Arlington East WRF Influent Channel Rehabilitation - Final
|
|
- Ursula Cobb
- 5 years ago
- Views:
Transcription
1 T E C H N I C A L M E M O R A N D U M ARLINGTON EAST WRF INFLUENT CHANNEL Arlington East WRF Influent Channel Rehabilitation - Final PREPARED FOR: PREPARED BY: JEA Capital Budget Planning David Kowalski DATE: 2/4/15 Updated Bill Clendening 5/18/16 Introduction & Background The Arlington WRF headworks influent structure was constructed in The headworks structure has a vertical channel with a roof over it and then discharges to a channel that flows through fine screens and then flows out through a channel and then continues with underground piping to splitter box number 1. The roof of the structure and the channels that convey the sewage through this area are the subject of concern. These channels are exposed to high levels hydrogen sulfide gases(1000 ppm) that are generated by the sewage has deteriorated these structures over the years and are in need of repair. Justification The channels that convey the sewage through the headworks structure have deterioration due to hydrogen sulfide gases that produce sulfuric acid which has damaged and deteriorated the concrete. The amount of deterioration to the roof is unknown as there is no access to this area because of continuous flow and there is no bypass around the structure. The channels that can be inspected have deteriorated due to sulfuric acid attack caused by hydrogen sulfide gas. If these channels are not repaired and coated with an acid resistance coating there may be failure of the concrete and raw sewage spilling onto the ground and possible structural failure in the future. Scope The scope of this project is to rehabilitate the influent and effluent channels of the headworks structures. This involves bypassing the plant flows from the influent pump station to the aeration tanks in order that the channels that normally convey the sewage can be repaired. The work includes the installation of line stops and bypass piping on the influent force mains in order that the plant can still operate properly. Replacing the 54 header pipe with valves for future bypass efforts. The work also includes concrete repair and the coating of the channels with an acid resistant coating (Spectrashield). The scope of work includes but is not limited to: Design of temporary bypass system to divert flow around the headworks structure. Installation of line stops on force mains and temporary bypass pumping. Remove And Replace approx. 50 of 54 DI header pipe including (2) 54 valves.
2 Structural repair of the damaged concrete ARLINGTON EAST WRF INFLUENT CHANNEL Application of an acid resistant coating on the influent/effluent channels and roof of the headworks structure. Remove and replace six (6) sluice gates and seals in existing frames Implementation Schedule FY 2016 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Engineering Design Duration = 210 days Procurement Bid Duration = 150 days Construction Duration = 120 days Closeout Duration = 0 days FY 2017 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Engineering Design Duration = 0 days Procurement Bid Duration = 60 days Construction Duration = 300 days Closeout Duration = 30 days Project Management & Delivery Stage Project Definition 10% Schematic Design 30% Conceptual Design 90% Detail Design 100% Final Design Bid Construction To Project Delivery W&WW PEC PEC PEC PEC PEC PEC OPB Established Trend Trend Trend 2
3 Cost Estimate and Expenditure Forecast ACTIVITY/DESCRIPTION SUB-TOTAL TOTAL Contractor Direct Cost $600, Contractor Indirect Cost $180, Overhead & Profit -15% $90, Miscellaneous-General/Special Conditions $30, Supplemental Work Allowance -10% max $60, JEA Cost & Engineering $156, Engineering $78, Project Management $39, Services During Construction $39, Real Estate $0.00 TOTAL PROJECT COST $936,000 PROJECTED EXPENDITURE FORECAST BY FISCAL YEAR ACTIVITY FY 2016 FY 2017 TOTAL QUARTER 1ST 2ND 3RD 4TH 1ST 2ND 3RD 4TH JEA Cost & Engineering 10% 3,900 $3,900 JEA Cost & Engineering 30% 23,400 7,800 3,900 $35,100 JEA Cost & Engineering Final 39,000 3,900 3,900 15,600 23,400 23,400 7,800 $117,000 Construction 78, , ,000 78,000 $780,000 Project Closeout $0 TOTAL 3,900 62,400 11,700 7,800 93, , ,400 85,800 $936,000 SIGNIFICANT MATERIAL SUMMARY DESCRIPTION UNIT MEASURE QUANTITY CONSTRUCTION 3
4 Risks: Possible structural failure in the future and raw sewage spilling onto the ground. Revision History Name Date Version Revision Notes 4
5 CP: Revision #: Date: Scope Approval The signatures below represent approval for this project. The groups represented must approve in writing changes to the scope, cost, or schedule, prior to implementing those changes. Corporate Planning Date O&M Date Outreach Date Environmental Date Others Signature Date Others Signature Date Rev 1 Description: Schedule Effect: Cost Effect: Approvals: Corporate Planning Date O&M Date Outreach Date Environmental Date Others Signature Date Others Signature Date Rev 2 Description: Schedule Effect: Cost Effect: Approvals: Corporate Planning Date O&M Date Outreach Date Environmental Date 5
6 Others Signature Date Others Signature Date 6
Index Number District II Primary Clarifier #2 and #3 Rehabilitation Project Definition FINAL
T E C H N I C A L M E M O R A N D U M DISTRICT II PRIMARY CLARIFIER #2 AND #3 REHABILITATION PROJECT DEFINITION Index Number 129-15 and #3 Rehabilitation Project Definition FINAL PREPARED FOR: JEA Capital
More informationNorwood High Service Pump Replacement
T E C H N I C A L M E M O R A N D U M 737-02 NORWOOD HIGH SERVICE PUMP REPLACEMENT 737-02 Norwood High Service Pump Replacement PREPARED FOR: JEA Planning PREPARED BY: Joshua M. Brown DATE: February 2017
More informationMcDuff WTP High Service Pump Replacement
T E C H N I C A L M E M O R A N D U M 642-03 MCDUFF WTP HIGH SERVICE PUMP REPLACEMENT 642-03 McDuff WTP High Service Pump Replacement PREPARED FOR: PREPARED BY: Capital Budget Planning Craig Jones DATE:
More informationIndex Number Greenland Burnt Mill PS to GEC Trans FM
INDEX NUMBER 100-62 GREENLAND BURNT MILL PS TO GEC TRANS - FM T E C H N I C A L M E M O R A N D U M Index Number 100-62 Greenland Burnt Mill PS to GEC Trans FM PREPARED FOR: JEA CAPITAL BUDGET PLANNING
More informationQUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 INFLUENT MONTHLY AVERAGE EFFLUENT MONTHLY AVERAGE
QUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE INFLUENT MONTHLY AVERAGE Month Flow MGD CBOD mg/l TSS mg/l July 26.7 350 320 August 29.1 370 340 September 27.3 380
More informationCase Study. BiOWiSH Aqua has Positive Long-Term Effects. Biological Help for the Human Race
Case Study BiOWiSH Aqua has Positive Long-Term Effects After Two Years, Sustains Improved Effluent Quality in South Korean Slaughterhouse Executive Summary BiOWiSH Aqua was implemented in a South Korean
More informationWater/Wastewater System Capital Projects Workshop June 29, 2017
Water/Wastewater System Capital Projects Workshop June 29, 2017 Agenda Safety Briefing Welcome/Purpose: Brian Roche, VP/GM Water Wastewater Systems CAPEX Overview: Raynetta Marshall, Director Project Engineering
More informationINTEROFFICE MEMORANDUM
INTEROFFICE MEMORANDUM DATE: October 23, 29 TO: Boise Public Works Commission FROM: Matt Hightree, Civil Engineer SUBJECT: Energy Consumption at Major Facilities Managed by Public Works This memo is presented
More informationQUARTERLY OPERATIONS REPORT 3 rd Quarter, January March 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 EFFLUENT MONTHLY AVERAGE INFLUENT MONTHLY AVERAGE
QUARTERLY OPERATIONS REPORT 3 rd Quarter, January March 2018 WASTEWATER PERMIT COMPLIANCE INFLUENT MONTHLY AVERAGE Month Flow MGD CBOD mg/l TSS mg/l July 26.7 350 320 August 29.1 370 340 September 27.3
More information2017 Annual Performance Report
2017 Annual Performance Report Thornbury Wastewater Treatment Plant and Associated Collection System Prepared by: Wastewater Operations Staff Reporting Period: January 1 December 31, 2017 1 P age Executive
More informationWoking. q business confidence report
Woking q1 business confidence report Woking q1 report headlines saw a new record in company registrations in Woking when compared to any previous. was a record quarter for company registrations in Woking
More informationMassachusetts Water Resources Authority Alewife Brook Pump Station Rehabilitation Design/CA/RE Services Contract 7034 Amendment No.
Massachusetts Water Resources Authority Alewife Brook Pump Station Rehabilitation Design/CA/RE Services Contract 7034 Amendment No. 3 April 12, 2017 Alewife Brook Pump Station 14 Rehabilitation Work to
More informationMassachusetts Water Resources Authority
Massachusetts Water Resources Authority Quabbin Precipitation 10 9.77 8 Inches 6 4 2 0 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Precipitation 10 Year Average System Yield - Quabbin and Wachusett
More informationAugust 2017 Monthly Report
August 7 Monthly Report Key Largo Wastewater Treatment District 55 Overseas Highway Tel: (5)5-9 KLWTD August 7 Monthly Report Operations Wastewater Treatment Plant The wastewater treatment plant processed
More informationISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action
ISO 14001 4.5.1 Monitoring and Measurement 4.5.2 Nonconformance and Corrective and Preventative Action 4.5.1 Monitoring and Measurement The organization shall establish and maintain documented procedures
More informationRE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System
14 th, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Wardsville Wastewater Treatment Plant and Collection System The Ontario Clean Water Agency
More informationUniversity of Michigan Eco-Driving Index (EDI) Latest data: August 2017
University of Michigan Eco-Driving Index () http://www.ecodrivingindex.org Latest data: August 2017 Developed and issued monthly by Michael Sivak and Brandon Schoettle Sustainable Worldwide Transportation
More informationGroundwater Discharge Permit Application ~ Part A Business Information
Groundwater Discharge Permit Application ~ Part A Business Information INSTRUCTIONS: Complete application in its entirety, incomplete applications will not be processed. A copy of this application will
More informationRainwater tank study of new homes
Rainwater tank study of new homes Helena Amaro UWSRA Science & Stakeholder Engagement Forum #4 The objectives Determine the quantity of water savings from rainwater tanks Identify opportunities to improve
More informationTraffic Department Anchorage: Performance. Value. Results.
Traffic Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements.
More informationThis document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works
This document can be made available in other accessible formats as soon as practicable and upon request Staff Report Infrastructure & Public Works Report To: Committee of the Whole Meeting Date: March
More informationStonecrest Estates Sewage Treatment Plant 2017 Annual Report
2017 Stonecrest Estates Sewage Treatment Plant 2017 Annual Report The Corporation of the City of Quinte West 0 Contents Table of Figures... 1 Executive Summary... 3 Summary and Interpretation of Monitoring
More informationFinch Drinking Water System O. Reg. 170/03 Schedule 22 - Summary Report for Municipalities
Finch Drinking Water System O. Reg. 170/03 Schedule 22 - Summary Report for Municipalities This report is a summary of water quality information for Finch s Drinking Water System, published in accordance
More informationAn Efficient Aeration Strategy Sits on a Three-Legged Stool
October 13, 2016 An Efficient Aeration Strategy Sits on a Three-Legged Stool A Case Study of Brookfield, WI by Wendy Raisbeck Outline Aeration Efficiency Stool Existing Conditions and Project Goals Aeration
More informationElectric Forward Market Report
Mar-01 Mar-02 Jun-02 Sep-02 Dec-02 Mar-03 Jun-03 Sep-03 Dec-03 Mar-04 Jun-04 Sep-04 Dec-04 Mar-05 May-05 Aug-05 Nov-05 Feb-06 Jun-06 Sep-06 Dec-06 Mar-07 Jun-07 Sep-07 Dec-07 Apr-08 Jun-08 Sep-08 Dec-08
More informationWater Resources Director: Chris Graybeal
Water Resources Director: Chris Graybeal Our Mission To promote and protect the environment, preserve natural resources, and ensure the health and safety of our customers. Granite Falls Wastewater Treatment
More informationTraffic Division Public Works Department Anchorage: Performance. Value. Results.
Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements. Direct Services Design, operate and maintain the
More informationAdministration Division Public Works Department Anchorage: Performance. Value. Results.
Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,
More informationCity of San Clemente Water Usage Report
Monthly Usage (AF) ACRE FEET City of San Clemente Overview of Usage FY 217-18 Monthly Water Use Type of Supply Total MWDOC 723 722 657 629 - - - - - - - - 2,731 Local Groundwater 33 23 69 84 - - - - -
More informationCapital Project Tracking Report
Bus Shelter Lighting Upgrades Firm: Start: End: Bus Shelter Pad & Installation Phase 6 Firm: GCW, Inc. Funding: $107,500 Start: Jun 2018 End: Jan 2019 % Complete: 33% Continue to submit exhibits for permit
More informationEGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT
EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT Township of Bonnechere Valley Water and Sewage Department January 2014 Table of Contents Executive Summary... 3 Introduction... 4 Report Availability...
More informationCold Weather Ammonia Removal
MWEA Annual Conference June 21, 2016 Cold Weather Ammonia Removal Mark Prein Welcome to Charlevoix the Beautiful Project Need NPDES Permit Project Need NPDES Permit Project Need MDEQ Compliance Schedule
More informationPerseus 1B North Rankin Drilling Rig Reinstatement. Perseus 1B North Rankin Drilling Rig Reinstatement. Presentation
Perseus 1B North Rankin Drilling Rig Reinstatement 8 th December 2005 RIG MOBILISATION Star Racker Efficiency Improvements Transfer & Rig Up Equipment Shared With GWA Maintenance To Return Facility Functionality
More informationWAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIR PROJECT Information Sheet
March 5, 2015 WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIR PROJECT Information Sheet Overview The purpose of this Project is to repair damages to the Waikoloa Reservoir No. 1 which were sustained during
More informationThe Corporation of the City of St. Thomas. Water Pollution Control Plant Annual Performance Report. Under Ontario Ministry of the Environment
The Corporation of the City of St. Thomas Water Pollution Control Plant 2008 Annual Performance Report Under Ontario Ministry of the Environment Certificate of Approval 5276-5M9JW7 February 2009 John Mansell,
More informationFinch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities
Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities This report is a summary of water quality information for Finch s Drinking Water System, published in accordance
More information2017 KEY INSIGHTS ON. Employee Attendance and Tardiness
2017 KEY INSIGHTS ON Employee Attendance and Tardiness THE AVERAGE NUMBER OF MINUTES THAT EMPLOYEES IN THE XIMBLE SYSTEM ARE LATE IS MINUTES. 114.2 MINUTES Statistical sample of 263258 clock-in records,
More informationChapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero
Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories Learning Objectives At the end of the class the student will be able to: 1. Describe the production budget process
More informationCombined Sewer Overflows July 2012-December 2013
CSO Facilities Summary Report 213 Combined Sewer Overflows July 212-December 213 Overview MWRA monitored four CSO facilities in the North System during the period covered in this report (July 212 December
More informationSECTION 813 SEWER FLOW CONTROL
SECTION 813 SEWER FLOW CONTROL 813-1 DESCRIPTION: Sewer flow control is a set of methods to adjust the flow in the sewer system to allow for inspection, maintenance, repair or replacement. This is accomplished
More informationUtilizing Airlift Water Reuse Technology to Help Achieve Electrical Energy Savings in Fish Hatcheries
Utilizing Airlift Water Reuse Technology to Help Achieve Electrical Energy Savings in Fish Hatcheries Ray Billings Jim Bomford Duaine Hardie Freshwater Fisheries Society of BC Why We re Keen on Energy
More informationCalifornia Independent System Operator Corporation. California ISO. Import resource adequacy. Department of Market Monitoring
k California Independent System Operator Corporation California ISO Import resource adequacy September 10, 2018 Department of Market Monitoring Summary This report provides an update of analysis and trends
More information5/1/2013. Puget Sound Conditions. LID research, data, guidelines, specifications, and regulations are evolving rapidly.
The goal of these workshops is to give designers, builders and managers the technical details necessary to properly design, construct and maintain LID facilities. LID research, data, guidelines, specifications,
More informationMaking a Dramatic Impact on Water Loss. Robert Horvat, PE cell:
Making a Dramatic Impact on Water Loss Robert Horvat, PE rhorvat@entecheng.com cell: 412-759-3140 Overview The Problem Management 3 Success Stories Water Loss the problem EPA Fact Sheet: Water Audits and
More informationDec Board of Education: Approve Educational Specifications. Dec Jan. 2016
Dec. 2015 Dec. 2015 Jan. 2016 Jan 2016 Fairfield Public Schools Develops Project Team Initial Funding request analysis (including temporary classrooms costs) for services through Design Development Board
More informationDesign Services Assessment Report, 2013
Design Services Assessment Report, 2013 1. Expected Outcome: Improve Communication Clients and stakeholders will be satisfied with communication efforts and therefore will be better informed about project
More informationHKU announces 2017 Q4 HK Macroeconomic Forecast
HKU announces 2017 Q4 HK Macroeconomic Forecast October 10, 2017 The of the Hong Kong Institute of Economics and Business Strategy at the University of Hong Kong (HKU) released its quarterly Hong Kong
More informationMassachusetts Water Resources Authority
Massachusetts Water Resources Authority Wet Fall Results in Increased Plant Flow 600 Plant Flow & Precipitation 10 MGD 500 8 400 6 300 200 4 100 2 0 0 J A S O N D J F M A M J Total Plant Flow, MGD 10 Yr
More informationPilot Testing a High-Speed Turbo Blower at the City of Plano, Illinois Water Reclamation Facility"
Pilot Testing a High-Speed Turbo Blower at the City of Plano, Illinois Water Reclamation Facility" Presented by: Mark J. Halm, P.E. - Yokhana Alkass, LEED AP EEC, PC Darrin B. Boyer - City of Plano- Illinois
More informationWASTEWATER DIVISION DECEMBER 2016 MONTHLY REPORT
WASTEWATER DIVISION DECEMBER 216 MONTHLY REPORT 1 P age Table of Contents Section 1: Regulatory Compliance Reporting pg. 6 Section2: OWTP Operations & Maintenance pg. 6 Section 3: Advanced Water Purification
More informationHOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN
HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins
More informationCITY OF LONDON WASTEWATER TREATMENT OPERATIONS ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT 2013 ANNUAL REPORT ADELAIDE WASTEWATER TREATMENT PLANT
CITY OF LONDON WASTEWATER TREATMENT OPERATIONS ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT 2013 ANNUAL REPORT ADELAIDE WASTEWATER TREATMENT PLANT FEBRUARY 2014 Adelaide Wastewater Treatment Plant 2013
More informationFeel free to contact me should you require any additional information regarding the report. I can be reached at
February 28, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Glencoe Wastewater Treatment Plant The Ontario Clean Water Agency is the Operating
More informationHis Worship Mayor Don Darling and Members of Common Council. SUBJECT: Project Performance Update Safe, Clean Drinking Water Project
COUNCIL REPORT M&C No. 2017-103 Report Date April 11, 2017 Meeting Date April 18, 2017 Service Area Saint John Water His Worship Mayor Don Darling and Members of Common Council SUBJECT: Project Performance
More informationHKU announces 2016 Q3 HK Macroeconomic Forecast
HKU announces 2016 Q3 HK Macroeconomic Forecast July 7, 2016 The of the Hong Kong Institute of Economics and Business Strategy at the University of Hong Kong (HKU) released its quarterly Hong Kong Macroeconomic
More informationIroquois Wastewater Treatment Plant 2016 Annual Performance Report
Iroquois Wastewater Treatment Plant 2016 Annual Performance Report The Iroquois WWTP is a Class II wastewater treatment facility owned and operated by the Municipality of South Dundas. Raw sewage is conveyed
More informationAnnual Report. December 2010 November Bradley Cole 2/7/2012
Annual Report December 2010 November 2011 Bradley Cole 2/7/2012 CH2M HILL annual report to the Board of Directors of the Pine-Strawberry Water Improvement District. This annual report provides an overview
More informationSafety Briefing. Exit Routes. Exit route Assembly Point 911 Security Extinguishers Hazards Phones on silent
September 11, 2018 Agenda Safety Briefing Joe Perez, Procurement Category Manager Welcome/Introductory Remarks Aaron Zahn, JEA Interim CEO Purpose Deryle Calhoun, VP/GM Water/Wastewater Systems Overview
More informationAGENDA ITEM D6. Climate Outlook
AGENDA ITEM D6 DATE: June 1, 2016 TO: Matt Jordan, General Manager FROM: Alison Adams, Chief Technical Officer SUBJECT: Regional Water Supplies and Member Demands Status Report SUMMARY: RECOMMENDATION:
More informationWelcome Waste Water Quality Breakout
Welcome Waste Water Quality Breakout 07 November 2016 Lawrence Gosden Managing Director, Wastewater Environmental protection 07 November 2016 Anthony Crawford, Matthew Hart and Andrew Hagger Pollution
More informationFacilities Management. FM Key Performance Indicators
Facilities Management FM Key Performance Indicators September 21, 2017 Facilities Management Key Volume Indicators Key Volume FM Change Evanston Chicago Full Time Equivalent (FTE) 369 +5 304 65 Acres 296
More informationEnhanced Pavement Management Program. Pavement Management Program
Enhanced Pavement Management Program Presented to the Transportation and Environment Committee Feb. 12, 2007 VISION STATEMENT Creating the Most Cost Effective, Pavement Management Program in the Nation
More informationJEDDAH INDUSTRIAL CITY
JEDDAH INDUSTRIAL CITY WASTEWATER TREATMENT PLANT A Presentation by : Engr. Mowafaq Al-Sugeir Managing Director ICDOC SAWEA 2007 WORKSHOP, AL-KHOBER 4 December 2007 Built & Being Operated by : on Build-Operate-Transfer
More informationINTEROFFICE MEMORANDUM
INTEROFFICE MEMORANDUM DATE: April 24, 29 TO: Boise Public Works Commission FROM: Matt Hightree, civil engineer SUBJECT: Energy Consumption at Major Facilities Managed by Public Works This report contains
More informationFacilities Management. FM Key Performance Indicators
Facilities Management FM Key Performance Indicators August 15, 2017 Facilities Management Key Volume Indicators Key Volume FM Change Evanston Chicago Full Time Equivalent (FTE) 364 +11 299 65 Acres 296
More informationCITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2012 ANNUAL REPORT
CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2012 ANNUAL REPORT FEBRUARY 2013 SUMMARY This annual report is in response
More informationLIST OF DIRECTIVES AND MEMORANDA
LIST OF DIRECTIVES AND MEMORANDA Technical Policies and Standards HSBM DO 2014-01 Format and Method for Policies Issued by HSB To provide guidance for the format and method of communicating the implementation
More informationWater and Waste Department
Water and Waste Department 2012 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association, March 7 th, 2012 Capital Budget Capital s Summary 2012 Capital Budget 2013 to
More informationHKU announces 2018 Q1 HK Macroeconomic Forecast 1
Q Q2 Q3 Q4 2Q 2Q2 2Q3 2Q4 3Q 3Q2 3Q3 3Q4 4Q 4Q2 4Q3 4Q4 5Q 5Q2 5Q3 5Q4 6Q 6Q2 6Q3 6Q4 7Q 7Q2 7Q3 7Q4 8Q year-on-year percentage HKU announces 208 Q HK Macroeconomic Forecast January 0, 208 The of the Hong
More informationTECHNICAL SPECIFICATIONS FOR DIGESTER CLEANING
TECHNICAL SPECIFICATIONS FOR DIGESTER CLEANING 1. SCOPE 1.1 This section covers the cleaning and sludge dewatering for digesters, containing sludge anaerobically digested to Class B Levels. 1.2 These areas
More informationWATER & WASTEWATER PLATFORM
WATER & WASTEWATER PLATFORM Presenter: Thomas E. Vossman WATER & WASTEWATER Thomas E. Vossman President, Insituform Technologies 134 Water & Wastewater Platform Water & Wastewater Cured-in-Place Pipe Potential
More informationExhibit A. Scope of Services for Flow Monitoring Program 2015 Flow Monitoring City of Lawrence, Kansas
Exhibit A Scope of Services for Flow Monitoring Program 2015 Flow Monitoring City of Lawrence, Kansas Intent and Purpose The City of Lawrence has begun a Rapid Inflow and Infiltration (I/I) Reduction Program.
More informationTL 9000 Quality Management System. Measurements Handbook. BRR Examples
Quality Excellence for Suppliers of Telecommunications Forum (QuEST Forum) TL 9000 Quality Management System Measurements Handbook Copyright 2012 QuEST Forum Version 1.0 7.2 7.2.1 Basic Calculation Example
More information2014 Annual Wastewater Report
214 Annual Wastewater Report Mar 6, 215 v.1. 214 Annual Wastewater Report Table of Contents REPORTS PAGE Wastewater Capital Spending Overview 1 Wastewater North - 214 1 Wastewater South 214 2 Lift Stations
More informationAppendix 3A Water Demand Projections
Appendix 3A Water Demand Projections 213 Water and Wastewater Master Plan Water Demand Summary GRAND TOTAL MAXIMUM DAY DEMAND PRESSURE ZONE 211 216 221 226 231 1W 18.37 19.35 19.99 21.22 22.47 1C 24.61
More information2019 Salt River Siphon Outage Customer Focus Meeting
2019 Salt River Siphon Outage Customer Focus Meeting Darrin Francom, PE Engineering Services Department Manager Agenda 1. Overview of the Siphon 2. Review of Repair in 2001 3. Results of 2009 Inspection
More informationNAPA SANITATION DISTRICT
NAPA SANITATION DISTRICT PSOMAS COMPANY - TASK ORDER No. 25 HEADWORKS EQUIPMENT REHAB-REPLACE PROJECT (CIP 17726) Date: July 25, 2018 Issued under Professional Services Agreement dated ---------, 2018.
More informationCIP Routine/Small Purchasing Team Close-out
CIP Routine/Small Purchasing Team Close-out Define Ken Koebel Control Measure January 26, 2011 Improve Analyze Cross Functional Team 2 Charter / Business Case Define Measure Routine purchasing (orders
More informationEffective Contract Preparation. Contents are subject to change. For the latest updates visit
Effective Contract Preparation Page 1 of 7 Why Attend The overall aim of this course is to provide participants with the knowledge, concepts and skills needed to perform all the tasks required in the pre-award
More informationFinancial Transaction Adjustment Request (FTAR) Processing Guide
Financial Transaction Adjustment Request (FTAR) Processing Guide Introduction With training and departmental approval, a department user will be able to complete a Financial Transaction Adjustment Request
More informationRemote Headworks Upgrade. November 4, 2010
Remote Headworks Upgrade November 4, 2010 Chelsea Creek Headworks Comb. and Sep. Trib. Areas (brown shading) Flow discharge to North Met Relief Tunnel Peak Cap (350 MGD), Avg. Flow (135 MGD) Columbus Park
More informationCollege Football Hall of Fame HAMMOCK R
- Contract Schedule MILESTONES DESIGN / PRECONSTRUCTION PROCUREMENT Construction Procurement CONSTRUCTION Hardscape / Landscape Hall Of Fame Building Sitework Earthwork A1060 Mobilize 5 18-Feb-13 A 22-Feb-13
More informationCI User Engagement Activities and Schedule Nov Apr 2013
OCEAN OBSERVATORIES INITIATIVE Activities and Schedule Nov 2012 - Apr 2013 Julie Thomas, Operations Director Susanne Jul, User Experience Lead 1 Overview Review engagement points in the iterative release
More informationNon-consolidated Forecast of Income <1>
Supplementary Materials, Financial Results for Nine Months Ended December 31, 20 Non-consolidated Forecast of Income FY Forecast FY Forecast Change Current Previous (in Oct.) (A) (B) (A)-(B) Operating
More informationSample Reports. for. HAP v4.80 Example Problem
Sample Reports for HAP v4.80 Example Problem October, 2013 Carrier Software Systems Copyright 2013 Carrier Corporation, All Rights Reserved Introduction This document contains reports generated using the
More informationFacilities Management. FM Key Performance Indicators
Facilities Management FM Key Performance Indicators October 20, 2017 Facilities Management Key Volume Indicators Key Volume FM Change Evanston Chicago Full Time Equivalent (FTE) 370 +1 301 69 Acres 296
More informationSouthside Wastewater Treatment Plant Renewable Energy Leasing Project
City of Dallas Water Utilities Department Southside Wastewater Treatment Plant Renewable Energy Leasing Project Presented to the TEC September 8, 2008 Southside Wastewater Treatment Plant Renewable Energy
More informationHeating the University of Glasgow with river sourced heat pumps. Adam McConkey Andrew Poon-King Zhibin Yu
Heating the University of Glasgow with river sourced heat pumps Adam McConkey Andrew Poon-King Zhibin Yu Opportunity - Reduce Glasgow University s 1.9 m gas bill - The University is set to upgrade its
More informationVoorhees Replacement Facility Schedule Summary Classic WBS Layout 29-Sep-09 13:50 Activity Name Original Start Finish Duration Voorhees Replacement F 1136 17-Nov-06 31-Mar-11 Schematic Design 87 17-Nov-06
More informationPresentation for the Local Government Commission and the Community Environmental Council. July 13, 2007
Community Choice Aggregation Presentation for the Local Government Commission and the Community Environmental Council July 13, 2007 1 Community Choice Aggregation (CCA) CCA Legislation (AB117) allows cities
More informationCull Cow Marketing And Feeding Alternatives. Dillon M. Feuz - Utah State University and John P. Hewlett University of Wyoming
Cull Cow Marketing And Feeding Alternatives Dillon M. Feuz - Utah State University and John P. Hewlett University of Wyoming OBJECTIVES Analyze Seasonal Cull Cow Prices Use to make short term price forecasts
More informationIndustry Perspective on Well Decommissioning Pennsylvania Orphaned and Abandoned Well Workshop May 16, 2018
Industry Perspective on Well Decommissioning Pennsylvania Orphaned and Abandoned Well Workshop May 16, 2018 Abandoned wells present a significant danger to the public. 2 Understanding the tactical nuances
More informationCAPITAL IMPROVEMENT PROGRAM PERFORMANCE REPORTS
CAPITAL IMPROVEMENT PROGRAM PERFORMANCE REPORTS CONTENTS: Construction Change Order Summary Report Design Consultant PSA Amendment Summary Report Contractors Active Projects Summary Report Consultant Construction
More informationREPORT TO THE 2013 LEGISLATURE SEMI-ANNUAL REPORT ON HAWAI I CANCER RESEARCH SPECIAL FUND. Pursuant to Section 304A-2168, Hawai i Revised Statutes
REPORT TO THE 2013 LEGISLATURE SEMI-ANNUAL REPORT ON HAWAI I CANCER RESEARCH SPECIAL FUND Pursuant to Section 304A-2168, Hawai i Revised Statutes January 2013 REPORT TO THE 2013 LEGISLATURE Hawai i Cancer
More informationCITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT
CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT FEBRUARY 2014 SUMMARY This annual report is in response
More informationImplementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Operation Name: Uzbekistan
More information