Arlington East WRF Influent Channel Rehabilitation - Final

Size: px
Start display at page:

Download "Arlington East WRF Influent Channel Rehabilitation - Final"

Transcription

1 T E C H N I C A L M E M O R A N D U M ARLINGTON EAST WRF INFLUENT CHANNEL Arlington East WRF Influent Channel Rehabilitation - Final PREPARED FOR: PREPARED BY: JEA Capital Budget Planning David Kowalski DATE: 2/4/15 Updated Bill Clendening 5/18/16 Introduction & Background The Arlington WRF headworks influent structure was constructed in The headworks structure has a vertical channel with a roof over it and then discharges to a channel that flows through fine screens and then flows out through a channel and then continues with underground piping to splitter box number 1. The roof of the structure and the channels that convey the sewage through this area are the subject of concern. These channels are exposed to high levels hydrogen sulfide gases(1000 ppm) that are generated by the sewage has deteriorated these structures over the years and are in need of repair. Justification The channels that convey the sewage through the headworks structure have deterioration due to hydrogen sulfide gases that produce sulfuric acid which has damaged and deteriorated the concrete. The amount of deterioration to the roof is unknown as there is no access to this area because of continuous flow and there is no bypass around the structure. The channels that can be inspected have deteriorated due to sulfuric acid attack caused by hydrogen sulfide gas. If these channels are not repaired and coated with an acid resistance coating there may be failure of the concrete and raw sewage spilling onto the ground and possible structural failure in the future. Scope The scope of this project is to rehabilitate the influent and effluent channels of the headworks structures. This involves bypassing the plant flows from the influent pump station to the aeration tanks in order that the channels that normally convey the sewage can be repaired. The work includes the installation of line stops and bypass piping on the influent force mains in order that the plant can still operate properly. Replacing the 54 header pipe with valves for future bypass efforts. The work also includes concrete repair and the coating of the channels with an acid resistant coating (Spectrashield). The scope of work includes but is not limited to: Design of temporary bypass system to divert flow around the headworks structure. Installation of line stops on force mains and temporary bypass pumping. Remove And Replace approx. 50 of 54 DI header pipe including (2) 54 valves.

2 Structural repair of the damaged concrete ARLINGTON EAST WRF INFLUENT CHANNEL Application of an acid resistant coating on the influent/effluent channels and roof of the headworks structure. Remove and replace six (6) sluice gates and seals in existing frames Implementation Schedule FY 2016 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Engineering Design Duration = 210 days Procurement Bid Duration = 150 days Construction Duration = 120 days Closeout Duration = 0 days FY 2017 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Engineering Design Duration = 0 days Procurement Bid Duration = 60 days Construction Duration = 300 days Closeout Duration = 30 days Project Management & Delivery Stage Project Definition 10% Schematic Design 30% Conceptual Design 90% Detail Design 100% Final Design Bid Construction To Project Delivery W&WW PEC PEC PEC PEC PEC PEC OPB Established Trend Trend Trend 2

3 Cost Estimate and Expenditure Forecast ACTIVITY/DESCRIPTION SUB-TOTAL TOTAL Contractor Direct Cost $600, Contractor Indirect Cost $180, Overhead & Profit -15% $90, Miscellaneous-General/Special Conditions $30, Supplemental Work Allowance -10% max $60, JEA Cost & Engineering $156, Engineering $78, Project Management $39, Services During Construction $39, Real Estate $0.00 TOTAL PROJECT COST $936,000 PROJECTED EXPENDITURE FORECAST BY FISCAL YEAR ACTIVITY FY 2016 FY 2017 TOTAL QUARTER 1ST 2ND 3RD 4TH 1ST 2ND 3RD 4TH JEA Cost & Engineering 10% 3,900 $3,900 JEA Cost & Engineering 30% 23,400 7,800 3,900 $35,100 JEA Cost & Engineering Final 39,000 3,900 3,900 15,600 23,400 23,400 7,800 $117,000 Construction 78, , ,000 78,000 $780,000 Project Closeout $0 TOTAL 3,900 62,400 11,700 7,800 93, , ,400 85,800 $936,000 SIGNIFICANT MATERIAL SUMMARY DESCRIPTION UNIT MEASURE QUANTITY CONSTRUCTION 3

4 Risks: Possible structural failure in the future and raw sewage spilling onto the ground. Revision History Name Date Version Revision Notes 4

5 CP: Revision #: Date: Scope Approval The signatures below represent approval for this project. The groups represented must approve in writing changes to the scope, cost, or schedule, prior to implementing those changes. Corporate Planning Date O&M Date Outreach Date Environmental Date Others Signature Date Others Signature Date Rev 1 Description: Schedule Effect: Cost Effect: Approvals: Corporate Planning Date O&M Date Outreach Date Environmental Date Others Signature Date Others Signature Date Rev 2 Description: Schedule Effect: Cost Effect: Approvals: Corporate Planning Date O&M Date Outreach Date Environmental Date 5

6 Others Signature Date Others Signature Date 6

Index Number District II Primary Clarifier #2 and #3 Rehabilitation Project Definition FINAL

Index Number District II Primary Clarifier #2 and #3 Rehabilitation Project Definition FINAL T E C H N I C A L M E M O R A N D U M DISTRICT II PRIMARY CLARIFIER #2 AND #3 REHABILITATION PROJECT DEFINITION Index Number 129-15 and #3 Rehabilitation Project Definition FINAL PREPARED FOR: JEA Capital

More information

Norwood High Service Pump Replacement

Norwood High Service Pump Replacement T E C H N I C A L M E M O R A N D U M 737-02 NORWOOD HIGH SERVICE PUMP REPLACEMENT 737-02 Norwood High Service Pump Replacement PREPARED FOR: JEA Planning PREPARED BY: Joshua M. Brown DATE: February 2017

More information

McDuff WTP High Service Pump Replacement

McDuff WTP High Service Pump Replacement T E C H N I C A L M E M O R A N D U M 642-03 MCDUFF WTP HIGH SERVICE PUMP REPLACEMENT 642-03 McDuff WTP High Service Pump Replacement PREPARED FOR: PREPARED BY: Capital Budget Planning Craig Jones DATE:

More information

Index Number Greenland Burnt Mill PS to GEC Trans FM

Index Number Greenland Burnt Mill PS to GEC Trans FM INDEX NUMBER 100-62 GREENLAND BURNT MILL PS TO GEC TRANS - FM T E C H N I C A L M E M O R A N D U M Index Number 100-62 Greenland Burnt Mill PS to GEC Trans FM PREPARED FOR: JEA CAPITAL BUDGET PLANNING

More information

QUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 INFLUENT MONTHLY AVERAGE EFFLUENT MONTHLY AVERAGE

QUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 INFLUENT MONTHLY AVERAGE EFFLUENT MONTHLY AVERAGE QUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE INFLUENT MONTHLY AVERAGE Month Flow MGD CBOD mg/l TSS mg/l July 26.7 350 320 August 29.1 370 340 September 27.3 380

More information

Case Study. BiOWiSH Aqua has Positive Long-Term Effects. Biological Help for the Human Race

Case Study. BiOWiSH Aqua has Positive Long-Term Effects. Biological Help for the Human Race Case Study BiOWiSH Aqua has Positive Long-Term Effects After Two Years, Sustains Improved Effluent Quality in South Korean Slaughterhouse Executive Summary BiOWiSH Aqua was implemented in a South Korean

More information

Water/Wastewater System Capital Projects Workshop June 29, 2017

Water/Wastewater System Capital Projects Workshop June 29, 2017 Water/Wastewater System Capital Projects Workshop June 29, 2017 Agenda Safety Briefing Welcome/Purpose: Brian Roche, VP/GM Water Wastewater Systems CAPEX Overview: Raynetta Marshall, Director Project Engineering

More information

INTEROFFICE MEMORANDUM

INTEROFFICE MEMORANDUM INTEROFFICE MEMORANDUM DATE: October 23, 29 TO: Boise Public Works Commission FROM: Matt Hightree, Civil Engineer SUBJECT: Energy Consumption at Major Facilities Managed by Public Works This memo is presented

More information

QUARTERLY OPERATIONS REPORT 3 rd Quarter, January March 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 EFFLUENT MONTHLY AVERAGE INFLUENT MONTHLY AVERAGE

QUARTERLY OPERATIONS REPORT 3 rd Quarter, January March 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 EFFLUENT MONTHLY AVERAGE INFLUENT MONTHLY AVERAGE QUARTERLY OPERATIONS REPORT 3 rd Quarter, January March 2018 WASTEWATER PERMIT COMPLIANCE INFLUENT MONTHLY AVERAGE Month Flow MGD CBOD mg/l TSS mg/l July 26.7 350 320 August 29.1 370 340 September 27.3

More information

2017 Annual Performance Report

2017 Annual Performance Report 2017 Annual Performance Report Thornbury Wastewater Treatment Plant and Associated Collection System Prepared by: Wastewater Operations Staff Reporting Period: January 1 December 31, 2017 1 P age Executive

More information

Woking. q business confidence report

Woking. q business confidence report Woking q1 business confidence report Woking q1 report headlines saw a new record in company registrations in Woking when compared to any previous. was a record quarter for company registrations in Woking

More information

Massachusetts Water Resources Authority Alewife Brook Pump Station Rehabilitation Design/CA/RE Services Contract 7034 Amendment No.

Massachusetts Water Resources Authority Alewife Brook Pump Station Rehabilitation Design/CA/RE Services Contract 7034 Amendment No. Massachusetts Water Resources Authority Alewife Brook Pump Station Rehabilitation Design/CA/RE Services Contract 7034 Amendment No. 3 April 12, 2017 Alewife Brook Pump Station 14 Rehabilitation Work to

More information

Massachusetts Water Resources Authority

Massachusetts Water Resources Authority Massachusetts Water Resources Authority Quabbin Precipitation 10 9.77 8 Inches 6 4 2 0 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Precipitation 10 Year Average System Yield - Quabbin and Wachusett

More information

August 2017 Monthly Report

August 2017 Monthly Report August 7 Monthly Report Key Largo Wastewater Treatment District 55 Overseas Highway Tel: (5)5-9 KLWTD August 7 Monthly Report Operations Wastewater Treatment Plant The wastewater treatment plant processed

More information

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action ISO 14001 4.5.1 Monitoring and Measurement 4.5.2 Nonconformance and Corrective and Preventative Action 4.5.1 Monitoring and Measurement The organization shall establish and maintain documented procedures

More information

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System 14 th, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Wardsville Wastewater Treatment Plant and Collection System The Ontario Clean Water Agency

More information

University of Michigan Eco-Driving Index (EDI) Latest data: August 2017

University of Michigan Eco-Driving Index (EDI)   Latest data: August 2017 University of Michigan Eco-Driving Index () http://www.ecodrivingindex.org Latest data: August 2017 Developed and issued monthly by Michael Sivak and Brandon Schoettle Sustainable Worldwide Transportation

More information

Groundwater Discharge Permit Application ~ Part A Business Information

Groundwater Discharge Permit Application ~ Part A Business Information Groundwater Discharge Permit Application ~ Part A Business Information INSTRUCTIONS: Complete application in its entirety, incomplete applications will not be processed. A copy of this application will

More information

Rainwater tank study of new homes

Rainwater tank study of new homes Rainwater tank study of new homes Helena Amaro UWSRA Science & Stakeholder Engagement Forum #4 The objectives Determine the quantity of water savings from rainwater tanks Identify opportunities to improve

More information

Traffic Department Anchorage: Performance. Value. Results.

Traffic Department Anchorage: Performance. Value. Results. Traffic Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements.

More information

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works This document can be made available in other accessible formats as soon as practicable and upon request Staff Report Infrastructure & Public Works Report To: Committee of the Whole Meeting Date: March

More information

Stonecrest Estates Sewage Treatment Plant 2017 Annual Report

Stonecrest Estates Sewage Treatment Plant 2017 Annual Report 2017 Stonecrest Estates Sewage Treatment Plant 2017 Annual Report The Corporation of the City of Quinte West 0 Contents Table of Figures... 1 Executive Summary... 3 Summary and Interpretation of Monitoring

More information

Finch Drinking Water System O. Reg. 170/03 Schedule 22 - Summary Report for Municipalities

Finch Drinking Water System O. Reg. 170/03 Schedule 22 - Summary Report for Municipalities Finch Drinking Water System O. Reg. 170/03 Schedule 22 - Summary Report for Municipalities This report is a summary of water quality information for Finch s Drinking Water System, published in accordance

More information

An Efficient Aeration Strategy Sits on a Three-Legged Stool

An Efficient Aeration Strategy Sits on a Three-Legged Stool October 13, 2016 An Efficient Aeration Strategy Sits on a Three-Legged Stool A Case Study of Brookfield, WI by Wendy Raisbeck Outline Aeration Efficiency Stool Existing Conditions and Project Goals Aeration

More information

Electric Forward Market Report

Electric Forward Market Report Mar-01 Mar-02 Jun-02 Sep-02 Dec-02 Mar-03 Jun-03 Sep-03 Dec-03 Mar-04 Jun-04 Sep-04 Dec-04 Mar-05 May-05 Aug-05 Nov-05 Feb-06 Jun-06 Sep-06 Dec-06 Mar-07 Jun-07 Sep-07 Dec-07 Apr-08 Jun-08 Sep-08 Dec-08

More information

Water Resources Director: Chris Graybeal

Water Resources Director: Chris Graybeal Water Resources Director: Chris Graybeal Our Mission To promote and protect the environment, preserve natural resources, and ensure the health and safety of our customers. Granite Falls Wastewater Treatment

More information

Traffic Division Public Works Department Anchorage: Performance. Value. Results.

Traffic Division Public Works Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements. Direct Services Design, operate and maintain the

More information

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Administration Division Public Works Department Anchorage: Performance. Value. Results. Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,

More information

City of San Clemente Water Usage Report

City of San Clemente Water Usage Report Monthly Usage (AF) ACRE FEET City of San Clemente Overview of Usage FY 217-18 Monthly Water Use Type of Supply Total MWDOC 723 722 657 629 - - - - - - - - 2,731 Local Groundwater 33 23 69 84 - - - - -

More information

Capital Project Tracking Report

Capital Project Tracking Report Bus Shelter Lighting Upgrades Firm: Start: End: Bus Shelter Pad & Installation Phase 6 Firm: GCW, Inc. Funding: $107,500 Start: Jun 2018 End: Jan 2019 % Complete: 33% Continue to submit exhibits for permit

More information

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT Township of Bonnechere Valley Water and Sewage Department January 2014 Table of Contents Executive Summary... 3 Introduction... 4 Report Availability...

More information

Cold Weather Ammonia Removal

Cold Weather Ammonia Removal MWEA Annual Conference June 21, 2016 Cold Weather Ammonia Removal Mark Prein Welcome to Charlevoix the Beautiful Project Need NPDES Permit Project Need NPDES Permit Project Need MDEQ Compliance Schedule

More information

Perseus 1B North Rankin Drilling Rig Reinstatement. Perseus 1B North Rankin Drilling Rig Reinstatement. Presentation

Perseus 1B North Rankin Drilling Rig Reinstatement. Perseus 1B North Rankin Drilling Rig Reinstatement. Presentation Perseus 1B North Rankin Drilling Rig Reinstatement 8 th December 2005 RIG MOBILISATION Star Racker Efficiency Improvements Transfer & Rig Up Equipment Shared With GWA Maintenance To Return Facility Functionality

More information

WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIR PROJECT Information Sheet

WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIR PROJECT Information Sheet March 5, 2015 WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIR PROJECT Information Sheet Overview The purpose of this Project is to repair damages to the Waikoloa Reservoir No. 1 which were sustained during

More information

The Corporation of the City of St. Thomas. Water Pollution Control Plant Annual Performance Report. Under Ontario Ministry of the Environment

The Corporation of the City of St. Thomas. Water Pollution Control Plant Annual Performance Report. Under Ontario Ministry of the Environment The Corporation of the City of St. Thomas Water Pollution Control Plant 2008 Annual Performance Report Under Ontario Ministry of the Environment Certificate of Approval 5276-5M9JW7 February 2009 John Mansell,

More information

Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities

Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities This report is a summary of water quality information for Finch s Drinking Water System, published in accordance

More information

2017 KEY INSIGHTS ON. Employee Attendance and Tardiness

2017 KEY INSIGHTS ON. Employee Attendance and Tardiness 2017 KEY INSIGHTS ON Employee Attendance and Tardiness THE AVERAGE NUMBER OF MINUTES THAT EMPLOYEES IN THE XIMBLE SYSTEM ARE LATE IS MINUTES. 114.2 MINUTES Statistical sample of 263258 clock-in records,

More information

Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero

Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories Learning Objectives At the end of the class the student will be able to: 1. Describe the production budget process

More information

Combined Sewer Overflows July 2012-December 2013

Combined Sewer Overflows July 2012-December 2013 CSO Facilities Summary Report 213 Combined Sewer Overflows July 212-December 213 Overview MWRA monitored four CSO facilities in the North System during the period covered in this report (July 212 December

More information

SECTION 813 SEWER FLOW CONTROL

SECTION 813 SEWER FLOW CONTROL SECTION 813 SEWER FLOW CONTROL 813-1 DESCRIPTION: Sewer flow control is a set of methods to adjust the flow in the sewer system to allow for inspection, maintenance, repair or replacement. This is accomplished

More information

Utilizing Airlift Water Reuse Technology to Help Achieve Electrical Energy Savings in Fish Hatcheries

Utilizing Airlift Water Reuse Technology to Help Achieve Electrical Energy Savings in Fish Hatcheries Utilizing Airlift Water Reuse Technology to Help Achieve Electrical Energy Savings in Fish Hatcheries Ray Billings Jim Bomford Duaine Hardie Freshwater Fisheries Society of BC Why We re Keen on Energy

More information

California Independent System Operator Corporation. California ISO. Import resource adequacy. Department of Market Monitoring

California Independent System Operator Corporation. California ISO. Import resource adequacy. Department of Market Monitoring k California Independent System Operator Corporation California ISO Import resource adequacy September 10, 2018 Department of Market Monitoring Summary This report provides an update of analysis and trends

More information

5/1/2013. Puget Sound Conditions. LID research, data, guidelines, specifications, and regulations are evolving rapidly.

5/1/2013. Puget Sound Conditions. LID research, data, guidelines, specifications, and regulations are evolving rapidly. The goal of these workshops is to give designers, builders and managers the technical details necessary to properly design, construct and maintain LID facilities. LID research, data, guidelines, specifications,

More information

Making a Dramatic Impact on Water Loss. Robert Horvat, PE cell:

Making a Dramatic Impact on Water Loss. Robert Horvat, PE cell: Making a Dramatic Impact on Water Loss Robert Horvat, PE rhorvat@entecheng.com cell: 412-759-3140 Overview The Problem Management 3 Success Stories Water Loss the problem EPA Fact Sheet: Water Audits and

More information

Dec Board of Education: Approve Educational Specifications. Dec Jan. 2016

Dec Board of Education: Approve Educational Specifications. Dec Jan. 2016 Dec. 2015 Dec. 2015 Jan. 2016 Jan 2016 Fairfield Public Schools Develops Project Team Initial Funding request analysis (including temporary classrooms costs) for services through Design Development Board

More information

Design Services Assessment Report, 2013

Design Services Assessment Report, 2013 Design Services Assessment Report, 2013 1. Expected Outcome: Improve Communication Clients and stakeholders will be satisfied with communication efforts and therefore will be better informed about project

More information

HKU announces 2017 Q4 HK Macroeconomic Forecast

HKU announces 2017 Q4 HK Macroeconomic Forecast HKU announces 2017 Q4 HK Macroeconomic Forecast October 10, 2017 The of the Hong Kong Institute of Economics and Business Strategy at the University of Hong Kong (HKU) released its quarterly Hong Kong

More information

Massachusetts Water Resources Authority

Massachusetts Water Resources Authority Massachusetts Water Resources Authority Wet Fall Results in Increased Plant Flow 600 Plant Flow & Precipitation 10 MGD 500 8 400 6 300 200 4 100 2 0 0 J A S O N D J F M A M J Total Plant Flow, MGD 10 Yr

More information

Pilot Testing a High-Speed Turbo Blower at the City of Plano, Illinois Water Reclamation Facility"

Pilot Testing a High-Speed Turbo Blower at the City of Plano, Illinois Water Reclamation Facility Pilot Testing a High-Speed Turbo Blower at the City of Plano, Illinois Water Reclamation Facility" Presented by: Mark J. Halm, P.E. - Yokhana Alkass, LEED AP EEC, PC Darrin B. Boyer - City of Plano- Illinois

More information

WASTEWATER DIVISION DECEMBER 2016 MONTHLY REPORT

WASTEWATER DIVISION DECEMBER 2016 MONTHLY REPORT WASTEWATER DIVISION DECEMBER 216 MONTHLY REPORT 1 P age Table of Contents Section 1: Regulatory Compliance Reporting pg. 6 Section2: OWTP Operations & Maintenance pg. 6 Section 3: Advanced Water Purification

More information

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins

More information

CITY OF LONDON WASTEWATER TREATMENT OPERATIONS ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT 2013 ANNUAL REPORT ADELAIDE WASTEWATER TREATMENT PLANT

CITY OF LONDON WASTEWATER TREATMENT OPERATIONS ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT 2013 ANNUAL REPORT ADELAIDE WASTEWATER TREATMENT PLANT CITY OF LONDON WASTEWATER TREATMENT OPERATIONS ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT 2013 ANNUAL REPORT ADELAIDE WASTEWATER TREATMENT PLANT FEBRUARY 2014 Adelaide Wastewater Treatment Plant 2013

More information

Feel free to contact me should you require any additional information regarding the report. I can be reached at

Feel free to contact me should you require any additional information regarding the report. I can be reached at February 28, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Glencoe Wastewater Treatment Plant The Ontario Clean Water Agency is the Operating

More information

His Worship Mayor Don Darling and Members of Common Council. SUBJECT: Project Performance Update Safe, Clean Drinking Water Project

His Worship Mayor Don Darling and Members of Common Council. SUBJECT: Project Performance Update Safe, Clean Drinking Water Project COUNCIL REPORT M&C No. 2017-103 Report Date April 11, 2017 Meeting Date April 18, 2017 Service Area Saint John Water His Worship Mayor Don Darling and Members of Common Council SUBJECT: Project Performance

More information

HKU announces 2016 Q3 HK Macroeconomic Forecast

HKU announces 2016 Q3 HK Macroeconomic Forecast HKU announces 2016 Q3 HK Macroeconomic Forecast July 7, 2016 The of the Hong Kong Institute of Economics and Business Strategy at the University of Hong Kong (HKU) released its quarterly Hong Kong Macroeconomic

More information

Iroquois Wastewater Treatment Plant 2016 Annual Performance Report

Iroquois Wastewater Treatment Plant 2016 Annual Performance Report Iroquois Wastewater Treatment Plant 2016 Annual Performance Report The Iroquois WWTP is a Class II wastewater treatment facility owned and operated by the Municipality of South Dundas. Raw sewage is conveyed

More information

Annual Report. December 2010 November Bradley Cole 2/7/2012

Annual Report. December 2010 November Bradley Cole 2/7/2012 Annual Report December 2010 November 2011 Bradley Cole 2/7/2012 CH2M HILL annual report to the Board of Directors of the Pine-Strawberry Water Improvement District. This annual report provides an overview

More information

Safety Briefing. Exit Routes. Exit route Assembly Point 911 Security Extinguishers Hazards Phones on silent

Safety Briefing. Exit Routes. Exit route Assembly Point 911 Security Extinguishers Hazards Phones on silent September 11, 2018 Agenda Safety Briefing Joe Perez, Procurement Category Manager Welcome/Introductory Remarks Aaron Zahn, JEA Interim CEO Purpose Deryle Calhoun, VP/GM Water/Wastewater Systems Overview

More information

AGENDA ITEM D6. Climate Outlook

AGENDA ITEM D6. Climate Outlook AGENDA ITEM D6 DATE: June 1, 2016 TO: Matt Jordan, General Manager FROM: Alison Adams, Chief Technical Officer SUBJECT: Regional Water Supplies and Member Demands Status Report SUMMARY: RECOMMENDATION:

More information

Welcome Waste Water Quality Breakout

Welcome Waste Water Quality Breakout Welcome Waste Water Quality Breakout 07 November 2016 Lawrence Gosden Managing Director, Wastewater Environmental protection 07 November 2016 Anthony Crawford, Matthew Hart and Andrew Hagger Pollution

More information

Facilities Management. FM Key Performance Indicators

Facilities Management. FM Key Performance Indicators Facilities Management FM Key Performance Indicators September 21, 2017 Facilities Management Key Volume Indicators Key Volume FM Change Evanston Chicago Full Time Equivalent (FTE) 369 +5 304 65 Acres 296

More information

Enhanced Pavement Management Program. Pavement Management Program

Enhanced Pavement Management Program. Pavement Management Program Enhanced Pavement Management Program Presented to the Transportation and Environment Committee Feb. 12, 2007 VISION STATEMENT Creating the Most Cost Effective, Pavement Management Program in the Nation

More information

JEDDAH INDUSTRIAL CITY

JEDDAH INDUSTRIAL CITY JEDDAH INDUSTRIAL CITY WASTEWATER TREATMENT PLANT A Presentation by : Engr. Mowafaq Al-Sugeir Managing Director ICDOC SAWEA 2007 WORKSHOP, AL-KHOBER 4 December 2007 Built & Being Operated by : on Build-Operate-Transfer

More information

INTEROFFICE MEMORANDUM

INTEROFFICE MEMORANDUM INTEROFFICE MEMORANDUM DATE: April 24, 29 TO: Boise Public Works Commission FROM: Matt Hightree, civil engineer SUBJECT: Energy Consumption at Major Facilities Managed by Public Works This report contains

More information

Facilities Management. FM Key Performance Indicators

Facilities Management. FM Key Performance Indicators Facilities Management FM Key Performance Indicators August 15, 2017 Facilities Management Key Volume Indicators Key Volume FM Change Evanston Chicago Full Time Equivalent (FTE) 364 +11 299 65 Acres 296

More information

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2012 ANNUAL REPORT

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2012 ANNUAL REPORT CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2012 ANNUAL REPORT FEBRUARY 2013 SUMMARY This annual report is in response

More information

LIST OF DIRECTIVES AND MEMORANDA

LIST OF DIRECTIVES AND MEMORANDA LIST OF DIRECTIVES AND MEMORANDA Technical Policies and Standards HSBM DO 2014-01 Format and Method for Policies Issued by HSB To provide guidance for the format and method of communicating the implementation

More information

Water and Waste Department

Water and Waste Department Water and Waste Department 2012 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association, March 7 th, 2012 Capital Budget Capital s Summary 2012 Capital Budget 2013 to

More information

HKU announces 2018 Q1 HK Macroeconomic Forecast 1

HKU announces 2018 Q1 HK Macroeconomic Forecast 1 Q Q2 Q3 Q4 2Q 2Q2 2Q3 2Q4 3Q 3Q2 3Q3 3Q4 4Q 4Q2 4Q3 4Q4 5Q 5Q2 5Q3 5Q4 6Q 6Q2 6Q3 6Q4 7Q 7Q2 7Q3 7Q4 8Q year-on-year percentage HKU announces 208 Q HK Macroeconomic Forecast January 0, 208 The of the Hong

More information

TECHNICAL SPECIFICATIONS FOR DIGESTER CLEANING

TECHNICAL SPECIFICATIONS FOR DIGESTER CLEANING TECHNICAL SPECIFICATIONS FOR DIGESTER CLEANING 1. SCOPE 1.1 This section covers the cleaning and sludge dewatering for digesters, containing sludge anaerobically digested to Class B Levels. 1.2 These areas

More information

WATER & WASTEWATER PLATFORM

WATER & WASTEWATER PLATFORM WATER & WASTEWATER PLATFORM Presenter: Thomas E. Vossman WATER & WASTEWATER Thomas E. Vossman President, Insituform Technologies 134 Water & Wastewater Platform Water & Wastewater Cured-in-Place Pipe Potential

More information

Exhibit A. Scope of Services for Flow Monitoring Program 2015 Flow Monitoring City of Lawrence, Kansas

Exhibit A. Scope of Services for Flow Monitoring Program 2015 Flow Monitoring City of Lawrence, Kansas Exhibit A Scope of Services for Flow Monitoring Program 2015 Flow Monitoring City of Lawrence, Kansas Intent and Purpose The City of Lawrence has begun a Rapid Inflow and Infiltration (I/I) Reduction Program.

More information

TL 9000 Quality Management System. Measurements Handbook. BRR Examples

TL 9000 Quality Management System. Measurements Handbook. BRR Examples Quality Excellence for Suppliers of Telecommunications Forum (QuEST Forum) TL 9000 Quality Management System Measurements Handbook Copyright 2012 QuEST Forum Version 1.0 7.2 7.2.1 Basic Calculation Example

More information

2014 Annual Wastewater Report

2014 Annual Wastewater Report 214 Annual Wastewater Report Mar 6, 215 v.1. 214 Annual Wastewater Report Table of Contents REPORTS PAGE Wastewater Capital Spending Overview 1 Wastewater North - 214 1 Wastewater South 214 2 Lift Stations

More information

Appendix 3A Water Demand Projections

Appendix 3A Water Demand Projections Appendix 3A Water Demand Projections 213 Water and Wastewater Master Plan Water Demand Summary GRAND TOTAL MAXIMUM DAY DEMAND PRESSURE ZONE 211 216 221 226 231 1W 18.37 19.35 19.99 21.22 22.47 1C 24.61

More information

2019 Salt River Siphon Outage Customer Focus Meeting

2019 Salt River Siphon Outage Customer Focus Meeting 2019 Salt River Siphon Outage Customer Focus Meeting Darrin Francom, PE Engineering Services Department Manager Agenda 1. Overview of the Siphon 2. Review of Repair in 2001 3. Results of 2009 Inspection

More information

NAPA SANITATION DISTRICT

NAPA SANITATION DISTRICT NAPA SANITATION DISTRICT PSOMAS COMPANY - TASK ORDER No. 25 HEADWORKS EQUIPMENT REHAB-REPLACE PROJECT (CIP 17726) Date: July 25, 2018 Issued under Professional Services Agreement dated ---------, 2018.

More information

CIP Routine/Small Purchasing Team Close-out

CIP Routine/Small Purchasing Team Close-out CIP Routine/Small Purchasing Team Close-out Define Ken Koebel Control Measure January 26, 2011 Improve Analyze Cross Functional Team 2 Charter / Business Case Define Measure Routine purchasing (orders

More information

Effective Contract Preparation. Contents are subject to change. For the latest updates visit

Effective Contract Preparation. Contents are subject to change. For the latest updates visit Effective Contract Preparation Page 1 of 7 Why Attend The overall aim of this course is to provide participants with the knowledge, concepts and skills needed to perform all the tasks required in the pre-award

More information

Financial Transaction Adjustment Request (FTAR) Processing Guide

Financial Transaction Adjustment Request (FTAR) Processing Guide Financial Transaction Adjustment Request (FTAR) Processing Guide Introduction With training and departmental approval, a department user will be able to complete a Financial Transaction Adjustment Request

More information

Remote Headworks Upgrade. November 4, 2010

Remote Headworks Upgrade. November 4, 2010 Remote Headworks Upgrade November 4, 2010 Chelsea Creek Headworks Comb. and Sep. Trib. Areas (brown shading) Flow discharge to North Met Relief Tunnel Peak Cap (350 MGD), Avg. Flow (135 MGD) Columbus Park

More information

College Football Hall of Fame HAMMOCK R

College Football Hall of Fame HAMMOCK R - Contract Schedule MILESTONES DESIGN / PRECONSTRUCTION PROCUREMENT Construction Procurement CONSTRUCTION Hardscape / Landscape Hall Of Fame Building Sitework Earthwork A1060 Mobilize 5 18-Feb-13 A 22-Feb-13

More information

CI User Engagement Activities and Schedule Nov Apr 2013

CI User Engagement Activities and Schedule Nov Apr 2013 OCEAN OBSERVATORIES INITIATIVE Activities and Schedule Nov 2012 - Apr 2013 Julie Thomas, Operations Director Susanne Jul, User Experience Lead 1 Overview Review engagement points in the iterative release

More information

Non-consolidated Forecast of Income <1>

Non-consolidated Forecast of Income <1> Supplementary Materials, Financial Results for Nine Months Ended December 31, 20 Non-consolidated Forecast of Income FY Forecast FY Forecast Change Current Previous (in Oct.) (A) (B) (A)-(B) Operating

More information

Sample Reports. for. HAP v4.80 Example Problem

Sample Reports. for. HAP v4.80 Example Problem Sample Reports for HAP v4.80 Example Problem October, 2013 Carrier Software Systems Copyright 2013 Carrier Corporation, All Rights Reserved Introduction This document contains reports generated using the

More information

Facilities Management. FM Key Performance Indicators

Facilities Management. FM Key Performance Indicators Facilities Management FM Key Performance Indicators October 20, 2017 Facilities Management Key Volume Indicators Key Volume FM Change Evanston Chicago Full Time Equivalent (FTE) 370 +1 301 69 Acres 296

More information

Southside Wastewater Treatment Plant Renewable Energy Leasing Project

Southside Wastewater Treatment Plant Renewable Energy Leasing Project City of Dallas Water Utilities Department Southside Wastewater Treatment Plant Renewable Energy Leasing Project Presented to the TEC September 8, 2008 Southside Wastewater Treatment Plant Renewable Energy

More information

Heating the University of Glasgow with river sourced heat pumps. Adam McConkey Andrew Poon-King Zhibin Yu

Heating the University of Glasgow with river sourced heat pumps. Adam McConkey Andrew Poon-King Zhibin Yu Heating the University of Glasgow with river sourced heat pumps Adam McConkey Andrew Poon-King Zhibin Yu Opportunity - Reduce Glasgow University s 1.9 m gas bill - The University is set to upgrade its

More information

Voorhees Replacement Facility Schedule Summary Classic WBS Layout 29-Sep-09 13:50 Activity Name Original Start Finish Duration Voorhees Replacement F 1136 17-Nov-06 31-Mar-11 Schematic Design 87 17-Nov-06

More information

Presentation for the Local Government Commission and the Community Environmental Council. July 13, 2007

Presentation for the Local Government Commission and the Community Environmental Council. July 13, 2007 Community Choice Aggregation Presentation for the Local Government Commission and the Community Environmental Council July 13, 2007 1 Community Choice Aggregation (CCA) CCA Legislation (AB117) allows cities

More information

Cull Cow Marketing And Feeding Alternatives. Dillon M. Feuz - Utah State University and John P. Hewlett University of Wyoming

Cull Cow Marketing And Feeding Alternatives. Dillon M. Feuz - Utah State University and John P. Hewlett University of Wyoming Cull Cow Marketing And Feeding Alternatives Dillon M. Feuz - Utah State University and John P. Hewlett University of Wyoming OBJECTIVES Analyze Seasonal Cull Cow Prices Use to make short term price forecasts

More information

Industry Perspective on Well Decommissioning Pennsylvania Orphaned and Abandoned Well Workshop May 16, 2018

Industry Perspective on Well Decommissioning Pennsylvania Orphaned and Abandoned Well Workshop May 16, 2018 Industry Perspective on Well Decommissioning Pennsylvania Orphaned and Abandoned Well Workshop May 16, 2018 Abandoned wells present a significant danger to the public. 2 Understanding the tactical nuances

More information

CAPITAL IMPROVEMENT PROGRAM PERFORMANCE REPORTS

CAPITAL IMPROVEMENT PROGRAM PERFORMANCE REPORTS CAPITAL IMPROVEMENT PROGRAM PERFORMANCE REPORTS CONTENTS: Construction Change Order Summary Report Design Consultant PSA Amendment Summary Report Contractors Active Projects Summary Report Consultant Construction

More information

REPORT TO THE 2013 LEGISLATURE SEMI-ANNUAL REPORT ON HAWAI I CANCER RESEARCH SPECIAL FUND. Pursuant to Section 304A-2168, Hawai i Revised Statutes

REPORT TO THE 2013 LEGISLATURE SEMI-ANNUAL REPORT ON HAWAI I CANCER RESEARCH SPECIAL FUND. Pursuant to Section 304A-2168, Hawai i Revised Statutes REPORT TO THE 2013 LEGISLATURE SEMI-ANNUAL REPORT ON HAWAI I CANCER RESEARCH SPECIAL FUND Pursuant to Section 304A-2168, Hawai i Revised Statutes January 2013 REPORT TO THE 2013 LEGISLATURE Hawai i Cancer

More information

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT FEBRUARY 2014 SUMMARY This annual report is in response

More information

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Operation Name: Uzbekistan

More information