SSI Tube 1000 Complete Aeration System Specification

Size: px
Start display at page:

Download "SSI Tube 1000 Complete Aeration System Specification"

Transcription

1 Stamford Scientific International, Inc. 4 Tucker Drive Poughkeepsie, N.Y U.S.A. Tel: Fax: info@stamfordscientific.com Scope: SSI Tube 1000 Complete Aeration System Specification Furnish all materials and equipment for a fine bubble membrane tube aeration system, beginning with a Van Stone flange and a 90 degree stainless steel elbow, and including all pre-engineered and pre-fabricated stainless steel and PVC piping within the tank, all fine bubble diffusers and accessories required to connect diffusers to pipe, as well 304L SS support stands, 304L SS shell expansion joints with PVC liners, and a moisture purge system for each piping grid Submittals: Sumbit the following information to establish compliance with the specifications A. Submittal detail drawing showing plan, elevation and appropriate cross section of the aeration equipment and anchor locations. In addition, these drawings shall show all pipe sizes and lengths, distances between air distribution headers, and the location of all diffusers, plugs, supports, and expansion joints. B. Complete headloss calculations for the aeration equipment from the manufacturer s point of responsibility. Headloss calculations should be derived using air at standard conditions and at a design maximum airflow rate per diffuser. C. Operation & maintenance manual and installation instructions to be submitted after the aeration equipment has been released for fabrication by the Owner System Performance and Design A. Type of tanks: B. Quantity of tanks: C. Passes Each: D. Dimensions/Pass:

2 Length: Width: Water Depth: Average Design Flow Per basin: E. Waste Characteristics Monthly average BOD: Monthly average NH3-N: Monthly average TKN: Average MLSS: F. Plant Effluent Requirements Monthly average BOD: Monthly average NH3-N: G. Design Conditions/Parameters Lbs BOD/Lb BOD: Lbs O2/Lb NH3-N: Alpha factor: Beta factor: Theta factor: MLSS Residual O2 required: Water Temp: Ambient Press: AOR: SOR: Total air required: Diffuser submergence: H. Diffuser Grid Configuration Design and furnish the membrane tube aeration system to transfer the following pounds of oxygen per day per tank in tap water at 14.7 PSIA, 20 C, zero dissolved oxygen, and a diffuser submergence of feet/meters (circle one) Furnish the following minimum quantity of SSI Tube 1000 diffuser units in each tank as follows: Diffusers Total per tank Oxygen (Oxygen/Day/Tank Clearwater) Lb or Kg (circle one) Air Rate (Per Tank) SCFM or Nm3/hr (circle one) I. Factory Oxygen Test

3 Provide clean water performance test data to demonstrate capacity of equipment to meet specified oxygen transfer requirements. The tests shall be approved by a Professional Engineer. The tests must be in accordance with the latest ASCE Clean Water Test Procedure The testing should be conducted in a tank having a surface area greater than 200 sq ft/18.4 sq meters to eliminate the potential of wall effects. Testing shall be conducted at the specific submergence and diffuser density equivalent to the actual project tank configuration, or a coefficient should be applied to allow the use of the bank of existing factory tests. Submit test data for approval by Owner prior to equipment shipment. Part 2.00 Products 2.01 Acceptable Manufacturers A. Stamford Scientific International, Inc. B. In the event that a manufacturer elects to bid an air diffuser system that does not comply with the specifications, then the manufacturer shall submit with the shop drawings a maintenance bond executed by an Officer of the Corporation in the amount of 150% of the bid price, guaranteeing repair or replacement of the air diffusion system in the event of a failure for a period of three years after installation. The Owner will, at its sole option, make the necessary repairs or replacement and deduct the costs from the aforementioned bond of the manufacturer Stainless Steel Materials and Fabrication: A. Fabricate all welded parts and assemblies from sheets and plates of 304L stainless steel. Fabricate non-welded parts and pieces from sheets and plates of 304L stainless steel. B. Pickle all stainless steel assemblies and parts after welding, fabrication and wire brushing by complete immersion in an acid solution as specified in ASTMA The acid shall be a nitric-hydrofluoric solution as defined in Table A2.1, Annex A2 of ASTM A380. Providing a final rinse using ordinary industrial or potable water and dry in conformance with Section 8.3 of ASTM A380. Corrosion protection techniques not employing full immersion methods are not acceptable.

4 C. Do all welding in the factory using MIG, TIG or plasma-arc welding inert gas processes. Field welding is not permitted PVC Materials and Fabrication A. Produce all PVC pipe and fittings from PVC compound with a minimum tensile strength of 7000 PSI. B. Provide lower drop pipes, manifold pipes and header pipes with a minimum of Sch 40 wall thickness. SDR sewer pipe is not acceptable for any in-tank piping. C. Factory solvent-weld all PVC joints. Field solvent welding is not permitted. D. Headers to terminate in removable end caps, to facilitate water flushing of the piping before installation of diffusers. E. One PVC drain line sump with airlift purge ejector line and eductor carrier column to be provided to drain the submerged aeration piping system. System to include one ball valve Membrane Aeration System Equipment Components A. Provide expansion joints with 304L SS shell and PVC liners. Minimum of 4 slotted bands with stainless steel screws to be used. B. Provide support stands, which include hold-down, guide straps, anchor bolts, and supporting structure. Guide straps shall be a minimum of 2 wide. Supports to have a mechanism to provide for +/- 2 vertical adjustment for alignment of the manifold in the field. Supports shall be designed to allow for complete removal from the tank (less anchor bolt) to enable cleaning and maintenance of tank bottom. C. Guide supports to consist of a self-limiting hold down and sliding mechanism. Hold down and sliding mechanism shall provide a full circumferential 2 wide contoured bearing surface with chamfered leading edges to minimize binding of the air distribution header. Sliding mechanism shall provide minimum resistance to movement of the air distribution header under full buoyant up-lit load. Mechanism to provide 1/8 clearance around header and be self-limiting if the mechanism is overtightened. Worm gear clamps are not to be utilized for attaching header pipe to supports, and U-bolts are not acceptable. D. Fixed supports to consist of a self-limiting hold down and sliding mechanism. Hold down and sliding mechanism shall provide a full circumferential 2 wide contoured bearing surface. Clamping device shall positively grip the air distribution header when tight and be self limiting to prevent overstressing the header if the clamp is overtightened. Worm gear clamps are not to be utilized for attaching header pipe to supports, and U-bolts are not acceptable. E. Aligning and adjusting shall be infinitely adjustable within its limits to allow precise leveling of the air distribution headers and

5 diffuser assemblies to within 1/2 /12mm of a common horizontal plane without removing the header from the support. F. Attach supports to tank floor with a minimum of two stainless steel expansion type anchor bolts or Hilte type chemical anchors designed for embedment in 3000 PSI concrete. Supports which utilize only one anchor bolt or one chemical anchor, or which are made of plastic are not acceptable Diffuser assemblies A. Furnish tube type 3.7 (94mm) or 2.5 (65mm) dia membrane diffusers only. Disc or square panel type diffusers are not acceptable. B. Diffuser to consist of a premium quality membrane sleeve with perforated base, SSI Super Saddle with quick connect wedge type saddle, and air flow control orifice.. Diffusers with ceramic or plastic type diffusion media elements are not acceptable as alternatives to the membrane. Diffusers that require a center bolt are not acceptable. C. Membrane material to be premium quality extruded EPDM with an oil content of less than 15%. Maximum tolerance of membrane wall thickness is +/- 0.2 mm. Inside diameter should be +/- 1 mm and membrane length to +/- 5mm. D. Membrane shall collapse and seal when aeration system air is turned off. Membrane shall collapse onto base when air is not being diffused. Design should permit air to exit through the entire periphery of the membrane. Membrane shall be designed to resist clogging, and should have 1mm or 2mm straight slits with no I type slits. Membrane to be at least 70% hydrophilic. Characteristics follow: Tensile strength 1850 PSI Tear strength 90 Lb/linear inch Ozone resistance Pass UV resistance Pass Durometer 45 Ultimate elongation 650% E. Diffuser saddle to be constructed of high strength type 2 PVC with carbon black to prevent UV degradation. Base tube to be constructed of PVC with 2% TiO2. Plastics that do not utilize UV protection shall not be acceptable. Saddle is adjustable and should be leveled upon installation to ensure that diffusers are within 1/2 /12mm on a common horizontal plane. Saddle is designed to fit over Imperial 4 pipe (4.5 /114.3mm OD) or Metric 110mm OD pipe. Saddle to accept 3.7 (93mm) or 2.5 (64mm) diameter tubular diffuser branches. One diffuser to be

6 installed per side up to a maximum length of 47 /1200 mm per diffuser. F. Diffuser is designed to prevent air escape at the support tube perforations. Unperforated strips on the membrane accomplish this. G. Diffuser is designed for neutral to minimum buoyancy with a proprietary internal pipe plug. Diffusers utilizing end plugs shall not be acceptable Warranty A. Warrant all parts to be free from defects in material and workmanship for a period of one year after installation. Furnish replacement parts to the Owner for any items to be found to be defective within the one year warranty period.

SECTION 1137X FINE BUBBLE DIFFUSER SYSTEM PTFE MEMBRANE

SECTION 1137X FINE BUBBLE DIFFUSER SYSTEM PTFE MEMBRANE SECTION 1137X FINE BUBBLE DIFFUSER SYSTEM PTFE MEMBRANE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish and install, complete and ready to operate, a flexible membrane fine bubble

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

Stainless Steel Aeration Equipment Specification

Stainless Steel Aeration Equipment Specification Section 15 Stainless Steel Aeration Equipment Specification Part 1 - General 1.01 Description A. Scope of Work 1. Furnish, install and test aeration system including air mains, drop pipes, valves, expansion

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

Water & Industrial Products Catalog

Water & Industrial Products Catalog Water & Industrial Products Catalog www.smith-blair.com info@smith-blair.com Phone: 800..9705 or 870.77.527 After Hours Number: 90.277.998 Fax: 800.8.792 or 870.77.52 EMERGENCY PHONE 90.277.998 In the

More information

SECTION 8130 XR-3-PW FABRIC BAFFLE WALL SPECIFICATION

SECTION 8130 XR-3-PW FABRIC BAFFLE WALL SPECIFICATION SECTION 8130 XR-3-PW FABRIC BAFFLE WALL SPECIFICATION PART 1 GENERAL 1.01 WORK INCLUDED 1.01.1 This specification covers the design, fabrication, and erection of tension-fabric baffle systems composed

More information

SECTION MECHANICALLY ASSISTED MOBILE STORAGE SHELVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION MECHANICALLY ASSISTED MOBILE STORAGE SHELVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 10560 MECHANICALLY ASSISTED MOBILE STORAGE SHELVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION

SECTION PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION Awning Works Inc Aluminum Decking Walkway Cover Specification CSI- Division 10 SECTION 10530 PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION PART 1 GENERAL 1.01 DESCRIPTION OF WORK

More information

SPECIFICATIONS FOR HONEYCOMB INTERNAL FLOATING ROOFS

SPECIFICATIONS FOR HONEYCOMB INTERNAL FLOATING ROOFS PETREX SPECIFICATIONS FOR HONEYCOMB INTERNAL FLOATING ROOFS APPLICATION: REGULAR HYDROCARBONS SCOPE The roof shall be full-surface contact type designed to eliminate the presence of air-vapor mixture under

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 00437 ELASTOMERIC MATERIALS 437.1 Description. This item shall govern for the materials, testing, fabrication and placement of elastomeric materials, except as otherwise covered

More information

SECTION TAPPING SLEEVES AND VALVES

SECTION TAPPING SLEEVES AND VALVES SECTION 33 12 16.17 TAPPING SLEEVES AND VALVES PART 1: GENERAL 1.01 SCOPE Furnish, install and test all tapping sleeves, tapping valves, and tapping saddles as shown on the Drawings. 1.02 RELATED WORK

More information

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances

More information

ADDENDUM No. 1 November 11, 2013

ADDENDUM No. 1 November 11, 2013 SAN ANTONIO WATER SYSTEM DOS RIOS WRC FIRST STAGE DIFFUSER REPLACEMENT SAWS Job No. 13-6502 SAWS Solicitation No. B-13-075-MF To Bidder of Record: ADDENDUM No. 1 November 11, 2013 This addendum, applicable

More information

University of Delaware

University of Delaware University Contact: Energy & Engineering Group (302) 831-1744 SECTION 22 14 00 _STORM WATER PIPING SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Storm water piping 2. Roof drains. 3. Area

More information

SECTION CHAIN LINK FENCES AND GATES (PARK)

SECTION CHAIN LINK FENCES AND GATES (PARK) SECTION 02821 CHAIN LINK FENCES AND GATES (PARK) PART I GENERAL 1.1 SECTION INCLUDES A. Installation of chain link fences, and gate units provided by single source including erection accessories, fittings,

More information

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS [OR WOOD] PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans.

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans. INC. ENGINEERING/CONSTRUCTION/MANUFACTURING /WWW.CONTAINWATER.COM SPRINGS, TEXAS. 78620 MODEL SPECIFICATION FOR CONTAIN WATER INC. 30 DEGREE ROOF CORRUGATED STEEL WATER STORAGE Part 1 GENERAL 1.01 SECTION

More information

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans.

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans. INC. ENGINEERING/CONSTRUCTION/MANUFACTURING /WWW.CONTAINWATER.COM SPRINGS, TEXAS. 78620 MODEL SPECIFICATION FOR CONTAIN WATER INC. DOME ROOF CORRUGATED STEEL WATER STORAGE TANKS. Part 1 GENERAL 1.01 SECTION

More information

Addendum #4 NEW LOW HEAD OXYGEN SYSTEM Contractor EXHIBIT T SPECIAL PROVISIONS SECTION METAL SHADE STRUCTURE

Addendum #4 NEW LOW HEAD OXYGEN SYSTEM Contractor EXHIBIT T SPECIAL PROVISIONS SECTION METAL SHADE STRUCTURE SECTION 13 34 00 METAL SHADE STRUCTURE PART 1 - GENERAL 1.01 STRUCTURE TYPE A. Structure shall be free standing rigid frame and gable roof with slopes as indicated. Structure shall also include foundation,

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION SECTION 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 - GENERAL 1.1 SUMMARY A. This section supplements all sections in this division, including pipe, fittings, valves, and connections for sprinkler

More information

AERATION SYSTEM with aeration diffusers EDI

AERATION SYSTEM with aeration diffusers EDI AERATION SYSTEM with aeration diffusers EDI EDI FlexAir ISM Disc With Integral Saddle Mount The FlexAir disc diffuser provils unmatched mechanical strength, operating flexibility and oxygen transfer efficiency.

More information

SPECIFICATION FOR PERMANENT BEAM GRANDSTAND WITH INTERLOCK WELDED DECK SYSTEM

SPECIFICATION FOR PERMANENT BEAM GRANDSTAND WITH INTERLOCK WELDED DECK SYSTEM E & D SPECIALTY STANDS, INC. MANUFACTURERS OF QUALITY STANDS AND SEATING 2081 FRANKLIN STREET - P.O. BOX 700 - NORTH COLLINS, NEW YORK 14111 716-337-0161-1-800-525-8515 FAX 716-337-2903 - SALES FAX 716-337-3436

More information

SECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports.

SECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports. SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Handrails and guardrails B. Guardrails for hatches and openings. C. Safety barriers. D. Roof edge protection. 1.2 RELATED SECTIONS

More information

SECTION PUBLIC WATER SERVICE CONNECTIONS

SECTION PUBLIC WATER SERVICE CONNECTIONS SECTION 33 14 14 PUBLIC WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for water service connections to small commercial, light industrial, and residential

More information

SECTION ALUMINUM GATES

SECTION ALUMINUM GATES P.O. Box 1058 370 South Athol Rd. Athol, Massachusetts 01331 Phone: (978) 249-7924 Fax: (978) 249-3072 SECTION ALUMINUM GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The CONTRACTOR shall furnish all labor,

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION ALUMINUM HANDRAIL SYSTEMS

SECTION ALUMINUM HANDRAIL SYSTEMS SECTION 05520 ALUMINUM HANDRAIL SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes aluminum handrails and railings. B. Related Work: 1. Section 03300 - Cast-in-Place Concrete C. References: 1. American

More information

PVC. System Specifications TABLE 1 TABLE 2

PVC. System Specifications TABLE 1 TABLE 2 TRICON PVC TABLE 1 Pipe Size Minimum Insulation Thickness PVC Jacket O.D. PVC Jacket Wall 2 1.81 6.14.070 3 1.25 6.14.070 4 1.75 8.16.080 6 1.69 10.20.100 8 1.69 12.24.120 10 1.65 14.32.140 12 1.47 16.00.160

More information

TRICON DOUBLE-CON PLUS

TRICON DOUBLE-CON PLUS TRICON DOUBLE-CON PLUS System Specifications Iron Pipe Size Steel Conduit O.D. Steel Conduit Wall Outer Insulation (IN)* Alum./Stainless/Galv. Jacket O.D. (IN) Metal Jacket Wall Thickness 1 4.50.120 1.75

More information

SECTION RETRIEVABLE FINE BUBBLE DIFFUSER SYSTEMS

SECTION RETRIEVABLE FINE BUBBLE DIFFUSER SYSTEMS SECTION 11350 RETRIEVABLE FINE BUBBLE DIFFUSER SYSTEMS PART 1 GENERAL 1.1 SECTION INCLUDES This section includes the design, manufacture, installation and start-up requirements for the fine bubble diffuser

More information

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT SECTION 11322 MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT PART 1 GENERAL 1.01 SCOPE There shall be furnished ( ) Grit Separator Mechanism(s) suitable for installation in (a) concrete tank(s) -ft.

More information

SECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS

SECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED BI-FOLD GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING 7160 Krick Rd., Walton Hills, OH 44146 800-321-3827 - Tel 440-439-8650 - Fax 440-439-6889 SECTION 12 48 16 ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING PART 1. GENERAL 1.01 SUMMARY: This section includes

More information

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system.

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. SECTION 08625 METAL FRAMED SKYLIGHT PART 1 GENERAL 1.01 SECTION INCLUDES: A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. B. Fabrication

More information

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING 7160 Krick Rd., Walton Hills, OH 44146 800-321-3827 - Tel 440-439-8650 - Fax 440-439-6889 SECTION 12 48 16 ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING PART 1. GENERAL 1.01 SUMMARY: This section includes

More information

SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE SECTION 02622 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE PART 1 - GENERAL 1.1 SCOPE A. The work covered by this section includes furnishing all labor, equipment, and materials required to install and test

More information

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing The following specification has been developed by: Superior Aluminum Products 555 East Main Street Russia, Ohio 45363-0430 to assist Architects and Designers in the specification of Non Welded Concealed

More information

Specifications for Concrete Embedment Liner

Specifications for Concrete Embedment Liner Specifications for Concrete Embedment Liner Part 1: GENERAL 1.01 SECTION INCLUDES A. Specifications and guidelines for MANUFACTURING high-density polyethylene embedment liners. 1.02 REFERENCES A. American

More information

University of Delaware

University of Delaware University Contact: Energy & Engineering Group (302) 831-1744 SECTION 22 13 00 _SANITARY SEWER PIPING SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Sanitary sewer piping buried 2. Sanitary

More information

All definitions are defined according to ANSI/AWWA C

All definitions are defined according to ANSI/AWWA C SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR REDUCED-WALL, RESILIENT-SEATED GATE AND TAPPING VALVES FOR WATER SUPPLY SERVICE 4 IN. THROUGH 48 IN. ANSI/AWWA C515-01 July 2017 1. SCOPE This product specification

More information

SECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES

SECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES SECTION 05440- PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section includes pre-engineered, pre-fabricated cold formed steel framing elements. Work includes:

More information

Jet Aeration Systems

Jet Aeration Systems Jet Aeration Systems KLa Systems Since 2001 a Systems has supplied innovative jet aeration and jet mixing systems for industry, water utilities and municipalities around the world. Our industrial customers

More information

WALL CANTILEVER WORK STATION JIB CRANE

WALL CANTILEVER WORK STATION JIB CRANE SECTION 14662 WALL CANTILEVER WORK STATION JIB CRANE ***** Gorbel, Inc. manufactures a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station

More information

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems. PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe and equipment support systems. B. Inserts. 1.02 RELATED SECTIONS A. Section 15890 - Ductwork Supports. 1.03 DEFINITIONS A. Supports: Attachments, hangers,

More information

SECTION ROOF EDGE SAFETY RAILING SYSTEM

SECTION ROOF EDGE SAFETY RAILING SYSTEM SECTION 07720 ROOF EDGE SAFETY RAILING SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. Provide and install freestanding KeeGuard Roof Edge Protection System, including pipe railings, uprights, bases, counterweights,

More information

SECTION ROOF SPECIALTIES

SECTION ROOF SPECIALTIES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 71 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of

More information

Series 2000PV Mechanical Joint Restraint for PVC Pipe

Series 2000PV Mechanical Joint Restraint for PVC Pipe Series 2000PV Mechanical Joint Restraint for PVC Pipe Features and Applications: For restraining plain end PVC pipe at mechanical joint fittings and appurtenances Sizes 3 inch through 36 inch Sizes 42

More information

Soundmaster & Modernfold TECHNICAL DATA

Soundmaster & Modernfold TECHNICAL DATA This specification along with product information and model details can be downloaded from www.modernfold.com SPECIFICATION - SECTION 08 35 13 ACCORDION FOLDING DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS

More information

Ice Rink Renovation & New Clubhouse

Ice Rink Renovation & New Clubhouse SECTION 331213 - WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for domestic water service connections to buildings. 2. Corporation stop assembly. 3. Curb

More information

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate. SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Welded stainless steel railing systems. 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete; coordination with substrate.

More information

T TABLE OF CONTENTS SPUNWRAP COLLAR

T TABLE OF CONTENTS SPUNWRAP COLLAR T TABLE OF CONTENTS SPUNWRAP COLLAR Underslab Air Duct with SpunWrap Collar Specification 2 SpunWrap Collar Installation Instructions 3 Physical Data for SpunWrap Collars 5 SpunWrap Field Installation

More information

HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS

HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS PART 1 - GENERAL WORK INCLUDED A. Provide all equipment and materials, and do all work necessary to construct a HydroGrid subsurface irrigated fastdry

More information

Trex Commercial Products page Metal Railing

Trex Commercial Products page Metal Railing SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Classic Railings (Picket). B. GridGuard Railings (Mesh). C. Post Rail (Glass). D. Tensiline Railings (Cable). E. Track Rail (Glass).

More information

SECTION WALL AND DOOR PROTECTION

SECTION WALL AND DOOR PROTECTION PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 10 26 00 WALL AND DOOR PROTECTION SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable to

More information

FIBERGLASS ROUND CONTROL DAMPERS. Model K-RD INTRODUCTION M.K. PLASTICS PROVIDES FOUR DAMPER MODELS K-RD SUGGESTED SPECIFICATION

FIBERGLASS ROUND CONTROL DAMPERS. Model K-RD INTRODUCTION M.K. PLASTICS PROVIDES FOUR DAMPER MODELS K-RD SUGGESTED SPECIFICATION INTRODUCTION The M.K. Plastics series K-RD are manufactured to meet the needs of the odor control and corrosive HVAC industries by providing a corrosion-resistant FRP Damper that is used to regulate an

More information

SECTION HANDRAILS AND RAILINGS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION HANDRAILS AND RAILINGS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES Display hidden notes to specifier. (Don't know how? Click Here) A. Classic Railings (Picket). B. GridGuard Railings (Mesh). C. Post

More information

SECTION SLUICE GATES

SECTION SLUICE GATES SECTION 11100 SLUICE GATES PART 1--GENERAL Fill in the blank with a short description of sluice gate usage, i.e., for isolation of wastewater, or for tank drainage, or for control of water surface. 1.01

More information

SECTION STRUCTURAL METAL FRAMING

SECTION STRUCTURAL METAL FRAMING SECTION 05100 STRUCTURAL METAL FRAMING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Structural steel framing including lintels, shelf angles, bearing plates, anchor bolts and other items as shown on

More information

SECTION MANUFACTURED ROOF EXPANSION JOINTS

SECTION MANUFACTURED ROOF EXPANSION JOINTS SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

11001 Moving Bed Biofilm Reactor

11001 Moving Bed Biofilm Reactor Shop Drawing Submittal 11001 Moving Bed Biofilm Reactor for Pender Commerce Park Wastewater Treatment Plant Phase 2 Final Design Issued for Bids EDA Award Number 04-01-06919 Volume 3 of 8 Prepared for

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

10331 Date Street Murrieta, CA SECTION HYBRID LAMINATE LOCKERS W/ PHENOLIC DOORS

10331 Date Street Murrieta, CA SECTION HYBRID LAMINATE LOCKERS W/ PHENOLIC DOORS 09/20/2017 10331 Date Street Murrieta, CA 92562 info@foremanproducts.com 951-677-1955 SECTION 10 5130 HYBRID LAMINATE LOCKERS W/ PHENOLIC DOORS PART 1 GENERAL Specifier Notes: This product specification

More information

DRAINS: & , S COMMERCIAL. Drains: Bath, Shower & Commercial

DRAINS: & , S COMMERCIAL. Drains: Bath, Shower & Commercial DRAINS: BATH,, SHOWER &, S COMMERCIAL SHOWER DRAINS GENERAL PURPOSE DRAINS FIT-FLUSH CLEAN-OUTS BATH WASTES BATH WASTES KITS/PARTS/COMPONENTS BATH DRAIN BODIES/ASSEMBLIES BATH DRAIN KITS/PARTS/COMPONENTS

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of work

More information

SANDBORN INTERNAL FLOATING ROOF SPECIFICATION

SANDBORN INTERNAL FLOATING ROOF SPECIFICATION 1. GENERAL SANDBORN INTERNAL FLOATING ROOF SPECIFICATION This specification defines the minimum requirements for the design, materials, fabrication, inspection, testing and documentation of a Sandborn

More information

SECTION ORCHESTRA PIT FILLER

SECTION ORCHESTRA PIT FILLER PART 1 - GENERAL 1.1 SECTION INCLUDES A. Orchestra pit filler. 1.2 REFERENCES SECTION 11 61 00 ORCHESTRA PIT FILLER A. American Hardboard Association (AHA): 1. AHA A135.4-95: Basic Hardboard. B. American

More information

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

ITEM 435 ELASTOMERIC MATERIALS

ITEM 435 ELASTOMERIC MATERIALS ITEM 4 ELASTOMERIC MATERIALS 4.1. Description. This Item shall govern for the furnishing and installation of elastomeric materials in accordance with the details shown on the plans and the requirements

More information

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,

More information

SECTION ROLLER GATES

SECTION ROLLER GATES GENERAL SUMMARY A. The Contractor shall provide all labor, materials, equipment, and incidentals required to furnish and install roller gates, complete and operational with all necessary accessories as

More information

SECTION ORNAMENTAL ALUMINUM FENCING

SECTION ORNAMENTAL ALUMINUM FENCING SECTION 032300 ORNAMENTAL ALUMINUM FENCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

All definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10.

All definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10. 21-02 SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR RESILIENT-SEATED GATE AND TAPPING VALVES FOR WATER SUPPLY SERVICE ANSI/AWWA C509-01 3 IN., 4 IN., 6 IN., 8 IN., 10 IN., 12 IN., 16 IN., & 20 IN. Revised

More information

CALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No ADDENDUM 2

CALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No ADDENDUM 2 CALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No. 11078 ADDENDUM 2 Date Issued: December 2, 2015 **** Receipt of addenda must be acknowledged

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 08 1119 - STAINLESS STEEL DOOR AND FRAMES GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B SECTION 05 5213 - PIPE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION CHAIN LINK FENCES AND GATES

SECTION CHAIN LINK FENCES AND GATES SECTION 32 31 13 CHAIN LINK FENCES AND GATES SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section in specifying permanent chain

More information

SECTION ORNAMENTAL ALUMINUM RAILING

SECTION ORNAMENTAL ALUMINUM RAILING SECTION 05730 ORNAMENTAL ALUMINUM RAILING PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Pipe Railing 1.2 RELATED SECTIONS A. Section 03300 Cast-In-Place Concrete: Placement of sleeves cast in concrete.

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION CONCRETE FORMWORK AND ACCESSORIES

SECTION CONCRETE FORMWORK AND ACCESSORIES SECTION 03100 CONCRETE FORMWORK AND ACCESSORIES Part 1 GENERAL 1.01 SUMMARY A. Furnish equipment, materials, and labor required for construction and removal of forms for the containment of concrete to

More information

GLASSWALL SPECIFICATIONS

GLASSWALL SPECIFICATIONS GLASSWALL SPECIFICATIONS Series GL1 Individual, Glass Panels PRODUCT OVERVIEW: Top Supported Side Stack Individual, Omni-Directional Panels Manually Operated Maximum Opening Height: 10' 5 [.m] Maximum

More information

SUBSTITUTION REQUEST (After the Bidding/Negotiating Phase)

SUBSTITUTION REQUEST (After the Bidding/Negotiating Phase) SUBSTITUTION REQUEST (After the Bidding/Negotiating Phase) Project: Substitution Request Number: From: To: Date: A/E Project Number: Re: Contract For: Specification Title: Section: Page: Description: Article/Paragraph:

More information

SECTION WELDED STEEL WATER STORAGE TANKS

SECTION WELDED STEEL WATER STORAGE TANKS SECTION 33 16 20 WELDED STEEL WATER STORAGE TANKS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Elevated tanks. 2. Appurtenances and accessories. B. Related Sections: 1. Section 03 31 20 - Concrete

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. GORBEL PRODUCT SPECIFICATIONS 2010 Gorbel, Inc., P.O., Box 593, Fisher, New York 14453-0593 PHONE: 800-821-0086, FAX: 585-924-6273; WEBSITE: www.gorbel.com November SECTION 41 22 31PRIVATE FREE STANDING

More information

RB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION

RB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION GENERAL DESCRIPTION The Orbinox model RB Weir Gate is designed for downward opening applications where a more accurate flow control is required. The water flows over the top of the slide permitting a constant

More information

STRUCTURAL STEEL FRAMING

STRUCTURAL STEEL FRAMING SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns. PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System SECTION 05720 ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System PART 1 GENERAL 1.01 WORK INCLUDED A. Furnish and/or install supported glass stainless steel railings, glass

More information

40'-0" PIPE SUPPORT (TYP.) (SEE DWG. NO. SK-2 OR DWG. NO. SK-4)

40'-0 PIPE SUPPORT (TYP.) (SEE DWG. NO. SK-2 OR DWG. NO. SK-4) SK-1 STANDARD LENGTH 4.301 40'-0" A 6" 2'-0" 9'-0" 9'-0" 9'-0" 9'-0" 2'-0" A 3" OF EXPOSED AT EACH END OF PIPE. PIPE SUPPORT (TYP.) (SEE DWG. NO. SK-2 OR DWG. NO. SK-4) EXPOSED PIPE MINIMUM GAUGE AND THICKNESS

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 05 5117 ALTERNATING TREAD STEEL STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System

SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System 2004 Specifications Houston District SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System 1. Description. Furnish and place a Multi-Duct Conduit (MDC) system that is suitable for installation in an outdoor

More information

SECTION SLUDGE HOLDING TANK DEWATERING

SECTION SLUDGE HOLDING TANK DEWATERING SECTION 13215 SLUDGE HOLDING TANK DEWATERING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Dewatering and cleaning of sludge holding tank and sludge disposal. Contractor shall pay for all sludge removal,

More information