CITY OF SANTA ANA PROPOSAL PROJECT NO.: CHESTNUT AVE & BUSH/CYPRESS BIKE LANES FAID#: U58DP005861

Size: px
Start display at page:

Download "CITY OF SANTA ANA PROPOSAL PROJECT NO.: CHESTNUT AVE & BUSH/CYPRESS BIKE LANES FAID#: U58DP005861"

Transcription

1

2 PROPOSAL BID PROPOSAL TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: REQUIREMENT: The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule: Item Description Qty. Unit Unit Price Amount 1 Install White Turn Lane Line per City of S.A Std. Plan No. 1125B-1, Detail "2". 2 Install 6 White Lines at 45 degrees at 20 O.C 3 Install Double Yellow per City of S.A Std. Plan No. 1125B-1, Detail 4. 4 Install Two-Way Left Turn Lane per City of S.A Std. Plan No B-1, Detail 5. 5 Install Yellow Center Line per City of S.A Std. Plan No. 1125B-1, Detail 6. 6 Install Bicycle Loop Legend per Detail L. 7 Install Lane Line Extension per City of S.A Std. Plan No. 1125B-2, Detail 8. 8 Install or Refresh Street Legends, Arrows, and Bike Lane Symbols. 9 Install Bike Lane Legend per Detail A (Green Epoxy-Modified Acrylic). 10 Install 6 Bike Lane Line per Caltrans Std. Plan A20D, Detail Install 6 Bike Lane Line per Caltrans Std. Plan A20D, Detail 39A. 12 Install Bike Lane Merging Area per Detail R (Green Epoxy-Modified Acrylic). 140 LF $ $ 78 LF $ $ 419 LF $ $ 240 LF $ $ 2838 LF $ $ 17 EA $ $ 223 LF $ $ 61 EA $ $ 1440 SF $ $ 4071 LF $ $ 3601 LF $ $ 3240 SF $ $ 13 Install 4 White Edge Line LF $ $ P-1 of P-39

3 PROPOSAL Item Description Qty. Unit Unit Price Amount 14 Install Bike Sharrow Panel per Detail S 1080 SF $ $ and Detail A (Green Epoxy-Modified Acrylic). 15 Install New Sign. 40 EA $ $ 16 Remove Conflicting Striping LF $ $ 17 Remove Legend. 43 EA $ $ 18 Install New 2 Square Steel Post and Sign per City of S.A Std. Plan EA $ $ 19 Install 12 White Thermoplastic Stop Bar. 180 SF $ $ 20 Install Type Q Bike Lane Loops per Detail B Modified Caltrans Std. Plan ES- 5B. 21 Install Circular Type D Bike Loops per Caltrans Std. Plan ES-5B. 1 EA $ $ 21 EA $ $ 22 Install Fog Seal SF $ $ TOTAL BASE BID $ P-2 of P-39

4 PROPOSAL The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any). * The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the 25% limit as stated in Section 3-2 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. This bid item is considered a Specialty Item per Section of the Standard Specifications. TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within thirty (30) working days after the commencement date stated in the Notice to Proceed. The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $1,000 per calendar day. Name of Firm Signature of BIDDER Title (If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) P-3 of P-39

5 SPECIFICATIONS 2.00 SPECIAL PROVISIONS - TRAFFIC SIGNING & STRIPING 2.01 SCOPE OF WORK The work to be done consists, in general, removal and installation of signs, posts, raised pavement markers, stripes, pavement markings and curb markings as shown on the plans and as described below. Items or details not specifically mentioned in the following Sub- Sections that are required by the project plans, in the applicable 2010 Caltrans Standard Specifications, 2010 Caltrans Standard Plans, City of Santa Ana Standard Plans, Standard Specifications for Public Works Construction (SSPWC) or these Special Provisions shall be performed, constructed or installed STRIPING (TRAFFIC STRIPES AND PAVEMENT MARKINGS) This Section shall conform to the latest City of Santa Ana Standard Plans, the Caltrans Standard Plans, provisions in Section 84 of the Caltrans Standard Specifications, and these Special Provisions. A. GENERAL All traffic stripes and pavement markings shall be thin-mil thermoplastic (sprayable) except for temporary striping, crosswalks and limit lines. All crosswalks and limit lines shall be thermoplastic. All bike lane symbols, bike sharrow panels, and bike lane merging areas shall be in green epoxy-modified acrylic or equal (such as Ride-A-Way from Ennis Flint). All curb markings and median island markings shall be painted using Environmental Protection Agency (EPA) compliant paint material. Paint shall be fast or rapid dry type solvent of similar or approved equal to that manufactured by Ennis or Pervo Paint Companies and shall meet all requirements of South Coast Air Quality Management District. The rate of paint to be applied shall be per recommendation of the paint manufacturer. All pavement markings including legends, arrows, and symbols shall be per Caltrans Standard Plan A24A - A24E. All crosswalks at signalized intersections with wheelchair ramps shall be striped with a 5' diagonal (45º) cut-off at the curb return, as shown in City of Santa Ana Standard Plans No Crosswalk stripes shall be 12 inches wide. B. REMOVAL Existing striping, pavement markings, curb marking and raised pavement markers superseded by the plans shall be removed. All conflicting striping within limit of project shall be removed even if not shown on the plan. 20

6 SPECIFICATIONS Removal of traffic stripes and pavement markings shall be by grinding. Thermoplastic and pavement tapes striping may be removed by grinding with the Engineer s approval. Existing pavement markings, which are removed by grinding, shall be completely removed to the satisfaction of the Engineer. All removal areas shall be sealed using fog seal. Fog seal shall be installed 2 feet wide per linear feet of removed striping unless directed otherwise by the engineer. The Contractor shall apply a fog seal of dilute (1:1) SS-1h emulsion, dilute emulsified recycling agent or equivalent at a rate of 0.08 to 0.12 gallon per square yard to all areas opened to traffic. C. TEMPORARY STRIPING The Contractor shall install temporary traffic striping within 24-hours after paving the street or on any unstriped lanes opened to traffic. Public traffic shall not be allowed on any multilane arterial street without temporary or permanent striping. Temporary striping can be per City of Santa Ana Standard Plan Nos. 1125B-1 & B-2 (without the raised pavement markers) or by installing reflectorized chip seal markers (single for 4 line, double for 8 line) at 20 feet on center when on a taper or curve, and at 40 feet on center elsewhere. If striping is used, stripes can be paint or temporary traffic striping tape. All temporary striping shall be removed prior to the final striping. D. FINAL STRIPING All final stripes, legends, including limit lines, shall be permanently striped within 72 hours after the street has received the final surface course or after legends have been removed for re-striping. Any existing striping to remain including striping on cross streets, which is disturbed during construction, shall be re-striped as necessary, even if not shown on the channelization plans. All striping and related roadside signage shall be in place prior to opening the lane(s) to public traffic. E. THIN-MIL THERMOPLASTIC (SPRAYABLE) AND THERMOPLASTIC Thin-mil thermoplastic traffic stripes and pavement markings, and thermoplastic crosswalks and limit lines shall conform to the provisions in Sections 84-1, General, and 84-2, Thermoplastic Traffic Stripes and Pavement Markings, of the Caltrans Standard Specifications and these special provisions. 21

7 SPECIFICATIONS Specifications for glass beads shall be (Type II). Glass beads shall be premixed within the thermoplastic material prior to application and also applied to the thermoplastic striping material immediately following the application of the striping. Thin-mil thermoplastic material shall conform to the requirements of Caltrans Specification No. PTH-02SPRAY, for Thermoplastic Traffic Striping Material, Sprayable, White and Yellow. The binder material shall be Alkyd. Copies of the Caltrans Specification No. PTH- 02SPRAY are available at the Caltrans Transportation Laboratory, Sacramento, California. Thermoplastic material shall conform to the requirements of Caltrans Specification No. PTH-02ALKYD. Thin-mil thermoplastic material for traffic stripes shall be applied by spray method in single uniform layer at the minimum thickness of 30 mils and not to exceed 45 mils. Thermoplastic shall not exceed mils. The Contractor shall not begin work until a written notice to proceed has been issued by the Engineer. The Contractor shall notify the City of Santa Ana - Public Works Agency Engineer a minimum of two working days prior to beginning the work to coordinate the work. A schedule of the streets to be re-striped for each day shall be provided to the Engineer one full workday prior to striping or re-striping any streets. The Contractor shall adjust the thermoplastic application rate as necessary to achieve the thermoplastic application rate stated above prior to striping. Thermoplastic application rate tests (up to and including 5 thermoplastic application rate tests per day, including the thermoplastic application rate test at the start of each workday) may be conducted at random times and locations throughout each workday at the discretion of the Engineer. Thermoplastic Application Rate Testing The paint application rate shall be determined by passing the striper over a metal plate while the paint application system is operating. The flow of glass beads shall be stopped while passing over the metal plate. The Engineer shall measure thickness of the applied thermoplastic immediately after application of thermoplastic on the metal plate. Striping shall not continue if the proper thickness of thermoplastic is not being applied. Adjustments and corrective measures shall be applied to insure that the correct thickness of thermoplastic will be applied. Testing of the thermoplastic application rate, as described above, will be required following any adjustment to the thermoplastic application rate, thermoplastic applicator nozzles, or any other thermoplastic application equipment prior to commencement or re-commencement of striping. The initial testing and re-testing of thermoplastic application rates at any location shall be considered as a single thermoplastic application rate test. 22

8 SPECIFICATIONS Street sweeping of the areas to be re-striped will not be required, but obvious accumulations of loose material or debris shall be removed prior to application of paint or thermoplastic. Thin-mil thermoplastic material shall be applied to the pavement at a temperature between 350º F. and 400º F., unless the manufacturer recommends a different temperature. Section , Payment, of the Caltrans Standard Specifications shall be deleted. Section , Payment, of the Caltrans Standard Specifications shall be deleted F. RAISED PAVEMENT MARKERS Raised pavement markers shall conform to Section 85, Pavement Markers, of the Caltrans Standard Specifications and these Special Provisions. Reflective pavement markers shall have abrasion-resistant surfaces. 1. Removal - The contractor shall remove any existing raised pavement markers that do not conform to the channelization plans, and repair any damaged pavement due to raised pavement marker removal to maintain a smooth and uniform surface per SSPWC Section Any missing or broken raised pavement markers shall be replaced, in kind, within the project boundaries. 2. Installation - Install raised pavement markers per the channelization plans in accordance with Section , Placement, of the Caltrans Standard Specifications and City of Santa Ana Standard Plans Nos. 1125A C. Section , Payment, of the Caltrans Standard Specifications shall be deleted SIGNS (ROADSIDE SIGNS) AND MARKERS This section shall conform to Section 56-2, Furnish Signs Panels, of the Caltrans Standard Specifications and these Special Provisions. A. GENERAL All new signs shall be furnished and installed by the Contractor. The sign sizes, messages, and colors shall conform to the current edition of the Caltrans Sign Specifications and current California Manual on Uniform Traffic Control Devices. The sign sizes shall be the standard size shown in the Sign Specifications unless shown otherwise on the plans. The sign backing material shall be anodized rolled sheet aluminum and shall be one piece with drilled holes for mounting. All signs installed in parkways, sidewalks or pedestrian areas shall have a minimum of 7 feet of vertical clearance from the bottom of the lowest sign to the surrounding surface. Street name signs shall have a minimum 9 feet of vertical clearance. All signs 23

9 SPECIFICATIONS installed in raised median areas shall have a minimum vertical clearance of 4 feet from the existing surface unless shown otherwise on the plans. When two signs are installed on one post, the signs shall be installed in the proper standard vertical positions unless shown otherwise on the plans. Regulatory, Warning and Guide signs shall be posted above parking restriction signs. The order of signs installation shall be from top to bottom Regulatory, Warning, Guide and parking signs. The Engineer shall determine the proper order for multiple signs. Sign panels shall not be overlapped. If signposts are not long enough to provide standard clearance for all signs, a longer post shall be furnished and installed. Signs shall be installed at right angles to approaching traffic unless shown otherwise on the plans. In no case shall signs be installed on wood utility poles or on wood street light poles. B. MATERIAL AND HARDWARE 1. Roadside signs shall be fabricated using inch thick aluminum sheeting and traffic signal mastarm mounted signs shall be fabricated using 0.10-inch thick aluminum sheeting. 2. ASTM D Type XI (3M Diamond Grade DG3 Series 4000 or equivalent) reflective sheeting shall be used for the followings: a. All Regulatory signs except parking restrictions signs. b. All Warning signs. 3. For school related signs, reflective sheeting shall be 3M Diamond Grade (Fluorescent) Series 4083 DG3 or equivalent. 4. For all other signs, including parking restrictions and Street Sweeping signs, the reflective sheeting shall be ASTM D Type III, IV (3M High Intensity Prismatic series 3930 or equivalent). 5. Temporary or construction signs shall be ASTM D Type III, IV (3M High Intensity Prismatic series 3930 or equivalent). 6. All signs, except for temporary or construction signs, shall have graffiti coating or film (such as 3M 1160 Overlay) as recommended by the manufacturer of the reflective material. Neither the color nor the reflective intensity of the finished sign panel shall be significantly diminished by the use of graffiti remover when used in a manner approved by Caltrans and the sheeting manufacturer. Reflective sheeting will be applied to the sign panel utilizing the method approved by the manufacturer of the sheeting and shall produce a durable bond equal to or greater 24

10 SPECIFICATIONS than the strength of the reflective sheeting. No air pockets or bubbles shall exist between the sheeting and the aluminum backing. All sign panels furnished by the Contractor shall be new with no scratches or tears in the reflective sheeting. No splice will be allowed in the sign panel reflective sheeting other than that which occurs in the manufactured roll of reflective sheeting on sign panels with a minor dimension of 48" or less. On all rectangular sign panels, the splice will be horizontal. No finished sign panel shall have more than one (1) splice and no splice will fall within 2" of the sign panel edge. When splices do occur, the adjoining reflective sheets shall be color matched under both incident and reflective light. Prior to sign installation the contractor will provide a Certificate of Compliance for the signs. Section B, Metal Posts, shall be deleted and replaced with the following paragraph: New signs shall be installed per City of Santa Ana Standard Plan No using square tubing signpost (such as Unistrut Telspar, UltiMate or Agency-approved equal), anchors and anchor sleeves. Anchors and sleeves shall be embedded with no more than four holes exposed and no less than two holes exposed. The signpost, anchor and anchor sleeve shall be fully perforated galvanized square 12 gauge steel tubing. The signpost shall be 2 inch square, the signpost anchor shall be 2.25 inch square (all dimensions are nominal). Section C, Wood Posts, of the Caltrans Standard Specifications shall be deleted. Section D, Laminated Wood Box Posts, of the Caltrans Standard Specifications shall be deleted. The third paragraph of Section E, Sign Panel Fastening Hardware, of the Caltrans Standard Specifications shall be amended to read as follows: All new signs shall be installed with all new mounting hardware. All new straps, saddle brackets, nuts, bolts, and washers shall be stainless steel. Heavy duty banding straps of shall be used. Each sign panel shall have a minimum of two rivets installed per sign. However, signs greater than 45 inches in height shall have three rivets per sign installed in the top, middle and bottom of the sign. Each signpost shall utilize a minimum of two rivets to attach the sign post to the sign post anchor assembly. The fourth paragraph of Section E, Sign Panel Fastening Hardware, of the Caltrans Standard Specifications shall be deleted. 25

11 SPECIFICATIONS C. INSTALLATION AND REMOVAL Section , Construction, of the Caltrans Standard Specifications shall be deleted and replaced with the following: The Contractor shall install new and relocate existing signs as noted on the plans, shall protect-in-place existing signs, posts and parking meters which are not to be removed, and shall replace any of these signs which are damaged during construction. Sign to be mounted on streetlight or traffic signal poles shall be installed using the strap and saddle bracket method as shown on Caltrans Standard Plan RS-4. Sign panels on traffic signal mast arms shall be installed per Caltrans Standard Plan ES-7N, Detail U. Signs mounted on streetlight poles (electroliers) shall be mounted so as not to cover electrolier identification tags. Posts shall be installed in driven post anchors per the manufacturer s specifications. New signs shall be installed on 10 foot posts, except a longer post shall be used if necessary to maintain a 7 foot vertical clearance from the bottom of the lowest sign to the top of the surrounding surface in pedestrian areas. Sign posts shall be installed a minimum of 6 feet from power poles, fire hydrants, and other obstructions. Sign posts shall be installed per City of Santa Ana Standard Plan No All signs to be salvaged, as called for on the plans, shall be become property of the contractor. All posts driven sign post anchors shall be completely removed and the sign post anchor assembly hole backfilled with clean fill dirt to match the existing surrounding grade (non-paved areas only). Driven sign post anchors in sidewalk or pavement areas shall be completely removed and backfilled with grout to the level of the surrounding grade. Sign posts with foundations in parkway area shall be completely removed and backfilled with clean fill dirt to match the grade of the surrounding area. Sign posts located within sidewalk or other paved areas, shall core drill the sidewalk and remove the sign post to below sidewalk or paving then backfilled with concrete or paving material to match the existing. 26

12 DEFINITION OF BID ITEMS DEFINITION OF BID ITEMS The unit prices paid for the items listed in the Contractor s Proposal as defined herein shall be considered full compensation for furnishing all labor, materials, tools, and equipment, and doing all work involved in furnishing and installing the materials complete and in place, in accordance with the details shown on the Plans, as specified herein, and as directed by the Engineer. All incidental work which is neither shown on the Plans nor otherwise specified, and which is necessary to complete the improvements as shown on the Plans and as specified in the Contract Documents (defined in the Contract/Agreement), shall be furnished and installed as though such work were shown on the Plans or specified in the Contract Documents, and no additional compensation shall be allowed therefore. The scope of work includes, but is not limited to, each bid item listed in the Contractor s Proposal and as described in the following. STREET IMPROVEMENT ITEMS Bid Items No. 1 to 19 Signing and Striping: The work under this item consists of removal of conflicting striping lines and legends/symbols including all associated hardware and labor as shown on the plans. The work under this item consists of painting temporary traffic stripes and markings or placing reflectorized temporary overlay markers (TOM s); repainting traffic stripes, pavement markings and legends; and replacing raised pavement markers as shown on the plans. The work under this item consists of furnishing, installing, removing signs and posts as needed including all associated hardware and labor as shown on the plans. The work under this item consists of mobilizing the Contractor s workforce, labor, equipment, and materials; providing bonds, insurance, and license; demobilizing; and performing final cleanup. All work shall be performed to the satisfaction of the Engineer. Payment for Signing and Striping shall be at the contract unit price bid per unit listed in the Bid Proposal, and shall include full compensation for furnishing all materials, labor, equipment, tools, disposal of all removed materials, and incidentals as required and no additional compensation will be allowed therefore. Bid Items No. 20 to 21 Install Loop Detectors: The work under this item consists of mobilizing the Contractor s workforce, labor, equipment, and materials; providing bonds, insurance, and license; demobilizing; and performing final cleanup. All work shall be performed to the satisfaction of the Engineer. Payment for the Install Loop Detectors shall be at the contract unit price bid per unit listed in the Bid Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, disposal of all removed materials, and incidentals as required and no additional compensation will be allowed therefore. 1 of 2

13 DEFINITION OF BID ITEMS Bid Item No. 22 Install Fog Seal: The work under this item consists of mobilizing the Contractor s workforce, labor, equipment, and materials; providing bonds, insurance, and license; demobilizing; and performing final cleanup. All work shall be performed to the satisfaction of the Engineer. Payment for the Install Fog Seal shall be at the contract unit price bid per unit listed in the Bid Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, disposal of all removed materials, and incidentals as required and no additional compensation will be allowed therefore. 2 of 2

14

15

16

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS Delete this Section in its entirety and replace with the following: SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS 905-1 DESCRIPTION: This

More information

CITY OF FARGO SPECIFICATIONS SIGNING

CITY OF FARGO SPECIFICATIONS SIGNING SIGNING PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of furnishing all labor, material and accessories necessary to complete

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA ADDENDUM NO. 1 FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA Bids to be received until 2:00 p.m., local time, July 9, 2012 SPECIFICATIONS Delete Section 00 41 53 Bid Unit Price in

More information

REQUEST FOR PROPOSAL Asphalt & Concrete Repair

REQUEST FOR PROPOSAL Asphalt & Concrete Repair REQUEST FOR PROPOSAL 2017 Asphalt & Concrete Repair English Landing Elementary School Union Chapel Elementary School Lakeview Middle School Park Hill High School Prairie Point Elementary School Congress

More information

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG): SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG): ARHM-GG shall conform to the provisions for Type "A" asphalt concrete in Section 39, "Asphalt Concrete," of the State Standard Specifications

More information

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9080 - Concrete Steps, Handrails, and Safety Rail CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART - GENERAL.0 SECTION INCLUDES

More information

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the

More information

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

HIGH MAST CAMERA POLE ASSEMBLY GENERAL 10-3.24 HIGH MAST CAMERA POLE ASSEMBLY GENERAL The Contractor must furnish and install the following equipment for high mast camera pole assembly as described herein and as shown on the plans: 1. Camera

More information

DIVISION 1100 TRAFFIC

DIVISION 1100 TRAFFIC SECTION 1102 STREET LIGHTING GENERAL INFORMATION The Idaho State Electrical Board has determined that all street lights are to be provided with an external fuse disconnect, in a junction box between the

More information

CITY OF ATLANTIC BEACH BID NUMBER PURCHASING DEPARTMENT 800 SEMINOLE ROAD ATLANTIC BEACH, FLORIDA (904)

CITY OF ATLANTIC BEACH BID NUMBER PURCHASING DEPARTMENT 800 SEMINOLE ROAD ATLANTIC BEACH, FLORIDA (904) CITY OF ATLANTIC BEACH BID NUMBER 1314-08 PURCHASING DEPARTMENT 800 SEMINOLE ROAD ATLANTIC BEACH, FLORIDA 32233 (904) 247-5880 REQUEST FOR BID CONTRACT - CONCRETE REPAIRS FOR THE PUBLIC WORKS/UTILITIES

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

ITEM 25 CHIP SEAL MATERIALS 2 A. Non-Polymer Modified Asphalt Emulsion (Fog Seal) 2 B. Polymer Modified Asphalt Emulsion Binder 2

ITEM 25 CHIP SEAL MATERIALS 2 A. Non-Polymer Modified Asphalt Emulsion (Fog Seal) 2 B. Polymer Modified Asphalt Emulsion Binder 2 ITEM 25 CHIP SEAL 25.1 DESCRIPTION 2 25.2 MATERIALS 2 A. Non-Polymer Modified Asphalt Emulsion (Fog Seal) 2 B. Polymer Modified Asphalt Emulsion Binder 2 25.3 AGGREGATES 3 25.4 MIX DESIGN 4 25.5 EQUIPMENT

More information

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) 686.1. Description. This Item shall govern for designing, fabricating, furnishing and erecting steel traffic signal pole assemblies of the various types

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

SECTION REINFORCING STEEL

SECTION REINFORCING STEEL SECTION REINFORCING STEEL 1. DESCRIPTION This specification shall govern the furnishing and placing of reinforcing steel, deformed and smooth, of the size and quantity designated on the plans and in accordance

More information

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007 Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION March 22, 2007 Description: This work consists of furnishing and applying asphalt rubber binder followed by an application of treated cover aggregate

More information

SECTION IMPACT RESISTANT WALL PROTECTION

SECTION IMPACT RESISTANT WALL PROTECTION SECTION 10265 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work under this Section shall include all materials and installation necessary to provide Impact-Resistant Wall Protection including Wall guards,

More information

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017 SECTION 055213 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL. 5.1 General Certification Fabrication...

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL. 5.1 General Certification Fabrication... SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL TABLE OF CONTENTS 5.1 General...5-1 5.2 Certification...5-1 5.3 Fabrication...5-1 5.4 Handling and Storage...5-1 5.5 Field Repair of Epoxy

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS TECHNICAL SPECIFICATIONS ITEM 00663 TRAFFIC BUTTONS & PAVEMENT MARKERS 663.1 Description. This item shall consist of furnishing and installing traffic buttons and reflectorized pavement markers and jiggle

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe. STANDARD SPECIFICATIONS SECTION 02445 BORING AND JACKING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for boring and jacking casing pipe. 1.2 DEFINITIONS A. Carrier Pipe: Sewer or water

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS April 1, 2009 CITY OF PORTSMOUTH Public Works Department Bid #54-09 2009 Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS This Addendum forms part of the original document marked Bid #54-09 2009

More information

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier 2.11 HIGH TENSION CABLE BARRIER 2.11.1 GENERAL This Work consists of the supply, installation, removal, disposal and reinstallation of High Tension Cable Barrier (HTCB) system. 2.11.2 DEFINITIONS AND INTERPRETATION

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 10505 - METAL STUDENT LOCKERS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) PART 1 GENERAL SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) 1.01 SCOPE This specification includes the materials and procedures required for the internal sealing of the frame-chimney

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

METAL HANDRAILS AND RAILINGS. A. Properly identified manufacturer's literature, including shop and erection drawings before starting work.

METAL HANDRAILS AND RAILINGS. A. Properly identified manufacturer's literature, including shop and erection drawings before starting work. SECTION 05520 METAL HANDRAILS AND RAILINGS PART 1 GENERAL 1.01 SUBMITTALS A. Properly identified manufacturer's literature, including shop and erection drawings before starting work. B. Railing Assemblies

More information

GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM

GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM 1 GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM 1.01 WORK INCLUDED PART 1: GENERAL A. Provide for all labor, equipment, materials, and services to furnish and install VERSA SHIELD Window

More information

SPECIFICATION : BORING AND JACKING

SPECIFICATION : BORING AND JACKING SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in

More information

American Metal Specialties, Inc.

American Metal Specialties, Inc. American Metal Specialties, Inc. www.cablerailings.com (253) 272-9344 (253) 627-3843 Fax PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 05 73 00 STAINLESS STEEL ORNAMENTAL HANDRAILS AND RAILINGS For best

More information

CONDUITS AND FITTINGS

CONDUITS AND FITTINGS CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit

More information

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY Guidance on restoration of City Rights-of-Way Public Works Department Directors Office 747 Market Street Suite 408 Tacoma, WA 98402 253-591-5525 Right-of-Way

More information

TXDOT SIGNING AND MARKINGS REVIEW OF MATERIALS & PRACTICES

TXDOT SIGNING AND MARKINGS REVIEW OF MATERIALS & PRACTICES TXDOT SIGNING AND MARKINGS REVIEW OF MATERIALS & PRACTICES Table of Contents 1 2 3 4 5 6 7 Introduction Traffic Marking Specifications Traffic Marking Practices Signing Specifications Retroreflective Sheeting

More information

PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces

PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces TECHNICAL CORRECTION January 2017 Structural PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process

More information

ITEM 458 WATERPROOFING FOR STRUCTURES

ITEM 458 WATERPROOFING FOR STRUCTURES ITEM 458 WATERPROOFING FOR STRUCTURES 458.1. Description. This Item shall govern for the furnishing and placing of waterproofing on concrete and steel bridge decks of railroad structures and on other structures

More information

BID PROPOSAL. For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES. Page Article 1 Bid Recipient...

BID PROPOSAL. For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES. Page Article 1 Bid Recipient... BID PROPOSAL For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES Page Article 1 Bid Recipient... 1 Article 2 Bidder s Acknowledgements... 1 Article 3 Bidder s Representations...

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 11 DESIGN-A-SPEC GUIDELINES FIVE STAR RS ANCHOR GEL CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

CHAPTER 11 CONDUITS AND FITTINGS

CHAPTER 11 CONDUITS AND FITTINGS CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1

More information

Request for Proposal: Due October 11, :00 pm

Request for Proposal: Due October 11, :00 pm Remove and replace approx. 6000 sq. ft. of asphalt, clean and tack 1200 sq. ft. of low spots, seal coat and stripe parking lot at 1030 Temple Ave Camarillo, CA 93010 Request for Proposal: Due October 11,

More information

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products. SECTION 05720 ORNAMENTAL ALUMINUM RAILING ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products. This section is based on the products of Superior Aluminum Products,

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

SECTION PANEL AND POST AND PYLON SIGNAGE. 1. Non-illuminated Panel and Post signs. 2. Internal illumination Pylon (Cabinet and Post) signs.

SECTION PANEL AND POST AND PYLON SIGNAGE. 1. Non-illuminated Panel and Post signs. 2. Internal illumination Pylon (Cabinet and Post) signs. PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Non-illuminated Panel and Post signs. 2. Internal illumination Pylon (Cabinet and Post) signs. 1.2 PERFORMANCE REQUIREMENTS A. Structural

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS March 2, 2015 806.01 Description 806.02 JMF Field Adjustments 806.03

More information

Cement Stabilized Soil (CSS) (Portland cement)

Cement Stabilized Soil (CSS) (Portland cement) Cement Stabilized Soil (CSS) (Portland cement) 1.0 DESCRIPTION. This specification shall govern the process known as Cement Stabilized Soil (CSS). CSS consists of mixing the existing base, subbase and

More information

A. Access doors and frames are part of an access door and frame allowance.

A. Access doors and frames are part of an access door and frame allowance. SECTION 08 31 13 ACCESS DOORS AND FRAMES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION 616 TEMPORARY TRAFFIC CONTROL

SECTION 616 TEMPORARY TRAFFIC CONTROL SECTION 616 TEMPORARY TRAFFIC CONTROL 616.1 Description. This work shall consist of furnishing, installing, operating, maintaining, cleaning, relocating and removing temporary traffic control devices and

More information

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000 Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000 610S.1 This item shall govern the proper care and treatment of all trees and other vegetation

More information

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 ADDENDUM No. 6 ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 Due: June 9, 2016 at 2:00 p.m. (local time) The following changes, additions, and/or deletions

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

STANFORD UNIVERSITY UNIVERSITY ARCHITECT / CAMPUS PLANNING AND DESIGN

STANFORD UNIVERSITY UNIVERSITY ARCHITECT / CAMPUS PLANNING AND DESIGN STANFORD UNIVERSITY UNIVERSITY ARCHITECT / CAMPUS PLANNING AND DESIGN CONSTRUCTION FENCING SPECIFICATIONS PERIMETER AND PROJECT INFORMATION FENCING University Architect / Campus Planning and Design Office

More information

REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM PROJECT DESCRIPTION

REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM PROJECT DESCRIPTION REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM The Carroll County Public Service Authority requests bids from properly licensed well drilling firms, hereafter referred to as

More information

Model # 922-S4. 12/18/2013 Page 1 of 8

Model # 922-S4. 12/18/2013 Page 1 of 8 Model # 922-S4 12/18/2013 Page 1 of 8 2/18/2013 Page 2 of 8 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

SECTION 1043 FENCE MATERIAL

SECTION 1043 FENCE MATERIAL SECTION 1043 FENCE MATERIAL 1043.1 Scope. This specification covers the material required in the construction of chainlink fence and woven wire fence. 1043.2 Basis of Acceptance. The basis of acceptance

More information

SECTION MANUFACTURED ROOF EXPANSION JOINTS

SECTION MANUFACTURED ROOF EXPANSION JOINTS SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

Model # 338S-OP. 9/30/2011 Page 1 of 13

Model # 338S-OP. 9/30/2011 Page 1 of 13 Model # 338S-OP 9/30/2011 Page 1 of 13 9/30/2011 Page 2 of 13 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL DOCUMENT 00 41 13 BID PROPOSAL TO: SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT, a California Community College District, acting by and through its Board of Trustees ("the District"). FROM: (Name of

More information

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. General Conditions Scope: It is the intent of these specifications

More information

Specifications for FL-100 Soffit Panel

Specifications for FL-100 Soffit Panel Union Corrugating Company Specifications for FL-100 Soffit Panel SECTION 07410 METAL SOFFIT PANELS PART 1 GENERAL 1.1 DESCRIPTON A. Section Includes: 1. Preformed metal soffit panel system 2. Associated

More information

Underground Piping for Private Hydrants & Sprinkler Supply Line

Underground Piping for Private Hydrants & Sprinkler Supply Line City of Brea Brea Fire Department Fire Prevention 1 Civic Center Circle Phone: (714) 990-7655 Underground Piping for Private Hydrants & Sprinkler Supply Line PURPOSE The provision of adequate water supplies

More information

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # 2016-04 PROJECT SPECIFICATIONS TABLE OF CONTENTS SECTION 100 GENERAL... 1 SECTION 200 MATERIALS... 1 CONSTRUCTION METHODS... 1 SECTION

More information

SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK MATERIAL REQUIREMENTS CONSTRUCTION AND INSTALLATION REQUIREMENTS...

SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK MATERIAL REQUIREMENTS CONSTRUCTION AND INSTALLATION REQUIREMENTS... SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK... 20-2 2. MATERIAL REQUIREMENTS... 20-2 3. CONSTRUCTION AND INSTALLATION REQUIREMENTS... 20-2 4. METHOD OF MEASUREMENT... 20-5 20-1 SECTION 20 PAVING FABRIC

More information

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

Model # 800SM-PS3. 8/3/2016 Page 1 of 8 Model # 800SM-PS3 8/3/2016 Page 1 of 8 /3/2016 Page 2 of 8 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

SECTION DECORATIVE METAL AND GLASS RAILING

SECTION DECORATIVE METAL AND GLASS RAILING SECTION 05 73 00 DECORATIVE METAL AND GLASS RAILING PART 1 GENERAL 1.1 SUMMARY A) This section includes both standard and custom handrails as shown in the contract drawings. B) These include aluminum,

More information

BID # REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER

BID # REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER BID # 14-47 REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER Board of Trustees Middlesex County College 2600 Woodbridge Avenue P.O. Box 3050 Edison, New Jersey

More information

SPECIFICATIONS: Architectural Aluminum Railings

SPECIFICATIONS: Architectural Aluminum Railings PART ONE: GENERAL 1.1 SUMMARY SPECIFICATIONS: Architectural Aluminum Railings A. Work in this section includes custom and standard Interior and Exterior aluminum railings and guardrails. 1.2 PERFORMANCE

More information

Model # 158-P4. 12/12/2013 Page 1 of 11

Model # 158-P4. 12/12/2013 Page 1 of 11 Model # 158-P4 12/12/2013 Page 1 of 11 2/12/2013 Page 2 of 11 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products. SECTION 05720 ORNAMENTAL ALUMINUM RAILING ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products. This section is based on the products of Superior Aluminum Products,

More information

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Model # 238HS-P8. 4/27/2011 Page 1 of 11

Model # 238HS-P8. 4/27/2011 Page 1 of 11 Model # 238HS-P8 4/27/2011 Page 1 of 11 4/27/2011 Page 2 of 11 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

SECTION CONSTRUCTION SERVICES

SECTION CONSTRUCTION SERVICES SECTION 01100 CONSTRUCTION SERVICES PART 1 GENERAL 1.01 - Section Includes A. Mobilization. B. Construction Surveys. C. Record Documents. 1.02 Description Of Work A. Mobilization: includes the preparatory

More information

REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET

REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET This project is being readvertised due to the small number of prequalification packages received in response to the county's

More information

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 SPECIFICATION FOR PLATFORM RUBBING EDGE ASSEMBLIES FOR 69 TH ST TC, 40 TH ST, 34 TH ST, 2 ND ST, SPRING GARDEN

More information

550 Surface Treatments

550 Surface Treatments Table of Contents 550 Surface Treatments... 550-1 550.1 Introduction... 550-1 551 Crack Sealing... 550-1 551.1 Project Selection... 550-1 551.2 Design Considerations... 550-1 552 Chip Sealing... 550-2

More information

A-Series Aluminum Gantry Crane

A-Series Aluminum Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 A-Series Aluminum Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an A-Series Gantry Crane into a competitive bid project or

More information

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4 x 4 x 3/8 Brace. C8 x 4.25 Strut. WT9 x 17.5. Sign length minus Adjust to avoid interference with sign legend A Deck fascia A 6" Equal Equal 6" Sign length (L) varies 6 to 12 PLAN 0 CONNECTION (DECK FASCIA) Angle connection assembly F Face of concrete

More information

TRANSPORT II " 10.5" MOUNTING POSTS FENCE LINE POST. Classic gate shown GATE OPENING CANTILEVER GATE SAFETY WARNING

TRANSPORT II  10.5 MOUNTING POSTS FENCE LINE POST. Classic gate shown GATE OPENING CANTILEVER GATE SAFETY WARNING TRANSPORT ESTATE TRANSPORT IS TRANSPORT LINK ADAPTRACK 2"sq x.25" UPRIGHTS & DIAGONAL BRACES 1"sq x.125" PICKETS GATE TRACKS PRE-DRILLED FOR LEFT OR RIGHT OPENINGS FENCE LINE POST 13.8125" 10.5" MOUNTING

More information

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction. General: 1. Construct utilities in accordance to TWA approved plans and shop drawings. Any deviation from the approved plans shall be approved by the DEVELOPER S ENGINEER and TWA 2. A preconstruction meeting

More information

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders Welcome to the O Keeffe s Guide Specification System prepared as an aid to specify in preparing written construction documents. For specification assistance with specific product applications, please contact

More information

***************************************************************************************************************

*************************************************************************************************************** 03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************

More information

CHAIN LINK FENCES AND GATES

CHAIN LINK FENCES AND GATES SECTION 02831 CHAIN LINK FENCES AND GATES PART 1 GENERAL 1.01 SUMMARY A. Alternate Material for Fence Post and Framing Material: Where schedule 40 galvanized steel is specified, the following will be accepted:

More information

SECTION ROLLER GATES

SECTION ROLLER GATES GENERAL SUMMARY A. The Contractor shall provide all labor, materials, equipment, and incidentals required to furnish and install roller gates, complete and operational with all necessary accessories as

More information

DRAFT TECHNICAL SPECIFICATIONS FOR

DRAFT TECHNICAL SPECIFICATIONS FOR DRAFT TECHNICAL SPECIFICATIONS FOR DETROIT RIVER AOC STONY ISLAND HABITAT RESTORATION PROJECT THE DETROIT RIVER, WAYNE COUNTY, MICHIGAN FOR INFORMATION JANUARY, 2016 Prepared for: FRIENDS OF THE DETROIT

More information

SIERRA MODEL 12 X 24 SPECIFICATIONS

SIERRA MODEL 12 X 24 SPECIFICATIONS SIERRA MODEL 12 X 24 SPECIFICATIONS Dimensions: Roof Dimensions 12-0 x 24-0 Column Dimensions (center to center) 9-0 x 21-0 Minimum Clearance 8-0 Shed Roof 1:12 pitch Square Feet Under Roof 288 Columns

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department Peralta Community College District 501 5 th Avenue Oakland, California 94606 Phone (510) 466-7225 Fax (510) 587-7873 Purchasing Department Date: March 30, 2011 ADDENDUM No. 3 BID NO.: 10-11/27 PCCD Smart

More information

The GREENBOOK 2015 Standard Specifications for Public Works Construction

The GREENBOOK 2015 Standard Specifications for Public Works Construction 203-3.4.4 Rubberized Polymer Modified Emulsion (RPME). 203-4.4.4.1 General. RPME shall consist of a mixture of emulsified asphalt, crumb rubber, and latex. RMPE shall contain between 0.55 pounds per gallon

More information

ROLLING RACK. Simple Security

ROLLING RACK. Simple Security Simple Security The graceful design and high security of the Rolling Rack has made this type of bike rack a standard for many schools and communities. The Rolling Rack can be used as a single-sided or

More information

B R OA DWAY RAC K. High Security

B R OA DWAY RAC K. High Security B R OA DWAY RAC K High Security The Broadway Rack is a great fit on Broadway or in areas where maximum security is a top priority. Made of thick, two-inch square steel, the Broadway Rack renders pipe-cutters

More information

SLATE ROOFING INSTALLATION PROPOSAL [Last updated 10/08/2017]

SLATE ROOFING INSTALLATION PROPOSAL [Last updated 10/08/2017] [Change these specifications as needed. Use this sample proposal at your own risk. This is a simple, general proposal and is not meant to be a comprehensive proposal for all situations or projects. If

More information