Update on implementation of 2014 Building Control Amendment Regulations Carlow Institute of Technology (29 th April 2015)

Size: px
Start display at page:

Download "Update on implementation of 2014 Building Control Amendment Regulations Carlow Institute of Technology (29 th April 2015)"

Transcription

1 Update on implementation of 2014 Building Control Amendment Regulations Carlow Institute of Technology (29 th April 2015) Kevin Sheridan EurBE MSc CEnv FSCSI, FRICS FIBCI FCIOB FCInstCES, P Eng, FCABE, CBuildE MICE President AEEBC

2 Overview Presentation Recap of key provisions of BCAR Issues affecting clients and Role of Third parties regarding building control process Design Certifier/AC Role & issues Implementation issues and problems Registration of Builders -CIRI registration Review of BCAR Implementation

3 BUILDING CONTROL Amendment Regulations (2014) SI 9 of 2014 signed into law by the Minister for the Environment Community & Local Government, into effect from 1 March 2014came Supporting COP issued February 2014 Statutory Instrument S.I. No. 105 of 2014 Building Control (Amendment (NO. 2) Regulations [105] BCA Framework Document

4 1 Recap of key provisions of BCAR

5 Building Control Acts Building Regulations Technical Guidance Documents Building Control Regulations - Commencement Notices - Fire Safety Certificates - Disability Access Certs - 7-day notices - Lodgement of Plans - Design Certificate - Notices of Assignment - Undertaking Certificates - Completion Certificate - Validation by BCA - Inspection Plan - Public Register Code of Practice Framework for BCAs

6 Building Regs and Building Control Regs Building Control regulations are different to Building Regulations Apart from exempted works, All extensions, material alterations and material changes of use, regardless of floor area, must comply with the Building regulations. Building regulations deal with how the building is constructed, whereas the building control regulations deal with the process regarding appointments, notifications, inspection and certification in relation to compliance.

7 Building Regs and Building Control Regs The regulations require that only competent registered building surveyors, registered architects or chartered engineers, can undertake statutory roles in relation to design, inspection and certification in conjunction with a code of practice for inspection.

8 Key Reference Documents Primary Building Control Regulations SI No.9 of Code of Practice for Inspecting & Certifying Buildings & Works. Framework for Building Control Authorities. Ancillary Certificates.

9 Regulations and Guidance Building Control Act 1990 and 2007 Building Regulations Building Control Regulations Building Control (Amendment) Regulations 2014 Planning Regulations Code of Practice for Inspecting and Certifying Buildings and Works Need to differentiate between Short commencement notice application process and full commencement notice process

10 Regulatory Context The BCAR Regulations apply to any development or work in connection with the construction, extension,alteration, repair or renewal of a building where a Commencement Notice is required to be lodged after March 1st 2014 The requirements of paragraph (1)(b) shall apply to the following works and buildings the design and construction of a new dwelling works to which Part III applies- Any building works which require a fire safety certificate. Design and construction of a new dwelling An extension to a dwelling involving a total floor area greater than 40m2. (Cumulative) Material Alterations (part B) Material change of use

11 BCA Role Oversight using a risk based approach to target those who are noncompliant. BCA Framework as a tool to standardise response consistency between BCA s Ensure that any failure of regulation among the stakeholders involved i.e. Building Owners, Designers, Builders etc is detected and remedied in an effective and timely manner. A key element in detection is the system of risk analysis, using the online system of notices and documents by BCAs to deploy available resources to target inspection and The investigation aim is that into the powers higher risk of enforcement areas and prosecution. Section 6(4) of the 1990 Act BCA shall not be under a duty to any person to ensure/verify that the: certificate complies with the requirements of.. Act or of regulations or orders made under.. Act, Or facts stated in the certificate are true and accurate

12 Commencement Notice Requirements TO ESTABLISH IF A COMMENCEMENT NOTICE IS REQUIRED- DOES THE PROJECT INVOLVE: (A) an erection of a building, (B) the material alteration of a building, (C) the extension of a building, or (D) the material change of use of a building to which the Building Regulations apply. S.I No. 496 of 1997 Art 7 (1) Buildings or works requiring Planning permission requirement Prior extensions from Oct 64 (Cumulative aspect)

13 Scope of buildings or works requiring New BCA certification- Reference Building Control Regulations 1997 Fire Safety Certificates 11. (1) Subject to sub-article (2) and articles 3 and 6, this Part applies to (a) works in connection with the design and construction of a new building, (b) works in connection with the material alteration of (i) a day centre, (ii) a building containing a flat, (iii) a hotel, hostel or guest building, or (iv) an institutional building, or (v) a place of assembly, or (vi) a shopping centre, but excluding works to such buildings, consisting solely of minor works, (c) works in connection with the material alteration of a shop, office or industrial building where: (i) additional floor area is being provided within the existing building, or (ii) the building is being subdivided into a number of units for separate occupancy, (d) works in connection with the extension of a building by more than 25 square metres, (e) a building as regards which a material change of use takes place, to which the requirements of Part B of the Second Schedule to the Building Regulations apply.

14 Statutory Forms Standard wording-no deviations permitted Person signing Design certificate -Certificate of compliance by Design Certifier (for submission with the commencement notice) Statutory certifiers must be persons on Building Surveyor/Architect statutory registers or CEng register)

15 Detail Design/Commencement Compliance and Inspection Document 1.Compliance Appraisal: Applicable parts of Building regulations 2. General Arrangement extract of Project drawings showing scope and scale. 3. Inspection Plan: Inspection schedule -work which the Certifier(s) will inspect from commencement to completion. 4. Testing and Commissioning Schedule: List all tests to support the Ancillary Certification 5. Drawings and Documents Schedule: 6. Ancillary Certificates in Agreed format from other members of the design team and certificates from specialist sub-contractors.

16 Commencement Process Lodgement of Commencement Notice on-line with plans and particulars including Inspection Plan prepared by the Assigned Certifier. The following is required for completing the Commencement Notice on the BCMS. Nomination of Parties on the BCMS Building Owner Design Certifier Assigned Certifier Builder

17 Commencement Stage Upload supporting Information by the Assigned Certifier General Arrangement Drawings Preliminary Inspection Plan INF-Inspection Notification Framework Design Certificate from designer and supporting Ancillary Certificates Building Regulation Compliance Report and any Additional Supporting Documents.

18 What must happen before the building is occupied? A Certificate of Compliance -completion certificate by the Builder/Assigned Certifier. Documents showing changes from those originally lodged Completed Inspection Plan showing what inspections were undertaken Ancillary Certificates on which they relied from specialist designers, subcontractors etc

19 Commencement Notices No work shall commence on site without a valid commencement notice (ie successfully registered by the Building Control Management System). Failure to submit a valid Commencement Notice will affect the possibility of obtaining a Completion Certificate (not possible to get it retrospectively) Where it applies a Fire Safety Certificate must be granted prior to submission of a Commencement Notice Failure to submit a valid commencement notice can also result in fines or imprisonment.

20 Prior Notification process re Prospective Cert of Completion Submit Plans Specifications and Particulars & Inspection Plan Not more than 5 weeks Or Building Control Authority Validation Period Minimum 21 days notification Submit Valid Cert of Compliance (1 day in advance of Nominated Day) Further 7 days at the discretion of the Building Authority (within reason) Place on Register? less than 3 Weeks:

21 Construction Stage Review & communicate Ensure construction drawings and specification are up to date with revisions uploaded to Building Control Management System. Weekly review of Programme & Inspection Plan notify & Follow-up consequences for builder and client of delays Inspections carried out only by appropriate persons Review BCMS uploads. Specific time set aside at all site meetings to review Actions with clear responsibilities

22 Responsibility for Compliance with BCAR & BRegs Primary responsibility for compliance rests in the first instance with building owners, developers/builders, and designers

23 Owner Responsibilities Not Passive but must exercise diligence in selecting Designer, Assigned Certifier & builder- (re qualifications & appropriate experience) not just Yellow Pages selection Must enable certifiers to act in independent manner Must allow adequate time frame & budget Submit required notices and including change of the assigned certifier or builder to the BCA within 14 days (if applicable) Smaller one-off clients are often reliant on local designers and builders Client requires pro-forma checklists for professionals and contractors to demonstrate that their selection process and compliance is rigorous

24 AC role in ensuring QA & QC in accordance with SI 9 and COP AC oversees inspection process and critical records during the construction period. Preliminary Inspection Plan including INF General arrangement drawings and detailed drawings schedule Tests and Certificates Schedule Inspection records and documents AC carries out on-going uploads of the Compliance and Inspection Record on the BCMS (Building Control Management System). Ancillary Certificates

25 Contrasting roles between Assigned Certifier and Employers Representative Assigned Certifier Inspection May not order works May be a member of the design team No requirement to be on site full time No financial responsibilities Keeps records Employer s Representative Oversight/Supervision? Power to order works Less likely to be a member of the design team Normally on site in a full time capacity Processes interim certification Keeps records Acknowledgement C Bradley rpsgroup.com/ireland

26 Contrasting roles between Assigned Certifier and Employers Representative Assigned Certifier Assigned Certifier role may also take on another role on the project. Assigned Certifier may recuse himself/herself from the role! Communication Interaction with Building Owner Employer s Representative Employer s Representative can t take on another role on the project. Interaction with Client Communication Acknowledgement C Bradley rpsgroup.com/ireland

27 Implications of Design Changes following Commencement Design Work due for completion must be uploaded Implications of contractor request to use alternative process or materials Client generated request for change may impact on completion date where prior notification of completion has been submitted to BCA Phased Completion- e.g. Houses or apartment blocks requiring separate Commencement Notice Separate Building Control Registration for each phase of a building

28 Progress Meetings Pre Tender and Pre-Contract The INF- progress Clarification required e.g. designers specifying performance criteria rather than specific products Each key project stakeholder to report on project status and address project issues, delays and clarifications required Inspection Plan- Reviewed Progress Meeting Minutes- opportunity to identify changes and assist project work flow. Follow-up correspondence

29 Authorising Payments E.R Ensuring that elements are complete (Practical completion???) Were critical elements inspected Ensuring that workmanship is adequate (tolerances???) Is material fit for purpose? Don t just rely on CE Marking Can you withold payment?? Is all appropriate documentation & certification available to AC /DC Don t accept undertakings as they may not suffice Did third party interpret drawings/spec/intentions Does As built structure follow design Have all critical parties signed off on work

30 During Construction BUILDER DoECLG position-that a Self-Builder can self-nominate as the Builder and sign the undertaking and the Certificate of Compliance on Completion (Part A). In nominating themselves as Builder and signing the Undertaking by the Builder, they are declaring that they are competent and undertaking to follow the certified design and to employ/engage competent persons, etc. and anyone signing these forms must of course be faithful to the undertakings so given. In relation to the signature by a Self-Builder of the Undertaking by the Builder or Certificate of Compliance on Completion (Part A), the Department does not foresee a difficulty in a Self-Builder signing this form where they are clearly not a company

31 Cost Considerations There will generally be a separate AC & DC except on small jobs- Professional Fees certification at different stages Coordination of subcontractors & ancillary certifiers for client and builder categories Supervision and Inspection costs Cost of Tests Ancillary fee costs for inspections and certification Briefing/Training costs for Client, Professional Team, Contractors, Subcontractors, Suppliers Contractor/Subcontractor/sub/sub contractors Additional resources QA, Planners, Supervisors etc

32 Cost Considerations Allowances need to be made in budgets/cost plans and tender documents for Builders role in Inspection Plan Inspection Notification Framework Testing & Commissioning & Inspection costs Certification is the responsibility of the entire project team managed by the Builder/Contractor and the Assigned certifier.

33 Prequalification of Contractors/Subcontractors Understanding of their duties & obligations Proposed methodology, programme & organisational structures - auditing mechanisms, QC procedures & individual responsibilities All aspects of process from appointment to handover Builder s methodology for ensuring compliance of materials and workmanship with the Building Regulations Sample of Builder s inspection records document Control of Supplier and Sub-Contractor Activities eg shop drawings, materials, offsite testing, mock-ups, benchmarking samples Keeping of records Subcontractors with design ancillary & design certs, inspections & proof of inspections required by AC

34 2. Issues involving clients and Role of Third Parties regarding building process

35 Inspection, Certification & interdependencies Local Authority BCMS Builder Client/ Building Owner Design Certifier Material Suppliers Builder s Specialist Contractors / Subcontractors Assigned Certifier Specialist Designers Specialist Trades Designer s Specialist Contractors/ Subcontractors

36 Advice to Client On Clients responsibility & Risks On Statutory approvals prior to commencement (FC & DAC (DAC Preferably at commencement) On Consequence of delays & non compliance On effects re compliance of existing building e.g. where extensions to earlier construction applies Role and responsibility of each of the designers, consultants and parties to the project Analysis of individual components of Building Regs (Parts A to M)

37 Advice to Client- Responsibility Matrix Schedule of items included with CN and later Key design aspects required for Inspection Plan & INF at tender stage prior to commencement Upfront checks and resources & costs associated with process Adequate records of compliance Communications with all relevant parties including contractor/builder Ensure that AC receives all information in the schedule and required ancillary compliance information

38 Advice to Client -Responsibility Matrix Each designer takes account of design, interfaces and inspection process & sign off Components with multiple design inputs from various disciplines- e.g. Fire Door Changes to General Arrangement drawings (DC & AC responsibilities) Third Party impartial review and audit (where required), at agreed stages to ensure QA diligence. Role of others (e.g. QS or Builder interpreting drawings) Material substitutions

39 Advice & Checklists Commencement Notice checklist Comprehensive checks of Legislation, Regulations & Guidance Building Regulations Checklists Portfolio Building Control Management Systems Report [BCMS Report] Interrelationship with Ancillary designers/ certifiers Compliance Matrix

40 Prequalification of Contractors/Subcontractors Tender Issues Assessment of contractors competence to carry out the specific work supported by CIRI specific registration Assessment of subcontractors competence to carry out the specific work (CIRI) Subcontractors/specialist competence (Ancillary Certifiers) Assessment Contractors method statement

41 Assigned Certifier clarification re Building Owner designated person Establish: Who in the Building Owner organisation is authorised to appoint the various stakeholders, sign all the statutory documentation required and be available when commencement notice is being lodged with the Building Control Management System (BCMS)?

42 Contract Award Ensure that each designated party has the requisite competence to inspect the type of work in question? and are familiar with the construction methods to be able to identify non compliant construction? If AC is also the Design Certifier- Issues Collateral Warranty arrangement with the Ancillary Certifier(s)?

43 Importance of Records Evidence of Inspections properly recorded including photos & records Document verification, validation & retention to demonstrate compliance Follow up oral advice in writing Retain notes of meetings, conversations, instructions etc Retain copies of Certificates AC/DC confirmation others have undertaken inspections according to Plan You are relying upon others responses and Certificates

44 THE BUILDING OWNER The Code of Practice defines 'Building Owner as- the person who has commissioned and paid for the works and who has legal entitlement to have such works carried out on their behalf. Ensure the necessary skills, capacity and experience appropriate to the proposed works. Ensure that adequate resources are available

45 Builder/contractor Specific Risks Has the Builder previously been pursued for non compliant work Does the design include unusual construction details and is the project size and complexity within the normal range of work carried out by the Builder and all specialist contractors/ sub-contractor? Is the tender price too low? Are the Builder s key staff competent and well supervised Implications of changes proposed e.g. Interpretations by contractor Implications of contractor request to use alternative process or materials

46 Issues that may cause potential difficulties/conflict between ER & AC Under PCW Employer s Representative Clause 4.4 Employer s Representative May give the Contractor (1) instructions which are either (a) directions in accordance with the Contract or (b) Change Orders and (2) objections in accordance with sub-clause May give the Contractor or Employer or both (1) opinions, assessments, determinations and certificates, in accordance with the Contract and (2) other communications [including clarifications] in accordance with the Contract or the Employer s Representative considers appropriate

47 Detail Design/Commencement-Compliance and Inspection Document 1.Compliance Appraisal: Applicable parts of Building regulations 2. General Arrangement Extract of Project drawings showing scope and scale. 3. Inspection Plan: Inspection schedule -work which the Certifier(s) will inspect from Inspection to completion. 4. Testing and Commissioning Schedule: List of all tests to support the Ancillary Certification 5. Drawings and Documents Schedule: 6. Ancillary Certificates: Agreed format

48 Progress Meetings Pre Tender and Pre-Contract The INF- progress Clarification required e.g. designers specifying performance criteria rather than specific products Each key project stakeholder to report on project status and address project issues, delays and clarifications required Inspection Plan- Reviewed Progress Meeting Minutes- opportunity to identify changes and assist project work flow. Follow-up correspondence

49 Construction Stage Review & Communicate Ensure construction drawing, specification on site are up to date with revisions uploaded to Building Control Management System. Weekly review of Programme & Inspection Plan notify immediately consequences for builder and client of delays Inspections carried out only by appropriate persons Review BCMS uploads. Specific time set aside at all site meetings to review Action with clear responsibilities

50 3 Design Certifier/AC Role & issues

51 Assigned Certifier s role (Ref COP) In consultation with the members of the design team, and builder plan and oversee the implementation of the inspection plan during construction Sign the relevant Statutory Certificates undertaking at commencement and Certificate of Compliance on completion -Co-ordinate the ancillary certification by members of the design team and other relevant bodies Identify all design professionals and certificates required in conjunction with the builder On termination or relinquishment of their appointment make available to the Building Owner all certification prepared and inspection reports carried out Act as the single point of contact with the Building Control Authority during construction

52 Assigned Certifier Needs adequate resources and back-up for emergencies/contingencies Is remuneration consistent with workload & risk Check if reliable and competent Ancillary Certifiers working as part of the Inspection Team? Adequate PI Insurance including PI for all other relevant certifiers If A.C is commissioned by Builder ensure impartiality and ensure that AC is not compromised? Collateral Warranty arrangement with the Ancillary Certifier(s)?

53 AC & DC Issues If AC is also the Design Certifier is this putting undue pressure undertaking both roles? (ideally they should be separate people) Where applicable design Audits to be undertaken by individual designers as part of their input into the inspection plan over the course of the design or as part of a stage review Clarification & caution regarding designer role where material substitutions or ER, PM, QS or other parties inadvertently assume a design role

54 AC & DC Issues Certification of Shell and Core Development Works Fit Out Contract Works Conflicting priorities when AC or DC is required to inspect properties in more than one area/region due to schedule conflicts Are there sufficient resources and back up for emergencies? Is PI insurance adequate including run off cover? Has adequate time been allowed to complete the project? What happens if the completed building does not get registered on the system due to LA dissatisfaction with final building/works?

55 Risk assessment (COP Guidance) Assigned Certifier Factors in Determining Inspection Plan Type of building, type of construction and expertise of the Builder; How complicated or relatively straightforward the method of construction is; The speed of construction, or methods of fast track construction.

56 Inspection Plans In the tendering process the Inspection Notification Framework (INF) describes the inspection requirements which need to be carried out and considered in pricing by the Builder The finalisation of The Preliminary Inspection Plan also provides required information Inspection Plans also sets out the requirement for Ancillary Certification for Specialists, Sub-Contractors and Suppliers Advance notice and time for inspections (say) Min 5 work days Re-Inspections/Follow up inspections (say) Min 3 work days

57

58 The Legal Responsibilities of the Assigned Certifier Must be satisfied with the general competency of the ancillary certifiers and that the Certificates generally attached the completion documentation lodged Completion certs give comfort to the AC re: Reliance on ancillary certifiers The Certificate requires exercise of reasonable skill, care and diligence The Completion Certificate is underpinned by Part A, completed by the builder

59 Assigned Certifier Potential Liabilities Contractually to the client -To third parties, on the basis of negligence/negligent misrepresentation -To the Building Control Authority on the basis of negligence/negligent misrepresentation It should be stated that the same principles applied under the old regime, where professionals carry out a professional service The last man standing situation is possible as occurred before

60 Issues for consideration Statutory Liability Contractual Liability Civil Liability Compliance with SI 109 & COP with perhaps no enforcement issues may clear the first hurdle May be covered by drafted wording in contract or terms of engagement Elephant in the room =Contractual & Civil Liability fears More of an issue with third parties

61 Materials in compliance with regulations

62 Materials Compliance Client generated request for change & interpretations by QS/ER Technical Specifications include harmonised European Standards, European Technical Approvals, National Standards & Agrement Certificates Reference the harmonised technical standards Within the contract documents and requirements of individual characteristics? Local Authority are market surveillance authority Onus on manufacturer to comply with declaration With CE Marking you must see supporting information Receiver of Products obliged to check its suitability Has the products declaration of performance and its suitability of application been checked for all products listed?

63 4 CIRI registration including Competence issues

64 Background DoECLG invited CIF to submit proposals relating to voluntary registration system Appointment of Competent Builders Complaints and Appeals Committee CIRI Registration No for Registered Builders Commitment to Code of Practice for Inspecting and Certifying Buildings and Works: Builders included on the Construction Industry Register Ireland or equivalent may be regarded as competent for projects consistent with their registration profile 64 64

65 Who is Register For? Designed for construction practitioners including: Main contractors and builders who deliver overall projects including sole traders Specialist contractors and sub contractors who deliver overall projects and/ or elements of projects Other trades who may be engaged by other contractors, sub contractors or by domestic clients Annual registration required 65 65

66 During Construction Self-BUILDER While not part of CIRI DoECLG position-that a Self-Builder can self-nominate as the Builder and sign the undertaking and the Certificate of Compliance on Completion (Part A). In nominating themselves as Builder and signing the Undertaking by the Builder, they are declaring that they are competent and undertaking to follow the certified design and to employ/engage competent persons, etc. and anyone signing these forms must of course be faithful to the undertakings so given. In relation to the signature by a Self-Builder of the Undertaking by the Builder or Certificate of Compliance on Completion (Part A), the Department does not foresee a difficulty in a Self-Builder signing this form where they are clearly not a company

67 BCAR Departmental Review Stakeholder Review at DoECLG April 2015 Targeted Departmental Pro-forma format of Issues/Solutions highlighted by Minister Stakeholder responses by Mid May Minister will announces changes in a short time after (about a month) CIRI board expected to become statutory by end of year Future of Single (Self Built) housing to be determined Position of practical architects & technicians role to be determined

68 Summary Recap of key provisions of BCAR Issues affecting clients and Role of Third parties regarding building control process Design Certifier/AC Role & issues Implementation issues and problems Registration of Builders -CIRI registration Review of BCAR Implementation

69 BUILDING CONTROL Amendment Regulations (2014) Thank you Questions Kevin Sheridan EurBE MSc CEnv FSCSI, FRICS FIBCI FCIOB MICE FCABE, President AEEBC Disclaimer This information is for training purposes only. It does not constitute legal or professional advice.

Update on implementation of 2014 Building Control Amendment Regulations for Property Managers at SCSI Dublin (11 th March 2015)

Update on implementation of 2014 Building Control Amendment Regulations for Property Managers at SCSI Dublin (11 th March 2015) Update on implementation of 2014 Building Control Amendment Regulations for Property Managers at SCSI Dublin (11 th March 2015) Kevin Sheridan EurBE MSc CEnv FSCSI, FRICS FIBCI FCIOB FCInstCES, P Eng,

More information

Building Control (Amendment) Regulations MBCA Guidance Document

Building Control (Amendment) Regulations MBCA Guidance Document Building Control (Amendment) Regulations 2014 Contents 1. Introduction 4 2. Legislative Background 5 3. Definitions 6 4. Process 7 5. Documents at tender stage 8 6. Building Control Management System 9

More information

Professional relationships in play Some Practicalities to consider- Assigned & Design Certifier

Professional relationships in play Some Practicalities to consider- Assigned & Design Certifier Professional relationships in play Some Practicalities to consider- Assigned & Design Certifier Presentation at CMG Royal Marine Hotel Dun Laoghaire- September 2017 Kevin Sheridan EurBE, MSc, CEnv, MICE,

More information

BUILDING CONTROL Amendment. Regulations. BUILDING CONTROL Amendment

BUILDING CONTROL Amendment. Regulations. BUILDING CONTROL Amendment BUILDING CONTROL Amendment Regulations BUILDING CONTROL Amendment Regulations (2013) Update A Building Surveyor s Perspective Presentation at Engineers Ireland January 2014 Kevin Sheridan EurBE, MSc CEnv,

More information

BUILDING CONTROL (AMENDMENT) REGULATIONS 2013

BUILDING CONTROL (AMENDMENT) REGULATIONS 2013 BUILDING CONTROL (AMENDMENT) REGULATIONS 2013 MIND THE GAP ARCHITECT PRACTITIONER PERSPECTIVE IEI SEMNAR January 2014 Orla Fitz.Gerald MRIAI FCIArb Member COP WG & Architect in Practice Code of Practice

More information

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015 for Inspecting and Certifying Buildings and Works Building Control Regulations 1997 to 2015 September, 2016 Table of Contents 1. Introduction 1 1.1 Status and Purpose of Code 1 1.2 Overview of Code 1

More information

BC(A)R S.I. 9 OF 2014 AND S.I 365 OF THE BUILDING CONTROL (AMENDMENT) REGULATIONS

BC(A)R S.I. 9 OF 2014 AND S.I 365 OF THE BUILDING CONTROL (AMENDMENT) REGULATIONS CLIENT GUIDANCE NOTE Updated April 2016 BC(A)R S.I. 9 OF 2014 AND S.I 365 OF 2015. THE BUILDING CONTROL (AMENDMENT) REGULATIONS What are the Building Regulations? The Building Regulations are the minimum

More information

Code of Practice Inspecting and Certifying Building Works

Code of Practice Inspecting and Certifying Building Works Engineers Ireland Building Control Seminar Code of Practice Inspecting and Certifying Building Works John O Connor 17 th January, 2014 Building Control Acts 2 Building Regulations Technical Guidance Documents

More information

S.I 9 of Building Control Management System (BCMS) Development & Code of Practice for BCO s. Presentation to IBCI 2 nd April 2014

S.I 9 of Building Control Management System (BCMS) Development & Code of Practice for BCO s. Presentation to IBCI 2 nd April 2014 S.I 9 of 2014 Building Control Management System (BCMS) Development & Code of Practice for BCO s Presentation to IBCI 2 nd April 2014 Mairéad Phelan, BE, C.Eng, FIEI, MBA Senior Engineer, Fingal County

More information

Meeting of the Joint Oireachtas Committee on Housing, Planning, Community & Local Government 13 April 2017 (10.45am) Opening Statement

Meeting of the Joint Oireachtas Committee on Housing, Planning, Community & Local Government 13 April 2017 (10.45am) Opening Statement Meeting of the Joint Oireachtas Committee on Housing, Planning, Community & Local Government 13 April 2017 (10.45am) Opening Statement Sarah Neary, Principal Adviser, Housing Advisers & Building Standards,

More information

Building Control (Amendment) Regulations 2013

Building Control (Amendment) Regulations 2013 Engineers Ireland West Building Control System Building Control (Amendment) Regulations 2013 John O Connor 20 th March, 2013 2 Legislation & Regulations Building Control Acts 1990 and 2007 Building Regulations

More information

Building Standards Customer Journey

Building Standards Customer Journey Building Standards Customer Journey Are you doing building work or home improvements? If so, this guide is for you. Building Standards Customer Journey Contents 2 Contents Building Standards Customer Journey

More information

BUILDING CONTROL An Architects View John Graby Director

BUILDING CONTROL An Architects View John Graby Director An Architects View John Graby Director ACEI, IEI, RIAI & SCS Report Starting with the view of ACEI/IEI, RIAI and SCS Building Control Strengthening the system Invisibility Inspection and compliance What

More information

Insurance Policy. Major Damage - 10 years. Ingress of water - 5 years. Defects in chimneys/flues - 5 years. Building Regulations defects 5 years

Insurance Policy. Major Damage - 10 years. Ingress of water - 5 years. Defects in chimneys/flues - 5 years. Building Regulations defects 5 years 1 About HomeBond Set up in 1978 With support of DOE, CIF National House Building Guarantee Company Ltd Members - Developers, Builders Structural inspections, claims procedures. HomeBond Insurance Services

More information

SAFETY, HEALTH & WELFARE AT WORK (CONSTRUCTION) REGULATIONS Briefing Note 1 for Clients, Designers and Project Supervisor Design Process

SAFETY, HEALTH & WELFARE AT WORK (CONSTRUCTION) REGULATIONS Briefing Note 1 for Clients, Designers and Project Supervisor Design Process SAFETY, HEALTH & WELFARE AT WORK (CONSTRUCTION) REGULATIONS 2006 1. Introduction Briefing Note 1 for Clients, Designers and Project Supervisor Design Process ISSUED NOVEMBER 2006 BY ACEI, EI, RIAI and

More information

Board Charter. 1.0 Purpose. 2.0 Functions and responsibilities

Board Charter. 1.0 Purpose. 2.0 Functions and responsibilities Board Charter 1.0 Purpose This Board Charter sets out the roles, responsibilities, composition, structure and approach of the Board the Company. The Board is responsible for the affairs and activities

More information

The Building Control Act 1990 places a statutory obligation on owners, designers and builders to design and build in accordance with the building

The Building Control Act 1990 places a statutory obligation on owners, designers and builders to design and build in accordance with the building 7FSTJPO +VMZ The Building Control Act 1990 places a statutory obligation on owners, designers and builders to design and build in accordance with the building regulations; establishes Building Control

More information

Casework Technical Support (Social Welfare - Project Management)

Casework Technical Support (Social Welfare - Project Management) Casework Technical Support (Social Welfare - Project Management) Request for Tenders for Services to MABS NATIONAL DEVELOPMENT The latest date for receipt of tenders is 09 June 2017 Commercial House Westend

More information

APPENDIX T.2 SACPCMP The South African Council for the Project and Construction Management Professions

APPENDIX T.2 SACPCMP The South African Council for the Project and Construction Management Professions APPENDIX T.2 SACPCMP The South African Council for the Project and Construction Management Professions The South African Council for the Project and Construction Management Professions (SACPCMP) Registration

More information

Trethowans LLP. Recruitment Agency Preferred Supplier List (PSL) Invitation to Tender

Trethowans LLP. Recruitment Agency Preferred Supplier List (PSL) Invitation to Tender Trethowans LLP Recruitment Agency Preferred Supplier List (PSL) Invitation to Tender 1. Tender Process 1.1. Trethowans LLP ( Firm ) is providing this Invitation to Tender ( ITT ) to various interested

More information

Appendix 3. POLICY & PROCEDURE No

Appendix 3. POLICY & PROCEDURE No DEPARTMENT OF PUBLIC WORKS DIVISION: ENGINEERING SERVICES SECTION: ADMINISTRATIVE PAGE NO: 1 OF 10 REVISION NO: 3 DATE: 1995 05 01 ESTABLISHED: 1986 03 03 Appendix 3 POLICY & PROCEDURE No. 2.3.1-020 TITLE:

More information

Audit and Risk Management Committee Charter

Audit and Risk Management Committee Charter Audit and Risk Management Committee Charter Qube Holdings Limited ACN 149 723 053 Audit and Risk Management Committee Charter (revised June 2018 ) Page 1 of 8 1. Introduction 1.1 Objectives The objectives

More information

HKIS QSD PQSL Series 2014

HKIS QSD PQSL Series 2014 HKIS QSD PQSL Series 2014 by Sr. TANG Ki-cheung FHKIS RPS(QS) FSZCEA MHKIVM Director of K C Tang Consultants Ltd. Quantity Surveyors. Construction Cost and Contract Consultants Ltd. on 9 May 2014 (Friday)

More information

SCHEME OF BUILDING REGULATION CHARGES AND ASSOCIATED MATTERS FOR South Cambridgeshire District Council

SCHEME OF BUILDING REGULATION CHARGES AND ASSOCIATED MATTERS FOR South Cambridgeshire District Council APPENDIX B4 (B) SCHEME OF BUILDING REGULATION CHARGES AND ASSOCIATED MATTERS FOR South Cambridgeshire District Council Date this Scheme will come into effect: 1st April 2013 Page 1 of 16 Index Page Purpose

More information

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1.

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1. PROBUILD SUBCONTRACTOR QUALITY MANAGEMENT GUIDE Section Two Project Specific Quality Management Plans Version No 1. PREFACE This document has been developed to assist subcontractors to meet Probuild s

More information

Design Team Procedures Practice Note 1, February DESIGN TEAM PROCEDURES PRACTICE NOTE 1 (Revision 2)

Design Team Procedures Practice Note 1, February DESIGN TEAM PROCEDURES PRACTICE NOTE 1 (Revision 2) DESIGN TEAM PROCEDURES PRACTICE NOTE 1 (Revision 2) CHANGES TO STAGE 2b, STAGE 3 & STAGE 4 ARISING FROM AMENDMENTS TO THE PUBLIC WORKS CONTRACTS 1. Introduction 1.1 Changes to Public Works Contracts (a)

More information

RIAI Agreement between Client and Architect for the Provision of Architectural Services Edition 1 (2014)

RIAI Agreement between Client and Architect for the Provision of Architectural Services Edition 1 (2014) RIAI Agreement between Client and Architect for the Provision of Architectural Services Edition 1 (2014) Note: In the event that the Architect is appointed as Assigned Certifier this is a separate agreement

More information

SECTION QUALITY REQUIREMENTS

SECTION QUALITY REQUIREMENTS SECTION 014000 - PART 1 - GENERAL 1.1 SUMMARY A. Defines SRP requirements for Contractor Quality Control and Owner Quality Assurance. As an Electric and Water Utility, SRP has many critical facilities.

More information

Board and Committee Charters. The Gruden Group Limited

Board and Committee Charters. The Gruden Group Limited Board and Committee Charters The Gruden Group Limited The Gruden Group Limited (Gruden) ABN 56 125 943 240 Approved by the Board on 26 May 2016 Board Charter In carrying out the responsibilities and powers

More information

E-lodgment Road Testing? Practical Completion Completion Validation + Micro issues.

E-lodgment Road Testing? Practical Completion Completion Validation + Micro issues. PROBLEMS PROBLEMS Role of Building Control and Resources? Registration of Builders How and When? Defects Insurance before 1 March 2014? E-lodgment Road Testing? Practical Completion Completion Validation

More information

RIAI Agreement between Client and Architect for Commercial Small Works Edition 1 ( 2014)

RIAI Agreement between Client and Architect for Commercial Small Works Edition 1 ( 2014) RIAI Agreement between Client and Architect for Commercial Small Works Edition 1 ( 2014) Note: In the event that the Architect is appointed as Assigned Certifier this is a separate agreement for which

More information

STRUCTURAL ENGINEER S SERVICES SCOPE

STRUCTURAL ENGINEER S SERVICES SCOPE ROYAL BOROUGH OF GREENWICH STRUCTURAL ENGINEER S SERVICES SCOPE WOOLWICH CREATIVE DISTRICT PROJECT status: R1 purpose: For information version: 1.0 date: 07/03/2016 1 This version Authored by: name: Nick

More information

Quality Assurance Manual

Quality Assurance Manual Quality Assurance Manual Current Electrical is committed to leading the market in satisfying customer needs by providing versatile and innovative electrical and control solutions We take pride in the ability

More information

GENERAL AND ORGANISATIONAL REQUIREMENTS

GENERAL AND ORGANISATIONAL REQUIREMENTS NBOG working document applicable for MDR and IVDR WD 2017-1 Draft list of documents to be submitted in the application for designation as a notified body under Regulation (EU) 2017/745 and Regulation (EU)

More information

Strengthened Regulations

Strengthened Regulations Building Regulations review Strengthened Regulations The Department of Environment, Land, Water and Planning has identified a number of changes to the Building Regulations to improve consumer protection

More information

Level 6 NVQ Diploma in Construction Site Management (Construction)

Level 6 NVQ Diploma in Construction Site Management (Construction) Level 6 NVQ Diploma in Construction Site Management (Construction) Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements

More information

Level 6 NVQ Diploma in Construction Site Management (Construction)

Level 6 NVQ Diploma in Construction Site Management (Construction) Level 6 NVQ Diploma in Construction Site Management (Construction) Qualification Specification ProQual 2014 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile

More information

Skill Set CPCSS00004 Provide Building Surveying Services for Residential Buildings up to Three Storeys

Skill Set CPCSS00004 Provide Building Surveying Services for Residential Buildings up to Three Storeys Skill Set CPCSS00004 Provide Building Surveying Services for Residential Buildings up to Three Storeys Candidate Coaching & RPL Pack 2018 Table of Contents Introduction... 3 What pathways are available

More information

Annex I: Summary of duty holders

Annex I: Summary of duty holders The Construction (Design and Management) Regulations 2007: Industry Guidance Annex I: Summary of duty holders Summary of key changes in CDM 2007 Regulations are re-ordered to group duties together by duty

More information

Deadline for documents submission June 11, 2009 before 12:00 hours (local time)

Deadline for documents submission June 11, 2009 before 12:00 hours (local time) United Nations Development Programme Date: 26 May 2009 Expression of Interest Pre-Qualification for Civil Works Ref: PRQ/KRT/09/001- R1 United Nations Development Programme (UNDP), Sudan office announces

More information

SENIOR PROJECT MANAGER

SENIOR PROJECT MANAGER POSITION Reports To; Direct Reports; Key Relationships; SENIOR PROJECT MANAGER Regional Construction Manager Site Managers, other staff allocated to assigned projects Project Directors, Clients, Consultants,

More information

ASI National Structural Steelwork Compliance Scheme. A Guide for Clients, Builders and Prime Contractors

ASI National Structural Steelwork Compliance Scheme. A Guide for Clients, Builders and Prime Contractors ASI National Structural Steelwork Compliance Scheme A Guide for Clients, Builders and Prime Contractors Version 2, 2017 USE OF THIS GUIDE This document is intended to be used by bodies responsible for

More information

TECHNICAL RELEASE TECH 05/14BL. Data Protection Handling information provided by clients

TECHNICAL RELEASE TECH 05/14BL. Data Protection Handling information provided by clients TECHNICAL RELEASE TECH 05/14BL Data Protection Handling information provided by clients ABOUT ICAEW ICAEW is a world leading professional membership organisation that promotes, develops and supports over

More information

Managing Contractors Policy (ratified by Full Governing Body 7 th July 2015)

Managing Contractors Policy (ratified by Full Governing Body 7 th July 2015) Alcester Academy To be the best that we can be Managing Contractors Policy (ratified by Full Governing Body 7 th July 2015) ALCESTER ACADEMY MANAGING CONTRACTORS POLICY REVIEW PROCEDURES The Managing Contractors

More information

Building Regulations and Fire Safety Procedural Guidance

Building Regulations and Fire Safety Procedural Guidance Building Regulations and Fire Safety Procedural Guidance General Introduction This guide has been prepared for any person with influence over the building s fire safety arrangements, which includes but

More information

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17 Quality Manual DRAFT Page 1 of 17 Document Acceptance and Release Notice This is Revision A1 of the East Coast Designer Builders Quality Manual. The Manual is a managed document. For identification of

More information

Corporate Policy and Procedure

Corporate Policy and Procedure Corporate Policy and Procedure POLICY CATEGORY AUTHORITY RELATED POLICIES APPROVED BY Safety Management When Outside Contractors are Retained (Contractor Safety Management Program) (the Policy ) Health

More information

11 AC Procurement and Management of Consultants

11 AC Procurement and Management of Consultants 11 AC Procurement and Management of Consultants Policy number: 11 AC Version 5.0 Approved by Name of author/originator Owner (director) Governing Body Date of approval July 2017 Date of last review June

More information

SPECIMEN. The Architect warrants that s/he is a Registered Architect and a Member of the RIAI.

SPECIMEN. The Architect warrants that s/he is a Registered Architect and a Member of the RIAI. Agreement between Client and Architect for Domestic Works Edition 2 (September 2016) Note: In the event that the Architect is appointed as Assigned Certifier there is a separate agreement for which there

More information

CONSTRUCTION MANAGER

CONSTRUCTION MANAGER The South African Council for the Project and Construction Management Professions CONSTRUCTION MANAGER IDENTIFICATION OF WORK AND SCOPE OF SERVICES FOR CONSTRUCTION MANAGERS REGISTERED IN TERMS OF THE

More information

BUILDING, RESOURCES AND MARKETS GROUP. Regulatory Charter. Building regulatory system

BUILDING, RESOURCES AND MARKETS GROUP. Regulatory Charter. Building regulatory system BUILDING, RESOURCES AND MARKETS GROUP Regulatory Charter Building regulatory system Context: regulatory charters Why have a regulatory charter? Government entities have stewardship obligations under the

More information

QSS 0 Products and Services without Bespoke Contracts.

QSS 0 Products and Services without Bespoke Contracts. QSS 0 Products and Services without Bespoke Contracts. Use: Typically Sub 50k processes without a bespoke contract. Amendment History Version Date Status V3 June 2018 Updated for 2018 deployment Contents

More information

Procurement Policy. (June 11, 2015)

Procurement Policy. (June 11, 2015) Procurement Policy (June 11, 2015) Table of Contents 1. PURPOSE AND OVERVIEW... 4 1.1. About MPAC... 4 1.2. Purpose... 4 1.3. Procurement Governance... 4 2. SCOPE AND APPLICATION... 4 2.1. Scope... 4 3.

More information

The Institute of Agricultural Management

The Institute of Agricultural Management The Institute of Agricultural Management Chartered Environmentalist Application Pack The Institute of Agricultural Management Portbury House Sheepway Portbury Nr Bristol BS20 7TE Rev 14 th Dec 2012 Rev

More information

QUALITY REQUIREMENTS

QUALITY REQUIREMENTS SECTION 014000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION QUALITY CONTROL

SECTION QUALITY CONTROL SECTION 01 45 00 QUALITY CONTROL PART 1 - GENERAL 1.1 DESCRIPTION This section specifies requirements for Contractor Quality Control (CQC) for Design-Bid-Build (DBB) or Design-Build (DB) construction projects.

More information

BRIEFING NOTE BUILDING MINISTERS FORUM- SHERGOLD & WEIR REPORT APRIL 2018

BRIEFING NOTE BUILDING MINISTERS FORUM- SHERGOLD & WEIR REPORT APRIL 2018 1. INTRODUCTION The Building Ministers Forum (BMF) comprises the Australian Government, State and Territory Ministers with responsibility for building and construction. In mid-2017 the BMF requested an

More information

REPUBLIC OF LITHUANIA LAW ON PUBLIC ADMINISTRATION. 17 June 1999 No VIII-1234 Vilnius. (As last amended on 3 June 2014 No XII-903)

REPUBLIC OF LITHUANIA LAW ON PUBLIC ADMINISTRATION. 17 June 1999 No VIII-1234 Vilnius. (As last amended on 3 June 2014 No XII-903) REPUBLIC OF LITHUANIA LAW ON PUBLIC ADMINISTRATION 17 June 1999 No VIII-1234 Vilnius (As last amended on 3 June 2014 No XII-903) CHAPTER I GENERAL PROVISIONS Article 1. Purpose of the Law This Law shall

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 014000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for quality assurance and quality control. B. Testing and inspecting services

More information

Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19

Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19 SRI Quality System Registrar Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19 Booklet Version 171122 Revision Date QP 4.0 Pre-Audit Registration Procedures 15 11/07/15 QP 5.0 On-Site Audit Procedure

More information

The Conveyancing Committee has been considering the implications for Solicitors of

The Conveyancing Committee has been considering the implications for Solicitors of The Conveyancing Committee has been considering the implications for Solicitors of the above Act and Regulations thereunder the main provisions of which come into effect on 1st June and 1st August next.

More information

Key to Disclosures Corporate Governance Council Principles and Recommendations

Key to Disclosures Corporate Governance Council Principles and Recommendations Rules 4.7.3 and 4.10.3 1 Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations Name of entity: Sayona Mining Limited ABN / ARBN: Financial year ended: 26 091 951 978

More information

BESCA CPS APPLICATION FOR REGISTRATION

BESCA CPS APPLICATION FOR REGISTRATION BESCA CPS APPLICATION FOR REGISTRATION BUSINESS Name: Public Limited Company Private Limited Company Partnership Sole Trader Other (Local Authority, Health Trust etc) Telephone: Principal Contact Name:

More information

Audit and Risk Management Committee Charter

Audit and Risk Management Committee Charter Audit and Risk Management Committee Charter This Charter sets out the role, responsibilities, structure and processes of the Audit and Risk Management Committee (Committee), which the Board of CI Resources

More information

RISK MANAGEMENT & AUDIT COMMITTEE CHARTER

RISK MANAGEMENT & AUDIT COMMITTEE CHARTER RISK MANAGEMENT & AUDIT COMMITTEE CHARTER August 2014 Energy Action Limited ABN 90 137 363 636 Contents 1 Introduction.3 2 Purpose 3 3 Authority 3 4 Composition 4 5 Meetings 4 5.1 Quorum & voting 4 5.2

More information

Board Charter Z Energy Limited

Board Charter Z Energy Limited Board Charter Z Energy Limited Z Energy Limited ( Z Energy ) is committed to the highest standards of corporate governance. This Board Charter ( Charter ) is the foundation document which sets out the

More information

CONTENTS. Quality Policy Statement. Managing Invitations to Tender. Rev 9

CONTENTS. Quality Policy Statement. Managing Invitations to Tender. Rev 9 QUALITY PLAN CONTENTS Section 1 Section 2 Section 3 Section 4 Section 5 Quality Policy Statement Quality System Managing Invitations to Tender Design and Drawings Contract Management Section 1 Quality

More information

CORPORATE GOVERNANCE STATEMENT

CORPORATE GOVERNANCE STATEMENT CORPORATE GOVERNANCE STATEMENT SOLID FOUNDATIONS FOR MANAGEMENT AND OVERSIGHT This statement outlines Icon Energy s Corporate Governance practices that were in place during the financial year. ROLE OF

More information

By-Law Finance and Risk Management Committee

By-Law Finance and Risk Management Committee By-Law Finance and Risk Management BY-LAW PURSUANT TO THE CONSITUTION OF THE ROYAL AUSTRALASIAN COLLEGE OF PHYSICIANS FOR THE ESTABLISHMENT AND MAINTENENACE OF A COMMITTEE OF THE COLLEGE TO BE KNOWN AS

More information

JK 1. RIBA stages JK START OF MAIN CONTRACT WORKS 1. DEFINITION 2. PURPOSE 3. PROCEDURE 3.1 PROJECT MANAGEMENT TEAM ROLE

JK 1. RIBA stages JK START OF MAIN CONTRACT WORKS 1. DEFINITION 2. PURPOSE 3. PROCEDURE 3.1 PROJECT MANAGEMENT TEAM ROLE THE UNIVERSITY of EDINBURGH Estates & Buildings ESTATE DEVELOPMENT ISSUE/REVISION JK 1 LAST MODIFIED 12 October 2011 DATE PRINTED RIBA stages JK JK 1 START OF MAIN CONTRACT WORKS 1. DEFINITION The Main

More information

CONSULTANCY POLICY Approved by Council 30 June 2011 (minor revisions 19 June 2012)

CONSULTANCY POLICY Approved by Council 30 June 2011 (minor revisions 19 June 2012) CONSULTANCY POLICY Approved by Council 30 June 2011 (minor revisions 19 June 2012) Equality and Diversity This Policy will be applied in a non-discriminatory way, irrespective of an employee s age, disability,

More information

PAYE (Employer) Compliance

PAYE (Employer) Compliance This should be read in conjunction with Tax and Duty Manual Part 42-05-06 Updated May 2018 1 Table of Contents 1. Introduction...4 2. The Income Tax (Employments) Regulations 2012...4 3. PAYE Regulation

More information

Building and renovating

Building and renovating Building and renovating Last updated: 20 November 2017 Summary This factsheet contains information about: the laws in Victoria on building and renovating the Victorian Building Authority owner-builders

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 4000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS

ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS CONSULTANT FEE SCHEDULE FOR LANDSCAPE ARCHITECTURAL CONSULTING SERVICES A GUIDELINE NOV 2008 TABLE OF CONTENTS Table Of Contents... 2 INTRODUCTION...

More information

LLOYDS BANKING GROUP AUDIT COMMITTEE TERMS OF REFERENCE (LLOYDS BANKING GROUP PLC, LLOYDS BANK PLC, BANK OF SCOTLAND PLC & HBOS PLC)

LLOYDS BANKING GROUP AUDIT COMMITTEE TERMS OF REFERENCE (LLOYDS BANKING GROUP PLC, LLOYDS BANK PLC, BANK OF SCOTLAND PLC & HBOS PLC) LLOYDS BANKING GROUP AUDIT COMMITTEE TERMS OF REFERENCE (LLOYDS BANKING GROUP PLC, LLOYDS BANK PLC, BANK OF SCOTLAND PLC & HBOS PLC) These terms of reference are the terms of reference for the Audit Committee

More information

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI - CoP 53.0 EHS Management During Construction Work Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude

More information

BALLYMUN REGENERATION LTD. INSTRUCTIONS TO TENDER FRAMEWORK AGREEMENT FOR PSDP CONSULTANT SERVICE

BALLYMUN REGENERATION LTD. INSTRUCTIONS TO TENDER FRAMEWORK AGREEMENT FOR PSDP CONSULTANT SERVICE BALLYMUN REGENERATION LTD. INSTRUCTIONS TO TENDER FRAMEWORK AGREEMENT FOR PSDP CONSULTANT SERVICE Issue Date: 12-08-07 Instructions to Tenderers Page 1 of 9 1. INTRODUCTION 1.1 Overview of BRL Ballymun

More information

MGD 001. Guidance Document for MCS 001. Version 1.0

MGD 001. Guidance Document for MCS 001. Version 1.0 MGD 001 Guidance Document for MCS 001 Version 1.0 This Microgeneration Installation Standard is the property of Department of Energy and Climate Change (DECC), 3 Whitehall Place, London,SW1A 2HH. DECC

More information

Microgeneration Installation Standard: MIS 3007

Microgeneration Installation Standard: MIS 3007 Microgeneration Installation Standard: MIS 3007 REQUIREMENTS FOR MCS CONTRACTORS UNDERTAKING THE DESIGN, SUPPLY, INSTALLATION, SET TO WORK, COMMISSIONING AND HANDOVER OF A HEATING SYSTEM CONTAINING A MICRO-COGENERATION

More information

Audit and Risk Committee Charter

Audit and Risk Committee Charter Audit and Risk Committee Charter This Charter sets out the role, responsibilities, structure and processes of the Audit and Risk Committee (Committee), established by the Board of Directors of Wesfarmers

More information

Conception Design Construction Operation.

Conception Design Construction Operation. 4 Development Process and Procurement 4.1 The development process by which the project moves from the earliest ideas to the final completion of the facilities and their use can be considered as having

More information

MCS 025. Installer Certification Scheme Competency Criteria Guidance. Issue 1.1

MCS 025. Installer Certification Scheme Competency Criteria Guidance. Issue 1.1 MCS 025 Installer Certification Scheme Competency Criteria Guidance Issue 1.1 This guidance is the property of Department of Energy and Climate Change (DECC), 3 Whitehall Place, London, SW1A 2AW. DECC

More information

COMPETENCE. Helicopter Landing Officer (HLO) Workplace Competence Assessment Standard

COMPETENCE. Helicopter Landing Officer (HLO) Workplace Competence Assessment Standard Helicopter Landing Officer (HLO) Workplace Competence Assessment Standard COMPETENCE HLO WORKPLACE COMPETENCE ASSESMENT Standard Title Code Helicopter Landing Officer (HLO) Workplace Competence Assessment

More information

APEC ENGINEER FRAMEWORK

APEC ENGINEER FRAMEWORK PART 1 APEC ENGINEER FRAMEWORK 1. Purpose The APEC Engineer Manual provides overall guidance to participating APEC economies for the operation of APEC Engineer Registers. The Manual includes a description

More information

CDM FAQ Sheet

CDM FAQ Sheet CDM 2015 - FAQ Sheet 1. The change to the regulations means Domestic works are now included. What if you are doing DIY in your own house? Do the regulations apply to this? If the home owner is doing the

More information

SECTION CONTRACTOR QUALITY CONTROL

SECTION CONTRACTOR QUALITY CONTROL SECTION 01451 CONTRACTOR QUALITY CONTROL PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

Capital Projects Group Mechanical Work Commissioning Specification

Capital Projects Group Mechanical Work Commissioning Specification Capital Projects Group Mechanical Work Commissioning Specification Specification 20 05 40 Revision 0 Date: August 2018 Mechanical Work Commissioning Specification Specification 20 05 40 Publication Date:

More information

Engaging Professional Consultants

Engaging Professional Consultants DEPARTMENT OF EDUCATION & SCIENCE Second Edition March 2009 Revision 2, 29 th April 2010 Planning & Building Unit Technical Guidance Document TGD-008 Engaging Professional Consultants for Devolved Grants

More information

CORPORATE GOVERNANCE CODE

CORPORATE GOVERNANCE CODE CORPORATE GOVERNANCE CODE 2014 1 Contents Foreword Chapter 1.Basis for corporate governance Chapter 2.Shareholders rights Chapter 3.Professional investors Chapter 4.Shareholders meeting Chapter 5.Board

More information

Facilities Planning and Construction (FP&C)

Facilities Planning and Construction (FP&C) Appendix 8.4a Facilities Planning and Construction (FP&C) UAA FP&C Quality Assessment Checklist (A) Project: PM: Project ID: Updated:

More information

Microgeneration Installation Standard: MIS 3007

Microgeneration Installation Standard: MIS 3007 Microgeneration Installation Standard: MIS 3007 REQUIREMENTS FOR CONTRACTORS UNDERTAKING THE DESIGN, SUPPLY, INSTALLATION, SET TO WORK, COMMISSIONING AND HANDOVER OF A HEATING SYSTEM CONTAINING A MICRO-COGENERATION

More information

CHAPTER AUXILIARY SERVICES. Prequalification of Contractors for Educational Facilities Construction 8.272

CHAPTER AUXILIARY SERVICES. Prequalification of Contractors for Educational Facilities Construction 8.272 Prequalification of Contractors for Educational Facilities Construction 8.272 The School Board shall prequalify contractors for a one (1) year period or for a specific project in accordance with the following:

More information

Audit report VET Quality Framework

Audit report VET Quality Framework The QCAA uses an exceptions-based model of reporting. This means that the QCAA will only record a comprehensive description of evidence gathered and compliance findings if noncompliance is identified at

More information

Project Management Rail Safety Worker Competence

Project Management Rail Safety Worker Competence Discipline: HR08-004 Contents Discipline: People, Culture and Development Category: Procedure Project Management Rail Safety Worker Competence HR08-004 Applicability ARTC Network Wide Interstate Network

More information

ROYAL DUTCH SHELL PLC AUDIT COMMITTEE TERMS OF REFERENCE

ROYAL DUTCH SHELL PLC AUDIT COMMITTEE TERMS OF REFERENCE ROYAL DUTCH SHELL PLC AUDIT COMMITTEE TERMS OF REFERENCE Purpose The Royal Dutch Shell plc (the Company ) Audit Committee (the Committee ) assists the Board of the Company (the Board ) in fulfilling its

More information

Collaborative Arrangements

Collaborative Arrangements Collaborative Arrangements Checklist Author: Helen Edwards Date: 27/02/2014 1. Introduction Collaborative arrangements are defined by the QAA as learning opportunities leading or contributing to the award

More information

Chapter 2 Parties to the Contract

Chapter 2 Parties to the Contract Chapter 2 Parties to the Contract 2.1 Introduction Construction work may include building of a new structure, additions, alterations, expansion, replacement, dismantling, erection, commissioning, rehabilitation,

More information

BOARD AUDIT COMMITTEE TERMS OF REFERENCE

BOARD AUDIT COMMITTEE TERMS OF REFERENCE Appendix 9 BOARD AUDIT COMMITTEE TERMS OF REFERENCE October 2016 TABLE OF CONTENTS A. AUTHORITY...3 B. ROLE OF THE COMMITTEE...4 C. COMMITTEE COMPOSITION...4 D. COMMITTEE MEETINGS...5 E. RESPONSIBILITIES...7

More information

Audit, Risk and Compliance Committee Terms of Reference. Atlas Mara Limited. (The "COMPANY") Amendments approved by the Board on 22 March 2016

Audit, Risk and Compliance Committee Terms of Reference. Atlas Mara Limited. (The COMPANY) Amendments approved by the Board on 22 March 2016 Audit, Risk and Compliance Committee Terms of Reference Atlas Mara Limited (The "COMPANY") Amendments approved by the Board on 22 March 2016 1. OVERVIEW 1.1 The primary objective of the committee is to

More information