SSI Tube 1000 Complete Aeration System Specification
|
|
- Maximilian Young
- 5 years ago
- Views:
Transcription
1 Stamford Scientific International, Inc. 4 Tucker Drive Poughkeepsie, N.Y U.S.A. Tel: Fax: info@stamfordscientific.com Scope: SSI Tube 1000 Complete Aeration System Specification Furnish all materials and equipment for a fine bubble membrane tube aeration system, beginning with a Van Stone flange and a 90 degree stainless steel elbow, and including all pre-engineered and pre-fabricated stainless steel and PVC piping within the tank, all fine bubble diffusers and accessories required to connect diffusers to pipe, as well 304L SS support stands, 304L SS shell expansion joints with PVC liners, and a moisture purge system for each piping grid Submittals: Sumbit the following information to establish compliance with the specifications A. Submittal detail drawing showing plan, elevation and appropriate cross section of the aeration equipment and anchor locations. In addition, these drawings shall show all pipe sizes and lengths, distances between air distribution headers, and the location of all diffusers, plugs, supports, and expansion joints. B. Complete headloss calculations for the aeration equipment from the manufacturer s point of responsibility. Headloss calculations should be derived using air at standard conditions and at a design maximum airflow rate per diffuser. C. Operation & maintenance manual and installation instructions to be submitted after the aeration equipment has been released for fabrication by the Owner System Performance and Design A. Type of tanks: B. Quantity of tanks: C. Passes Each: D. Dimensions/Pass:
2 Length: Width: Water Depth: Average Design Flow Per basin: E. Waste Characteristics Monthly average BOD: Monthly average NH3-N: Monthly average TKN: Average MLSS: F. Plant Effluent Requirements Monthly average BOD: Monthly average NH3-N: G. Design Conditions/Parameters Lbs BOD/Lb BOD: Lbs O2/Lb NH3-N: Alpha factor: Beta factor: Theta factor: MLSS Residual O2 required: Water Temp: Ambient Press: AOR: SOR: Total air required: Diffuser submergence: H. Diffuser Grid Configuration Design and furnish the membrane tube aeration system to transfer the following pounds of oxygen per day per tank in tap water at 14.7 PSIA, 20 C, zero dissolved oxygen, and a diffuser submergence of feet/meters (circle one) Furnish the following minimum quantity of SSI Tube 1000 diffuser units in each tank as follows: Diffusers Total per tank Oxygen (Oxygen/Day/Tank Clearwater) Lb or Kg (circle one) Air Rate (Per Tank) SCFM or Nm3/hr (circle one) I. Factory Oxygen Test
3 Provide clean water performance test data to demonstrate capacity of equipment to meet specified oxygen transfer requirements. The tests shall be approved by a Professional Engineer. The tests must be in accordance with the latest ASCE Clean Water Test Procedure The testing should be conducted in a tank having a surface area greater than 200 sq ft/18.4 sq meters to eliminate the potential of wall effects. Testing shall be conducted at the specific submergence and diffuser density equivalent to the actual project tank configuration, or a coefficient should be applied to allow the use of the bank of existing factory tests. Submit test data for approval by Owner prior to equipment shipment. Part 2.00 Products 2.01 Acceptable Manufacturers A. Stamford Scientific International, Inc. B. In the event that a manufacturer elects to bid an air diffuser system that does not comply with the specifications, then the manufacturer shall submit with the shop drawings a maintenance bond executed by an Officer of the Corporation in the amount of 150% of the bid price, guaranteeing repair or replacement of the air diffusion system in the event of a failure for a period of three years after installation. The Owner will, at its sole option, make the necessary repairs or replacement and deduct the costs from the aforementioned bond of the manufacturer Stainless Steel Materials and Fabrication: A. Fabricate all welded parts and assemblies from sheets and plates of 304L stainless steel. Fabricate non-welded parts and pieces from sheets and plates of 304L stainless steel. B. Pickle all stainless steel assemblies and parts after welding, fabrication and wire brushing by complete immersion in an acid solution as specified in ASTMA The acid shall be a nitric-hydrofluoric solution as defined in Table A2.1, Annex A2 of ASTM A380. Providing a final rinse using ordinary industrial or potable water and dry in conformance with Section 8.3 of ASTM A380. Corrosion protection techniques not employing full immersion methods are not acceptable.
4 C. Do all welding in the factory using MIG, TIG or plasma-arc welding inert gas processes. Field welding is not permitted PVC Materials and Fabrication A. Produce all PVC pipe and fittings from PVC compound with a minimum tensile strength of 7000 PSI. B. Provide lower drop pipes, manifold pipes and header pipes with a minimum of Sch 40 wall thickness. SDR sewer pipe is not acceptable for any in-tank piping. C. Factory solvent-weld all PVC joints. Field solvent welding is not permitted. D. Headers to terminate in removable end caps, to facilitate water flushing of the piping before installation of diffusers. E. One PVC drain line sump with airlift purge ejector line and eductor carrier column to be provided to drain the submerged aeration piping system. System to include one ball valve Membrane Aeration System Equipment Components A. Provide expansion joints with 304L SS shell and PVC liners. Minimum of 4 slotted bands with stainless steel screws to be used. B. Provide support stands, which include hold-down, guide straps, anchor bolts, and supporting structure. Guide straps shall be a minimum of 2 wide. Supports to have a mechanism to provide for +/- 2 vertical adjustment for alignment of the manifold in the field. Supports shall be designed to allow for complete removal from the tank (less anchor bolt) to enable cleaning and maintenance of tank bottom. C. Guide supports to consist of a self-limiting hold down and sliding mechanism. Hold down and sliding mechanism shall provide a full circumferential 2 wide contoured bearing surface with chamfered leading edges to minimize binding of the air distribution header. Sliding mechanism shall provide minimum resistance to movement of the air distribution header under full buoyant up-lit load. Mechanism to provide 1/8 clearance around header and be self-limiting if the mechanism is overtightened. Worm gear clamps are not to be utilized for attaching header pipe to supports, and U-bolts are not acceptable. D. Fixed supports to consist of a self-limiting hold down and sliding mechanism. Hold down and sliding mechanism shall provide a full circumferential 2 wide contoured bearing surface. Clamping device shall positively grip the air distribution header when tight and be self limiting to prevent overstressing the header if the clamp is overtightened. Worm gear clamps are not to be utilized for attaching header pipe to supports, and U-bolts are not acceptable. E. Aligning and adjusting shall be infinitely adjustable within its limits to allow precise leveling of the air distribution headers and
5 diffuser assemblies to within 1/2 /12mm of a common horizontal plane without removing the header from the support. F. Attach supports to tank floor with a minimum of two stainless steel expansion type anchor bolts or Hilte type chemical anchors designed for embedment in 3000 PSI concrete. Supports which utilize only one anchor bolt or one chemical anchor, or which are made of plastic are not acceptable Diffuser assemblies A. Furnish tube type 3.7 (94mm) or 2.5 (65mm) dia membrane diffusers only. Disc or square panel type diffusers are not acceptable. B. Diffuser to consist of a premium quality membrane sleeve with perforated base, SSI Super Saddle with quick connect wedge type saddle, and air flow control orifice.. Diffusers with ceramic or plastic type diffusion media elements are not acceptable as alternatives to the membrane. Diffusers that require a center bolt are not acceptable. C. Membrane material to be premium quality extruded EPDM with an oil content of less than 15%. Maximum tolerance of membrane wall thickness is +/- 0.2 mm. Inside diameter should be +/- 1 mm and membrane length to +/- 5mm. D. Membrane shall collapse and seal when aeration system air is turned off. Membrane shall collapse onto base when air is not being diffused. Design should permit air to exit through the entire periphery of the membrane. Membrane shall be designed to resist clogging, and should have 1mm or 2mm straight slits with no I type slits. Membrane to be at least 70% hydrophilic. Characteristics follow: Tensile strength 1850 PSI Tear strength 90 Lb/linear inch Ozone resistance Pass UV resistance Pass Durometer 45 Ultimate elongation 650% E. Diffuser saddle to be constructed of high strength type 2 PVC with carbon black to prevent UV degradation. Base tube to be constructed of PVC with 2% TiO2. Plastics that do not utilize UV protection shall not be acceptable. Saddle is adjustable and should be leveled upon installation to ensure that diffusers are within 1/2 /12mm on a common horizontal plane. Saddle is designed to fit over Imperial 4 pipe (4.5 /114.3mm OD) or Metric 110mm OD pipe. Saddle to accept 3.7 (93mm) or 2.5 (64mm) diameter tubular diffuser branches. One diffuser to be
6 installed per side up to a maximum length of 47 /1200 mm per diffuser. F. Diffuser is designed to prevent air escape at the support tube perforations. Unperforated strips on the membrane accomplish this. G. Diffuser is designed for neutral to minimum buoyancy with a proprietary internal pipe plug. Diffusers utilizing end plugs shall not be acceptable Warranty A. Warrant all parts to be free from defects in material and workmanship for a period of one year after installation. Furnish replacement parts to the Owner for any items to be found to be defective within the one year warranty period.
SECTION 1137X FINE BUBBLE DIFFUSER SYSTEM PTFE MEMBRANE
SECTION 1137X FINE BUBBLE DIFFUSER SYSTEM PTFE MEMBRANE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish and install, complete and ready to operate, a flexible membrane fine bubble
More informationDiffused Aeration Piping Equipment
1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections
More informationStainless Steel Aeration Equipment Specification
Section 15 Stainless Steel Aeration Equipment Specification Part 1 - General 1.01 Description A. Scope of Work 1. Furnish, install and test aeration system including air mains, drop pipes, valves, expansion
More informationNORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS
PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment
More informationSECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM
Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING
More informationWater & Industrial Products Catalog
Water & Industrial Products Catalog www.smith-blair.com info@smith-blair.com Phone: 800..9705 or 870.77.527 After Hours Number: 90.277.998 Fax: 800.8.792 or 870.77.52 EMERGENCY PHONE 90.277.998 In the
More informationSECTION 8130 XR-3-PW FABRIC BAFFLE WALL SPECIFICATION
SECTION 8130 XR-3-PW FABRIC BAFFLE WALL SPECIFICATION PART 1 GENERAL 1.01 WORK INCLUDED 1.01.1 This specification covers the design, fabrication, and erection of tension-fabric baffle systems composed
More informationSECTION MECHANICALLY ASSISTED MOBILE STORAGE SHELVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 10560 MECHANICALLY ASSISTED MOBILE STORAGE SHELVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationSECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS
Page 1 of 6 SECTION 08 32 20 EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More informationSECTION PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION
Awning Works Inc Aluminum Decking Walkway Cover Specification CSI- Division 10 SECTION 10530 PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION PART 1 GENERAL 1.01 DESCRIPTION OF WORK
More informationSPECIFICATIONS FOR HONEYCOMB INTERNAL FLOATING ROOFS
PETREX SPECIFICATIONS FOR HONEYCOMB INTERNAL FLOATING ROOFS APPLICATION: REGULAR HYDROCARBONS SCOPE The roof shall be full-surface contact type designed to eliminate the presence of air-vapor mixture under
More informationTECHNICAL SPECIFICATION
TECHNICAL SPECIFICATION ITEM 00437 ELASTOMERIC MATERIALS 437.1 Description. This item shall govern for the materials, testing, fabrication and placement of elastomeric materials, except as otherwise covered
More informationSECTION TAPPING SLEEVES AND VALVES
SECTION 33 12 16.17 TAPPING SLEEVES AND VALVES PART 1: GENERAL 1.01 SCOPE Furnish, install and test all tapping sleeves, tapping valves, and tapping saddles as shown on the Drawings. 1.02 RELATED WORK
More informationSECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS
SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.
More informationSECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS
SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances
More informationADDENDUM No. 1 November 11, 2013
SAN ANTONIO WATER SYSTEM DOS RIOS WRC FIRST STAGE DIFFUSER REPLACEMENT SAWS Job No. 13-6502 SAWS Solicitation No. B-13-075-MF To Bidder of Record: ADDENDUM No. 1 November 11, 2013 This addendum, applicable
More informationUniversity of Delaware
University Contact: Energy & Engineering Group (302) 831-1744 SECTION 22 14 00 _STORM WATER PIPING SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Storm water piping 2. Roof drains. 3. Area
More informationSECTION CHAIN LINK FENCES AND GATES (PARK)
SECTION 02821 CHAIN LINK FENCES AND GATES (PARK) PART I GENERAL 1.1 SECTION INCLUDES A. Installation of chain link fences, and gate units provided by single source including erection accessories, fittings,
More informationSECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS
Page 1 of 6 SECTION 08 32 20 CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS [OR WOOD] PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More information1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans.
INC. ENGINEERING/CONSTRUCTION/MANUFACTURING /WWW.CONTAINWATER.COM SPRINGS, TEXAS. 78620 MODEL SPECIFICATION FOR CONTAIN WATER INC. 30 DEGREE ROOF CORRUGATED STEEL WATER STORAGE Part 1 GENERAL 1.01 SECTION
More information1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans.
INC. ENGINEERING/CONSTRUCTION/MANUFACTURING /WWW.CONTAINWATER.COM SPRINGS, TEXAS. 78620 MODEL SPECIFICATION FOR CONTAIN WATER INC. DOME ROOF CORRUGATED STEEL WATER STORAGE TANKS. Part 1 GENERAL 1.01 SECTION
More informationAddendum #4 NEW LOW HEAD OXYGEN SYSTEM Contractor EXHIBIT T SPECIAL PROVISIONS SECTION METAL SHADE STRUCTURE
SECTION 13 34 00 METAL SHADE STRUCTURE PART 1 - GENERAL 1.01 STRUCTURE TYPE A. Structure shall be free standing rigid frame and gable roof with slopes as indicated. Structure shall also include foundation,
More informationSECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION
SECTION 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 - GENERAL 1.1 SUMMARY A. This section supplements all sections in this division, including pipe, fittings, valves, and connections for sprinkler
More informationAERATION SYSTEM with aeration diffusers EDI
AERATION SYSTEM with aeration diffusers EDI EDI FlexAir ISM Disc With Integral Saddle Mount The FlexAir disc diffuser provils unmatched mechanical strength, operating flexibility and oxygen transfer efficiency.
More informationSPECIFICATION FOR PERMANENT BEAM GRANDSTAND WITH INTERLOCK WELDED DECK SYSTEM
E & D SPECIALTY STANDS, INC. MANUFACTURERS OF QUALITY STANDS AND SEATING 2081 FRANKLIN STREET - P.O. BOX 700 - NORTH COLLINS, NEW YORK 14111 716-337-0161-1-800-525-8515 FAX 716-337-2903 - SALES FAX 716-337-3436
More informationSECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports.
SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Handrails and guardrails B. Guardrails for hatches and openings. C. Safety barriers. D. Roof edge protection. 1.2 RELATED SECTIONS
More informationSECTION PUBLIC WATER SERVICE CONNECTIONS
SECTION 33 14 14 PUBLIC WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for water service connections to small commercial, light industrial, and residential
More informationSECTION ALUMINUM GATES
P.O. Box 1058 370 South Athol Rd. Athol, Massachusetts 01331 Phone: (978) 249-7924 Fax: (978) 249-3072 SECTION ALUMINUM GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The CONTRACTOR shall furnish all labor,
More informationSECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS
SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More informationSECTION ALUMINUM HANDRAIL SYSTEMS
SECTION 05520 ALUMINUM HANDRAIL SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes aluminum handrails and railings. B. Related Work: 1. Section 03300 - Cast-in-Place Concrete C. References: 1. American
More informationPVC. System Specifications TABLE 1 TABLE 2
TRICON PVC TABLE 1 Pipe Size Minimum Insulation Thickness PVC Jacket O.D. PVC Jacket Wall 2 1.81 6.14.070 3 1.25 6.14.070 4 1.75 8.16.080 6 1.69 10.20.100 8 1.69 12.24.120 10 1.65 14.32.140 12 1.47 16.00.160
More informationTRICON DOUBLE-CON PLUS
TRICON DOUBLE-CON PLUS System Specifications Iron Pipe Size Steel Conduit O.D. Steel Conduit Wall Outer Insulation (IN)* Alum./Stainless/Galv. Jacket O.D. (IN) Metal Jacket Wall Thickness 1 4.50.120 1.75
More informationSECTION RETRIEVABLE FINE BUBBLE DIFFUSER SYSTEMS
SECTION 11350 RETRIEVABLE FINE BUBBLE DIFFUSER SYSTEMS PART 1 GENERAL 1.1 SECTION INCLUDES This section includes the design, manufacture, installation and start-up requirements for the fine bubble diffuser
More informationSECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT
SECTION 11322 MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT PART 1 GENERAL 1.01 SCOPE There shall be furnished ( ) Grit Separator Mechanism(s) suitable for installation in (a) concrete tank(s) -ft.
More informationSECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS
Page 1 of 6 SECTION 08 32 20 HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED BI-FOLD GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More informationSECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING
7160 Krick Rd., Walton Hills, OH 44146 800-321-3827 - Tel 440-439-8650 - Fax 440-439-6889 SECTION 12 48 16 ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING PART 1. GENERAL 1.01 SUMMARY: This section includes
More informationSECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system.
SECTION 08625 METAL FRAMED SKYLIGHT PART 1 GENERAL 1.01 SECTION INCLUDES: A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. B. Fabrication
More informationSECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING
7160 Krick Rd., Walton Hills, OH 44146 800-321-3827 - Tel 440-439-8650 - Fax 440-439-6889 SECTION 12 48 16 ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING PART 1. GENERAL 1.01 SUMMARY: This section includes
More informationSECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE
SECTION 02622 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE PART 1 - GENERAL 1.1 SCOPE A. The work covered by this section includes furnishing all labor, equipment, and materials required to install and test
More informationSuperior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing
The following specification has been developed by: Superior Aluminum Products 555 East Main Street Russia, Ohio 45363-0430 to assist Architects and Designers in the specification of Non Welded Concealed
More informationSpecifications for Concrete Embedment Liner
Specifications for Concrete Embedment Liner Part 1: GENERAL 1.01 SECTION INCLUDES A. Specifications and guidelines for MANUFACTURING high-density polyethylene embedment liners. 1.02 REFERENCES A. American
More informationUniversity of Delaware
University Contact: Energy & Engineering Group (302) 831-1744 SECTION 22 13 00 _SANITARY SEWER PIPING SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Sanitary sewer piping buried 2. Sanitary
More informationAll definitions are defined according to ANSI/AWWA C
SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR REDUCED-WALL, RESILIENT-SEATED GATE AND TAPPING VALVES FOR WATER SUPPLY SERVICE 4 IN. THROUGH 48 IN. ANSI/AWWA C515-01 July 2017 1. SCOPE This product specification
More informationSECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES
SECTION 05440- PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section includes pre-engineered, pre-fabricated cold formed steel framing elements. Work includes:
More informationJet Aeration Systems
Jet Aeration Systems KLa Systems Since 2001 a Systems has supplied innovative jet aeration and jet mixing systems for industry, water utilities and municipalities around the world. Our industrial customers
More informationWALL CANTILEVER WORK STATION JIB CRANE
SECTION 14662 WALL CANTILEVER WORK STATION JIB CRANE ***** Gorbel, Inc. manufactures a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station
More informationDIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.
PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe and equipment support systems. B. Inserts. 1.02 RELATED SECTIONS A. Section 15890 - Ductwork Supports. 1.03 DEFINITIONS A. Supports: Attachments, hangers,
More informationSECTION ROOF EDGE SAFETY RAILING SYSTEM
SECTION 07720 ROOF EDGE SAFETY RAILING SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. Provide and install freestanding KeeGuard Roof Edge Protection System, including pipe railings, uprights, bases, counterweights,
More informationSECTION ROOF SPECIALTIES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 71 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping
SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of
More informationSeries 2000PV Mechanical Joint Restraint for PVC Pipe
Series 2000PV Mechanical Joint Restraint for PVC Pipe Features and Applications: For restraining plain end PVC pipe at mechanical joint fittings and appurtenances Sizes 3 inch through 36 inch Sizes 42
More informationSoundmaster & Modernfold TECHNICAL DATA
This specification along with product information and model details can be downloaded from www.modernfold.com SPECIFICATION - SECTION 08 35 13 ACCORDION FOLDING DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS
More informationIce Rink Renovation & New Clubhouse
SECTION 331213 - WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for domestic water service connections to buildings. 2. Corporation stop assembly. 3. Curb
More informationSECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.
SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Welded stainless steel railing systems. 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete; coordination with substrate.
More informationT TABLE OF CONTENTS SPUNWRAP COLLAR
T TABLE OF CONTENTS SPUNWRAP COLLAR Underslab Air Duct with SpunWrap Collar Specification 2 SpunWrap Collar Installation Instructions 3 Physical Data for SpunWrap Collars 5 SpunWrap Field Installation
More informationHYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS
HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS PART 1 - GENERAL WORK INCLUDED A. Provide all equipment and materials, and do all work necessary to construct a HydroGrid subsurface irrigated fastdry
More informationTrex Commercial Products page Metal Railing
SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Classic Railings (Picket). B. GridGuard Railings (Mesh). C. Post Rail (Glass). D. Tensiline Railings (Cable). E. Track Rail (Glass).
More informationSECTION WALL AND DOOR PROTECTION
PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 10 26 00 WALL AND DOOR PROTECTION SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable to
More informationFIBERGLASS ROUND CONTROL DAMPERS. Model K-RD INTRODUCTION M.K. PLASTICS PROVIDES FOUR DAMPER MODELS K-RD SUGGESTED SPECIFICATION
INTRODUCTION The M.K. Plastics series K-RD are manufactured to meet the needs of the odor control and corrosive HVAC industries by providing a corrosion-resistant FRP Damper that is used to regulate an
More informationSECTION HANDRAILS AND RAILINGS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES Display hidden notes to specifier. (Don't know how? Click Here) A. Classic Railings (Picket). B. GridGuard Railings (Mesh). C. Post
More informationSECTION SLUICE GATES
SECTION 11100 SLUICE GATES PART 1--GENERAL Fill in the blank with a short description of sluice gate usage, i.e., for isolation of wastewater, or for tank drainage, or for control of water surface. 1.01
More informationSECTION STRUCTURAL METAL FRAMING
SECTION 05100 STRUCTURAL METAL FRAMING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Structural steel framing including lintels, shelf angles, bearing plates, anchor bolts and other items as shown on
More informationSECTION MANUFACTURED ROOF EXPANSION JOINTS
SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More information11001 Moving Bed Biofilm Reactor
Shop Drawing Submittal 11001 Moving Bed Biofilm Reactor for Pender Commerce Park Wastewater Treatment Plant Phase 2 Final Design Issued for Bids EDA Award Number 04-01-06919 Volume 3 of 8 Prepared for
More informationSmarter. Safer. Leaner.
Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter
More information10331 Date Street Murrieta, CA SECTION HYBRID LAMINATE LOCKERS W/ PHENOLIC DOORS
09/20/2017 10331 Date Street Murrieta, CA 92562 info@foremanproducts.com 951-677-1955 SECTION 10 5130 HYBRID LAMINATE LOCKERS W/ PHENOLIC DOORS PART 1 GENERAL Specifier Notes: This product specification
More informationDRAINS: & , S COMMERCIAL. Drains: Bath, Shower & Commercial
DRAINS: BATH,, SHOWER &, S COMMERCIAL SHOWER DRAINS GENERAL PURPOSE DRAINS FIT-FLUSH CLEAN-OUTS BATH WASTES BATH WASTES KITS/PARTS/COMPONENTS BATH DRAIN BODIES/ASSEMBLIES BATH DRAIN KITS/PARTS/COMPONENTS
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB #
SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationSECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of work
More informationSANDBORN INTERNAL FLOATING ROOF SPECIFICATION
1. GENERAL SANDBORN INTERNAL FLOATING ROOF SPECIFICATION This specification defines the minimum requirements for the design, materials, fabrication, inspection, testing and documentation of a Sandborn
More informationSECTION ORCHESTRA PIT FILLER
PART 1 - GENERAL 1.1 SECTION INCLUDES A. Orchestra pit filler. 1.2 REFERENCES SECTION 11 61 00 ORCHESTRA PIT FILLER A. American Hardboard Association (AHA): 1. AHA A135.4-95: Basic Hardboard. B. American
More informationSERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651
SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows
More informationSECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection
SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION
More informationITEM 435 ELASTOMERIC MATERIALS
ITEM 4 ELASTOMERIC MATERIALS 4.1. Description. This Item shall govern for the furnishing and installation of elastomeric materials in accordance with the details shown on the plans and the requirements
More informationSECTION POLYVINYL CHLORIDE (PVC) WATERLINE
SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,
More informationSECTION ROLLER GATES
GENERAL SUMMARY A. The Contractor shall provide all labor, materials, equipment, and incidentals required to furnish and install roller gates, complete and operational with all necessary accessories as
More informationSECTION ORNAMENTAL ALUMINUM FENCING
SECTION 032300 ORNAMENTAL ALUMINUM FENCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationAll definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10.
21-02 SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR RESILIENT-SEATED GATE AND TAPPING VALVES FOR WATER SUPPLY SERVICE ANSI/AWWA C509-01 3 IN., 4 IN., 6 IN., 8 IN., 10 IN., 12 IN., 16 IN., & 20 IN. Revised
More informationCALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No ADDENDUM 2
CALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No. 11078 ADDENDUM 2 Date Issued: December 2, 2015 **** Receipt of addenda must be acknowledged
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018
SECTION 08 1119 - STAINLESS STEEL DOOR AND FRAMES GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationPRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B
SECTION 05 5213 - PIPE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSECTION CHAIN LINK FENCES AND GATES
SECTION 32 31 13 CHAIN LINK FENCES AND GATES SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section in specifying permanent chain
More informationSECTION ORNAMENTAL ALUMINUM RAILING
SECTION 05730 ORNAMENTAL ALUMINUM RAILING PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Pipe Railing 1.2 RELATED SECTIONS A. Section 03300 Cast-In-Place Concrete: Placement of sleeves cast in concrete.
More informationSECTION EXPANSION CONTROL
SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationSECTION CONCRETE FORMWORK AND ACCESSORIES
SECTION 03100 CONCRETE FORMWORK AND ACCESSORIES Part 1 GENERAL 1.01 SUMMARY A. Furnish equipment, materials, and labor required for construction and removal of forms for the containment of concrete to
More informationGLASSWALL SPECIFICATIONS
GLASSWALL SPECIFICATIONS Series GL1 Individual, Glass Panels PRODUCT OVERVIEW: Top Supported Side Stack Individual, Omni-Directional Panels Manually Operated Maximum Opening Height: 10' 5 [.m] Maximum
More informationSUBSTITUTION REQUEST (After the Bidding/Negotiating Phase)
SUBSTITUTION REQUEST (After the Bidding/Negotiating Phase) Project: Substitution Request Number: From: To: Date: A/E Project Number: Re: Contract For: Specification Title: Section: Page: Description: Article/Paragraph:
More informationSECTION WELDED STEEL WATER STORAGE TANKS
SECTION 33 16 20 WELDED STEEL WATER STORAGE TANKS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Elevated tanks. 2. Appurtenances and accessories. B. Related Sections: 1. Section 03 31 20 - Concrete
More informationThis guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.
GORBEL PRODUCT SPECIFICATIONS 2010 Gorbel, Inc., P.O., Box 593, Fisher, New York 14453-0593 PHONE: 800-821-0086, FAX: 585-924-6273; WEBSITE: www.gorbel.com November SECTION 41 22 31PRIVATE FREE STANDING
More informationRB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION
GENERAL DESCRIPTION The Orbinox model RB Weir Gate is designed for downward opening applications where a more accurate flow control is required. The water flows over the top of the slide permitting a constant
More informationSTRUCTURAL STEEL FRAMING
SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical
More informationSECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION
Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationEssex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More information1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.
PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More informationSECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System
SECTION 05720 ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System PART 1 GENERAL 1.01 WORK INCLUDED A. Furnish and/or install supported glass stainless steel railings, glass
More information40'-0" PIPE SUPPORT (TYP.) (SEE DWG. NO. SK-2 OR DWG. NO. SK-4)
SK-1 STANDARD LENGTH 4.301 40'-0" A 6" 2'-0" 9'-0" 9'-0" 9'-0" 9'-0" 2'-0" A 3" OF EXPOSED AT EACH END OF PIPE. PIPE SUPPORT (TYP.) (SEE DWG. NO. SK-2 OR DWG. NO. SK-4) EXPOSED PIPE MINIMUM GAUGE AND THICKNESS
More informationMulti-Institutional Academic Health Science & Research Center Evansville, IN
SECTION 05 5117 ALTERNATING TREAD STEEL STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSPECIAL SPECIFICATION 6623 Multi-Duct Conduit System
2004 Specifications Houston District SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System 1. Description. Furnish and place a Multi-Duct Conduit (MDC) system that is suitable for installation in an outdoor
More informationSECTION SLUDGE HOLDING TANK DEWATERING
SECTION 13215 SLUDGE HOLDING TANK DEWATERING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Dewatering and cleaning of sludge holding tank and sludge disposal. Contractor shall pay for all sludge removal,
More information