SCALE BAR 1:2500 RM OF WOODLANDS OVERALL PLAN - LOW PRESSURE SEWER MAIN. Certificate of Authorization JESSICA MANNESS ENGINEERING, INC. No.

Size: px
Start display at page:

Download "SCALE BAR 1:2500 RM OF WOODLANDS OVERALL PLAN - LOW PRESSURE SEWER MAIN. Certificate of Authorization JESSICA MANNESS ENGINEERING, INC. No."

Transcription

1 OF SURVEY OVERALL PLAN - LOW PRESSURE SEWER MAIN SCALE BAR 1: THIS IS NOT A LEGAL PLAN - CONCEPT ONLY

2 OF SURVEY PLAN - LOW PRESSURE SEWER MAIN SCALE BAR 1: THIS IS NOT A LEGAL PLAN - CONCEPT ONLY

3 Elevation (m) PROFILE 0+00 to 6+40 OF SURVEY

4 Elevation (m) JME Woodlands LPS STATION PROFILE 4+20 to OF SURVEY

5 Elevation (m) JME Woodlands LPS STATION PROFILE 9+10 to OF SURVEY

6 Elevation (m) OF SURVEY PROFILE to 20+00

7 LOW PRESSURE SEWER SERVICE CONSTRUCTION STANDARDS ALL INSTALLATIONS SHALL COMPLY WITH MANITOBA REGULATIONS, LOCAL STANDARDS, AND MANITOBA WATER SERVICES BOARD SPECIFICATIONS. GENERAL NOTES 1. THE CONTRACTOR SHALL VERIFY THE LOCATION, SIZE, AND TYPE OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER OF ANY CONFLICTS OF DISCREPANCIES. 2. ALL INSTALLATIONS THAT CROSS THROUGH A MUNICIPAL ROAD SHALL BE INSTALLED TRENCHLESS METHODS. 3. ANY PLANNED CROSSING THROUGH A PROVINCIAL ROAD REQUIRES THE APPROVAL OF MANITOBA INFRASTRUCTURE. 4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROTECT INFRASTRUCTURE FROM DAMAGE. ANY ROAD, BOULEVARD, OR OTHER MUNICIPAL OR UTILITY INFRASTRUCTURE THAT IS DISTURBED OR DAMAGED DURING CONSTRUCTION SHALL BE RESTORED AT THE CONTRACTOR'S EXPENSE. 5. THE PROPOSED SEWER SERVICE LOCATIONS SHALL BE CONFIRMED IN THE FIELD MUNICIPAL PUBLIC WORKS OR THE MUNICIPAL ENGINEER. 6. THE CONTRACTOR IS RESPONSIBLE FOR TEMPORARY TRAFFIC CONTROL INCLUDING BARRICADES, CONES, AND PERSONNEL, AS REQUIRED PER THE MANITOBA INFRASTRUCTURE "WORK ZONE TRAFFIC CONTROL MANUAL", LATEST EDITION. 7. THE CONTRACTOR SHALL PROVIDE A SIEVE ANALYSIS TEST REPORT FOR ANY BEDDING OR IMPORTED GRANULAR BACKFILL MATERIALS. 8. MATERIALS SHALL BE STORED AND HANDLED IN CONFORMANCE WITH THE MANUFACTURER'S SPECIFICATIONS. ANY DAMAGED OR DEGRADED MATERIALS SHALL NOT BE USED. GRANULAR MATERIAL PILES SHALL NOT BE PERMITTED TO REST ON ROADWAYS OVERNIGHT. ALL OPEN TRENCHES SHALL BE BACKFILLED OR COVERED WITH A MINIMUM OF 2 LAYERS OF 3 4" PLYWOOD AND PROTECTED WITH BARRIERS WHEN CONTRACTOR PERSONNEL ARE ABSENT. ANY WASTE MATERIALS SHALL BE REMOVED FROM THE SITE. LOW PRESSURE SEWER MAIN CONSTRUCTION SPECIFICATIONS 1. APPROVED MATERIALS: A. ALL PIPE SHALL BE CSA CERTIFIED HDPE DR17 IN ACCORDANCE WITH MWSB B. ALL FITTINGS SHALL MEET OR EXCEED ASTM D2837 AND CSA STANDARD B137.1 C. LPS GATE VALVES SHALL BE MUELLER 2360 SERIES RESILIENT WEDGE GATE VALVES. D. CLEAN OUT ASSEMBLIES SHALL BE AS-SHOWN AND DESCRIBED BELOW. 2. PIPES SHALL BE INSTALLED A MINIMUM OF 2.6 m BELOW GRADE OR INSULATED TO A MINIMUM OF R8 ON 3-SIDES FOR INSTALLS BETWEEN 1.2 m TO 2.6 m. ANY INSULATION SHALL BE RATED FOR UNDERGROUND USE AND MAY BE COMPRISED OF RIGID FOAM BOARDS, SPRAYED FOAM, OR PRE-INSULATED PIPE. NO INSTALL ARE PERMITTED UNDER BASEMENTS OR GARAGE FLOORS. CROSSINGS UNDER DRIVEWAYS AND ROADS SHALL BE AVOIDED. WHERE PIPE IS TO BE INSTALLED UNDER A DRIVEWAY, THE BURIAL DEPTH SHALL BE INCREASED TO BE GREATER THAN 3.0 m, OR THE PIPE SHALL BE INSTALLED 2.6 m DEEP AND INSULATED. THE CONTRACTOR SHALL PROVIDE SURVEY AS REQUIRED TO CONFIRM THAT THE DEPTH AND LOCATION OF THE INSTALL CONFORMS WITH THE ENGINEERED DESIGN. 3. THE PRESSURE SEWER MAIN LINE PIPE SHALL BE BEDDED IN AND COVERED WITH SAND BEDDING WHEN INSTALLED IN A TRENCH AND AT ALL EXCAVATIONS. 4. HYDROSTATIC TESTING IN CONFORMANCE WITH THE MWSB IS REQUIRED AND SHALL BE CONDUCTED INDEPENDENT LAB, AS SUBCONTRACTED THE CONTRACTOR. THE MUNICIPAL ENGINEER SHALL BE NOTIFIED 48 HRS IN ADVANCE OF WHEN THE TESTING WILL OCCUR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL WATER REQUIRED FOR THE TESTING. LINES SHALL BE SWABBED PRIOR TO TESTING. THE PRESSURE TEST SHALL BE CONDUCTED AT 700 KPa. CLEANOUT ASSEMBLIES CLEAN OUT ASSEMBLIES SHALL BE INSTALLED ON MAINS AT INTERVALS NOT EXCEEDING m UNLESS (A) AT TERMINUS OF MAIN, OR (B) AS OTHERWISE SPECIFIED ON DESIGN DRAWINGS. CLEAN OUTS, WHEN LOCATED ON A BRANCH LINE, SHALL INCLUDE: A. A TEE ON THE MAIN SERVICE LINE B. A GATE VALVE ON THE BRANCH LINE, 600 mm FROM THE MAIN SERVICE LINE C. THE CLEAN OUT PIPE SHALL TERMINATE WITH A BLIND FLANGE LOCATED 900 mm BELOW THE GROUND SURFACE D. THE CLEAN OUT SHALL BE PROTECTED FROM FROST. THE MINIMUM FROST PROTECTION SHALL BE R8 AND RATED FOR MOIST CONDITIONS. E. THE CLEAN OUT PIPE SHALL BE ENCASED IN A 600 mm Ø PRECAST CONCRETE MANHOLE RISER SECTION COMPLETE WITH FRAME AND COVER, PER DETAIL. F. ANY JOINTS IN THE MANHOLE RISER SHALL BE SEALED FROM WATER ENTRY USING NON-SHRINK GROUT. G. BEDDING SHALL BE PLACED BELOW THE CLEAN OUT MANHOLE AND BELOW ANY VALVES OR PIPE IN OPEN EXCAVATION AREAS. LOW PRESSURE SEWER MAIN DETAILS OF SURVEY

8 LOW PRESSURE SEWER SERVICE CONSTRUCTION STANDARDS ALL INSTALLATIONS SHALL COMPLY WITH LOCAL STANDARDS AND MANITOBA WATER SERVICES BOARD SPECIFICATIONS. ALL SERVICE INSTALLATIONS REQUIRE A PERMIT THE MUNICIPALITY OF WOODLANDS PRIOR TO COMMENCING CONSTRUCTION. GENERAL NOTES 1. CONTRACTOR TO VERIFY LOCATION, SIZE, AND TYPE OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER OF ANY CONFLICTS OF DISCREPANCIES. 2. ALL INSTALLATIONS THAT CROSS THROUGH A ROAD SHOULD BE INSTALLED TRENCHLESS METHODS. 3. ANY ROAD, BOULEVARD, OR MUNICIPAL INFRASTRUCTURE THAT IS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED AT THE CONTRACTOR'S EXPENSE. 4. PROPOSED SEWER SERVICE LOCATIONS SHALL BE CONFIRMED IN THE FIELD MUNICIPAL PUBLIC WORKS OR THE MUNICIPAL ENGINEER. 5. THE CONTRACTORS SHALL PROVIDE A SIEVE ANALYSIS TEST REPORT FOR ANY BEDDING OR IMPORTED GRANULAR BACKFILL MATERIALS. LOW PRESSURE SEWER SERVICE SPECIFICATIONS 1. SERVICE SHALL BE SIZED ACCORDING TO THE FOLLOWING: LENGTH OF SERVICE LPS SERVICE SIZE 0-80m 32mm m 38mm m 50mm 2. SERVICE PIPE SHALL BE HDPE DR17 CSA CERTIFIED. ALL FITTINGS SHALL MEET OR EXCEED ASTM D2837 ABD CSA STANDARD B137.1 LPS GATE VALVES SHALL BE MUELLER 2360 SERIES RESILIENT WEDGE GATE VALVE. 3. PIPES SHALL BE INSTALLED A MINIMUM OF 2.6 m BELOW GRADE OR INSULATED TO A MINIMUM OF R8 ON 3-SIDES FOR INSTALLS BETWEEN 1.2 m TO 2.6 m. ANY INSULATION SHALL BE RATED FOR UNDERGROUND USE AND MAY BE COMPRISED OF RIGID FOAM BOARDS, SPRAYED FOAM, OR PRE-INSULATED PIPE. NO INSTALL ARE PERMITTED UNDER BASEMENTS OR GARAGE FLOORS. CROSSINGS UNDER DRIVEWAYS SHALL BE AVOIDED. WHERE PIPE IS TO BE INSTALLED UNDER DRIVEWAY, BURIAL DEPTH SHALL BE GREATER THAN 3.0 m, OR PIPE SHALL BE INSULATED. 4. CURB STOPS SHALL BE USED IN ALL SERVICE INSTALLS. CURB STOPS SHALL BE BRASS, BALL-TYPE. 5. CORPORATION STOPS SHALL BE USED IN ALL SERVICE INSTALLS. CORPORATION STOPS SHALL BE BALL-TYPE WITH TAPPING SLEEVE AND INCLUDE STAINLESS STEEL CLAMPS FOR INSTALL ON HDPE LOW PRESSURE SEWER MAIN mm THICK SAND BEDDING SHALL BE USED AS PIPE BEDDING IN ALL OPEN CUT EXCAVATIONS AND BELOW ANY EXCAVATED PIPE SECTIONS. 7. WHERE SERVICE INLET IS LOWER THAN CONNECTION AT MAIN, AN ELECTRIC VALVE SHALL BE INSTALLED TO PREVENT SIPHONING. 8. CLEAN OUTS, WHERE REQUIRED FOR SERVICES LONGER THAN m, SHALL BE LOCATED ON A BRANCH LINE AND SHALL INCLUDE: A. A TEE ON THE MAIN SERVICE LINE B. A GATE VALVE ON THE BRANCH LINE, 600 mm FROM THE MAIN SERVICE LINE C. THE CLEAN OUT PIPE SHALL TERMINATE WITH A BLIND FLANGE LOCATED 900 mm BELOW THE GROUND SURFACE D. HE CLEAN OUT SHALL BE PROTECTED FROM FROST E. THE CLEAN OUT PIPE SHALL BE ENCASED IN A 600 mm Ø PRECAST CONCRETE MANHOLE RISER SECTION COMPLETE WITH FRAME AND COVER, PER MUNICIPAL SPECIFICATION AND DETAIL. MIN. 300 MAX LOW PRESSURE SEWER TANKS 1. A MINIMUM OF TWO 4,500 L (1000 GAL) ONE-CHAMBER SEPTIC TANKS (ONE FOR EFFLUENT, ONE FOR SLUDGE) OR ONE 4,500 L BAFFLED HOLDING TANK, IN COMPLIANCE WITH THE MANITOBA REGULATION 83/2003 AND THE ENVIRONMENT ACT C.C.S.M C. E125, ARE PERMITTED. TANK SHALL BE LOCATED IN FRONT OF ALL BUILDINGS AND ACCESSIBLE YEAR-ROUND. TANKS MUST BE SIZED TO PERMIT 24 HOURS HOLDING CAPACITY ON THE SETTLEMENT SIZE. TYPICALLY, 4500 L (1000 GAL) IS THE REQUIRED SIZE FOR RESIDENTIAL HOMES. 2. WHERE A NEW TANK IS BEING INSTALLED, THE TANK SHALL BE LOWERED ONTO A MINIMUM OF 100 mm THICK OF 25 mm Ø COMPACTED CLEAN STONE. CLEAN STONE SHALL BE PLACED AROUND THE TANK. WHERE THE MANUFACTURER'S SPECIFICATIONS DIFFER FROM THIS SPECIFICATION, THE MANUFACTURER'S SPECIFICATIONS SHALL PREVAIL. 3. THE INLET PIPE AND OUTLET PIPE SHALL BE CONNECTED USING A FLEXIBLE, WATERPROOF GASKET OR BOOT. THE INLET AND OUTLET PIPES SHALL BE PLACED ON COMPACTED BEDDING MATERIAL. 4. ALL TANK RISERS EXTENSIONS SHALL BE WATER-TIGHT AND SEALED TO THE TANK. COVERS SHALL BE TAMPER-PROOF AND SHALL BE INSTALLED 150 mm ABOVE GRADE. 5. NEW TANKS SHALL BE INSTALLED A MINIMUM OF 2.6m BELOW GRADE, AS MEASURED TO TOP OF TANK. SHALLOW BURIAL TANKS SHALL REQUIRED INSULATION. 6. TANKS SHALL BE INSTALLED IN ACCORDANCE WITH MANITOBA REGULATIONS. EFFLUENT PUMP PUMPS SHALL BE SUBMERSIBLE 15 AMP 1 2 H.P. WITH A MIN 182 kpa AND MAX 203 kpa TOTAL DYNAMIC SHUT-OFF AND MINIMUM PUMP CAPACITY OF 56 L/min AT 149 kpa. ALARM INSTALLATION OF HIGH-WATER ALARM IS OPTIONAL. WHERE INSTALLED OUTDOORS, ALARM SHALL BE RATED FOR OUTDOOR USE. LOW PRESSURE SEWER SERVICE MAINTENANCE 1. LOW PRESSURE SEWER IS A LOW-MAINTENANCE OPTION FOR THE COLLECTION AND MANAGEMENT OF WASTEWATER IN A RURAL COMMUNITY AREA. TYPICALLY, LANDOWNERS ARE RESPONSIBLE FOR INSTALLING AND MAINTAINING INFRASTRUCTURE THAT IS LOCATED WITHIN THE PRIVATE PROPERTY. THE MUNICIPALITY IS RESPONSIBLE FOR ALL PORTIONS OF THE LOW PRESSURE SEWER SYSTEM THAT ARE LOCATED WITHIN THE MUNICIPAL RIGHT OF WAY. 2. THE MUNICIPALITY SHALL REMOVE THE SLUDGE FROM THE PRIVATE TANKS ANNUALLY. ANY ADDITIONAL CLEAN OUTS WILL BE THE RESPONSIBILITY OF PROPERTY OWNER. 2.4 MIN., 2.7 MAX. BURY TYP. AUG 25, 2017 YY JAM LOW PRESSURE SEWER SERVICE DETAILS OF SURVEY

Town of Cornwall Water & Sewer Utility Corporation

Town of Cornwall Water & Sewer Utility Corporation Town of Cornwall Water & Sewer Utility Corporation Minimum Standard of Acceptability for Water, Sewer & Sprinkler Connections At the time of application for water, sewer and/or sprinkler service the applicant

More information

Charlottetown - Water & Sewer Utility Minimum Standard of Acceptability for Water, Sewer & Sprinkler Connections

Charlottetown - Water & Sewer Utility Minimum Standard of Acceptability for Water, Sewer & Sprinkler Connections Charlottetown - Water & Sewer Utility Minimum Standard of Acceptability for Water, Sewer & Sprinkler Connections At the time of application for water, sewer and/or sprinkler service the applicant shall

More information

Section 10 Design Criteria: Components

Section 10 Design Criteria: Components 1. Tanks and Vaults Section 10 Design Criteria: Components a. Watertightness i. Septic tanks, vaults, dosing tanks, other treatment components, risers and lids must not allow infiltration of ground water

More information

SPECIAL SPECIFICATION 3504 Septic Tank System

SPECIAL SPECIFICATION 3504 Septic Tank System 1993 Specifications CSJ s 3136-01-126, etc. & 0683-01-070, etc. SPECIAL SPECIFICATION 3504 Septic Tank System 1. Description. This Item shall govern for all materials, equipment and labor necessary for

More information

SECTION 1 GENERAL NOTES

SECTION 1 GENERAL NOTES ISSUE DATE NOVEMBER 1st, 2011 SECTION 1 Page List Page Number Page Title COVER COVER GN-01 PAGE 1 GN-02 PAGE 2 GN-03 PAGE 3 GN-04 PAGE 4 GN-05 PAGE 5 GN-06 PAGE 6 GN-07 PAGE 7 : 1. (CCU) STANDARD SPECIFICATIONS

More information

ONE PIPE LENGTH MAX (REFER TO 1/4"/FT SLOPE (MIN) 5'-0" (MIN) OR 4" LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4"x6" REFER TO TYPICAL EXCAVATION,

ONE PIPE LENGTH MAX (REFER TO 1/4/FT SLOPE (MIN) 5'-0 (MIN) OR 4 LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4x6 REFER TO TYPICAL EXCAVATION, VENT CAP (MUSHROOM TYPE) SOLID CAP EXIST GRADE MIN BUILDING REFER TO NOTE #4 MIN CONCRETE SIDEWALK CURB OR EDGE OF SIDEWALK STREET CLEANOUT (REFER TO NOTE #3) VENT PIPE 4" PVC 6" PVC CLEANOUT CONCRETE

More information

The Standards referred to shall be the most recent edition.

The Standards referred to shall be the most recent edition. Page 1 of 7 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described hereunder shall consist of the excavation of trenches and tunnels; the supply and installation of pipe and/or encasement pipe; the

More information

Procedures for Connecting to Central Sewer System

Procedures for Connecting to Central Sewer System Procedures for Connecting to Central Sewer System These procedures and requirements are taken from the Taney County Regional Sewer District s appoved Sewer Use Regulation, Article 4 Building Sewers and

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

Common Septic System Installation Mistakes

Common Septic System Installation Mistakes Common Septic System Installation Mistakes Inspection Tips for Health Agents Chris Sparages, P.E. Principal at Williams & Sparages LLC Learning Objectives Review Title 5 Regulations Governing the Design,

More information

Beacon Hill Water & Sewer District Standard Specifications

Beacon Hill Water & Sewer District Standard Specifications Beacon Hill Water & Sewer District Standard Specifications STEP Sewer Systems Including: Design Criteria Standard Construction Drawings REVISED JANUARY 2012 Alternative sewer systems must meet the requirements

More information

Section 403. DRAINAGE STRUCTURES

Section 403. DRAINAGE STRUCTURES 403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads

More information

SECTION PUBLIC WATER SERVICE CONNECTIONS

SECTION PUBLIC WATER SERVICE CONNECTIONS SECTION 33 14 14 PUBLIC WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for water service connections to small commercial, light industrial, and residential

More information

ROUTE 3 OLD WINTHROP ROAD PROJECT LOCATION I-95 PROJECT LOCATION WESTERN AVENUE NORTH BELFAST AVE.

ROUTE 3 OLD WINTHROP ROAD PROJECT LOCATION I-95 PROJECT LOCATION WESTERN AVENUE NORTH BELFAST AVE. PROJECT LOCATION PROJECT LOCATION NORTH BELFAST AVE. ROUTE 3 WESTERN AVENUE I-95 OLD WINTHROP ROAD INSTALL NEW 3" x 1" CC DOUBLE STRAP SERVICE SADDLE, 1" CC x 1 1/4" COMPRESSION CORPORATION AND 1 1/4"

More information

Commonwealth of Massachusetts City/Town of Septic System Installation Checklist

Commonwealth of Massachusetts City/Town of Septic System Installation Checklist Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. DEP has provided this form for use by local Boards of Health if they wish to do

More information

ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02 ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 28, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance

More information

SEPTIC TANK CONSTRUCTION GUIDELINES

SEPTIC TANK CONSTRUCTION GUIDELINES SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic

More information

THIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE.

THIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE. (f) The minimum requirements for construction, materials and foundations of grease traps shall be the same as those required for septic tanks, as prescribed in N.J.A.C. 7:9A-8.2. (g) The inlet and outlet

More information

GB-20. Submittal Specifications Installation Application Specific Details

GB-20. Submittal Specifications Installation Application Specific Details GREASE INTERCEPTOR TECHNICAL DATA Submittal Specifications Installation Application Specific Details 27" (68.6 cm) 4¼" (10.8 cm) 15" (38.1 cm) 10¾" (27.3 cm) SUBMITTAL (53.3 cm) STANDARD: 2" plain end

More information

Section 4 Service Lines

Section 4 Service Lines Section 4 Service Lines A. General 1. A service line is that portion of a sanitary sewer line that extends from the outer building wall or foundation wall to its connection with the sewer lateral at the

More information

SECTION PRECAST CONCRETE MANHOLES

SECTION PRECAST CONCRETE MANHOLES SECTION 02601 PRECAST CONCRETE MANHOLES PART 1 GENERAL 1.1 The work specified in this section shall include the furnishing, hauling, and placing of all precast manholes shown on the drawings and as specified

More information

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02 ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 23, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance

More information

DRINKING WATER LINE INSTALLATION STANDARDS

DRINKING WATER LINE INSTALLATION STANDARDS 30" MIN. 72" MAX. ORIGINAL GROUND SURFACE BACKFILL WITH A-1-a OR NATIVE MATERIAL PER APWA STANDARDS. MATERIAL MUST MEET APWA STANDARD FOR GRANULAR BORROW. COMPACT BACKFILL ABOVE PIPE ZONE TO 96% DENSITY

More information

INSTALLATION MANUAL. Hydrodynamic Separation. Bio Clean Environmental Services, Inc. 398 Via El Centro Oceanside, CA 92058

INSTALLATION MANUAL. Hydrodynamic Separation. Bio Clean Environmental Services, Inc. 398 Via El Centro Oceanside, CA 92058 Hydrodynamic Separation INSTALLATION MANUAL Bio Clean Environmental Services, Inc. 398 Via El Centro Oceanside, CA 92058 www.biocleanenvironmental.com p: 760.433.7640 f: 760.433.3176 INSTALLATION PROCEDURES

More information

Changes for the. TOHOPEKALIGA WATER AUTHORITY Standards, Specifications and Details

Changes for the. TOHOPEKALIGA WATER AUTHORITY Standards, Specifications and Details Changes for the 2017 TOHOPEKALIGA WATER AUTHORITY Standards, Specifications and Details The following changes are made to the existing standards and details to clarify or improve existing information.

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...

More information

AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MANHOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS

AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MANHOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS Works and Emergency Services CITY OF TORONTO WATER AND WASTEWATER SERVICES STANDARD CONSTRUCTION SPECIFICATIONS TS 408 November 2010 AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

PERMANENT PAVEMENT REPAIR NO SCALE

PERMANENT PAVEMENT REPAIR NO SCALE SAWCUT EXISTING PAVEMENT 2" BITUMINOUS CONCRETE SURFACE COURSE, CLASS 2 (MIN) CLEAN EDGE PRIOR TO PAVING AND PAINT WITH LIQUID BITUMEN. INSTALL SEALANT OVER JOINT UPON COMPLETION 2" BITUMINOUS CONCRETE

More information

ROCKY VIEW COUNTY GUIDELINES FOR CONNECTIONS BRAGG CREEK WATER AND SANITARY SYSTEMS

ROCKY VIEW COUNTY GUIDELINES FOR CONNECTIONS BRAGG CREEK WATER AND SANITARY SYSTEMS ROCKY VIEW COUNTY GUIDELINES FOR CONNECTIONS TO BRAGG CREEK WATER AND SANITARY SYSTEMS DATE: OCTOBER 3, 2013 REVISION: 0 TABLE OF CONTENTS 1.0 INTRODUCTION 1 1.1 General 1 1.2 Permits and Inspections 1

More information

Copper-Type K soft Drawn 40, 50 HDPE 100 and larger

Copper-Type K soft Drawn 40, 50 HDPE 100 and larger 1.0 GENERAL 1.1 Scope 1.1.1 The work covered by this section involves the installation of water and sewer service connections and all other associated work. 1.2 Authorization 1.2.1 Do not install service

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following

More information

SPECIAL SPECIFICATION 6664 Level (3) Communications System

SPECIAL SPECIFICATION 6664 Level (3) Communications System 2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6664 Level (3) Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Level (3) Communications,

More information

SPECIAL SPECIFICATION 6658 Time Warner Communications System

SPECIAL SPECIFICATION 6658 Time Warner Communications System 2004 Specifications CSJ 1200-05-014 1. Description. SPECIAL SPECIFICATION 6658 Time Warner Communications System A. This Item will govern the installation of all facilities belonging to Time Warner Cable

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY CAST-IN-PLACE. Section CAST-IN-PLACE CONCRETE MANHOLES

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY CAST-IN-PLACE. Section CAST-IN-PLACE CONCRETE MANHOLES PART 1 GENERAL 1.01 SUMMARY This Section includes: Section 02081 CAST-IN-PLACE A. Cast-in-place concrete manholes for sanitary sewers and storm sewers, including box sewers. B. Pile-supported concrete

More information

STANDARD SPECIFICATIONS

STANDARD SPECIFICATIONS TOWN OF COLONIE DEPARTMENT OF PUBLIC WORKS DIVISION OF PURE WATERS STANDARD SPECIFICATIONS for RESIDENTIAL SANITARY SEWER CONNECTIONS Latest Revision Date: November 2017 TABLE OF CONTENTS Section Page

More information

SUPPLEMENTAL DRAWINGS

SUPPLEMENTAL DRAWINGS CITY OF GREATER SUDBURY SUPPLEMENTAL DRAWINGS TO THE ONTARIO PROVINCIAL STANDARD DRAWINGS Rev: February 2012 CITY OF GREATER SUDBURY STANDARD DRAWINGS TABLE OF CONTENTS Greater Sudbury Standard Drawings

More information

STANDARD CONSTRUCTION DETAILS SANITARY SEWER REVISED MARCH 2018 DEPARTMENT OF ENGINEERING

STANDARD CONSTRUCTION DETAILS SANITARY SEWER REVISED MARCH 2018 DEPARTMENT OF ENGINEERING STANDARD CONSTRUCTION DETAILS REVISED MARCH 2018 GENERAL NOTES EMBEDMENT DETAILS EMBEDMENT DETAILS TWO-WAY CLEANOUT - EXISTING LATERAL TWO-WAY CLEANOUT - NEW CONSTRUCTION TYPICAL SEWER HOUSE SERVICE CONNECTION

More information

SUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018

SUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018 STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018 PART 1 - GENERAL... 2 1.1 Work Included... 2 1.2 Related Sections... 2 1.3 Reference Standards... 2 1.4 Shop Drawings... 3 1.5 Certificates...

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS - SANITARY DEPARTMENT DETAIL

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS - SANITARY DEPARTMENT DETAIL STANDARD SPECIFICATIONS - SEWER MAINS AND APPURTENANCES DEVELOPER/ENGINEER PROCEDURES All Developer/Engineering Procedures as established by Cuyahoga County Department of Public Works (CCDPW) shall be

More information

CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER

CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER WATER MAIN 1. All open cut water main shall be polyvinyl chloride plastic (PVC) pressure pipe per AWWA specification

More information

FOX METRO WATER RECLAMATION DISTRICT MANHOLE / SEWER PIPE MATERIALS AND INSTALLATION SPECIFICATIONS MATERIALS 1. PIPE & FITTINGS

FOX METRO WATER RECLAMATION DISTRICT MANHOLE / SEWER PIPE MATERIALS AND INSTALLATION SPECIFICATIONS MATERIALS 1. PIPE & FITTINGS FOX METRO WATER RECLAMATION DISTRICT MANHOLE / SEWER PIPE MATERIALS AND INSTALLATION SPECIFICATIONS MATERIALS 1. PIPE & FITTINGS Rev: 3/26/18 Pipe and fittings used in sanitary sewer construction shall

More information

TABLE OF CONTENTS

TABLE OF CONTENTS DIVISION 33: SEWER AND SEPTIC SYSTEMS 33 3633 UTILITY SEPTIC TANK DRAINAGE FIELD TABLE OF CONTENTS 33 0000-1 SECTION 33 3633-- UTILITY SEPTIC TANK DRAINAGE FIELD PART 1 - GENERAL 1.1 SUMMARY A. Includes

More information

CORPORATION OF THE TOWN OF WHITBY

CORPORATION OF THE TOWN OF WHITBY CORPORATION OF THE TOWN OF WHITBY PUBLIC WORKS DEPARTMENT ENGINEERING SECTION The Town of Whitby has adopted the Ontario Provincial Standards. They consist of the following: Ontario Provincial Standard

More information

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices. SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

SECTION SANITARY UTILITY SEWERAGE PIPING

SECTION SANITARY UTILITY SEWERAGE PIPING SECTION 33 31 00 SANITARY UTILITY SEWERAGE PIPING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Sanitary sewer pipe and fittings. 2. Underground pipe markers. 3. Connection to existing manholes. 4.

More information

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection PERMITS & INSPECTIONS 750 17th Street West Vancouver BC V7V 3T3 westvancouver.ca/permits t: 604-925-7040 f: 604-925-7234

More information

BUILDING SEWER AND GRINDER PUMP CONNECTION & CONSTRUCTION STANDARDS

BUILDING SEWER AND GRINDER PUMP CONNECTION & CONSTRUCTION STANDARDS TOWN OF MILO, NEW YORK Department of Sewer and Water Attention: Doug Marchionda, Jr. Operator Jeffrey Finger Operator 137 Main Street Penn Yan, New York 14527 Telephone No.: (315) 536-8501 Facsimile No.:

More information

2.1.2 Minimum wall thickness shall be 90 mm Frames and covers shall be bitumen coated by dipping.

2.1.2 Minimum wall thickness shall be 90 mm Frames and covers shall be bitumen coated by dipping. 1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of the construction, renovation or the adjustment of manholes and/or catchbasins as detailed on the plans or where designated by the Engineer

More information

SECTION SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS

SECTION SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS SECTION 02530 - SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

Rural Servicing Guidelines

Rural Servicing Guidelines Rural Servicing Guidelines for Low-Pressure Sanitary Sewer System and Trickle Feed Water Distribution System FOREWORD This manual is intended to provide information to Developers, Engineering and Geotechnical

More information

SECTION PRECAST CONCRETE MANHOLES

SECTION PRECAST CONCRETE MANHOLES SECTION 03 48 10 PRECAST CONCRETE MANHOLES PART 1: GENERAL 1.01 SECTION INCLUDES A. Precast concrete manholes for sanitary sewers and water lines or as indicated on the Drawings. B. Precast concrete sanitary

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

STANDARD SPECIFICATION FOR OIL GRIT SEPARATOR (OGS) STORMWATER QUALITY TREAMENT DEVICE

STANDARD SPECIFICATION FOR OIL GRIT SEPARATOR (OGS) STORMWATER QUALITY TREAMENT DEVICE STANDARD SPECIFICATION FOR OIL GRIT SEPARATOR (OGS) STORMWATER QUALITY TREAMENT DEVICE PART 1 GENERAL 1.1 WORK INCLUDED This section specifies requirements for constructing underground stormwater treatment

More information

City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860)

City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860) City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT 06457 TEL: (860) 638-3500 FAX: (860) 343-8091 GENERAL REQUIREMENTS WATER MAIN AND SERVICE INSTALLATION JANUARY 2017 WATER MAINS:

More information

SECTION STORM SEWER COLLECTION SYSTEM

SECTION STORM SEWER COLLECTION SYSTEM SECTION 02722 STORM SEWER COLLECTION SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This section addresses the installation of storm sewer collection mains and includes the acceptable products, materials, and construction

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

YAKIMA COUNTY, WASHINGTON. Special Provisions For Water Main Construction

YAKIMA COUNTY, WASHINGTON. Special Provisions For Water Main Construction YAKIMA COUNTY, WASHINGTON Special Provisions For Water Main Construction The 2014 Standard Specifications for Road, Bridge, and Municipal Construction as prepared by the Washington State Department of

More information

ELEVATION (A - A) PLAN GATE W ELL JOB NO. SHEET NO. DATE MARCH 2015 OF. Gate Wel Dimensions - Inches

ELEVATION (A - A) PLAN GATE W ELL JOB NO. SHEET NO. DATE MARCH 2015 OF. Gate Wel Dimensions - Inches CL Gate Wel Opening East Jordan Iron Works, Inc. Manhole Cover No. 1040 (or approved equal) w/ bolted frame 01-APR-2015 15:29 = I:\MSV8i\Plotting\piblack.ptb V:\201001\\C\8x11_Howell_Det\wm_det01_8x11_wm01.dgn

More information

SECTION UTILITY MANHOLES AND STRUCTURES

SECTION UTILITY MANHOLES AND STRUCTURES SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition

More information

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SPECIAL SPECIFICATION 6666 Charter Communications System

SPECIAL SPECIFICATION 6666 Charter Communications System 2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6666 Charter Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Charter Communications,

More information

Description Unit Quantity Rate Kshs. Amount Kshs.

Description Unit Quantity Rate Kshs. Amount Kshs. BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove

More information

Requirements for On-Lot Sewer Facilities Amador County, California

Requirements for On-Lot Sewer Facilities Amador County, California Requirements for On-Lot Sewer Facilities Amador County, California Installation & Materials Specifications for STEF Systems (Septic Tank Effluent Flow/Gravity) July 2016 Amador Water Agency TABLE OF CONTENTS

More information

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.

More information

Public Water Supply District #2 of St. Charles County, Missouri

Public Water Supply District #2 of St. Charles County, Missouri Public Water Supply District #2 of St. Charles County, Missouri POLICIES, PROCEDURES, AND REQUIREMENTS FOR CONNECTION AND INSPECTIONS OF: RESIDENTIAL WATER AND/OR SEWER SERVICE CONNECTIONS COMMERCIAL WATER

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 Project: Coteau Street & Utility Improvements Bid Date: 1:00 P.M., Local Time, March 20, 2017 Bid Location: Office of the City Administrator/Clerk, City of Lake Benton 106 S. Center Street

More information

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT]

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT] PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT] A. - General. B. - Streets. C. - Stormwater drainage system. D. - Water

More information

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE TORONTO TRANSPORTATION March 2012 TS 803 DUCTS TABLE OF CONTENTS 1. DRAWINGS TTD 803.001 TTD 803.010 DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE 2. CONSTRUCTION

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

SECTION STORM DRAIN

SECTION STORM DRAIN PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract

More information

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 7

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 7 September 2013 Page 1 of 7 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of a wetwell as shown on the Plans and in accordance with Section 01001,

More information

PRECAST CONCRETE MANHOLES. A. Precast concrete manholes for sanitary sewers, storm sewers, and water lines.

PRECAST CONCRETE MANHOLES. A. Precast concrete manholes for sanitary sewers, storm sewers, and water lines. Section 02082 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Precast concrete manholes for sanitary sewers, storm sewers, and water lines. B. Precast concrete sanitary sewer manholes with PVC liner where

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

B. Fiberglass for construction in back lot easements placed on cast-in-place base.

B. Fiberglass for construction in back lot easements placed on cast-in-place base. Section 02083 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fiberglass manholes for unpaved areas placed on top of a precast base to form a manhole. B. Fiberglass for construction in back lot easements

More information

PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe

PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe Design and Installation Guide PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe TABLE OF CONTENTS Introduction 2 Products 3 Main-Line Fittings & Service-Line Fittings 3-4 Connections to Dissimilar

More information

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES SECTION 15420 DRAINAGE AND VENT SYSTEMS PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. All cleanouts above finished (accessible and non-accessible) ceilings shall be extended to the floor above. B. Do

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 02514 MANHOLES 1.0 GENERAL 1.1 SCOPE This section provides for construction of sewer manholes complete in place, including the furnishing and adjusting to grade of an existing

More information

CURRENT NORTH LAS VEGAS ADDENDA

CURRENT NORTH LAS VEGAS ADDENDA SECTION 1 Section 1.01.73 Fire Service Meter ADD: Type I is not approved for installation in the City of North Las Vegas service area. Section 1.01.107 Pressure Reducing Valve (PRV) or Pressure Regulator

More information

STANDARD SPECIFICATION FOR OIL GRIT SEPARATOR (OGS) STORMWATER QUALITY TREAMENT DEVICE

STANDARD SPECIFICATION FOR OIL GRIT SEPARATOR (OGS) STORMWATER QUALITY TREAMENT DEVICE STANDARD SPECIFICATION FOR OIL GRIT SEPARATOR (OGS) STORMWATER QUALITY TREAMENT DEVICE PART 1 GENERAL 1.1 WORK INCLUDED This section specifies requirements for constructing underground stormwater treatment

More information

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems.

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems. Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to provide design guidelines for Utility Direct Buried

More information

All service lines shall conform to the following requirements:

All service lines shall conform to the following requirements: 505 WATER SERVICE INSTALLATION 505.1 DEFINITION A service line is comprised of the piping and related appurtenances including the connection installed from the Des Moines Water Works water main to the

More information

DIVISION 33 UTILITIES

DIVISION 33 UTILITIES DIVISION 33 UTILITIES This Article on Codes, Regulation and Standards shall apply to all Divisions of the Building Standards Table of Contents 33 05 13 MANHOLES AND STRUCTURES... 3 33 10 00 WATER UTILITIES...

More information

401 Sanitary Sewer System Design Criteria. The following additional design requirements shall also apply:

401 Sanitary Sewer System Design Criteria. The following additional design requirements shall also apply: SECTION 400 SANITARY SEWER SYSTEM The design of sanitary sewers shall be in conformance with the applicable sections of the State of Washington, Department of Ecology manual, Criteria for Sewage Works

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 602 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

CHAPTER 6. Sanitary Sewer

CHAPTER 6. Sanitary Sewer CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide

More information

Special Provision No. 405F03 March 2005

Special Provision No. 405F03 March 2005 PIPE SUBDRAINS - Item No. VIDEO CAMERA INSPECTION Item No. Special Provision No. 405F03 March 2005 OPSS 405, February 1990, Construction Specification for Pipe Subdrains is deleted in its entirety and

More information

SECTION 67 SERVICE CONNECTION SYSTEM

SECTION 67 SERVICE CONNECTION SYSTEM 2019 - SECTION 67 SERVICE CONNECTION SYSTEM 67.1 GENERAL Building service connections for water and sewer shall be installed in accordance with these Specifications and/or approved Detailed Engineering

More information

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows. 403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage

More information

COTTONWOOD IMPROVEMENT DISTRICT SALT LAKE COUNTY SERVICE AREA #3 SOLITUDE IMPROVEMENT DISTRICT TOWN OF ALTA WATERSHED SERVICE LINE SPECIFICATIONS

COTTONWOOD IMPROVEMENT DISTRICT SALT LAKE COUNTY SERVICE AREA #3 SOLITUDE IMPROVEMENT DISTRICT TOWN OF ALTA WATERSHED SERVICE LINE SPECIFICATIONS COTTONWOOD IMPROVEMENT DISTRICT SALT LAKE COUNTY SERVICE AREA #3 SOLITUDE IMPROVEMENT DISTRICT TOWN OF ALTA WATERSHED SERVICE LINE SPECIFICATIONS WATERSHED AREA: The entire area in any canyon above the

More information

MEASUREMENT & PAYMENT (CITY FUNDED PROJECTS)

MEASUREMENT & PAYMENT (CITY FUNDED PROJECTS) 00950 - Measurement & Payment Page 00950-1 00950 - MEASUREMENT & PAYMENT (CITY FUNDED PROJECTS) (Last revised 5/20/10) SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Base Course & Paving Curb & Gutter,

More information

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities ADDENDUM NO. TO Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities Date of Addendum: December, 00 Hethcoat & Davis, Inc. 78 Franklin Road,

More information

CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01

More information

CHAPTER 6 - SANITARY SEWER

CHAPTER 6 - SANITARY SEWER CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings

More information