1 BIA Summer Water Resources Training Dam Safety Inspections Part 4 - Inspections July 28, 2012 Presented by Michael Johnson, Ph.D., P.E. Types of Inspections Periodic Inspections A comprehensive visual onsite inspection is conducted. Not all of the mechanical equipment may not be tested. Routine Inspection Typically conducted by field or operating personnel. Focus is on the current conditions of the dam and its features. Data may not be reviewed and evaluated. Special Inspection Conducted when only a particular feature of a dam is to be inspected. Types of Inspections Typical Inspection Equipment Dam Safety Oversight Inspections Frequency contingent on hazard class, annual, triennial and once every five years. Following Unusual or Stressful Events Conducted immediately following severe storm events, overtopping, earthquakes, etc. Prior to Inspection Embankment Dams Review As-built Drawings Correspondence Files Associated Data and Reports Operations & Maintenance Plans Inspection Plans Contact Owner to Schedule Visit

2 Crest Sighting the Crest Settlements, slides, depressions Misalignment Longitudinal/Transverse Cracking Animal Burrows Adverse Vegetation Transverse Cracking Indicates differential settlement within the embankment or underlying foundation. Longitudinal Cracking Indication of uneven settlement between adjacent embankment zones of differing compressibility. Desiccation Cracking Cracking and Jugholes Caused by the drying out and shrinking of certain types of embankment soils. Develop in a random, honeycomb pattern. Typically occurs in the crest and the downstream slope.

3 Inspection Tips - Cracks Side Slopes Photograph and record the location, depth, length, width, and offset of each crack observed. Monitor the crack for changes. A useful monitoring tool is to establish a reference line using stakes. Inspection Methods Zigzag Back and Forth Upstream & Downstream Slopes Inadequate ground cover Adverse vegetation Longitudinal/Transverse Cracking Inadequate Riprap Stone Deterioration Settlements, Slides, Depressions, Bulges Animal Burrows Soft Spots or Boggy Areas (Downstream) Instability can indicate: Instability Overly steep slope aggravated by a rapid lowering of the reservoir. Can indicate an overly steep slope. Deep Seated Slides: Well Defined Scarp Toe Bulge Arc Shaped Cracks Instability Inspection Tips - Slides Photograph and record the location of the slide. Measure and record the extent and displacement of the slide. Look for any surrounding cracks, especially uphill from the slide. Probe the entire area to determine the depth and extent of the slide. Determine if there are seepage areas near or in the slide. Monitor the area to determine if the condition is becoming worse. A useful monitoring tool is to establish a reference line using stakes.

4 Inspection Tip - Slides In most instances, deep-seated slides will require the lowering or draining of the reservoir to prevent the possible breaching of the dam. The owner must be notified. Slope Instability and Damaged Outlet Works Depressions Wave action against the upstream slope that removes embankment fines or bedding from beneath riprap may form a depression as the riprap settles into the vacated space. Localized settlement in the embankment due to poor compaction or foundation due to compressible materials. Loss of sub-surface material through the decay of vegetative matter, or through internal erosion or piping. Inspection Tip - Depressions Although depressions, in most cases, do not represent an immediate danger to the dam, they may be early indicators of more serious problems. If you observe a depression: Photograph and record the location, size, and depth of the depression. Probe the floor of the depression to determine whether or not there is an underlying void. An underlying void is indicative of a sinkhole. Frequently observe the depression to ensure it has stopped developing. Erosion Inspection Tips - Erosion Make sure that the slope protection is adequate to prevent erosion. Look for signs of wave action erosion and degradation of the slope protection. Make sure you check the low points along the upstream and downstream shoulders and groins since surface runoff can concentrate in these areas. Check for any unique problems, such as people, animal, or recreational vehicle traffic, that may be contributing to erosion.

5 Deep-rooted Vegetation Large trees could be blown over and uprooted during a storm. Root systems could penetrate into the dam's cross section. Root systems can pose a threat by providing seepage paths. Animal Burrows The following animals can cause destruction to embankment dams: Muskrats Beavers Groundhogs Ground Squirrels Prairie Dogs Badgers Gophers Abutments Differential Movement Cracks Settlement, Slides, Depressions, Bulges Seepage Animal Burrows Seepage/Piping Control Design Features Internal Drains Flowing Seepage at or Beyond toe Does it contain fines? Evidence of sand boils at or beyond toe What is Seepage? Passage of water through the embankment and foundation materials. Problems due to excessive seepage: Instability Piping Internal Erosion Internal Drains Designed to intercept and discharge it safely

6 What is Piping and Sand Boils? Sand Boil and Sand Bags Inspection Tip Piping and Sand Boils Internal Erosion Record the reservoir's water surface elevation, and approximate elevation. Photograph and record the size of any deposition cone. Measure or estimate the flow rate. Make sure that it is evaluated by a qualified engineer so that appropriate remedial action, if necessary, can be taken. Internal Erosion Inspection Tips - Seepage Drop a dirt clod in a container of water. If the water rapidly becomes cloudy, the soil is dispersive. Look for evidence of seepage along the toe, around appurtenant structures, near embankment-abutment contacts, and at transverse cracks. Look for subtle vegetation changes.

7 Change in vegetation pattern or type of vegetation can indicate seepage Monitoring Seepage Location and quantity or flow rate Recent precipitation that may affect the appearance and quantity of seepage. Temperature of the discharge as compared to the reservoir. Level of the reservoir at the time of the observation. Turbidity of the discharge. Monitoring Devices for Seepage River Reservoir Dam Example Weirs & Flumes Piezometers Drains Principal Outlets Principal Outlet Components Outlets release water impounded by the dam. Typical purposes: Normal release for irrigation, power generation, municipal, and industrial Stream bypass for min. release requirements Reservoir drainage.

8 Principal Outlet Approach Channels/Inlet Structures Seepage into the structure Debris or obstructions Exposed reinforcement Metal Corrosion Coating deficient Misalignment Loss of Material or backcutting Broken or Bent Corroded or rusted Obstructed Trashracks Operator, Gates, and Valves Broken or Bent Corroded or Rusted Leaking Not seated Properly Not Operational or Maintained Principal Outlet Conduits Seepage Debris Exposed reinforcement Metal Corrosion Coating Deficient Misalignment or split seams Loss of material Stilling Basins/Energy Dissipaters Exposed Reinforcement Loss of material Energy Dissipaters Signs of deterioration Covered with debris Signs of inadequacy Principal Outlet Channels Eroding or Backcutting Sloughing Obstructions or restrictions Poorly riprapped Tailwater elevation and flow condition

9 Inspection Tip Principal Outlets Do not enter pipes Confined Space Video Inspect Use Inspection Divers who are qualified to inspect and dive safely Be mindful of critters! Ponding of water in certain reaches of the pipe may indicate settlement-related problems. Inspection Tips Principal Outlet Cavitation damage downstream from gates and valves, and at sharp bend, joints, and discontinuities or buckling is a sign of stress Deformation of conduit shape Efflorescence or gel on concrete is areas of high velocity Emergency Spillways Emergency Spillway Components Pass water in a manner to protect the structural integrity of the dam. Designed to carry the maximum flood event the dam will withstand. Seepage into the structure Debris/obstructions Exposed reinforcement Metal Corrosion Coating deficient Misalignment Loss of Material /backcutting Emergency Spillway Entrance Channel Exposed Reinforcement Displacement/Offset Loss of Joint Material Unlined Sloughing Emergency Spillway Control Section

10 Emergency Spillway Discharge Channel Obstructions/Restrictions Spalling/ Scaling Exposed reinforcement Loss of Material Unlined /backcutting Emergency Spillway Stilling Basin/Energy Dissipaters Exposed Reinforcement Loss of material Energy Dissipaters Signs of deterioration Covered with debris Signs of inadequacy Emergency Spillway Outlet Channel Eroding or Backcutting Sloughing Obstructions or Restrictions Reservoir High Water Marks /Slides into Pool Area Sediment Accumulation Floating Debris Present Depressions, sinkholes or vortices Low ridges/saddle allowing overflow Structures below dam crest elevation Instrumentation Repair or Replacement Date of the last monitoring report Instrumentation Differences between on-site and remote data collection What to observe and document? Reservoir level, outlet/ spillway flows: If operating, are the outlets and spillway functioning as expected? Visual clarity and amount of flow from internal drains Vertical crest settlement and slope movements of embankment dams Vertical and horizontal surveys of concrete dams

11 Keeping Records Importance? Accurate records can help in the evaluation of the performance and condition of the structure over time. Keeping Records Inspection Checklist: Convenient to compile inspection observations. Field Sketch: Sketch observed conditions. A copy of the plan view of the dam, usually included as part of the construction drawings for the dam, can be a good base. Photographs: Photographs provide a pictorial history. Annotate and date photos. Monitoring Data: Collect seepage rates, spillway discharge rates, settlement, and for some dams, readings from instruments such as piezometers, crack gauges, and survey monuments. Record reservoir level. How to Document Questions? S Sketch if a photograph would not capture important aspects. I Investigate the extent of the deficiency. M Measure and record the dimensions of the deficiency. P Photograph the deficiency and describe its characteristics in your notes. L Locate the deficiency in relation to some standard reference point. E Engage a qualified engineer if the deficiency could pose a threat to the safety of the dam.

DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety

DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety NAME OF DAM: Milltown Dam DEPDAMNO.: 15-146 LOCATION: Municipality: East Goshen Township

More information

DAM SAFETY INSPECTION REPORT GLENWOOD LAKE DAM CLASS B, INTERMEDIATE HAZARD DAM

DAM SAFETY INSPECTION REPORT GLENWOOD LAKE DAM CLASS B, INTERMEDIATE HAZARD DAM May 1, 2013 DAM SAFETY INSPECTION REPORT GLENWOOD LAKE DAM CLASS B, INTERMEDIATE HAZARD DAM Name of Dam: Glenwood Lake Dam Westchester County, NY, NYSDEC ID No. 215-0184 NATDAM ID No. NY13618 Hazard Potential:

More information

Dam Safety Inspection Checklist

Dam Safety Inspection Checklist Dam Safety Inspection Checklist Complete All Portions of This Section (Pre-inspection) Date of Inspection: Name of Dam: EAP: (yes, no) OM&I: (yes, no) File Number: Review Inventory - Highlight missing

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

Dam Safety Guidelines Province of BritishLands Columbia Ministry of Environment, and Parks Water Management Branch Branch Water Management Inspection & Maintenance of Dams ii Canadian Cataloguing in Publication

More information

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10 Table of Contents 1.0 Introduction...4 2.0 Description of Landfill...4 3.0 Review of Available Information...5 4.0 Inspection...5 4.1 Changes in Geometry since Last Inspection...5 4.2 Volume...5 4.3 Definitions

More information

Inspection of Embankment Dams

Inspection of Embankment Dams Inspection of Embankment Dams Course No: G06-004 Credit: 6 PDH Allen Hughes, P.E. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

Application for resource consent Form B Damming and diversion of water

Application for resource consent Form B Damming and diversion of water Application for resource consent Form B Damming and diversion of water Notes Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan or

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010047 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE

More information

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010047 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE

More information

10.1 INTRODUCTION 10.1 DRAINAGE

10.1 INTRODUCTION 10.1 DRAINAGE CHAPTER 10 DRAINAGE 10.1 INTRODUCTION The drainage system manages both surface and subsurface water coming off the road surface and from the surrounding countryside. The purpose of the system is to ensure

More information

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08 (b) Discuss in brief shaft spillway with neat sketches. Marks 04 OR Q (2) Explain in brief USBR stilling basin. Marks 08 Stilling Basins The basins are usually provided with special appurtenances including

More information

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA Overview Romania has built 2,617 dams out of which 246 are large and medium dams and 1260 are small dams, as per

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]] Extended Detention Basin Plan for [[== Insert Project Name ==]] [[== Insert Date =]] Project Address and Cross Streets Assessor s Parcel No.: Property Owner: Phone No.: Designated Contact: Phone No.: Extended

More information

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO 2016 LANDFILL INSPECTION REPORT GERS-16-004 CARDINAL PLANT BRILLIANT, OHIO PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Cardinal Plant Landfill Inspection

More information

Mr. Paul Dunlap, California Department of Water Resources

Mr. Paul Dunlap, California Department of Water Resources Memorandum To: From: Mr. Paul Dunlap, California Department of Water Resources Oroville Dam Spillway Incident Independent Forensic Team Date: September 5, 2017 Re: Interim Status Memorandum Introduction

More information

Filter Tube Barriers (Instream)

Filter Tube Barriers (Instream) Filter Tube Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo

More information

DAM AND CANAL SAFETY GUIDELINES

DAM AND CANAL SAFETY GUIDELINES WATER ACT WATER (MINISTERIAL) REGULATION PART 6 DAM AND CANAL SAFETY GUIDELINES Prepared by: Dam Safety and Water Projects Branch Alberta Environmental Protection 8th Floor, Oxbridge Place 9820-106 Street

More information

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp Geneva Dam Design of a Steep, Temporary, Riprap Ramp A Run-of of-river Dam Analysis for Geneva Dam Credit to: Yu-Chun Su, Ph.D., P.E., CFM David T. Williams. Ph.D., P.E, CFM Presentation Purpose History

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 2 SPECIAL BENCHING AND SIDEHILL EMBANKMENT FILLS Geotechnical Bulletin GB2

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm

More information

SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010031 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No Environmental Resources Management January 13, 2017 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0352436 CityCentre Four 840 West Sam Houston Parkway North, Suite 600 Houston,

More information

LEVEE DEFICIENCY CORRECTION PROCEDURES

LEVEE DEFICIENCY CORRECTION PROCEDURES LEVEE DEFICIENCY CORRECTION PROCEDURES USACE, LOS ANGELES DISTRICT 24 APRIL 2015 LEVEE SAFETY PROGRAM Deficiencies noted on the inspection checklist portion of the Periodic Inspection Report shall be addressed

More information

PART 1 GENERAL REQUIREMENTS

PART 1 GENERAL REQUIREMENTS PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...

More information

APPENDIX A EARTHEN EMBANKMENT. VERSION 1.0 March 1, 2011

APPENDIX A EARTHEN EMBANKMENT. VERSION 1.0 March 1, 2011 APPENDIX A EARTHEN EMBANKMENT VERSION 1.0 March 1, 2011 SECTION A-1: DESCRIPTION OF PRACTICE An earthen embankment is a raised impounding structure made from compacted soil. The embankment is the feature

More information

Sediment Basin. Fe= (Depends on soil type)

Sediment Basin. Fe= (Depends on soil type) 3.9 Sediment Control Description: A sediment basin is an embankment with a controlled outlet that detains stormwater runoff, resulting in the settling of suspended sediment. The basin provides treatment

More information

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016 SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri September 21, 2016 CONTENT Introduction Potential in Southeast Asia Challenges in Small Hydro Main Design Steps (Bad) Examples

More information

MSHA s Review of Impoundment Plans

MSHA s Review of Impoundment Plans MSHA s Review of Impoundment Plans Kelvin K. Wu, Ph.D, P.E. Harold L. Owens, P.E. John W. Fredland, P.E. Chief, Mine Waste and Geotechnical Engineering Division, Pittsburgh, PA Supervisory Civil Engineer,

More information

Mining, Tailings and Dam Safety: the Mt. Polley Disaster and Next Steps. Dr. Andrea Kennedy, Ph.D. Bridgeway Consulting for Adams Lake Indian Band

Mining, Tailings and Dam Safety: the Mt. Polley Disaster and Next Steps. Dr. Andrea Kennedy, Ph.D. Bridgeway Consulting for Adams Lake Indian Band Mining, Tailings and Dam Safety: the Mt. Polley Disaster and Next Steps Dr. Andrea Kennedy, Ph.D. Bridgeway Consulting for Adams Lake Indian Band 11 August 2014 Presentation Outline General Introduction

More information

LEVEE DEFICIENCY CORRECTION PROCEDURES

LEVEE DEFICIENCY CORRECTION PROCEDURES LEVEE DEFICIENCY CORRECTION PROCEDURES USACE, LOS ANGELES DISTRICT 26 JANUARY 2016 LEVEE SAFETY PROGRAM Revised 26 MARCH 2018 Deficiencies noted on the inspection checklist portion of the Periodic Inspection

More information

TEMPORARY SEDIMENT TRAP CODE

TEMPORARY SEDIMENT TRAP CODE ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY SEDIMENT TRAP CODE 960 Source: DEFINITION A small temporary stormwater storage structure designed to trap sediment. PURPOSE The purpose of this practice

More information

LOW WATER CROSSINGS, fords, or drifts, as they

LOW WATER CROSSINGS, fords, or drifts, as they Chapter 9 For ords and Low-Water Crossings Keep the ford profile low, armor the driving surface, and protect against scour. LOW WATER CROSSINGS, fords, or drifts, as they are commonly called, can offer

More information

Annual Inspection Report

Annual Inspection Report Annual Inspection Report J.C. WEADOCK GENERATING FACILITY DRY ASH LANDFILL 2016 CCR LANDFILL INSPECTION REPORT Essexville, Michigan Pursuant to 40 CFR 257.84 Submitted To: Consumers Energy Company 1945

More information

VOTR Site Assessment Victoria on the River

VOTR Site Assessment Victoria on the River i Executive Summary A. Introduction AECOM New Zealand Limited (AECOM) was engaged by Hamilton City Council (HCC) to undertake a geotechnical assessment of the (VOTR) site in Hamilton s central business

More information

SANTA ANA RIVER/ SAN TIMOTEO CREEK 1 LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

SANTA ANA RIVER/ SAN TIMOTEO CREEK 1 LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # SANTA ANA RIVER/ SAN TIMOTEO CREEK 1 LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805030015 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE

More information

Ground Improvement for Mitigation of Failure Risks to Existing Embankment Dams

Ground Improvement for Mitigation of Failure Risks to Existing Embankment Dams Ground Improvement for Mitigation of Failure Risks to Existing Embankment Dams by James K. Mitchell, Sc.D., P.E., Dist. M.ASCE University of Alberta, Edmonton, Alberta October 6, 2010 1 SCOPE OF THE LECTURE

More information

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building... Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3

More information

2016 ANNUAL DAM AND DIKE INSPECTION REPORT

2016 ANNUAL DAM AND DIKE INSPECTION REPORT 2016 ANNUAL DAM AND DIKE INSPECTION REPORT Fly Ash Dams 1, 2 & Bottom Ash Pond Complex Cardinal PLANT BRILLIANT, OHIO December, 2016 Prepared for: Cardinal Operating Company Brilliant, Ohio Prepared by:

More information

City of Charlotte BMP Maintenance and Inspection Check List Grassed Channels / Swales [Note: a separate form must be used for each BMP]

City of Charlotte BMP Maintenance and Inspection Check List Grassed Channels / Swales [Note: a separate form must be used for each BMP] City of Charlotte BP aintenance and Inspection Check List Grassed Channels / Swales [Note: a separate form must be used for each BP] Project Name: Project Address: Owner s Name: Owner s Address: Recorded

More information

Brush layering construction

Brush layering construction Brush layering construction Brush layering consists of embedding live branches on successive horizontal rows along contours on the face of a slope. Rooted plants can also be placed among the live branches.

More information

POND CONSTRUCTION. Woodland Steward Series

POND CONSTRUCTION. Woodland Steward Series POND CONSTRUCTION Woodland Steward Series BOB TWOMEY DISTRICT CONSERVATIONIST USDA NATURAL RESOURCES CONSERVATION SERVICE COURSE OUTLINE DEFINITION OF A POND OR LAKE TYPES OF PONDS GEOLOGIC CONSIDERATIONS

More information

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two.

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two. Design Manual Chapter 6 - Geotechnical 6C - Pavement Systems 6C-1 Pavement Systems A. General Information This section addresses the importance of pavement foundations and the potential for pavement problems

More information

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers 4.1-a PERVIOUS PAVEMENT Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers DESCRIPTION Pervious pavement is any system comprised of a load bearing surface that allows for movement of

More information

United States Army Corps of Engineers. Addicks and Barker Dam Safety Update

United States Army Corps of Engineers. Addicks and Barker Dam Safety Update United States Army Corps of Engineers Addicks and Barker Dam Safety Update COL Richard P. Pannell District Commander, Galveston District U.S. Army Corps of Engineers March 9, 2016 US Army Corps of Engineers

More information

Installation and Maintenance of Erosion Control BMPs

Installation and Maintenance of Erosion Control BMPs Installation and Maintenance of Erosion Control BMPs Or Common BMPs Applications Specifications Installation Problems Maintenance Utility Design Professionals Clarifications, proactive problem solving

More information

POST CLOSURE PLAN. CFR (d) GERS Landfill. Pirkey Plant Hallsville, Texas. October, 2016

POST CLOSURE PLAN. CFR (d) GERS Landfill. Pirkey Plant Hallsville, Texas. October, 2016 POST CLOSURE PLAN CFR 257.104(d) Landfill Pirkey Plant Hallsville, Texas October, 2016 Prepared for : Southwest Electric Power Company Pirkey Power Plant Hallsville, Texas Prepared by: American Electric

More information

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall SWM MD-378 Pond Checklist Training 10/17/07 Ken Wolfe Warren Johnson USDA, NRCS Frederick, Maryland ROLES AND RESPONSIBILITIES Small Pond Approval MDE, WMA, Dam Safety Division Authority (COMAR 26.17.04.03)

More information

Appraisal of the Safety of the Tiga and Challawa Gorge dams, Nigeria APPRAISAL OF THE SAFETY OF THE TIGA AND CHALLAWA GORGE DAMS, NIGERIA.

Appraisal of the Safety of the Tiga and Challawa Gorge dams, Nigeria APPRAISAL OF THE SAFETY OF THE TIGA AND CHALLAWA GORGE DAMS, NIGERIA. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Appraisal of the Safety of the Tiga and Challawa Gorge dams, Nigeria World Bank / Lake

More information

Watershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan)

Watershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan) A. B. Brown History of Construction 40 CFR 257.73 (c) (i.) (ii.) (iii.) Owner Name: Southern Indiana Gas and Electric Company dba Vectren Power Supply Owner Address: One Vectren Square, PO Box 209, Evansville,

More information

Coal Combustion Facility Assessment Report. October 20, 2010

Coal Combustion Facility Assessment Report. October 20, 2010 Coal Combustion Facility Assessment Report October 20, 2010 Introduction Stantec Consulting Services Inc. North American Consulting Firm 10,000 Engineers, Geologists, Architects, Scientists and Technicians

More information

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS APRIL 2011 APRIL 2011 Page 1 Chapter Table of Contents 12.1 Policy... 12-3 12.1.1 Table 1... 12-3

More information

Constructed Wetland Use in Nonpoint Source Control

Constructed Wetland Use in Nonpoint Source Control Constructed Wetland Use in Nonpoint Source Control Description Constructed wetlands are excavated basins with irregular perimeters and undulating bottom contours into which wetland vegetation is purposely

More information

North Umpqua Hydroelectric Project (FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form

North Umpqua Hydroelectric Project (FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form (FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form Site # CW2-3 Priority Ranking Med Locator Information/GPS Lat: Long: Impact Rating 3 Start Project Development: Clearwater 2 Risk Rating

More information

CHAPTER 5 - RUBBLE-MOUND STRUCTURES SECTION 1. STRUCTURAL COMPONENTS

CHAPTER 5 - RUBBLE-MOUND STRUCTURES SECTION 1. STRUCTURAL COMPONENTS CHAPTER 5 - RUBBLE-MOUND STRUCTURES SECTION 1. STRUCTURAL COMPONENTS 5.1.1 MOUND. A mound is an artificial embankment or ridge composed of sand, gravel, and cobbles, constructed on the oceanic floor by

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

The Afton TSF, situated approximately 12 km west of Kamloops, BC has been under care and maintenance since 1997.

The Afton TSF, situated approximately 12 km west of Kamloops, BC has been under care and maintenance since 1997. November 27, 2014 KGHM Ajax Mining Inc. Ajax Project Suite 200-124 Seymour Street Kamloops, BC V2C 2E1 ISSUED FOR USE FILE: V15103098-01 via Email: kate.parsons@kghm.com Attention: Subject: Kate Parsons,

More information

Constructed Wetland Pond T-8

Constructed Wetland Pond T-8 Constructed Wetland Pond T-8 Description A constructed wetlands pond is a shallow retention pond designed to permit the growth of wetland plants such as rushes, willows, and cattails. Constructed wetlands

More information

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by:

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by: Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual for: Insert Development Name Located at: Insert Address Prepared for: Insert Property Owner Name, Address, and Phone Number

More information

Factors affecting health of Ash Dyke and Preventive Measures. Kukreti RC Chowdhury Ujjwal Naresh D N

Factors affecting health of Ash Dyke and Preventive Measures. Kukreti RC Chowdhury Ujjwal Naresh D N Factors affecting health of Ash Dyke and Preventive Measures Kukreti RC Chowdhury Ujjwal Naresh D N 1 1 ENVIRONMENTAL REGULATIONS Before any construction activity - MOEF clearance is a must MOEF stipulation

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

iv) Alberta fish weirs

iv) Alberta fish weirs Fish passage at culverts in New Zealand 36 iv) Alberta fish weirs The fish weirs used by Alberta Transportation are weir baffles with a partial slot (Figure 16). The best designs from Rajaratnam et al.

More information

Stream Watch Visual Survey Instructions

Stream Watch Visual Survey Instructions Stream Watch Visual Survey Instructions The Stream Watch Visual Survey is based on assessment parameters from the EPA's Rapid Bioassessment Protocol Habitat Assessment, Georgia Adopt a Stream Visual Survey,

More information

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow Straw Bale Barrier SE-9 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

Infiltration Guidelines

Infiltration Guidelines Appendix E Infiltration Guidelines As a stormwater management method, infiltration means retaining or detaining water within soils to reduce runoff. Infiltration can be a cost-effective method to manage

More information

Storm Drain Inlet Protection for Construction Sites (1060)

Storm Drain Inlet Protection for Construction Sites (1060) Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

Flow Measuring Structures

Flow Measuring Structures Flow Measuring Structures Flow measurement structures are required in irrigation canals in order to facilitate the distribution of water through out the system and to keep account for seepage losses, etc.

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

PERFORMANCE OF SOIL-CEMENT PLATING IN THE TEXAS PANHANDLE. Abstract

PERFORMANCE OF SOIL-CEMENT PLATING IN THE TEXAS PANHANDLE. Abstract PERFORMANCE OF SOIL-CEMENT PLATING IN THE TEXAS PANHANDLE By: D.N. Clute, P.E.; M.S. Garsjo, P.E.; K.R. Worster, P.E. National Design, Construction, and Soil Mechanics Center, USDA-NRCS, Fort Worth, Texas

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR RIPRAP. Conditions Where Practice Applies

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR RIPRAP. Conditions Where Practice Applies STANDARD FOR RIPRAP Definition A layer of loose rock, aggregate, bagged concrete, gabions, or concrete revetment blocks placed over an erodible soil surface. Purpose The purpose of riprap is to protect

More information

TVA Colbert Fossil Facility Ash Disposal Pond 4

TVA Colbert Fossil Facility Ash Disposal Pond 4 2011 World of Coal Ash (WOCA) Conference May 9-12, 2011 in Denver, CO, USA http://www.flyash.info/ TVA Colbert Fossil Facility Ash Disposal Pond 4 Improving Operations While Preparing for Closure May 10,

More information

Regulation No July Engineering and Design REPORTING EARTHQUAKE EFFECTS TABLE OF CONTENTS

Regulation No July Engineering and Design REPORTING EARTHQUAKE EFFECTS TABLE OF CONTENTS DEPARTMENT OF THE ARMY *ER 1110-2-1802 U.S. Army Corps of Engineers CECW-EG Washington, DC 20314-1000 Regulation No. 1110-2-1802 28 July 2017 Engineering and Design REPORTING EARTHQUAKE EFFECTS Paragraph

More information

Manure Storage for Environmental Management Systems

Manure Storage for Environmental Management Systems WiMStor01 MStor Manure Storage for Environmental Management Systems Key: 1)Low Risk 2)Low-Moderate Risk 3)Moderate-High Risk 4)High Risk Location of Manure Storage Are the manure storage facilities in

More information

Standard Operating Procedure (SOP) For Sand Filter Basin (SFB) Inspection and Maintenance

Standard Operating Procedure (SOP) For Sand Filter Basin (SFB) Inspection and Maintenance Standard Operating Procedure (SOP) For Sand Filter Basin (SFB) Inspection and Maintenance Douglas County, Colorado 2014 1 TABLE OF CONTENTS ACRONYMS... 3 SFB-1 BACKGROUND... 4 SFB-2 INSPECTING SAND FILTER

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

Prepared for Urban Drainage and Flood Control District

Prepared for Urban Drainage and Flood Control District BERM FAILURE TECHNICAL ANALYSES SOUTH PLATTE GRAVEL PIT EVALUATION CRITERIA Prepared for Urban Drainage and Flood Control District Wright Water Engineers, Inc. January 2013 121-030.000 TABLE OF CONTENTS

More information

A.2.a Random Riprap... Table

A.2.a Random Riprap... Table 3601 RIPRAP MATERIAL 3601.1 SCOPE Provide stone and filter layer material for use in random or hand-placed riprap, gabion, and revet mattress construction. 3601.2 REQUIREMENTS A Stones A.1 Quality Provide

More information

BMP #: Infiltration Basin

BMP #: Infiltration Basin Structural BMP Criteria BMP #: Infiltration Basin An Infiltration Basin is a shallow impoundment that stores and infiltrates runoff over a level, subtle, uncompacted, (preferably undisturbed area) with

More information

Standards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities

Standards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities Standards for SWMF s (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities August 2017 PREAMBLE Development results in a great amount of impervious area,

More information

Hydraulic Design of Highway Culverts HDS 5 September 1985

Hydraulic Design of Highway Culverts HDS 5 September 1985 Hydraulic Design of Highway Culverts HDS 5 September 1985 Welcome to HDS 5 - Hydraulic Design of Highway Culverts Table of Contents Preface Tech Doc U.S. - SI Conversions DISCLAIMER: During the editing

More information

PANAMA CANAL BORINQUEN DAMS AND THIRD SET OF LOCKS OPERATIONS AND MAINTENANCE STRATEGY

PANAMA CANAL BORINQUEN DAMS AND THIRD SET OF LOCKS OPERATIONS AND MAINTENANCE STRATEGY PANAMA CANAL BORINQUEN DAMS AND THIRD SET OF LOCKS OPERATIONS AND MAINTENANCE STRATEGY Rachael V. Bisnett, P.E. 1 Wonnie Kim, P.E. 2 Donald J. Montgomery, P.E. 3 ABSTRACT The new Third Set of Locks for

More information

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District. Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas

Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District. Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas March 2016 1. PURPOSE AND REQUIREMENTS 1.1 PURPOSE This

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

REROUTING DRAINAGE SYSTEMS

REROUTING DRAINAGE SYSTEMS MINNESOTA WETLAND RESTORATION GUIDE REROUTING DRAINAGE SYSTEMS TECHNICAL GUIDANCE DOCUMENT Document No.: WRG 4A-4 Publication Date: 10/14/2015 Table of Contents Introduction Application Design Considerations

More information

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS WATER RESOURCES MANAGEMENT DIVISION Water Investigations Section

More information

ODOT Design & Construction Requirements for MSE Walls

ODOT Design & Construction Requirements for MSE Walls ODOT Design & Construction Requirements for MSE Walls Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering 2006 Ohio Transportation

More information

The Good, The Bad, and The Ugly

The Good, The Bad, and The Ugly Overview The Good, The Bad, and The Ugly Stormwater Regulations for the Construction Industry Seminar March 20, 2012 Wendy Terlizzi Arizona Department of Transportation Office of Environmental Services

More information

Geotechnical Design and Factors of Safety

Geotechnical Design and Factors of Safety Geotechnical Design and Factors of Safety Technical Bulletin Ontario Ministry of Natural Resources This publication is available online at: Ontario.ca/dams Ces documents sont offerts en anglais seulement

More information

Departments of Agronomy C709 Conservation Farming and Biological and Agricultural Engineering. Permanent grass cover

Departments of Agronomy C709 Conservation Farming and Biological and Agricultural Engineering. Permanent grass cover Terrace Maintenance Photo 1. Measuring the ridge height above the channel is easily done with a straight board, carpenters level, and tape measure. Departments of Agronomy C709 Conservation Farming and

More information

Inspection and Maintenance Checklist Catch Basin Inserts

Inspection and Maintenance Checklist Catch Basin Inserts Inspection and Checklist Catch Basin Inserts Facility Name/Designator Date of Inspection: Type of Inspection: Pre-rainy season Monthly Quarterly Is Needed Results Expected When Is Performed Accumulation

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

These potential changes and their implications are outlined in Annex 1.

These potential changes and their implications are outlined in Annex 1. Guidance Note Hydropower Guidance Note: This Guidance Note has been prepared by Natural Resources Wales (NRW) to provide applicants for abstraction and impoundment licences for hydropower schemes with

More information

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS 8.1 INTRODUCTION To minimize the detrimental effects of erosion and sedimentation, Henrico County requires that those individuals responsible for

More information