LIST OF DIRECTIVES AND MEMORANDA

Size: px
Start display at page:

Download "LIST OF DIRECTIVES AND MEMORANDA"

Transcription

1 LIST OF DIRECTIVES AND MEMORANDA Technical Policies and Standards HSBM DO Format and Method for Policies Issued by HSB To provide guidance for the format and method of communicating the implementation of technical policies and standards issued by HSB. Mar 24, 2014 Contract Preparation System (CPS) QST-B-033 Contract Preparation System (CPS) Implementation of CPS and assignment of responsibilities for training, system support, and system maintenance. Nov 30, 1994 Feb 01, PHY-B-213 Contract Documentation PHY-C-066 Processing of Standard Special Provisions To confirm existing procedures for preparing, issuing and implementing special provisions. Nov 26, 1979 PHY-C-84 PHY-C-073 Monitoring and Reviewing Specifications and Special Provisions Policies and procedures for monitoring and reviewing the application of specifications and special provisions in contract documents. Feb 20, Feb 21, PHY-A- 002At.17 PHY-B-164 Preparation and Administration of Regional/District and Maintenance and Municipal for Local Road Boards and Statue Labour Boards 1. To establish uniform policies for the preparation and administration of Regional / District construction and maintenance contracts, and Air Program, municipal contracts for Local Roads Boards and Statute Labour Boards, prepared, tendered and awarded by the Regions / Districts*. 2. To provide guidelines and standard procedures for use in applying these policies. * Herein called "Regional / District ". This Directive is not applicable to Structural Coatings. See Directive B-187. May 19, 1983 PHY-B-058 PHY-C-161 Canadian Content In To introduce guidelines and procedures for use by the Regional construction staff, to monitor the origin of structural steel, reinforcing steel, steel H and tube piles and strand used for prestressing and post tensioning work. Jul 8, 1985 PHY-C-053 No-Plans Contract Format 1. To change the terminology for the small size contract format from No-Plans Format to Limited Plans Format. 2. To re-emphasize the use of this format as an effective way to accelerate the design process and to reduce pre-contract engineering costs. 3. To extend the use of the format to include new construction, rehabilitation (preservation) and capital maintenance type contracts. Dec 13, 1985 RECAP 6:2 PHY-B- 13A.2&3 PHY-B-228 CDED Ch. F August (UNDER REVIEW) Page 1 of 6 CDED A-105

2 PHY-C-173 Special Provision Format and Numbering To introduce a new special provision format and standard special provision numbering system for use in contract documents. Apr 22, 1988 PHY-C-084 PHY-B-232 Post Contract Package Evaluation Processes Process for evaluating the effectiveness of the Contract Package after completion of construction. Jul 1, 1989 QST-B-013 Ontario Provincial Standards - General Conditions of Contract (OPS GC) To implement-ops General Conditions of Contract -MTO Supplemental General Conditions of contract.-standard General Special Provisions associated with the OPS GC and MTO Supplemental GC. Sep 2, 1992 Jun 28, 2001 QST-C-013 Implementation of Revisions to Standards, Procedures and Policies That Affect the Preparation of the Capital Contract Package To define the processes and procedures to be followed for the introduction of new or revised standards and policies into capital construction contract packages. Sep 6, 1994 PHY-C-084 PHY-C-066 QST-B-037 Pre-Contract Engineering Quality Control Process Responsibilities of Regional and Head Office Units in the preparation of contract documents. Feb 1, 1995 PHY-B-231 PHY-C-144 PHY-B-113 PHY-B-185 QST-C-013 Implementation of OPS Specifications in 1. To update QST-C-13 for determining implementation dates of OPSSs. 2. To establish a communication protocol between OPS and MTO for the review of OPSSs. Aug 27, 2007 Updates QST-C-013 Renumbering of OPS Specifications - OPS Relocation Initiative To provide a status update on how the ministry is managing implementation of changes to the numbering system of OPS Specifications and related changes to MTO contract documents. Feb 3, 2011 HDB Management of New NSTIs, NSSPs and Modified SPs To establish procedures to manage the development and use of new NSTIs, NSSPs, and modified SSPs in contract documents as part of detail design work. Sep 19, Implementation of the Design Policy for Identification of Designated Substances Through SSP 101F21 To provide requirements for documenting Designated Substances on MTO contracts. Oct 20, 2014 August (UNDER REVIEW) Page 2 of 6 CDED A-105

3 Contract Plans and PHY-C-005 Revised MTO Form Structure Excavation Detail Design and Contract Documentation PHY-C-013 Aggregate Sources Lists for Maintenance Crushed Gravel PHY-C-052 Contract Package Preparation and Content (2) - Contract Details PHY-C-048 CPPC a) Horizontal & Vertical Control b) Alignment Detail PHY-B-080 Working for Falsework and Other Temporary Structures PHY-C-041 Contract Books - Printing Contract Documents PHY-C-103 CPPC (4) - Guideline for Contract Drawing Preparation PHY-C-132 Standard - Electrical PHY-C-147 Abbreviations and Symbols Manual PHY-B-074 Original Cross- Section for Capital Projects 1. To introduce and explain revised estimating presentation and documentation procedures for contracts advertised after To introduce the revised Concrete and Timber Culvert Sheet, DB RD 53. To update requirements for provision of Aggregate Sources Lists with tender documents for maintenance crushed gravel contracts. To implement further CPPC Recommendations to minimize and/or simplify information on contract drawings. To eliminate Horizontal and Vertical Control and Alignment Detail from contract books and streamline the process. To introduce a new policy with respect to specification requirements of working drawings for falsework and other temporary structures. Implementation of duplex (back-to-back) printing for the printing of all Ministry Contract Books. This directive formally introduces Book II of the CPPC Task Force, thereby completing the work of the Task Force. To introduce highway engineering traffic signal standard drawings (DD ) that were previously issued as construction design (CD) drawings. To introduce the revised Abbreviations and Symbols Manual as a single source document for all abbreviations and symbols that may be used in the preparation of plans and contract documents. The purpose of this directive is to state Ministry policy and to establish requirements and responsibilities for the taking and retention of original cross-sections on capital construction projects by conventional, photogrammetric and total station methods. Aug 11, 1978 Oct 25, 1978 Aug 13, 1979 Sep 17, 1979 Apr 15, Jul 31, Feb 3, Jul 6, 1982 Sep 12, 1983 Jun 5, 1986 MTC FORM 539 MTC FORM 902 CPPC 10 CPPC 11 CPPC 15 CPPC Rec.Extra ASD C-3?? RECAP 6:6 CPPC Rec. #2 CPPC Rec. #7 PHY-C-085 CPPC Dir. #3 PHY-C-048 PHY-C-052 PHY-C-085 CPPC Book1 RECAP 6:4 Replaces: PHY-C-077 RECAP 7:4 August (UNDER REVIEW) Page 3 of 6 CDED A-105

4 PHY-C-085 CPPC (3) - Depiction of Details in Contract and Documents Contains appended guidelines for the depiction of details in contract drawings and documents. Jul 22, 1986 PHY-C-048 PHY-C-052 PHY-C-026 PHY-C-041 PHY-C-053 PHY-B-218 Foundation Investigation Data in Capital To provide bidders with foundation investigation data on appropriate Capital. Mar 11, 1988 PHY-C-175 Original Contract Availability and preservation of Original Contract. Oct 27, 1988 PHY-C-186 Contract - Guide Rail Details To change Ministry policy regarding the depiction of guide rail details on contract drawings. Feb 1, 1991 Feb 21, Cancelled By: CDED B721-1, B721-2, B723, B730, B731 CPPC PHY-C-085 QST-C-009 Modifications To Standard To detail the policy and procedure for preparing modified Standard. May 1, 1993 QST-C-015 Horizontal and Vertical Control To eliminate horizontal and vertical control drawings from the contract books and to make the horizontal and vertical control information available during bidding. Nov 29, 1994 PHY-C-181 QST-B-038 Integrated Engineering System (IES) Steering Committee Roles, responsibilities, membership, and reporting relationships of the IES steering committee. Mar 16, 1995 HSB Providing Digital Information to Contractors SSP 199F61 To provide the ministry's policy with respect to facilitating project construction by providing digital and data files to contractors. Mar 4, 2010 Ministry of Transportation Ontario (MTODs) To implement a new method of including MTODs in contract documents of capital construction projects. Jun 23, 2011 Estimating PHY-B-067 Project Value Determination, Update Procedures From Project Inception to Project Award 1. To establish a procedure for the updating and recording of Cost Estimates for projects on the Program, on a regular basis. 2. To define the areas responsible for each of the project design phases (inception of project by Status Report, Preliminary Design, Detailed Design, D4 to tender opening). Jan 16, May 22, 2012 PHY-B-002 August (UNDER REVIEW) Page 4 of 6 CDED A-105

5 PHY-C-072 Estimating Engineering Costs and Establishing the Number of Working Days for To define policies and appropriate procedures for: A) Estimating Engineering Costs for. B) Establishing the number of working days, free time period, and commencement date to be assigned to construction contracts. Feb 20, RECAP 4:12 RECAP 15:2 PHY-B-068 PHY-B-081 Major Items. Payments of Overruns Exceeding the Percentage Stated in the Contract To state Ministry policy covering the payment to contractors during the negotiations on major items that overrun in excess of the percentage stated in the contract. Apr 16, Mar 23, 2000 B-58 PHY-C-086 Small Quantity Tender Items The purpose of this memorandum is to raise the awareness of Design and staff to the potential cost savings possible by utilizing small quantity tender items only when practical and cost-effective to do so. Jul 14, RECAP 6:4 PHY-B-105 Working Days and Liquidated Damages To introduce revised Special Provisions for liquidated damages and working days to be used in MTC contracts. Jan 19, Mar 23, 2000 PHY-B-002 (a) The Security of Estimated and Bid Prices (b) Responsibility for the Preparation of Cost Estimates and the Determination of Project Values 1. Redefine the respective responsibilities of the units that provide a design service to the Regions in the preparation of project values for projects on the Capital, Maintenance and Municipal Roads Program. 2. Stress the need to provide the Transportation Capital Branch with accurate project values throughout the pre-contract engineering process in order to facilitate programming and expenditure prediction for projects on the Capital Roads Program. 3. Reaffirm the confidential nature of Ministry estimated costs and unit prices and contractors' bid unit prices. Jan 15, 1985 PHY-B-113 Plan Quantity Payment For To implement Plan Quantity Payment. Further instructions on procedures and implementation policies will be issued as attachments to this directive. Nov 6, 1986 Feb 01, RECAP 16:1 PHY-B-231 Final Verification of Plan Quantity Payment Quantities To redefine the Final Verification of Plan Quantity Payment (PQP) Quantities Process, to cancel the requirement for carrying out an Independent Verification of PQP Quantities, and to state the respective responsibilities of the Regional and Head Office Units. May 1, 1989 Mar 23, 2000 Cancelled By: QST-B-037 PHY-B-113 PHY-B-185 PHY-C-047 HOC Calculation of Liquidated Damages To provide uniformity in the calculation and administration of Liquidated Damages. Aug 22, 2006 August (UNDER REVIEW) Page 5 of 6 CDED A-105

6 Contract Tendering PHY-B-068 Refinement of Award Schedule (Both Current and Multiyear) PHY-B-111 Scheduling of Maintenance and Provision of Aggregate Sources Lists PHY-C-114 Information To Contractors During Period Of Tender Calling PHY-B-146 Guidelines for Rehabilitation in Locations With High Traffic Volumes PHY-B-178 Time of Tender Calls (Engineering ) 1. To refine the establishment of the current and multi-year Award Schedule. 2. To obtain the optimal award date for each project. To clarify the scheduling process, from submission of District requirements to issuance of D4's and Aggregate Sources Lists, and to provide procedural guidelines for the preparation of Aggregate Sources Lists. To ensure uniformity of replies to questions raised by bidders during the tendering period on the Ministry's Engineering contracts opened in Downsview. To establish guidelines and procedures for compiling, advertising and awarding rehabilitation contracts in locations having unusually high traffic volumes. To advise the industry of the days throughout the year on which tenders will not be opened in Downsview. Feb 4, Aug 12, Oct 1, Jun 28, 1982 Jun 25, 1984 RECAP 4:8 RECAP 15:2 RECAP 12:2 B-2? Note: The directives and memos listed in the above table are for reference purposes only and do not reflect the actual status as active or obsolete. August (UNDER REVIEW) Page 6 of 6 CDED A-105

NON-STANDARD DOCUMENTATION

NON-STANDARD DOCUMENTATION NON-STANDARD DOCUMENTATION 1.0 Introduction Non-standard documentation consists of non-standard tender items (NSTIs), nonstandard special provisions (NSSPs), modified standard special provisions (SSPs),

More information

E1.0 SPECIAL PROVISIONS Reference Documents. The following documents are referenced in this chapter and can be found at the location specified.

E1.0 SPECIAL PROVISIONS Reference Documents. The following documents are referenced in this chapter and can be found at the location specified. E1.0 SPECIAL PROVISIONS 1.0.1 Reference Documents The following documents are referenced in this chapter and can be found at the location specified. Document Title Location of Document OPSS.PROV 100, MTO

More information

Special Provision No. 599S22 March 2001

Special Provision No. 599S22 March 2001 RETAINED SOIL SYSTEM, TRUE ABUTMENT - Item No. RETAINED SOIL SYSTEM, FALSE ABUTMENT - Item No. RETAINED SOIL SYSTEM, WALL/SLOPE, HIGH RETAINED SOIL SYSTEM, WALL/SLOPE, MEDIUM RETAINED SOIL SYSTEM, WALL/SLOPE,

More information

TENDER DOCUMENT. The cover page contains information about the contract and the ratings that are required in order to bid on the project.

TENDER DOCUMENT. The cover page contains information about the contract and the ratings that are required in order to bid on the project. TENDER DOCUMENT 1.0 Introduction The contains the contract provisions. It is generated by the Designer from CPS and contains the design documents that have been prepared, added, and modified by the Designer.

More information

B441 - WATERMAINS - OPSS GENERAL

B441 - WATERMAINS - OPSS GENERAL B441 - - OPSS 441 441.1 GENERAL Watermains are a component of a water supply network. Watermains are a system of engineered hydraulic components designed for the conveyance of water from storage to consumption.

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200- GRADING 219.101 Light Duty Straw

More information

B701 WATERMAINS- OPSS 701

B701 WATERMAINS- OPSS 701 B701 - OPSS 701 701.1 GENERAL Watermains are a component of a water supply network. Watermains are a system of engineered hydraulic components designed for the conveyance of water from storage to consumption.

More information

ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES. Special Provision No. 199S38 March 2003

ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES. Special Provision No. 199S38 March 2003 ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES Special Provision No. 199S38 March 2003 The following MTO specification is not based on or referenced to an OPS Specification.

More information

B STEEL BEAM GUIDE RAIL - OPSS.PROV 721

B STEEL BEAM GUIDE RAIL - OPSS.PROV 721 B721-2 - - OPSS.PROV 721 721-2.1 GENERAL Steel beam guide rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,

More information

ONTARIO-MICHIGAN BORDER TRANSPORTATION PARTNERSHIP Planning/Need and Feasibility Study. 1. Work Accomplished This Period (4 Weeks)

ONTARIO-MICHIGAN BORDER TRANSPORTATION PARTNERSHIP Planning/Need and Feasibility Study. 1. Work Accomplished This Period (4 Weeks) ONTARIO-MICHIGAN BORDER TRANSPORTATION PARTNERSHIP Planning/Need and Feasibility Study MONTHLY #5 Period Ending July 31, 2002 1. Work Accomplished This Period (4 Weeks) Strategic and Geographic Area Overview

More information

CONSTRUCTION SPECIFICATION FOR TEMPORARY PROTECTION SYSTEMS

CONSTRUCTION SPECIFICATION FOR TEMPORARY PROTECTION SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 539 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR TEMPORARY PROTECTION SYSTEMS TABLE OF CONTENTS 539.01 SCOPE 539.02 REFERENCES 539.03 DEFINITIONS

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200 GRADING 219.101 Light Duty Straw

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200- GRADING 219.101 Light Duty Straw

More information

Contract Design, Estimating and Documentation (CDED) Manual. CDED REVISION No. 206

Contract Design, Estimating and Documentation (CDED) Manual. CDED REVISION No. 206 Contract Design, Estimating and Documentation (CDED) Manual CDED REVISION No. 206 March 3, 2016 The CDED Manual has been revised as detailed below and copies of the updated documents are attached. The

More information

Arlington East WRF Influent Channel Rehabilitation - Final

Arlington East WRF Influent Channel Rehabilitation - Final T E C H N I C A L M E M O R A N D U M 135-11 ARLINGTON EAST WRF INFLUENT CHANNEL 135-11 Arlington East WRF Influent Channel Rehabilitation - Final PREPARED FOR: PREPARED BY: JEA Capital Budget Planning

More information

LIST OF ACTIVE STRUCTURAL STANDARD DRAWINGS (SSDs)

LIST OF ACTIVE STRUCTURAL STANDARD DRAWINGS (SSDs) LIST OF ACTIVE STRUCTURAL STANDARD DRAWINGS (SSDs) 0002.0001 Structural Standard Drawings - Layering Structure n/a Aug 2014 Dec 18, 2014 0005.0002 Retaining Wall - Rustication Details n/a Jun 2002 Jul

More information

The Statutes of Upper Canada and the Province of Canada, 1792 to 1866

The Statutes of Upper Canada and the Province of Canada, 1792 to 1866 The Statutes of Upper Canada and the Province of Canada, 1792 to 1866 On Self-Service Microfilm INTRODUCTION This finding aid is a reel-by-reel listing of the Archives of Ontario s microfilm holdings of

More information

Dec Board of Education: Approve Educational Specifications. Dec Jan. 2016

Dec Board of Education: Approve Educational Specifications. Dec Jan. 2016 Dec. 2015 Dec. 2015 Jan. 2016 Jan 2016 Fairfield Public Schools Develops Project Team Initial Funding request analysis (including temporary classrooms costs) for services through Design Development Board

More information

Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD Phone: 605/ FAX: 605/

Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD Phone: 605/ FAX: 605/ Connecting South Dakota and the Nation Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD 57709-1970 Phone: 605/394-2244 FAX: 605/394-1904 July 9, 2014

More information

5 Star London Hotels - Example Report

5 Star London Hotels - Example Report 5 Star London Hotels - Example Report January 2018 CONTENTS Your Benchmark Report Website Traffic Conversion Rates Ecommerce Performance AdWords Spend Your Traffic Index Your Conversion Rate Index Your

More information

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Administration Division Public Works Department Anchorage: Performance. Value. Results. Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,

More information

Contract Design, Estimating and Documentation (CDED) Manual. CDED REVISION No. 216

Contract Design, Estimating and Documentation (CDED) Manual. CDED REVISION No. 216 Contract Design, Estimating and Documentation (CDED) Manual CDED REVISION No. 216 July 13, 2017 The CDED Manual has been revised as detailed below and the documents are available for viewing and download,

More information

AUSTIN AREA SUMMARY REPORT ON BUSINESS February 2018

AUSTIN AREA SUMMARY REPORT ON BUSINESS February 2018 INSTITUTE FOR SUPPLY MANAGEMENT- ISM AUSTIN, INC. P.O. Box 26155 Austin, Texas 78755-0155 Steven Leatherwood, CPSM, MCIPS Econ-report@ism-austin.org AUSTIN AREA SUMMARY REPORT ON BUSINESS Region Economy

More information

Municipal Solid Waste Characteristics

Municipal Solid Waste Characteristics CITY OF LETHBRIDGE Municipal Solid Waste Characteristics Juliane Ruck, the City of Lethbridge and Xiaomei Li, Alberta Innovates Energy and Environmental Solutions SWANA Northern Lights 2015 Conference

More information

MASTER COMPETITIVE SERVICE AGREEMENT MANAGEMENT OFFICE SUMMARY REPORT May 2008

MASTER COMPETITIVE SERVICE AGREEMENT MANAGEMENT OFFICE SUMMARY REPORT May 2008 MASTER COMPETITIVE SERVICE AGREEMENT MANAGEMENT OFFICE SUMMARY REPORT May 2008 1 1. Initiative Overview On March 23, 20, the Province and the broader public sector entities comprised of the Insurance Corporation

More information

I2-0 LIST OF ACTIVE SSDs

I2-0 LIST OF ACTIVE SSDs I2-0 0002.0001 Structural Standard Drawings - Layering Structure Aug 1, 2014 Dec 18, 2014 0005.0002 Retaining Wall - Rustication Details Jun 1, 2002 Jul 17, 2002 0007.0002 Grout Vent Detail Mar 1, 2006

More information

The Corporation of the City of London Quarterly Report on Internal Audit Results

The Corporation of the City of London Quarterly Report on Internal Audit Results www.pwc.com/ca The Corporation of the City of London Quarterly Report on Internal Audit Results - Building Control - Parks & Recreation Health & Safety - Purchasing Cards September 27, 2012 Agenda Internal

More information

Traffic Department Anchorage: Performance. Value. Results.

Traffic Department Anchorage: Performance. Value. Results. Traffic Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements.

More information

Special Provision No. 599S22 March 2018 REQUIREMENTS FOR RETAINED SOIL SYSTEMS (RSS)

Special Provision No. 599S22 March 2018 REQUIREMENTS FOR RETAINED SOIL SYSTEMS (RSS) RETAINED SOIL SYSTEM, TRUE ABUTMENT - Item No. RETAINED SOIL SYSTEM, FALSE ABUTMENT - Item No. RETAINED SOIL SYSTEM, WALL/SLOPE, HIGH PERFORMANCE - Item No. RETAINED SOIL SYSTEM, WALL/SLOPE, MEDIUM PERFORMANCE

More information

Telecommunication Expansion Project (II)

Telecommunication Expansion Project (II) Ghana Telecommunication Expansion Project (II) Report Date: October, 2002 Field Survey: July, 2001 1. Project Profile and Japan s ODA Loan Project Site Switchboard System (Accra Station) 1.1 Background

More information

GENERAL SPECIFICATION FOR THE MANAGEMENT AND DISPOSAL OF EXCESS MATERIAL

GENERAL SPECIFICATION FOR THE MANAGEMENT AND DISPOSAL OF EXCESS MATERIAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 180 JANUARY 1994 GENERAL SPECIFICATION FOR THE MANAGEMENT AND DISPOSAL OF EXCESS MATERIAL 180.01 SCOPE 180.02 REFERENCES 180.03 DEFINITIONS TABLE OF

More information

Contract Preparation, Tendering and Bids Evaluation. Contents are subject to change. For the latest updates visit

Contract Preparation, Tendering and Bids Evaluation. Contents are subject to change. For the latest updates visit Contract Preparation, Tendering and Bids Evaluation Page 1 of 7 Why Attend The overall aim of this course is to provide participants with the knowledge, concepts and skills needed to perform all the tasks

More information

CONTRACT DESIGN, ESTIMATING AND DOCUMENTATION (CDED) VOLUME 2A

CONTRACT DESIGN, ESTIMATING AND DOCUMENTATION (CDED) VOLUME 2A CONTRACT DESIGN, ESTIMATING AND DOCUMENTATION (CDED) VOLUME 2A DESIGN AND CONTRACT STANDARDS OFFICE ISSN 2291-0298 (2-VOLUME SET) Copyright Queen s Printer for Ontario 2017 Reproduced With Permission CHAPTER

More information

LIST OF ACTIVE OPSSs

LIST OF ACTIVE OPSSs LIST OF ACTIVE OPSSs DIVISION 1 - GENERAL SPECIFICATIONS 100 PROV MTO General Conditions of Contract Nov 2016 Jan 12, 2017 102 COMM Weighing of Materials Oct 1992 Mar 17, 1994 106 PROV Electrical Work

More information

2017 ACEC/WisDOT Transportation Improvement Conference February 2017

2017 ACEC/WisDOT Transportation Improvement Conference February 2017 2017 ACEC/WisDOT Transportation Improvement Conference February 2017 Scott Lawry, P.E., WisDOT Bureau Project Development Fred Schunke, P.E., WisDOT Bureau Project Development Cheryl Simon, P.E., WisDOT

More information

Effective Contract Preparation. Contents are subject to change. For the latest updates visit

Effective Contract Preparation. Contents are subject to change. For the latest updates visit Effective Contract Preparation Page 1 of 7 Why Attend The overall aim of this course is to provide participants with the knowledge, concepts and skills needed to perform all the tasks required in the pre-award

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 492 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF

More information

CONTRACT DESIGN ESTIMATING and DOCUMENTATION (CDED) MANUAL REVISION PACKAGE #189

CONTRACT DESIGN ESTIMATING and DOCUMENTATION (CDED) MANUAL REVISION PACKAGE #189 CONTRACT DESIGN ESTIMATING and DOCUMENTATION (CDED) MANUAL REVISION PACKAGE #189 Dated: May 15, Portable Document Format (PDF) copies of this Revision Package as well as individual CDED documents, and

More information

Traffic Division Public Works Department Anchorage: Performance. Value. Results.

Traffic Division Public Works Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements. Direct Services Design, operate and maintain the

More information

Contract Design, Estimating and Documentation (CDED) Manual. CDED REVISION No. 214

Contract Design, Estimating and Documentation (CDED) Manual. CDED REVISION No. 214 Contract Design, Estimating and Documentation (CDED) Manual CDED REVISION No. 214 March 2, 2017 The CDED Manual has been revised as detailed below and the documents are available for viewing and download,

More information

B STEEL BEAM GUIDE RAIL - OPSS 552

B STEEL BEAM GUIDE RAIL - OPSS 552 B552-2 - - OPSS 552 552-2.1 GENERAL Steel Beam Guide Rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,

More information

B STEEL BEAM GUIDE RAIL - OPSS 721

B STEEL BEAM GUIDE RAIL - OPSS 721 B721-2 - - OPSS 721 721-2.1 GENERAL Steel Beam Guide Rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2016 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Norwood High Service Pump Replacement

Norwood High Service Pump Replacement T E C H N I C A L M E M O R A N D U M 737-02 NORWOOD HIGH SERVICE PUMP REPLACEMENT 737-02 Norwood High Service Pump Replacement PREPARED FOR: JEA Planning PREPARED BY: Joshua M. Brown DATE: February 2017

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 514 APRIL 2008 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 514.01 SCOPE 514.02 REFERENCES 514.03 DEFINITIONS

More information

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS Ontario Provincial Standards Unit 301 St. Paul St., 2 nd Floor North St. Catharines, ON L2R 7R4 Telephone: 905-704-2258 Fax: 905-704-2051 REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 401 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01 SCOPE 401.02 REFERENCES 401.03 DEFINITIONS

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

Amendment to OPSS 416 (Nov 2013) Construction Specification for Pipeline and Utility Installation by Jacking and Boring

Amendment to OPSS 416 (Nov 2013) Construction Specification for Pipeline and Utility Installation by Jacking and Boring Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 416 September 2017 Amendment to OPSS 416 (Nov 2013) Construction Specification for Pipeline and Utility

More information

Schedule Guidance Document

Schedule Guidance Document Schedule Guidance Document Version: 1.2 Effective Date: August 20, 2013 Contents 1. Purpose... 1 2. Applicability and Basic Requirements... 2 3. Baseline Schedule... 3 3.1. General... 3 3.2. Schedule Work

More information

DS3 System Services Project Plan Detailed Design and Implementation Phase

DS3 System Services Project Plan Detailed Design and Implementation Phase DS3 System Services Project Plan Detailed Design and Implementation Phase Dated: 20/5/2015 Executive Summary The System Services work stream within the DS3 Programme relates to the procurement of services

More information

B STEEL BEAM GUIDE RAIL - OPSS 721

B STEEL BEAM GUIDE RAIL - OPSS 721 B721-2 - - OPSS 721 721-2.1 GENERAL Design guidance and a description of Steel Beam Guide Rail systems, including various types and treatments, are provided in the Roadside Design Manual (RDM). 721-2.2

More information

Construction Specification for Trenching, Backfilling and Compacting

Construction Specification for Trenching, Backfilling and Compacting Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 401 November 2016 Amendment to OPSS.MUNI 401 (Nov 2015) Construction Specification for Trenching, Backfilling

More information

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 180 NOVEMBER 2005 GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS TABLE OF CONTENTS 180.01 SCOPE 180.02 REFERENCES 180.03 DEFINITIONS

More information

Appendix C. Construction Programme

Appendix C. Construction Programme Appendix C Construction Programme Activity ID Activity Name Orig Dur Planned Start Planned Finish Revision 2 827d 14-Oct-13 31-Jul-16 0d Preliminaries 827d 14-Oct-13 31-Jul-16 0d Total Float Contract Key

More information

Manager, Statistical Programs Tel: Tel: Fax: Fax: SHIPMENTS OF ALUMINUM FOIL

Manager, Statistical Programs Tel: Tel: Fax: Fax: SHIPMENTS OF ALUMINUM FOIL Industry Statistics Nicholas A. Adams, Jr. Henry F. Sattlethight V.P., Statistics & Business Information Manager, Statistical Programs Tel: 1-703-358-2984 Tel: 1-703-358-2985 Fax: 1-703-358-2961 Fax: 1-703-358-2961

More information

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP &

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP & TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP 4910-29 & 0504-14 Contract No. 1002252 Project Overview is in need of professional and technical assistance to provide detail design for State

More information

Plymouth Hospitals NHS Trust Business Case for replacement Managed Equipment Service

Plymouth Hospitals NHS Trust Business Case for replacement Managed Equipment Service Plymouth Hospitals NHS Trust Business Case for replacement Managed Equipment Service Purpose The Business Case describes and seeks approval to award the contract for the replacement of the existing Pathology

More information

MASTER COMPETITIVE SERVICE AGREEMENT TRANSPARENCY REPORT May 2009

MASTER COMPETITIVE SERVICE AGREEMENT TRANSPARENCY REPORT May 2009 MASTER COMPETITIVE SERVICE AGREEMENT TRANSPARENCY REPORT May 2009 1 1. INITIATIVE OVERVIEW On March 23, 2005, the Province and the broader public sector entities comprised of the Insurance Corporation

More information

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 416 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING TABLE OF CONTENTS 416.01 SCOPE 416.02 REFERENCES

More information

DRILLSAFE APPEA DRILLING STEERING COMMITTEE UPDATE BRETT DARLEY 6 MARCH 2014

DRILLSAFE APPEA DRILLING STEERING COMMITTEE UPDATE BRETT DARLEY 6 MARCH 2014 DRILLSAFE APPEA DRILLING STEERING COMMITTEE UPDATE BRETT DARLEY 6 MARCH 2014 SUBSEA FIRST RESPONSE TOOLKIT STATUS 2 Equipment delivered Familiarisation Training for Member Companies commencing late this

More information

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - ECCENTRIC LOADER TERMINAL SYSTEM

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - ECCENTRIC LOADER TERMINAL SYSTEM ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 555 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - ECCENTRIC LOADER TERMINAL SYSTEM TABLE OF CONTENTS 555.01 SCOPE 555.02

More information

a) Seek clarification from the Department for Transport in respect of future core funding for the work of the Strategic Transport Forum.

a) Seek clarification from the Department for Transport in respect of future core funding for the work of the Strategic Transport Forum. Strategic Transport Forum 15 th December 2017 englandseconomicheartland@b uckscc.gov.uk Agenda Item 6: Draft Business Plan Recommendation: It is recommended that the Forum: a) Seek clarification from the

More information

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 180 NOVEMBER 2016 GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS TABLE OF CONTENTS 180.01 SCOPE 180.02 REFERENCES 180.03 DEFINITIONS

More information

California Independent System Operator Corporation. California ISO. Import resource adequacy. Department of Market Monitoring

California Independent System Operator Corporation. California ISO. Import resource adequacy. Department of Market Monitoring k California Independent System Operator Corporation California ISO Import resource adequacy September 10, 2018 Department of Market Monitoring Summary This report provides an update of analysis and trends

More information

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 180 NOVEMBER 2011 GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS TABLE OF CONTENTS 180.01 SCOPE 180.02 REFERENCES 180.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 401 NOVEMBER 2015 (Formerly OPSS 401, November 2013) CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01

More information

The BIM Toolkit. Sarah Delany February 2015 v2.0

The BIM Toolkit. Sarah Delany February 2015 v2.0 The BIM Toolkit Sarah Delany February 2015 v2.0 BIM Government Construction Strategy Completing Level-2 BIM Suite The Missing Pieces The Project Clients Brief Team Industry 2014 2015 Jan Feb Mar Apr May

More information

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 416 NOVEMBER 2018 (Formerly OPSS 416, November 2013) Note: The MUNI implemented in November 2018 replaces OPSS 416 COMMON, November 2013 with no technical

More information

TERMS OF REFERENCE FOR THE HUMAN RESOURCES AND COMPENSATION COMMITTEE

TERMS OF REFERENCE FOR THE HUMAN RESOURCES AND COMPENSATION COMMITTEE TERMS OF REFERENCE FOR THE I. PURPOSE The purpose of the Human Resources and Compensation Committee (the Committee ) is to assist the Board in fulfilling its obligations relating to human resource and

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES

CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 631 NOVEMBER 2011 CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES TABLE OF CONTENTS 631.01

More information

CONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL

CONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 721 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL TABLE OF CONTENTS 721.01 SCOPE 721.02 REFERENCES 721.03

More information

ATTACHMENT D SCOPE OF SERVICES

ATTACHMENT D SCOPE OF SERVICES ATTACHMENT D SCOPE OF SERVICES OBJECTIVE Owner s Capital Improvement Program (major capital, minor construction, repair, and rehabilitation projects) includes numerous construction and renovation projects.

More information

Electric Forward Market Report

Electric Forward Market Report Mar-01 Mar-02 Jun-02 Sep-02 Dec-02 Mar-03 Jun-03 Sep-03 Dec-03 Mar-04 Jun-04 Sep-04 Dec-04 Mar-05 May-05 Aug-05 Nov-05 Feb-06 Jun-06 Sep-06 Dec-06 Mar-07 Jun-07 Sep-07 Dec-07 Apr-08 Jun-08 Sep-08 Dec-08

More information

GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES

GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 185 NOVEMBER 2012 GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES TABLE OF CONTENTS 185.01 SCOPE 185.02 REFERENCES

More information

Woking. q business confidence report

Woking. q business confidence report Woking q1 business confidence report Woking q1 report headlines saw a new record in company registrations in Woking when compared to any previous. was a record quarter for company registrations in Woking

More information

Environmental Planning/Environmental Technical Specialty

Environmental Planning/Environmental Technical Specialty Planning/ Specialty No. Phase/Task Methodology Deliverables Reference Manuals 1. Background Data Collection Review correspondence, photos, reports, historical records, site data Summary and specialty reports

More information

Hartford Area ITS Architecture. Stakeholder Meetings March 2004

Hartford Area ITS Architecture. Stakeholder Meetings March 2004 Hartford Area ITS Architecture Stakeholder Meetings March 2004 Project Team Project Leader: Connecticut Department of Transportation Key Participants: Capitol Region Council of Governments Central Connecticut

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF

More information

University of Michigan Eco-Driving Index (EDI) Latest data: August 2017

University of Michigan Eco-Driving Index (EDI)   Latest data: August 2017 University of Michigan Eco-Driving Index () http://www.ecodrivingindex.org Latest data: August 2017 Developed and issued monthly by Michael Sivak and Brandon Schoettle Sustainable Worldwide Transportation

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 November 2015 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT TABLE OF CONTENTS D 422.01 D 422.02 D 422.03

More information

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT Township of Bonnechere Valley Water and Sewage Department January 2014 Table of Contents Executive Summary... 3 Introduction... 4 Report Availability...

More information

Table of Contents Local Agency Guidelines Section B August 2011

Table of Contents Local Agency Guidelines Section B August 2011 Table of Contents SECTION B NON-CERTIFIED AGENCY 2 Chapter 10 Design Approval... 2 A. OVERVIEW... 2 B. DESIGN ACCEPTANCE PACKAGE (30 PERCENT)... 2 1. Traffic Data... 3 2. Right of Way... 3 3. Horizontal-

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 507 JULY 1991 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES 507.01 SCOPE 507.02 REFERENCES 507.03 Not Used 507.04 Not Used

More information

NAPA SANITATION DISTRICT

NAPA SANITATION DISTRICT NAPA SANITATION DISTRICT PSOMAS COMPANY - TASK ORDER No. 25 HEADWORKS EQUIPMENT REHAB-REPLACE PROJECT (CIP 17726) Date: July 25, 2018 Issued under Professional Services Agreement dated ---------, 2018.

More information

The Market Vending Centre

The Market Vending Centre Please submit completed applications to: Office 335 Student Centre, York University, 4700 Keele St. Toronto, ON M3J 1P3 Please note the application processing time is usually 1 2 weeks. Phone: 416-736-5658

More information

Times square & Social media. Social media - why

Times square & Social media. Social media - why Times square & Social media Social media - why Goal: broaden reach of our messaging by obtaining 100,000 fans/followers by january 1, 2011 use social media to Support: Businesses of times square through

More information

Special Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

Special Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS ... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE

More information

B STEEL BEAM GUIDE RAIL - OPSS 721

B STEEL BEAM GUIDE RAIL - OPSS 721 B721-2 - - OPSS 721 721-2.1 GENERAL Steel Beam Guide Rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,

More information

We are here to:

We are here to: Welcome! We are here to: Provide an overview and update of the proposed wind energy project Introduce the Project team Review the wind project development process Answer your questions NextEra Energy Resources

More information

CONSTRUCTION SPECIFICATION FOR TRAFFIC CONTROL SIGNING

CONSTRUCTION SPECIFICATION FOR TRAFFIC CONTROL SIGNING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 706 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR TRAFFIC CONTROL SIGNING TABLE OF CONTENTS 706.01 SCOPE 706.02 REFERENCES 706.03 DEFINITIONS 706.04

More information

ADVERTISING

ADVERTISING 209 MEDIA KIT FCAP is a statewide membership organization committed to the training and equipping of Florida community association managers and board members. FAMILY OF SERVICES Florida Community Association

More information

REPORT TO THE 2013 LEGISLATURE SEMI-ANNUAL REPORT ON HAWAI I CANCER RESEARCH SPECIAL FUND. Pursuant to Section 304A-2168, Hawai i Revised Statutes

REPORT TO THE 2013 LEGISLATURE SEMI-ANNUAL REPORT ON HAWAI I CANCER RESEARCH SPECIAL FUND. Pursuant to Section 304A-2168, Hawai i Revised Statutes REPORT TO THE 2013 LEGISLATURE SEMI-ANNUAL REPORT ON HAWAI I CANCER RESEARCH SPECIAL FUND Pursuant to Section 304A-2168, Hawai i Revised Statutes January 2013 REPORT TO THE 2013 LEGISLATURE Hawai i Cancer

More information

TL 9000 Quality Management System. Measurements Handbook. BRR Examples

TL 9000 Quality Management System. Measurements Handbook. BRR Examples Quality Excellence for Suppliers of Telecommunications Forum (QuEST Forum) TL 9000 Quality Management System Measurements Handbook Copyright 2012 QuEST Forum Version 1.0 7.2 7.2.1 Basic Calculation Example

More information

Special Provision No. 904S11 July Section of OPSS 904, January 1995 is amended by the addition of the following:

Special Provision No. 904S11 July Section of OPSS 904, January 1995 is amended by the addition of the following: CONCRETE IN STRUCTURE - Item No. CONCRETE IN SUBSTRUCTURE - Item No. CONCRETE IN APPROACH SLAB - Item No. CONCRETE IN DECK - Item No. CONCRETE IN BARRIER WALLS - Item No. CONCRETE IN PARAPET WALLS - Item

More information

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - STEEL BEAM ENERGY ATTENUATING TERMINAL SYSTEMS

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - STEEL BEAM ENERGY ATTENUATING TERMINAL SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 732 APRIL 2017 CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - STEEL BEAM ENERGY ATTENUATING TERMINAL SYSTEMS TABLE OF CONTENTS 732.01

More information

Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities

Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities This report is a summary of water quality information for Finch s Drinking Water System, published in accordance

More information

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS Ontario Provincial Standards 301 St. Paul St., 2 nd Floor North St. Catharines, ON L2R 7R4 Telephone: 905-704-2258 Fax: 905-704-2051 REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND

More information

NHS Supply Chain May SME participation figure is 28% by sales value across both transacted and nontransacted

NHS Supply Chain May SME participation figure is 28% by sales value across both transacted and nontransacted SME Engagement and Participation The SME Special Interest Group has deemed that it is more fair and equitable, and in line with OJEU compliance, that NHS Supply Chain put processes and allied measures

More information

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - EXTRUDER TERMINAL SYSTEM

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - EXTRUDER TERMINAL SYSTEM ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 559 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - EXTRUDER TERMINAL SYSTEM TABLE OF CONTENTS 559.01 SCOPE 559.02 REFERENCES

More information