1 BIM4HOUSING Constructing Excellence National Case Study Richard Whittaker Head of Development

2 Arms Length Management Organisation of Nottingham City Council. 29,000 tenancies, 1,000 leaseholders, over 1,000 employees 115 million investment in new homes across Nottingham Biggest council house building programme for a generation Ongoing circa 900 new build programme Replacing inefficient, uneconomic housing with high quality, efficient homes

3 1960 s design principles to meet demand

4 If a builder has built a house for a man, and has not made his work sound, and the house he built has fallen, and caused the death of its owner, that builder shall be put to death. Ancient Babylonian law The Code of Hammurabi, 1750 BC

5 BIM4Housing National Case Study Accurate design and material schedules Reduces up front design costs Accurately model the life of a building Benefits in terms of design repetition Quick and efficient changes at planning stage Much more detailed interactive view of the plans at consultation stage

6 Meadows and Cranwell Design Meadows Q blocks currently out to tender in conjunction with Cranwell Road and consists of: 8 x 2 b semi-detached bungalows 1 x 2b detached bungalow 16 x 2b terraced houses 24 x 2b semi-detached houses 1 x 2b detached house 4 x 3b semidetached houses National BIM pilot Cranwell Road consists of: 12 x 1 bedroom flats plus study 10 x 2 b terraced bungalows 1 x 1b detached bungalow 14 x 2b semi-detached houses 10 x 2b with study semi-detached houses 1 x 2b detached house

7 BIM Summary Two sites One constructor partner Meadows BIM Modern Methods of Construction Cranwell Traditional construction methods Opportunities Compare apples with apples Clear Lessons learnt Inform & Influence delivery of social housing Improve community consultation Full scale 3d models Allows a full walkthrough of both the estate and house types Can be embedded in google street view to give real life views Savings in time and cost should be achieved through design, procurement and delivery Reductions in waste and defective works will be realised Better tender information and Greater cost certainty

8 Two sites One constructor partner Meadows BIM Modern Methods of Construction Cranwell Traditional construction methods Construction Project Information Exchange (CPIX) All documents for exchange of information are prepared using the rules of CPIx Project Implementation Plan (PIP) This is submitted pre-contract-award to convey each potential supplier s capability related to information management. Task Information Delivery Plan (TIDP)

9 Two sites One constructor partner

10 Difficulties to Date A significant amount of effort to set up Contractor buy in, early engagement Contractors not using BIM models to price work Supply chain using BIM to inform the model Client not managing the change process.

11 Success to Date Communication with Residents, the Community and Members greatly improved Tender information has been much better contributing to greater cost certainty Modelling the life of a building has informed our 30 year business plan Library of fully designed house archetypes for use on future sites 15% saving on future design fees The quality of information has made our procurement team happy.

12 Success to Date Robust tender documents NEC form of contract Half of contingency declared surplus Early warning comparison Compensation event comparison Scheme will come in under budget Employed on ILS schemes, infil sites and our biggest scheme to date of 340 units.

13 Final Thoughts The biggest danger is that we get bogged down in a technical discussion, when BIM is a behavioural change programme more than anything else David Philp Head of BIM Implementation Cabinet Office

14

15 BIM4HOUSING Constructing Excellence National Case Study sentations/bim4housing-presentations/

Richard Whittaker Bobby Chakravarthy Philippa McKenna Derek Green Casey Harper and a Viking

Richard Whittaker Bobby Chakravarthy Philippa McKenna Derek Green Casey Harper and a Viking Welcome Richard Whittaker Bobby Chakravarthy Philippa McKenna Derek Green Casey Harper and a Viking Investing in Social Housing Across Nottingham Arms Length Management Organisation of Nottingham City

More information

November 2011 SUSTAINABILITY POLICY

November 2011 SUSTAINABILITY POLICY November 2011 SUSTAINABILITY POLICY Introduction Cotts Builders and Contractors were founded in circa 1900 and are building contractors to both public authorities and private clients. We wish to be known

More information

STRUCTURAL ENGINEER S SERVICES SCOPE

STRUCTURAL ENGINEER S SERVICES SCOPE ROYAL BOROUGH OF GREENWICH STRUCTURAL ENGINEER S SERVICES SCOPE WOOLWICH CREATIVE DISTRICT PROJECT status: R1 purpose: For information version: 1.0 date: 07/03/2016 1 This version Authored by: name: Nick

More information

MECHANICAL & ELECTRICAL ENGINEER S SERVICES SCOPE

MECHANICAL & ELECTRICAL ENGINEER S SERVICES SCOPE ROYAL BOROUGH OF GREENWICH MECHANICAL & ELECTRICAL ENGINEER S SERVICES SCOPE PROJECT xxx status: R1 purpose: For information version: 1.0 date: 07/03/2016 1 This version Authored by: name: role: signed:

More information

NEC Experience Sharing on Improvement of Fuk Man Road Nullah Partnering and Financial Aspects from Contractor s view. Ir Ko Wing Nin, Ken

NEC Experience Sharing on Improvement of Fuk Man Road Nullah Partnering and Financial Aspects from Contractor s view. Ir Ko Wing Nin, Ken NEC Experience Sharing on Improvement of Fuk Man Road Nullah Partnering and Financial Aspects from Contractor s view Ir Ko Wing Nin, Ken 1 Agenda Tendering Subletting Early Warning Notification 2 Partnering

More information

Highways Roundtable 2 Highways Roundtable 2

Highways Roundtable 2 Highways Roundtable 2 Highways Roundtable 2 Highways Roundtable 2 Beale & Company hosted its second Highways Roundtable in March this year; the latest in an ongoing series of industry focussed roundtables. The roundtable was

More information

The Hyde Group Metering & Billing Framework Agreement

The Hyde Group Metering & Billing Framework Agreement The Hyde Group Metering & Billing Framework Agreement User Guide Framework Scope: Lot 1: Credit Metering and Billing Services Lot 2: Pre-Payment Metering and Billing Services Contract Notice Number in

More information

Use of consultants and temporary staff

Use of consultants and temporary staff Report by the Comptroller and Auditor General Cross-government Use of consultants and temporary staff HC 603 SESSION 2015-16 13 JANUARY 2016 4 Key facts Use of consultants and temporary staff Key facts

More information

N:\NPH Corporate & Customer Services\NPH Board\Key NPH Documents\Delivery Plan\Delivery Plan V13.doc 1

N:\NPH Corporate & Customer Services\NPH Board\Key NPH Documents\Delivery Plan\Delivery Plan V13.doc 1 N:\NPH Corporate & Customer Services\NPH Board\Key NPH Documents\Delivery Plan\Delivery Plan V13.doc 1 Contents 1. Foreword... 3 2. Introduction... 4 3. Vision, Mission and Values... 5 4. National Context...

More information

ORGANISATIONAL INFORMATION REQUIREMENTS (OIR)

ORGANISATIONAL INFORMATION REQUIREMENTS (OIR) Document control ORGANISATIONAL INFORMATION REQUIREMENTS (OIR) The Shared Estates Service (SES) Cluster: Project Control Framework STD/BIM/P002 (G0300) A strategic overview of MoJ data requirements and

More information

Value for Money Statement

Value for Money Statement Value for Money Statement April 1st 2013 March 31st 2014 Doing more with your money Our vision We are committed to making a difference to the lives of our customers and the neighbourhoods you live in Our

More information

Value for Money Statement

Value for Money Statement Value for Money Statement April 1st 2013 March 31st 2014 Doing more with your money Our vision We are committed to making a difference to the lives of our customers and the neighbourhoods you live in Our

More information

Getting ready for AMP6 Delivering Capex Programmes in the Water Sector

Getting ready for AMP6 Delivering Capex Programmes in the Water Sector www.pwc.co.uk/water Getting ready for AMP6 Delivering Capex Programmes in the Water Sector January 2013 PwC has worked with capital programme delivery organisations in many of the UK s water and sewerage

More information

New Models of Construction Procurement

New Models of Construction Procurement New Models of Construction Procurement Don Ward Chief Executive, Constructing Excellence Chair, Cabinet Office Trial Projects Working Group https://www.gov.uk/government/collections/new-models-of-construction-procurement

More information

The Welsh Assembly Government is grateful for the report. We welcome the findings and offer the following response to the recommendations within it.

The Welsh Assembly Government is grateful for the report. We welcome the findings and offer the following response to the recommendations within it. The Welsh Assembly Government s response to the report of the National Assembly Audit Committee's report on NHS Energy Management: Committee Report (2)07-06 The Welsh Assembly Government is grateful for

More information

Process Map. Risk management Early contractor engagement. Collaboration Local growth Speed. Performance management. National Construction framework

Process Map. Risk management Early contractor engagement. Collaboration Local growth Speed. Performance management. National Construction framework National Construction framework Process Map Collaboration Local growth Speed Performance management Risk management Early contractor engagement Process Map Inception RIBA Stage 0 Gateway 1 Access Agreement

More information

BIM objects: what manufacturers and specialist contactors need to know. Ben Councell

BIM objects: what manufacturers and specialist contactors need to know. Ben Councell BIM objects: what manufacturers and specialist contactors need to know Ben Councell AGENDA Introductions What is happening in the industry BIM: what is it? BIM objects: what are they? BIM in action Industry

More information

BIM Essentials & Case Studies Richard Lane Departmental Support / Training Development Officer UK BIM Task Group. 9 September 2014

BIM Essentials & Case Studies Richard Lane Departmental Support / Training Development Officer UK BIM Task Group. 9 September 2014 BIM Essentials & Case Studies Richard Lane Departmental Support / Training Development Officer UK BIM Task Group 9 September 2014 Introduction Richard Lane Project Management Consulting Change Management

More information

ROLE PROFILE KEY ACCOUNTABILITIES

ROLE PROFILE KEY ACCOUNTABILITIES ROLE PROFILE POSITION Project Surveyor TEAM Asset Management LOCATION Coastline House VERSION 1.1 LAST UPDATED May 2017 PURPOSE OF ROLE Contract and project management of a range of contracts including

More information

Approach to Value for Money. Ginny Warr Head of Procurement

Approach to Value for Money. Ginny Warr Head of Procurement Approach to Value for Money Ginny Warr Head of Procurement Background to Sovereign Pre 2011 Sovereign Housing Group Ltd Sovereign Housing Association Ltd Twynham Housing Association Ltd The Vale Housing

More information

Assistant Director, Capability and Organisational Development

Assistant Director, Capability and Organisational Development Assistant Director, Capability and Organisational Development POSITION PURPOSE The Assistant Director, Capability and Organisational Development reports to the Chief Corporate and Regulatory Strategy Officer.

More information

Here are the questions that were not answered during the webinar session.

Here are the questions that were not answered during the webinar session. Integrating BIM into NEC Contracts webinar 6 June 2018 Q&A session Here are the questions that were not answered during the webinar session. You can find the full recording here: https://www.neccontract.com/nec4-products/nec-

More information

Three Year Audit Programme and 2012/13 Audit Plan

Three Year Audit Programme and 2012/13 Audit Plan ITEM: 7(vii) AUDIT COMMITTEE 12 NOVEMBER 2012 Nottingham City Homes Three Year Audit Programme and 2012/13 Audit Plan Final (Updated August 2012) Contents 1 Introduction...3 2 Audit Needs Assessment...3

More information

What is a sustainability benefit?

What is a sustainability benefit? Benefit Tracker 14 What is a sustainability benefit? Sustainability Based Benefits can be defined as positive outcomes in relation to social, economic or environmental areas, enabled or achieved through

More information

POWYS COUNTY COUNCIL AFFORDABLE HOUSING PROGRAMME. 25 September 2017.

POWYS COUNTY COUNCIL AFFORDABLE HOUSING PROGRAMME. 25 September 2017. POWYS COUNTY COUNCIL AFFORDABLE HOUSING PROGRAMME. 25. Procurement Workshop Attendance Mark Davies Housing Kimberly Caruana Housing Donna Heatlie Finance Jim Knight Housing Simone Hodges Housing Dafydd

More information

Constructing Excellence

Constructing Excellence Constructing Excellence Members Forum 8 th October 2014 The SCMG Trial Project Professor David Mosey Director, Centre of Construction Law and Dispute Resolution, King s College London Two Stage Open Book

More information

FAFAFA. Marlon. Welcome!

FAFAFA. Marlon. Welcome! Welcome! Welcome! I m pleased to welcome you to our e-learning program, which is designed to make your organization more successful and to help you significantly differentiate it from the competition you

More information

Process mapping Ministry of Justice Jaimie Johnston BIM Task Group, Delivery & Productivity. Bryden Wood Technology Limited 2017

Process mapping Ministry of Justice Jaimie Johnston BIM Task Group, Delivery & Productivity. Bryden Wood Technology Limited 2017 Process mapping Ministry of Justice Jaimie Johnston BIM Task Group, Delivery & Productivity BIS BIM Strategy March 2011 Government as a client can derive significant improvements in cost, value and carbon

More information

CONSTRUCTION INDUSTRY COUNCIL Technical Seminar on Construction Procurement Selection of Consultants 27 November 2015

CONSTRUCTION INDUSTRY COUNCIL Technical Seminar on Construction Procurement Selection of Consultants 27 November 2015 CONSTRUCTION INDUSTRY COUNCIL Technical Seminar on Construction Procurement Selection of Consultants 27 November 2015 Background A Task Force established by CIC Comprising Government, Clients, Consultants,

More information

Medical Category Tower Providers Contract Awards. Questions and Answers

Medical Category Tower Providers Contract Awards. Questions and Answers Medical Category Tower Providers Contract Awards Questions and Answers 1. What is the Future Operating Model (FOM)? The National Health Service (NHS) has the potential, through greater collaboration, to

More information

Sustainable Procurement

Sustainable Procurement Sustainable Procurement Liz Holford MBA MCIPS Supply Chain Development Ltd CIPS Harrow Branch, 24 th June 2015 What we do Tendering & value chain management Project development & delivery Benchmarking

More information

RE-PROCUREMENT OF THE COLLABORATIVE SOUTH EAST WALES HIGHWAYS AND CIVILS CONSTRUCTION FRAMEWORK (SEWHIGHWAYS2)

RE-PROCUREMENT OF THE COLLABORATIVE SOUTH EAST WALES HIGHWAYS AND CIVILS CONSTRUCTION FRAMEWORK (SEWHIGHWAYS2) CARDIFF COUNCIL CYNGOR CAERDYDD CABINET MEETING: 27 JULY 2017 RE-PROCUREMENT OF THE COLLABORATIVE SOUTH EAST WALES HIGHWAYS AND CIVILS CONSTRUCTION FRAMEWORK (SEWHIGHWAYS2) REPORT OF CORPORATE DIRECTOR

More information

Readiness for service. Gate. Great state. Great opportunity.

Readiness for service. Gate. Great state. Great opportunity. Readiness for service Gate 4 Great state. Great opportunity. The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and

More information

LABC, 3 rd Floor, 66 South Lambeth Road, London, SW8 1RL t: f: e:

LABC, 3 rd Floor, 66 South Lambeth Road, London, SW8 1RL t: f: e: LABC, 3 rd Floor, 66 South Lambeth Road, London, SW8 1RL t: 020 7091 6860 f: 020 7091 6879 e: info@labc.co.uk www.labc.co.uk To all building control departments and building control surveyors, LABC has

More information

Value for Money Annual Self-Assessment 2016/17. Value at the Heart of the First Ark Group 1

Value for Money Annual Self-Assessment 2016/17. Value at the Heart of the First Ark Group 1 Value for Money Annual Self-Assessment 2016/17 Value at the Heart of the First Ark Group 1 Contents 1. Introduction 2. What value for money means to us 3. What value we are delivering 4. Optimising the

More information

The BBC s management of its Digital Media Initiative

The BBC s management of its Digital Media Initiative British Broadcasting Corporation The BBC s management of its Digital Media Initiative Report by the Comptroller and Auditor General This report has been prepared at the request of the BBC Trust under clause

More information

From Uncertainty to Certainty; How Clients can Improve their Experience of the Construction Process

From Uncertainty to Certainty; How Clients can Improve their Experience of the Construction Process From Uncertainty to Certainty; How Clients can Improve their Experience of the Construction Process www.provelio.com Summary This paper is an independent project manager s critique of two projects. One

More information

Quality and Performance in Construction Delivered by Trusted expertise for the product manufacturing sector

Quality and Performance in Construction Delivered by Trusted expertise for the product manufacturing sector Quality and Performance in Construction Delivered by Building responsibly World-class high performing supply chains & products you can build on Trusted expertise for the product manufacturing sector www.bregroup.com

More information

Cost Led Procurement

Cost Led Procurement Trial project: Anchor Property New delivery model / procurement route: Cost Led Procurement Cost savings achieved: Achieved cost savings on an out-turn cost of 3,400,000 of 9% ( 306,000). Other key benefits

More information

The Rail Industry Supplier Qualification Scheme - RISQS

The Rail Industry Supplier Qualification Scheme - RISQS The Rail Industry Supplier Qualification Scheme - RISQS RISQS The Railway Industry Supplier Qualification Scheme (RISQS) is the supplier pre-qualification service used by buyers of products and services

More information

Technical Education Services

Technical Education Services BIM Management Certificate Course Course Duration: 4 days BIM Fundamentals BIM Advanced Concepts Competency Assessment Course Overview Part 1 will discuss the basic themes and knowledge required to understand

More information

Building Information Modelling (BIM) BIM Use in Social Housing with Westminister Council

Building Information Modelling (BIM) BIM Use in Social Housing with Westminister Council Building Information Modelling (BIM) BIM Use in Social Housing with Westminister Council Presenting today Patrick King Associate Director & Head of BIM Technologies Lizzy Westmacott Associate Director

More information

November Introduction. What was your role with the company? Has your business awareness and use of BIM advanced in the last twelve months?

November Introduction. What was your role with the company? Has your business awareness and use of BIM advanced in the last twelve months? November 2016 Executive Summary The second national survey to benchmark the level of Building Information Modelling (BIM) adoption in Ireland revealed that 76% (67% 2015) of respondents possessed confidence

More information

Corporate Social Responsibility Making it our business

Corporate Social Responsibility Making it our business Corporate Social Responsibility Making it our business Our commitment Riverside has been committed to regenerating neighbourhoods and providing affordable homes for more than 80 years. We invest millions

More information

Training & Development 2017/2018 ALERT + INFORM + ENABLE

Training & Development 2017/2018 ALERT + INFORM + ENABLE Training & Development 2017/2018 Training and Development Our course oerings include: Risk Management & Business Continuity International Consortium for Organisational Resilience Business Continuity Institute

More information

CIHT NORTH WEST REGION ANNUAL HIGHWAY MAINTENANCE CONFERENCE. Asset Delivery Approach. Martin Hobbs Asset Delivery National Rollout Director

CIHT NORTH WEST REGION ANNUAL HIGHWAY MAINTENANCE CONFERENCE. Asset Delivery Approach. Martin Hobbs Asset Delivery National Rollout Director CIHT NORTH WEST REGION ANNUAL HIGHWAY MAINTENANCE CONFERENCE Asset Delivery Approach Martin Hobbs Asset Delivery National Rollout Director 1 Asset Delivery approach Background to Asset Delivery approach

More information

Commercialisation in Social Housing. Andrew Carlin Commercial Director

Commercialisation in Social Housing. Andrew Carlin Commercial Director Commercialisation in Social Housing Andrew Carlin Commercial Director What PfH members are telling us. 1/3 Only one third feel they are sufficiently resourced 14% Have total spend visibility. Nearly one

More information

Contracts & Procurement masterclass series for 2012

Contracts & Procurement masterclass series for 2012 Contracts & Procurement masterclass series for 2012 Masterclass 2: The importance of the business case and the project procurement strategy Presented by: Helen Barrow 28 March 2012 The masterclass series

More information

Job Description. Major Works Planning and Delivery Manager Salary SCP Staffing responsibilities

Job Description. Major Works Planning and Delivery Manager Salary SCP Staffing responsibilities Job Description Position Adaptations Project Manager Department/ Location Housing Options Reports to Major Works Planning and Delivery Manager Salary SCP 38-41 Staffing responsibilities (1 x Administrator;

More information

CAPABILITY STATEMENT SUSTAINABILITY ADVISORY SERVICES CLEAN ENERGY. CORPORATION AUSTRALIA

CAPABILITY STATEMENT SUSTAINABILITY ADVISORY SERVICES CLEAN ENERGY.   CORPORATION AUSTRALIA CLEAN ENERGY CORPORATION AUSTRALIA CAPABILITY STATEMENT www.cleanenergycorp.com.au ENERGY, CARBON, WATER & WASTE REDUCTION STRATEGY ECOLOGICALLY SUSTAINABLE DESIGN (ESD) STRATEGY ORGANISATIONAL SUSTAINABILITY

More information

Working to deliver an effective, efficient and sustainable estate. Ministering Change A Lean Journey. Terry Stocks Deputy Director MOJ Estates

Working to deliver an effective, efficient and sustainable estate. Ministering Change A Lean Journey. Terry Stocks Deputy Director MOJ Estates Working to deliver an effective, efficient and sustainable estate Ministering Change A Lean Journey Terry Stocks Deputy Director MOJ Estates What s in a Word? Ministering attend to the needs of a person

More information

Delivering Social Value Through Effective Frameworks

Delivering Social Value Through Effective Frameworks Delivering Social Value Through Effective Frameworks Victoria Brambini Managing Director David Boyer, Warrington Borough Council Phil Wright, Balfour Beatty John Simons, Scape Group Alison Ramsey, Scape

More information

Contract Management. Managing Risks in Construction Contracts

Contract Management. Managing Risks in Construction Contracts Contract Management Managing Risks in Construction Contracts Presented by Architect Charles Ndungu TRIAD Architects 3 Key Pillars of any Building Project or Contract. Construction Contract. Formal binding

More information

Apprentices KPIs In Public Contracts. Daniel Milnes Head of Business Law Forbes 2012

Apprentices KPIs In Public Contracts. Daniel Milnes Head of Business Law Forbes 2012 Apprentices KPIs In Public Contracts Daniel Milnes Head of Business Law Forbes 2012 Legal Notice Your Attention Is Directed To This Note These materials are supplied as general illustrations of legal issues

More information

Housing Association Regulatory Assessment

Housing Association Regulatory Assessment Welsh Government Housing Directorate - Regulation Housing Association Regulatory Assessment Linc-Cymru Housing Association Limited Registration number: L109 Date of publication: 21 December 2012 Welsh

More information

Design and Build the NEC3 Way Getting the right results. 05/11/2015 NEC Contracts 1

Design and Build the NEC3 Way Getting the right results. 05/11/2015 NEC Contracts 1 Design and Build the NEC3 Way Getting the right results 05/11/2015 NEC Contracts 1 Design and Build with NEC3 Interactive Collaborative Informative Useful 2 Design and Build with NEC3 What is Design and

More information

Clear Building Management Transparency

Clear Building Management Transparency Clear Building Management Quality Value Transparency We don t just say it Having worked with Ian and his team on the Islington Wharf Mews development, he provided practical problem-solving that greatly

More information

Corporate Social Responsibility Making it our business

Corporate Social Responsibility Making it our business Corporate Social Responsibility Making it our business Our commitment Riverside has been committed to regenerating neighbourhoods and providing affordable homes for more than 80 years. We invest millions

More information

PPP experiences from the Danish Building & Property Agency s perspective. Chief advisor and project manager Njal Olsen August 24, 2016

PPP experiences from the Danish Building & Property Agency s perspective. Chief advisor and project manager Njal Olsen August 24, 2016 PPP experiences from the Danish Building & Property Agency s perspective Chief advisor and project manager Njal Olsen August 24, 2016 1 Agenda 1. The Danish Building and Property Agency 2. What PPP is

More information

Insourcing Andrew Moss Assistant Director Highways & Transport

Insourcing Andrew Moss Assistant Director Highways & Transport Insourcing Andrew Moss Assistant Director Highways & Transport Overview context options our plan the process benefits next steps our Cumbrian context large rural network 3 way partnership concern about

More information

E-Procurement on large tenders: advantages and disadvantages for European contractors. April 2015

E-Procurement on large tenders: advantages and disadvantages for European contractors. April 2015 E-Procurement on large tenders: advantages and disadvantages for European contractors April 2015 Agenda Background Tendering truths Advantages of etendering Example of etendering in practice etendering

More information

Best Value Procurement a change of paradigm

Best Value Procurement a change of paradigm Best Value Procurement a change of paradigm Carlita Vis Procurement manager Ministry of Transport and the Environment Agenda 1. 2.Priority Road Investment Programme leads to Best Value Procurement (BVP)

More information

Street lighting design and management. Improving street lighting design and performance. Better built environments

Street lighting design and management. Improving street lighting design and performance. Better built environments Street lighting design and management Improving street lighting design and performance Better built environments Street lighting design and management It s no secret that local authorities are coming under

More information

Chucks A. Omeife FNIOB President, Nigerian Institute Of Building

Chucks A. Omeife FNIOB President, Nigerian Institute Of Building Chucks A. Omeife FNIOB President, Nigerian Institute Of Building The rising number of cases of construction infrastructure collapse during and after completion justifies need for Construction, Engineering

More information

1. Introduction. 2. Our Allocations Scheme

1. Introduction. 2. Our Allocations Scheme 1. Introduction The Localism Act 2011 gave local authorities more freedom and flexibility for Local Government, rights and powers to local communities, reform to the planning system and decisions about

More information

Street lighting design and management. Improving street lighting design and performance. Creating excellence in the built environment

Street lighting design and management. Improving street lighting design and performance. Creating excellence in the built environment Street lighting design and management Improving street lighting design and performance Creating excellence in the built environment Street lighting design and management It s no secret that local authorities

More information

Structural Engineering & Civils Scope of Services

Structural Engineering & Civils Scope of Services Structural Engineering & Civils Scope of Services 1.0 General The scope of services set out below is indicative and are not intended to be exhaustive. This scope of service should be read in conjunction

More information

A CHANGE WORTH MAKING. Minor Works 70% 70% Facilities Management. Minor Works. Project Management & Quantity Surveying.

A CHANGE WORTH MAKING. Minor Works 70% 70% Facilities Management. Minor Works. Project Management & Quantity Surveying. Main Colours Pantone 640 C Hex Pantone Cool Grey 10 C Hex Pantone Cool Grey 6 C Hex Tints Secondary Colours Pantone 354 C Civil Engineering & Infrastructure Project Management & Quantity Surveying Pantone

More information

Street lighting design and management. Improving street lighting design and performance. Better built environments

Street lighting design and management. Improving street lighting design and performance. Better built environments Street lighting design and management Improving street lighting design and performance Better built environments Street lighting design and management It s no secret that local authorities are coming under

More information

Renewable Heat Incentive: proposals for a domestic scheme. Community Housing Cymru Group response

Renewable Heat Incentive: proposals for a domestic scheme. Community Housing Cymru Group response Renewable Heat Incentive: proposals for a domestic scheme Community Housing Cymru Group response 1. About Us The Community Housing Cymru Group (CHC Group) is the representative body for housing associations

More information

Stoneham Green PROJECT SUMMARY

Stoneham Green PROJECT SUMMARY Stoneham Green PROJECT SUMMARY Stoneham Green is the first Code for Sustainable Homes Level 6 development in Southampton. Indeed, the eleven family homes that will provide a variety of affordable accommodation

More information

Procurement of FM Services

Procurement of FM Services Next Generation FM Services Procurement of FM Services 22nd June 2017 Presented by Mark French Procurement of FM Services Introducing Crown Commercial Service (CCS) We re one of the biggest public procurement

More information

The impact and progress achieved against each of the principles of the 2015 WPPS is summarised below:

The impact and progress achieved against each of the principles of the 2015 WPPS is summarised below: Y Pwyllgor Cyfrifon Cyhoeddus / Public Accounts Committee PAC(5)-07-18 P2 National Assembly for Wales Public Accounts Committee: Public Procurement Evidence from Welsh Government Welsh Government Leadership

More information

Cookham Wood and BIM: Practical Lessons Learnt Fiona Moore Cirrus Consultant Services 10 July 2014

Cookham Wood and BIM: Practical Lessons Learnt Fiona Moore Cirrus Consultant Services 10 July 2014 Cookham Wood and BIM: Practical Fiona Moore 10 July 2014 Topics Covered: Project Overview BIM Early Adopter Project: Why Cookham Wood and how we got involved Ministry of Justice (MoJ) and BIM Key Client

More information

Auckland Transport HS08-01 Safety In Design

Auckland Transport HS08-01 Safety In Design Auckland Transport HS08-01 Safety In Design (Procedure uncontrolled when printing) Relating to Standard: HS08 Safety In Design December 2016 Health and Safety-Procedure-HS08-01 Safety In Design Contents

More information

Procurement Strategy Version 08 October Reference Version 08

Procurement Strategy Version 08 October Reference Version 08 Strategy 2016-2020 Version 08 October 2016 Reference Version 08 Issue date October 2016 Review date October 2018 Introduction At Red Kite, achieving value for money in delivering our corporate vision is

More information

Initiating Planning Implementing Controlling Closing Develop project charter Develop project plans Direct project work

Initiating Planning Implementing Controlling Closing Develop project charter Develop project plans Direct project work and Introduction is a high level guide to project, very similar in structure to the Project Management Institute s (PMI ) Guide to the Project Management Body of Knowledge (PMBoK ). It is important to

More information

THE CASE FOR LEAN CONSTRUCTION THE ARDMAC STORY

THE CASE FOR LEAN CONSTRUCTION THE ARDMAC STORY THE CASE FOR LEAN CONSTRUCTION THE ARDMAC STORY October 2018 CONTENTS INTRODUCTION WHY LEAN? WHAT IS LEAN? LEAN PROCESSES INTEGRATED PROJECT DELIVERY LEAN & TECHNOLOGY THE FUTURE FOR ARDMAC SUMMARY Lean

More information

SUBCONTRACTOR HANDBOOK

SUBCONTRACTOR HANDBOOK SUBCONTRACTOR HANDBOOK Overview 1 2 3 4 5 6 7 Introduction Subcontractor Statement Company Vision & Values Heron Bros Requirements: A. Health & Safety Management B. Quality Management C. Environmental

More information

London fit-out summer 2017 survey

London fit-out summer 2017 survey London fit-out summer 2017 survey Market update making the difference 1 Key themes Impact of clients delaying decisions to invest now being felt London fit-out update One year on from the Brexit referendum,

More information

Plymouth Hospitals NHS Trust Business Case for replacement Managed Equipment Service

Plymouth Hospitals NHS Trust Business Case for replacement Managed Equipment Service Plymouth Hospitals NHS Trust Business Case for replacement Managed Equipment Service Purpose The Business Case describes and seeks approval to award the contract for the replacement of the existing Pathology

More information

Building Information Modelling (BIM) BIM Use in Social Housing with Westminster Council

Building Information Modelling (BIM) BIM Use in Social Housing with Westminster Council Building Information Modelling (BIM) BIM Use in Social Housing with Westminster Council Presenting today Patrick King Associate Director & Head of BIM Technologies Agenda Introduction Implementing BIM

More information

Transforming the local authority housing business

Transforming the local authority housing business HOUSING AND CONSULTANCY SERVICES Transforming the local authority housing business Making the most of HRA self-financing South West Housing Event April 2013 Jon Lloyd-Owen 07880 043574 jonlloyd-owen@sector-group.com

More information

managementors creating sustainable business advantage m 2 Fujitsu work with Managementors to drive performance improvement and get fit for digital

managementors creating sustainable business advantage m 2 Fujitsu work with Managementors to drive performance improvement and get fit for digital managementors creating sustainable business advantage Case study Name: Fujitsu Services Limited Sector: IT Infrastructure Support Location: Telford, UK Fujitsu work with Managementors to drive performance

More information

Value for Money 2016/17 Self-Assessment

Value for Money 2016/17 Self-Assessment Value for Money 2016/17 Self-Assessment Introduction Guinness is a Registered Provider of social housing, with approximately 66,000 affordable homes across England. The majority of our customers are those

More information

Briefing on 10-Year Hospital Development Plan Date: 15 September 2016 Time: 2:30pm 4:00pm

Briefing on 10-Year Hospital Development Plan Date: 15 September 2016 Time: 2:30pm 4:00pm Briefing on 10-Year Hospital Development Plan Date: 15 September 2016 Time: 2:30pm 4:00pm Q&A Session Preamble: Below is a record of the questions and answers given at the 10-year Hospital Development

More information

Part and Parcel to Enhance Cost Control under NEC Contracts

Part and Parcel to Enhance Cost Control under NEC Contracts Part and Parcel to Enhance Cost Control under NEC Contracts Hayman Choi Director Contract Management Mott MacDonald Hong Kong Limited 19 June 2017 The Association of Consulting Engineers of Hong Kong Through

More information

certificate in management practice financial skills

certificate in management practice financial skills NQF Level 4 certificate in management practice financial skills Building a cost conscious culture amongst non-financial managers about the programme The training need The need to embed cost effectiveness

More information

Off-site manufacturing for construction. Response to the House of Lords Science and Technology Committee, 4 May 2018

Off-site manufacturing for construction. Response to the House of Lords Science and Technology Committee, 4 May 2018 Off-site manufacturing for construction Response to the House of Lords Science and Technology Committee, 4 May 2018 Introduction The Royal Academy of Engineering welcomes this opportunity to submit evidence

More information

The new Scottish Capital Investment Manual

The new Scottish Capital Investment Manual The new Scottish Capital Investment Manual Presented by: Paul Mortimer: Asset Management Policy Advisor for HFS Yvonne Summers: Performance Manager - Health Performance and Delivery Directorate Today s

More information

BIDDING FOR BIM. CIF Bidding for BIM. September

BIDDING FOR BIM. CIF Bidding for BIM. September BIDDING FOR BIM CIF September 2017 www.cif.ie Document Control Sheet Client: Project Title: Document Title: Document No: Construction Industry Federation (CIF) Lean Construction, Building Information Modelling

More information

NCHA Equality and Diversity Strategy February 2012

NCHA Equality and Diversity Strategy February 2012 NCHA Equality and Diversity Strategy February 2012 Diversity Supporting NCHA 1 EQUALITY AND DIVERSITY STRATEGY RESPONSIBLE DIRECTOR: CHIEF EXECUTIVE RESPONSIBLE OFFICER: HUMAN RESOURCES MANAGER LAST UPDATE:

More information

Peter Cunningham Project LR0470

Peter Cunningham Project LR0470 External Research Report Issue Date: 30/06/2015 ISSN: 2423-0839 Report ER6 Government as Client: Using Building Information Modelling on NZ Construction Projects Peter Cunningham Project LR0470 Futurum

More information

FRAMEWORK AGREEMENT GUIDE

FRAMEWORK AGREEMENT GUIDE FRAMEWORK AGREEMENT GUIDE For offsite construction of new homes Trusted procurement for better buildings and homes 03 WHY WORK WITH LHC? About this framework agreement These are the key reasons to work

More information

BIM-MEP AUS 2013 FORUM. Efficiencies Gained through BIM; from Design to Construction. Martin Howland

BIM-MEP AUS 2013 FORUM. Efficiencies Gained through BIM; from Design to Construction. Martin Howland BIM-MEP AUS 2013 FORUM Efficiencies Gained through BIM; from Design to Construction Martin Howland July 26 th, 2013 Efficiencies Gained through BIM; From Design to Construction Presentation will consider:-

More information

Surrey Minor Maintenance Works Panel of Contractors

Surrey Minor Maintenance Works Panel of Contractors Supporting the local economy in Surrey Surrey Minor Maintenance Works Panel of Contractors 13 th July 2012 Surrey Minor Maintenance Works Panel of Contractors Introduction Ross Duguid Category Manager

More information

Procedure for Stage 8 Post Project Evaluation. Procedure No. 017

Procedure for Stage 8 Post Project Evaluation. Procedure No. 017 Procedure for Stage 8 Post Project Evaluation Procedure No. 017 Print Name Title Date Prepared by C Hanratty CATSO 16 th Feb 05 Reviewed by Corporate Authorisation J.G. MacNamara J.G. MacNamara T.S.O.

More information

CIH consultation response

CIH consultation response CIH response to the final report of Building a Safer Future: Independent Review of Building Regulations and Fire Safety About CIH The CIH (Chartered Institute of Housing) is the professional body for people

More information

DORSET PROCUREMENT. Procurement Strategy

DORSET PROCUREMENT. Procurement Strategy DORSET PROCUREMENT Procurement Strategy 2018 2020 To provide procurement and commercial expertise that supports contracts and purchasing activity to deliver value for money, social value and added value

More information