PROVING OUR PROFESSIONALISM
|
|
- Archibald Richard
- 6 years ago
- Views:
Transcription
1 PROVING OUR PROFESSIONALISM 49 TH ANNUAL CONFERENCE MAY 22-25, 2016 ORLANDO, FLORIDA DESIGN-BUILD 101 Joanne Flick, CPPO, CPPB
2 TODAY S TOPICS Project Delivery Overview Comparing Project Delivery Methods The Nitty Gritty, CCNA & Design-Build Solicitation Strategies
3 PROJECT DELIVERY OVERVIEW
4 PROJECT DELIVERY OVERVIEW A COMPREHENSIVE PROCESS NECESSARY FOR ORGANIZING, EXECUTING AND COMPLETING A BUILDING, FACILITY OR PROJECT. Design-Bid-Build Construction Manager at Risk (CM@R or CMAR) Design-Build
5 DESIGN-BID-BUILD Traditional Construction Project Delivery Low Bid Two contracts Linear Sequential Responsive & Responsible
6 PROJECT DELIVERY SYSTEMS I. Design-Bid-Build A/E prepares plans and specifications Low dollar bid from general contractor Separate contracts for design and construction OWNER ARCHITECT/ ENGINEER DESIGN SUBS BUILDER/GC SUBS & SUPPLIERS
7 PROJECT DELIVERY SYSTEMS CONSTRUCTION MANAGER AT RISK Competitive Selection Negotiated Contract Two contracts Design Construction GMP Contingencies Possible fast track Spearin Doctrine
8 PROJECT DELIVERY SYSTEMS II. Construction Management Select Designer Select CM Based on Qualifications Two separate Companies under Contract CM Responsible for Delivery of Construction Services OWNER ARCHITECT/ ENGINEER DESIGN SUBS CM SUBS & SUPPLIERS
9 PROJECT DELIVERY SYSTEMS DESIGN-BUILD Negotiated Contract One contract Single point of responsibility Faster to Contract Award Concurrent Design/Construction Fast track Total Cost Known earlier No Spearin Doctrine (if done right!)
10 PROJECT DELIVERY SYSTEMS Design-Build Design and construction under a single contract Project may begin before design is complete OWNER DESIGN-BUILDER ARCHITECT/ ENGINEER BUILDER/GC
11 COMPARING PROJECT DELIVERY METHODS
12 COMPARING PROJECT DELIVERY METHODS Design-Bid-Build Owner Selects Designer Design by A/E Owner Warrant Plans Construction Bid after Plans Complete Construction Starts after Construction Contract Awarded Design-Build Owner Selects DB Designer Part of DB Team Design by DB DB Warrants Plans RFP for Design and Construction Construction may Start upon Contract Award
13 COMPARING PROJECT DELIVERY METHODS Construction Manager at Risk Owner Selects Designer 2 Contracts Design by A/E Owner Warrants Plans CM Input GMP may be Negotiated Before Plans Complete Construction Starts after CM@R Contract Awarded Design-Build Owner Selects DB Designer Part of DB Team 1 Contract=Single Responsibility Design by DB DB Warrants Plans Builder input Design + Construction Cost Proposed & Negotiated Construction may Start upon Contract Award
14 DESIGN-BID-BUILD Determine Need Define Scope of Work Solicit Designer Award Designer Design Project Solicit Contractor Award Contractor Construct Project Project Completion
15 DESIGN-BUILD Determine Need Develop Design Criteria Solicit Design- Builder Award Design- Build Complete Design Construct Project Project Completion
16 DESIGN-BID-BUILD Advantages Familiar process, established procedure Suitable for many projects Checks & balances Legal precedent No legal barriers to procurement & licensing Insurance and Bonding Disadvantages Lowest bidder not always most qualified Owner is referee Spearin Doctrine Slower No innovation Total cost known at end of project
17 DESIGN-BUILD Advantages Single point of responsibility Faster to award Less conflict No Spearin Doctrine (if done right!) Quality & Innovation Cost savings potential Schedule Early knowledge of cost Fast Track Construction Disadvantages New territory, different roles & risks Complex process Designer not under owner s control Design-Criteria Package Best value vs. Lowest price
18 CONSTRUCTION INDUSTRY INSTITUTE STUDY 351 Projects Various types/industry sectors Compared performance between D-B-B, CM at Risk, and D-B Performance evaluated Cost, Schedule, Quality areas
19 CONSTRUCTION INDUSTRY INSTITUTE STUDY Design-Build Performance compared to Design-Bid-Build Unit Cost - 6% less Construction Time - 12% faster Project Time (design and construction) - 33% faster
20 CONSTRUCTION INDUSTRY INSTITUTE STUDY Quality on a 10-point scale - Start-up; Call Backs; O&M; Exterior and Structure; Interior; Environmental; Equipment D-B outperformed D-B-B in every category
21 THE NITTY-GRITTY CCNA FS
22 CCNA AND DESIGN-BUILD CCNA FS Competitive Proposals (Best Value) Qualification-Based Selection (Progressive Designbuild) Defines: design-build firm design-build contract design criteria package design criteria professional design-build
23 CCNA DEFINITIONS Design Build Firm Certified or Registered General Contractor, OR Certified or Registered Building Contractor, OR Engineering firm, OR Architecture firm, OR Landscape Architecture firm.
24 CCNA DEFINITIONS Design-Build Contract One contract for design AND construction of public project Design Criteria Professional Architect, LA, or Engineer Employed by or under contract with agency Prepares Design Criteria Package
25 CCNA DEFINITIONS Design Criteria Package Concise Performance-oriented drawings Performance-oriented specifications Sufficient to permit DB firms to submit a proposal, OR Sufficient to permit negotiations with a DB Not specifications!
26 CCNA - APPLICABILITY TO DESIGN-BUILD CONTRACTS Design Criteria package prepared by Design Criteria Professional Design Criteria Professional not eligible to render services under the design-build contract Non-State agencies must adopt own rules for award of Design-Build contracts
27 CCNA - APPLICABILITY TO DESIGN-BUILD CONTRACTS 2 Selection Processes Competitive Proposal Selection aka Best Value Qualifications Based Selection aka Progressive Design-Build
28 COMPETITIVE PROPOSALS/BEST VALUE Design Criteria Package Short listing based on qualifications Weighted Evaluation Criteria published Competitive technical & price proposals from short listed firms Evaluation of technical and price proposals by design criteria professional
29 COMPETITIVE PROPOSALS/BEST VALUE 3 proposals from each firm Qualifications Statement Technical Proposal Price Proposal
30 SOLICITATION STRATEGIES
31 COMPETITIVE PROPOSALS - OPTIONS One Step Qualifications, Technical & Price Proposal from each firm Two Step Qualifications proposals received and firms short listed Short listed firms submit Technical and Price Proposals
32 COMPETITIVE PROPOSALS A WAR STORY Temporary Jail Housing One Step Design Criteria limiting Form follows Function
33 QUALIFICATION-BASED SELECTION Same announcement and qualifications procedures as A/E selection Same competitive selection as A/E Same Competitive Negotiation requirements as A/E Owner must retain or employ licensed designer to serve as Owner s rep Design criteria package required to negotiate GMP & guaranteed completion time
34 QUALIFICATION-BASED SELECTION/PROGRESSIVE DESIGN-BUILD Evaluation Criteria Specific to Project Capabilities Adequacy of Personnel Past Record Experience of Firm Experience of Key personnel Design of similar projects Construction of similar projects Prior Design-Build experience Same team? Project Approach MWBE standing / participation
35 QUALIFICATION-BASED SELECTION Negotiate Contract Bids from Trades Use of contingency; Owner s/design-builder s Owner Direct Purchases Award Contract Negotiate GMP Open Book Pre-GMP Costs General Conditions Design Cost Cost of the Work Contingencies Negotiate Guaranteed Completion Date
36 SUMMARY
37 DESIGN-BUILD SUMMARY Review of 3 Project Delivery Methods Each has advantages/disadvantages Design-Build CII Study Faster Cheaper Better Quality CCNA Application to Design-Build Solicitation Strategies Best Value Selection Progressive Design-Build
38 QUESTIONS??
39 THANK YOU ALL! Joanne Flick, CPPO, CPPB Purchasing Agent City of Daytona Beach
AVIATION AUTHORITY POLICY
PURPOSE: To establish a policy for the selection of development related professional services firms, including design-build firms for professional services and the Consulting Engineer, pursuant to the
More informationDesign Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright
Design Process 101 Michael Barnard, AIA, NCARB animalsheltering.org/expo #AnimalCareExpo Copyright 1 Design and Construction Process Needs Assessment Conceptual Design Schematic Design Design Development
More informationAPPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1)
APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter
More informationLease-Leaseback Project Delivery Method
Lease-Leaseback Project Delivery Method ASBA Technical Meeting & Tradeshow Winter 2013 Presented by: Mark Baginski Principal Verde Design, Inc. James Moore V.P. of Pre-Construction Services Robert A. Bothman,
More information1/4/2014. Alternative Project Delivery Methods 1. Agenda
Steven. C. Thweatt Assistant Vice Chancellor Facilities Management University of Colorado @ Boulder Steven.thweatt@colorado.edu Introduction Fun in the air More Fun in Chattanooga Licensed Architect Georgia
More informationIntegrated Project Delivery
2014 HDR Architecture, 2014 HDR, Inc., all all rights reserved. Integrated Project Delivery It s A New World, And How It Can Benefit Municipal Owners Rich Atoulikian, PMP, PE Rich.Atoulikian@hdrinc.com
More informationComparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013
Comparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013 Outline Alternative Delivery Options Oregon and Washington Legal Context Things an Owner Should
More informationRisks Associated with Alternative Delivery Methods. Managing Expectations. Presented by Dan Becker, CCM, PMP, CCE
Risks Associated with Alternative Delivery Methods Managing Expectations Presented by Dan Becker, CCM, PMP, CCE 1 3 Primary Methods for Delivering Projects in WA and OR Design/Bid/Build Design/Build CM
More informationPROGRESSIVE DESIGN BUILD WHAT IS IT? AN UPDATE FROM LAST YEAR
PROGRESSIVE DESIGN BUILD WHAT IS IT? AN UPDATE FROM LAST YEAR Moderator: Praful Kulkarni, AIA President/CEO of gkkworks National Chairman of DBIA Presenters: Geoffrey Neumayr, SE Chief Development Officer
More informationProcurement Guidelines
Reference 21 CM@Risk Procurement Guidelines Draft June 5, 2014 Purpose: These guidelines are intended to provide (1) assistance to those who may be responsible for implementation, processing and/or management
More informationLB 889 The Political Subdivisions Construction Alternatives Act
1 LB 889 The Political Subdivisions Construction Alternatives Act What cities, villages, counties, state colleges, community colleges, and school districts need to know about their construction options.
More informationStandard Form of Agreement Between Owner and Architect with Standard Form of Architect s Services
B-Series B- S E R I E S The documents in the B Series relate to various forms of agreement between an owner and an architect for professional services. B141 Standard Form of Agreement Between Owner and
More informationA , Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum
A101 2007, Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AIA Document A101 2007 is a standard form of agreement between owner and contractor for
More informationTwo Parts of our Discussion
Two Parts of our Discussion Part One: The basics (what, why, how, when, etc) An overview of process By no means comprehensive (not enough time) Part Two: From the trenches stuff Not contained in statute
More informationNew York State Contract Reporter NYS' official source of contracting opportunities Bringing business and government together
The New York State Contract Reporter NYS' official source of contracting opportunities Bringing business and government together This document printed Friday, 04/15/2016 Contracting Opportunity Title:
More informationState Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund
State Historic Preservation Office Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund April 2014 Table of Contents Conflict of Interest... 3 Floodplains... 3 Hazardous
More informationDepartment of Public Works Division of Engineering. Nassau County, New York
TOWN OF OYSTER BAY Department of Public Works Division of Engineering Nassau County, New York REQUEST FOR PROPOSALS FOR CONSULTANT SERVICES SOLICITATION NO. 2017-12 NOTES: 1. ISSUANCE DATE: Thursday, October
More informationCM AT RISK VS. DESIGN BID BUILD
CM AT RISK VS. DESIGN BID BUILD A TEXAS CASE STUDY ON PROCUREMENT AND IMPLEMENTATION September 28, 2010 Acknowledgement Mike Adams, P.E Executive Director of Engineering and Utilities City of Midlothian
More informationRequest for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Bishop Woods Landscape Restoration Response
More informationYou Passed Your Bond Now What? a Part 3: Multi-Prime and Design-Build Project Delivery Methods and Project Labor Agreements
You Passed Your Bond Now What? a Part 3: Multi-Prime and Design-Build Project Delivery Methods and Project Labor Agreements January 25, 2017 Presented By: Deidree Sakai Cameron Ward SAN FRANCISCO LONG
More informationTampa Bay Water is a wholesale water
FWRJ Utilizing The Engineer-Procure-Construction Management Procurement Process To Get A Bang Without Going Bust Suzannah Folsom, Jonathan Kennedy, Jerry Russell, and Eric Peters Tampa Bay Water is a wholesale
More informationThe documents in the A-Series relate to various forms of agreement between an owner and a contractor.
A-Series A- S E R I E S The documents in the A-Series relate to various forms of agreement between an owner and a contractor. A101 Owner-Contractor Agreement Form Stipulated Sum Basis of payment is a stipulated
More informationStrategic Management and Project Selection
Strategic Management and Project Selection Strategic Management and Project Selection Maturity of Project Management Overview Criteria for PS Models Nature of PS Models Types of PS Models Uncertainty Analysis
More informationConstruction Manager as Constructor (CMc) Manual
Construction Manager as Constructor (CMc) Manual Manual Courtesy of Purdue University Presented By Table of Contents 1.0 Executive Summary 2.1 House Bill 1196 2.2 Analysis of House Bill 1196 and Requirements
More informationChoosing a Project Delivery Method. A Design-Build Done Right Primer
Choosing a Project Delivery Method A Design-Build Done Right Primer DESIGN-BUILD DONE RIGHT PRIMER 1 Choosing a Project Delivery Method A DESIGN-BUILD DONE RIGHT PRIMER A DESIGN-BUILD INSTITUTE OF AMERICA
More informationBID AND PURCHASING LAWS/BEST PRACTICES
BID AND PURCHASING LAWS/BEST PRACTICES BEFORE YOU DO ANYTHING, ASK YOURSELF THIS QUESTION. Is this purchase or contract for goods or services exempt from the bid laws? Exemptions: Piggy back off a contract
More informationFEMA PA Match Training
FEMA PA Match Training PROCUREMENT REQUIREMENTS USING CDBG-DR FUNDS Regulatory/Statutory Citations Selection Procedures - (2 CFR 200.319) Conflict of Interest - (2 CFR 200.318) Contract Administration
More informationConstruction Family of Documents
Construction Family of Documents The EJCDC Construction Family Documents (C-Series) is intended for engineered construction projects. The current edition (2013) is endorsed by both the Construction Specifications
More informationContracting Methods and Risk Management
Contracting Methods and Risk Management In Tunneling and Underground Construction Michael S Schultz Senior Vice President CDM Smith Boston, Massachusetts September 12, 2016 Topics What is a Contract and
More informationEJCDC Contract Documents for America s Infrastructure Buy online at
EJCDC Contract Documents for America s Infrastructure Buy online at www.booksforengineers.com N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction
More informationProgressive Design-Build
November 15,2016 Progressive Design-Build A Smart Alternative to Lease/Lease back? PRESENTERS Praful Kulkarni, AIA Rebekah Gladson, FAIA, DBIA Robynne T. Parkinson, JD, DBIA Presentation Outline Value
More informationOwner s Representative SCOPE OF SERVICES
Owner s Representative SCOPE OF SERVICES Scope of Services DeMaria s steady growth has enabled the construction of more sophisticated buildings through various methods and services. As your Owners Representative,
More informationTsawwassen First Nation Procurement Policy. February, 2010
Tsawwassen First Nation Procurement Policy February, 2010 TFN Procurement Policy Page 0 of 10 Table of Contents 1. Authority... 2 2. Purpose and Scope... 2 3. Principles... 2 4. Purchasing authority and
More informationHow to Prepare a Request for Qualifications (RFQ) Response for A/E & CMR Solicitations
How to Prepare a Request for Qualifications (RFQ) Response for A/E & CMR Solicitations September 29, 2014 at 9:00 am School Board Administrative Building (Auditorium) 1 Who We Are: THE SCHOOL BOARD OF
More informationCONTRACT / CONSTRUCTION REQUIREMENTS FOR PUBLIC SCHOOLS PROJECTS. August 2005
CONTRACT / CONSTRUCTION REQUIREMENTS FOR PUBLIC SCHOOLS PROJECTS August 2005 Projects Requiring Licensed Architect / Engineer: *Project Cost Threshold New Construction or Additions $135,000 + Major Repairs
More informationFACILITIES CONFERENCE
FACILITIES CONFERENCE April 24-26, 2013 Construction Manager at Risk Lessons Learned Minnesota State Colleges and Universities The Minnesota State Colleges and Universities system is an Equal Opportunity
More informationFairfax County Government Construction Management At Risk (CMAR)
Fairfax County Government Construction Management At Risk (CMAR) Presented for: CMAA - Owner s Committee Presented by: Matt Doyle Branch Chief, Wastewater Design and Construction Division Department of
More informationPROJECT DESCRIPTION. The project is the Spartan Complex Seismic Upgrade, San Jose, California.
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE SPARTAN COMPLEX SEISMIC UPGRADE PROJECT SAN JOSE STATE UNIVERSITY ONE WASHINGTON SQUARE, SAN JOSE, CA 95192-0010 The Trustees of
More informationContracting for Architectural and Engineering (A/E) Services Webinar. August 30, AM to 11:30 AM
Contracting for Architectural and Engineering (A/E) Services Webinar August 30, 2011 10 AM to 11:30 AM 1 Where We're Going Today Webinar Operation - Fred Ward 5 minutes (+/-) Topic Introduction - John
More informationSAN DIEGO COMMUNITY COLLEGE DISTRICT. SDCCD Design/Build Subcontracting Plan Preparation Workshop
SAN DIEGO COMMUNITY COLLEGE DISTRICT SDCCD Design/Build Subcontracting Plan Preparation Workshop April 7, 2015 Welcome Chris Manis Vice Chancellor, Facilities Management Purpose To share information useful
More informationBoardDocs Pro http://www.boarddocs.com/fla/leon/board.nsf/public 1 of 2 3/9/2015 12:39 PM Agenda Item Details Meeting Mar 10, 2015 - Business Meeting Category Subject Type Budget Source 18. Items for Consideration
More informationJob Order Contracting (JOC) ITB JE Overview August 2016
Job Order Contracting (JOC) ITB 16-14204-JE Overview August 2016 Job Order Contracting (JOC) What is JOC? Using general and specialty trade contractors to perform a series of projects on an as-needed basis.
More informationSeattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices
Seattle Public Schools Office of Internal Audit Issue Date: December 5, 2017 Introduction and Background In accordance with the fiscal year 2018 capital audit plan, we have completed an audit of the district
More informationDesign-Build Highway Projects: A Review of Practices and Experiences Final Report PRC F
Design-Build Highway Projects: A Review of Practices and Experiences Final Report PRC 15-53 F Design-Build Highway Projects: A Review of Practices and Experiences Texas A&M Transportation Institute PRC
More informationProject Procurement Considerations in This Market. October 14, 2016
Project Procurement Considerations in This Market October 14, 2016 Overview Thank you for being here! Introduction About QBS Colorado Project Delivery Methods Market Information Federal & State Information
More informationNeighborhood Community and Revitalization Program (NCR) Procurement, Contract, and Construction Standards
Subrecipient Administrative Training (SAT) Meeting McAfee Center, Fort Monmouth, NJ August 13, 2014 Neighborhood Community and Revitalization Program (NCR) Procurement, Contract, and Construction Standards
More informationOffice. RdM s confidence and apparent interest in our business operation proved to be real. They became knowledgable
RdM s confidence and apparent interest in our business operation proved to be real. Office They became knowledgable about how our people interacted internally and made educated alternative suggestions
More informationADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION
ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build
More informationJackson Miracle Building Plan Outreach Roundtable. February 14, 2017
Jackson Miracle Building Plan Outreach Roundtable February 14, 2017 $1.8 billion Expanded Footprint Improved Patient Experience World-Class Facilities Innovative, Leading-Edge Care A Stronger, More Competitive
More informationOperational Procedures Supplementing the JEA Procurement Code
Operational Procedures Supplementing the JEA Procurement Code Revised: June 2006 April 2011 June 2017 Approved By: Date: Table of Contents PART A: INTRODUCTION... 6 1.0 Intent of Operational Procedures...
More informationSubmitted by: Kathleen Krauss, CPPB, Purchasing Manager, City of Deltona, FL
Purchasing Month Jeopardy Submitted by: Kathleen Krauss, CPPB, Purchasing Manager, City of Deltona, FL This game helps individuals learn about Purchasing. We actually pass out the questions prior to the
More informationARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)
More informationSelection of Contractor Step 5. June 2013
Selection of Contractor Step 5 June 2013 Project Management Concept Step 1: Needs Development Step 2: Scope Development Step 3: Procurement of Design Team Step 4: Design Step 5: Bid/Procurement of Contractor
More informationInvitation to Negotiate
Invitation to Negotiate Programming, Design, and Consulting Services Lisa Daws 4/3/2012 CLERKS OF COURT OPERATIONS CORPORATION Table of Contents Agency Background... 3 Statement of Purpose... 3 Scope of
More informationProgressive Design-Build
Progressive Design-Build Progressive Design-Build Design-Build Procured with a Progressive Design & Price A Design-Build Done RightTM Primer 1 Design-Build Progressive Design-build Design-Build Procured
More informationSounds good. What could possibly go wrong? 5/6/2014. Potential Benefits of Design Build. Potential Downsides of Design Build
When Design Build Goes Wrong: Worst Practices to Avoid DBIA Edition for the O.N.E. Conference Blue Springs MO May 8, 2014 Dale Munhall, AIA Sounds good. What could possibly go wrong? Potential Benefits
More informationFebruary Procurement Overview
February 2017 Procurement Overview The Strategic Procurement objective TCHC Strategic Procurement team is committed to open, fair and transparent procurement practices to achieve best value for money in
More informationREQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT RISK SERVICES SUPPLEMENTAL INFORMATION PACKAGE
MASSACHUSETTS PORT AUTHORITY CAPITAL PROGRAMS DEPARTMENT SUITE 209S - LOGAN OFFICE CENTER ONE HARBORSIDE DRIVE EAST BOSTON, MASSACHUSETTS 02128-2909 REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT
More informationUNDP Procurement. UNDP Angola Procurement
UNDP Procurement The term procurement refers to the process of acquiring goods, works and services. The process spans the whole cycle from identification of needs, choosing the adequate procurement methods,
More informationRequest for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.
Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions
More informationDocument B252TM 2007
Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation
More informationWorkforce Innovation and Opportunity Act of 2014, Public Law , Sections 107(d)(10)(A), 107(g)(2), and 121(d),
Administrative Policy POLICY NUMBER 097 Title: Program: One-Stop Operator Procurement Workforce Innovation and Opportunity Act (WIOA) Adopted: September 25, 2017 Effective: September 25, 2017 I. PURPOSE
More informationConstruction Manager at Risk Delivery Method
County of Alameda Board of Supervisors Transportation and Planning Committee May 4, 2015 Caroline Judy, Acting Director Construction Manager at Risk Delivery Method Briefing and Discussion Purpose Briefing
More informationREQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES
REQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES Pueblo Urban Renewal Authority (PURA) Pueblo Convention Center Expansion &
More informationALTERNATIVE PROJECT DELIVERY METHODS DO THEY SAVE TIME AND MONEY?
ALTERNATIVE PROJECT DELIVERY METHODS DO THEY SAVE TIME AND MONEY? Gordon Culp Smith Culp Consulting SmithCulp.com INTRODUCTION Are there alternative methods for delivering water and wastewater treatment
More informationRequest for Proposal (RFP) Medical and Dental Supplies RFP No MD-S ADDENDUM NO. 1. July 12, 2016
Request for Proposal (RFP) ADDENDUM NO. 1 July 12, 2016 Contained herein are the answers to the questions submitted to the Department of Management Services (Department). The Department hereby amends as
More informationAIA Contract Documents
AIA Contract Documents Contract Relationship Diagrams April 2017 Conventional (A201) Design-Bid-Build For use when the s project is divided into separate contracts for design () and construction (Contractor).
More information3,740. Demonstrating Competent Performance SIX EXPERIENCE AREAS. INTRODUCTION What is the Architectural Experience Program?
What is the Architectural Experience Program? The Architectural Experience Program (AXP ) is an essential step in the path to becoming an architect. Through the AXP, you will learn about the daily realities
More informationREQUEST FOR PROPOSAL. Construction Management Services Not at Risk
REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk
More informationOBJECTIVES, SCOPE, AND METHODOLOGY
OBJECTIVES, SCOPE, AND METHODOLOGY Pursuant to our approved annual plan, we have completed an audit of the University Major Construction Project, specifically Student Academic Success Center Capital Project.
More informationInternational Airport Expansion Project. Terms of Reference for Legal Advisor
A. Background International Airport Expansion Project Terms of Reference for Legal Advisor 1. [ ] International Airport (IA) is a medium size airport with a total passenger per year volume of [ ]. IA has
More informationKirk W Buffington, CPFIM, CPPO, C.P.M.,
Kirk W Buffington, CPFIM, CPPO, C.P.M., An Overview We will be talking about: The elements of the RFP process Factors determining the selection of the procurement method The elements of risk and how they
More informationConsensusDocs. Catalog. Updated Docs Inside
ConsensusDocs ConsensusDocs Contracts Catalog Updated Docs Inside ConsensusDocs Keeping You Ahead of the Cur ve ConsensusDocs... Building A Better Way! Whether working at the office, from the road or even
More informationBID PROPOSAL. For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES. Page Article 1 Bid Recipient...
BID PROPOSAL For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES Page Article 1 Bid Recipient... 1 Article 2 Bidder s Acknowledgements... 1 Article 3 Bidder s Representations...
More informationREQUEST FOR QUALIFICATIONS FOR Design-Build Services for the University of Washington Seismic Improvements
Page 1 of 16 University of Washington REQUEST FOR QUALIFICATIONS FOR Design-Build Services for the University of Washington Seismic Improvements Project No. 205729 Submittal Deadline Date: No later than
More informationQualifications Based Selection of Contractors
Qualifications Based Selection of Contractors AGC of America Project Delivery Committee QBS Working Group 1 Table of Contents QBS & The Industry: An Introduction Pages 3-4 Selection Criteria for QBS Page
More informationRequest for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION
Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION May 19, 2015 The Addison Public Library invites you to submit a reply to this Request for
More informationChoosing Delivery Method
Page 1 of 12 Advancing Professional Construction and Program Management Worldwide home contact us site map Search Find-A-CM/PM My Account Sign In Bookstore Career Center Home Choosing Delivery Method Choosing
More informationForsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101
Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101 Request for Qualifications Construction Manager at Risk (CMAR) INSTRUCTIONS
More informationTrinity Well Field and Production Facilities Project Management Using CMAR
Trinity Well Field and Production Facilities Project Management Using CMAR Ian Taylor, P.E., PMP New Braunfels Utilities David Bennett, P.E. Freese and Nichols Kirby Anderson MGC Contractors February 27,
More informationConstruction 101. C.A.S.H. 36 th Annual Conference February 23-25, 2015 Sacramento Convention Center
Construction 101 C.A.S.H. 36 th Annual Conference February 23-25, 2015 Sacramento Convention Center This training is provided for educational, compliance and loss-prevention purposes only and, absent the
More informationMarch 6, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Addendum No. 1/RFP Y15-1023-CH DISASTER DEBRIS MONITORING SERVICES Proposal Opening Date: March 17, 2015 This addendum is hereby incorporated
More informationADDENDUM NUMBER ONE Clarifications
August 25, 2017 ADDENDUM NUMBER ONE Clarifications RE: Interdisciplinary Science and Technology Building VII (ISTB 7) Request for Qualifications No. CMAR 11976 Total pages in this addendum: Five (5) The
More informationRole of Procurement / Purchasing Within the Authority
Role of Procurement / Purchasing Within the Authority What is Purchasing s Role / Why Is Purchasing Important? The Authorized entity within the Water Authority that procures the goods / services required.
More informationConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K
CONTRACTS CATALOG Updated Docs Inside ou Ah ead o f the Cur v e gy epin e K ... BUILDING A BETTER WAY! Whether working at the office, from the road or even at home, the platform provides instant access
More informationArchitectural Services
Architectural Services 2016 Capital Improvement Program Request for Proposal Number: 18-20 Title of the Projects: Renovations to Weaver Middle School Procurement Department Bibb County School District
More information1) Please share the last years expenditure under this contract. Answers: LIPA expects to spend approximately $1.2 million a year.
RFP for Information Technology Services- Questions Due: 8/11, 3pm, Answers due 8/16 Questions/Answers 1) Please share the last years expenditure under this contract. Answers: LIPA expects to spend approximately
More informationEthical Issues in Design-Build (Live Webinar)
PDHonline Course R136W (2 PDH) Ethical Issues in Design-Build (Live Webinar) Instructor: J. Paul Guyer, P.E., R.A., Fellow ASCE, Fellow AEI 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax,
More informationATTACHMENT D SCOPE OF SERVICES
ATTACHMENT D SCOPE OF SERVICES OBJECTIVE Owner s Capital Improvement Program (major capital, minor construction, repair, and rehabilitation projects) includes numerous construction and renovation projects.
More informationSubject: Statement of Qualifications for Public Safety Building Design
March 5, 2010 Subject: Statement of Qualifications for Public Safety Building Design The City of Porterville seeks Statements of Qualification (SOQ) from qualified architectural and engineering firms for
More informationPROFESSIONAL TECHNICAL ADVISORY BOARD
Introduction Design professionals should be selected on specialized experience and qualifications. The Owner needs to utilize a qualification-based selection process to obtain the best firm at the least
More informationREQUEST FOR QUALIFICATIONS DELTONA MIDDLE 250 ENTERPRISE ROAD DELTONA, FLORIDA REPLACEMENT SCHOOL PROJECT NO
REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES DELTONA MIDDLE 250 ENTERPRISE ROAD DELTONA, FLORIDA 32725 REPLACEMENT SCHOOL PROJECT NO. 184620 Facilities Planning and Business Services 3750 Olson Drive,
More informationSEATTLE S NEW WMBE INCLUSION PLAN
SEATTLE S NEW WMBE INCLUSION PLAN This past summer Seattle Mayor Mike McGinn announced a new WMBE program for Seattle public works contracts he called an Inclusion Plan to increase women and minority owned
More informationRFQ WEB Advertisement
165 Capitol Avenue, Hartford, CT 06106 Selection Type: Request for Qualifications (RFQ) Web Advertisement Construction Manager at Risk Adv. No.: Web Advertisement Date: July 18, 2008 General Statement:
More informationDocument B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition
Document B132 2009 Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN
More informationA Decision Support System for Project Delivery Method Selection in the Transit Industry
A Decision Support System for Project Delivery Method Selection in the Transit Industry A Dissertation Presented by Kamran Ghavamifar To The Department of Civil and Environmental Engineering in partial
More informationDESIGN-BUILD WASHTO WYDOT
DESIGN-BUILD An OVERVIEW for STATE DEPARTMENTS of TRANSPORTATION Prepared for WASHTO (Western Association of State Highway and Transportation Officials) WYDOT by Wyoming Department of Transportation June
More informationREQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September
More informationUnderstanding Public Bid Law La. R.S. 38:
Understanding Public Bid Law La. R.S. 38:2211-2293 E R I N D A Y, A S S I S T A N T A T T O R N E Y G E N E R A L L O U I S I A N A D E P A R T M E N T O F J U S T I C E Application All Political Subdivisions
More informationPROCUREMENT GUIDELINES For Grantees Receiving Federal Transit Funds via MDOT Revised March 2017
Michigan Department Of Transportation 3182 (03/17) PROCUREMENT GUIDELINES For Grantees Receiving Federal Transit Funds via MDOT Revised March 2017 Page 1 of 28 PURPOSE The purpose of these guidelines is
More information