1 Vandalia-Butler City Schools Vandalia-Butler City Schools 306 S. Dixie Drive Vandalia, Ohio Instructions to Bidders and General Conditions Vandalia-Butler City Schools 1

2 Article 1 Proposal Date The Vandalia-Butler City School District is accepting proposals for all material, labor and services necessary for the Renovation of the new Board of Education (BOE) located at 500 S. Dixie Drive, Vandalia, Ohio as described in the Scope of Work Sections of this BOE Renovation Project Proposal Instructions document. Energy Optimizers, USA has been hired by the District to oversee, manage and ensure that the project intent and implementation adheres to the spirit of this bid document and scope of work. Proposals are to be sealed and addressed to the Vandalia-Butler City School District, 306 S. Dixie Drive, Vandalia, Ohio 45377, and plainly marked on the outside Proposal for BOE Renovation Project. Proposals received later than 2:00 PM local time, January 12, 2017 will not be accepted. Proposals will begin to be opened and recorded starting at 2:15 PM. The Vandalia-Butler City School District reserves the right to reject any and all bids for any reason and to waive minor defects in the Proposal Instructions. The Vandalia-Butler City School District reserves the right to accept any proposal deemed lowest responsive and responsible. Based upon the District issuing a purchase order to the selected bidder(s) prior to the end of the day (5:00 PM) on January 31, 2017, agreed upon scope of work must be completed by July 31, If the completion of the awarded scope of work is not complete by July 31, 2017, a penalty of $500 per day for everyday over the July 31, 2017 deadline will be deducted from the winning bidder(s) final payment associated with the awarded scope of work. Article 2 Proposal The proposal shall contain the following documents. 1. The Bidder s actual detailed proposal 2. The Form of Proposal form 3. The attached Information form 4. The attached Reference form. Bidders are requested to provide project reference information on three (3) projects where they have performed similar work called for in this project. 5. The attached Personnel Profile Summary form. Bidders are requested to provide information on the company s key personnel (Project Manager, Foreman, & Lead Installer) who will be directly involved in some aspect of this project. 6. The attached List of Subcontractors form. Bidders are requested to provide information on all subcontractors that will be performing work on this project. Article 3 Mandatory Pre-Bid Meeting and Site Visits There will be a mandatory pre-bid meeting and site visit on Tuesday January 3, 2017 beginning sharply at 9:00 AM. No one shall be accepted to attend after 9:15 AM. Bidders will be able to review the project sites and the scopes of work will be discussed, including the ability to ask questions. This walkthrough will be completed at approximately 11:30 AM. Proposals will only be accepted from Bidders who attend the mandatory pre-bid meeting. Bidders will be required to sign-in at the new BOE site location (located at 500 S. Dixie Drive, Vandalia, Ohio 45377). Energy Optimizers, USA will represent the district and serve as the Owner s Agent for the duration of this project and will coordinate and manage the project on behalf of the District. 2

3 Should the Bidder submit a proposal it shall be construed as an acceptance by him to fully perform all work required, whether directly shown as described in the Scope of Work Sections of this BOE Renovation Project Proposal Instructions document. Article 4 Questions Any questions concerning any aspect of the project should be directed to Russ Morningstar with Energy Optimizers, USA. No questions will be accepted after 5:00 PM on January 9, All questions are required to be submitted via to: rmorningstar@energyoptusa.com. Answers will be ed to all contractors who have signed the Sign-In sheet at the mandatory Meeting and provided a valid address within 72 hours. Article 5 Bidder s Insurance The successful Bidder shall not commence any work under this contract, nor shall he allow any subcontractor to commence any work until both he and the subcontractor have provided the Owner with evidence that they have the following insurance in force. General Liability: Comprehensive, Premises and operations. Products and Complete operations, Contractual, Independent Contractors, Broad from Property Damage, and Personal Injury. a. Bodily Injury $1,000,000 each person b. Property Damage $1,000,000 each occurrence c. Personal Injury $ 2,000,000 aggregate Automobile Liability: Any Automobiles or Vehicles, All Owner Automobiles or Vehicles (Private Pass) All owned Automobiles or Vehicles (Other than Private Pass), Hired Automobiles or Vehicles, and Non- Owned Automobiles or Vehicles. a. Bodily Injury $500,000 per person, $1,000,000 per accident b. Property Damage $100,000 Workers Compensation Insurance: As required by the laws of the State of Ohio. A Certificate of Insurance shall be submitted to the Owner as evidence of such insurance. In addition, the Bidder shall hold the Owner and their representatives harmless from any and all accidents resulting in bodily injury or property damage during the life of this contract. Article 6 Taxes This project is exempted from State sales tax. Article 7 Prevailing Wages This is a non-prevailing wage job. Article 8 Names of Subcontractors If any phase of the work is to be performed by a person or company other than the Bidder or persons in his direct employment, he shall accompany with his proposal the name and address of such subcontractor(s). The same general terms and conditions, and specifications shall apply to subcontractors as listed for the Bidder. Energy Optimizers, USA will hold the Bidder responsible for any acts of the subcontractor. 3

4 Article 9 Permits, Licenses and Code Requirements The successful Bidder will be responsible for all costs associated with obtaining any required building permits and licenses. The Bidder will also be responsible for all installation work to comply with the current versions of the Ohio Basic Building code, Ohio Mechanical Code, Ohio Plumbing Code, Ohio Electrical Code, NFPA 70 and the Ohio Board of Health. Article 10 Bid Guaranty to be Filed with Bid Per the Ohio Revised Code Section , each bid shall be accompanied by an approved Surety Company Bid Bond or a Certified Check, made payable to the Board of Education in an amount equal to ten (10%) of the bid tendered as a guarantee that the bidder will perform their bid. If for any reason whatsoever, the bidder fails to enter a proper contract, or fails to perform as required as described in the Scope of Work Sections of this BOE Renovation Project Proposal Instructions document, the amount of the Bond or Certified Check shall be retained by the Board of Education as and for liquidated damages sustained by their failure to do so. Article 11 Quality Assurance The bidder will be a licensed contractor in the State of Ohio. The bidder will have been in business for at least 10 years. The bidder will have installed similar types of projects (provide references). The bidder will follow all Health and Safety rules and guidelines. The bidder will follow all local and state codes and guidelines. The bidder will install all equipment and materials as described in the Scope of Work Sections of this BOE Renovation Project Proposal Instructions document and per manufacturer recommendations. Article 12 Working Hours The successful Bidder will be able to work in the building during normal working hours. A Vandalia- Butler City School District approved work schedule will be required and agreed upon before any work may begin. Article 13 Background Check The successful Bidder must provide to the Vandalia-Butler City School District an approved BCI background check for all individuals (including subcontractors) who will be working on property. Article 14 Temporary Heating and Cooling The successful Bidder will be responsible for all costs (both labor and materials) associated with maintaining acceptable comfort in the areas that are associated (directly or non-directly) with the work being performed. This includes providing any portable or temporary heating and cooling to maintain comfort. Article 15 Smoking Policy There is to be no smoking on school property. Article 16 Payment and Contract The successful bidder will enter into an AIA contract with Vandalia-Butler City School District and be paid based on completion of the schedule of values. 4

5 The Bidder is responsible for the following: Scope of Work for BOE Renovation Project 1. General This is a true, 100% turn-key Design Build project and all bids must include all costs associated with completion of the project, including, but not limited to parts, material, labor, permits, engineering, project management, taxes, warranties, etc. The Bidder is responsible for all site inspections, measurements, demolition, rigging, and site preparation. No change orders will be accepted after the acceptance of the Bidder s Proposal. Provide all necessary submittal documentation to complete the Project s Scope of Work Provide all necessary documentation for work schedules and phasing (if required) of tasks to be coordinated with Energy Optimizers USA and the Owner s Representative. Provide all necessary shop drawings with submittals prior to beginning work. Provide all necessary as-built drawings to document the installation of the Scope of Work described herein. The drawings shall represent a schematic representation of the work provided for each item of the Scope of Work and equipment description. o Design-build and as-built drawings shall be required (to be provided in both paper and electronic format) Provide submittals for all pieces of major equipment prior to ordering prior to the ordering of the said equipment. Energy Optimizers, USA will review the proposed equipment and issue a notice to proceed order in a written communication with a Letter of Transmittal. The Bidder shall be prepared to communicate with Energy Optimizers, USA on a regular basis their progress and attend regular project review meetings with Energy Optimizers, USA, the customer s representative, and all other appropriate trades or subcontractors. The Bidder will be required to participate in the Cx (Commissioning) process with Four Seasons Environmental, Inc. Provide a (3) three year parts and equipment Warranty for all items not included with the manufacture s standard 5-year (or more) warranty, and one (1) year labor Warranty for all work installed under this defined Scope of Work. The Bidder is responsible for all permitting per State and Local Codes and is required to adhere to all State and Local Building Codes based on the defined scope of work. A tentative schedule of work shall be included with each proposal along with a tentative schedule of values (invoicing schedule). The Bidder will be responsible for all necessary engineering, permit, and drawings. The Bidder is responsible to verify all equipment prior to ordering. The attached submittals are provided for reference but not guaranteed to be accurate. The Bidder shall supply equipment by the specified manufactures only, no substitutions will be accepted. Asbestos testing and abatement has already been completed by the District. 5

6 2. Scope of Work: This scope of work is a guide to the Bidder on the overall scope of work. This is a Design/Build Project and the Bidder s proposal should reflect their creativity and ingenuity. The Successful Bidder will be responsible for all site work, design, permits, permit drawings, engineering, limited programming (design intent drawing included), material and equipment selection based on criteria noted below and procurement, turn-key installation, commissioning and warranties of all work. Vandalia-Butler City Schools Board of Education (BOE) Renovation Project is a Design/Build Project for renovating an existing one-story 9,000-square foot former public library building into the new Vandalia- Butler City Schools Board of Education (BOE) offices. Construction drawings of the existing building are available. The district has a budget of $500,000 to renovate the existing building. The scope includes adding ten new offices, a new HVAC system with individual zones for simultaneous heating and cooling, new flooring, new ceilings, new LED lighting, and the necessary electrical and network infrastructure for a fully operating office building. Code Compliance: This project shall comply with the latest edition of all applicable codes. If allowable by code, upgrade only public restrooms to current ADA accessibility standards. Roof and Interior Wall Repair: Roofing, roof drain and/or downspout replacement may be required. Water damage is visible on the interior and exterior of building. Notable cracking on northernmost interior masonry wall and surrounding areas. Proposal for corrective measures resulting in like-in appearance and performance to be shown as separate line item. Brick Repair: Brick damage is visible on the exterior, notably on north face of building. Proposal for corrective measures resulting in like-new appearance and performance to be shown as separate line item. Interior Renovation Work Included: Removal of northern entry door of vestibule and associated framing and glazing o Show removal and replacement of southern vestibule entry doors and associated framing and glazing as separate line item (see storefront criteria below) Removal of flooring and wall base throughout o Exclude vestibule o Exclude restrooms Removal of ceiling tile, suspension grid, and associated items throughout Removal of existing window treatments and associated hardware Removal of casework and appliances o Workroom casework to remain Removal of superficial panels, brackets, fasteners, screws, etc. from wall o Patch/repair to level of surrounding/adjacent material(s) Infill abandoned return air ducts in slab with concrete o Approximately 6 wide x 30 long x 32 deep o Total 6, location shown on design intent drawing 6

7 Provide new aluminum storefront system at northern vestibule wall o Nominal 4 ½ x 2 thermally broken with anodized finish to match existing frame color o Insulated glazing with low-e o Prep frame for future electric strike (reference electrical scope) o Door configuration shown on design intent drawing unless otherwise required by Code Provide 5 new window openings and window assemblies (reference design intent drawing for locations) o Size to match adjacent existing windows o Fixed o Tooth-in masonry o Frame color to match existing windows Construct 10 new offices along perimeter of building (reference design intent drawing) o Gypsum wallboard partitions between offices o Full glass wall and door with translucent pattern adjacent to open office areas o One office separation wall to be mobile/retractable to function as conference room (reference design intent drawing for desired location) 12-person capacity Marker board and projector Credenza o Construction of partitions should deter sound transmission between offices Minimum STC 45 tested in field Furnish and install new finishes throughout (see attachment for level of quality for finish) o Painting Gypsum board walls and ceiling elements Concrete block walls Wood trim Hollow metal doors Exclude wall and floor tile Exclude face brick o Carpet and wall base Exclude rooms with sealed concrete Exclude restrooms o Acoustical ceiling tile and suspension grid Flat throughout with exception of areas with clerestory windows Match existing ceiling height in vestibule, restrooms, community room, existing storage and mechanical rooms Ceiling height to be maximum 8-6 in single offices and associated areas Ceiling height to be maximum 9-6 in open office areas Provide new window coverings at all new and existing windows (show as separate line item) o Horizontal blinds Provide ADA compliant door hardware throughout o Hardware to be Class 1 o Doors keyed separately. Coordinate with owner. Provide interior signage as required by Code Furniture, casework, and countertops by separate contract 7

8 HVAC Equipment and Controls: Provide all necessary material and labor for installing a new HVAC system. The system is to include all required ductwork, diffusers, a complete building automation and control system, and zone controls for the individual rooms, office and common areas to have simultaneous heating and cooling. System is to be balanced and have a TAB report for both the hot water system and the air system. The basis for design is natural gas fired Trane packaged rooftop unit (RTUs) with VFD, variable air volume boxes with reheat, and a hot water heating boiler system for zone reheat. The RTU would be used for primary cooing air and building morning warm up (MWU) functions. The boiler would be used to provide reheat to the variable air volume boxes only. The existing domestic water heating system would remain as is. The District s existing BAS (Building Automation System) control system and equipment is Tridium Niagara AX (BuildingLogix) maintained by Waibel Energy Systems. The new BAS control system is to be Open and based on the Tridium system and use Tridium N4 hardware. The new BAS control system will need to be integrated with the Districts existing Niagara AX (BuildingLogix). The new BAS installed control system will need to be BACnet protocol for local devices and integrated into the District s existing BAS system as part of this project. This project will include all graphical and global references required for a complete and functional BAS control system. The existing District BAS control system utilizes a trending and reporting package. The new BAS system will need to be added to the District s existing BAS reporting systems. All new equipment and local controllers will need to follow the existing BAS structures based on the Tridium Open Control system. Additional BAS control system packages operating independent of the District s existing BAS system will not be allowed. For information on the existing BAS control system and for Trane equipment pricing contact Rodney Rhoades with Waibel Energy Systems ( ). 25-ton Package Unit o Provide and install a 25-ton package unit designed for a VAV system including curb, VFD, economizer, supply air sensor, return air sensor, mixed air sensor, return air humidity sensor, outdoor air sensor, Co2 sensor, controls, and communication card. Location of RTU is to be confirmed with Structural Engineer. High Efficient Boiler o Provide and install a high efficient boiler system for supplying reheat to the VAV boxes including required pumps, copper piping and fittings, gas lines, electric, flue materials, controls, and hot water valve installation. Ductwork and Diffusers o Provide and install properly sized supply air and return air sheet metal ductwork with insulation wrap, supply air lay-in diffusers, return air grills, flex duct supply air duct connectors (maximum 6 long), required fire dampers and access panels, and balance dampers. VAV Boxes with Reheat 8

9 o Provide and install VAV boxes with reheat and controls (VAV controller, hot water valve, damper actuator, digital wall sensor, and discharge air sensor). Tridium N4 Based Building Automation System o Provide and install a Tridium N4 control system that can integrate with the District s existing Tridium Building Logix system and reporting system. BAS system is to include controlling the RTU unit, Boiler and pumps, and VAV boxes. BAS system schedules, zoning, demand control ventilation, and hot water and discharge air reset is to be included in the control sequence. System graphics are to include a floor plan, individual pages for each major piece of equipment (RTU, VAV Boxes, Boilers and Pumps ) Electric and low-voltage for HVAC o Provide and install all required high voltage and low voltage electric wires and materials for a complete and operating system. Include in the installation any required duct smoke detectors and safety devices. Electrical: Provide all necessary materials and labor for installing new electric outlets, light switches, and lights for the 10 new office spaces and in the existing building (including the cubicle spaces). Verify all new and existing electrical load requirements Verify existing service is adequate for the new and existing load requirements Create new panel schedules for all power panels Verify electrical service and all sub-panels meet electrical codes Re-use existing branch circuits where applicable Demo all un-used wire and/or conduit back to nearest junction box and/or power panel Demo all interior lighting and recycle associated materials Replace all existing switches, receptacles and cover plates with new All switches and receptacles to be 20 Amp Standard switching no dimming in facility Field verify that existing fire alarm system is operational and code compliant Interior lighting to be LED Verify all emergency and egress lighting is code compliant Include power to all HVAC equipment Include equipment disconnects where needed Supply power and data to cubicles Include cabling only to door locations for future card access Network: Provide all necessary materials and labor for installing new network outlets and network cable for the 10 new offices. Demo all unused data cabling Offices, conference rooms, cubicles and receptionist spaces to have (2) CAT6 data drops in each space Include data cabling only no devices or terminations 9

10 Other: Provide all necessary materials and labor for repairing minor cracks inside the building and finishing out the interior of the building for any items not mentioned above that are necessary for a complete and functional office space. Structural Engineering: A Structural Engineering Assessment Report has been provided by Shell & Meyer Associates and is attached to this document. Bidder is to provide an Add for all these repairs as listed on the Price sheet. The final decision on the location of the rooftop unit needs to be approved by Shell & Meyer Associates as outlined in the report. 10

11 11

12 12

13 Existing Building 13

14 Renovated Building 14

15 NOTE: No Change Orders This is a Turn Key Design Build Project and it is the Bidder s Responsibility to include all Equipment, Materials, and Labor required for a complete (from start to finish) project. The bidder is responsible to verify all equipment prior to ordering. No Change Orders will be allowed after the acceptance of the Bidder s proposal for the defined general Scope of Work. 15

16 Bidder s Company Information Company Name: Contact: Title: Address: Office Number: Cell Number: Signature of Principal: Date: 16

17 Bidder s References Company #1: Company Name: Contact: Title: Address: Office Number: Cell Number: Referenced Project Name Company #2: Company Name: Contact: Title: Address: Office Number: Cell Number: Referenced Project Name 17

18 Bidder s References Company #3: Company Name: Contact: Title: Address: Office Number: Cell Number: Referenced Project Name Company #4: Company Name: Contact: Title: Address: Office Number: Cell Number: Referenced Project Name 18

19 Bidder s Key Personnel Profile Summary 19

20 Bidder s Subcontractor Information Vandalia-Butler City Schools Subcontractor #1: Company Name: Contact: Title: Address: Office Number: Cell Number: Subcontractor #2: Company Name: Contact: Title: Address: Office Number: Cell Number: 20

21 Bidder s Subcontractor Information Vandalia-Butler City Schools Subcontractor #3: Company Name: Contact: Title: Address: Office Number: Cell Number: Subcontractor #4: Company Name: Contact: Title: Address: Office Number: Cell Number: 21

22 Vandalia-Butler City Schools BOE Renovation Project Pricing The undersigned does hereby designate the address listed on the Bidders Company Information form as the legal address to which all notices, directions, or other communications may be served or mailed. Having carefully read the specifications attached hereto as prepared by Energy Optimizers, USA, 7950 S. County Road 25A, Tipp City, Ohio 45371; and likewise having inspected all the project work sites for the Vandalia-Butler City Schools District located at 307 S. Dixie Drive, Vandalia, Ohio 45377; and the conditions affecting and governing the delivery and inspection of equipment for said project, the undersigned hereby proposes to furnish, deliver and install the following equipment as specified herein. Signed Title Date Base Bid Amount Add: Roof and Drain Repair Amount Add: Interior wall Repair Amount Add: Exterior Brick Repair Amount Add: Northern Vestibule Wall Amount Add: Window Treatment Amount Please Note: It is the intent of the district to fully implement the entire Scope of Work as described in this document if the proposal received comes within the district s budget. 22

COMMUNITY COLLEGE DISTRICT OF JEFFERSON COUNTY, MISSOURI REQUEST FOR PROPOSAL: WINDOW, DOOR, AND FRAME REPLACEMENT

COMMUNITY COLLEGE DISTRICT OF JEFFERSON COUNTY, MISSOURI REQUEST FOR PROPOSAL: WINDOW, DOOR, AND FRAME REPLACEMENT COMMUNITY COLLEGE DISTRICT OF JEFFERSON COUNTY, MISSOURI REQUEST FOR PROPOSAL: WINDOW, DOOR, AND FRAME REPLACEMENT RFP # 1710002 Sheree Bell Due Date: November 30, 2017 Procurement Coordinator Not later

More information

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL DOCUMENT 00 41 13 BID PROPOSAL TO: SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT, a California Community College District, acting by and through its Board of Trustees ("the District"). FROM: (Name of

More information

Main Building Auditorium

Main Building Auditorium Main Building Auditorium Theatre and Lighting Upgrade Moberly Area Community College 101 College Avenue Moberly, Missouri This document contains all necessary instructions and specifications to perform

More information

Architectural Services

Architectural Services Architectural Services 2016 Capital Improvement Program Request for Proposal Number: 18-20 Title of the Projects: Renovations to Weaver Middle School Procurement Department Bibb County School District

More information

INVITATION TO BID. WHATCOM COUNTY LIBRARY SYSTEM ADMINISTRATIVE SERVICES BUILDING REMODEL 5205 Northwest Drive, Bellingham, WA 98226

INVITATION TO BID. WHATCOM COUNTY LIBRARY SYSTEM ADMINISTRATIVE SERVICES BUILDING REMODEL 5205 Northwest Drive, Bellingham, WA 98226 INVITATION TO BID WHATCOM COUNTY LIBRARY SYSTEM ADMINISTRATIVE SERVICES BUILDING REMODEL 5205 Northwest Drive, Bellingham, WA 98226 February 23, 2016 DESCRIPTION OF SERVICES The intent of this invitation

More information

ALL-ALUMINUM DOOR & WINDOW FRAMING

ALL-ALUMINUM DOOR & WINDOW FRAMING ALL-ALUMINUM DOOR & WINDOW FRAMING WITH INTEGRATED ALUMINUM DOOR STOP SECTION 08 41 13 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS SPECIFICATION PART 1 GENERAL 1.1 SECTION INCLUDES: A. Prefinished aluminum

More information

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST City of North Royalton Mayor Robert A. Stefanik Community Development, Building Division Dan Kulchytsky Building Commissioner 11545 Royalton Road, North Royalton, OH 44133 Phone: 440-582-3000 Fax: 440-582-3089

More information

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO SECTION 01010 - SCOPE OF WORK PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General provisions of Contract, General Conditions and Technical Specification Sections, apply to this Section. 1.02 PROJECT DESCRIPTION

More information

DATE: December 15, 2009 BID NO.: FWC 09/ CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM DECEMBER 18, 2009 to DECEMBER 22, 2009 AT 3:00 PM

DATE: December 15, 2009 BID NO.: FWC 09/ CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM DECEMBER 18, 2009 to DECEMBER 22, 2009 AT 3:00 PM DATE: December 15, 2009 ADDENDUM NO.: 1 BID NO.: FWC 09/10-48 BID TITLE: CHANGE: ADD: RENOVATION OF THE PRAIRIE LAKES FIELD OFFICE AT THE THREE LAKES WMA CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

PROFESSIONAL DESIGN MANUAL INDEX

PROFESSIONAL DESIGN MANUAL INDEX PROFESSIONAL DESIGN MANUAL INDEX DIVISION A--GENERAL PROJECT REQUIREMENTS... A2-A15 A.1 INTRODUCTION... A-2 A.2 CODES COMPLIANCE (VERIFY CITY REQUIREMENTS)... A-5 A.3 SPECIAL SUBSURFACE AND LAND CONDITIONS...

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS Mr. & Mrs. FL Schlagle Library Improvements Kansas City Kansas Public Schools USD 500 IFB 16-043 ADVERTISEMENT FOR BIDS 1.1 PROJECT INFORMATION A. Notice to Bidders: Qualified bidders may submit bids for

More information

Building Systems and Design Elements included in SliDeRulE

Building Systems and Design Elements included in SliDeRulE Building Systems and Design Elements included in SliDeRulE No. System Subsystem Design Element 1.1.1 Foundation Deep Foundation Steel H-pile 1.1.2 Foundation Deep Foundation Steel pipe pile 1.1.3 Foundation

More information

11/1/2016. Smoke detectors will be furnished by MHA and installed by contractor.

11/1/2016. Smoke detectors will be furnished by MHA and installed by contractor. 11/1/2016 Request for Proposal: Make Ready Services McKinney Housing Authority (MHA) requests proposals for vendors to perform make ready services on vacant units within the authority. All bidders must

More information

I N V I T A T I O N T O B I D City and Borough of Wrangell Premanufactured Restroom

I N V I T A T I O N T O B I D City and Borough of Wrangell Premanufactured Restroom Overview The (CBW) requests sealed bids from interested and qualified firms to provide a, on a one-time basis. Supplier shall furnish all labor, materials, tools, and equipment necessary for supplying

More information

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding

More information

All Plan Holders 3/3/

All Plan Holders 3/3/ All Plan Holders 3/3/2017 14-044 Marina Middle School Window Replacement and Seismic Retrofit 5 Window Replacement and Seismic Retrofit 11 DSA No. 01-116273 San Francisco Unified School District 16 SFUSD

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

INVITATION TO BID. Roof Repair Multiple Elastomeric Coating Roofs. Invitation to Bid No. 2013/14-09

INVITATION TO BID. Roof Repair Multiple Elastomeric Coating Roofs. Invitation to Bid No. 2013/14-09 INVITATION TO BID Invitation to Submittal Deadline: Wednesday, April 30, 2014 at 2:00 p.m. Mail bids to the following address: Curry County Administration 700 N. Main Street, Suite 10 Clovis, NM 88101

More information

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen:

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen: March 6, 2018 Subject: Addendum No. 2 Toyota Park Transit Center Phase II Ladies and Gentlemen: This Addendum No. 2 is being issued to provide responses to questions submitted by potential bidders and

More information

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following: SECTION 01700 - CONTRACT CLOSEOUT PART 1 - GENERAL 1.01 RELATED DOCUMENTS 1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Residential Sewer Backup Prevention Program

Residential Sewer Backup Prevention Program City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety

More information

Energy Trigger (A Existing Building Upgrade Mechanism Model)

Energy Trigger (A Existing Building Upgrade Mechanism Model) Trigger (A-11.2.1.2 Existing Building Upgrade Mechanism Model) Applicability All Building Permit applications for projects related to existing buildings are required to follow the energy upgrade trigger

More information

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

1 BASE HOME CONSTRUCTION SPECIFICATIONS: TOWNHOMES 5-13-2015 Note: Specifications noted below may change based on selected options. Verify upgrades from the base specifications with the option sheets and

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual FORM HEADWALL (floating) Installation Manual FORM HEADWALL (floating) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated

More information

Communications Page 1 of 9

Communications Page 1 of 9 Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

DOCUMENT AGREEMENT FORM STIPULATED SUM (SINGLE-PRIME CONTRACT)

DOCUMENT AGREEMENT FORM STIPULATED SUM (SINGLE-PRIME CONTRACT) DOCUMENT 00 52 13 AGREEMENT FORM STIPULATED SUM (SINGLE-PRIME CONTRACT) THIS AGREEMENT IS MADE AND ENTERED INTO THIS DAY OF, 2014, by and between the Ohlone Community College District ( District ) and

More information

Commercial Tax Abatement

Commercial Tax Abatement A confirmation letter is issued by the City upon receipt of this application. This application is not effective and not considered filed until the confirmation letter has been issued. Filing does not assure

More information

A. Submit the following in addition to the standard requirements.

A. Submit the following in addition to the standard requirements. SECTION [13120] OMNIFLEX 300 MODULAR WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,

More information

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 CONTENTS A. PURPOSE B. DESIGNATED RESPONSIBILITIES C. DEFINITIONS D. PROJECT SUBMITTAL PROCEDURE E. REQUIREMENTS

More information

ADMINISTRATION CHAPTER 1

ADMINISTRATION CHAPTER 1 CHAPTER 1 ADMINISTRATION PART 1 SCOPE AND APPLICATION SECTION 101 SCOPE AND GENERAL REQUIREMENTS 101.1 Title. This code shall be known as the Florida Building Code, Energy Conservation, and shall be cited

More information

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies MasterFormat LEVEL TWO NUMBERS AND TITLES Introductory Information 00001 Project Title Page 00005 Certifications Page 00007 Seals Page 00010 Table of Contents 00015 List of Drawings 00020 List of Schedules

More information

For Receipt Prior To 3:00 PM Local Time Wednesday, March 29, 2017 And Will Be Publicly Opened And Read At 3:30 PM.

For Receipt Prior To 3:00 PM Local Time Wednesday, March 29, 2017 And Will Be Publicly Opened And Read At 3:30 PM. Section BF Bid Form For Receipt Prior To 3:00 PM Local Time Wednesday, March 29, 2017 And Will Be Publicly Opened And Read At 3:30 PM. Bid Proposals will be received at the office of the Owner. Identified

More information

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Franklin County Septic & Zoning permit application: A septic and zoning permit is required for residential or commercial

More information

INVITATION TO BID CITY OF HOPKINSVILLE

INVITATION TO BID CITY OF HOPKINSVILLE INVITATION TO BID CITY OF HOPKINSVILLE Office of the Procurement Specialist 715 South Virginia Street P. O. Box 707 Hopkinsville, Kentucky 42241-0707 TITLE: DESIGN BUILD BUIDLING FOR THE CITY OF HOPKINSVILLE,

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-02 42 91 (May 2010) ------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS SECTION TABLE

More information

MATERIAL ALLOWANCES AND UNIT PRICES

MATERIAL ALLOWANCES AND UNIT PRICES PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION 012200 MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to

More information

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower DOCUMENT 001153 - REQUEST FOR QUALIFICATIONS 1.1 PURPOSE, LAWS, AND REGULATIONS A. The purpose of the Prequalification Procedure described in this Document is to provide Owner with a mechanism to evaluate

More information

Finance & Technology Administrator (815) ext 223

Finance & Technology Administrator (815) ext 223 2017 PAVING IMPROVEMENTS BID PACKET Due: Location: April 26, 2017 by 10:00 am Oregon Park District Fairgrounds Park 607 Fair Park Drive Oregon, IL 61061 Bid Proposal: 2017 Paving Improvements Administrative

More information

CONSTRUCTION MANAGEMENT

CONSTRUCTION MANAGEMENT CONSTRUCTION MANAGEMENT AND MANAGER that offers comprehensive management throughout the project, from concept to completion, yielding the greatest possible benefit to the owner. IPS will offer uncolored

More information

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how? SECTION 08360 SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Glazed Aluminum

More information

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) Construction Criteria The unit costs for the Physical Fitness Center (Exercise Room) space type are based on the construction quality and design features in

More information

PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL Acoustic Ceiling Tiles

PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL Acoustic Ceiling Tiles PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL FOR 2015 Acoustic Ceiling Tiles Southeast Elementary REQUEST FOR PROPOSAL February 23, 2015 Contractor: The Park Hill School District is soliciting bids for

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

Building Inspection Report

Building Inspection Report Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941

More information

3. Has a hazardous materials survey been completed for the project to identify any potential contaminates? Answer: Yes.

3. Has a hazardous materials survey been completed for the project to identify any potential contaminates? Answer: Yes. 1. Page A401 details 3, 4, 5 show storefront sections, but no storefront specification exists. Can this be provided? Answer: This frame these sections apply to is to be changed to hollow metal. Delete

More information

How to estimate the cost of new air conditioning system to an existing storage warehouse.

How to estimate the cost of new air conditioning system to an existing storage warehouse. How to estimate the cost of new air conditioning system to an existing storage warehouse. 1 How to estimate the cost of new air conditioning system to an existing storage warehouse. Table of Contents Section

More information

The Inspection Process. Waxhaw N.C.

The Inspection Process. Waxhaw N.C. The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"

More information

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS 1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new

More information

REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET

REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET This project is being readvertised due to the small number of prequalification packages received in response to the county's

More information

LEVEL I PREQUALIFICATION DOCUMENTS

LEVEL I PREQUALIFICATION DOCUMENTS Project No. LEVEL I PREQUALIFICATION DOCUMENTS for MUIR BIOLOGY BUILDING 3RD FLOOR RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La Jolla,

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Bid: Seventy-First High School Gym Floor Refinishing

Bid: Seventy-First High School Gym Floor Refinishing REQUEST FOR QUOTATION CUMBERLAND COUNTY SCHOOLS PLANT OPERATIONS FACILITY 810 GILLESPIE STREET FAYETTEVILLE, NC 28306 May 31, 2013 Kathy Miller, Director Operations (910) 678-2645 fax - (910) 678-2642

More information

Town of New Gloucester INVITATION TO BID Timber For Sale by Bid. Project Details

Town of New Gloucester INVITATION TO BID Timber For Sale by Bid. Project Details Town of New Gloucester INVITATION TO BID Timber For Sale by Bid To: Stumpage Buyers From: Town of New Gloucester The Town of New Gloucester is requesting bids for timber to be harvested using whole tree

More information

FACILITIES MAINTENANCE WORKER

FACILITIES MAINTENANCE WORKER FACILITIES MAINTENANCE WORKER Summary Statement: Under supervision, is responsible for performing routine building maintenance tasks and assisting Building Maintenance Supervisor with the performance of

More information

Building Construction Occupations

Building Construction Occupations Job Ready Assessment Blueprint Building Construction Occupations Test Code: 2011 / Version 01 Measuring What Matters Specific Competencies and Skills Tested in this Assessment: Safety and General Knowledge

More information

JEFFERSON PARISH SHERIF S OFFICE

JEFFERSON PARISH SHERIF S OFFICE ADDENDUM NO. 1 TO THE BID DOCUMENTS FOR: NEW JEFFERSON PARISH SHERIFF S OFFICE 1 ST DISTRICT STATION 3620 HESSMERAVENUE METAIRIE, LOUISIANA 70002 JEFFERSON PARISH SHERIF S OFFICE Jefferson Parish Bid No.:

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ 08014 856-467-3626--- FAX 856-467-9260 Application for Certificate of Occupancy for Change of Occupancy Pursuant to Chapter 119 of the Township

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com Edouard Modern Living Made Easy uichomes.com - new construction - 3 stories + full basement - 4 bedrooms - 2.5 baths - 2,380 s.f. call 314.881.2333 or e-mail sales@uicstl.com PLAN NTS DECK 13' 0" X 12'-0"

More information

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board. 1.2 RELATED WORK A. Installation of steel framing members for walls, partitions,

More information

Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017

Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017 Exterior Alterations and New Office/ Warehouse for All Weather Shelters Northwest Business Park, Building 5, Bay 3 13459-149 Street Edmonton, AB Issued for Tender: Site Visit: Available upon request. Closing

More information

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS SECTION 13096 MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 MODULAR GALVANIZED RF SHIELDING SYSTEM PART

More information

TILE TILE

TILE TILE 09300 - TILE 09300-1 PART ONE: GENERAL 1.1 Description TILE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the requirements

More information

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. FEMA 50% RULE - SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT/DAMAGE Z101-0410 NOTICE TO PROPERTY OWNERS Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information

More information

CITY OF CHINO HILLS. Request for Proposals (RFP) for. On-call Electrical Repair Service. On-call Electrical Repair including Water and Wastewater

CITY OF CHINO HILLS. Request for Proposals (RFP) for. On-call Electrical Repair Service. On-call Electrical Repair including Water and Wastewater CITY OF CHINO HILLS Request for Proposals (RFP) for On-call Electrical Repair Service March 30, 2016 Department: Project Name: Public Works On-call Electrical Repair including Water and Wastewater Proposal

More information

Kelly Village Apartments 3118 Green Houston, Texas 77020

Kelly Village Apartments 3118 Green Houston, Texas 77020 Kelly Village Apartments 3118 Green Houston, Texas 77020 Houston Housing Authority J. Allen Management Managing Agent Scope for Kelly Village Unit #1125 Overall Scope: Demolition, Renovation, and Restoration

More information

Basement Renovation Guide For Residential Dwellings

Basement Renovation Guide For Residential Dwellings 1 Development Services Department Building Permit & Inspection Services Basement Renovation Guide For Residential Dwellings This document is a guide for home owners and does not cover all possible conditions.

More information

REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA Northwest Trek Core Area Fence Upgrade SWR BID NO. T Request for Bids

REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA Northwest Trek Core Area Fence Upgrade SWR BID NO. T Request for Bids REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA Northwest Trek Core Area Fence Upgrade SWR BID NO. T-2016-0210-05410910 Request for Bids The Metropolitan Park District of Tacoma will receive sealed

More information

BID SPECIFICATIONS FOR CLEANING & MAINTENANCE SERVICES FOR CITY OF ZION

BID SPECIFICATIONS FOR CLEANING & MAINTENANCE SERVICES FOR CITY OF ZION BID SPECIFICATIONS FOR CLEANING & MAINTENANCE SERVICES FOR CITY OF ZION The City of Zion is requesting bids for cleaning and maintenance services to be performed at: Zion City Hall, 2828 Sheridan Road,

More information

Page 3 of 12. Inspected Describe. Explained. Health & Safety. Maj. Def. Examiner Notes STRUCTURE N/A. Financial Impact. Impact.

Page 3 of 12. Inspected Describe. Explained. Health & Safety. Maj. Def. Examiner Notes STRUCTURE N/A. Financial Impact. Impact. STRUCTURE Foundations * Floor structure * Wall structure * Ceiling structure * Roof structure * Deficiencies in structure * Access Method d Under floor crawlspace/attic * Page 3 of 12 EXTERIOR Exterior

More information

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department Peralta Community College District 501 5 th Avenue Oakland, California 94606 Phone (510) 466-7225 Fax (510) 587-7873 Purchasing Department Date: March 30, 2011 ADDENDUM No. 3 BID NO.: 10-11/27 PCCD Smart

More information

WOOD FLOORING WOOD FLOORING

WOOD FLOORING WOOD FLOORING 09550 - WOOD FLOORING 09550-1 PART ONE: GENERAL 1.1 Description WOOD FLOORING 1.1.1 Work in this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance

More information

REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA Project: Multiple Park Demolition Project Bid#P

REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA Project: Multiple Park Demolition Project Bid#P August 20, 2014 Re: P2014-04 Multiple Park Demolition To Small Works Roster: Demolition Contractors REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA Project: Multiple Park Demolition Project Bid#P2014-04

More information

CONTRACTOR S PREQUALIFICATION FORM

CONTRACTOR S PREQUALIFICATION FORM Toronto Catholic District School Board Materials Management Department 80 Sheppard Avenue East, Toronto, ON M2N 6E8 Phone: 416/222-8282 Fax: 416/512-3440 www.tcdsb.org CONTRACTOR S PREQUALIFICATION FORM

More information

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards Laboratory Standards These criteria include general planning guidelines. They are intended for use of Designers during the design phases of the project. Planning Assumptions Overview In order to maximize

More information

SECTION ALUMINUM WINDOWS

SECTION ALUMINUM WINDOWS SECTION 08520 ALUMINUM WINDOWS PART 1 - GENERAL 1.01 SUMMARY A. Section includes: 1. Storefront systems and aluminum framed glass doors. 2. Hardware, fasteners, accessories, filler pieces, etc., required

More information

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE: HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT POST OFFICE BOX 2340 * 640 SOUTH MAIN STREET * LABELLE, FLORIDA 33975 * (863) 675-5245 * FAX: (863) 674-4194 1100 OLYMPIA ST CLEWISTON, FLORIDA 33440

More information

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com

More information

REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St.

REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St. 531 N. Nash Street Hortonville, WI 54944-0099 Phone: 920-779-6011 Fax: 920-779-6552 www.hortonvillewi.org REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St. Date Issued: February 5, 2016 Date Due: March

More information

Bureau Policy for Tent Permit

Bureau Policy for Tent Permit Bureau Policy for Tent Permit Introduction: Occasionally we receive applications for erecting temporary or permanent tents at schools or commercial establishments. This policy is generated to give a general

More information

WILL COUNTY LAND USE DEPARTMENT 2018 CONTRACTOR REGISTRATION

WILL COUNTY LAND USE DEPARTMENT 2018 CONTRACTOR REGISTRATION 2018 CONTRACTOR REGISTRATION 58 E. Clinton St., Suite 100 Joliet, Illinois 60432 Telephone (815) 727-8634 Facsimile (815) 727-8638 Internet Site - http://www.willcountyillinois.com/county-offices/economic-development/land-use

More information

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003 University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003 May 16, 2016 Addendum #1 Contract Number: UMA16-25 Project Number: 1000730 Speedtype: 157194 Title:

More information

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS Project Name: Address: Owner: Phone/Fax/Email: Architect / General Contractor Name: : BID DEADLINE DATE: SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME:

More information

PURCHASING DEPARTMENT

PURCHASING DEPARTMENT PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at http://www.norwalkct.org Adobe Acrobat reader is required to view this document. If you do

More information

LECKIE ELEMENTARY SCHOOL

LECKIE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Project Manual For. Lincoln, Alabama. March 11, Owner: McDowell & Associates 128 Heath Road Carrollton, Ga Phone:

Project Manual For. Lincoln, Alabama. March 11, Owner: McDowell & Associates 128 Heath Road Carrollton, Ga Phone: Project Manual For PIER POINT Apartments Lincoln, Alabama Owner: McDowell & Associates 128 Heath Road Carrollton, Ga 30116 Phone: 770.834.3341 Architect of Record: Alan Bell Architect, Inc 211 Gordon Street

More information

Mechanical (HVAC)* * MasterFormat Specifications Division 23

Mechanical (HVAC)* * MasterFormat Specifications Division 23 40 Mechanical (HVAC)* The mechanical subcontractor (more commonly referred to as the heating, ventilation, and air conditioning, or HVAC, subcontractor) will furnish and install all equipment, ductwork,

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 3: Roofs 1 & 3 DATE: December 29, 2017 1235 Mission

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information