1 Analysis and design of balanced cantilever prestressed box girder bridge considering constructions stages and creep redistribution 1. Introduction Assoc. Prof. Dr. Amorn Pimanmas Sirindhorn International Institute of Technology Thammasat University The cantilevering construction method is recommended for medium to long span bridges (span length from 60 to 150 m) The major advantage of this method is the elimination of scaffolding which is difficult or impossible to erect, such as over deep valleys or wide rivers. In this method, the bridge is built by a succession of segments symmetrically cantilevering in both directions from the pier. The segments may be cast-in place by means of formwork traveler or prefabricated and lifted to place with appropriate lifting device. The previous segment carries the load of the next segment. Each segment is connected to the previous ones by means of prestressing cables at the top fiber. In this method, the structure will be cantilever for a short term during construction and becomes continuous in the long term. As a result, the analysis and design of the structure must follow the construction stages. Dead load of the bridge girder shall be carried by the cantilevering structure during construction while the superimposed dead load as well as traffic shall be carried in the continuous state after the completion of the bridge. Moreover, the redistribution of dead load moments due to creep must be considered since it can significantly affect the moment pattern. The effect of creep is also significant during construction especially for long bridge where the construction may take years to finish. The deflection due to creep is not negligible and must be accurately predicted for preparing the camber of the bridge. In this report, the authors are mainly concerned with the structural analysis and design of balanced cantilever bridge considering construction stages and effect of creep redistribution.. Description of bridge, construction procedures and design criteria.1 General layout of the bridge The example bridge to be design is assumed to cross a rather wide river as shown in Fig. 1. It shall consist of six traffic lanes. The superstructure consists of two parallel box girders. Each box girder has its own supporting pier. The cross section of the box girder is shown in Fig.. The entire top slab width of each box is 10.8 m. The width of the bottom slab is 5.5 m. The height is 4.07 m at the pier head and 3 m at the mid-span. Since the river must serve the navigational purpose, no scaffolding is allowed. The balanced cantilevering method is therefore adopted for construction. The final bridge structure consists of four continuous spans, two side spans and two main spans as shown in Fig. 1. The side spans are 1

2 47.0 m long and the main spans are 73.0 m long. The bridge is supported on bearings on pier and 4 and cast integrally with pier 3. Since the bridge cannot be constructed in the complete form from the beginning due to its large scale and no scaffolding is allowed in the river due to navigational purpose. The pattern of internal actions such as moment and shear forces cannot be obtained from the analysis of the complete structures. The design actions must be associated with the construction procedures and proper consideration of creep effect must be taken into account. The superstructure shall be analyzed and designed in both longitudinal and transverse directions. Both prestressing and ordinary deformed bars shall be used in both directions.. Construction method The construction method of this bridge is shown in Fig. 3. The pier head will be cast on scaffolding first over pier axes 1, and 3. Then, the bridge shall be constructed in balanced cantilevering from pier 1, and 3 as shown in Fig. 3a. Pier axis consists of 17 cast-in place segments on each side of the pier. Pier axes 1 and 3 consist of 9 cast in place segments on each side of the pier. On the two sides of the river banks, the 0 m abutment span is cast on temporary scaffolding, which is remained until the side and main cantilevers are connected. During construction, piers 1 and 3 must be fixed to the superstructure otherwise unbalanced moment will lead to the instability. This temporary fixity can be achieved by means of vertical prestressing and must be indicated on the drawings for construction. During construction, the structure is in the cantilevering state with the bending moment pattern as shown in Fig. 3a. It is seen that this bending moment mainly results from the dead load of the superstructure and formwork traveler. The moment is thus negative throughout the span and highest over the pier and zero at the tip of the cantilever. After the construction of balanced cantilever is completed, the side and main cantilevers are connected to each other by 1.5 m closure pour. The moment due to formwork traveler supported on the side spans is shown in Fig. 3b. The dead weight of the fresh closure pour also generates moment in the side and main cantilevers as shown in Fig. 3c. At this state, the form traveler is supported on cantilevers on both sides in order to assure the same tip deflection of the joining cantilevers. As a result, each cantilever is assumed to take half of the weight of fresh pour. After the side and main cantilevers are connected, the form travelers are removed from the bridge. At this state, the closure pour becomes hardened. So the moment pattern due to the removal of formwork traveler is shown in Fig. 3d. Then the bridge is connected to the 0.0 m abutment span via a closure pour of 1.5 m length. After the closure pour hardens, bottom tendons are prestressed. At this stage, the 0 m abut span is still supported on the temporary scaffolding. The secondary moment due to prestressing is shown in Fig. 3e. It should be noted that during cantilevering construction, there is no secondary moment due to top tendons since the cantilever is statically determinate system. After bottom prestressing, the temporary scaffolding is removed. The structure is in the complete continuous form. The weight of 0 m abutment span and closure pour is then transferred to the continuous structure. The moment pattern generated at this stage is shown in Fig. 3f. Any load

3 applied after this, for example the superimposed dead load including asphalt pavement and barrier, traffic loads and other live loads shall be applied to the continuous structure. Just after the completion of structure, the effect of dead load cantilever moment is locked in the structure. In the long time, this moment will be redistributed due to the time-dependent creep effect. As a result, the negative moment at the pier is usually reduced and the positive moment at the mid-span increased. The creep effect on this moment redistribution shall be considered in the design too. It should be also noted that the segments are assumed to be simultaneously cast on each side of the pier. If the alternate casting is implemented, the pier must be checked for unbalanced moment. The design of the bridge will follow the AASHTO 1996 and ACI for load specification and member design. Since the redistribution of moment due to creep effect shall be considered in the analysis, the Norwegian Concrete Structure Design rules (NS3473E) which provides the creep factor as the function of time is adopted. Note that the creep equation specified in Norwegian code gives the same result as CEB-FIP code..3 Computer model The computer model of the full bridge is shown in Fig. 4a. The computer model for the main cantilever (pier ) and side cantilevers (piers 1 and 3) is shown in Fig. 4b. The bridge superstructure (box girder) and the pier are modeled by -node one-dimensional frame element. Each segment of the cantilever is modeled by a frame element. The whole structure consists of 104 frame elements. The properties of the frame are defined with respect to the local axis as shown in the Fig. 4. Since the cross-section varies along the element length, the average cross sectional area and the moment of inertia are calculated at the middle section of the element. The calculation of cross sectional area (A) and moment of inertia I N and I L is based on the entire cross section while the calculation of moment of inertia I M is based on the torsional section as shown in Fig. 5. It should be noted that in the final structure, the pier is to be fixedly connected to the superstructure so it is modeled using frame element to obtain the relative stiffness between pier and superstructure. On the contrary, the superstructure will be supported on bearings on piers 1 and 3, hence no moment is transferred to the pier, consequently, hinge supports are used to model the piers. The uncracked stiffness is used for superstructure since pre-stressing effect results in almost uncracked state. But half of the uncracked stiffness is used for the pier to represent the cracked condition..4 Loads The loads to be considered include 1. Dead weight of the bridge. The unit weight of concrete used is 5.5 kn/m 3. The internal action due to dead weight shall be computed following the construction stages mentioned before. 3

4 . Superimposed dead load. The superimposed dead load includes asphalt pavement with the unit weight of 4 kn/m 3 and barrier. This load is applied to the complete structure. 3. Traffic load. The traffic load is to represent the weight of moving trucks with impact. In AASHTO 1996, this load consists of the American truck (HS0-44) load and the lane load as shown in Fig. 6a and 6b, respectively. Normally, for span less than 30 m, truck load shall be the governing case. But for longer span, the lane load shall govern the design. In case of the example bridge, the length of main and side spans is 73 and 47 m, respectively. Consequently, only the lane load shall be considered in the design. The AASHTO lane load is supposed to represent a line of trucks. As shown in Fig. 6b, it consists of uniform load (w) of 9.53 kn/m, a concentrated load (P M ) 8.0 kn for moment calculation and a concentrated load (P V ) of kn for shear calculation. These loads are assumed to occupy a 3.05 m width or one traffic lane. These loads shall be multiplied by number of lanes, which is 3 for each box girder in case of the problem concerned. A reduction factor of 0.9 can be used if the number of lanes is greater than or equal to three. The traffic load shall be increased due to the impact of moving vehicles. The impact factor is, according to AASHTO, computed as, I = 15.4/(L + 38) where L is the span length. For the main span, L = 73 m, the impact factor is calculated to be 0.14 and for the side span, L = 47 m, the impact factor is The traffic load shall be applied to the complete structure. The load must be placed on the span to obtain the maximum effect of moments at mid-span and over support and shear as shown in Fig. 7 and Fig. 8. As for torsion, since the bridge is straight, the torsion shall mainly result if the traffic load is placed eccentric to the box centerline as shown in Fig. 9. In this case, the torsion is maximum when the lane loads occupy two lanes as shown. The effect of the above loads shall be combined according to the load factors specified by the codes. It is noted that other loads such as wind loads, longitudinal forces, overturning forces, centrifugal forces and so on are not relevant in the design of superstructure. Hence, they are omitted in the analysis of superstructure..5 Materials The specified compressive strength of concrete at 8 days is 35 MPa. The strength at transfer of prestress is 30 MPa. The ordinary deformed reinforcement has the nominal yield strength of 400 MPa. A prestressing steel is low relaxation seven wire strand grade 70 ASTM. Each longitudinal tendon consists of 1 strands. Each transverse tendon consists of 3 strands. Each strand has the diameter of 15. mm with the area of 140 mm. The ultimate strength of prestressing steel is 1860 MPa. The ultimate force of each tendon is therefore 3.1 MN for longitudinal tendon and 0.78 MN for transverse tendon. The initial jacking stress is 70% of the ultimate strength..6 Prestressing Layout 4

5 From the preliminary design together with practical experience, the layout of longitudinal prestressing is obtained as shown in Fig. 10. Any tendon longer than 30 m is to be stressed from both sides. For shorter tendons, the prestresssing can be done from one side only. In this case, the prestressing should be alternated on each side of the pier. The top prestressing consists of 38 tendons over the pier and 0 tendon each over piers 1 and 3. The bottom prestressing consists of 16 tendons each in span 1- and -3 and 1 tendons each in span 0-1 and 3-4. The transverse pre-stressing is shown in Fig. 11. The tendons are spaced at 0.5 mm apart. 3. Effect of creep on long term moment redistribution As mentioned, the creep will redistribute the dead load moment from that at just the bridge completion to the long-term state. As a result, the long-term design moment is usually between the values at the bridge completion and the long-term state. In the simple calculation, the dead load moment to be designed can be estimated using the simple formula as, M = 0. M D M Where M D is the dead load moment considering the stages of construction at the time of bridge completion and M is the dead load moment if the dead load is assumed to apply on the final continuous structure. The above equation approximately takes into account the effect of creep. A better equation can be obtained considering that the creep depends on several factors such as relative humidity (RH), concrete composition (water/cement ratio), cross-sectional geometry and time duration, age of concrete when first loaded. The better form of equation 1 can be written as, M = e -φ M D + (1-e -φ ) M 3 A creep factor φ(t, t 0 ) shown in the above equation is defined as, ε CR = (σ c /E c ) φ(t, t 0 ) 4 where σ c is the total concrete stress, E c is the elastic modulus of concrete and φ(t, t 0 ) is the creep factor. The variables t and t 0 are time and time when concrete is first loaded, respectively. In the design of this bridge, the creep factor provided in Norwegian code NS3473E is used. It is noted the Norwegian code gives the same results as the CEB-FIP 1990 model code. Based on Norwegian code, the creep factor can be calculated from the following formulas, φ(t, t 0 ) = φ 0 β 1 β β c (t-t 0 ) 5 Where φ 0 = 1 + (1-RH/100) / (0.08 h 0 ) 1/3 6 β 1 = 8.3 / (3 + f 0.5 c ) 7 β =.4 / (0.1 + t ) 8 β c (t-t 0 ) = {(t-t 0 )/( β h + t t 0 )} β h = 1.5 { (RH/50) 18 } h

6 Where t is the age of concrete in days, t 0 is the age of concrete at loading, RH is the relative humidity measured in percent, h 0 is the effective cross-sectional depth measured in mm and defined as, h 0 = A c / U 11 The creep factor during the time t 1 to t can be computed as, Δφ(t, t 1 ) = φ 0 β 1 β Δβ c (t -t 1 ) 1 Where Δβ c (t -t 1 ) = {(t -t 0 )/( β h + t t 0 )} {(t 1 -t 0 )/( β h + t 1 t 0 )} Where A c is the area of concrete cross section and U is the length of the perimeter exposed to evaporation (in case of a box section, half of the internal perimeters should be included). The above equations may be applicable to plain concrete. For reinforced section, the reinforcing bars may restrain the creep deformation, hence a factor 0.8 is applied to the calculated creep factor. In the calculation of long term creep factor, a period of ten years (3650 days) is considered sufficient. It is noted that only the partial creep factor relevant to the calculation of moment redistribution is the creep factor in the period of concrete age at time of connection to long term (10 years). Since each segment is cast at different times and each segment also has variable cross section, the partial creep factor will not be the same. The segment cast before will have smaller partial creep factor than that cast after. Table 1 shows partial creep factors used in the analysis. In the table, t 0 is the age of concrete at the time of prestressing. It is assumed to be days. Segment 17 is the first segment casted nearest to the pier. Segment 0 is the closure segment linking with the side cantilever. Table 1 Partial creep factors used for calculation of moment redistribution due to creep effect. Casted t 0 t 1 t h 0 Δφ(t, t 1 ) segment days days days (mm)

7 4. Longitudinal analysis and design of bridge super-structure The longitudinal analysis and design of bridge superstructure consists of three parts, namely, 1. the service limit state,. flexural strength (ultimate limit state) and 3. shear and torsion. 4.1 Service limit state This check is to assure that during service the stresses occurring in the superstructure must be within allowable limits, which according to AASHTO 1996, are set as follows, (a) At construction stage (transfer of prestressing) f ac = 0.55 f ci 14 f at = 0.65 (f ci ) (b) At service working stage f ac = 0.6 (f c ) f at = 0.5 (f c ) Where f ac is the allowable compressive strength, f at is the allowable tensile strength, f ci is strength of concrete at transfer and f c is the strength of concrete at 8 days. The short term prestress loss consists of elastic shortening, anchorage wedge draw-in and friction loss. The long-term prestress loss consists of the above-mentioned short-term loss plus creep, shrinkage and relaxation loss. Based on the calculation, it is found that the short-term loss is less than 10% and the long-term loss is less than 0%. Hence, the stress in prestressing tendon is assumed to be 90% and 80% of initial jacking stress for short and long-term, respectively. The check of allowable stresses must be done for both construction stages and working stages. At construction stages, the moment is mainly negative due to the dead weight of the bridge and the formwork traveler. It can be computed as follows, M SC = M G1 + M BB 18 Where M SC is the moment at the service construction stage, M G1 is the moment due to dead weight and M BB is the moment due to formwork traveler (bridge builder) weighing 60 kn. As for the working stage, two conditions are considered, the bridge opening stage and the long-term stage. The bridge opening state is defined as the state just after the bridge is connected to each other by means of bottom prestressing. At this stage, the creep redistribution has not yet taken place. The moment can be obtained as follows, M SO = M G1 + ΔM PS + M G + M L 19 7

8 Where M SO is the moment at the service opening stage, ΔM PS is the secondary moment due to bottom prestressing, M G is moment due to superimposed dead load and M L is the moment due to traffic load. It is noted that there is no secondary moment associated with top tendons as top prestressings are applied when the structure is in the statical system, i.e. cantilevering state. In the service long-term stage, the creep redistribution has taken place and the moment due to this must be considered. The moment in the service long-term stage can be computed as, M SL = M G1 + ΔM G1 + ΔM PS + M G + M L + M DS 0 Where M SL is the moment at the service long-term state, ΔM G1 is the moment redistribution due to creep and M DS is the moment due to differential settlement of the adjacent piers. It is noted that AASHTO does not particularly specify the moment due to differential settlement, however, the differential settlement of 50 mm is considered in this design since the bridge is rather big and important. As a result of creep, the elastic modulus of concrete is decreased as a function of time. In order to calculate the moment due to differential settlement, the elastic modulus of concrete is reduced for both superstructure and pier by the following formula, E = E c /(1+φ) 1 Where φ is the long-term creep factor. As mentioned, the calculation of M G1 must follow the construction stages. Hence, it can be computed as follows, M G1 = M GC + M BB + M WC + M BBR + M SCF Where M GC is the moment during cantilevering construction (Fig. 3a), M BB is the moment due to formwork traveler in the cantilever state (for concreting closure) (Fig. 3b), M WC is the moment due to the weight of wet concrete closure (Fig. 3c), M BBR is the moment due to the removal of formwork traveler after closure hardens (Fig. 3d), M SCF is the moment due to 0 m concrete portion cast on temporary scaffolding (Fig. 3f) The dead load moment at various construction stages is shown in Fig. 1. It is noticed that the moment due to creep redistribution is negative all over the span. In effect, this will increase the negative moment at pier and reduce positive moment at midspan. Generally, the effect of creep should result in the decrease in the negative moment over the pier and increase in the positive moment in the span. The opposite tendency may occur in this case if the section is overly prestressed as in this example. It is noted that if the effect of creep redistribution is computed by using simplified equations, equations, 3, for example, the opposite creep effect cannot be obtained. So in order to obtain realistic results, the creep factor of each segment must be considered. 8

9 The calculation of flexural stresses at the top and bottom fiber of the cross section can be computed as follows (Fig. 13). f top = P/A c + P e c t / I M c t /I 3 f bot = P/A c - P e c b / I + M c b /I 4 Where e is eccentricity of prestressing tendon, I is the gross moment of inertia. Fig. 14 and Fig. 15 show fiber stresses of the main cantilever sections and side cantilever sections, respectively, during construction. Fig. 16 and Fig. 17 show fiber stresses of the main cantilever sections under minimum negative moment and maximum positive moment, respectively, in the working stage. Fig. 18 and Fig. 19 show fiber stresses of side cantilever sections under minimum negative moment and maximum positive moment, respectively, in the working stage. It is found that the fiber stresses during both construction period and working state are mainly compressive and little tensile stress occur on the cross section. This indicates large prestressing force on the cross section. 4. Flexural strength (Ultimate limit state) The design for flexural strength follows the AASHTO 1996 code. The flexural strength of the cross section is assumed to reach when the compressive strain of concrete reaches The design moment has to be combined using the AASHTO load factors as follows, (a) At opening state M U = 1.3 {(M G1 + M G ) M L } + ΔM PS 5 (b) At long term state M U = 1.3 {(M G1 + ΔM G1 + M G + ΔM DS ) M L } + ΔM PS 6 The stress in pre-stressing steel for calculating the moment capacity can be calculated as, f * su = f su {1-(γ * /β 1 )[(ρ * f s /f c ) + (d t /d)(ρf sy /f c )]} 7 The moment capacity can be governed by concrete crushing or yielding of prestressing bars. The AASHTO code gives separate design moment capacity formulas for both cases. Fig. 0 and Fig. 1 show design moment and moment capacity of the main and side cantilever sections, respectively. 4.3 Shear and torsion The design for shear and torsion follows the AASHTO 1996 code. The design shear has to be combined using the AASHTO load factors as follows, (a) At opening state V U = 1.3 {(V G1 + V G ) V L } + ΔV PS 8 (b) At long-term state V U = 1.3 {(V G1 + ΔV G1 + V G + ΔV DS ) V L } + ΔV PS 9 9

10 The shear capacity of the superstructure is taken by the web and the compression force in bottom slab as follows (see Fig. ), V U = C U (dz/dx) + z (dc U /dx) 30 Where C U (dz/dx) is the shear taken by bottom slab and z (dc U /dx) is shear taken by webs. For side cantilevers (axes and 4) and the 0 m abutment span cast on temporary scaffolding, the bottom slab has horizontal profile, hence the entire shear force is carried by the webs. According to AASHTO 1996, the shear strength provided by concrete V c is taken as the lesser of the values V ci or V cw. The former is associated with flexural-shear crack and the latter with webshear crack. The shear strength V ci is computed by, V ci = f c 0.5 b d + V d + V i M cr / M max 31 Where V d is the unfactored shear force due to dead load, V i and M max are factored shear and moment due to externally applied load, M cr is the moment causing flexural crack. The shear strength V ci need not be less than 0.14 fc 0.5 b d. The effective depth d need not be taken less than 0.8h, where h is the entire height of the section. The shear strength V cw is computed by V cw = (0.9 f c f pc )b d + V p 3 Where V p is the vertical component of effective prestress force at the section and f pc is the effective prestress at centroid of the cross-section. As for torsion design, the ACI is adopted. According to ACI318-99, the torsion reinforcements are not required if the ultimate design torque is less than cracking torque (T U < φt cr /4). The value of φt cr /4 is given by the following, φt cr /4 = 0.85 [0.083 f c 0.5 (A cp/p cp ) (1 + 3f pc /f c 0.5 ) Where A cp and p cp are defined as shown in Fig. 3. For this bridge, the maximum design torsion is less than φt cr /4, so the consideration of torsion is not needed. The longitudinal shear at the interface between web and deck slab must be designed as shown in Fig. 4. The shear flow (dt/dx) can be computed based on equilibrium as follows (dt/dx) = V/z 34 Reinforcements are needed at the junction between web and deck slab. The shear-friction concept is used to calculate the reinforcements. A s = (dt/dx) / (μφf y ) 35 10

11 The coefficient of friction (μ) can be taken as 1.4 if the entire box is cast at the same time, and 1.0 if top slab is cast separately from the webs. The longitudinal shear transfer between web and bottom slab must also be considered as shown in Fig. 5. From the figure, we have V a = (C UA C UB )/ 36 Where C U = 0.85 f c (b-t w )x ; if x < t = 0.85 f c (b-t w )t ; if x t Where x is the depth of compression zone. The reinforcement can be designed using the shearfriction concept as above. Fig. 6 and Fig. 7 show design shear and shear capacity of the main and side cantilever sections, respectively. 5. Transverse analysis and design The transverse analysis and design consists of 1. cantilever deck slab,. deck slab between webs and 3. design of bottom slabs as shown in Fig. 8. In the design of cantilever deck slab and deck slab between webs, the load consists of dead load, superimposed dead load and traffic. As for traffic, the load of truck wheel plus impact is applied on the slab. The placement of traffic wheels to obtain maximum effect is done using influence surface of elastic plates as shown in Figs In these figures, the cross sign is the location of truck wheel. For cantilever transverse slab, the unfactored negative moment (moment at sections A and B in Fig. 8) due to HS0-44 can be computed as (Fig. 9), M = 1/(8π) (7) ( ) = 54.7 knm/m 38 For deck slab between webs, partially restrained condition is considered. For hinged condition, the positive moment at mid span (section C in Fig. 8) is obtained as (Fig. 30) M H = 1/(8π) (7) ( / / /4 ) = 35.0 knm/m For fixed condition, the positive moment at mid span (section C in Fig. 8) is obtained as (Fig. 31) M H = 1/(8π) (7) ( /4 ) = 17.6 knm/m The average positive moment between fixed and hinge conditions is used to design positive reinforcement for section C

12 6. References 1. Standard Specifications for Highway Bridges (AASHTO 1996). CEB-FIP model code Norwegian Standard, Concrete structures Design rules NS3473E 4. J. Mathivat, The cantilever construction of prestressed concrete bridges, A Wiley-Interscience Publication, ACI COMMITTEE 318, Building Code Requirements for Structural Concrete and Commentary (1999), American Concrete Institute, Farmington Hills, Michigan 6. A. Pucher, Influence surface of elastic plates, Springer-Verlag W. Podlny and J.M. Muller, Construction and design of prestressed concrete segmental bridges, John Wiley and Sons, 198 1

13 CL EXP JOINT CL EXP JOINT CL MSL CL CL CL 400 R50 Fig. 1. Bridge profile and layout % % R Fig. Cross section of box girder superstructure

14 1 3 (a) Balanced cantilevering construction 1 3 (b) Form traveler on side cantilever for casting closure segment 1 3 (c) Dead weight of wet closure segment Fig. 3 Construction stages 14

15 1 3 (d) Removal of bridge builder Temp. Scaffolding (e) Secondary moment due to bottom prestressing (f) After releasing temp. scaffolding, weight of abutment span is supported by continuous structure Fig. 3 Construction stages 15

16 Full bridge computer model Main cantilever computer model 3 1 Side cantilever computer model Fig. 4 computer model M N L 16

17 N For calculating IL and IN L M For calculating IM Fig. 5 Geometrical section used for calculating moment of inertia HS kn 144 kn 144 kn 0.W 0.1W 0.1W 0.8W 4. m m 0.8W 0.4W 0.4W 0.4W 0.4W Fig. 6a Standard AASHTO truck load 17

18 P = 8.0 kn (for moment calculation) = kn (for shear calculation) w = 9.53 kn/m Fig. 6b Standard AASHTO lane load 0.9 m 3.0 m Fig. 9 Torsion is caused by eccentric of lane load on girder 18

19 L 0.4L 0.4L Load cases to obtain maximum positive moment Load cases to obtain maximum negative moment over pier 1, 3 0.4L 0.4L Load cases to obtain maximum negative moment over pier Fig. 7 Load cases to obtain maximum moment (positive span moment and negative support moments) 19

20 Load case to obtain maximum shear at abutment Load case to obtain maximum shear at pier 1 Load case to obtain maximum shear at pier Fig. 8 Load cases to obtain maximum shear 0

21 TOT. 0 TENDONS 4 TOT. 38 TENDONS 4 4 TOT. 0 TENDONS @ @ @500 6@ @000 11@ @ @ CLOSURE CLOSURE CLOSURE CLOSURE POUR POUR POUR POUR PRESTRESSING LAYOUT TOT. 1 TENDONS TOT. 16 TENDONS TOT. 16 TENDONS TOT. 1 TENDONS Fig. 10 Longitudinal prestressing layout 4 1

22 BRIDGE CL TRANSVERSE 0.50 m Fig. 11 Transverse prestressing layout

23 MNm (a) Dead load: cantilever construction (b) Formwork traveler 5. MNm (c) Wet closure Fig. 1 Moment at various construction stages 57.1 MNm 6.8 MNm 3.4 MNm 3

24 MNm -7.7 MNm 4.3 MNm (d) Removal of formwork traveler (e) 0 m abutment span cast on scaffolding 34.5 MNm (f) Bottom prestressing Fig. 1 Moment at various construction stages -.9 MNm 4

25 (g) Superimposed dead load (Asphalt pavement, barrier etc.) (h) Creep redistribution Fig. 1 Moment at various stages MNm 5

26 e CG ct e cb Fig. 13 Calculation of top and bottom fiber stresses of the cross section Symm. Stress (MPa) Pier axis Top fiber stress Bottom fiber stress Allowable compres. strength = MPa Location (m) Fig. 14 Fiber stresses of main cantilever section during construction 6

27 Symm. Pier axis 1, 3 Location (m) Top fiber stress Bottom fiber stress Allowable compres. strength = MPa Stress (MPa) Symm. Fig. 15 Fiber stresses of side cantilever sections during construction Pier axis 13 Location (m) Top fiber stress Bottom fiber stress Allowable compres. strength = MPa Stress (MPa) Fig. 16 Fiber stresses of main cantilever sections under minimum negative moment, working state 7

28 Symm. Pier axis Bottom fiber stress Top fiber stress Location (m) 50 Allowable compres. strength = MPa Stress (MPa) Fig. 17 Fiber stresses of main cantilever sections under maximum positive moment, working state Bottom fiber stress Top fiber stress Allowable compres. strength = MPa -0 Stress (MPa) Pier axis 1, 3 Location (m) Fig. 18 Fiber stresses of side cantilever sections under minimum negative moment, working state 8

29 Pier axis 1, 3 Location (m) Bottom fiber stress Allowable compres. strength = MPa Top fiber stress Stress (MPa) Fig. 19 Fiber stresses of side cantilever sections under maximum positive moment, working state Symm. Pier axis Negative moment Positive moment capacity Positive moment Negative moment capacity Moment (MNm) Location (m) Fig. 0 Moment and moment capacity of main cantilever sections, ultimate state 9

30 00 Pier axis 1, 3 Positive moment capacity Z +dz Positive moment Negative moment Negative moment capacity Moment (MNm) Location (m) Fig. 1 Moment and moment capacity of side cantilever sections, ultimate state T u +dt u M vu +dm vu V u +dv u C u +dc u dx 1 V u C u Fig. Equilibrium of a segment with inclined bottom slab P cp A cp T u M vu Z Fig. 3 Definition of A cp and p cp 30

31 a a dx T+ dt T M M+ dm V+dV Z V C C+ dc a 1 Fig. 4 Longitudinal shear at web/deck slab interface x t t w a a t w b a C UB ΔL V a Fig. 5 Longitudinal shear at web/bottom slab interface V a C UA 31

32 30 Pier axis Vc Moment (MNm) Vtot Vu Vs 50 Location (m) Fig. 6 Shear and shear capacity of main cantilever sections, ultimate state Pier axis 1, 3 Vtot Moment (MNm) Location (m) Vu Fig. 7 Shear and shear capacity of side cantilever sections, ultimate state Vc Vs 3

33 A CANTILEVER PART B 0.5 Fig. 8 Transverse analysis.45 m 33

34 .45 m x 7 kn kn Fig. 9 Moment for cantilever transverse slab y 34

35 4.70 m 7 kn x 7 kn 18 kn 7 kn 7 kn kn kn kn 18 kn Fig. 30 Moment due to traffic wheel on deck slab between web obtained for hinged condition 1. m 1.83 m y 35

36 4.70 m 7 kn 7 kn 7 kn x 7 kn 7 kn kn 18 kn kn 18 kn Fig. 31 Moment due to traffic wheel on deck slab between web obtained for fixed condition 1. m 1.83 m y 36

MIDAS Training Series

MIDAS Training Series MIDAS midas Civil Title: All-In-One Super and Sub Structure Design NAME Edgar De Los Santos / MIDAS IT United States 2016 Substructure Session 1: 3D substructure analysis and design midas Civil Session

More information

A Guide for the Interpretation of Structural Design Options for Residential Concrete Structures

A Guide for the Interpretation of Structural Design Options for Residential Concrete Structures CFA Technical Note: 008-2010 A Guide for the Interpretation of Structural Design Options for Residential Concrete Structures CFA Technical This CFA Technical Note is intended to serve as a guide to assist

More information

Hyperstatic (Secondary) Actions In Prestressing and Their Computation

Hyperstatic (Secondary) Actions In Prestressing and Their Computation 5.5 Hyperstatic (Secondary) Actions In Prestressing and Their Computation Bijan O Aalami 1 SYNOPSIS This Technical Note describes the definition, computation, and the significance of hyperstatic (secondary)

More information

CHAPTER 11: PRESTRESSED CONCRETE

CHAPTER 11: PRESTRESSED CONCRETE CHAPTER 11: PRESTRESSED CONCRETE 11.1 GENERAL (1) This chapter gives general guidelines required for the design of prestressed concrete structures or members with CFRM tendons or CFRM tendons in conjunction

More information

Strength Design of Reinforced Concrete Structures

Strength Design of Reinforced Concrete Structures Chapter 6 Strength Design of Reinforced Concrete Structures 6.1 Analysis and Design General Considerations 6.1.1 Convention and Notation Unless otherwise explicitly stated, the following units shall be

More information

Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE

Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE Design of continuity slabs and the 020 Gajanan Chaudhari Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE Anand Panpate Senior Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE

More information

Two-way slabs. Flat plate with or without drop panels / capitals

Two-way slabs. Flat plate with or without drop panels / capitals Two-way slabs Two-way slab behavior is described by plate bending theory which is a complex extension of beam bending. Codes of practice allow use of simplified methods for analysis and design of two-way

More information

5.4 Analysis for Torsion

5.4 Analysis for Torsion 5.4 Analysis for Torsion This section covers the following topics. Stresses in an Uncracked Beam Crack Pattern Under Pure Torsion Components of Resistance for Pure Torsion Modes of Failure Effect of Prestressing

More information

Sabah Shawkat Cabinet of Structural Engineering 2017

Sabah Shawkat Cabinet of Structural Engineering 2017 3.1-1 Continuous beams Every building, whether it is large or small, must have a structural system capable of carrying all kinds of loads - vertical, horizontal, temperature, etc. In principle, the entire

More information

Stress distributions of PSC box girder bridge due to creep shrinkage effect

Stress distributions of PSC box girder bridge due to creep shrinkage effect Stress distributions of PSC box girder bridge due to creep shrinkage effect Baskoro Abdi Praja 1 1 Civil Eng. Department of Universitas Atma Jaya, 44 Babarsari, Yogyakarta Special Distric Indonesia Abstract.

More information

BrD Superstructure Tutorial

BrD Superstructure Tutorial AASHTOWare BrD 6.8 BrD Superstructure Tutorial PS12 Prestressed Concrete I Beam Using BrD LRFD Engine BrD Superstructure Training PS12 - Prestressed Concrete I Beam Using BrD LRFD Engine 1'-9" 55'-6" Total

More information

Bijan Khaleghi, Ph, D. P.E., S.E.

Bijan Khaleghi, Ph, D. P.E., S.E. 0 Submission date: July, 0 Word count: 0 Author Name: Bijan Khaleghi Affiliations: Washington State D.O.T. Address: Linderson Way SW, Tumwater WA 0 INTEGRAL BENT CAP FOR CONTINUOUS PRECAST PRESTRESSED

More information

THE EUROPE BRIDGE, IN PORTUGAL: THE CONCEPT AND STRUCTURAL DESIGN

THE EUROPE BRIDGE, IN PORTUGAL: THE CONCEPT AND STRUCTURAL DESIGN THE EUROPE BRIDGE, IN PORTUGAL: THE CONCEPT AND STRUCTURAL DESIGN A.J.Reis 1,J.J.Oliveira Pedro 2 ABSTRACT The Europe bridge is a cable stayed bridge with a main span of 186m. A 3D stay cable arrangement

More information

Part B: Design Calculations

Part B: Design Calculations Part B: Design Calculations Table of Contents Part B: Design Calculations... i Chapter 1: Introduction... 1-1 Chapter 2 Project Statement... 2-1 2.1 Introduction... 2-2 2.2 Geometric properties... 2-3

More information

7.1 Transmission of Prestress (Part I)

7.1 Transmission of Prestress (Part I) 7.1 Transmission of Prestress (Part I) This section covers the following topics. Pre-tensioned Members 7.1.1 Pre-tensioned Members The stretched tendons transfer the prestress to the concrete leading to

More information

BRIDGE GIRDERS TECHNICAL GUIDE

BRIDGE GIRDERS TECHNICAL GUIDE ARMTEC.COM BRIDGE MATERIALS / / TECHNICAL GUIDE REGIONal SPECIFICATIONS / AB / MB / SK PRECAST CONCRETE GIRDERS AND BEAMS DESIGNED TO SUPPORT BRIDGE DECKS AND TRAFFIC LOADS Proven strength In-house engineering

More information

Fundamentals of Prestressed Concrete Bridge

Fundamentals of Prestressed Concrete Bridge Fundamentals of Prestressed Concrete Bridge MAB1053 Bridge Engineering Prof. Dr. Azlan Abdul Rahman Universiti Teknologi Malaysia UTM 2006 azlanfka/utm05/mab1053 1 Introduction In prestressed concrete,

More information

HIGH PERFORMANCE CONCRETE. by John J. Roller CTLGroup

HIGH PERFORMANCE CONCRETE. by John J. Roller CTLGroup HIGH PERFORMANCE CONCRETE by John J. Roller CTLGroup Early Louisiana HPC Research Law & Rasoulian (1980) Adelman & Cousins (1990) Bruce, Russell & Roller (1990-1993) Law & Rasoulian (1980) Concrete strengths

More information

DESIGN RECOMMENDATIONS FOR THE OPTIMIZED CONTINUITY DIAPHRAGM FOR PRESTRESSED CONCRETE BULB-T BEAMS

DESIGN RECOMMENDATIONS FOR THE OPTIMIZED CONTINUITY DIAPHRAGM FOR PRESTRESSED CONCRETE BULB-T BEAMS FINAL CONTRACT REPORT VTRC 09-CR1 DESIGN RECOMMENDATIONS FOR THE OPTIMIZED CONTINUITY DIAPHRAGM FOR PRESTRESSED CONCRETE BULB-T BEAMS STEPHANIE KOCH Graduate Research Assistant CARIN L. ROBERTS-WOLLMANN

More information

Substructure systems, specifically retaining walls

Substructure systems, specifically retaining walls Design principles of totally prefabricated counterfort retaining wall system compared with existing cast-in-place concrete structures Maen Farhat and Mohsen Issa An alternative to cast-in-place concrete

More information

POST-TENSIONING APPLICATION AND TECHNOLOGY. Moe Kyaw Aung

POST-TENSIONING APPLICATION AND TECHNOLOGY. Moe Kyaw Aung POST-TENSIONING APPLICATION AND TECHNOLOGY Moe Kyaw Aung Overview 1. Background 2. Basic Design Concept 3. Application and Benefits 4. Components of Post-tensioning System 5. Installation Process 6. Construction

More information

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E. BRIDGE DESIGN MANUAL UPDATES Jamie F. Farris, P.E. October 2015 Table of Contents 1 BDM Chapter 2 Limit States and Loads 2 BDM Chapter 3 Superstructure Design 3 BDM Chapter 4 Substructure Design 4 Questions

More information

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 1, 2012

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 1, 2012 INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 1, 2012 Copyright by the authors - Licensee IPA- Under Creative Commons license 3.0 Research article ISSN 0976 4399 Finite element

More information

Design of Short Span Steel Bridges

Design of Short Span Steel Bridges PDHonline Course S122 (3 PDH) Design of Short Span Steel Bridges Instructor: Frank Russo, Ph.D. & John C. Huang, Ph.D., PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone

More information

AUGUST 2016 LRFD BRIDGE DESIGN 3-1

AUGUST 2016 LRFD BRIDGE DESIGN 3-1 AUGUST 2016 LRFD BRIDGE DESIGN 3-1 3. LOADS AND LOAD FACTORS The loads section of the AASHTO LRFD Specifications is greatly expanded over that found in the Standard Specifications. This section will present

More information

ULTIMATE LOAD-CARRYING CAPACITY OF SELF-ANCHORED CONCRETE SUSPENSION BRIDGE

ULTIMATE LOAD-CARRYING CAPACITY OF SELF-ANCHORED CONCRETE SUSPENSION BRIDGE ULTIMATE LOAD-CARRYING CAPACITY OF SELF-ANCHORED CONCRETE SUSPENSION BRIDGE Meng Jiang*, University of Technology Dalian, P. R. China Wenliang Qiu, University of Technology Dalian, P. R. China Lihua Han,

More information

LARSA 2000/4th Dimension: Staged Construction Analysis

LARSA 2000/4th Dimension: Staged Construction Analysis LARSA 2000/4th Dimension: Staged Construction Analysis LARSA 2000/4th Dimension: Staged Construction Analysis for LARSA 2000 Finite Element Analysis and Design Software Larsa, Inc. Melville, New York,

More information

CONSTRUCTION OF BALANCE CANTILEVER APPROACH SURAMADU BRIDGE

CONSTRUCTION OF BALANCE CANTILEVER APPROACH SURAMADU BRIDGE CONSTRUCTION OF BALANCE CANTILEVER APPROACH SURAMADU BRIDGE By Masakazu Matsubara Resident Engineer for Approach & Main Bridge Suramadu Bridge Project 1. DESIGN 1.1. Concept of Design of Cantilever Erection

More information

PUNCHING SHEAR STRENGTH OF GFRP REINFORCED DECK SLABS IN SLAB- GIRDER BRIDGES

PUNCHING SHEAR STRENGTH OF GFRP REINFORCED DECK SLABS IN SLAB- GIRDER BRIDGES IV ACMBS MCAPC 4 th International Conference on Advanced Composite Materials in Bridges and Structures 4 ième Conférence Internationale sur les matériaux composites d avant-garde pour ponts et charpentes

More information

The Europe Bridge in Portugal: concept and structural design

The Europe Bridge in Portugal: concept and structural design Journal of Constructional Steel Research 60 (2004) 363 372 www.elsevier.com/locate/jcsr The Europe Bridge in Portugal: concept and structural design A.J. Reis a,b,, J.J. Oliveira Pedro a,b a GRID-Consulting

More information

ADAPT-PTRC 2016 Getting Started Tutorial ADAPT-PT mode

ADAPT-PTRC 2016 Getting Started Tutorial ADAPT-PT mode ADAPT-PTRC 2016 Getting Started Tutorial ADAPT-PT mode Update: August 2016 Copyright ADAPT Corporation all rights reserved ADAPT-PT/RC 2016-Tutorial- 1 This ADAPT-PTRC 2016 Getting Started Tutorial is

More information

TORSION SIMPLIFIED: A FAILURE PLANE MODEL FOR DESIGN OF SPANDREL BEAMS

TORSION SIMPLIFIED: A FAILURE PLANE MODEL FOR DESIGN OF SPANDREL BEAMS TORSION SIMPLIFIED: A FAILURE PLANE MODEL FOR DESIGN OF SPANDREL BEAMS Gary Klein, Gregory Lucier, Sami Rizkalla, Paul Zia and Harry Gleich Biography: Gary Klein, FACI, is Executive Vice President and

More information

Lecture Retaining Wall Week 12

Lecture Retaining Wall Week 12 Lecture Retaining Wall Week 12 Retaining walls which provide lateral support to earth fill embankment or any other form of material which they retain them in vertical position. These walls are also usually

More information

The use of 0.5 and 0.6 in. (13 and 15 mm) diameter

The use of 0.5 and 0.6 in. (13 and 15 mm) diameter Benefits of using.7 in. (18 mm) diameter strands in precast, pretensioned girders: A parametric investigation Jessica Salazar, Hossein Yousefpour, Alex Katz, Roya Alirezaei Abyaneh, Hyun su Kim, David

More information

Concrete and Masonry structures 3

Concrete and Masonry structures 3 Concrete and Masonry structures 3 133CM03 Model Homework 1 Post-tensioned prestressed concrete bridge - assignment Design a post-tensioned prestressed concrete bridge of a three-span arrangement. The construction

More information

JULY 2014 LRFD BRIDGE DESIGN 5-1

JULY 2014 LRFD BRIDGE DESIGN 5-1 JULY 014 LRFD BRIDGE DESIGN 5-1 5. CONCRETE STRUCTURES Reinforced and prestressed concrete are used extensively in bridge projects. In addition to general design guidance and information on detailing practices,

More information

Scientific Seminar Design of Steel and Timber Structures SPbU, May 21, 2015

Scientific Seminar Design of Steel and Timber Structures SPbU, May 21, 2015 Riga Technical University Institute of Structural Engineering and Reconstruction Scientific Seminar The research leading to these results has received the funding from Latvia state research programme under

More information

Creep and Shrinkage Analysis of Composite Truss Bridge with Double Decks

Creep and Shrinkage Analysis of Composite Truss Bridge with Double Decks Abstract Creep and Shrinkage Analysis of Composite Truss Bridge with Double Decks XIN Haohui; LIU Yuqing; Zheng Shuangjie Tongji University,Shanghai, China 2011xinhaohui@tongji.edu.cn; yql@tongji.edu.cn;

More information

Design of Rigid Pavements

Design of Rigid Pavements Traffic and Highway Engineering (ІІ) CVL 4324 Chapter 20 Design of Rigid Pavements Dr. Sari Abusharar Assistant Professor Civil Engineering Department Faculty of Applied Engineering and Urban Planning

More information

Parametric Study of Continuous Concrete Beam Prestressed with External Tendon

Parametric Study of Continuous Concrete Beam Prestressed with External Tendon Parametric Study of Continuous Concrete Beam Prestressed with External Tendon Assistant Professor, College of Engineering, Diyala University, Iraq ABSTRACT This paper presents the results of a parametric

More information

Shear Capacity of Prestressed Concrete Beams

Shear Capacity of Prestressed Concrete Beams 2007-47 Shear Capacity of Prestressed Concrete Beams Take the steps... Research...Knowledge...Innovative Solutions! Transportation Research Technical Report Documentation Page 1. Report No. 2. 3. Recipients

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

CHAPTER 7: SERVICEABILITY LIMIT STATES

CHAPTER 7: SERVICEABILITY LIMIT STATES CHAPTER 7: SERVICEABILITY LIMIT STATES 7.1 GENERAL It shall be in accordance with JSCE Standard Specification (Design), 7.1. 7.2 CALCULATION OF STRESS AND STRAIN It shall be in accordance with JSCE Standard

More information

Design Aids of NU I-Girders Bridges

Design Aids of NU I-Girders Bridges Nebraska Transportation Center Report SPR-P1(09) P322 Final Report 26-1120-0042-001 Design Aids of NU I-Girders Bridges Kromel E. Hanna, Ph.D. Department of Civil Engineering University of Nebraska-Lincoln

More information

FINITE ELEMENT ANALYSIS OF REINFORCED CONCRETE BRIDGE PIER COLUMNS SUBJECTED TO SEISMIS LOADING

FINITE ELEMENT ANALYSIS OF REINFORCED CONCRETE BRIDGE PIER COLUMNS SUBJECTED TO SEISMIS LOADING FINITE ELEMENT ANALYSIS OF REINFORCED CONCRETE BRIDGE PIER COLUMNS SUBJECTED TO SEISMIS LOADING By Benjamin M. Schlick University of Massachusetts Amherst Department of Civil and Environmental Engineering

More information

Design of the new extra-dosed bridge over the Kelani River

Design of the new extra-dosed bridge over the Kelani River SECM/15/014 Design of the new extra-dosed bridge over the Kelani River Y.K.R. Gunawardena 1*, H. Ohashi 2, Y. Yamahana 3 and T. Nohmi 2 1 Consulting Engineers and Architects Associated (Pvt) Ltd, Kotte,

More information

Behavior of a multiple spans cable-stayed bridge

Behavior of a multiple spans cable-stayed bridge Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Behavior of a multiple spans cable-stayed bridge S. Arnaud, N. Matsunaga, S. Nagano

More information

> 0. 1 f, they are treated as beam-columns.

> 0. 1 f, they are treated as beam-columns. 223 A- Flexural Members (Beams) of Special Moment Frames Requirements of ACI 21.5 are applicable for special moment frame members proportioned primarily to resist flexure with factored axial forces 0.

More information

BEAMS: COMPOSITE BEAMS; STRESS CONCENTRATIONS

BEAMS: COMPOSITE BEAMS; STRESS CONCENTRATIONS BEAMS: COMPOSITE BEAMS; STRESS CONCENTRATIONS Slide No. 1 Bending of In the previous discussion, we have considered only those beams that are fabricated from a single material such as steel. However, in

More information

One-Way Wide Module Joist Concrete Floor Design

One-Way Wide Module Joist Concrete Floor Design One-Way Wide Module Joist Concrete Floor Design A 1 3 4 30'-0" 30'-0" 30'-0" 3' B 3' C 3' D 3' E 4" 4" (typ.) 3' F 0" 0" (typ.) Figure 1 One-Way Wide Module Joist Concrete Floor Framing System 1 Overview

More information

ABC: Vigas Pretensadas para Puentes Principios Básicos de Diseño. Pre-Stressed Concrete Structures Basic Concepts

ABC: Vigas Pretensadas para Puentes Principios Básicos de Diseño. Pre-Stressed Concrete Structures Basic Concepts 1 PRE-STRESSED CONCRETE SEMINAR Centro de Transferencia de Tecnología en Transportación ABC: Vigas Pretensadas para Puentes Principios Básicos de Diseño Pre-Stressed Concrete Structures Basic Concepts

More information

Reinforced Concrete Tilt-Up Wall Panel Analysis and Design (ACI 551)

Reinforced Concrete Tilt-Up Wall Panel Analysis and Design (ACI 551) Reinforced Concrete Tilt-Up Wall Panel Analysis and Design (ACI 551) Reinforced Concrete Tilt-Up Wall Panel Analysis and Design (ACI 551) Tilt-up is form of construction with increasing popularity owing

More information

Precast Concrete Bearing Wall Panel Design (Alternative Analysis Method) (Using ACI )

Precast Concrete Bearing Wall Panel Design (Alternative Analysis Method) (Using ACI ) Precast Concrete Bearing Wall Panel Design (Alternative Analysis ethod) (Using ACI 318-14) Precast Concrete Bearing Wall Panel Design (Alternative Analysis ethod) (Using ACI 318-14) A structural precast

More information

Live Load Distribution Factors Suitable For Concrete Bridges Under Ecp 201 And Euro Code 1991 Loading

Live Load Distribution Factors Suitable For Concrete Bridges Under Ecp 201 And Euro Code 1991 Loading Live Load Distribution Factors Suitable For Concrete Bridges Under Ecp 201 And Euro Code 1991 Loading Ahmed M. Saleh, Mohamed Rabie and Ezz-El-Din Kamel Structural Engineering Department, Faculty of Engineerin,g

More information

Reinforced Concrete Design. A Fundamental Approach - Fifth Edition

Reinforced Concrete Design. A Fundamental Approach - Fifth Edition CHAPTER REINFORCED CONCRETE Reinforced Concrete Design A Fundamental Approach - Fifth Edition Fifth Edition REINFORCED CONCRETE A. J. Clark School of Engineering Department of Civil and Environmental Engineering

More information

Reinforced Concrete Column Design

Reinforced Concrete Column Design Reinforced Concrete Column Design Compressive Strength of Concrete f cr is the average cylinder strength f c compressive strength for design f c ~2500 psi - 18,000 psi, typically 3000-6000 psi E c estimated

More information

PROFESSIONAL DEVELOPMENT SERIES

PROFESSIONAL DEVELOPMENT SERIES Post-Tensioning for Two-Way Flat Plate Construction By Amy Reineke Trygestad, P.E. PROFESSIONAL DEVELOPMENT SERIES October 2005 Professional Development Series Every major metropolitan area is getting

More information

Seismic Detailing of RC Structures (IS: )

Seismic Detailing of RC Structures (IS: ) Seismic Detailing of RC Structures (IS:13920-1993) Sudhir K Jain Indian Institute of Technology Gandhinagar November 2012 1 Outline This lecture covers: Covers important clauses of IS13920 With particular

More information

DISPLACEMENT-BASED SEISMIC DESIGN OF CONCRETE BRIDGES

DISPLACEMENT-BASED SEISMIC DESIGN OF CONCRETE BRIDGES DISPLACEMENT-BASED SEISMIC DESIGN OF CONCRETE BRIDGES V.G. Bardakis 1 and M.N. Fardis 2 1 Post-Doctoral Researcher, Structures Lab, Dept. of Civil Engineering, University of Patras, Patras,Greece 2 Professor

More information

Title Page: Modeling & Load Rating of Two Bridges Designed with AASHTO and Florida I-Beam Girders

Title Page: Modeling & Load Rating of Two Bridges Designed with AASHTO and Florida I-Beam Girders Catbas, Darwash, Fadul / 0 0 0 Title Page: Modeling & Load Rating of Two Bridges Designed with AASHTO and Florida I-Beam Girders F.N. Catbas, H. Darwash and M. Fadul Dr. F. Necati Catbas, P.E. Associate

More information

PORTAL FRAMES 1.0 INTRODUCTION

PORTAL FRAMES 1.0 INTRODUCTION 36 PORTAL FRAMES 1.0 INTRODUCTION The basic structural form of portal frames was developed during the Second World War, driven by the need to achieve the low - cost building envelope. Now they are the

More information

GFRP-STEEL HYBRID REINFORCED CONCRETE BRIDGE DECK SLABS IN QUEBEC, CANADA

GFRP-STEEL HYBRID REINFORCED CONCRETE BRIDGE DECK SLABS IN QUEBEC, CANADA Fourth Asia-Pacific Conference on FRP in Structures (APFIS 213) 11-13 December 213, Melbourne, Australia 213 International Institute for FRP in Construction GFRP-STEEL HYBRID REINFORCED CONCRETE BRIDGE

More information

AASHTOWare BrD 6.8. BrR and BrD Tutorial. PS7-3 Stem PS Bridge Example

AASHTOWare BrD 6.8. BrR and BrD Tutorial. PS7-3 Stem PS Bridge Example AASHTOWare BrD 6.8 BrR and BrD Tutorial PS7-3 Stem PS Bridge Example BrR and BrD Training PS7 3 Stem PS Bridge Example From the Bridge Explorer create a new bridge and enter the following description data.

More information

CHAPTER 9 STAIR CASES 9.1 GENERAL FEATURES 9.2 TYPES OF STAIR CASES

CHAPTER 9 STAIR CASES 9.1 GENERAL FEATURES 9.2 TYPES OF STAIR CASES CHAPTER 9 STAIR CASES 9.1 GENERAL FEATURES Stair cases are provided for connecting successive floors. It is comprised with flights of steps with inter mediate landings which provides rest to the user and

More information

Fundamentals of Post Tensioned Concrete Design for Buildings

Fundamentals of Post Tensioned Concrete Design for Buildings Fundamentals of Post Tensioned Concrete Design for Buildings Part Three by John P. Miller Overview of This Course This is Part Two of a two-part course that covers the fundamentals of post-tensioned concrete

More information

AASHTO LRFD. Reinforced Concrete. Eric Steinberg, Ph.D., P.E. Department of Civil Engineering Ohio University

AASHTO LRFD. Reinforced Concrete. Eric Steinberg, Ph.D., P.E. Department of Civil Engineering Ohio University AASHTO LRFD Reinforced Concrete Eric Steinberg, Ph.D., P.E. Department of Civil Engineering Ohio University steinber@ohio.edu Ohio University (July 2007) 1 AASHTO LRFD This material is copyrighted by Ohio

More information

Example. Monday, October 19, 2015

Example. Monday, October 19, 2015 Example Monday, October 19, 2015 11:26 AM Using a prestressed Y4 beam with reinforced concrete deck slab as the deck example as shown in Fig.1; the deck having a 10 skew, a span of 20m and carrying a 7.3m

More information

Fundamentals of Post-Tensioned Concrete Design for Buildings

Fundamentals of Post-Tensioned Concrete Design for Buildings Fundamentals of Post-Tensioned Concrete Design for Buildings Part One by John P. Miller www.suncam.com Copyright 2012 John P. Miller Page 1 of 49 Overview of This Course This is Part One of a three-part

More information

Introduction to Structural Analysis TYPES OF STRUCTURES LOADS AND

Introduction to Structural Analysis TYPES OF STRUCTURES LOADS AND AND Introduction to Structural Analysis TYPES OF STRUCTURES LOADS INTRODUCTION What is the role of structural analysis in structural engineering projects? Structural engineering is the science and art

More information

CSiBridge Version Release Notes

CSiBridge Version Release Notes CSiBridge Version 20.0.0 Release Notes Copyright Computers and Structures, Inc., 2017 Notice Date: 2017-12-14 This file lists all changes made to CSiBridge since the previous version. Most changes do not

More information

Seismic Performance of Precast Concrete Bents used for Accelerated Bridge Construction. Bijan Khaleghi 1

Seismic Performance of Precast Concrete Bents used for Accelerated Bridge Construction. Bijan Khaleghi 1 Seismic Performance of Precast Concrete Bents used for Accelerated Bridge Construction Bijan Khaleghi 1 Abstract Ductility of precast prestressed girder bridges can be achieved by proper detailing of pier

More information

DIRECT DESIGN METHOD DDM

DIRECT DESIGN METHOD DDM DIRECT DESIGN METHOD DDM Load Transfer Path For Gravity Loads All gravity loads are basically Volume Loads generated due to mass contained in a volume Mechanism and path must be found to transfer these

More information

DESIGN OF FLYOVER TRANSVERSE VERTICALLY BY USING HYDRAULIC JACK

DESIGN OF FLYOVER TRANSVERSE VERTICALLY BY USING HYDRAULIC JACK DESIGN OF FLYOVER TRANSVERSE VERTICALLY BY USING HYDRAULIC JACK M. Hari Sathish Kumar 1, K. S. Binitha 2, K. Balaji 3 1,2Assistant Professor, Department of Civil Engineering, PERI Institute of Technology,

More information

Page 53 pren (Final draft)

Page 53 pren (Final draft) Page 53 SECTION 5 STRUCTURAL ANALYSIS 5.1 General provisions The purpose of analysis is to establish the distribution of either internal forces and moments, or stresses, strains and displacements, over

More information

Forensic Testing of Post Tensioned Concrete Girders

Forensic Testing of Post Tensioned Concrete Girders CAIT-UTC-033 Forensic Testing of Post Tensioned Concrete Girders Final Report July 2014 Wing Hong (Louis) Lo Graduate Student Utah State University Logan UT 84332 Paul J. Barr Professor Utah State University

More information

Special Reinforced Concrete Structural Walls

Special Reinforced Concrete Structural Walls 135 Special Reinforced Concrete Structural Walls The requirements of this section apply to special reinforced concrete structural walls serving as part of the earthquake force-resisting system. Shear Strength:

More information

Modelling of RC moment resisting frames with precast-prestressed flooring system

Modelling of RC moment resisting frames with precast-prestressed flooring system Modelling of RC moment resisting frames with precast-prestressed flooring system B.H.H. Peng, R.P. Dhakal, R.C. Fenwick & A.J. Carr Department of Civil Engineering, University of Canterbury, Christchurch.

More information

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1 Department of Civil Engineering Lecture 2.1 Methods of Prestressing Advantages of Prestressing Section remains uncracked under service loads Reduction of steel corrosion (increase durability) Full section

More information

Route 360 Inverted T-beams. Carin Roberts-Wollmann Virginia Tech Tommy Cousins Clemson University Fatmir Menkulasi Louisiana Tech

Route 360 Inverted T-beams. Carin Roberts-Wollmann Virginia Tech Tommy Cousins Clemson University Fatmir Menkulasi Louisiana Tech Route 360 Inverted T-beams Carin Roberts-Wollmann Virginia Tech Tommy Cousins Clemson University Fatmir Menkulasi Louisiana Tech Background Outline Scope and Objectives Development and Testing Topping

More information

SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE

SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE NOTE: MOMENT DIAGRAM CONVENTION In PT design, it is preferable to draw moment diagrams to the tensile

More information

Construction Stage Analysis Midas Civil. Presenter: Robert Salca technical support engineer, Midas UK

Construction Stage Analysis Midas Civil. Presenter: Robert Salca technical support engineer, Midas UK Construction Stage Analysis Midas Civil Presenter: Robert Salca technical support engineer, Midas UK In order to make sure that the sound system is working well a poll will appear shortly on your screens.

More information

Chapter. Masonry Design

Chapter. Masonry Design Chapter Masonry Design The masonry design section contains modules for the analysis of reinforced masonry beams subjected to pure bending and unreinforced masonry walls subjected to axial compression and

More information

UHPC Connection of Precast Bridge Deck

UHPC Connection of Precast Bridge Deck Jan L. Vitek, Metrostav, a.s. and CTU in Prague Jiri Kolisko, CTU in Prague, Klokner Institute David Citek, CTU in Prague, Klokner Institute Stanislav Rehacek, CTU in Prague, Klokner Institute Robert Coufal,

More information

Design and Rating of Steel Bridges

Design and Rating of Steel Bridges 2014 Bentley Systems, Incorporated Parametric and Integrated Bridge Design LEAP Bridge Steel Steve Willoughby Design and Rating of Steel Bridges 2 WWW.BENTLEY.COM 2014 Bentley Systems, Incorporated 1 Discussion

More information

Continuous Beam Design with Moment Redistribution (ACI )

Continuous Beam Design with Moment Redistribution (ACI ) Continuous Beam Design with Moment Redistribution (ACI 318-14) Continuous Beam Design with Moment Redistribution (ACI 318-14) A structural reinforced concrete continuous beam at an intermediate floor level

More information

DESIGN OF STEEL FIBRE REINFORCED CONCRETE BEAMS USING THE NEW FIB MODEL CODE 2010 AN EVALUATIVE

DESIGN OF STEEL FIBRE REINFORCED CONCRETE BEAMS USING THE NEW FIB MODEL CODE 2010 AN EVALUATIVE 147 Paper No. 739 DESIGN OF STEEL FIBRE REINFORCED CONCRETE BEAMS USING THE NEW FIB MODEL CODE 2010 AN EVALUATIVE AMMAR ABID, K. B. FRANZEN 148 Ammar Abid, K. B. Franzen 72 nd Annual Session of Pakistan

More information

APPENDIX A: BRIDGE DRAWINGS AND PHOTOS

APPENDIX A: BRIDGE DRAWINGS AND PHOTOS APPENDICES APPENDIX A: BRIDGE DRAWINGS AND PHOTOS APPENDIX A: BRIDGE DRAWINGS AND PHOTOS List of Figures Figure A-1: Bridge location... 2 Figure A-2: Horsetail Creek Bridge... 2 Figure A-3: Bridge during

More information

OPTIMIZED ALTERNATIVE STRUCTURAL FORMS FOR STANDARD HIGHWAY BRIDGE BEAMS WITH HIGHER STRENGTH CONCRETES

OPTIMIZED ALTERNATIVE STRUCTURAL FORMS FOR STANDARD HIGHWAY BRIDGE BEAMS WITH HIGHER STRENGTH CONCRETES OPTIMIZED ALTERNATIVE STRUCTURAL FORMS FOR STANDARD HIGHWAY BRIDGE BEAMS WITH HIGHER STRENGTH CONCRETES Abstract K S M Silva, Department of Civil Engineering, University of Moratuwa. Email: mangala_xp@yahoo.com

More information

PERFORMANCE STUDY OF RETROFITTED GRAVITY LOAD DESIGNED WALL FRAME STRUCTURES (SC-140)

PERFORMANCE STUDY OF RETROFITTED GRAVITY LOAD DESIGNED WALL FRAME STRUCTURES (SC-140) PERFORMANCE STUDY OF RETROFITTED GRAVITY LOAD DESIGNED WALL FRAME STRUCTURES (SC-140) *A. Ahmed 1, K. H. Tan 1 1 Department of Civil and Environmental Engineering National University of Singapore, Singapore,

More information

Bridge articulation No. 1.04

Bridge articulation No. 1.04 Bridge articulation Scope This Guidance Note gives advice on the selection of the articulation arrangements, the choice of bearing types and dispositions of bearings, for bridges where relative movement

More information

2012 IBC/2011 MSJC MASONRY CODE COMPILATION

2012 IBC/2011 MSJC MASONRY CODE COMPILATION 2012 IBC/2011 MSJC MASONRY CODE COMPILATION 2012 IBC CHAPTER 21 MASONRY Merged IBC/MSJC 2011 MSJC CODE CHAPTER 1 BUILDING CODE REQUIREMENTS AND SPECIFICATION FOR MASONRY STRUCTURES SECTION 2101 GENERAL

More information

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Overall Information Location: Singapore Date of Completion: 2010 Cost: $5.7 billion Architect: Moshe Safdie Executive Architect: Aedas, Pte

More information

Behavior and failure mode of reinforced concrete members damaged by pre-cracking

Behavior and failure mode of reinforced concrete members damaged by pre-cracking ORIGINAL ARTICLE Behavior and failure mode of reinforced concrete members damaged by pre-cracking Amorn Pimanmas 1 Abstract damaged by pre-cracking Songklanakarin J. Sci. Technol., 2007, 29(4) : 1039-1048

More information

Bridging Your Innovations to Realities

Bridging Your Innovations to Realities Tutorial 2 Prestressed Concrete Bridge Bridging Your Innovations to Realities 1 Contents 2 1. Project Information 2. Definition of materials 3. Definition of Sections 4. Definition of Time dependent Materials

More information

Seismic Fragility of Concrete Bridges with Deck Monolithically Connected to the Piers or Supported on Elastomeric Bearings

Seismic Fragility of Concrete Bridges with Deck Monolithically Connected to the Piers or Supported on Elastomeric Bearings Seismic Fragility of Concrete Bridges with Deck Monolithically Connected to the Piers or Supported on Elastomeric Bearings G. Tsionis & M.N. Fardis University of Patras, Greece SUMMARY: The seismic vulnerability

More information

PROFESSIONAL DEVELOPMENT SERIES

PROFESSIONAL DEVELOPMENT SERIES Torsion Design of Structural Concrete Based on ACI 318-05 By Mahmoud E. Kamara, Ph.D., and Basile G. Rabbat, Ph.D., S.E. PROFESSIONAL DEVELOPMENT SERIES September 2007 Professional Development Series Torsion

More information

Studies on ductility of RC beams in flexure and size effect

Studies on ductility of RC beams in flexure and size effect Studies on ductility of RC beams in flexure and size effect G. Appa Rao* & I. Vijayanand *University of Stuttgart, 7569, Stuttgart, Germany Indian Institute of Technology Madras, Chennai-6 36, India R.

More information

Effect of beam dimensions on structural performance of wide beam-column joints

Effect of beam dimensions on structural performance of wide beam-column joints Effect of beam dimensions on structural performance of wide beam-column joints J.S. Kuang 1) and *Wing Shan Kam 2) 1), 2) Department of Civil and Environmental Engineering, Hong Kong University of Science

More information