CUY-480-Valley View Bridge Matchmaker April 20, 2017 Bureau of Workers Compensation 4800 E. 131 st Street Agenda Welcome Project Overview Prequalification & Work types Procurement Overview Matchmaker 2

More information

Get In, Get Out, Stay Out!

Get In, Get Out, Stay Out! Get In, Get Out, Stay Out! FHWA Accelerated Bridge Construction Program By Gary Jakovich, P.E. Senior Bridge Engineer, FHWA Virginia Concrete Conference Richmond, VA March 6-7, 2007 Federal Highway Administration

More information

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) SPECIAL PROVISION August 31, 2009 PROJECT # S-R399(42) PROJECT # S-R399(59) PIN # 6697/7236 SECTION 03253S BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) Add Section 03253S: PART

More information

KIEWIT FOUNDATIONS CO.

KIEWIT FOUNDATIONS CO. KIEWIT FOUNDATIONS CO. KIEWIT ADVANTAGE LOCAL CONTRACTOR, EXPANSIVE REACH With a strong local presence, access to a vast network of resources throughout North America and a focus on self-performing work,

More information

SOUTH MEDFORD INTERCHANGE BRIDGES

SOUTH MEDFORD INTERCHANGE BRIDGES Eleven bridges were required for the project THe I-5 south medford Interchange by Keith Kaufman, Knife River Corporation Northwest and Daniel J. McIntier, formerly with H.W. Lochner Inc. Interstate 5 is

More information

St. Anthony Falls I-35W Bridge Replacement. ASHE National Conference June 13, Dustin Thomas, P.E. I-35W Bridge Construction Engineer

St. Anthony Falls I-35W Bridge Replacement. ASHE National Conference June 13, Dustin Thomas, P.E. I-35W Bridge Construction Engineer St. Anthony Falls I-35W Bridge Replacement ASHE National Conference June 13, 2014 Dustin Thomas, P.E. I-35W Bridge Construction Engineer The Former Bridge - 9340 Opened to traffic in 1967 Steel truss bridge

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

Provide a Table of Contents that identifies all sections of the proposal, including Appendices.

Provide a Table of Contents that identifies all sections of the proposal, including Appendices. CONTRACTOR so-called, which shall be responsible for guaranteeing the delivery of the PROJECT on time and on budget in accordance with the contract provisions. Provide the name, title, address, telephone

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION STR 6947 MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY INSPECTION REPORT Facility Latitude / Longitude MDOT Structure ID Structure Condition 9 MILE ROAD 43.5362 / -84.4294 56200055000B010 Fair Condition(6)

More information

SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT. Srdjan Brasic, M.Sc., P.Eng.

SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT. Srdjan Brasic, M.Sc., P.Eng. SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT Srdjan Brasic, M.Sc., P.Eng. UMA Engineering Ltd. Paper prepared for presentation at the Technical

More information

Canadian Consulting Engineering Awards 2016 CANADIAN NIAGARA POWER FOREBAY BRIDGE RECONSTRUCTION

Canadian Consulting Engineering Awards 2016 CANADIAN NIAGARA POWER FOREBAY BRIDGE RECONSTRUCTION Canadian Consulting Engineering Awards 2016 CANADIAN NIAGARA POWER FOREBAY BRIDGE RECONSTRUCTION April 2016 ELLIS Engineering Inc. 214 Martindale Road, Suite 201 St. Catharines, Ontario L2S 0B2 www.ellis.on.ca

More information

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015 SHRP2 SOLUTONS Innovative Bridge Designs for Rapid Renewal Peer-to-Peer Exchange Workshop Atlanta, GA November 2015 VIJAYKUMAR THAKER, PE HARDEV DAVÉ INTRODUCTION VIJAYKUMAR THAKER, PE EXECUTIVE MANAGER

More information

Fall 2018 Engineer Trainee Recruitment Preference Sheet

Fall 2018 Engineer Trainee Recruitment Preference Sheet Please indicate with an X your position preference. Please also indicate your preferred work location(s) for the postion(s) in which you are interested, by using 1 to indicate your first choice, 2 as your

More information

CONGESTION PRICING FOR NEW YORK? Discussion by Robert E Paaswell, M. NYAS Distinguished Professor of Civil Engineering CCNY Oct 26, 2007

CONGESTION PRICING FOR NEW YORK? Discussion by Robert E Paaswell, M. NYAS Distinguished Professor of Civil Engineering CCNY Oct 26, 2007 CONGESTION PRICING FOR NEW YORK? Discussion by Robert E Paaswell, M. NYAS Distinguished Professor of Civil Engineering Oct 26, 2007 DISCUSSION POINTS LONDON NYC DIFFERENCES CONGESTION PRICING OBJECTIVES

More information

THE NEW NY BRIDGE IN THIS ISSUE 4. Progress At A Glance: Building the Eastbound Span. Eastbound Span: Nearing Completion

THE NEW NY BRIDGE IN THIS ISSUE 4. Progress At A Glance: Building the Eastbound Span. Eastbound Span: Nearing Completion THE NEW NY BRIDGE The New NY Bridge Project Magazine NewNYBridge.com SUMMER 2018 IN THIS ISSUE 4 Progress At A Glance: Building the Eastbound Span 6 Eastbound Span: Nearing Completion 8 Second Act: Recycling

More information

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT PROJECT DESCRIPTION McFarland-Johnson, Inc. (MJ) has prepared this proposal to perform

More information

The Pennsylvania Rapid Bridge Replacement Project

The Pennsylvania Rapid Bridge Replacement Project 1 The rebuilding of 558 structurally deficient bridges in the Commonwealth of Pennsylvania over a 3+ year span April 2017 Charles Zugell The Plenary Walsh Keystone Partners believe engaging local community

More information

Ellis Powell, PE NCDOT State Construction Engineer

Ellis Powell, PE NCDOT State Construction Engineer 7 Bridges in 74 Days (Or Less) Ellis Powell, PE NCDOT State Construction Engineer NC 12 Detour Ocracoke Island Former hangout of Blackbeard late 1600 s to early 1700 s National Seashore owned and controlled

More information

COUNTY ENGINEERS ASSOCIATION OF MARYLAND SPRING 2016 CONFERENCE. Conference Center at the Maritime Institute Anne Arundel County, Maryland

COUNTY ENGINEERS ASSOCIATION OF MARYLAND SPRING 2016 CONFERENCE. Conference Center at the Maritime Institute Anne Arundel County, Maryland COUNTY ENGINEERS ASSOCIATION OF MARYLAND SPRING 2016 CONFERENCE Conference Center at the Maritime Institute Anne Arundel County, Maryland Thursday, April 28, 2016 Two bridges in Two Months - Accelerated

More information

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally

More information

The preservation and upgrading of historic metal truss bridges and the load carrying capacity

The preservation and upgrading of historic metal truss bridges and the load carrying capacity Structural Studies, Repairs and Maintenance of Heritage Architecture IX 483 The preservation and upgrading of historic metal truss bridges and the load carrying capacity J. B. Kim Department of Civil &

More information

RETROFIT AND REPLACEMENT OF DUMBARTON RAILROAD BRIDGES

RETROFIT AND REPLACEMENT OF DUMBARTON RAILROAD BRIDGES RETROFIT AND REPLACEMENT OF DUMBARTON RAILROAD BRIDGES Kuan S. Go, P.E., Semyon Treyger, S.E., Michael Jones, S.E., HNTB Corporation Stephen J. Hill, Bernard Susanto, Wenlin Yang, San Mateo County Transit

More information

NJTPA 2014 Local Concept Development Study Hudson & Essex Counties Clay Street Bridge over the Passaic River. Public Information Center

NJTPA 2014 Local Concept Development Study Hudson & Essex Counties Clay Street Bridge over the Passaic River. Public Information Center NJTPA 2014 Local Concept Development Study Hudson & Essex Counties Clay Street Bridge over the Passaic River Public Information Center June 24, 2015 PROJECT STATUS Study Began January 2014 Data collection

More information