Unit Price Labor. INSTALL 138KV DISCONNECT SWITCH WITH MOTOR OPERATOR AND AUXILIARY SWITCHES ON EXISTING STRUCTURE 1 ea.

Size: px
Start display at page:

Download "Unit Price Labor. INSTALL 138KV DISCONNECT SWITCH WITH MOTOR OPERATOR AND AUXILIARY SWITCHES ON EXISTING STRUCTURE 1 ea."

Transcription

1 SUBSTATION B UPGRADE CONSTRUCTION MAJOR MATERIAL NOTES: Contractor to fill in line item column "Est. Qty." for items left blank. Construction Unit No. Description Est. Qty. Unit Labor 100 INSTALL 138KV DISCONNECT SWITCH WITH MOTOR OPERATOR AND AUXILIARY SWITCHES ON EXISTING STRUCTURE 1 ea. $ - by OTHERS 101 INSTALL 138KV POTENTIAL TRANSFORMER ON EXISTING STRUCTURE 3 ea. $ - by OTHERS 102 INSTALL 2000A CURRENT TRANSFORMER ON EXISTING STRUCTURE 3 ea. $ - by OTHERS 104 INSTALL 2000A WAVE TRAP ON EXISTING CCVT 1 ea. $ - by OTHERS 301 INSTALL 477 ACSR CONDUCTOR 30 ft. $ - by OTHERS 302 INSTALL DOUBLE 1272 ACSR CONDUCTOR 1,600 ft. $ - by OTHERS 303 FURNISH AND INSTALL 10 AWG SIS CONDUCTOR ft. $ - $ INSTALL COMPRESSION TERMINAL, 4 HOLE PAD TO 477 ACSR 6 ea. $ - by OTHERS 402 INSTALL COMPRESSION TERMINAL, 4 HOLE PAD TO 1272 ACSR 40 ea. $ - by OTHERS 403 INSTALL COMPRESSION TERMINAL, 4 HOLE PAD TO 1272 ACSR, 90 DEGREES 14 ea. $ - by OTHERS 404 INSTALL COMPRESSION TEE, 4 HOLE PAD TO 795 ACSS 3 ea. $ - by OTHERS 406 INSTALL BOLTED DEADEND ASSEMBLY, DOUBLE 1272 ACSR 12 ea. $ - by OTHERS TOTAL THIS PAGE EXTENDED LABOR & MATERIALS Labor & Extended Bid Price Labor & Substation B Upgrade Construction Bid Form /24/2011

2 Construction Unit No. Description Est. Qty. Unit Labor Labor & Extended Bid Price Labor & 407 INSTALL CABLE SPACERS, 1272 ACSR 41 ea. $ - by OTHERS 408 INSTALL COMPRESSION TEE, 4 HOLE TO 1272 ACSR 3 ea. $ - by OTHERS 409 INSTALL CHAIN, 5/8 INCH DIAMETER, 54,000 LB RATING 6 ea. $ - by OTHERS 410 FURNISH AND INSTALL SUSPENSION INSULATOR, 138KV, EPOXY, Y-CLEVIS BALL, 30,000 LB ea. $ - $ FURNISH AND INSTALL SHACKLE, 5/8 INCH DIAMETER AND 2-25/32 INCH LONG, 30,000 LB ea. $ - $ FURNISH AND INSTALL SOCKET CLEVIS, 30,000 LB, 2-5/8 INCH LONG ea. $ - $ & , 503, 504, 505 & , 601 & 602 FURNISH AND INSTALL FLEXIBLE CONDUIT AND CONNECTOR, 1-1/2 INCH FOR MOTOR OPERATOR HOUSING ft. $ - $ - FURNISH AND INSTALL 4 INCH CONDUIT AND FITTINGS 1 lot $ - $ - FURNISH AND INSTALL GROUNDING TO DISCONNECT SWITCH, CT'S AND PT'S 1 lot $ - $ - MOBILIZATION (SETTING UP FACILITIES, UTILITIES AND CONTROLS) 1 lot $ - $ REMOVAL OF EXISTING EQUIPMENT lot $ - $ CABLE TERMINATIONS, 10 AWG SIS 1 lot $ - $ TEST CURRENT AND POTENTIAL CIRCUITS FROM THE NEW CT'S AND PT'S TO EXISTING RELAYING AND METERING 1 lot $ - $ - TEST EXISTING SOUTH COFFEYVILLE CARRIER SET 1 lot $ - $ - TOTAL THIS PAGE TOTAL PREVIOUS PAGE TOTAL EXTENDED LABOR & MATERIALS Substation B Upgrade Construction Bid Form /24/2011

3 Construction Unit No. Description Est. Qty. Unit 705 Labor OPTION PRICE TO FURNISH AND INSTALL POWER AND CONTROL CABLE TO MOTOR OPERATOR (SEE BREAKDOWN BELOW) 1 lot $ - $ - TWO 1/C #8, 450 FT EACH ONE 2/C #10, 210 FT EACH TWO 12/C #10, 450 FT EACH 706 DEMOBILIZATION AND SITE CLEANUP 1 lot $ - $ - Labor & Extended Bid Price Labor & TOTAL THIS PAGE TOTAL PREVIOUS PAGE TOTAL EXTENDED LABOR & MATERIALS Substation B Upgrade Construction Bid Form /24/2011

4 CITY OF COFFEYVILLE, KANSAS 138-kV Transmission Line Upgrade CN Substation B Upgrade Construction Sega Project No , CN 120 ADDENDUM NO. 1 The original Sega-Submitted Specifications remain in full force and effect as revised by the following additions and changes, which shall take precedence over anything to the contrary. CHANGES TO THE SPECIFICATIONS: 1. Section Bid Form: See attached revision. 2. Section Summary, Item 1.7-A.2: Revise as follows: 2. Substation B: a. Tentative Outage Schedule (South Coffeyville Line): 1) Line De-Energization Start Date Sept. 19 to Oct. 3, ) Line Energization Date On or before Dec. 9, 2011 b. Construction Activities: 1) General: a) Mobilize Start Date Sept. 12 to Sept. 26, Section Electrical Installation of Major Substation Equipment, Item 2.4-A: Revise as follows: A. All suspension insulators inside of the substation and some of the hardware shall be reused per the Drawings. Contractor shall replace any broken or damage suspension insulators and hardware at Contractor s expense. 4. Section Electrical Installation of Major Substation Equipment, Item 2.4-B: Revise as follows: B. Install instrument transformers on the existing structure in accordance with the Drawings and the following instructions. To avoid phase-to-ground clearances between the new CTs and PTs, three new steel plates will cover and be bolted to the existing mounting plates that are welded to the structure. Three new CT risers will be bolted to these plates. The PTs will need new mounting bolts and the Contracor shall drill new holes into the existing plates. The new steel plates and risers will be provided by others. See Appendix D - Reference Pictures to view the existing installation. 5. Appendix A - Bill of : Updated to include Items 409 through 412. See attached revision. 6. Add new Appendix D - Reference Pictures. See attached. COF CN Substation B Upgrade Construction ADDENDUM NO. 1 June 22, 2011 Page 1

5 CHANGES TO THE DRAWINGS: 1. CVB-5, Rev. 9: Was not included in the original Issued for Bid. 2. CVB-9, Rev. 7: Modified cloud to include Detail SUC in ELEVATION FF. 3. CVB-10, Rev. 7: Modified cloud to include Detail SUC in ELEVATION II. 4. CVB-19, Rev. 10: Added Bill of Material Items 410, 411, and 412 in Details SUB, SUC, and SUD. QUESTIONS FROM CONTRACTOR CLARIFICATIONS: 1. Is this project a prevailing wage project? The project is not a prevailing wage project. 2. Per the Specification, it appears that this project is not tax exempt and all Kansas taxes such as sales tax on services apply, is that correct? The City of Coffeyville will have to pay the taxes addressed in Section General Conditions, Item 6.1. ACKNOWLEDGEMENT: Each bidder shall acknowledge receipt of this Addendum No. 1 by his signature below and shall attach a copy of this Addendum to the submitted bid. Sega Inc. Overland Park, Kansas June 22, 2011 CERTIFICATION OF SUPPLIER: The undersigned acknowledges receipt of this Addendum No. 1 and the bid submitted is in accordance with information, instructions, and stipulations set forth herein. Signed Name of Bidder COF CN Substation B Upgrade Construction ADDENDUM NO. 1 June 22, 2011 Page 2

6 SUBSTATION B UPGRADE CONSTRUCTION MAJOR MATERIAL NOTES: Contractor to fill in line item column "Est. Qty." for items left blank. Construction Unit No. Description Est. Qty. Unit Labor 100 INSTALL 138KV DISCONNECT SWITCH WITH MOTOR OPERATOR AND AUXILIARY SWITCHES ON EXISTING STRUCTURE 1 ea. $ - by OTHERS 101 INSTALL 138KV POTENTIAL TRANSFORMER ON EXISTING STRUCTURE 3 ea. $ - by OTHERS 102 INSTALL 2000A CURRENT TRANSFORMER ON EXISTING STRUCTURE 3 ea. $ - by OTHERS 104 INSTALL 2000A WAVE TRAP ON EXISTING CCVT 1 ea. $ - by OTHERS 301 INSTALL 477 ACSR CONDUCTOR 30 ft. $ - by OTHERS 302 INSTALL DOUBLE 1272 ACSR CONDUCTOR 1,600 ft. $ - by OTHERS 303 FURNISH AND INSTALL 10 AWG SIS CONDUCTOR ft. $ - $ INSTALL COMPRESSION TERMINAL, 4 HOLE PAD TO 477 ACSR 6 ea. $ - by OTHERS 402 INSTALL COMPRESSION TERMINAL, 4 HOLE PAD TO 1272 ACSR 40 ea. $ - by OTHERS 403 INSTALL COMPRESSION TERMINAL, 4 HOLE PAD TO 1272 ACSR, 90 DEGREES 14 ea. $ - by OTHERS 404 INSTALL COMPRESSION TEE, 4 HOLE PAD TO 795 ACSS 3 ea. $ - by OTHERS 406 INSTALL BOLTED DEADEND ASSEMBLY, DOUBLE 1272 ACSR 12 ea. $ - by OTHERS TOTAL THIS PAGE EXTENDED LABOR & MATERIALS Labor & Extended Bid Price Labor & Substation B Upgrade Construction Bid Form - 1 6/22/2011

7 Construction Unit No. Description Est. Qty. Unit Labor Labor & Extended Bid Price Labor & 407 INSTALL CABLE SPACERS, 1272 ACSR 41 ea. $ - by OTHERS 408 INSTALL COMPRESSION TEE, 4 HOLE TO 1272 ACSR 3 ea. $ - by OTHERS 409 INSTALL CHAIN, 5/8 INCH DIAMETER, 54,000 LB RATING 6 ea. $ - by OTHERS 410 FURNISH AND INSTALL SUSPENSION INSULATOR, 138KV, EPOXY, Y-CLEVIS BALL, 30,000 LB ea. $ - $ FURNISH AND INSTALL SHACKLE, 5/8 INCH DIAMETER AND 2-25/32 INCH LONG, 30,000 LB ea. $ - $ FURNISH AND INSTALL SOCKET CLEVIS, 30,000 LB, 2-5/8 INCH LONG ea. $ - $ & , 503, 504, 505 & , 601 & 602 FURNISH AND INSTALL FLEXIBLE CONDUIT AND CONNECTOR, 1-1/2 INCH FOR MOTOR OPERATOR HOUSING ft. $ - $ - FURNISH AND INSTALL 4 INCH CONDUIT AND FITTINGS 1 lot $ - $ - FURNISH AND INSTALL GROUNDING TO DISCONNECT SWITCH, CT'S AND PT'S 1 lot $ - $ MOBILIZATION (SETTING UP FACILITIES, UTILITIES AND CONTROLS) 1 lot $ - $ REMOVAL OF EXISTING EQUIPMENT lot $ - $ CABLE TERMINATIONS, 10 AWG SIS 1 lot $ - $ TEST CURRENT AND POTENTIAL CIRCUITS FROM THE NEW CT'S AND PT'S TO EXISTING RELAYING AND METERING 1 lot $ - $ - TEST EXISTING SOUTH COFFEYVILLE CARRIER SET 1 lot $ - $ - TOTAL THIS PAGE TOTAL PREVIOUS PAGE TOTAL EXTENDED LABOR & MATERIALS Substation B Upgrade Construction Bid Form - 2 6/22/2011

8 Construction Unit No. Description Est. Qty. Unit 705 Labor OPTION PRICE TO FURNISH AND INSTALL POWER AND CONTROL CABLE TO MOTOR OPERATOR (SEE BREAKDOWN BELOW) 1 lot $ - $ - TWO 1/C #8, 450 FT EACH ONE 2/C #10, 210 FT EACH TWO 12/C #10, 450 FT EACH 706 DEMOBILIZATION AND SITE CLEANUP 1 lot $ - $ - Labor & Extended Bid Price Labor & TOTAL THIS PAGE TOTAL PREVIOUS PAGE TOTAL EXTENDED LABOR & MATERIALS Substation B Upgrade Construction Bid Form - 3 6/22/2011

9 SUBSTATION BILL OF MATERIAL (ELECTRICAL) CITY OF COFFEYVILLE SUBSTATION B UPGRADE ADDENDUM NO. 1 6/21/2011 ID QTY UNIT DESCRIPTION MANUFACTURER OR EQUIVALENT CATALOG NUMBER 100 BY OTHERS AIR BREAK SWITCH, 3-POLE, VERTICAL BREAK, 138KV, 650KV BIL, 2000A, WITH ARCING HORNS, QUICK WHIPS, OPERATOR MECHANISM FOR MOTOR OPERATOR AND MOUNTING HARDWARE 101 BY OTHERS POTENTIAL TRANSFORMER, 138KV, 650KV BIL, 700/1200:1:1 RATIO 102 BY OTHERS CURRENT TRANSFORMER, 2000A, 650KV BIL, 1000/2000:5 A RATIO, 0.3B1-1.8 BURDEN 104 BY OTHERS LINE TRAP, 2000A,SINGLE FREQUENCY, 70 TO 200 KHZ TUNED TO 182 KHZ TRENCH TYPE LTP 300 NOT USED 301 BY OTHERS CONDUCTOR, 477 MCM 26/7 ACSR 302 BY OTHERS CONDUCTOR, 1272 MCM 45/7 ACSR 303 FT. CONDUCTOR, SIS, 10 AWG 400 NOT USED 401 BY OTHERS TERMINAL, COMPRESSION, ALUMINUM, 4-HOLE PAD TO 477 MCM 26/7 ACSR ALCOA BY OTHERS TERMINAL, COMPRESSION, ALUMINUM, 4-HOLE PAD TO 1272 MCM 45/7 ACSR ALCOA BY OTHERS TERMINAL, COMPRESSION, ALUMINUM, 4-HOLE PAD TO 1272 MCM 45/7 ACSR, 90 DEGREES ALCOA BY OTHERS TEE, COMPRESSION, ALUMINUM, 795 MCM 26/7 ACSR TO 4-HOLE PAD ALCOA HT 405 NOT USED 406 BY OTHERS STRAIN CLAMP, BOLTED, ALUMINUM, QUADRANT, TWO 1272 MCM 45/7 ACSR ANDERSON AR2150N 407 BY OTHERS CABLE SPACER, ALUMINUM, FOR 1272 ACSR, 4 INCH SPACING ANDERSON APCS BY OTHERS TEE, COMPRESSION, ALUMINUM, 1272 MCM 45/7 ACSR TO 4-HOLE PAD ALCOA BY OTHERS CHAIN, 5/8 INCH DIAMETER, 54,000 LB RATING 410 EA. SUSPENSION INSULATOR, 138KV, EPOXY, Y-CLEVIS BALL, 30,000 LB 411 EA. SHACKLE, 5/8 INCH DIAMETER AND 2-25/32 INCH ANDERSON AS-25-L 412 EA. SOCKET CLEVIS, 30,000 LB, 2-5/8 INCH LONG ANDERSON SC FT. CONDUIT, FLEXIBLE, LIQUID-TIGHT, 1-1/2 INCH 501 EA. CONNECTOR, LIQUID-TIGHT, 1-1/2 INCH, STRAIGHT, GALVANIZED WITH LOCKNUT AND SEALING RING 502 FT. CONDUIT, PVC RIGID, SCH 40, 4 INCH 503 EA. COUPLING, 4 INCH 504 EA. INSULATED BUSHING, 4 INCH 505 EA. STANDARD CONDUIT LOCKNUT, 4 INCH 506 EA. MALE TERMINAL ADAPTER, 4 INCH 507 EA. INSULATED GROUNDING BUSHING, 1-1/2 INCH 508 EA. THREE PIECE COUPLING, TYPE 4, 1-1/2 INCH 509 EA. MALLEABLE IRON CONDUIT BODY, TYPE LL, 1-1/2 INCH 510 EA. CONDUIT LOCKNUT, TYPE 1, 1-1/2 INCH 511 EA. CONDUIT, RGS, 1-1/2 INCH 600 FT. CABLE, 4/0 AWG, 19 STRAND, SD TINNED COPPER 601 EA. TERMINAL, BOLTED, BRONZE, 2-HOLE PAD TO 4/0 CABLE 602 EA. TERMINAL, BOLTED, BRONZE, PARALLEL 4/0 CABLE TO 4/0 CABLE DWG. NO. LOCATION

10

11

12

13

14

15

RE: City of Claremore, OK, BH Substation Bid #SB Addendum #1 and Clarifications ( )

RE: City of Claremore, OK, BH Substation Bid #SB Addendum #1 and Clarifications ( ) January 28, 2013 TO ALL BIDDERS RE: City of Claremore, OK, BH Substation Bid #SB-2013-01 Addendum #1 and Clarifications (023515003) This letter is to provide Addendum #1 and Clarifications for the above

More information

OVERHEAD SERVICES - SECONDARY

OVERHEAD SERVICES - SECONDARY OVERHEAD SERVICES - SECONDARY Contents - Overhead Services... O-1 General Requirements for Overhead Service... O-2 Names of Parts for Overhead Service... O-3 Service Attachment on an Unguyed Service Mast...

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 48-05 Van Dam Street Long Island City, NY 11101 ELECTRIC METER SHOP DEPARTMENT METER ENGINEERING SPECIFICATION MES-350 REVISION 3 June 2016 EFFECTIVE DATE

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

TEMPORARY FACILITIES

TEMPORARY FACILITIES MUNICIPAL LIGHT & POWER & CHUGACH ELECTRIC ASSOCIATION ELECTRIC SERVICE REQUIREMENTS EXCERPT TEMPORARY FACILITIES 2015 EDITION Effective August 3, 2015 This is an EXCERPT; the complete book is available

More information

XXXXXXXXXXX Solar (XXX) Generation Interconnection

XXXXXXXXXXX Solar (XXX) Generation Interconnection Facility Study For XXXXXXXXXXX Solar (XXX) Generation Interconnection Prepared For: Randy Harlas, Substation Manager El Paso Electric Company El Paso, TX September 2010 Table of Contents 1. GENERAL...

More information

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

Colorado River Aqueduct Pumping Plants 230 kv Disconnect Switches Replacement

Colorado River Aqueduct Pumping Plants 230 kv Disconnect Switches Replacement DATE: July 15, 2011 ADDENDUM NUMBER: 2 MODIFYING: Specifications No. 1698 PROJECT: Colorado River Aqueduct Pumping Plants 230 kv Disconnect Switches Replacement BID TIME AND DATE: 2:00 p.m., July 19, 2011

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

SECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION

SECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION SECTION 16-372 SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION 1. GENERAL SPECIFICATIONS The work of this Section includes furnishing all labor, equipment, materials (unless specifically identified as Owner-furnished)

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section

More information

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS SECTION 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide labor, materials, equipment, and incidentals as shown, specified, and

More information

TEMPORARY METER POLE INSTALLATION

TEMPORARY METER POLE INSTALLATION TEMPARY METER POLE INSTALLATION MEMBER PROVIDED Location to be made by REMC within 50' of our transformer or existing service Temporary pole to be properly braced 24" 3 wire weatherhead (located 24" from

More information

1. Contractor shall obtain a valid electrical permit from the Town of Perinton.

1. Contractor shall obtain a valid electrical permit from the Town of Perinton. Fairport Electric allows one electric service location per tax parcel. To obtain this service, Fairport Electric will require the following prior to energization. IN THE TOWN OF PERINTON: 1. Contractor

More information

MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT

MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 2476 JANUARY 1990 MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT 2476.01 SCOPE 2476.02 REFERENCES 2476.05 MATERIALS TABLE OF CONTENTS

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

CHAPTER 13 GROUNDING AND BONDING

CHAPTER 13 GROUNDING AND BONDING GROUNDING AND BONDING CHAPTER 13 GROUNDING AND BONDING Grounding and bonding must be in accordance with Article 250 of the National Electrical Code (NEC). Bonding is defined in the NEC as the permanent

More information

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification

More information

In case this proposal is accepted by GRDA, the following surety company, or bank, namely,

In case this proposal is accepted by GRDA, the following surety company, or bank, namely, Dollars ($ ) payable to the Grand River Dam Authority, all as called for in the REQUEST FOR PROPOSAL, and it is hereby agreed that in case of failure on the part of the undersigned to execute the Contract

More information

OPERATING PROCEDURE NO. 310

OPERATING PROCEDURE NO. 310 OPERATING PROCEDURE NO. 310 Related Operating Procedures: 310A; 310B; 310C; 310D SUBJECT: Conditions of Service Issued: February 10, 2014 Revised: March 28, 2016 OBJECTIVE: To establish the rules, regulations

More information

Section 7: Specifications

Section 7: Specifications Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required

More information

PRE-INSTALLATION GUIDE

PRE-INSTALLATION GUIDE TRUMPF MEDICAL SYSTEMS Inc. Charleston, SC PRE-INSTALLATION GUIDE FOR CEILING MOUNTED EQUIPMENT MANAGEMENT SYSTEMS, SURGICAL / EXAM LIGHTS, AND FLAT PANELS EMS and Light Pre-installation Guide File: 110720

More information

SECTION 4 - SECONDARY CONSTRUCTION OVERHEAD TABLE OF CONTENTS

SECTION 4 - SECONDARY CONSTRUCTION OVERHEAD TABLE OF CONTENTS 4. GENERAL SECONDARIES & SERVICES 4.- INDIVIDUAL PHASE SECONDARY OVERHEAD LINE EXTENSIONS 4.- SECONDARY AND SERVICE CABLE SPLICES 4.- INSULATED SERVICE ENTRANCE COMPRESSION CONNECTORS 4.- 4. POLE ATTACHMENTS

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 617 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES TABLE OF CONTENTS 617.01 SCOPE 617.02 REFERENCES 617.03 DEFINITIONS

More information

d.p. Consulting Engineers, Inc.

d.p. Consulting Engineers, Inc. d.p. Consulting Engineers, Inc. 3727 Doctors Drive Port Arthur, Tx 77642 Phone: 409-983-6263 Fax : 409-983-6265 Firm Registration No: F-3356 Email : dp@dpengineersinc.com ADDENDUM NO. 1 ADDENDUM ISSUE

More information

Proposed Facility Study Report. Project: A380_A383_A415_A414_A413 MISO # F088. Prepared for Midwest ISO

Proposed Facility Study Report. Project: A380_A383_A415_A414_A413 MISO # F088. Prepared for Midwest ISO Proposed Facility Study Report Project: A380_A383_A415_A414_A413 MISO # F088 Prepared for Midwest ISO January 15 th, 2010 Great River Energy Contact: Greg Schutte, Project Manager Great River Energy 1

More information

Cutouts and Fuse Links Equipment to protect against faults and over-current conditions on power distribution systems. Open-Type Cutouts Linkbreak Cutouts Loadbreak Cutouts Cutout-Arrester Combinations

More information

Index GROUNDING CONNECTORS. TYPE WB Ground Rod Clamps. TYPE G/SRC Ground Rod Clamps. Heavy-Duty Clamps. Standard-Duty Clamps (Universal)

Index GROUNDING CONNECTORS. TYPE WB Ground Rod Clamps. TYPE G/SRC Ground Rod Clamps. Heavy-Duty Clamps. Standard-Duty Clamps (Universal) TYPE B Ground Rod Clamps Heavy-Duty Clamps GROUNDING CONNECTORS R30117 For direct burial. For connecting ground wire to driven rod. Designed to maintain proper alignment between ground wire and rod. Cast

More information

Madhya Bhotekoshi Jalavidyut Company Limited

Madhya Bhotekoshi Jalavidyut Company Limited Madhya Bhotekoshi Jalavidyut Company Limited Middle Bhotekoshi Hydroelectric Project (102MW) BIDDING DOCUMENTS For Design, Supply, Construction, Testing and Commissioning of Single Circuit 220kV Transmission

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF SIGN LUMINAIRES

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF SIGN LUMINAIRES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 612 SEPTEMBER 1984 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF SIGN LUMINAIRES 612.01 SCOPE 612.02 REFERENCES 612.03 Not Used 612.04 Not Used

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

Section 2: Underground

Section 2: Underground Section 2: Underground GENERAL INSTALLATION REQUIREMENTS FOR UNDERGROUND FACILITIES Underground electric service and meter location will be established by NHEC upon site visit. In some instances the type,

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

ASTM C857 A -16 AASHTO H -20 (for vaults beneath roadways) ASTM C857 A-8 (for vaults beneath incidental light truck traffic)

ASTM C857 A -16 AASHTO H -20 (for vaults beneath roadways) ASTM C857 A-8 (for vaults beneath incidental light truck traffic) 1 Scope This specification outlines the minimum requirements for 5i 7i (56I 84I) vaults to be used for three-phase sectionalizing cabinets and metering equipment. This specification applies to all 5i 7i

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the

More information

ADDENDUM NO. 2 ITB-PW-U CITY OF PALM COAST WTP 3 ELECTRICAL DISTRIBUTION FACILITIES TO SERVE WELL SITES PH 2

ADDENDUM NO. 2 ITB-PW-U CITY OF PALM COAST WTP 3 ELECTRICAL DISTRIBUTION FACILITIES TO SERVE WELL SITES PH 2 ADDENDUM NO. 2 ITB-PW-U-12-09 CITY OF PALM COAST WTP 3 ELECTRICAL DISTRIBUTION FACILITIES TO SERVE WELL SITES PH 2 ISSUE DATE: August 20, 2012 BID DATE: August 28, 2012, at 2:00 PM This addendum is issued

More information

New Product Flyer Introduction

New Product Flyer Introduction Dec. 5, 2013 New Product Flyer Introduction Preferred Lightning Protection, Inc. is excited to introduce our newest products and capabilities. Following are several new products with current inventories

More information

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL WARNING Before digging or trenching... Call 811 Indiana Underground Protection Service 1-800-382-5544 AVOID BURIED POWER CABLES 4901 East Park 30 Drive P.O.

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or

More information

GENERAL NOTES PEDERNALES ELECTRIC COOPERATIVE, INC. RESIDENTIAL AND COMMERCIAL AMP METER LOOP SPECIFICATIONS

GENERAL NOTES PEDERNALES ELECTRIC COOPERATIVE, INC. RESIDENTIAL AND COMMERCIAL AMP METER LOOP SPECIFICATIONS GENERAL NOTES 1. Residential and commercial meter loops are typically used when constructing facilities for permanent service. It is important that all guidelines outlined in this document be followed

More information

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications Addendum No. 2 Project No. 2016-01EL West Barbour Street 12kV Underground Reconductoring Revisions to Drawings and Specifications Pre-Bid Meeting Notes and Scope of Work Clarifications Replace Section

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 617 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES TABLE OF CONTENTS 617.01 SCOPE 617.02 REFERENCES 617.03 DEFINITIONS

More information

New Construction Units. a. Includes the furnishing of all labor and equipment for the installation of new construction units.

New Construction Units. a. Includes the furnishing of all labor and equipment for the installation of new construction units. 1 All construction is to follow design and construction documents approved by the Engineer and marked approved for construction. All construction shall also follow the National Electrical Safety Code,

More information

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS Greenbook Prepared by: ABB1 ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS 052521 Asset Type: Electric Metering Function: Construction Issued by: Quoc Hoang (QxH1) Date: 08-15-17 Rev. #06:

More information

STANDARD DRAWINGS. September 2013 UPDATED FEBRUARY 2016

STANDARD DRAWINGS. September 2013 UPDATED FEBRUARY 2016 STANDARD DRAWINGS September 2013 UPDATED FEBRUARY 2016 CONSTRUCTION STANDARD DRAWINGS DIVISION 15 LIST OF DRAWINGS: 1. 01 2004-1 Rev. A - Concrete Standards General Outline and Reinforcement Notes 2. 01

More information

ITEM 555 CHAIN LINK FENCING

ITEM 555 CHAIN LINK FENCING ITEM 555 AFTER MARCH 1, 2012 CHAIN LINK FENCING 555.1 Description. This item shall govern for furnishing the quantities of chain link fencing and gates as shown on the plans, including all posts, bracing

More information

Transmission and Distribution Substation Projects. Operating Company: Entergy Gulf States - Texas. Customer: PID #202

Transmission and Distribution Substation Projects. Operating Company: Entergy Gulf States - Texas. Customer: PID #202 Transmission and Distribution Substation Projects Operating Company: Entergy Gulf States - Texas Customer: PID #202 Funding Project Number: F4PPGS0386 Facility Study for PID #202 Facility Study for 146

More information

SERVICES CHAPTER 35. wire. For all other installations, the rating of the ungrounded conductors shall be not less than 60 amperes.

SERVICES CHAPTER 35. wire. For all other installations, the rating of the ungrounded conductors shall be not less than 60 amperes. CHAPTER 35 SERVICES SECTION E3501 GENERAL SERVICES E3501.1 Scope. This chapter covers service conductors and equipment for the control and protection of services and their installation requirements. E3501.2

More information

1.05 Power System Fault and Coordination Study with Arc Flash Calculations

1.05 Power System Fault and Coordination Study with Arc Flash Calculations PART 1: GENERAL 1.01 Underground Ducts and Manholes A. The work included in this section of the construction standards consists of the design requirements for the complete layout and installation of a

More information

04.00 GENERAL SECONDARIES & SERVICES SECONDARY AND SERVICE CABLE SPLICES INSULATED SERVICE ENTRANCE COMPRESSION CONNECTORS 04.

04.00 GENERAL SECONDARIES & SERVICES SECONDARY AND SERVICE CABLE SPLICES INSULATED SERVICE ENTRANCE COMPRESSION CONNECTORS 04. 4. GENERAL SECONDARIES & SERVICES 4.- TIE COLOR CODING 4.-6 SECONDARY AND SERVICE CABLE SPLICES 4.- INSULATED SERVICE ENTRANCE COMPRESSION CONNECTORS 4.- 4. POLE ATTACHMENTS POLE ATTACHMENT DEVICES NEUTRAL

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF UNDERPASS LUMINAIRES

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF UNDERPASS LUMINAIRES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 611 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF UNDERPASS LUMINAIRES TABLE OF CONTENTS 611.01 SCOPE 611.02 REFERENCES 611.03 DEFINITIONS

More information

Welcome to Douglas County PUD

Welcome to Douglas County PUD Welcome to Douglas County PUD We are committed to providing the best possible utility services at the lowest possible cost consistent with sound business principles. To better serve you, please fill out

More information

DOCUMENT SCHEDULE OF UNIT BID PRICES

DOCUMENT SCHEDULE OF UNIT BID PRICES CONTRACT NO. 2420 DOCUMENT 00311 SCHEDULE OF UNIT BID PRICES Schedule A Schedule B Number Work Item Unit QTY Price QTY Price 001 Mobilization/Demobilization 002 Clearing and Grubbing 101 Replace 45 foot

More information

OVERHEAD SERVICE. Table of Contents - Section 400

OVERHEAD SERVICE. Table of Contents - Section 400 OVERHEAD SERVICE Table of Contents - Section 400 PARAGRAPH 400.0 OVERHEAD SERVICES (0-600 VOLTS)... 1 400.1 GENERAL 1 400.2 IDENTIFICATION OF CONDUCTORS. 1 400.3 MAXIMUM SERVICE ENTRANCE CONDUCTOR SIZE

More information

TEMPORARY PROTECTIVE GROUNDING EQUIPMENT

TEMPORARY PROTECTIVE GROUNDING EQUIPMENT TEMPORARY PROTECTIVE GROUNDING EQUIPMENT TEMPORARY PROTECTIVE GROUNDING EQUIPMENT NOTE: When ordeing assemblies of grounding products, please make sure all items included in the assembly are only from

More information

QTY 7/374 8/346 11/375 12/348 17/298 18/324 19/ / /472 24/473 3 QTY

QTY 7/374 8/346 11/375 12/348 17/298 18/324 19/ / /472 24/473 3 QTY PAGE 20 BUTT SPLICES - COPPER Produced from high conductivity seamless copper tubing Marked with die index and color coded Tin plated to provide corrosion resistance SC SERIES Standard Barrel 5808 SC 8

More information

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL). 16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the

More information

A. This section includes building wire and cable rated 600V and less Full Short Circuit Device, Coordination and Arc Fault Study

A. This section includes building wire and cable rated 600V and less Full Short Circuit Device, Coordination and Arc Fault Study PART 1: GENERAL 1.01 Underground Ducts and Manholes A. The work included in this section of the construction standards consists of the design requirements for the complete layout and installation of a

More information

Facilities Study. For. XXXXXXXXXXXX Wind Park Interconnection Switching Station

Facilities Study. For. XXXXXXXXXXXX Wind Park Interconnection Switching Station Facilities Study For XXXXXXXXXXXX Wind Park Interconnection Switching Station Prepared For: Randy Harlas, Substation Manager El Paso Electric Company El Paso, TX September 2010 Table of Contents CERTIFICATION...

More information

Merrimac Municipal Light Department. Commercial Developments Policy

Merrimac Municipal Light Department. Commercial Developments Policy Merrimac Municipal Light Department Commercial Developments Policy General: This document provides specific instructions for the provision of underground electrical facilities associated with the construction

More information

ELECTRICAL SERVICE UPGRADE RESIDENTIAL AND COMMERCIAL QUICK INFORMATION REFERENCE

ELECTRICAL SERVICE UPGRADE RESIDENTIAL AND COMMERCIAL QUICK INFORMATION REFERENCE ELECTRICAL SERVICE UPGRADE RESIDENTIAL AND COMMERCIAL QUICK INFORMATION REFERENCE PROVO CITY POWER STANDARDS ELECTRICAL ENGINEERING UPDATED: 2015 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTIFICATION.

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Please check with your local inspection authority for any additional requirements before installation.

Please check with your local inspection authority for any additional requirements before installation. Specifications for Residential Underground Electric Service Installation This brochure addresses most typical residential underground service installations. Variances for the following specifications must

More information

[Type text] Heber Light & Power. Developers & Excavators. Electrical Service Requirements Manual

[Type text] Heber Light & Power. Developers & Excavators. Electrical Service Requirements Manual [Type text] Heber Light & Power Developers & Excavators Electrical Service Requirements Manual May 2017 E.1.1 - GENERAL REQUIREMENTS PURPOSE This section was prepared to aid developers, contractors, engineers

More information

WIRING RULES AND REGULATIONS OF TOMBIGBEE ELECTRIC POWER ASSOCIATION

WIRING RULES AND REGULATIONS OF TOMBIGBEE ELECTRIC POWER ASSOCIATION WIRING RULES AND REGULATIONS OF TOMBIGBEE ELECTRIC POWER ASSOCIATION The following rules and information are issued to make it possible for anyone engaged in electrical wiring or installation of electrical

More information

Please acknowledge receipt of both Addendum No. 0 1 (issued

Please acknowledge receipt of both Addendum No. 0 1 (issued Bids for the construction of Water Supply Well PW-14 (), will be received by the City of Westerville, Ohio until the revised closing date and time indicated in this Addendum No. 02 and will be publicly

More information

ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV

ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION IN THE TOWN OF MALTA AND A PORTION OF THE 115KV LUTHER FOREST STATION IN THE TOWN OF STILLWATER SARATOGA

More information

CITY OF KENOSHA PUBLIC WORKS DEPARTMENT- ENGINEERING LAKEFRONT LIGHTING PROJECT LIGHT POLES, LED LUMINAIRE FIXTURES & ARM HARDWARE NOTICE #17-18

CITY OF KENOSHA PUBLIC WORKS DEPARTMENT- ENGINEERING LAKEFRONT LIGHTING PROJECT LIGHT POLES, LED LUMINAIRE FIXTURES & ARM HARDWARE NOTICE #17-18 CITY OF KENOSHA PUBLIC WORKS DEPARTMENT- ENGINEERING LAKEFRONT LIGHTING PROJECT LIGHT POLES, LED LUMINAIRE FIXTURES & ARM HARDWARE Issued: November 28, 2018 NOTICE #17-18 INSTRUCTIONS TO BIDDERS 1.0 Sealed

More information

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES 7.01 GENERAL UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES Also refer to Chapter 3 (Service Entrances), and Chapter 4 (Metering Installation). OPPD will install,

More information

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2

More information

TECHNIACL SPECIAL PROVISION FOR NON-STRUCTURAL AND STRUCTURAL INTEGRAL PILE JACKET WITH SACRIFICIAL CATHODIC PROTECTION

TECHNIACL SPECIAL PROVISION FOR NON-STRUCTURAL AND STRUCTURAL INTEGRAL PILE JACKET WITH SACRIFICIAL CATHODIC PROTECTION TECHNIACL SPECIAL PROVISION FOR NON-STRUCTURAL AND STRUCTURAL INTEGRAL PILE JACKET WITH SACRIFICIAL CATHODIC PROTECTION Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official

More information

REA LISTED. Throughout the catalog you will notice blue highlighted items. These are the most frequently ordered BURNDY Products.

REA LISTED. Throughout the catalog you will notice blue highlighted items. These are the most frequently ordered BURNDY Products. Grounding BURNDY Products E-44 TYPE GRC HIGH STRENGTH GROUND ROD CLAMP For Copper Cable to Rod High copper alloy ground connector for joining a range of cable to copper clad, galvanized steel, and stainless

More information

C o u n t y o f F a i r f a x, V i r g i n i a

C o u n t y o f F a i r f a x, V i r g i n i a 001961 Page 2 C o u n t y o f F a i r f a x, V i r g i n i a A D D E N D U M DATE: August 2, 2016 ADDENDUM NO. 4 TO: REFERENCE: FOR: DUE DATE/TIME: ALL PROSPECTIVE BIDDERS Government Center Generator System

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

Transmission Line General Requirements Including Typical Overhead Line Structures. Document Number: 1-03-FR-09

Transmission Line General Requirements Including Typical Overhead Line Structures. Document Number: 1-03-FR-09 Transmission Line General Requirements Including Typical Overhead Line Structures Document Number: 1-03-FR-09 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's

More information

ZG Scope. 2 Applicable Documents. 3 General. 4 Stock Item Numbers. Padvault Single-Phase Residential, 2.1 PacifiCorp Material Specifications

ZG Scope. 2 Applicable Documents. 3 General. 4 Stock Item Numbers. Padvault Single-Phase Residential, 2.1 PacifiCorp Material Specifications 1 Scope This specification outlines the minimum requirements for a 48 48 padvault for single-phase primary service. Single-phase transformers and sectionalizers (elbow switched cabinets) can be mounted

More information

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard PART 1 GENERAL 1.1 Scope A. The intent of this specification is to provide power control for the parallel operation of generator

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 614 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT TABLE OF CONTENTS 614.01 SCOPE 614.02 REFERENCES 614.03 DEFINITIONS

More information

SECTION CONDUITS AND BOXES

SECTION CONDUITS AND BOXES PART 1 GENERAL 1.01 DESCRIPTION A. Work covered by this section includes the furnishing and installation of conduits and boxes and the testing of the completed electrical systems 1.02 SUBMITTALS A. The

More information

SPECIFICATIONS FOR NASSAU SUBSTATION COMBINED METERING UNIT REPLACEMENTS ENGINEERING AND CONSTRUCTION SERVICES SUBSTATION PROJECT DESIGN 20410

SPECIFICATIONS FOR NASSAU SUBSTATION COMBINED METERING UNIT REPLACEMENTS ENGINEERING AND CONSTRUCTION SERVICES SUBSTATION PROJECT DESIGN 20410 SPECIFICATIONS FOR NASSAU SUBSTATION COMBINED METERING UNIT REPLACEMENTS ENGINEERING AND CONSTRUCTION SERVICES SUBSTATION PROJECT DESIGN 20410 SECTION VII - TECHNICAL SPECIFICATIONS - SPECIFIC INSTRUCTIONS

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR BRIDGE NAVIGATION LIGHTING

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR BRIDGE NAVIGATION LIGHTING 809-1(a-e) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR BRIDGE NAVIGATION LIGHTING These special provisions amend and where in conflict, supersede applicable sections of the 2009 Standard

More information

Standard of Practice - Campus Electrical Distribution System

Standard of Practice - Campus Electrical Distribution System A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all

More information

PRIMARY LINE EXTENSION

PRIMARY LINE EXTENSION PRIMARY LINE EXTENSION Installation of new electric service to an empty parcel/lot or extending a transformer to within 150' of proposed meter location. This includes installing a permanent branch, addition,

More information

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS SECTION 26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

METERING INSTALLATION

METERING INSTALLATION 4.01 METERING SPECIFICATIONS METERING INSTALLATION Metering specifications will be issued to the customer by OPPD. Metering specifications are required before any work is started on all new wiring or additions

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 GROUNDING AND BONDING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

RFP Questions and Answers 1 (Pre-Bid Meeting)

RFP Questions and Answers 1 (Pre-Bid Meeting) RFP 40860 Questions and Answers 1 (Pre-Bid Meeting) Amendment to Page 8 of 99 of the Proposal for RFQ 40860 to change from 120 days stated to 270 days for completion of project. Clarifications of drawings:

More information

An altered service that is moved, upgraded (ex., 200 to 400 amp) or changed to meet today's standards for electric service.

An altered service that is moved, upgraded (ex., 200 to 400 amp) or changed to meet today's standards for electric service. ALTERED SERVICE An altered service that is moved, upgraded (ex., 200 to 400 amp) or changed to meet today's standards for electric service. Customer Responsibilities Provide, install and maintain all required

More information

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL WARNING Before digging or trenching... Call Indiana Underground Protection Service 1-800-382-5544 AVOID BURIED POWER CABLES CONTENTS Page # 100-200 OR 400 AMP

More information

SECTION EARTHING AND EARTH FAULT PROTECTION

SECTION EARTHING AND EARTH FAULT PROTECTION SECTION 16660 PART 1 - GENERAL 1.01 DESCRIPTION A. The work to be performed includes, but is not necessarily limited to, all work involved with the construction and assembly of a complete electrical earthing

More information

PRICE BID FOR TENDER NOTICE NO- CONSTRUCTION OF 11KV LINE, LT LINE & SUBSTATION FOR SAMBALPUR FLYOVER PROJECT- WESCO / INSTALLATION / WORKS

PRICE BID FOR TENDER NOTICE NO- CONSTRUCTION OF 11KV LINE, LT LINE & SUBSTATION FOR SAMBALPUR FLYOVER PROJECT- WESCO / INSTALLATION / WORKS PRICE BID FOR TENDER NOTICE NO- CONSTRUCTION OF 11KV LINE, LT LINE & SUBSTATION FOR SAMBALPUR FLYOVER PROJECT- / INSTALLATION / A - DIG BUILDING TO LAXMI TALKIES CHOWK 1 2 Supply & of 3-ph 3-wire 11KV

More information

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION E11 : General Electrical Earthing and LIGHTNING Protection PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION 1 2009-05-12 Review of Mechanical / Electrical and Control

More information

Repair Maintenance Hangar Phase II August 2010 SECTION LIGHTNING PROTECTION SYSTEM PART 1 GENERAL

Repair Maintenance Hangar Phase II August 2010 SECTION LIGHTNING PROTECTION SYSTEM PART 1 GENERAL SECTION 16601 LIGHTNING PROTECTION SYSTEM PART 1 GENERAL 1.1 SCOPE A. Furnish and install all materials and labor required to provide a complete functional lightning protection and common ground system

More information

SECTION MEDIUM VOLTAGE ELECTRICAL DISTRUBUTION (ABOVE 600 VOLTS)

SECTION MEDIUM VOLTAGE ELECTRICAL DISTRUBUTION (ABOVE 600 VOLTS) SECTION 26 10 00 MEDIUM VOLTAGE ELECTRICAL DISTRUBUTION (ABOVE 600 VOLTS) UNIVERSITY OF SOUTH ALABAMA REFERENCE INFORMATION University s Design and Construction Standards, one line diagrams, campus power

More information

BASIC MATERIALS & METHODS

BASIC MATERIALS & METHODS SECTION 15591 BASIC MATERIALS & METHODS 1. SCOPE 1.1 Work Included: 1. SCOPE... 1 2. PIPING SYSTEMS... 1 3. HWS/R PIPING SYSTEM... 2 4. GAS PIPING SYSTEMS... 5 5. PROTECTION OF EXISTING STRUCTURES AND

More information

S. C. Electric Cooperative s Specification for a Single-Phase, Two Bushing Overhead Distribution Transformer (Revised 10/2013)

S. C. Electric Cooperative s Specification for a Single-Phase, Two Bushing Overhead Distribution Transformer (Revised 10/2013) S. C. Electric Cooperative s Specification for a Single-Phase, Two Bushing Overhead Distribution Transformer (Revised 10/2013) 1.0 GENERAL 1.1 This specification covers the electrical and mechanical characteristics

More information

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC). SECTION 16111 CONDUITS PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide conduits, complete, as shown, specified or required per Contract Documents. Principal items include: 1. Rigid aluminum conduit.

More information

PROPOSAL: Q July 9, 2018

PROPOSAL: Q July 9, 2018 MECHANICAL EQUIPMENT SPECIFICATIONS Motor Driven Roller Conveyor (MDR): Motorized-roller conveyor sets the standard in material handling flexibility. Its key is the use of a motorized roller that powers

More information